ML073230328: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML073230328
| number = ML073230328
| issue date = 11/20/2007
| issue date = 11/20/2007
| title = Acknowledgement Letter Steam Generator Tube Rupture Re-Analysis (TAC MD3750 and MD3751)
| title = Acknowledgement Letter Steam Generator Tube Rupture Re-Analysis
| author name = Morgan N S
| author name = Morgan N
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| addressee name = Sena P P
| addressee name = Sena P
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000412
| docket = 05000334, 05000412
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:November 20, 2007  
{{#Wiki_filter:November 20, 2007 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
 
Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077  


==SUBJECT:==
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 - ACKNOWLEDGEMENT LETTER RE: STEAM GENERATOR TUBE RUPTURE RE-ANALYSIS (TAC NOS. MD3750 AND M D3751)  
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -
ACKNOWLEDGEMENT LETTER RE: STEAM GENERATOR TUBE RUPTURE RE-ANALYSIS (TAC NOS. MD3750 AND M D3751)


==Dear Mr. Sena:==
==Dear Mr. Sena:==


In response to your original application dated October 4, 2004, the Nuclear Regulatory  
In response to your original application dated October 4, 2004, the Nuclear Regulatory Commission (NRC) issued Amendment No. 275 to Facility Operating License No. DPR-66 and Amendment No. 156 to Facility Operating License No. NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) on July 19, 2006. Subsequently, by letter dated November 30, 2006, as supplemented by letter dated March 28, 2007, you submitted certain corrected information regarding the steam generator tube rupture analysis, impacted by the extended power uprate. Your correction letters indicated that you have performed a Title 10 of the Code of Federal Regulations (CFR) 50.59 evaluation to address the analytical changes and the Emergency Operating Procedure updates and determined that prior NRC approval was not required to implement the changes.
 
Pursuant to 10 CFR 50.59, licensees are permitted to make changes to the facility and procedures, as described in the updated final safety analysis report (UFSAR), and to conduct tests or experiments not described in the UFSAR, without prior NRC approval, provided a change to the Technical Specifications is not involved or the proposed change, test or experiment does not meet the criteria of 10 CFR 50.59(c)(2).
Commission (NRC) issued Amendment No. 275 to Facility Operating License No. DPR-66 and Amendment No. 156 to Facility O perating License No. NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) on July 19, 2006. Subsequently, by letter dated November 30, 2006, as supplemented by letter dated March 28, 2007, you submitted certain corrected information regarding the steam generator tube rupture analysis, impacted by the extended power uprate. Your correction letters indicated that you have performed a Title 10 of the Code of Federal Regulations (CFR) 50.59 evaluation to address the analytical changes and the Emergency Operating Procedure updates and determined that prior NRC approval was not required to implement the changes.  
 
Pursuant to 10 CFR 50.59, lic ensees are permi tted to make changes to the facility and procedures, as described in the updated final safety analysis report (UFSAR), and to conduct tests or experiments not described in the UFSAR, without prior NRC approval, provided a change to the Technical Specifications is not involved or the proposed change, test or experiment does not meet the criteria of 10 CFR 50.59(c)(2).  
 
P. Sena III  Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.
 
Sincerely, 
      /RA/  Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket Nos. 50-334 and 50-412
 
cc:  See next page P. Sena III Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.
 
Sincerely, 
      /RA/  Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket Nos. 50-334 and 50-412
 
cc:  See next page
 
DISTRIBUTION
:  PUBLIC  LPLI-1 R/F  RidsNrrDorlLpli-1 NMorgan RidsOgcRp  RidsNrrDssSrxb  SMiranda  DWerkheiser, R1 BSingal, DorlDpr  RidsRegionIMailCenter RidsNrrLASLittle  RidsAcrsAcnwMailCenter
 
ADAMS Accession Number:  ML OFFICE  LPLI-1/PM LPLI-1/LA LPLI-1/BC
 
NAME  NMorgan  SLittle  MKowal DATE  11/19/07  11/19/07  11/20/07  OFFICIAL RECORD COPY Beaver Valley Power Station, Unit Nos. 1 and 2
 
cc:
 
Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-19 76 South Main Street Akron, OH  44308
 
James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
 
Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH  44308
 
Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH  44308
 
David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH  44308
 
Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH  44308
 
Ohio EPA-DERR ATTN:  Zack A. Clayton P.O. Box 1049 Columbus, OH  43266-0149
 
Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA  15077
 
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44308
 
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA  15077
 
Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company 76 South Main Street Mail Stop A-GO-14 Akron, Ohio 44308
 
Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV  25305
 
Director, Utilit ies Department Public Utilities Commission 180 East Broad Street Columbus, OH  43266-0573
 
Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA  17110-9364
 
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued)
 
cc:
 
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA  16803


Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469
P. Sena III                                  Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.
Sincerely,
                                            /RA/
Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page


Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA  15077
P. Sena III                                  Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.
Sincerely,
                                            /RA/
Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION:
PUBLIC                  LPLI-1 R/F                  RidsNrrDorlLpli-1    NMorgan RidsOgcRp              RidsNrrDssSrxb              SMiranda            DWerkheiser, R1 BSingal, DorlDpr        RidsRegionIMailCenter        RidsNrrLASLittle    RidsAcrsAcnwMailCenter ADAMS Accession Number: ML OFFICE          LPLI-1/PM                  LPLI-1/LA                  LPLI-1/BC NAME            NMorgan                    SLittle                    MKowal DATE            11/19/07                    11/19/07                  11/20/07 OFFICIAL RECORD COPY


Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Joseph J. Hagan President and Chief Nuclear Officer            Peter P. Sena III FirstEnergy Nuclear Operating Company          Site Vice President Mail Stop A-GO-19                              FirstEnergy Nuclear Operating Company 76 South Main Street                          Beaver Valley Power Station Akron, OH 44308                                Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 James H. Lash                                  Shippingport, PA 15077 Senior Vice President of Operations and Chief Operating Officer                  Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company          FirstEnergy Nuclear Operating Company Mail Stop A-GO-14                              Mail Stop A-GO-2 76 South Main Street                          76 South Main Street Akron, OH 44308                                Akron, Ohio 44308 Danny L. Pace                                  Manager, Site Regulatory Compliance Senior Vice President, Fleet Engineering      FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company          Beaver Valley Power Station Mail Stop A-GO-14                              Mail Stop A-BV-A 76 South Main Street                          P.O. Box 4, Route 168 Akron, OH 44308                                Shippingport, PA 15077 Jeannie M. Rinckel                            Richard Anderson Vice President, Fleet Oversight                Vice President, Nuclear Support FirstEnergy Nuclear Operating Company          FirstEnergy Nuclear Operating Company Mail Stop A-GO-14                              76 South Main Street 76 South Main Street                          Mail Stop A-GO-14 Akron, OH 44308                                Akron, Ohio 44308 David W. Jenkins, Attorney                    Commissioner James R. Lewis FirstEnergy Corporation                        West Virginia Division of Labor Mail Stop A-GO-15                              749-B, Building No. 6 76 South Main Street                          Capitol Complex Akron, OH 44308                                Charleston, WV 25305 Manager, Fleet Licensing                      Director, Utilities Department FirstEnergy Nuclear Operating Company          Public Utilities Commission Mail Stop A-GO-2                              180 East Broad Street 76 South Main Street                          Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Ohio EPA-DERR                                    Management Agency ATTN: Zack A. Clayton                          2605 Interstate Dr.
P.O. Box 1049                                  Harrisburg, PA 17110-9364 Columbus, OH 43266-0149


Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077}}
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077}}

Latest revision as of 15:24, 22 March 2020

Acknowledgement Letter Steam Generator Tube Rupture Re-Analysis
ML073230328
Person / Time
Site: Beaver Valley
Issue date: 11/20/2007
From: Nadiyah Morgan
NRC/NRR/ADRO/DORL/LPLI-1
To: Sena P
FirstEnergy Nuclear Operating Co
Morgan N, NRR/DORL, 415-1016
References
TAC MD3750, TAC MD3751
Download: ML073230328 (5)


Text

November 20, 2007 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -

ACKNOWLEDGEMENT LETTER RE: STEAM GENERATOR TUBE RUPTURE RE-ANALYSIS (TAC NOS. MD3750 AND M D3751)

Dear Mr. Sena:

In response to your original application dated October 4, 2004, the Nuclear Regulatory Commission (NRC) issued Amendment No. 275 to Facility Operating License No. DPR-66 and Amendment No. 156 to Facility Operating License No. NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) on July 19, 2006. Subsequently, by letter dated November 30, 2006, as supplemented by letter dated March 28, 2007, you submitted certain corrected information regarding the steam generator tube rupture analysis, impacted by the extended power uprate. Your correction letters indicated that you have performed a Title 10 of the Code of Federal Regulations (CFR) 50.59 evaluation to address the analytical changes and the Emergency Operating Procedure updates and determined that prior NRC approval was not required to implement the changes.

Pursuant to 10 CFR 50.59, licensees are permitted to make changes to the facility and procedures, as described in the updated final safety analysis report (UFSAR), and to conduct tests or experiments not described in the UFSAR, without prior NRC approval, provided a change to the Technical Specifications is not involved or the proposed change, test or experiment does not meet the criteria of 10 CFR 50.59(c)(2).

P. Sena III Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

P. Sena III Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION:

PUBLIC LPLI-1 R/F RidsNrrDorlLpli-1 NMorgan RidsOgcRp RidsNrrDssSrxb SMiranda DWerkheiser, R1 BSingal, DorlDpr RidsRegionIMailCenter RidsNrrLASLittle RidsAcrsAcnwMailCenter ADAMS Accession Number: ML OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME NMorgan SLittle MKowal DATE 11/19/07 11/19/07 11/20/07 OFFICIAL RECORD COPY

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Joseph J. Hagan President and Chief Nuclear Officer Peter P. Sena III FirstEnergy Nuclear Operating Company Site Vice President Mail Stop A-GO-19 FirstEnergy Nuclear Operating Company 76 South Main Street Beaver Valley Power Station Akron, OH 44308 Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 James H. Lash Shippingport, PA 15077 Senior Vice President of Operations and Chief Operating Officer Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Mail Stop A-GO-2 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, Ohio 44308 Danny L. Pace Manager, Site Regulatory Compliance Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-GO-14 Mail Stop A-BV-A 76 South Main Street P.O. Box 4, Route 168 Akron, OH 44308 Shippingport, PA 15077 Jeannie M. Rinckel Richard Anderson Vice President, Fleet Oversight Vice President, Nuclear Support FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street 76 South Main Street Mail Stop A-GO-14 Akron, OH 44308 Akron, Ohio 44308 David W. Jenkins, Attorney Commissioner James R. Lewis FirstEnergy Corporation West Virginia Division of Labor Mail Stop A-GO-15 749-B, Building No. 6 76 South Main Street Capitol Complex Akron, OH 44308 Charleston, WV 25305 Manager, Fleet Licensing Director, Utilities Department FirstEnergy Nuclear Operating Company Public Utilities Commission Mail Stop A-GO-2 180 East Broad Street 76 South Main Street Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Ohio EPA-DERR Management Agency ATTN: Zack A. Clayton 2605 Interstate Dr.

P.O. Box 1049 Harrisburg, PA 17110-9364 Columbus, OH 43266-0149

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:

Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077