Acknowledgement Letter Steam Generator Tube Rupture Re-Analysis
ML073230328
Person / Time
Site: Beaver Valley
Issue date: 11/20/2007
From: Nadiyah Morgan
NRC/NRR/ADRO/DORL/LPLI-1
To: Sena P
FirstEnergy Nuclear Operating Co
Morgan N, NRR/DORL, 415-1016
References
TAC MD3750, TAC MD3751
Download: ML073230328 (5)


Text

November 20, 2007 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 -

ACKNOWLEDGEMENT LETTER RE: STEAM GENERATOR TUBE RUPTURE RE-ANALYSIS (TAC NOS. MD3750 AND M D3751)

Dear Mr. Sena:

In response to your original application dated October 4, 2004, the Nuclear Regulatory Commission (NRC) issued Amendment No. 275 to Facility Operating License No. DPR-66 and Amendment No. 156 to Facility Operating License No. NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) on July 19, 2006. Subsequently, by letter dated November 30, 2006, as supplemented by letter dated March 28, 2007, you submitted certain corrected information regarding the steam generator tube rupture analysis, impacted by the extended power uprate. Your correction letters indicated that you have performed a Title 10 of the Code of Federal Regulations (CFR) 50.59 evaluation to address the analytical changes and the Emergency Operating Procedure updates and determined that prior NRC approval was not required to implement the changes.

Pursuant to 10 CFR 50.59, licensees are permitted to make changes to the facility and procedures, as described in the updated final safety analysis report (UFSAR), and to conduct tests or experiments not described in the UFSAR, without prior NRC approval, provided a change to the Technical Specifications is not involved or the proposed change, test or experiment does not meet the criteria of 10 CFR 50.59(c)(2).

P. Sena III Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

P. Sena III Please be advised that you are required to maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to 10 CFR 50.59(c), in accordance with 10 CFR Part 50 Appendix B. These records may be subject to NRC audit/inspection, if any.

Sincerely,

/RA/

Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page DISTRIBUTION:

PUBLIC LPLI-1 R/F RidsNrrDorlLpli-1 NMorgan RidsOgcRp RidsNrrDssSrxb SMiranda DWerkheiser, R1 BSingal, DorlDpr RidsRegionIMailCenter RidsNrrLASLittle RidsAcrsAcnwMailCenter ADAMS Accession Number: ML OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME NMorgan SLittle MKowal DATE 11/19/07 11/19/07 11/20/07 OFFICIAL RECORD COPY

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Joseph J. Hagan President and Chief Nuclear Officer Peter P. Sena III FirstEnergy Nuclear Operating Company Site Vice President Mail Stop A-GO-19 FirstEnergy Nuclear Operating Company 76 South Main Street Beaver Valley Power Station Akron, OH 44308 Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 James H. Lash Shippingport, PA 15077 Senior Vice President of Operations and Chief Operating Officer Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Mail Stop A-GO-2 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, Ohio 44308 Danny L. Pace Manager, Site Regulatory Compliance Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-GO-14 Mail Stop A-BV-A 76 South Main Street P.O. Box 4, Route 168 Akron, OH 44308 Shippingport, PA 15077 Jeannie M. Rinckel Richard Anderson Vice President, Fleet Oversight Vice President, Nuclear Support FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street 76 South Main Street Mail Stop A-GO-14 Akron, OH 44308 Akron, Ohio 44308 David W. Jenkins, Attorney Commissioner James R. Lewis FirstEnergy Corporation West Virginia Division of Labor Mail Stop A-GO-15 749-B, Building No. 6 76 South Main Street Capitol Complex Akron, OH 44308 Charleston, WV 25305 Manager, Fleet Licensing Director, Utilities Department FirstEnergy Nuclear Operating Company Public Utilities Commission Mail Stop A-GO-2 180 East Broad Street 76 South Main Street Columbus, OH 43266-0573 Akron, OH 44308 Director, Pennsylvania Emergency Ohio EPA-DERR Management Agency ATTN: Zack A. Clayton 2605 Interstate Dr.

P.O. Box 1049 Harrisburg, PA 17110-9364 Columbus, OH 43266-0149

Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:

Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077