| | title = Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2(TAC ME6018 and ME6019) | | | title = Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 |
| | author name = | | | author name = |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
Latest revision as of 04:59, 21 March 2020
Letter Sequence Meeting |
---|
|
|
MONTHYEARML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 Project stage: Meeting 2011-04-13
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24296B1652024-10-22022 October 2024 Pre-Submittal Meeting Slides Oct 24 GSI191 ML24264A1592024-09-30030 September 2024 Adtf Exemption Request Pre-submittal Meeting Presentation ML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting ML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23223A2032023-08-11011 August 2023 (ANO) Unit 1 Licensee'S Slide Presentation for 8/15/23 Public Meeting Pressurizer Heaters ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 ML23122A1012023-05-0202 May 2023 Assessment Presentation 2022 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23075A3352023-03-16016 March 2023 KM-KT Session Presentation Disputed Violations ML23075A3332023-03-16016 March 2023 Ts/Rg 1.33 V. Appendix B, Criterion V ML23075A3312023-03-16016 March 2023 KM Session OL Process February 9, 2023 ML23075A3322023-03-16016 March 2023 Containment 2008 ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML22153A1702022-06-16016 June 2022 Public Presentation Slides for Palisades Webinar June 16, 2022 ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22124A0692022-05-10010 May 2022 RVCH Penetration No. 1 Relief Request Public Meeting May 10, 2022 (EPID L-2022-LRM-0036) (Slides) ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant 0CAN062101, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling2021-06-15015 June 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML21095A2122021-04-0808 April 2021 Pre-Submittal Meeting - ANO-1 LAR Related to RCS Primary Activity and Primary-to-Secondary Leak Rate ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A1982021-01-15015 January 2021 Relocate Toxic Gas Monitoring Technical Specifications to Technical Requirements Manual License Amendment Request - NRC Pre-submittal Meeting ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting 2024-09-04
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24264A1592024-09-30030 September 2024 Adtf Exemption Request Pre-submittal Meeting Presentation ML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24212A3452024-07-30030 July 2024 August 1, 2024 Holtec Public Meeting Presentation on Potential Palisades Nuclear Plant Restart ML24193A0252024-07-11011 July 2024 NRC Presentation on Palisades Nuclear Plant Potential Reauthorization Scoping Meeting ML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis ML24116A2932024-04-29029 April 2024 Pre-Submittal Meeting on April 29, 2024 - Palisades Nuclear Plant Power Operations Quality Assurance Program Manual ML24086A5822024-04-0303 April 2024 Construction Permit Application: Initial Environmental & Site Characterization ML24074A3302024-03-18018 March 2024 March 18, 2024 Pre-submittal Meeting for Proposed Emergency Plan at the Palisades Nuclear Plant (Presentation) ML24036A1082024-02-0606 February 2024 Pre-submittal Meeting for Palisades Nuclear Plant Power Operations Technical Specifications Administrative Controls and Quality Assurance Program (Presentation) ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23334A1322023-12-0505 December 2023 Pre-submittal Meeting with Holtec for Palisades Nuclear Plant Power Operations Technical Specifications (Presentation) ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations ML23235A1802023-08-29029 August 2023 Public Meeting 08/29/23 - Palisades Nuclear Plant - Return to Power Operations - Exemption to CFR 50.82(a)(2) ML23139A1922023-05-24024 May 2023 Slides for Public Meeting on 5/24/23 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22262A3032022-09-22022 September 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - September 22, 2022 ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21351A0282021-12-16016 December 2021 Preliminary Information of ANO-1 1R17 (2002) Findings on CRDM Nozzle 56, and Presentation Slides for PT Exam of Nozzle 56 ML21348A1262021-12-14014 December 2021 RCP TS LAR Pre-Submittal Meeting Slides, December 16, 2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21242A2792021-08-30030 August 2021 ANO Slides Presentation for 9-1-21 Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21196A0872021-07-15015 July 2021 Slideshow for the July 1, 2021 Public End of Cycle Meeting for Palisades Nuclear Plant ML21124A0062021-05-12012 May 2021 Pre-Application PDTS Meeting Slides (L-2021-LRM-xxxx) ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20342A0022020-12-0808 December 2020 NRC License Transfer Application Pre-Submittal Meeting ML20315A1582020-11-17017 November 2020 Presentation Meeting Slides for the 11/17/20 Teleconference ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20114E2752020-04-29029 April 2020 (ANO) Carbon Fiber Reinforced Polymer (Cfrp) Relief Request Pre-Submittal Meeting with NRC - April 29, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML19231A2852019-08-19019 August 2019 NEIMA Meeting Slides - August 21 Palisades Meeting ML19136A2512019-06-13013 June 2019 Handout for the June 13, 2019 Pre-submittal Public Meeting for Planned License Amendment Request Regarding Fuel Handling Accident Analysis ML18176A1312018-06-21021 June 2018 Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18081A1922018-03-20020 March 2018 Presentation at the PRA Workshop ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload 2024-09-04
[Table view] |
Text
NFPA 805 LICENSE AMENDMENT REQUESTS Pre-Application Meeting with NRC Staff April 13, 2011 Arkansas Nuclear One (ANO) 1&2 Palisades (PLP)
Waterford 3 (WF3) 1
Agenda
- Fleet Project Management Approach
- 805 PRA Peer Review Status
- 6850 Alternative Treatments
- Site Specific p Updates p
- ANO-1 & 2
- PLP
- WF3
- Summary Dial-In: 800-369-3325 with Participant passcode: 56518 followed by #
2
Introductions
- Licensing - Dave Mannai, Bryan Ford
- Engineering Manager - Luis Terrazas
- Fleet Project Management - Andy Thomas, Doug Kibler
- Corporate PRA - Deepak Rao
- NFPA 805 Technical Lead - Jessica Walker
- ANO
- Engineering Director - Jaime McCoy
- Fire Protection/PRA - Jessica Walker
- PLP
- Engineering Manager - Jim Miksa
- Fire Protection - Tom Swiecicki
- WF3
- Engineering Manager - Rex Putnam
- Fire Protection - Dennis Kunas 3
Fleet Project Management Approach
- Integrated Fleet (corporate and site) Project Team
- Bi-Monthly Executive Stakeholder Briefs
- Weekly Fleet Project Team Meetings
- Active Project Risk Management Program
- Dedicated Fleet and Site Schedulers 4
LAR Submittal Forecast
- ANO 1&2, PLP, and WF3 - June 29, 2011
- Submittals will meet acceptance criteria (LIC-109)
805 PRA Peer Review Status
- Conduct Internal Events Peer Review
- Complete
- Closure / disposition of Internal Events Peer Review
- F&Os will be resolved prior to LAR Submittal
- Conduct Fire PRA Peer Review
- Complete (Palisades Draft Report)
- Closure Clos re / disposition of Fire PRA Peer Review Re ie
- F&Os will be resolved prior to LAR Submittal 6
6850 Alternative Treatments Treatment ANO-1 ANO-2 PLP WF3 Transient combustible HRR. Use a lower HRR for a postulated transient fire. Instead of using the HRR for transients as shown in NUREG/CR-6850, Table E-1, Case 8, the HRR for Case 7 is used. The basis for this is X X X X described in the ERIN Fire Factors report submitted to the EPRI/NEI Review Group.
Transient Combustible Ignition Frequency - Use of a weighting factor applied to transient fires to reflect the reduced probability of a fire impacting critical targets based on procedural controls and the reduced likelihood X X X X of transient type fire conditions existing in close proximity to targets of concern (submitted to methodology review committee).
Treatment of Ventilated Panels for Non-Suppression Probability. X X Credit for reduction of zone of influence for panels with limited ventilation, used to support Multi-Compartment X X Analysis.
Hot Short Probability Reduction for Outside of a Panel Configuration (ANO-2 only) X 7
ANO--1& 2 - Current Status ANO Major Project Milestones ANO-1 ANO-2 Milestone Status Status Table B-1 Fundamental FP Elements In Progress In Progress Internal Events PRA COMPLETE COMPLETE Fi PRA Fire I Progress In P I Progress In P Table B NSCA Methodology In Progress COMPLETE Table B NSCA Fire Area Compliance In Progress In Progress Fire Risk Evaluations In Progress In Progress Table F Non-Power Operations In Progress In Progress Table G Radioactive Release COMPLETE COMPLETE 8
ANO--1&2 - Challenges ANO
ANO--1&2 - Items for Approval ANO
- 3.3.5.2 Metal conduits and cable trays
- ANO uses PVC in underground and embedded applications
- 3.5.16 Firewater dedicated for Fire Protection use
- ANO uses the fire water system for other functions 10
ANO--1&2 - Modification Overview ANO
- Independent AFW pump/piping/valves/controls
- Electrical cable re-route/fire wrap
- RCP trip circuit backup power supply
- Modifications for Table B-1 Issues
- NFPA 10 fire extinguisher type and location changes
- NFPA 15 update non-UL listed modules
PLP - Current Status Major Project Milestones Milestone Status Table B-1 Fundamental FP Elements In Progress Internal Events PRA COMPLETE Fire PRA In Progress Table B NSCA Methodology COMPLETE Table B NSCA Fire Area Compliance In Progress Fire Risk Evaluations In Progress Table F Non-Power Operations In Progress Table G Radioactive Release COMPLETE 12
PLP - Challenges
PLP - Items for Approval
- 3.5.16 Firewater dedicated for Fire Protection use
- PLP uses the fire water system for other functions
- 3.11.4. Through Penetration Fire Stops Unsealed conduits 5 feet or longer 14
PLP - Modification Overview
- Independent AFW pump / piping / valves / controls
- Independent breakers for 2400 VAC Safeguards & Startup Transformers
- Primary Coolant Pump breaker trip pushbuttons
- 2400 VAC b breaker k control t l power ffuses
- Bypass switches for AFW & ECCS systems 15
WF3 - Current Status Major Project Milestones Milestone Status Table B-1 Fundamental FP Elements In Progress Internal Events PRA COMPLETE Fire PRA In Progress Table B NSCA Methodology In Progress Table B NSCA Fire Area Compliance In Progress Fire Risk Evaluations In Progress Table F Non-Power Operations In Progress Table G Radioactive Release In Progress 16
WF3 - Challenges
WF3 - Items for Approval
WF3 - Modification Overview
- Electrical circuit modifications
- Suppression system upgrades
- Detection system upgrade 19
Summary
- All Entergy sites plan to meet June 29, 2011