| number = ML112630041
| number = ML112630041
| issue date = 09/16/2011
| issue date = 09/16/2011
| title = Prairie Island Ngp Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 (TAC Nos. ME6849 and ME6850)
| title = Ngp Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3
| author name = Wengert T J
| author name = Wengert T
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Vincent D M
| addressee name = Vincent D
| addressee affiliation = Northern States Power Co
| addressee affiliation = Northern States Power Co
| docket = 05000282, 05000306
| docket = 05000282, 05000306
| license number = DPR-042, DPR-060
| license number = DPR-042, DPR-060
| contact person = Wengert T J
| contact person = Wengert T
| case reference number = TAC ME6849, TAC ME6850
| case reference number = TAC ME6849, TAC ME6850
| document type = E-Mail
| document type = E-Mail
| page count = 1
| page count = 1
| project = TAC:ME6849, TAC:ME6850
| project = TAC:ME6849, TAC:ME6850
| stage = RAI
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:From: Wengert, Thomas Sent: Friday, September 16, 2011 10:03 AM To: Vincent, Dale M.  
{{#Wiki_filter:From:                     Wengert, Thomas Sent:                     Friday, September 16, 2011 10:03 AM To:                       Vincent, Dale M.


==Subject:==
==Subject:==
Prairie Island NGP Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 (TAC Nos. ME6849 and ME6850)
Prairie Island NGP Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 (TAC Nos. ME6849 and ME6850)
By letter dated August 11, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112240140), Northern States Power Company - Minnesota, doing business as Xcel Energy, submitted a license amendment request (LAR) to revise Technical Specifications 3.7.8, "Cooling Water (CL) System" and 3.8.3, "Diesel Fuel Oil", and to add diesel fuel license bases for Prairie Island Nuclear Generating Plant, Units 1 and 2. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
By letter dated August 11, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112240140), Northern States Power Company - Minnesota, doing business as Xcel Energy, submitted a license amendment request (LAR) to revise Technical Specifications 3.7.8, Cooling Water (CL) System and 3.8.3, Diesel Fuel Oil, and to add diesel fuel license bases for Prairie Island Nuclear Generating Plant, Units 1 and 2. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
If you have any questions, please contact me.
Tom Wengert Project Manager U. S. Nuclear Regulatory Commission NRR/DORL/LPLIII-1 (301) 415-4037}}
Tom Wengert Project Manager U. S. Nuclear Regulatory Commission NRR/DORL/LPLIII-1 (301) 415-4037}}

Latest revision as of 21:11, 20 March 2020

Ngp Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3
ML112630041
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/16/2011
From: Thomas Wengert
Plant Licensing Branch III
To: Vincent D
Northern States Power Co
Wengert T
References
TAC ME6849, TAC ME6850
Download: ML112630041 (1)


Text

From: Wengert, Thomas Sent: Friday, September 16, 2011 10:03 AM To: Vincent, Dale M.

Subject:

Prairie Island NGP Units 1 and 2 - Acceptance Review of LAR to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 and 3.8.3 (TAC Nos. ME6849 and ME6850)

By letter dated August 11, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112240140), Northern States Power Company - Minnesota, doing business as Xcel Energy, submitted a license amendment request (LAR) to revise Technical Specifications 3.7.8, Cooling Water (CL) System and 3.8.3, Diesel Fuel Oil, and to add diesel fuel license bases for Prairie Island Nuclear Generating Plant, Units 1 and 2. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Tom Wengert Project Manager U. S. Nuclear Regulatory Commission NRR/DORL/LPLIII-1 (301) 415-4037