ML13098B071: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13098B071 | | number = ML13098B071 | ||
| issue date = 04/05/2013 | | issue date = 04/05/2013 | ||
| title = | | title = NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review Relief Request RR-4L3 | ||
| author name = Beltz T | | author name = Beltz T | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = Millen M | | addressee name = Millen M | ||
Line 13: | Line 13: | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 2 | | page count = 2 | ||
| project = TAC:MF1144, TAC:MF1145 | |||
| stage = Acceptance Review | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:NRR-PMDAPEm Resource From: Beltz, Terry Sent: Friday, April 05, 2013 7:18 AM To: Millen, Michael Cc: Hanneman, Harv; Carlson, Robert; Cumblidge, Stephen | |||
==Subject:== | |||
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: Relief Request RR-4L3 (TAC Nos. MF1144 and MF1145) | |||
==Dear Mr. Millen:== | |||
By letter dated March 19, 2013 (Agencywide Documents Access and Management System (ADAMS) | |||
Accession No. ML13079A144), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted a relief request for the Point Beach Nuclear Plant, Units 1 and 2. The proposed request would grant relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code), Section XI, 1998 Edition through 2000 Addenda, for examination of specified welds due geometric or design configurations that limit the examination coverage which could be obtained. Relief is requested on the basis that alternative methods would provide an acceptable level of quality and safety. | |||
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. | |||
Please dont hesitate to contact me if you have any questions. | |||
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 656 Mail Envelope Properties (Terry.Beltz@nrc.gov20130405071800) | |||
==Subject:== | |||
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: Relief Request RR-4L3 (TAC Nos. MF1144 and MF1145) | |||
Sent Date: 4/5/2013 7:18:08 AM Received Date: 4/5/2013 7:18:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients: | |||
"Hanneman, Harv" <Harv.Hanneman@nexteraenergy.com> | |||
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov> | |||
Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov> | |||
Tracking Status: None "Millen, Michael" <Michael.Millen@nexteraenergy.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 2280 4/5/2013 7:18:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 06:41, 20 March 2020
ML13098B071 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 04/05/2013 |
From: | Beltz T Plant Licensing Branch III |
To: | Millen M Point Beach |
References | |
TAC MF1144, TAC MF1145 | |
Download: ML13098B071 (2) | |
Text
NRR-PMDAPEm Resource From: Beltz, Terry Sent: Friday, April 05, 2013 7:18 AM To: Millen, Michael Cc: Hanneman, Harv; Carlson, Robert; Cumblidge, Stephen
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: Relief Request RR-4L3 (TAC Nos. MF1144 and MF1145)
Dear Mr. Millen:
By letter dated March 19, 2013 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML13079A144), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted a relief request for the Point Beach Nuclear Plant, Units 1 and 2. The proposed request would grant relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code),Section XI, 1998 Edition through 2000 Addenda, for examination of specified welds due geometric or design configurations that limit the examination coverage which could be obtained. Relief is requested on the basis that alternative methods would provide an acceptable level of quality and safety.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Please dont hesitate to contact me if you have any questions.
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 656 Mail Envelope Properties (Terry.Beltz@nrc.gov20130405071800)
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review re: Relief Request RR-4L3 (TAC Nos. MF1144 and MF1145)
Sent Date: 4/5/2013 7:18:08 AM Received Date: 4/5/2013 7:18:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
"Hanneman, Harv" <Harv.Hanneman@nexteraenergy.com>
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov>
Tracking Status: None "Cumblidge, Stephen" <Stephen.Cumblidge@nrc.gov>
Tracking Status: None "Millen, Michael" <Michael.Millen@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2280 4/5/2013 7:18:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: