MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22193A1142022-09-12012 September 2022 Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System ML22140A1272022-05-25025 May 2022 Subsequent License Renewal Application Safety Evaluation Revision 1 Public ML22041A3342022-02-23023 February 2022 Transmittal Letter for Point Beach Final SE for SLRA Review to AA La 2-9 (3) ML22054A1082022-02-23023 February 2022 Subsequent License Renewal Application Safety Evaluation Public ML21148A2552021-07-21021 July 2021 Issuance of Amendment Nos. 269 and 271 Technical Specification Changes to Implement New Surveillance Methods for Transient Heat Flux Hot Channel Factor ML20363A1762021-02-23023 February 2021 Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis ML20241A0582020-09-25025 September 2020 Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19)) ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML19064A9042019-04-25025 April 2019 Issuance of Amendments to Extend Containment Leakage Rate Test Frequency ML19052A5442019-03-27027 March 2019 Issuance of Amendments 264 and 267 to Adopt TSTF-547, Clarification of Rod Position Requirements ML18289A3782018-11-26026 November 2018 Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18079A0452018-06-13013 June 2018 Issuance of Amendments Revision to the Point Beach Nuclear Plant Emergency Action Level Scheme (CAC Nos. MF9859 and MF9860 EPID L-2017-LLS-0278) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17159A7782017-07-27027 July 2017 Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17039A3002017-02-22022 February 2017 Issuance of Amendments -Removal of Completed License Conditions and Changes to the Ventilation Filter Testing Program ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16241A0002016-09-23023 September 2016 Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation ML16196A0932016-09-0808 September 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) ML16118A1542016-06-17017 June 2016 Issuance of Amendments ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML16035A5092016-03-0909 March 2016 Correction of Typographical Error in Safety Evaluation Associated with License Amendment Nos. 238 and 242 ML15293A4572015-11-25025 November 2015 Issuance of Amendments for the Steam Generator Technical Specifications, to Reflect Adoption of TSTF-510 ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15195A2012015-07-28028 July 2015 Issuance of Amendments Regarding Relocation of Surveillance Frequencies to Licensee Control ML15155A5392015-07-14014 July 2015 Issuance of Amendments Concerning Extension of Cyber Security Plan Milestone 8 ML15161A5352015-06-24024 June 2015 Relief Request VR-01; Alternatives to Certain Inservice Testing Requirements of the American Society of Mechanical Engineers (ASME) Code of Operation and Maintenance of Nuclear Power Plants ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML15014A2492015-01-27027 January 2015 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation (Tac Nos. MF4353 and MF4354) ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML14293A0022014-10-21021 October 2014 Issuance of Safety Evaluation Regarding Relief Request RR-5 ML14126A3782014-06-30030 June 2014 Issuance of License Amendment Nos. 250 and 254 Regarding Change to Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report ML14058B0292014-05-0909 May 2014 Issuance of Amendment Nos. 249 and 253 Regarding Use of Optimized Zirlo Fuel Cladding Material ML14014A2052014-01-30030 January 2014 Issuance of Relief Request Regarding Risk-Informed Inservice Inspection Program for the Fifth 10-Year Inservice Inspection Interval ML13329A0422013-12-20020 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L3) ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) ML13346A0402013-12-18018 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L2) ML13135A2712013-05-29029 May 2013 Safety Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12362A0092013-01-29029 January 2013 Issuance of License Amendment Nos. 248 and 252 Operations Manager Qualification Requirements ML12251A1552012-11-23023 November 2012 Issuance of Amendment to Renewed Facility Operating License Revised Cyber Security Plan Implementation Schedule Milestone 6 2024-01-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 20, 2013 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2- RELIEF FROM THE REQUIREMENTS OF THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) BOILER AND PRESSURE VESSEL CODE (CODE),
SECTION XI, FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL (TAC NOS. MF1144 AND MF1145)
Dear Mr. Meyer:
By letter dated March 19, 2013, as supplemented by letter dated August 28, 2013, NextEra Energy Point Beach, LLC (NextEra, the licensee), submitted to the U.S. Nuclear Regulatory Commission (NRC) a Request for Relief (RR-4L3) from certain inspection coverage requirements of the ASME Code,Section XI, for two full-penetration welds at the Point Beach Nuclear Plant (PBNP), Units 1 and 2.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.55a(g)(6)(i), the licensee requested relief from the 100 percent weld examination coverage requirements specified in Subarticle IWB-2500 of the ASME Code,Section XI on the basis that the code requirement is impractical. The request is applicable to two Class 1 full-penetration welds at PBNP, Units 1 and 2, with access limitations caused by design, and reduced coverage caused by the materials of construction.
The NRC staff has reviewed the request and concludes, as set forth in the enclosed safety evaluation, that NextEra has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(6)(i) based on the impracticality to comply with the ASME Code examination coverage requirements for the subject welds listed in RR-4L3. The NRC staff determines that the ASME Code-required essentially 100 percent volumetric examination from both sides of Welds AC-1 0-SI-1 001-19 and AC-1 0-SI-2001-17 is considered impractical. Furthermore, the staff concludes that the examinations performed provide reasonable assurance of structural integrity of the subject components.
~----------------------------------------------------
L. Meyer If you have any questions, please contact Terry Beltz at (301) 415-3049, or via e-mail at T errv.Beltz@ nrc.gov.
Sincerely, Robert D. Carlson, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING RELIEF REQUEST RR-4L3 FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL NEXTERA ENERGY POINT BEACH. LLC POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 DOCKET NOS. 50-266 AND 50-301 TAC NOS. MF1144 AND MF1145
1.0 INTRODUCTION
By letter dated March 19, 2013 (Agencywide Document Access and Management System (ADAMS) Accession Number ML13079A144), as supplemented by letter dated August 28, 2013, (ADAMS Accession No. ML13241A201 ), Next Era Energy Point Beach, LLC (NextEra, the licensee), requested relief from inspection coverage requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI for two full-penetration welds.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR), Part 50, Section 50.55a(g)(6)(i), the licensee submitted Relief Request (RR)-4L3 requesting relief from the 100 percent weld examination coverage requirements specified in Subarticle IWB-2500 of the ASME Code Section XI on the basis that the code requirement is impractical. The request is applicable to two Class 1 full-penetration welds at the Point Beach Nuclear Plant (PBNP),
Units 1 and 2, with access limitations caused by design, and reduced coverage caused by the materials of construction.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, which was Enclosure
~-------------------------------------- -- - -
incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the conditions listed therein.
10 CFR 50.55a(g)(5)(iii), states, in part, that licensees may determine that conformance with certain code requirements is impractical, and shall notify the Commission and submit information in support of the determination.
10 CFR 50.55a(g)(6)(i), states that the Commission will evaluate determinations under paragraph (g)(5) of this section that code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The licensee has requested relief from the ASME Code,Section XI requirements pursuant to 10 CFR 50.55a(g)(5)(iii). Based on the above, and subject to the following technical evaluation, the U.S. Nuclear Regulatory Commission (NRC) staff finds that regulatory authority exists for the licensee to request and the Commission to grant the relief requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Relief Request Component Descriptions Relief Request RR-4L3 includes two Inspection Category R-A Item Number R1.16 piping welds.
These welds are listed below in Table 1.
Table 1 - Examination Category R-A Item Number R1.16 Welds Claimed Unit Weld 10 Description Materials Coverage Auxiliary Cooling 10-inch Pipe Wrought Stainless Steel Pipe 1 AC-1 0-SI-1001-19 50%
to Valve 1Sl-8678 to Cast Stainless Steel Valve
~--~----------~--------~~~~~~~~~~
Auxiliary Cooling 10-inch Pipe Wrought Stainless Steel Pipe 2 AC-1 0-SI-2001-17 50%
to Valve 2SI-8678 to Cast Stainless Steel Valve
~--~----------~--------~-----------------
Applicable ASME Code Requirement The licensee was granted permission to use a risk-informed in service inspection (RI-ISI) program for the fourth inspection interval in a letter dated July 2, 2003 (ADAMS Accession No. ML031630940). The RI-ISI program was developed in accordance with the Electric Power Research Institute (EPRI) Topical Report TR-112657, Revision 8-A, using the Nuclear Energy Institute template methodology. The welds are assigned Examination Category R-A, Item R1.16, and are either subject to thermal fatigue/stratification or defaulted to thermal fatigue" as the most likely degradation mechanism.
The ASME Code,Section XI and the licensee's RI-ISI program require "essentially 100 percent volumetric examinations of the Category R-A Item Number R 1.16. ASME Code Case N-460, "Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1,"is an
alternative approved for use by the NRC in Regulatory Guide (RG) 1.147, Revision 16, "lnservice Inspection Code Case Acceptability," and states that a reduction in examination coverage due to part geometry or interference for any Class 1 and 2 weld is acceptable provided that the reduction is less than 10 percent, (i.e., greater than 90 percent examination coverage is obtained).
The ASME Code of record for the fourth inspection interval at PBNP, Units 1 and 2, is the ASME Code,Section XI, 1998 Edition through the 2000 Addenda. The fourth inspection interval at PBNP, Units 1 and 2, began on July 1, 2002, and ended on July 31 , 2012.
Basis for Relief The licensee has examined the welds to the maximum extent possible utilizing approved examination techniques and equipment. Ultrasonic exam ination of each of the welds was conducted using personnel, equipment, and procedures qualified in accordance with ASME Code Section XI, Appendix VIII.
The system leakage tests were performed each refueling outage in accordance with Table IWB-2500-1; Examination Category B-P. Examination Category B-P requires a VT-2 visual examination to detect evidence of leakage.
In addition to the above ASME Code required examinations (volumetric and pressure test),
Reactor Building Normal Sump monitoring provided assurance that, in the event that leakage did occur through this weld, it would be detected and proper action taken.
The licensee did not propose any alternative examinations for the subject welds.
3.2 NRC Staff Evaluation Welds AC-1 0-SI-1001 -19 and AC-1 0-SI-2001-17 are both 10-inch diameter Class 1 stainless steel welds joining a wrought stainless steel auxiliary cooling pipe to cast stainless steel valves in Units 1 and 2. The ASME Code,Section XI and the Licensee's RI-ISI program require essentially 100 percent volumetric coverage of the welds. However, volumetric examinations are limited by the geometry of the welds and the associated piping configurations, which restrict scanning to one side only.
To gain access for examination, the welds and piping would require design modifications.
Imposition of this requirement would create a burden on the licensee.
The ASME Code coverage for each weld was 50 percent. The licensee stated that their "best efforf' coverage values are 50 percent for axial flaws and 80 percent coverage for circumferential flaws for Weld AC-10-SI-1 001-19 and 50 percent for axial flaws and 56.25 percent coverage for circumferential flaws for AC-1 0-SI-2001-17. This coverage was obtained using 45 degree shear and 60 degree longitudinal waves in the axial scans for circumferential flaws. The entire length of the weld was examined on one side of the pipe side for circumferential flaws and the entire weld width was scanned for axial flaws.
Although the essentially 100 percent ASME Code-required coverage could not be obtained, the ultrasonic testing techniques employed provided volumetric coverage for the near-side of the
welds and limited volumetric coverage for the weld far-side, weld fusion zone and base materials on the opposite side of the welds. The staff has determined that there is no known operational experience showing cracking in similar stainless steel welds, and the only forms of cracking that are expected to occur are thermal fatigue, due to very low oxygen concentration in pressurized water reactor coolant. Given the location of these welds, it is expected that thermal fatigue cracking would progress relatively slowly though the weld. Considering the coverage obtained, axial cracking would likely be detected and circumferential cracking on the near side or initiating near the weld root should also be detected.
4.0 CONCLUSION
As set forth above, the NRC staff has reviewed the licensee's submittals and determined that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest given due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. Furthermore, the staff concluded that the examinations performed to the extent practical provide reasonable assurance of structural integrity of the subject components. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(5). Therefore, the NRC staff grants relief for the subject examinations of the components contained in RR-4L3 for the fourth 10-year inspection intervals at the Point Beach Nuclear Plant, Units 1 and 2.
The NRC staff concludes that the burden on the licensee, the ASME Code-required essentially 100 percent volumetric examination from both sides of Welds AC-10-SI-1001-19 and AC-10-SI-2001-17, is considered impractical. Furthermore, the staff concludes that the examinations performed provide reasonable assurance of structural integrity of the subject components.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: S. Cumblidge Date: December 20, 2013