Letter Sequence Request |
---|
|
|
MONTHYEARNRC 2013-0020, CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval2013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval Project stage: Request NRC 2013-0021, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i)2013-03-19019 March 2013 Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) Project stage: Request ML13110A0062013-04-17017 April 2013 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review Request for a Risk-Informed/Safety Based Inservice Inspection Alternative Project stage: Acceptance Review ML13184A0962013-07-0101 July 2013 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information Risk Evaluation for Fifth 10-Year ISI Program Plan Project stage: Draft RAI NRC 2013-0071, Request for Approval of Risk-Informed/Safety Based Lnservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i), Response to Request for Additional Information2013-08-0909 August 2013 Request for Approval of Risk-Informed/Safety Based Lnservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i), Response to Request for Additional Information Project stage: Response to RAI NRC 2013-0074, Request for Approval of Risk-Informed/Safety Based Lnservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) Response to Request for Additional Information2013-09-0505 September 2013 Request for Approval of Risk-Informed/Safety Based Lnservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) Response to Request for Additional Information Project stage: Response to RAI ML14014A2052014-01-30030 January 2014 Issuance of Relief Request Regarding Risk-Informed Inservice Inspection Program for the Fifth 10-Year Inservice Inspection Interval Project stage: Approval 2013-07-01
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24068A2492024-04-22022 April 2024 – Authorization and Safety Evaluation for Alternative Request No. I6-RR-01 ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components NRC 2015-0025, Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B2015-05-14014 May 2015 Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) ML13079A1412013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval NRC 2013-0020, CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval2013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12286A1042012-11-15015 November 2012 Evaluation of Relief Requests RR-2 & RR-3 (ME7974 & ME7975) ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0527001972006-01-18018 January 2006 Relief Request - Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 ML0526503122005-09-27027 September 2005 Relief Requests - the Previsions of ASME Section XI, IWA-5244, Buried Components, RR-1-26 and RR-2-34 NRC 2005-0084, Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 22005-07-0101 July 2005 Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 NRC 2005-0016, Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 162005-02-0404 February 2005 Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 16 NRC 2005-0015, Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 152005-01-21021 January 2005 Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 15 ML0408601612004-04-0101 April 2004 Request for Relief VRR 03-01 on a One Time Basis for Performing Inservice Testing of Relief Valve 1RH-861C ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0323104022003-09-10010 September 2003 Relief, MR 02 018-2 Pertaining to Reactor Vessel Closure Head Penetration Repair ML0306203282003-03-21021 March 2003 Relief, Use of Code Case N-600 for the Fourth 10-Year Interval, MB5403 and MB5404 ML0225401092003-03-21021 March 2003 Relief Request No 8 - Requirement for Scheduling of Components for Examination ML0302101262003-02-27027 February 2003 Relief, Alternative to Examine All Three Vessels of the Regenerative Heat Exchanger, MB5401 & MB5402 ML0225300232002-10-0808 October 2002 Relief, Granted for ASME Code Section XI, Relief Request 6 Regarding Evaluation of Leakage with Bolting In-Place ML0225300062002-10-0808 October 2002 Code Relief, ASME Code Section XI, Relief Request 5 Regarding Visual Examination of Insulted Bolting on Borated Systems NRC 2002-0073, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-22002-08-28028 August 2002 Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 2024-04-22
[Table view] Category:Letter type:NRC
MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] |
Text
NEXT ENEkw -
March 19,2013 7 POINT Bknbn NRC 2013-0020 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 10 CFR 50.55a Request, Relief Request RR-4L3 lnservice Inspection lmpracticalitv Examination Limitations Due to Configuration Fourth Ten-Year lnservice Inspection Program Interval In accordance with 10 CFR 50.55a, "Codes and Standards," Paragraph (a)(3)(i), NextEra Energy Point Beach, LLC (NextEra) requests that the Nuclear Regulatory Commission (NRC) grant relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (B&PV Code),Section XI, 1998 Edition through 2000 Addenda requirement for 100 percent coverage of the subject weld(s) due to geometric or design configuration, which limited the examination coverage which could be obtained. Relief is requested on the basis that alternative methods will provide an acceptable level of quality and safety.
NextEra requests approval of this request as described in the enclosure prior to December 31,201 3.
Summary of Commitments This submittal contains no new commitments or revisions to existing commitments.
Very truly yours, NextEra Energy Point Beach, LLC
' e Vice President Enclosure Regional Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mr. Mike Verhagan, Department of Commerce, State of Wisconsin NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
ENCLOSURE RELIEF REQUEST RR-4L3 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 10 CFR 50.55a REQUEST, RELIEF REQUESTS RR-4L3 INSERVICE INSPECTION IMPRACTICALITY EXAMINATION LIMITATIONS DUE TO CONFIGURATION FOURTH TEN-YEAR INSERVICE INSPECTION PROGRAM INTERVAL ASME Code Component(s) Affected Code Class:
Examination Category: R-A Item Number(s):
==
Description:==
Listed In Table 4L3-1 Applicable ASME Code Edition and Addenda ASME Section XI, 1998 Edition through 2000 Addenda.
Applicable Code Requirement
ASME Section XI requires examination of 100 percent of the weld length as defined in the applicable Code Tables and shown in the applicable Code Figures. The alternative requirements of ASME Section XI, Code Case N-460, approved for use in Regulatory Guide 1.I 47, Revision 16, allows credit for essentially 100 percent coverage of welds provided greater than 90 percent of the required volume has been examined.
10 CFR 50.55a(b)(2)(xv)(A) requires the following examination coverage when applying Supplement 2 to Appendix VIII:
(1) Piping must be examined in two axial directions, and when examination in the circumferential direction is required, the circumferential examination must be performed in two directions, provided access is available.
(2) Where examination from both sides is not possible, full coverage credit may be clamed from a single side for ferritic welds. Where examination from both sides is not possible on austenitic welds, full coverage credit from a single side may be claimed only after completing a successful single-side Appendix Vlll demonstration using flaws on the opposite side of the weld.
10 CFR 50.55a(b)(2)(xvi)(B) requires that examinations performed from one side of a stainless steel pipe weld must be conducted with equipment, procedures, and personnel Page 1 of 5
that have demonstrated proficiency with single side examinations. To demonstrate equivalency to two sided examinations, the demonstration must be performed-to the requirements of Appendix Vlll as conditioned by 10 CFR 50a55a(b)(2)(xvi)(B)and 10 CFR 50.55a(b)(2)(xv)(A).
Impracticality of Compliance Pursuant to 10 CFR 50.55a(g)(5)(iii), relief is requested from the 100 percent coverage of the subject weld(s) due to geometric or design configuration, which limited the examination coverage that can be obtained. Due to Point Beach Nuclear Plant's use of the Risk-Informed in-service inspection (ISI) concept, the welds examined within the Risk Segment were selected in an attempt to gain the highest examination coverage possible. In the case of the welds with limitations, the welds selected were the only welds within that risk segment 1 degradation mechanism.
In the case of austenitic piping welds, there are currently no Performance Demonstration Initiative (PDI) qualified single sided examination procedures which have been demonstrated to provide equivalency to dual sided examination procedures. Current technology is not capable of reliably detecting or sizing flaws on the far side of an austenitic weld. PDI Performance Demonstration Qualification Summary (PDQS) certificates for austenitic piping list the limitation that single sided examinations are performed on a "best-effort" basis. The "best-effort" statement is provided in place of a complete single side qualification to demonstrate that the examiner's qualification and any subsequent weld examinations are based upon the application of the best available technology.
Relief is requested from compliance with the 100 percent required examination coverage for piping welds listed in Table 4L3-1 based on configurations limited to single side access. The coverage listed was obtained during the examination with no credit taken for the far side of the weld (i.e., no austenitic weld will have greater than 50 percent coverage).
Generic limitation sketches for austenitic welds are provided in Figure 4L3-1.
Burden Caused by Compliance Compliance would require extensive modification or replacement of components with a design that allows examination from both sides of the weld. This option to meet the 100 percent examination coverage requirement is considered impractical.
Proposed Alternative and Basis for Use The subject welds received a volumetric examination to the maximum extent practical utilizing best available techniques as qualified through PDI. The PDI technique was used to examine the far side of the weld using the search unit angle(s) and frequencies as required by the PDI Generic procedure (PDI-UT-2). Additionally, a visual (VT-2) examination was performed each refueling outage on the applicable system as required by ASME Section XI.
Based on the volumetric examination coverage obtained with acceptable results and the visual (VT-2) examination performed each refueling outage with acceptable results, it is Page 2 of 5
reasonable to conclude that service induced degradation would be detected. Therefore, these proposed alternativesprovide an acceptablelevel of quality and safety by providing reasonable assurance of structural integrity of the subject welds.
Duration of Proposed Alternative Relief is requested for the fourth 10-year inservice inspection interval for Point Beach Nuclear Plant, Units 1 and 2, which began on July 1, 2002 and ended on July 31, 2012.
Precedents Similar relief requests documenting limited examinations have been granted to the following plants:
NRC Letter to Seabrook Station, Dated June 4, 2012, Seabrook Station, Unit 1 -
Second 10-Year Interval lnservice lnspection Program Plan Request for Relief No. 21R-19 (TAC No ME6902), (ML12145A048)
NRC Letter to Seabrook Station, Dated June 4, 2012, Seabrook Station, Unit 1 -
Second 10-Year Interval lnservice Inspection Program Plan Request for Relief No. 21R-20 (TAC No ME6901), (ML12145A170)
Page 3 of 5
Figure 4L3-1 Typical OD Configuration Pipe to ValveNalve to Pipe Typical OD Configuration PipelCap to Branch ConnectionIBranch Connection to PipelCap No coverage due to configuration geometry Page 4 of 5
Table 4L3-1 Limited Risk-Informed Piping Examinations for the Fourth IS1 Interval Point Beach Unit 1 Component Identification/ Item Damage System Exam Limitation Description Description No. Mechanism Coverage AC-10-SI-1001-19 Intergranular Stress Auxiliary 50%* Examined from pipe side only.
Pipe to Valve 1SI-867B Corrosion Cracking Cooling R1 and Thermal Point Beach Unit 2 Component Identification / Item Damage System or Exam Limitation Description Description No. Mechanism Component Coverage AC-10-SI-2001-17 Intergranular Stress Auxiliary 50%* Examined from pipe side only.
Pipe to Valve 2SI-867B Corrosion Cracking Cooling R1.16 and Thermal Transients Examination Category R-A 1 R1.16 Pressure Retaining Stainless Steel Welds Coverage Limitations and UT Parameters*
Point Beach Unit 1 Weld ID Number Configuration Thickness YO Angle Mode Frequency Comments (Inches) Coverage MHz AC-10-SI-1001-19 10-inch Pipe to >0.50 50* 45" Shear 2.25 Examined from pipe side only due Valve1SI-867B 60" RL 2.0 to configuration.
Point Beach Unit 2 Weld ID Number Configuration Thickness YO Angle Mode Frequency Comments (Inches) Coverage MHz AC-10-SI-2001-17 10-inch Pipe to >0.50 50* 45" Shear 2.25 Examined from pipe side only due Valve2SI-867B 60" RL 2.0 to configuration.
- SO% coverage is the maximum claimed due to limitations of procedure NDE-173 (i.e. PDI-UT-2). The maximum amount of weld volume and base material on the far-side was insonified utilizing the guidance contained within the procedure for single-sided examinations.