(12 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15023A214 | | | number = ML15023A214 |
| | issue date = 01/23/2015 | | | issue date = 01/23/2015 |
| | title = 2015/01/23 NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989) | | | title = NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) |
| | author name = Lingam S P | | | author name = Lingam S |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
| | addressee name = Richardson M | | | addressee name = Richardson M |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| | project = TAC:MF4988, TAC:MF4989 | | | project = TAC:MF4988, TAC:MF4989 |
| | | stage = Acceptance Review |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Lingam, SivaSent:Friday, January 23, 2015 9:43 AMTo:mjrm@pge.comCc:Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3@pge.com); Burkhardt, JanetSubject:Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4), | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Lingam, Siva Sent: Friday, January 23, 2015 9:43 AM To: mjrm@pge.com Cc: Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3 |
| "coolable geometry." The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
| | @pge.com); Burkhardt, Janet |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
| |
|
| |
|
| | ==Subject:== |
| | Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989) |
| | By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4), |
| | coolable geometry. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| If you have any questions, please contact me. | | If you have any questions, please contact me. |
| Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) | | Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1) |
| Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: NRR_PMDA Email Number: 1829 Mail Envelope Properties (Siva.Lingam@nrc.gov20150123094200) | | Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1 |
| Subject: Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989) | | |
| Sent Date: 1/23/2015 9:42:52 AM Received Date: 1/23/2015 9:42:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: "Oesterle, Eric" <Eric.Oesterle@nrc.gov> Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov> Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com> | | Hearing Identifier: NRR_PMDA Email Number: 1829 Mail Envelope Properties (Siva.Lingam@nrc.gov20150123094200) |
| Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov> Tracking Status: None "mjrm@pge.com" <mjrm@pge.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2485 1/23/2015 9:42:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | | |
| }} | | ==Subject:== |
| | Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989) |
| | Sent Date: 1/23/2015 9:42:52 AM Received Date: 1/23/2015 9:42:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: |
| | "Oesterle, Eric" <Eric.Oesterle@nrc.gov> |
| | Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov> |
| | Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> |
| | Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com> |
| | Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov> |
| | Tracking Status: None "mjrm@pge.com" <mjrm@pge.com> |
| | Tracking Status: None Post Office: |
| | Files Size Date & Time MESSAGE 2485 1/23/2015 9:42:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML14309A1562014-11-12012 November 2014 Request for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1 Project stage: Withholding Request Acceptance ML15023A2142015-01-23023 January 2015 NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) Project stage: Acceptance Review 2014-11-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mother'S for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML21124A0612021-05-0404 May 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML21054A3112021-02-23023 February 2021 NRR E-mail Capture - Acceptance Review: Diablo Canyon Request for One-Time Exemption from Select 10 CFR 55.59 Requirements ML21012A4432021-01-12012 January 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation ML20328A3002020-11-23023 November 2020 Email from Cgnp to the NRC - Comment Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Dcdep Public Meeting - November 24, 2020 ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20239A9492020-08-26026 August 2020 (External Sender) E-Mail Comment by D. Lochbaum Regarding Diablo Canyon Unit 1 AFW System Piping ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue ML20234A2422020-08-20020 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20233A3222020-08-18018 August 2020 Comment (4) e-mail from D. Lochbaum Regarding Diablo Canyon Exigent LAR ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G 2023-08-18
[Table view] |
Text
NRR-PMDAPEm Resource From: Lingam, Siva Sent: Friday, January 23, 2015 9:43 AM To: mjrm@pge.com Cc: Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3
@pge.com); Burkhardt, Janet
Subject:
Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4),
coolable geometry. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1829 Mail Envelope Properties (Siva.Lingam@nrc.gov20150123094200)
Subject:
Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
Sent Date: 1/23/2015 9:42:52 AM Received Date: 1/23/2015 9:42:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:
"Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>
Tracking Status: None "mjrm@pge.com" <mjrm@pge.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2485 1/23/2015 9:42:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: