ML15023A214: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(12 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15023A214
| number = ML15023A214
| issue date = 01/23/2015
| issue date = 01/23/2015
| title = 2015/01/23 NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
| title = NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4)
| author name = Lingam S P
| author name = Lingam S
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Richardson M
| addressee name = Richardson M
Line 14: Line 14:
| page count = 2
| page count = 2
| project = TAC:MF4988, TAC:MF4989
| project = TAC:MF4988, TAC:MF4989
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Lingam, SivaSent:Friday, January 23, 2015 9:43 AMTo:mjrm@pge.comCc:Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3@pge.com); Burkhardt, JanetSubject:Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4)  (TAC Nos. MF4988 and MF4989)By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4),
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Lingam, Siva Sent:                       Friday, January 23, 2015 9:43 AM To:                         mjrm@pge.com Cc:                         Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3
"coolable geometry."  The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
                            @pge.com); Burkhardt, Janet
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.


==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4),
coolable geometry. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: NRR_PMDA Email Number: 1829   Mail Envelope Properties   (Siva.Lingam@nrc.gov20150123094200)
Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1
Subject:   Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
 
Sent Date:   1/23/2015 9:42:52 AM Received Date: 1/23/2015 9:42:00 AM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov Recipients:     "Oesterle, Eric" <Eric.Oesterle@nrc.gov> Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov> Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com> Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Hearing Identifier:     NRR_PMDA Email Number:           1829 Mail Envelope Properties       (Siva.Lingam@nrc.gov20150123094200)
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov> Tracking Status: None "mjrm@pge.com" <mjrm@pge.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2485     1/23/2015 9:42:00 AM   Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
 
}}
==Subject:==
Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
Sent Date:               1/23/2015 9:42:52 AM Received Date:           1/23/2015 9:42:00 AM From:                   Lingam, Siva Created By:             Siva.Lingam@nrc.gov Recipients:
"Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>
Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>
Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>
Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>
Tracking Status: None "mjrm@pge.com" <mjrm@pge.com>
Tracking Status: None Post Office:
Files                             Size                     Date & Time MESSAGE                           2485                     1/23/2015 9:42:00 AM Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 16:40, 19 March 2020

NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4)
ML15023A214
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/23/2015
From: Siva Lingam
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
TAC MF4988, TAC MF4989
Download: ML15023A214 (2)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Friday, January 23, 2015 9:43 AM To: mjrm@pge.com Cc: Oesterle, Eric; Lyon, Fred; Schrader, Kenneth (KJSe@pge.com); Soenen, Philippe R (PNS3

@pge.com); Burkhardt, Janet

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)

By letter dated October 2, 2014 (ADAMS Accession No. ML14276A195), Pacific Gas and Electric Company (the licensee) submitted a license amendment request 14-04 for Diablo Canyon Power Plant, Units 1 and 2, requesting an approval to perform the fuel assembly structural analyses based on a pipe break, which considers the application of leak-before-break (LBB) that allows the exclusion of the dynamic effects of certain breaks, consistent with Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A, General Design Criterion 4. Further, the licensee requests approval to use the fuel assembly structural analysis results to satisfy, in part, the emergency core cooling system performance acceptance criterion, 10 CFR 50.46(b)(4),

coolable geometry. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL4-1)

Cooper Nuclear Station Diablo Canyon Nuclear Power Plant Location: O8-D5; Mail Stop: O8-B3 Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 1829 Mail Envelope Properties (Siva.Lingam@nrc.gov20150123094200)

Subject:

Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)

Sent Date: 1/23/2015 9:42:52 AM Received Date: 1/23/2015 9:42:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Oesterle, Eric" <Eric.Oesterle@nrc.gov>

Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>

Tracking Status: None "Schrader, Kenneth (KJSe@pge.com)" <KJSe@pge.com>

Tracking Status: None "Soenen, Philippe R (PNS3@pge.com)" <PNS3@pge.com>

Tracking Status: None "Burkhardt, Janet" <Janet.Burkhardt@nrc.gov>

Tracking Status: None "mjrm@pge.com" <mjrm@pge.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2485 1/23/2015 9:42:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: