ML18086A300: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 27: Line 27:
[£III I                        During an inspection of the Spent Fuel Pit, a leak of approximately 2.7 liters/hr.
[£III I                        During an inspection of the Spent Fuel Pit, a leak of approximately 2.7 liters/hr.
was discovered at telltale drain nwnber 6.                                                      The Spent Fuel Pit level has been
was discovered at telltale drain nwnber 6.                                                      The Spent Fuel Pit level has been
[]]I]                          maintained at 23 feet of water over the top of the irradiated fuel assemblies
[))I]                          maintained at 23 feet of water over the top of the irradiated fuel assemblies
[Q]]J                          seated in the storage racks in accordance with Technical Specification 3.9.11.
[Q))J                          seated in the storage racks in accordance with Technical Specification 3.9.11.
Previous similar occurrence:                                        80-09.
Previous similar occurrence:                                        80-09.
ITTIJ 7                8 9 L                                                                                                                                                                            BO SYSTEM                CAUSE              CAUSE                                                      COMP.          VALVE CODE                  CODE            SUB CODE                  COMPONENT CODE                    SUBCODE          SUBCODE
ITTIJ 7                8 9 L                                                                                                                                                                            BO SYSTEM                CAUSE              CAUSE                                                      COMP.          VALVE CODE                  CODE            SUB CODE                  COMPONENT CODE                    SUBCODE          SUBCODE
Line 34: Line 34:
7                8                              9            10            11                12              13                              18        19              20 SEQUENTIAL                            OCCURRENCE          REPORT                      REVISION
7                8                              9            10            11                12              13                              18        19              20 SEQUENTIAL                            OCCURRENCE          REPORT                      REVISION
                           ~        LE R RO CVENT YE.A.R                                          REPORT NO.                              CODE              TYPE                        NC.
                           ~        LE R RO CVENT YE.A.R                                          REPORT NO.                              CODE              TYPE                        NC.
                           \:..:.,J REPORT NUMBER I 11 I
                           \:..:.,J REPORT NUMBER I 11 I 8
* 8
                                                           *
                                                           *
* l=:J              I oI3 I 4 I              1.....-1        1°  13 29I        Ll:J            l=J          LQJ 21          22            23                24            26        27            28                  30              31          32 ACTION        FUTURE                EFFECT            SHUTDOWN                                r:;:::.,  ATTACHMENT        NPR0-4        PRIME COMP.            COMPONENT TAKEt>J      ACTION              ON PLANT            METHOD                        HOURS ~            SUBMITTED      FORM ::.UB.      SUPPLIER            MANUFACTURER
* l=:J              I oI3 I 4 I              1.....-1        1°  13 29I        Ll:J            l=J          LQJ 21          22            23                24            26        27            28                  30              31          32 ACTION        FUTURE                EFFECT            SHUTDOWN                                r:;:::.,  ATTACHMENT        NPR0-4        PRIME COMP.            COMPONENT TAKEt>J      ACTION              ON PLANT            METHOD                        HOURS ~            SUBMITTED      FORM ::.UB.      SUPPLIER            MANUFACTURER

Latest revision as of 18:05, 17 March 2020

LER 81-034/03L-0:on 810210,spent Fuel Pit Telltale Drain 6 Found Leaking.Caused by Defective Seams.Plate Welded Over Defect in Side Wall.Floor Seam Defects Sealed
ML18086A300
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/14/1981
From: Steele W
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18086A299 List:
References
LER-81-034-03L-01, LER-81-34-3L-1, NUDOCS 8104240539
Download: ML18086A300 (1)


Text

' .. C FORM 366 U.S. NUCLEAR REGULATORY COMMISSION

.*1.17)

.... ** **. P"'":"'"'__.

e LICENSEE EVENT REPORT e

CONTROL BLOCK: I I I fi\

L-__._~_.__..~_._____._~6\.Y (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

~ IN I J Is I GI sI 1 I@ p I 0I - I 0 I 0 I 0I 0 I 0 I - I 0 I 0 1014 I i I i I i I i 101 I I 0 7 B 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 5o CON'T fil2J 7 8

=~~~~~ L!J© I oI s I oIo I oI 60 61 DOCKET NUMBER 2 I 1 I 26810169 o I 2 I i I o I 8 I i 74I© Io EVENT DATE 75 I 4 I i 14 I s1i 8010 REPORT DATE EVENT DESCRIPTIO.~ AND PROBABLE CONSEQUENCES@

[£III I During an inspection of the Spent Fuel Pit, a leak of approximately 2.7 liters/hr.

was discovered at telltale drain nwnber 6. The Spent Fuel Pit level has been

[))I] maintained at 23 feet of water over the top of the irradiated fuel assemblies

[Q))J seated in the storage racks in accordance with Technical Specification 3.9.11.

Previous similar occurrence: 80-09.

ITTIJ 7 8 9 L BO SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUB CODE COMPONENT CODE SUBCODE SUBCODE

~ IF IB I@ ~@ L:.J@ I x I x I x I x I x I x I@ ~@) ~@

7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION

~ LE R RO CVENT YE.A.R REPORT NO. CODE TYPE NC.

\:..:.,J REPORT NUMBER I 11 I 8

  • l=:J I oI3 I 4 I 1.....-1 1° 13 29I Ll:J l=J LQJ 21 22 23 24 26 27 28 30 31 32 ACTION FUTURE EFFECT SHUTDOWN r:;:::., ATTACHMENT NPR0-4 PRIME COMP. COMPONENT TAKEt>J ACTION ON PLANT METHOD HOURS ~ SUBMITTED FORM ::.UB. SUPPLIER MANUFACTURER

~@12.J@ ~@ ~ 10101010140 ~@ ~@) ~@ I u I 0 18 I 0 I@

33 34 35 36 37 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

I The apparent cause was leaking welded seams. A stainless steel plate was welded over a defect in a side wall and epoxy was used to seal three defects in floor seams.

Inspection of the remaining seams is planned when the fuel racks are relocated. A supplemental report will address the results of the inspection and any corrective action taken.

7 8 9 80 FACILITY ljQ\ METHOD OF STATUS  % POWER OTHER STATUS ~ DISCOVERY DISCOVERY DESCRIPTION @

EE~ 111 0 I 0 l@ I.....__N__/_A_ __ L!J@I Operator Observation 7 B 9 10 12 11 44 45 46 80 ACTIVITY CONTENT ~

RELEASED OF RELEASE AMOUNT OF ACTIVITY~ LOCATION OF RELEASE @

EE] ~@) W@l N/A N/A 7 B 9 10 11 44 45 80 PERSONNEL EXPOSURES r:;;:;._

NUMBER (':;:;\TYPE DESCRIPTION

[2l2J 7 8 I9 0 I ~

0 I 01116Ll.J@ 12 1~3_ _ _ _.:;.;.;..-=..;;...

N A ______________________________ ~80 PERSONNEL INJURIES t:::;\

NUMBER DESCRIPTION6

~I 7 B 9 ol ol ol~

11 NA

~12--------=~-------------------------------8_.0 LO.SS OF OR DAMAGE TO FACILITY f43\

TYPE DESCRIPTION i,::_v EE 7 B UJ@

9 NA 1~0~--~-------.._---~-----------------------~-~~~80 PUBLICITY C\

ISSUEDt,;";;\ DESCRIPTION~ NRC USE ONL y "'

I2I2J Ll:!J~--~~~~~~-N=-::A'--~~~~~~~~~~~~....J I I I I I I I I I I I I I!

7 s _9 2. 410, /1' ::!'f . 68 69 80 ~

Q O

10 4 N VV W. J. Steele AME OF P R E P A R E R - - - - - - - - - - - - - - - - - - PHONE:-------------

609-935-0998 a.

ci