ML20010B379: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 33: Line 33:
                                                                                     - L Attorneys for Joint Intervenors 314 North Broadway St. Louis, MO 63100 314/241-7961 40 4
                                                                                     - L Attorneys for Joint Intervenors 314 North Broadway St. Louis, MO 63100 314/241-7961 40 4
e h?//
e h?//
6';d          [ 6fb[[)v]
6';d          [ 6fb(()v]
I'U h l. 31981 =.    -
I'U h l. 31981 =.    -
                                                                               ""7ggjjgwon          4 r    N
                                                                               ""7ggjjgwon          4 r    N

Latest revision as of 12:10, 15 March 2020

Second Request for Production of Documents Directed to Applicant.Related Correspondence
ML20010B379
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/12/1981
From: Chackes K
CHACKES & HOARE, JOINT INTERVENORS - CALLAWAY
To:
UNION ELECTRIC CO.
References
ISSUANCES-OL, NUDOCS 8108140421
Download: ML20010B379 (6)


Text

  • '

Iml ATED CORRESPONU < $

UNITED STATES OF AMERICA U .t<

NUCLEAR REOULATORY COMMISSION , s BEFORE TIIE ATOMIC SAFETY AND LICENSING BOAR >

0" b cfthe t w c k y

\g, bd2bg & Sardce *

\

In the Matter of )

) b A UNION ELECTRIC COMPANY ) Docket No. STN $0-483-OL *

)

(Callaway Plant, Unit 1) . )

JOINT INTERVENORS' SECOND REQUEST FOR PRODUCTION OF DOCUMENTS TO UNION ELECTRIC Joint Intervenors Coalition for the Environment St. Louis Region, Missourians for Safe Energy and Crawdad Alliance request that Union Electric Company produce for inspection and copying at the offices of Chackes and floare, 314 North Broadway, St. Louis, Missouri the originals or exact copies of the following documents.

Joint Intervenors state that each of the documents requested is relevant to their contentions in this proceeding.

Respectfully submitted, CIIACKES AND IIOARE f -n_

Kenneth M. Chackes

- L Attorneys for Joint Intervenors 314 North Broadway St. Louis, MO 63100 314/241-7961 40 4

e h?//

6';d [ 6fb(()v]

I'U h l. 31981 =. -

""7ggjjgwon 4 r N

{' 8140421!$$

ADOCK o

1. Provide Supplier Deviation Disposition Requests for Cives Steel Company j for Job 10466 Numbers 1 through 5.

1

2. Provide a copy sf the internal memo confirming a telephone conversation

, between Bechtel's Procurement and Bechtel's shop inspector in which directions were Issued to perform 100 percent shop inspection at Cives (as per enclosure to BLUE-446).  ;

i

3. Noqconformance Report (NR'C) No. 2-0017-C-A dated October 12, 1976 i

(referenced in SLBM 6-514 dated November 5,1976).

2-

4. BLSM-3284 dated October 21, 1978 re Bechtel/SNUPPS QA Program Review (referenced in SLBM 6-514, dated November 5,1976 - File
0491.13.3).'
5. NCR No. 2-1193-C-B.
6. Transmittal Form, June 19, 1980 - Study on Embed Plates Installed Prior to June 9,1977 (as per ULS-3298 (June 27,1980) File: 0273.1).
7. UE letter - Schnell to Keppler dated June 29, 1980 - NRC Questions on j- UE Embed Report, Additional Information (as per same letter above).

4

8. UTD B-1475 (Cives) dated June 17,1980 (referenced in BLUE-712; July 22,

! 1980).

i

9. UTD-3181 dated December 28, '.977 (referenced in DLUC-5865 dated October 6,1980).

I

10. UTD-6936 (referenced in DLUC-5407 dated May 22, 1980).

11 Bechtel BLSE-4729.

12. BLSM-6379 dated November 7,1977 (referenced in SLBM 7-499 dated November 30, 1977).
13. SLU 6-41 telephone conversation of Non aber 2,1976, as referenced b l DLUC-5407 dated May 22, 1980.
14. Letter of June 24, 1977, from Paul Divjak (of Bechtel) to Cives. (Refer e;nced in letter from Cives to Bechtel dated November 18,1977 - perhaps #SL: 161 - the l number of the Cives letter is illegible in our copy). '

i

--_ - , _r, - . , - - . _ _ . . . _ . _ . , , _ - , . - . _ - _ , , . _ _ . _ _ _ , _ _ _ . . _ _ - . _ - . _ . - - . _ _ - _
15. The Material Control Report for Bechtel Purchase Order Number 10466-C-131-2, Revision 13 (referenced in DLUC-2188 dated November 25, 1977) and Revision 12.
16. Provlje the following NCRs of reported concrete cracks as per Appt ~ ant's Answer to Interrogatory No. 31: 2-1973-C; 2 SN-2611-C; and 2 SN-3593-C.
17. Provide a cooy of WP-109, Revisions 4, 5, 6 and 7 regarding Concrete Placement, grouting and Post Pour, Section 4.0 Procedure. (Pages 24 and 25 of Revision 5 have already been provided.
18. The eight slides or photos of the Reactor Cavity Moat Area crack taken in May or June 1977, and referenced on page 22 of the Applicant's Answers to Joint Intervenors' Interrogatories, July 10, 1981.
19. Provide copics of the following letters regarding the Reactor Cavity Moat Area: BLUE 403 dated June 7,1977; BLUE 403 dated June 21, 1977; and BLUE 461 dated Deceiriber 13, 1977.
20. Provide copies of any correspondence or reports involving Chicago Bridge and Stect with regard to the testbg of the liner plate as a result of the discovery of the Reactor Cavity Moat Area crack.

21 Provide all correspondence or reports concerning the cracks in the Control Building walls described in NCR Numbers 2-2081-C-A and 2-2173-C-A, including any that would indicate the dates, personnel, and results of the initial discovery of the cracks, measurements taken, and ultimate repair action.

22. PCE-488 dated May 12, 1977, and PCE-531 dated June 21, 1977, referenced in Applicant's Answer to Interrogatory No. 42 (July 10,1981).
23. Firmi report of Containment Dome Concrete Imperfections at Callaway Unit 1, when available, as per Applicant's Answer to Interrogatory No. 64.
24. Providt Quality Control Surveillance Reports prepared by the Applicant or

,its contractors during the concrete placement in the five lifts of the Reactor Building Base Mat.

25. Provide the revisions dated November 3 and 7,1977, to' Work Procedure No.109 and Quality Control No.109 which the Applicant issued as a result of the Citatlan referred to in NRC Report No. 50-483/77-07. Provide also the revisions which preceded those.
26. Provide copies of all nonconformance reports and field change notices pertaining in whole or in part to the placement of reinforcing steel and concrete for -

the Fourth Lift of the Reactor Containment Building Exterior Wall.

27. MCR Number 2-1532-C-B regarding the Reactor Building wall third lift.
28. Provide any documents which specify or discuss the nonconformances about which the nine NCRs wer2 written which were still outstanding as of November 21, 1977 (pertaining to the third lift of the Reactor Building Wall).
29. Provide any correspondence or reports between any or all of the following:

Union Electric, Bechtel, Daniel International, SNUPPS, or the NRC, relating to the scheduling of or decision to proceed with the concrete placement of the third lift of the Reactor Building.

30. Provide the same documents as requested immediately above, with regard to the fourth lift of the Reactor Building.

31 Daniel's Inter-Office Communication PQCM-464 (which was superceded by PQCM-491 dated May 5,1978).

32. IITD dated November 16, 1977.
33. ULD-822.
34. SLM-7-78 dated June 6,1977, regarding vendor performance.
35. Daniel Quality Control manuals.
33. NCR No. 2-1470-C-D.
37. NCR No. 2-1511-C-A.
38. NCR No. 2-1532-C-B.
39. NCR No. 2-1582-C-A.

.~

40. NCR No. 2-1595-C-D.

41 NCR No. 2-1605-C-B.

42. NCR No. 2-1613-C-A.
43. NCR No. 2-1634-C-A.
44. NCR No. 2-1637-C-D.
45. Provide a copy of the nonconformance report regarding the longitudinal l

l cracks in #18 bars installed in the Turbine Pedestal legs as mentioned on page one of l 1

the Bechtel Trip Report dated May 10-11, 1977, Job Number 10884-001; also provide l

copies of correspondance or other. notification report issued to Paper Calmenson and Bechtel Inspection advising them "to reject such bars before they are shipped."

46. Provide the nonconformance report on the longitudinal cracks in #18 bars installed in the Turbine Pedestal legs as per the SNUPPS (Bechtel) Trip Report of May 10-11, 1977, regarding the Reactor Pit Moat Area crack, page 1 of 4. Also provide any additional reports or correspondence on this nonconformance between any or all of the following: the vendor, Union Electric, Bechtel, Daniel International, SNUPPS, Paper Calmenson, or the NRC.
47. Provide complete copy of NCR 2-0653-C-A regarding the Tendon Access Gallery. (Only pages 4 and 5 of the 6-page document were provided as an enclosure Mth BLSE-4472 dated June 6,1977).
48. NCR No. 2-Il76-C-A regarding the nonconforming dry packs used in the Tendon Gallery.
43. The- final cost impact statement submitted by Daniel to Union Electric regarding the cost of repairing the honeycombing in the Tendon Access Gallery.
50. I;echtel Specification 10466-M-206[Q] with all revisions.
51. Bechtel Specification 10466-G-001 with all revisions.

5 2. _ Bechtel Specification 10466-M-201B with all revisions.

---_n___. _.a ________- - _ .. - ____ _ _ _ - - - _ -

53. Nuclear Energy Services Pre-Service Inspection Program Document 80A-4540.
54. Union Electric letter ULS-2198, dated May 1,1978.
55. The Quality Assurance Manual (s) for all the organizations designated as the N, NPT, and NA certificate holders for the Callaway Plant as defined by the ASME Code Section III, Articles NA-3000 and NA-4000.
56. All documents identified in Applicant's Answers to Joint Intervenors' Second Set of Interrogatories to Union Electric.

\

i s

!