ML050690411: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML050690411
| number = ML050690411
| issue date = 01/27/2005
| issue date = 01/27/2005
| title = Arkansas Nuclear One, Unit 2 - 01-2005 - Final Operating Exam
| title = 01-2005 - Final Operating Exam
| author name = Gody A T
| author name = Gody A
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Forbes J S
| addressee name = Forbes J
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000368
| docket = 05000368
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 1 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
{{#Wiki_filter:JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                   PAGE 1 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:     000                           DATE:
SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform offsite power availability and vital electrical availability checklist.
SYSTEM/DUTY AREA:         A1a Conduct of Operations TASK:     Perform offsite power availability and vital electrical availability checklist.
JTA#: ANO2-RO-ELECD-SURV-25 KA VALUE RO: 4.2 SRO: 3.9 KA  
JTA#:     ANO2-RO-ELECD-SURV-25 KA VALUE       RO:         4.2     SRO:           3.9         KA  


==REFERENCE:==
==REFERENCE:==
2.1.31 APPROVED FOR ADMINISTRATION TO:              RO:              SRO:
X TASK LOCATION:            INSIDE CR:                OUTSIDE CR:                  BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:                                LAB:
Perform POSITION EVALUATED:          RO:                      SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:                  PLANT SITE:          LAB:
TESTING METHOD:          SIMULATE:                PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                    15 Minutes REFERENCE(S):      OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME:                                                      SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time              Stop Time                Total Time SIGNED:                                                DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.1.31 APPROVED FOR ADMINISTRATION TO:
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                           PAGE 2 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected.
RO:  X  SRO:    TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 2 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE
 
JPM INITIAL TASK CONDITIONS:   100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected.
Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
TASK STANDARD:        Supplement 4 complete and 2B5 voltage determined to be low and the bus inoperable.
TASK PERFORMANCE AIDS:            Copy of OP 2107.001 Supplement 4.
SIMULATOR SETUP: Degrade Offsite voltage to ~ 490KV. Degrade 2B5 voltage to ~ 431VAC and 2B6 voltage to ~ 440VAC.


TASK STANDARD:    Supplement 4 complete and 2B5 voltage determined to be low and the bus inoperable.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                       PAGE 3 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
TASK PERFORMANCE AIDS:    Copy of OP 2107.001 Supplement 4.                                                               
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
 
CRITICAL STEPS:       33, 34, 38, 39, 41 PERFORMANCE CHECKLIST                                 STANDARDS               (Circle One)
SIMULATOR SETUP: Degrade Offsite voltage to ~ 490KV. Degrade 2B5 voltage to ~ 431VAC  and 2B6 voltage to ~ 440VAC.           
EXAMINERS NOTE:
 
The steps of this surveillance may be performed in any order.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 3 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
: 1. Verify SU-2 status.               Verified only SU #2 to 2A2, 2H1, N/A SAT UNSAT 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK.
The SM/CRS directs, "Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage."
On Supplement 4, step 2, initialed step 2.1and 2.3 and NAd the rest.
CRITICAL STEPS:   33, 34, 38, 39, 41 PERFORMANCE CHECKLIST STANDARDS (Circle One) EXAMINER'S NOTE:
On Supplement 4, 3.0 table 1 circled NA for UA to 2A1 and UA to 2A2.
The steps of this surveillance may be performed in any order.  
: 2. Verify SU-2 To 2A1 (2A-111)       Verified 2A-111 green and white N/A SAT UNSAT status.                            lights lit.
: 1. Verify SU-2 status.  
On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column.
 
On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL RANGE.
Verified only SU #2 to 2A2, 2H1, 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK.
: 3. Verify SU-2 To 2A2 (2A-211)       Verified 2A-211 green and white N/A SAT UNSAT status.                            lights lit.
On Supplement 4, step 2, initialed step 2.1and 2.3 and NA'd the rest. On Supplement 4, 3.0 table 1 circled NA for UA to 2A1 and UA to 2A2.
N/A  SAT  UNSAT  2. Verify SU-2 To 2A1 (2A-111) status. Verified 2A-111 green and white lights lit.
On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column.  
 
On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL  
 
RANGE. N/A  SAT  UNSAT  3. Verify SU-2 To 2A2 (2A-211) status.
Verified 2A-211 green and white lights lit.  
 
On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column.
On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN  
On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN ACCEPTABLE NORMAL RANGE.
 
ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  4  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  4. Verify 2A3 Supply Breaker (2A-309) CLOSED.
 
Verified 2A-309 CLOSED.
Observed red light ON for 2A-309. On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column.
 
On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL
 
RANGE. N/A  SAT  UNSAT  5. Verify 2A4 Supply breaker (2A-409) CLOSED.
 
Verified 2A-409 CLOSED.
Observed red light ON for 2A-409. On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column.
 
On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  6. Verify SU-2 voltage.
EXAMINER's CUE: ER-ANO-2004-0548 is not installed. 


Using SPDS-EST2R OR PMS E4013, verified SU-2 voltage  
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                    PAGE 4 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                      (Circle One)
> 154 KV.
: 4. Verify 2A3 Supply Breaker        Verified 2A-309 CLOSED.              N/A SAT UNSAT (2A-309) CLOSED.
On Supplement 4, Table 2, recorded SU-2 voltage in "Measured Value" column.
Observed red light ON for 2A-309.
On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE  
On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.
: 5. Verify 2A4 Supply breaker        Verified 2A-409 CLOSED.              N/A SAT UNSAT (2A-409) CLOSED.
Observed red light ON for 2A-409.
On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.
: 6. Verify SU-2 voltage.            Using SPDS-EST2R OR PMS             N/A SAT UNSAT E4013, verified SU-2 voltage
                                              > 154 KV.
EXAMINERs CUE:
On Supplement 4, Table 2, ER-ANO-2004-0548 is not          recorded SU-2 voltage in installed.                      "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE NORMAL RANGE.
Note to Examiner:
The answers to the System Dispatcher calls should be given by the Examiner.


NORMAL RANGE. N/A  SAT  UNSAT Note to Examiner: The answers to the System Dispatcher calls should be given by the Examiner.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                   PAGE 5 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                             STANDARDS                     (Circle One)
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 5 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 7. Contact dispatcher to determine if ANO switchyard capacitors "in service" or not required.  
: 7. Contact dispatcher to determine   Contacted dispatcher to            N/A SAT UNSAT if ANO switchyard capacitors "in determine if ANO switchyard service" or not required.         capacitors "in service" or not required.
 
EXAMINERS CUE:
EXAMINER'S CUE:
On Supplement 4, Table 2, Dispatcher reports ANO placed a check in ANO switchyard capacitors "in switchyard capacitor "Measured service".
Dispatcher reports ANO switchyard capacitors "in service". Contacted dispatcher to determine if ANO switchyard capacitors "in service" or not  
Value" column.
 
On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE.
required.
: 8. Contact dispatcher to determine   Contacted dispatcher to            N/A SAT UNSAT if Russellville East Substation   determine if Russellville East capacitors "in service" or not   Substation capacitors "in service" required.                         or not required.
On Supplement 4, Table 2, placed a check in ANO switchyard capacitor "Measured Value" column.
EXAMINERS CUE:                  On Supplement 4, Table 2, placed a check in Russellville Dispatcher reports East Substation capacitor Russellville East Substation "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  8. Contact dispatcher to determine if Russellville East Substation capacitors "in service" or not required.
capacitors "in service".
EXAMINER'S CUE:
On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE.
Dispatcher reports Russellville East Substation capacitors "in service".
: 9. Contact dispatcher to determine   Contacted dispatcher to            N/A SAT UNSAT if any other condition that could determine if any other condition degrade offsite power sources     that could degrade offsite power is known.                         sources was known.
Contacted dispatcher to determine if Russellville East Substation capacitors "in service" or not required.  
EXAMINERS CUE:                  On Supplement 4, Table 2, placed a check in "Measured Dispatcher reports NO Value" column for other conditions which could conditions known which could degrade offsite are power degrade offsite power.
 
known.
On Supplement 4, Table 2, placed a check in Russellville East Substation capacitor "Measured Value" column.
On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE.
On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  9. Contact dispatcher to determine if any other condition that could degrade offsite power sources  
 
is known.
EXAMINER'S CUE:
Dispatcher reports NO conditions which could degrade offsite are power known. Contacted dispatcher to determine if any other condition that could degrade offsite power sources was known.
On Supplement 4, Table 2, placed a check in "Measured Value" column for other conditions known which could degrade offsite power.  
 
On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  6  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  10. Contact Dispatcher to determine if SU-2 automatic voltage regulator is in service or not required.
EXAMINER'S CUE:
SU-2 Automatic Voltage Regulator is in service.
Contacted dispatcher to determine if SU-2 Automatic Voltage Regulator is in service or if it is not required.
On Supp 4 Table 2, placed check in status column for SU-2 Voltage Regulator in service.
 
On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE
 
NORMAL RANGE. N/A  SAT  UNSAT  11. Verify SU-3 To 2A1 (2A-113) status.
Checked 2A-113 green and white lights lit.  


JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                    PAGE 6 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                  STANDARDS                (Circle One)
: 10. Contact Dispatcher to              Contacted dispatcher to            N/A SAT UNSAT determine if SU-2 automatic        determine if SU-2 Automatic voltage regulator is in service or Voltage Regulator is in service or not required.                      if it is not required.
EXAMINERS CUE:                    On Supp 4 Table 2, placed check in status column for SU-2 Voltage SU-2 Automatic Voltage Regulator in service.
Regulator is in service.
On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE.
: 11. Verify SU-3 To 2A1 (2A-113)        Checked 2A-113 green and white    N/A SAT UNSAT status.                            lights lit.
On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column.
On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN  
On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN ACCEPTABLE NORMAL RANGE.
 
: 12. Verify SU-3 To 2A2 (2A-213)       Verified 2A-213 green and white   N/A SAT UNSAT status.                            lights lit.
ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  12. Verify SU-3 To 2A2 (2A-213) status. Verified 2A-213 green and white lights lit.
On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column.
On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  13. Verify 2A3 Supply breaker (2A-309) CLOSED.
On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE.
Verified 2A-309 CLOSED. Observed red light ON for 2A-309. On Supplement 4, Table 3, placed a check in 2A-309 "Measured Value" column. On Supplement 4, Table 3, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE. N/A SAT UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  7  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  14. Verify 2A4 Supply breaker (2A-409) CLOSED.
: 13. Verify 2A3 Supply breaker         Verified 2A-309 CLOSED.           N/A SAT UNSAT (2A-309) CLOSED.
EXAMINER'S CUE:
Observed red light ON for 2A-309.
Red light ON for 2A409 to 2A4. Verified 2A-409 CLOSED. Observed red light ON for 2A-409. On Supplement 4, Table 3, placed a check in 2A-409 "Measured Value" column. On Supplement 4, Table 3, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL
On Supplement 4, Table 3, placed a check in 2A-309 "Measured Value" column.
 
On Supplement 4, Table 3, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.
RANGE. N/A  SAT  UNSAT  15. Verify SU-3 Voltage.
Using SPDS point E2ST3R, OR using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV. On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column. On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT  15. Contact dispatcher to determine Auto-Transformer status.
EXAMINER'S CUE:
Dispatcher reports 500 KV source connected to AUTO transformer.
Contacted dispatcher to determine if Auto-Transformer 500 KV source was connected. On Supplement 4, Table 3, placed a check in Auto-Transformer 500 KV source "Measured Value" column. On Supplement 4, Table 3, circled "YES" for Auto-Transformer 500 KV source WITHIN ACCEPTABLE NORMAL RANGE. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  8  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  16. Contact Dispatcher to determine if SU-3 automatic voltage regulator is in service or not required.
EXAMINER'S CUE:
SU-3 Automatic Voltage Regulator is in service.
Contacted dispatcher to determine if SU-3 Automatic Voltage Regulator is in service or if it is not required. On Supp 4 Table 3, placed check in status column for SU-3 Voltage Regulator in service. On Supp 4 Table 3, circled YES for SU-3 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE.. N/A  SAT  UNSAT  17. Verify both SU-2 and SU-3 operable. Verified both SU-2 and SU-3 operable as shown in Table 2 and Table 3. Circled "YES" in step 3.1.1. N/A  SAT  UNSAT  18. Mark step 3.1.2 & 3.1.3 "N/A".
Marked step 3.1.2 & 3.1.3 "N/A". N/A  SAT  UNSAT  19. Evaluate steps 3.1.1 through 3.1.3 for "NO" answers.
Evaluated steps 3.1.1 through 3.1.2 for "NO" answers. Determined that there were no "NO"  answers NA'd bullets below 3.1.4. N/A  SAT  UNSAT EXAMINER's NOTE: This starts section 3.2, of electrical checklist.
: 20. Verify 2A3-2A4 Tie Breaker (2A-310) OPEN.  


Verified 2A-310 OPEN.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check              PAGE 7 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS                  (Circle One)
Observed green light ON for 2A-310. On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column.  
: 14. Verify 2A4 Supply breaker      Verified 2A-409 CLOSED.          N/A SAT UNSAT (2A-409) CLOSED.
Observed red light ON for 2A-409.
EXAMINERS CUE:                On Supplement 4, Table 3, placed a check in 2A-409 Red light ON for 2A409 to "Measured Value" column.
2A4.
On Supplement 4, Table 3, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.
: 15. Verify SU-3 Voltage.            Using SPDS point E2ST3R, OR      N/A SAT UNSAT using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV.
On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column.
On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE.
: 15. Contact dispatcher to determine Contacted dispatcher to          N/A SAT UNSAT Auto-Transformer status.        determine if Auto-Transformer 500 KV source was connected.
On Supplement 4, Table 3, EXAMINERS CUE:
placed a check in Dispatcher reports 500 KV      Auto-Transformer 500 KV source source connected to AUTO        "Measured Value" column.
transformer.
On Supplement 4, Table 3, circled "YES" for Auto-Transformer 500 KV source WITHIN ACCEPTABLE NORMAL RANGE.


On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition  
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check                    PAGE 8 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                  STANDARDS                (Circle One)
: 16. Contact Dispatcher to              Contacted dispatcher to            N/A SAT UNSAT determine if SU-3 automatic        determine if SU-3 Automatic voltage regulator is in service or Voltage Regulator is in service or not required.                      if it is not required.
On Supp 4 Table 3, placed check in status column for SU-3 Voltage EXAMINERS CUE:
Regulator in service.
SU-3 Automatic Voltage On Supp 4 Table 3, circled YES Regulator is in service.
for SU-3 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE..
: 17. Verify both SU-2 and SU-3          Verified both SU-2 and SU-3        N/A SAT UNSAT operable.                          operable as shown in Table 2 and Table 3.
Circled "YES" in step 3.1.1.
: 18. Mark step 3.1.2 & 3.1.3 "N/A". Marked step 3.1.2 & 3.1.3 "N/A". N/A SAT UNSAT
: 19. Evaluate steps 3.1.1 through      Evaluated steps 3.1.1 through      N/A SAT UNSAT 3.1.3 for "NO" answers.            3.1.2 for "NO" answers.
Determined that there were no "NO" answers NAd bullets below 3.1.4.
EXAMINERs NOTE: This starts section 3.2, of electrical checklist.
: 20. Verify 2A3-2A4 Tie Breaker        Verified 2A-310 OPEN.              N/A SAT UNSAT (2A-310) OPEN.
Observed green light ON for 2A-310.
On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition for operability.


for operability. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 9 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 21. Verify 2A3-2A4 Tie Breaker (2A-410) OPEN.  
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check             PAGE 9 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARDS                   (Circle One)
 
: 21. Verify 2A3-2A4 Tie Breaker   Verified 2A-410 OPEN.             N/A SAT UNSAT (2A-410) OPEN.
Verified 2A-410 OPEN.
Observed green light ON for 2A-410.
Observed green light ON for 2A-410. On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column.  
On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column.
 
On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition for operability.
On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition  
: 22. Verify 2A3 voltage.           On panel 2C33 OR using SPDS       N/A SAT UNSAT point E2A3, verified 2A3 voltage
 
                                            > 3640v and < 4440v.
for operability. N/A  SAT  UNSAT  22. Verify 2A3 voltage.
On panel 2C33 OR using SPDS point E2A3, verified 2A3 voltage > 3640v and < 4440v.
On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column.
On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability. N/A  SAT  UNSAT  23. Determine 2A3 Operability Knowing the status of 2VEF-56B, weather data and Table 4 data, USED the flow chart to verify 2A3 operable. N/A  SAT  UNSAT  24. Verify 2A3-2A4 Tie Breaker (2A-310) OPEN.
On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.
Verified 2A-310 OPEN. Observed green light ON for 2A-310. On Supplement 4, Table 5, placed a check in 2A-310 "Measured Value" column. On Supplement 4, Table 5, circled "YES" for 2A-310 status agreeing with limiting condition for operability. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  10  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  25. Verify 2A3-2A4 Tie Breaker (2A-410) OPEN.  
: 23. Determine 2A3 Operability     Knowing the status of 2VEF-56B,   N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A3 operable.
: 24. Verify 2A3-2A4 Tie Breaker   Verified 2A-310 OPEN.             N/A SAT UNSAT (2A-310) OPEN.
Observed green light ON for 2A-310.
On Supplement 4, Table 5, placed a check in 2A-310 "Measured Value" column.
On Supplement 4, Table 5, circled "YES" for 2A-310 status agreeing with limiting condition for operability.


Verified 2A-410 OPEN. Observed green light ON for 2A-410. On Supplement 4, Table 5, placed a check in 2A-410 "Measured Value" column. On Supplement 4, Table 5, circled "YES" for 2A-410 status agreeing with limiting condition  
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check              PAGE 10 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
 
: 25. Verify 2A3-2A4 Tie Breaker    Verified 2A-410 OPEN.             N/A SAT UNSAT (2A-410) OPEN.
for operability. N/A  SAT  UNSAT  26. Verify 2A4 voltage.
Observed green light ON for 2A-410.
On panel 2C33 OR using SPDS point E2A4, verified 2A4 voltage > 3640v and < 4440v. On Supplement 4, Table 5, recorded 2A4 voltage in "Measured Value" column. On Supplement 4, Table 5, circled "YES" for 2A3 voltage agreeing with limiting condition  
On Supplement 4, Table 5, placed a check in 2A-410 "Measured Value" column.
 
On Supplement 4, Table 5, circled "YES" for 2A-410 status agreeing with limiting condition for operability.
for operability. N/A  SAT  UNSAT  27. Determine 2A4 Operability Knowing the status of 2VEF-56A, weather data and Table 4 data, USED the flow chart to verify 2A4  
: 26. Verify 2A4 voltage.           On panel 2C33 OR using SPDS       N/A SAT UNSAT point E2A4, verified 2A4 voltage
 
                                            > 3640v and < 4440v.
operable. N/A  SAT  UNSAT  28. Verify both 2A3 and 2A4 operable.
On Supplement 4, Table 5, recorded 2A4 voltage in "Measured Value" column.
 
On Supplement 4, Table 5, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.
Verified both 2A3 and 2A4 operable as shown in Table 4 and Table 4.
: 27. Determine 2A4 Operability     Knowing the status of 2VEF-56A,   N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A4 operable.
Circled "YES" in step 3.2.1. N/A  SAT  UNSAT  29. Mark step 3.2.2 "N/A".
: 28. Verify both 2A3 and 2A4       Verified both 2A3 and 2A4         N/A SAT UNSAT operable.                      operable as shown in Table 4 and Table 4.
Marked step 3.2.2 "N/A". N/A SAT UNSAT   30. Evaluate steps 3.2.1 and 3.2.2 for "NO" answers.
Circled "YES" in step 3.2.1.
Evaluated steps 3.2.1 and 3.2.2 for "NO" answers.
: 29. Mark step 3.2.2 "N/A".         Marked step 3.2.2 "N/A".         N/A SAT UNSAT
: 30. Evaluate steps 3.2.1 and 3.2.2 Evaluated steps 3.2.1 and 3.2.2   N/A SAT UNSAT for "NO" answers.              for "NO" answers.
Determined 2A3 and 2A4 to be operable.
Determined 2A3 and 2A4 to be operable.
And NA'd initialed step 3.2.3. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  11  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  31. Verify 2B5-2B6 Tie Breaker (2B-513) OPEN.  
And NAd initialed step 3.2.3.


Verified 2B-513 OPEN.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check            PAGE 11 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
Observed green light ON for 2B-513. On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.  
: 31. Verify 2B5-2B6 Tie Breaker    Verified 2B-513 OPEN.            N/A SAT UNSAT (2B-513) OPEN.
 
Observed green light ON for 2B-513.
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition  
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.
 
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.
for operability. N/A  SAT  UNSAT  32. Verify 2B5-2B6 Tie Breaker (2B-613) OPEN.  
: 32. Verify 2B5-2B6 Tie Breaker   Verified 2B-613 OPEN.           N/A SAT UNSAT (2B-613) OPEN.
 
Observed green light ON for 2B-613.
Verified 2B-613 OPEN.
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.
Observed green light ON for 2B-613. On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.  
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.
 
(C)   33. Verify 2B5 voltage.           On panel 2C33 OR using SPDS     N/A SAT UNSAT point E2B5, verified 2B5 voltage is NOT > 436v.
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. N/A  SAT  UNSAT (C) 33. Verify 2B5 voltage.
On panel 2C33 OR using SPDS point E2B5, verified 2B5 voltage is NOT > 436v.
On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column.
On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition  
On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition for operability.
(C)  34. Determine 2B5 Operability    Using the Low voltage recorded  N/A SAT UNSAT in Table 6, used flow chart to determine that 2B5 is INOPERBLE.


for operability. N/A  SAT  UNSAT (C) 34. Determine 2B5 Operability Using the Low voltage recorded in Table 6, used flow chart to determine that 2B5 is INOPERBLE. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 12 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 35. Verify 2B5-2B6 Tie Breaker (2B-513) OPEN.  
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check             PAGE 12 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                           STANDARDS                 (Circle One)
: 35. Verify 2B5-2B6 Tie Breaker   Verified 2B-513 OPEN.            N/A SAT UNSAT (2B-513) OPEN.
Observed green light ON for 2B-513.
On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.
: 36. Verify 2B5-2B6 Tie Breaker    Verified 2B-613 OPEN.            N/A SAT UNSAT (2B-613) OPEN.
Observed green light ON for 2B-613.
On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.
: 37. Verify 2B6 voltage.          On panel 2C33 OR using SPDS      N/A SAT UNSAT point E2B6, verified 2B6 voltage is > 436v.
On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column.
On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability.
(C)  38. Determine 2B6 Operability    Using the status of 2VEF-56A,    N/A SAT UNSAT weather data, the status of ESF Switchgear Room Coolers 2VUC-2A and 2VUC-2B, and Table 5 data, used the flow chart to verify 2B6 OPERABLE.


Verified 2B-513 OPEN.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check            PAGE 13 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS                (Circle One)
Observed green light ON for 2B-513. On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.  
(C)  39. Verify 2B5 INOPERABLE and      Verified 2B5 INOPERABLE and    N/A SAT UNSAT 2B6 OPERABLE.                  2B6 OPERABLE as shown in Table 6 and Table 7.
Circled "NO" in step 3.3.1.
: 40. Mark step 3.3.2 "N/A".        Marked step 3.3.2 "N/A".        N/A SAT UNSAT (C)  41. Evaluate steps 3.3.1 and 3.3.2 Evaluated steps 3.3.1 and 3.3.2 N/A SAT UNSAT for "NO" answers.             for "NO" answers.
Determined 2B5 to be INOPERABLE and 2B6 to be EXAMINERs CUE:
operable.
Do not refer to Tech Specs the SM will perform that for you.
Inform the SM SM has been informed.
Initiate CR Initiating Condition Report has been simulated complete.
Initialed steps 3.3.3.
NOTE CRITICAL PART OF THIS STEP IS DECLARING 2B5 INOPERABLE.
END


On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check           PAGE 14 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
 
Initiating CUE:
for operability. N/A  SAT  UNSAT  36. Verify 2B5-2B6 Tie Breaker (2B-613) OPEN.
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
 
Verified 2B-613 OPEN.
Observed green light ON for 2B-613. On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.
 
On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability. N/A  SAT  UNSAT  37. Verify 2B6 voltage.
On panel 2C33 OR using SPDS point E2B6, verified 2B6 voltage is > 436v. On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column. On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability. N/A  SAT  UNSAT (C) 38. Determine 2B6 Operability Using the status of 2VEF-56A, weather data, the status of ESF Switchgear Room Coolers 2VUC-2A and 2VUC-2B, and Table 5 data, used the flow chart to verify 2B6 OPERABLE. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 13  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 39. Verify 2B5 INOPERABLE and 2B6 OPERABLE.
 
Verified 2B5 INOPERABLE and 2B6 OPERABLE as shown in Table 6 and Table 7.
Circled "NO" in step 3.3.1. N/A  SAT  UNSAT  40. Mark step 3.3.2 "N/A".
Marked step 3.3.2 "N/A". N/A  SAT  UNSAT (C) 41. Evaluate steps 3.3.1 and 3.3.2 for "NO" answers.  
 
EXAMINER's CUE:
"Do not refer to Tech Specs the SM will perform that for you."  "SM has been informed."
 
"Initiating Condition Report has been simulated complete."
NOTE CRITICAL PART OF THIS STEP IS DECLARING


2B5 INOPERABLE.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check           PAGE 15 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Evaluated steps 3.3.1 and 3.3.2 for "NO" answers. Determined 2B5 to be INOPERABLE and 2B6 to be operable.
Inform the SM Initiate CR
 
Initialed steps 3.3.3.
 
N/A  SAT  UNSAT END JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 14  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Initiating CUE:
Initiating CUE:
The SM/CRS directs, "Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage."
The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.
JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check  PAGE  15  OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.
Initiating CUE:
The SM/CRS directs, "Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage."
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4  PAGE  1  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2  REV #: 000  DATE:
SYSTEM/DUTY AREA: A1a Conduct of Operations


TASK: Review and approve offsite power availability and vital electrical availability checklist.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4                                    PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:      2                      REV #:  000                          DATE:
JTA#: ANO-SRO-ADMIN-NORM-152 KA VALUE RO: 4.2 SRO: 3.9 KA  
SYSTEM/DUTY AREA:        A1a Conduct of Operations TASK:     Review and approve offsite power availability and vital electrical availability checklist.
JTA#:     ANO-SRO-ADMIN-NORM-152 KA VALUE       RO:       4.2       SRO:         3.9         KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.31 APPROVED FOR ADMINISTRATION TO:           RO:               SRO:
2.1.31 APPROVED FOR ADMINISTRATION TO:
X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:                   BOTH:
RO:   SRO: X   TASK LOCATION:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
INSIDE CR:
PLANT SITE:                       SIMULATOR:                            LAB:
OUTSIDE CR:
Perform POSITION EVALUATED:       RO:                     SRO:
BOTH: X   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:                 PLANT SITE:                 LAB:
PLANT SITE:
TESTING METHOD:       SIMULATE:               PERFORM:
SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:                 15 Minutes REFERENCE(S):     OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME:                                                   SSN:
Perform LAB:    POSITION EVALUATED:
EVALUATOR'S NAME:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:   TESTING METHOD:
SIMULATE:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2107.001 Supplement 4 Rev. 049-00-0  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                     UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Start Time           Stop Time               Total Time SIGNED:                                             DATE:
 
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4  PAGE  2  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE
 
JPM INITIAL TASK CONDITIONS:    100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather  is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.


TASK STANDARD:   Review Supplement 4 data and identify the following:
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4                                      PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:          100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
TASK STANDARD: Review Supplement 4 data and identify the following:
: 1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable.
: 1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable.
: 2) Declared SU3 INOPERBLE.
: 2) Declared SU3 INOPERBLE.
: 3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour.
: 3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour.
: 4) Initiated Condition Report to correct problem.  
: 4) Initiated Condition Report to correct problem.
TASK PERFORMANCE AIDS:            Completed copy of OP 2107.001 Supplement 4.
SIMULATOR SETUP: N/A.


TASK PERFORMANCE AIDS:    Completed copy of OP 2107.001 Supplement 4.                                                               
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4                                             PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)
SIMULATOR SETUP:
N/A.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The SM directs, "Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)"
Critical Steps: 1,2,3 START TIME:
Critical Steps: 1,2,3 START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Review completed copy of OP 2107.001 Supplement 4 and identify Table3, startup 3 has been completed incorrectly.
PERFORMANCE CHECKLIST                                 STANDARDS                         (Circle One)
Review Table 3, startup 3 and identified that SU #3 voltage is lower than acceptable.
(C)     1. Review completed copy of OP       Review Table 3, startup 3 and           N/A SAT UNSAT 2107.001 Supplement 4 and          identified that SU #3 voltage is identify Table3, startup 3 has    lower than acceptable.
N/A  SAT  UNSAT (C) 2. Declared SU #3 inoperable.
been completed incorrectly.
Determined that SU #3 should be declared inoperable due to low voltage. N/A  SAT  UNSAT (C) 3. Identified Technical Specification 3.8.1.1 is  
(C)     2. Declared SU #3 inoperable.         Determined that SU #3 should be         N/A SAT UNSAT declared inoperable due to low voltage.
 
(C)     3. Identified Technical               Identified that Technical              N/A SAT UNSAT Specification 3.8.1.1 is           Specification 3.8.1.1 LCO is applicable.                        applicable and that action A.1, performance of OP 2107.001 Supplement 4 must be performed within one hour.
applicable.
: 4. Initiate Condition report.        Identified need to initiate            N/A SAT UNSAT condition report.
Identified that Technical Specification 3.8.1.1 LCO is applicable and that action A.1, performance of OP 2107.001 Supplement 4 must be performed within one hour. N/A SAT UNSAT 4. Initiate Condition report. EXAMINER's CUE:
EXAMINERs CUE:
Condition report will be initiated by Shift Engineer.
Condition report will be initiated by Shift Engineer.
Identified need to initiate condition report. N/A  SAT  UNSAT END STOP TIME:                              
END STOP TIME:


JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4                         PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
Initiating CUE:
Initiating CUE:
The SM directs, "Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)"
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)
JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4  PAGE  5  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable. 


JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4                          PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.
Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.
Initiating CUE:
Initiating CUE:
The SM directs, "Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)"
The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)


JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE   1   of   6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                               PAGE 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
SYSTEM/DUTY AREA: A1b C onduct of Operations TASK: Spent Fuel Pool Makeup                    
SYSTEM/DUTY AREA:         A1b Conduct of Operations TASK:     Spent Fuel Pool Makeup JTA#:
 
KA VALUE     RO:         3.9     SRO:         4.0       KA  
JTA#:
KA VALUE RO: 3.9 SRO: 4.0 KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.23 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:
2.1.23 APPROVED FOR ADMINISTRATION TO:
X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:             BOTH:
RO: SRO:     TASK LOCATION:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
INSIDE CR:
PLANT SITE:                       SIMULATOR:                        LAB:
OUTSIDE CR:
Perform POSITION EVALUATED:         RO:                   SRO:
BOTH: X   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:               PLANT SITE:         LAB:
PLANT SITE:
TESTING METHOD:         SIMULATE:             PERFORM:
SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:                 20 Minutes REFERENCE(S):     OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME:                                                 SSN:
Perform LAB:    POSITION EVALUATED:
EVALUATOR'S NAME:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SIMULATOR:
SATISFACTORY:                     UNSATISFACTORY:
PLANT SITE:
PERFORMANCE CHECKLIST COMMENTS:
LAB:   TESTING METHOD:
Start Time             Stop Time             Total Time SIGNED:                                             DATE:
SIMULATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE(S):
OP 2104.006, Rev 021-06-0, Attachment F  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
 
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
SYSTEM/DUTY AREA:
SYSTEM/DUTY AREA:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:


JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE   2   of   6 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                                           PAGE     2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401' 0Tilt Pit Gate is installed Cask Loading Pit Gate is installed 'A' BAM tank concentration is 5950 ppmb SFP boron concentration is 2964 ppmb  
* Plant is at 100% power.
 
* PMS computer is out of service.
TASK STANDARD:
* Spent Fuel Pool Level = 401 0
RO candidates should calculate required SFP makeup vo lume to be within 1828 to 1928 gallons, determine Boric acid volume to be within 910 gallons to 960 gallons, det ermine DI water volume to be within 918 gallons to 968 gallons.
* Tilt Pit Gate is installed
* Cask Loading Pit Gate is installed
* A BAM tank concentration is 5950 ppmb
* SFP boron concentration is 2964 ppmb TASK STANDARD:
RO candidates should calculate required SFP makeup volume to be within 1828 to 1928 gallons, determine Boric acid volume to be within 910 gallons to 960 gallons, determine DI water volume to be within 918 gallons to 968 gallons.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 2104.006, Rev 021-06-0, Attachment F JPM-#-  ANO-2-JPM-NRC-ADMIN SFPMU        PAGE    3  of  6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
OP 2104.006, Rev 021-06-0, Attachment F
Chemistry has just notified the Contro l Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, "Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F."
 
CRITICAL ELEMENTS (C):    5, 7, 8 START TIME:
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. Record initial Spent Fuel Pool Level. On 2104.006, Attachment F recorded initial Spent Fuel Pool
 
level of 401' 0" given in initial
 
conditions.
N/A  SAT  UNSAT Examiner's Note:
It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP. 2. Calculate initial Spent Fuel Pool Volume. 


Obtained Gal/Ft value for Fuel Pool - Top of racks to Elev 401'6"
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                                            PAGE    3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
 
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.
(5634.4 gal/ft).
CRITICAL ELEMENTS (C):              5, 7, 8 START TIME:
PERFORMANCE CHECKLIST                                  STANDARDS                    (Circle One)
: 1. Record initial Spent Fuel Pool      On 2104.006, Attachment F            N/A SAT UNSAT Level.                              recorded initial Spent Fuel Pool level of 401 0 given in initial conditions.
Examiners Note: It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP.
: 2. Calculate initial Spent Fuel Pool  Obtained Gal/Ft value for Fuel       N/A SAT UNSAT Volume.                            Pool - Top of racks to Elev 4016 (5634.4 gal/ft).
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Multiplied 469.5 by 6 inches to obtain 2817 gallons.
Multiplied 469.5 by 6 inches to obtain 2817 gallons.
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks  
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)
Subtracted 1878 gal from 133,817 gal to obtain 131000 gallons total volume above top of racks.
Added 131000 gal and 84,255 gal to find initial pool volume of 215255 gallons.
: 3. Record desired Spent Fuel          On 2104.006, Attachment F            N/A SAT UNSAT Pool Level.                        recorded desired Spent Fuel Pool level of 401 4.


to Elev 401'6" (133,817 gal)
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                                     PAGE     4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                               STANDARDS                     (Circle One)
Subtracted 1878 gal from 133,817 gal to obtain 131000
: 4. Calculate desired Spent Fuel       Obtained Gal/Ft value for Fuel       N/A SAT UNSAT Pool Volume.                      Pool - Top of racks to Elev 4016 (5634.4 gal/ft).
 
gallons total volume above top of racks. Added 131000 gal and 84,255 gal to find initial pool volume of
 
215255 gallons.
N/A  SAT  UNSAT  3. Record desired Spent Fuel Pool Level.
On 2104.006, Attachment F recorded desired Spent Fuel
 
Pool level of 401' 4".
N/A  SAT  UNSAT JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE   4   of   6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 4. Calculate desired Spent Fuel Pool Volume.
Obtained Gal/Ft value for Fuel Pool - Top of racks to Elev 401'6"
 
(5634.4 gal/ft).
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.
Multiplied 469.5 by 2 inches to obtain 939 gallons.
Multiplied 469.5 by 2 inches to obtain 939 gallons.
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks  
Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)
 
Subtracted 939 gal from 133,817 gal to obtain 132878 gallons total volume above top of racks.
to Elev 401'6" (133,817 gal)
Added 132878 gal and 84,255 gal to find desired pool volume of 217133 gallons.
Subtracted 939 gal from 133,817 gal to obtain 132878 gallons total  
C     5. Calculate volume of makeup         Subtracted initial Spent Fuel Pool  N/A SAT UNSAT required to raise Spent Fuel       volume from desired Spent Fuel Pool level to desired level.       Pool volume and determined amount of makeup needed to be Total Volume within 1828 to 1878 gallons.
 
1928.
volume above top of racks.
: 6. Record A BAMT boron             On 2104.006, Attachment F,           N/A SAT UNSAT concentration.                    recorded value of 5950 ppm for A BAMT concentration.
Added 132878 gal and 84,255 gal to find desired pool volume of  
C     7. Calculate feed volume of boric     Inserted values into formula and    N/A SAT UNSAT acid required to raise pool level. determined Boric acid volume to Volume within 910 gallons to       be 935.53 gallons.
 
217133 gallons.
N/A  SAT  UNSAT C 5. Calculate volume of makeup required to raise Spent Fuel  
 
Pool level to desired level.
Total Volume within 1828 to 1928. Subtracted initial Spent Fuel Pool volume from desired Spent Fuel
 
Pool volume and determined  
 
amount of makeup needed to be  
 
1878 gallons.
N/A  SAT  UNSAT  6. Record 'A' BAMT boron concentration.
On 2104.006, Attachment F, recorded value of 5950 ppm for  
 
'A' BAMT concentration.
N/A  SAT  UNSAT C 7. Calculate feed volume of boric acid required to raise pool level.  
 
Volume within 910 gallons to  
 
960 gallons.
960 gallons.
Inserted values into formula and determined Boric acid volume to
C    8. Calculate the feed volume of DI    Inserted values into formula and     N/A SAT UNSAT water required to raise pool       determined DI water volume to level. Volume within 918           be 942.47 gallons.
 
be 935.53 gallons.
N/A SAT UNSAT C 8. Calculate the feed volume of DI water required to raise pool  
 
level. Volume within 918  
 
gallons to 968 gallons.
gallons to 968 gallons.
Inserted values into formula and determined DI water volume to
END STOP TIME:


be 942.47 gallons.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                            PAGE    5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
N/A SAT  UNSAT END  STOP TIME:
* Plant is at 100% power.
* PMS computer is out of service.
* Spent Fuel Pool Level = 401 0
* Tilt Pit Gate is installed
* Cask Loading Pit Gate is installed
* A BAM tank concentration is 5950 ppmb
* SFP boron concentration is 2964 ppmb INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.


JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE    of   6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                             PAGE    6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401' 0Tilt Pit Gate is installed Cask Loading Pit Gate is installed 'A' BAM tank concentration is 5950 ppmb SFP boron concentration is 2964 ppmb INITIATING CUE:
* Plant is at 100% power.
Chemistry has just notified the Control Room t hat when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, "Per OP 2104.006 step 10.3, manually calculate the total volume, the am ount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level f our (4) inches due to cask loading pit operations using OP 2104.006, Attachment F."
* PMS computer is out of service.
* Spent Fuel Pool Level = 401 0
* Tilt Pit Gate is installed
* Cask Loading Pit Gate is installed
* A BAM tank concentration is 5950 ppmb
* SFP boron concentration is 2964 ppmb INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.


JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE   6  of  6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                             PAGE  1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
Plant is at 100% power. PMS computer is out of service. Spent Fuel Pool Level = 401' 0" Tilt Pit Gate is installed  Cask Loading Pit Gate is installed  'A' BAM tank concentration is 5950 ppmb  SFP boron concentration is 2964 ppmb INITIATING CUE:
SYSTEM/DUTY AREA:         A1b Conduct of Operations TASK:     Spent Fuel Pool Makeup JTA#:
Chemistry has just notified the Control Room t hat when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, "Per OP 2104.006 step 10.3, manually calculate the total volume, the am ount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level f our (4) inches due to cask loading pit operations using OP 2104.006, Attachment F."
KA VALUE     RO:         3.9     SRO:         4.0       KA  
 
JPM-#-  ANO-2-JPM-NRC-ADMIN SFPMU        PAGE    1   of   5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
SYSTEM/DUTY AREA: A1b C onduct of Operations TASK: Spent Fuel Pool Makeup                    
 
JTA#:
KA VALUE RO: 3.9 SRO: 4.0 KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.23 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:
2.1.23 APPROVED FOR ADMINISTRATION TO:
X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:             BOTH:
RO:   SRO: X   TASK LOCATION:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
INSIDE CR:
PLANT SITE:                       SIMULATOR:                        LAB:
OUTSIDE CR:
Perform POSITION EVALUATED:         RO:                   SRO:
BOTH: X   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:             PLANT SITE:         LAB:
PLANT SITE:
TESTING METHOD:         SIMULATE:             PERFORM:
SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:               15 Minutes REFERENCE(S):     OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME:                                               SSN:
Perform LAB:    POSITION EVALUATED:
EVALUATOR'S NAME:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SIMULATOR:
SATISFACTORY:                     UNSATISFACTORY:
PLANT SITE:
PERFORMANCE CHECKLIST COMMENTS:
LAB:   TESTING METHOD:
Start Time             Stop Time             Total Time SIGNED:                                             DATE:
SIMULATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2104.006, Rev 021-06-0, Attachment F  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
 
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
SYSTEM/DUTY AREA:
SYSTEM/DUTY AREA:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:


JPM-#-   ANO-2-JPM-NRC-ADMIN SFPMU       PAGE   2   of   5 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                                             PAGE     2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Plant is at 100% power. PMS computer is out of service. Initial Spent Fuel Pool Level = 401' 0Tilt Pit Gate is installed Cask Loading Pit Gate is installed 'A' BAM tank concentration is 5950 ppmb SFP boron concentration is 2964 ppmb Cask loading pit operations has lowered the SFP level CBOT has performed actions per OP 2104.006 step 10.3. Final Spent Fuel Pool Level = 401' 4"
* Plant is at 100% power.
 
* PMS computer is out of service.
TASK STANDARD:
* Initial Spent Fuel Pool Level = 401 0
SRO candidates should identify the following: 1) Boron Concentration of the feed source should be 5950 NOT 4950.  
* Tilt Pit Gate is installed
: 2) The Feed volume (F) calculated previously was tr ansposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated.
* Cask Loading Pit Gate is installed
Therefore both the calculated Boric acid and DI water volumes are wrong. And calculate the following correct feed volumes:
* A BAM tank concentration is 5950 ppmb
: 3) Boric acid volume calculated to be within 910 gallons to 960 gallons. 4) Determine DI water volume to be within 918 gallons to 968 gallons.
* SFP boron concentration is 2964 ppmb
 
* Cask loading pit operations has lowered the SFP level
* CBOT has performed actions per OP 2104.006 step 10.3.
* Final Spent Fuel Pool Level = 401 4 TASK STANDARD:
SRO candidates should identify the following:
: 1) Boron Concentration of the feed source should be 5950 NOT 4950.
: 2) The Feed volume (F) calculated previously was transposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated. Therefore both the calculated Boric acid and DI water volumes are wrong.
And calculate the following correct feed volumes:
: 3) Boric acid volume calculated to be within 910 gallons to 960 gallons.
: 4) Determine DI water volume to be within 918 gallons to 968 gallons.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 2104.006, Rev 021-06-0, Attachment F JPM-#-  ANO-2-JPM-NRC-ADMIN SFPMU        PAGE    3  of  5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
OP 2104.006, Rev 021-06-0, Attachment F
Chemistry has just notified the Contro l Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, "Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F."
CRITICAL ELEMENTS (C):    3, 4, 5, 6 START TIME:
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. Reviewed the completed form OP 2104.006, Attachment F.
Reviewed the completed form OP 2104.006, Attachment F.
N/A  SAT  UNSAT  2. Determined the calculated volume of solution to be correct.
Calculated the feed volume to be added to the SFP, F, to be 1878
 
gallons. N/A  SAT  UNSAT C 3. Determined that the boron concentration of the feed source was in error.
Recognized the boron concentration of the feed source
 
was recorded as 4950 ppm
 
instead of the given value of
 
5940 ppm.
N/A  SAT  UNSAT C 4. Determined the calculated volume of solution used in the
 
calculation of the feed volumes
 
of boric acid Recognized that the feed volume to be added to the SFP, F, was
 
recorded in error as 1788 gallons
 
NOT the 1878 gallons calculated
 
on the previous page.
N/A  SAT  UNSAT Examiner's Note: the candidate may need to be prompted to calculate the volume of Boric acid and DI water. C 5. Determined the Boron volume to be added as calculated was
 
in error and determined the
 
correct volume to be 910


JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                                        PAGE    3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.
CRITICAL ELEMENTS (C):            3, 4, 5, 6 START TIME:
PERFORMANCE CHECKLIST                                STANDARDS                    (Circle One)
: 1. Reviewed the completed form        Reviewed the completed form        N/A SAT UNSAT OP 2104.006, Attachment F.        OP 2104.006, Attachment F.
: 2. Determined the calculated          Calculated the feed volume to be    N/A SAT UNSAT volume of solution to be correct. added to the SFP, F, to be 1878 gallons.
C      3. Determined that the boron          Recognized the boron                N/A SAT UNSAT concentration of the feed          concentration of the feed source source was in error.              was recorded as 4950 ppm instead of the given value of 5940 ppm.
C      4. Determined the calculated          Recognized that the feed volume    N/A SAT UNSAT volume of solution used in the    to be added to the SFP, F, was calculation of the feed volumes    recorded in error as 1788 gallons of boric acid                      NOT the 1878 gallons calculated on the previous page.
Examiners Note: the candidate may need to be prompted to calculate the volume of Boric acid and DI water.
C      5. Determined the Boron volume        Recognized the Boron volume to      N/A SAT UNSAT to be added as calculated was      be added as calculated was in in error and determined the        error and determined the correct correct volume to be 910          volume to be 935.5 gallons.
gallons to 960 gallons.
gallons to 960 gallons.
Recognized the Boron volume to be added as calculated was in  
C      6. Determined the DI water            Recognized the DI water volume      N/A SAT UNSAT volume to be added as             to be added as calculated was in calculated was in error and        error and determined the correct determined the correct volume      volume to be 942.5 gallons.
to be within 918 gallons to 968 gallons.
END STOP TIME:


error and determined the correct
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                            PAGE  4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
* Plant is at 100% power.
* PMS computer is out of service.
* Initial Spent Fuel Pool Level = 401 0
* Tilt Pit Gate is installed
* Cask Loading Pit Gate is installed
* A BAM tank concentration is 5950 ppmb
* SFP boron concentration is 2964 ppmb
* Cask loading pit operations has lowered the SFP level
* CBOT has performed actions per OP 2104.006 step 10.3.
* Final Spent Fuel Pool Level = 401 4 INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.


volume to be 935.5 gallons.
JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU                                            PAGE  5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
N/A SAT  UNSAT C 6. Determined the DI water volume to be added as
* Plant is at 100% power.
* PMS computer is out of service.
* Initial Spent Fuel Pool Level = 401 0
* Tilt Pit Gate is installed
* Cask Loading Pit Gate is installed
* A BAM tank concentration is 5950 ppmb
* SFP boron concentration is 2964 ppmb
* Cask loading pit operations has lowered the SFP level
* CBOT has performed actions per OP 2104.006 step 10.3.
* Final Spent Fuel Pool Level = 401 4 INITIATING CUE:
Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.


calculated was in error and
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                     PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
 
SYSTEM/DUTY AREA:       A.2: Equipment Control TASK:     Review completed 2P89B surveillance and determine 2P-89B operability JTA#:
determined the correct volume
KA VALUE       RO:       3.5     SRO:       3.9       KA  
 
to be within 918 gallons to 968
 
gallons. Recognized the DI water volume to be added as calculated was in
 
error and determined the correct
 
volume to be 942.5 gallons.
N/A  SAT  UNSAT END  STOP TIME:
 
JPM-#-  ANO-2-JPM-NRC-ADMIN SFPMU        PAGE    4  of  5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Plant is at 100% power. PMS computer is out of service. Initial Spent Fuel Pool Level = 401' 0"  Tilt Pit Gate is installed  Cask Loading Pit Gate is installed  'A' BAM tank concentration is 5950 ppmb  SFP boron concentration is 2964 ppmb  Cask loading pit operations has lowered the SFP level  CBOT has performed actions per OP 2104.006 step 10.3. Final Spent Fuel Pool Level = 401' 4" INITIATING CUE:
Chemistry has just notified the Control Room t hat when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, "Review for accuracy and
 
correct any errors in the completed OP 2104.006, Attachment F."
 
JPM-#-  ANO-2-JPM-NRC-ADMIN SFPMU        PAGE    5  of  5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Plant is at 100% power. PMS computer is out of service. Initial Spent Fuel Pool Level = 401' 0"  Tilt Pit Gate is installed  Cask Loading Pit Gate is installed  'A' BAM tank concentration is 5950 ppmb  SFP boron concentration is 2964 ppmb  Cask loading pit operations has lowered the SFP level  CBOT has performed actions per OP 2104.006 step 10.3. Final Spent Fuel Pool Level = 401' 4"
 
INITIATING CUE:
Chemistry has just notified the Control Room t hat when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the 'A' BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, "Review for accuracy and
 
correct any errors in the completed OP 2104.006, Attachment F."
 
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review completed 2P89B surveillance and determine 2P-89B operability JTA#:   KA VALUE RO: 3.5 SRO: 3.9 KA  


==REFERENCE:==
==REFERENCE:==
2.2.12 APPROVED FOR ADMINISTRATION TO:          RO:            SRO:
X TASK LOCATION:          INSIDE CR:              OUTSIDE CR:            BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:                      LAB:
Perform POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME:                                              SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.2.12 APPROVED FOR ADMINISTRATION TO:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                                       PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
RO:  X  SRO:    TASK LOCATION:
2P89C is aligned to the GREN side.
INSIDE CR:
OUTSIDE CR:
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2104.039  Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
 
Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P)
TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P)
Pump  P is out of LIMITING RANGE FOR OPERABILITY. Calculation for determining lower pump  P limit is in error. Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY. Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.  
* Pump  P is out of LIMITING RANGE FOR OPERABILITY.
* Calculation for determining lower pump  P limit is in error.
* Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
* Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
TASK PERFORMANCE AIDS:          marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA


TASK PERFORMANCE AIDS:    marked-up copy of Supplement 2 2P-89B quarterly test
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                                       PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
 
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.
SIMULATOR SETUP:
CRITICAL STEPS:         2, 3, 4, 5 START TIME:
NA JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
PERFORMANCECHECKLIST                                   STANDARD                     CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
The Control Room Supervisor/Shift Manager directs determination of the operability of the 'B' HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.
: 1. Perform review of the surveillance Reviews the surveillance procedure         N/A procedure results.                  provided.
CRITICAL STEPS:     2, 3, 4, 5 START TIME:
(C)     2.
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
Pump  P is out of LIMITING         Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY.             FOR OPERABILITY.                          N/A SAT UNSAT (C)     3. Calculation for determining lower  Calculation for determining lower pump pump  P limit is in error.         P limit should be 1380.81 psid.          N/A SAT UNSAT This calculation is below the table in supplement 2 section 3 and recorded in the table on the line for pump  P.
: 1. Perform review of the surveillance procedure results. Reviews the surveillance procedure provided.
(C)     4. Inboard Radial Bearing #1 Vibes     Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR        LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
N/A (C) 2. Pump  P is out of LIMITING RANGE FOR OPERABILITY.
(C)     5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR          LIMITING RANGE FOR OPERABILITY.           N/A SAT UNSAT OPERABILITY.
Pump D/P is out of LIMITING RANGE FOR OPERABILITY.
EXAMINERs CUE: The Shift Engineer will enter the pump data into the database.
N/A SAT UNSAT (C) 3. Calculation for determining lower pump  P limit is in error. This calculation is below the table in supplement 2 section 3 and recorded in the table on the  
: 6. Report to CRS that the results of Reports to CRS that results of the the surveillance are unsatisfactory surveillance are unsatisfactory and      N/A SAT UNSAT and 2P89B is inoperable.            2P89B is inoperable.
 
END STOP TIME:
line for pump  P. Calculation for determining lower pump  P limit should be 1380.81 psid.
N/A  SAT  UNSAT (C) 4. Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
N/A SAT UNSAT (C) 5. Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
N/A SAT UNSAT EXAMINER's CUE: The Shift Engineer will enter the pump data into the database. 6. Report to CRS that the results of the surveillance are unsatisfactory and 2P89B is inoperable. Reports to CRS that results of the surveillance are unsatisfactory and 2P89B is inoperable.
N/A  SAT  UNSAT END STOP TIME:                        


JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                           PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
Initiating CUE:
The Control Room Supervisor/Shift Manager direct s determination of the operability of the 'B' HPSI pump, 2P89B, by reviewing the comple ted surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calc ulations performed and identify all errors.  
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.


JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                           PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
Initiating CUE:
The Control Room Supervisor/Shift Manager direct s determination of the operability of the 'B' HPSI pump, 2P89B, by reviewing the comple ted surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calc ulations performed and identify all errors.  
The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.


PROC./WORK PLAN NO.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                                 PAGE:     61 of 148 2104.039                      HPSI SYSTEM OPERATION                        CHANGE:
2104.039 PROCEDURE/WORK PLAN TITLE:
SUPPLEMENT 2 PAGE 7 OF 9 3.0    ACCEPTANCE CRITERIA 3.1    Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.
HPSI SYSTEM OPERATION PAGE: 61 of 148 CHANGE:   SUPPLEMENT 2 PAGE 7 OF 9  
Record date and time Test begins          TODAYs DATE / 0800 TABLE 1 TEST QUANTITY      INSTRUMENT      MEASURED        ACCEPTABLE      LIMITING      IS DATA IN (INCLUDE          VALUE          NORMAL      RANGE FOR        LIMITING TEST INST)                          RANGE    OPERABILITY        RANGE?
Running Suct.        2PI-5100 33.5 psig          8 psig        8 psig        YES    NO Pressure          (local) 2PI-5101 1389 psig            N/A          N/A            N/A (local)
Discharge          2PI-5109 Pressure                              1379 psig            N/A          N/A            N/A (2C16)
RWT          2TIS-5675 Temperature          (2C17)          90 &deg;F        40 to 110&deg;F        N/A          N/A Pump P        2PI-5101 -                                    1360.81(1)to 1355.5 psid            N/A                        YES    NO
{4.3.1}          2PI-5100                                    1612.8 psid Motor Running      Ammeter at A      34  Amps        N/A          N/A            N/A Amps            2A-406 B      33  Amps (CR-1-96-0272-                    C      35  Amps 07)
Inboard Brg      VIB001                              0.325        0.700 0.825 in/sec                                      YES    NO Radial #1                                            in/sec        in/sec Vibes Inboard Brg      VIB001                              0.325        0.700 0.22 in/sec                                      YES    NO Radial #2                                            in/sec        in/sec Vibes Inboard Brg      VIB001                              0.325        0.700 0.073 in/sec                                      YES    NO Axial Vibes                                          in/sec        in/sec Outboard Brg      VIB001                              0.325        0.700 0.187 in/sec                                      YES    NO Radial #1                                            in/sec        in/sec Vibes Outboard Brg      VIB001                              0.325        0.700 0.207 In/sec                                      YES    NO Radial #2                                            in/sec        in/sec Vibes Outboard Brg      VIB001                              0.232        0.558 0.610 In/sec                                      YES    NO Axial Vibes                                          in/sec        in/sec Record date and time Test completed          TODAYs DATE  0930 Vibration Instrument Cal Due Date        7 days from TODAY Vibration Data Collected By        Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90      - 40)/4] =  1360.81    psid 3.2    Independently verify pump P calculation.


===3.0 ACCEPTANCE===
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                        PAGE:      62 of 148 2104.039                        HPSI SYSTEM OPERATION              CHANGE:
CRITERIA  
SUPPLEMENT 2 PAGE 8 OF 9 3.3   Document observation of check valve stroke in Table 2.
TABLE 2 CHECK          TEST                  TEST CRITERIA     IS PROPER VALVE VALVE      DIRECTION                                  STROKE INDICATED?
2SI-10C        Closed            2P-89C NOT rotating    YES  NO    N/A 2SI-10B        Closed            2P-89B NOT rotating    YES  NO    N/A 3.4    IF NO circled in Table 1 OR 2, THEN perform the following:
* Declare affected component inoperable.
* Refer to Tech Spec 3.5.2 OR 3.5.3.
* Notify Shift Manager.
* Initiate WR/WO as applicable.
NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator.
3.5    IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
THEN perform the following:
* Initiate notification to perform test during current quarter OR as directed by IST Coordinator.                                    N/A
* Annotate on status board.                                              N/A
* Annotate in Work Exceptions section of WR/WO.                          N/A 3.6    Pump Data recorded in database AND reviewed by SRO.
3.7    IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O).                      N/A Comments ________________________________________________________________
Performed By        Jimmy Reactor                          Date  TODAY_____


===3.1 Record===
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                        PAGE:    63 of 148 2104.039                        HPSI SYSTEM OPERATION              CHANGE:
values observed during 2P-89B operation below AND compare with limiting range of values for operability.
SUPPLEMENT 2 PAGE 9 OF 9 4.0  SUPERVISOR REVIEW AND ANALYSIS 4.1   Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY?                     YES NO 4.2   Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside      YES NO N/A normal range also outside limiting range.)
Record date and time Test begins    TODAY's DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT (INCLUDE TEST INST)
4.3   IF NO answered to 4.1, THEN perform the following corrective actions:
MEASURED VALUE ACCEPTABLE NORMAL RANGE LIMITING RANGE FOR OPERABILITY IS DATA IN LIMITING RANGE? Running Suct.
* Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
Pressure 2PI-5100 (local) 33.5 psig  8 psig  8 psig YES   NO 2PI-5101 (local) 1389 psig N/A N/A N/A Discharge Pressure 2PI-5109 (2C16) 1379 psig N/A N/A N/A RWT Temperature 2TIS-5675 (2C17) 90  F 40 to 110 F N/A N/A Pump P {4.3.1} 2PI-5101 - 2PI-5100 1355.5 psid N/A 1360.81 (1)to 1612.8 psid YES  NO 34 33 35 Motor Running Amps  (CR-1-96-0272-07)Ammeter at 2A-406 A B C Amps Amps AmpsN/A N/A N/A Inboard Brg Radial #1 Vibes VIB001 0.825 in/sec  0.325 in/sec  0.700 in/sec YES   NO Inboard Brg Radial #2 Vibes VIB001 0.22 in/sec  0.325 in/sec  0.700 in/sec YES  NO Inboard Brg Axial Vibes VIB001 0.073 in/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Radial #1 Vibes VIB001 0.187 in/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Radial #2 Vibes VIB001 0.207 In/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Axial Vibes VIB001 0.610 In/sec  0.232 in/sec  0.558 in/sec YES  NO  Record date and time Test completed    TODAY's DATE  0930 Vibration Instrument Cal Due Date    7 days from TODAY Vibration Data Collected By  Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is: 1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90  - 40)/4] =  1360.81 psid  3.2   Independently verify pump P calculation.
* Verify Condition Report initiated.
PROC./WORK PLAN NO.
4.4   IF NO circled in 4.2, THEN perform the following corrective actions:
2104.039 PROCEDURE/WORK PLAN TITLE:
* Verify WR/WO has been initiated.
HPSI SYSTEM OPERATION PAGE: 62 of 148 CHANGE:    SUPPLEMENT 2 PAGE 8 OF 9
* Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________
4.5   Are all administrative requirements of this test satisfied?
YES NO Supervisor ______________________________________________ Date __________


===3.3 Document===
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                       PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
observation of check valve stroke in Table 2.
SYSTEM/DUTY AREA:       A.2: Equipment Control TASK:     Review and approve as a supervisor the completed 2P89B surveillance.
TABLE 2 CHECK VALVE TEST DIRECTION TEST CRITERIA IS PROPER VALVE STROKE INDICATED? 2SI-10C Closed 2P-89C NOT rotating YES  NO  N/A 2SI-10B Closed 2P-89B NOT rotating YES  NO  N/A 3.4  IF NO circled in Table 1 OR 2, THEN perform the following:  Declare affected component inoperable. Refer to Tech Spec 3.5.2 OR 3.5.3. Notify Shift Manager. Initiate WR/WO as applicable.
JTA#:
NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per 
KA VALUE       RO:       3.5     SRO:         3.9       KA  
 
IST Coordinator.
3.5  IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
THEN perform the following:  Initiate notification to perform test during current quarter  OR as directed by IST Coordinator.        N/A  Annotate on status board.          N/A  Annotate in Work Exceptions section of WR/WO.      N/A 3.6  Pump Data recorded in database AND reviewed by SRO.
 
3.7  IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O).                N/A Comments ________________________________________________________________  ________________________________________________________________ ________________________________________________________________ ________________________________________________________________
Performed By    Jimmy Reactor Date  TODAY_____
____________________________________________
 
PROC./WORK PLAN NO.
2104.039 PROCEDURE/WORK PLAN TITLE:
HPSI SYSTEM OPERATION PAGE: 63 of 148 CHANGE:    SUPPLEMENT 2 PAGE 9 OF 9
 
===4.0 SUPERVISOR===
REVIEW AND ANALYSIS 4.1  Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY?
 
4.2  Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside normal range also outside limiting range.)
 
4.3  IF NO answered to 4.1, THEN perform the following corrective actions:  Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed. Verify Condition Report initiated.
4.4  IF NO circled in 4.2, THEN perform the following corrective actions:  Verify WR/WO has been initiated. Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________  ________________________________________________________________
________________________________________________________________ ________________________________________________________________
4.5  Are all administrative requirements of this test satisfied?
 
Supervisor ______________________________________________ Date __________
 
YES  NO YES  NO  N/A YES  NO JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review and approve as a supervisor the completed 2P89B surveillance.
JTA#:   KA VALUE RO: 3.5 SRO: 3.9 KA  


==REFERENCE:==
==REFERENCE:==
2.2.12 APPROVED FOR ADMINISTRATION TO:          RO:              SRO:
X TASK LOCATION:          INSIDE CR:              OUTSIDE CR:              BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:                        LAB:
Perform POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                15 Minutes REFERENCE(S):      OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.2.12 APPROVED FOR ADMINISTRATION TO:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                                           PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
RO:    SRO:  X  TASK LOCATION:
2P89C is aligned to the GREEN side.
INSIDE CR:
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
OUTSIDE CR:
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2104.039  Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
 
Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREEN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.  
 
TASK STANDARD:
TASK STANDARD:
  (Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy)
(Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy)
Pump  P is out of LIMITING RANGE FOR OPERABILITY. Calculation for determining lower pump  P limit is in error. Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY. Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY. Determine TS 3.5.2 applicability Yes is circled on parameters that do not meet acceptance criteria  
* Pump  P is out of LIMITING RANGE FOR OPERABILITY.
* Calculation for determining lower pump  P limit is in error.
* Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
* Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
* Determine TS 3.5.2 applicability
* Yes is circled on parameters that do not meet acceptance criteria TASK PERFORMANCE AIDS:              marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA


TASK PERFORMANCE AIDS:   marked-up copy of Supplement 2 2P-89B quarterly test
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                                        PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
CRITICAL STEPS: 2, 3, 4, 5, 6, 7 START TIME:
PERFORMANCECHECKLIST                                    STANDARD                      CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
: 1. Perform supervisor review of the Reviews the surveillance acceptance          N/A surveillance procedure results and criteria provided.
determine errors.
EXAMINERs NOTE: the following are the errors in the form provided.
(C)      2. Pump  P is out of LIMITING          Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY.              FOR OPERABILITY.                          N/A SAT UNSAT (C)      3. Calculation for determining lower    Calculation for determining lower pump pump  P limit is in error.          P limit should be 1380.81 psid.          N/A SAT UNSAT This calculation is below the table in supplement 2 section 3 and recorded in the table on the line for pump  P.
(C)      4. Inboard Radial Bearing #1 Vibes      Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR        LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.
(C)      5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR            LIMITING RANGE FOR OPERABILITY.          N/A SAT UNSAT OPERABILITY.
(C)      6. Identify the technical specification Identifies TS 3.5.2 applicability.
applicability error.                                                          N/A SAT UNSAT (C)      7. Identified that YES was circled on Identifies that YES was circled on parameters that did not meet        parameters that did not meet acceptance N/A SAT UNSAT acceptance criteria.                criteria.
EXAMINERs NOTE: The candidate will probably require another RO to review the data table before proceeding.
Ask the candidate to continue on with completing section 4.0 as though that review matched the same errors previously identified.
: 8. Inoperable equipment checklist        Identifies need to perform inoperable needed.                              equipment checklist must be completed. N/A SAT UNSAT EXAMINERs CUE:
The SRO ADMIN will perform the inoperable equipment checklist.
: 9. Condition Report needed.            Identifies need to generate condition report.                                  N/A SAT UNSAT EXAMINERs CUE:
The SE will initiate the condition report.


SIMULATOR SETUP:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B              PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE END STOP TIME:
NA   


JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                       PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
The Shift Manager directs "perform supervisor review and analysis of the 'B' HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2." CRITICAL STEPS:    2, 3, 4, 5, 6, 7 START TIME:
2P89C is aligned to the GREEN side.
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
: 1. Perform supervisor review of the surveillance procedure results and determine errors. Reviews the surveillance acceptance criteria provided.
N/A EXAMINER's NOTE: the following are the errors in the form provided. (C) 2. Pump  P is out of LIMITING RANGE FOR OPERABILITY.
Pump D/P is out of LIMITING RANGE FOR OPERABILITY.
N/A  SAT  UNSAT (C) 3. Calculation for determining lower pump  P limit is in error. This calculation is below the table in supplement 2 section 3 and recorded in the table on the line for pump  P. Calculation for determining lower pump  P limit should be 1380.81 psid.
N/A  SAT  UNSAT (C) 4. Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
 
Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
N/A  SAT  UNSAT (C) 5. Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
 
Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
N/A  SAT  UNSAT (C) 6. Identify the technical specification applicability error. Identifies TS 3.5.2 applicability.
N/A  SAT  UNSAT (C) 7. Identified that YES was circled on parameters that did not meet acceptance criteria.
Identifies that YES was circled on parameters that did not meet acceptance criteria.
N/A  SAT  UNSAT EXAMINER's NOTE: The candidate will probably require another RO to review the data table before proceeding. Ask the candidate to continue on with completing section 4.0 as though that review matched the same errors previously identified. 8. Inoperable equipment checklist needed. EXAMINER's CUE: The SRO ADMIN will perform the inoperable equipment checklist. Identifies need to perform inoperable equipment checklist must be completed.
N/A  SAT  UNSAT  9. Condition Report needed.
EXAMINER's CUE:
 
The SE will initiate the condition report. Identifies need to generate condition report. N/A  SAT  UNSAT JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE  4  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE END  STOP TIME:                         
 
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE  5  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREEN side.  
 
The 2P-89B Quarterly test has been comp leted using OP 2104.039 Supplement 2.
Initiating CUE:
Initiating CUE:
The Shift Manager directs "perform supervisor review and analysis of the 'B' HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2."
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE  6  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment. 2P89C is aligned to the GREEN side.  


The 2P-89B Quarterly test has been comp leted using OP 2104.039 Supplement 2.
JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B                                      PAGE 6 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.
2P89C is aligned to the GREEN side.
The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.
Initiating CUE:
Initiating CUE:
The Shift Manager directs "perform supervisor review and analysis of the 'B' HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2."
The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.
PROC./WORK PLAN NO.
2104.039 PROCEDURE/WORK PLAN TITLE:
HPSI SYSTEM OPERATION PAGE: 61 of 148 CHANGE:    SUPPLEMENT 2 PAGE 7 OF 9


===3.0 ACCEPTANCE===
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                                  PAGE:    61 of 148 2104.039                      HPSI SYSTEM OPERATION                        CHANGE:
CRITERIA
SUPPLEMENT 2 PAGE 7 OF 9 3.0     ACCEPTANCE CRITERIA 3.1    Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.
Record date and time Test begins          TODAYs DATE / 0800 TABLE 1 TEST QUANTITY      INSTRUMENT      MEASURED        ACCEPTABLE      LIMITING      IS DATA IN (INCLUDE          VALUE          NORMAL      RANGE FOR        LIMITING TEST INST)                          RANGE    OPERABILITY        RANGE?
Running Suct.        2PI-5100 33.5 psig          8 psig        8 psig        YES    NO Pressure          (local) 2PI-5101 1389 psig            N/A          N/A            N/A (local)
Discharge          2PI-5109 Pressure                              1379 psig            N/A          N/A            N/A (2C16)
RWT          2TIS-5675 Temperature          (2C17)          90 &deg;F        40 to 110&deg;F        N/A          N/A Pump P        2PI-5101 -                                    1360.81(1)to 1355.5 psid            N/A                        YES    NO
{4.3.1}          2PI-5100                                    1612.8 psid Motor Running      Ammeter at A      34  Amps        N/A          N/A            N/A Amps            2A-406 B      33  Amps (CR-1-96-0272-                    C      35  Amps 07)
Inboard Brg      VIB001                              0.325        0.700 0.825 in/sec                                      YES    NO Radial #1                                            in/sec        in/sec Vibes Inboard Brg      VIB001                              0.325        0.700 0.22 in/sec                                      YES    NO Radial #2                                            in/sec        in/sec Vibes Inboard Brg      VIB001                              0.325        0.700 0.073 in/sec                                      YES    NO Axial Vibes                                          in/sec        in/sec Outboard Brg      VIB001                              0.325        0.700 0.187 in/sec                                      YES    NO Radial #1                                            in/sec        in/sec Vibes Outboard Brg      VIB001                              0.325        0.700 0.207 In/sec                                      YES    NO Radial #2                                            in/sec        in/sec Vibes Outboard Brg      VIB001                              0.232        0.558 0.610 In/sec                                      YES    NO Axial Vibes                                          in/sec        in/sec Record date and time Test completed          TODAYs DATE  0930 Vibration Instrument Cal Due Date        7 Days from TODAY Vibration Data Collected By        Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:
1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90      - 40)/4] =   1360.81    psid 3.2    Independently verify pump P calculation.                                        JJB


===3.1 Record===
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                            PAGE:      62 of 148 2104.039                        HPSI SYSTEM OPERATION                  CHANGE:
values observed during 2P-89B operation below AND compare with limiting range of values for operability.
SUPPLEMENT 2 PAGE 8 OF 9 3.3    Document observation of check valve stroke in Table 2.
Record date and time Test begins    TODAY's DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT (INCLUDE TEST INST)
TABLE 2 CHECK          TEST                 TEST CRITERIA          IS PROPER VALVE VALVE      DIRECTION                                      STROKE INDICATED?
MEASURED VALUE ACCEPTABLE NORMAL RANGE LIMITING RANGE FOR OPERABILITY IS DATA IN LIMITING RANGE? Running Suct.
2SI-10C        Closed            2P-89C NOT rotating        YES  NO     N/A 2SI-10B        Closed            2P-89B NOT rotating        YES  NO    N/A 3.4    IF NO circled in Table 1 OR 2, THEN perform the following:
Pressure 2PI-5100 (local) 33.5 psig  8 psig  8 psig YES  NO 2PI-5101 (local) 1389 psig N/A N/A N/A Discharge Pressure 2PI-5109 (2C16) 1379 psig N/A N/A N/A RWT Temperature 2TIS-5675 (2C17) 90  F 40 to 110 F N/A N/A Pump P {4.3.1} 2PI-5101 - 2PI-5100 1355.5 psid N/A 1360.81 (1)to 1612.8 psid YES  NO 34 33 35 Motor Running Amps  (CR-1-96-0272-07)Ammeter at 2A-406 A B C Amps Amps AmpsN/A N/A N/A Inboard Brg Radial #1 Vibes VIB001 0.825 in/sec  0.325 in/sec  0.700 in/sec YES  NO Inboard Brg Radial #2 Vibes VIB001 0.22 in/sec  0.325 in/sec  0.700 in/sec YES  NO Inboard Brg Axial Vibes VIB001 0.073 in/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Radial #1 Vibes VIB001 0.187 in/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Radial #2 Vibes VIB001 0.207 In/sec  0.325 in/sec  0.700 in/sec YES  NO Outboard Brg Axial Vibes VIB001 0.610 In/sec  0.232 in/sec  0.558 in/sec YES  NO  Record date and time Test completed    TODAY's DATE  0930 Vibration Instrument Cal Due Date    7 Days from TODAY Vibration Data Collected By  Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is: 1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90  - 40)/4] =  1360.81 psid  3.2  Independently verify pump P calculation. JJB PROC./WORK PLAN NO.
* Declare affected component inoperable.                                  N/A
2104.039 PROCEDURE/WORK PLAN TITLE:
* Refer to Tech Spec 3.5.2 OR 3.5.3.                                      N/A
HPSI SYSTEM OPERATION PAGE: 62 of 148 CHANGE:    SUPPLEMENT 2 PAGE 8 OF 9
* Notify Shift Manager.                                                    N/A
* Initiate WR/WO as applicable.                                            N/A NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator.
3.5    IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
THEN perform the following:
* Initiate notification to perform test during current quarter OR as directed by IST Coordinator.                                         N/A
* Annotate on status board.                                                  N/A
* Annotate in Work Exceptions section of WR/WO.                             N/A 3.6    Pump Data recorded in database AND reviewed by SRO.                           SBR 3.7    IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O).                         N/A Comments ________________________________________________________________
Performed By    Sammy Reactor                        Date TODAY Jimmy Reactor


===3.3 Document===
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                        PAGE:    63 of 148 2104.039                        HPSI SYSTEM OPERATION              CHANGE:
observation of check valve stroke in Table 2.
SUPPLEMENT 2 PAGE 9 OF 9 4.0  SUPERVISOR REVIEW AND ANALYSIS 4.1  Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY?                     YES NO 4.2   Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside      YES NO N/A normal range also outside limiting range.)
TABLE 2 CHECK VALVE TEST DIRECTION TEST CRITERIA IS PROPER VALVE STROKE INDICATED? 2SI-10C Closed 2P-89C NOT rotating YES   NO  N/A 2SI-10B Closed 2P-89B NOT rotating YES   NO   N/A 3.4  IF NO circled in Table 1 OR 2, THEN perform the following: Declare affected component inoperable.       N/A  Refer to Tech Spec 3.5.2 OR 3.5.3.      N/A  Notify Shift Manager.          N/A  Initiate WR/WO as applicable.             N/A NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per 
4.3   IF NO answered to 4.1, THEN perform the following corrective actions:
* Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
* Verify Condition Report initiated.
4.4  IF NO circled in 4.2, THEN perform the following corrective actions:
* Verify WR/WO has been initiated.
* Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________
4.5  Are all administrative requirements of this test satisfied?
YES NO Supervisor ______________________________________________ Date __________


IST Coordinator.
JPM-ANO-2-JPM-ADMIN-RWP and stay times                                                   PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   000                     DATE:
3.5  IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),
SYSTEM/DUTY AREA:       A.3 Radiation Control TASK:     Review the emergency RWP and determine stay time based on radiation levels expected.
THEN perform the following:  Initiate notification to perform test during current quarter  OR as directed by IST Coordinator.        N/A  Annotate on status board.          N/A  Annotate in Work Exceptions section of WR/WO.      N/A 3.6  Pump Data recorded in database AND reviewed by SRO. SBR
JTA#:
 
KA VALUE       RO:       2.9     SRO:         3.3       KA  
3.7  IF this surveillance performed as PMT,  THEN complete Unit 2 IST Data Collection (1015.016O).      N/A Comments ________________________________________________________________  ________________________________________________________________ ________________________________________________________________ ________________________________________________________________
Performed By  Sammy Reactor Date  TODAY Jimmy Reactor               
 
PROC./WORK PLAN NO.
2104.039 PROCEDURE/WORK PLAN TITLE:
HPSI SYSTEM OPERATION PAGE: 63 of 148 CHANGE:    SUPPLEMENT 2 PAGE 9 OF 9
 
===4.0 SUPERVISOR===
REVIEW AND ANALYSIS 4.1  Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY?
 
4.2  Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside normal range also outside limiting range.)
 
4.3  IF NO answered to 4.1, THEN perform the following corrective actions:  Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed. Verify Condition Report initiated.
4.4  IF NO circled in 4.2, THEN perform the following corrective actions:  Verify WR/WO has been initiated. Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.
Comments ________________________________________________________________  ________________________________________________________________
________________________________________________________________ ________________________________________________________________
4.5  Are all administrative requirements of this test satisfied?
 
Supervisor ______________________________________________ Date __________
 
YES  NO YES  NO  N/A YES  NO JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 000 DATE:
SYSTEM/DUTY AREA: A.3 Radiation Control TASK: Review the emergency RWP and determine stay time based on radiation levels expected.
JTA#:   KA VALUE RO: 2.9 SRO: 3.3 KA  


==REFERENCE:==
==REFERENCE:==
2.3.10 APPROVED FOR ADMINISTRATION TO:          RO:              SRO:
X              X TASK LOCATION:          INSIDE CR:              OUTSIDE CR:              BOTH:        X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:        Perform      SIMULATOR:                        LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:            LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                15 Minutes REFERENCE(S):      2004-0009; emergency RWP and status board printout of Aux Building 354.
EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.3.10  APPROVED FOR ADMINISTRATION TO:
JPM-ANO-2-JPM-ADMIN-RWP and stay times                                                           PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
RO:  X  SRO:  X  TASK LOCATION:
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
INSIDE CR:
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
OUTSIDE CR:
: 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
: 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
PLANT SITE:
: 5. Fuel Pool low level alarm is in and SFP level is lowering.
Perform SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
2004-0009; emergency RWP and status board printout of Aux Building 354'.
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. 2. Power has been lost to both SFP cooling pumps and 2K11-K5 "FUEL POOL TEMP HI" is in alarm. 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. 5. Fuel Pool low level alarm is in and SFP level is lowering.
: 6. RP coverage will not be available.
: 6. RP coverage will not be available.
TASK STANDARD:
TASK STANDARD:
Using Emergency RWP: Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR. Determine a maximum stay time of  
Using Emergency RWP:
* Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR.
* Determine a maximum stay time of 1.6 hours based on EAD alarm set-points.
Using normal inspection RWP:
* Determine appropriate dosimeter
* Entered RCA
* Observed proper radiological controls while in RCA
* Properly uses the PCM-1
* Properly scans loose items in TCM JPM time is based on the review of the emergency RWP and the calculation of the stay time.
TASK PERFORMANCE AIDS:          Emergency RWP 2004-0009 SIMULATOR SETUP: NA


===1.6 hours===
JPM-ANO-2-JPM-ADMIN-RWP and stay times                                                                  PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
based on EAD alarm set-points. Using normal inspection RWP:  Determine appropriate dosimeter  Entered RCA Observed proper radiological controls while in RCA Properly uses the PCM-1 Properly scans loose items in TCM JPM time is based on the review of the emergency RWP and the calculation of the stay time.
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency Radiological Work Permit, RWP, and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
Critical Steps:              2, 3, 4, 5, 6 START TIME:
PERFORMANCECHECKLIST                                      STANDARD                      CIRCLE ONE NOTE: Provide Emergency RWP.
EXAMINERs CUE: The candidate may attempt to check out a radiation survey meter per monitoring step 7.0. It is not a part of this JPM to check out the survey meter, but that the candidate knows one is needed.
: 1. Review Emergency RWP for            Determines that the alarming dosimeter    N/A limits.                            is set to alarm in an 800mr/hr field and that the Dose alarm is set at 800 mrem.
(C)      2.
Determine stay time in SFP valve Using the status board printout provided gallery to be a maximum of 1.6      determined that the General Area (GA)      N/A SAT UNSAT hours.                              field is 500 MR/HR so the maximum stay time will be 1.6 hours.
EXAMINERs NOTE: The rest of these steps determine the candidates ability to enter and exit controlled access correctly using the Actual RWP for inspections, DO NOT allow the candidate to use the emergency RWP to enter controlled access.
(C)      3. Determined that an alarming        Obtained an alarming dosimeter from dosimeter will be required for      rack.                                      N/A SAT UNSAT entry into the Radiologically Controlled Area, RCA, using the normal inspection RWP.
(C)      4. Entered appropriate information    Entered the RCA under the general into the log in screen and          inspection RWP.                            N/A SAT UNSAT successfully entered the RCA.
(C)      5. While in the RCA the examinee      While in the RCA the examinee observes observes and adheres to all        and adheres to all applicable postings    N/A SAT UNSAT applicable postings and entry      and entry requirements.
requirements.
(C)      6. When exiting the RCA the           Enters and exits PCM-1.
examinee enters the control point                                              N/A SAT UNSAT area and enters a PCM-1 monitor.
: 7. All loose materials will be cleared Examinee places loose items in the TCM through the tool contamination      for counting.                              N/A SAT UNSAT monitor (TCM)
: 8. After clearing the PCM-1 monitor,  Examinee clears the Portal Monitor the examinee exits through the                                                 N/A SAT UNSAT Portal Monitor
: 9. Examinee deactivates EAD at        Examinee deactivates his EAD and final exit of session              returns it to the Health Physics rack. N/A SAT UNSAT END STOP TIME:


TASK PERFORMANCE AIDS:    Emergency  RWP 2004-0009
JPM-ANO-2-JPM-ADMIN-RWP and stay times                                               PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
 
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
SIMULATOR SETUP:
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
NA   
: 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
 
: 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 3  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:
: 5. Fuel Pool low level alarm is in and SFP level is lowering.
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency Radiological Work Permit, RWP, and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354' elevation SFP valve gallery, excluding entry and exit times to and from the area. Critical Steps:                2, 3, 4, 5, 6 START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide Emergency RWP. EXAMINER's CUE: The candidate may attempt to check out a radiation survey meter per monitoring step 7.0. It is not a part of this JPM to check out the survey meter, but that the candidate knows one is needed.
: 1. Review Emergency RWP for limits. Determines that the alarming dosimeter is set to alarm in an 800mr/hr field and that the Dose alarm is set at 800 mrem.
N/A (C) 2. Determine stay time in SFP valve gallery to be a maximum of 1.6 hours. Using the status board printout provided determined that the General Area (GA) field is 500 MR/HR so the maximum stay time will be 1.6 hours.
N/A  SAT  UNSAT EXAMINER's NOTE: The rest of these steps determine the candidate's ability to enter and exit controlled access correctly using the Actual RWP for inspections, DO NOT allow the candidate to use the emergency RWP to enter controlled access.
 
(C) 3. Determined that an alarming dosimeter will be required for entry into the Radiologically Controlled Area, RCA, using the normal inspection RWP. Obtained an alarming dosimeter from rack. N/A  SAT  UNSAT (C) 4. Entered appropriate information into the log in screen and successfully entered the RCA. Entered the RCA under the general inspection RWP.
N/A  SAT  UNSAT (C) 5. While in the RCA the examinee observes and adheres to all applicable postings and entry requirements.
While in the RCA the examinee observes and adheres to all applicable postings and entry requirements.
N/A  SAT  UNSAT (C) 6. When exiting the RCA the examinee enters the control point area and enters a PCM-1 monitor.Enters and exits PCM-1.
N/A  SAT  UNSAT  7. All loose materials will be cleared through the tool contamination monitor (TCM)  Examinee places loose items in the TCM for counting.
 
N/A  SAT  UNSAT  8. After clearing the PCM-1 monitor, the examinee exits through the Portal Monitor Examinee clears the Portal Monitor  N/A  SAT  UNSAT  9. Examinee deactivates EAD at final exit of session Examinee deactivates his EAD and returns it to the Health Physics rack.
N/A  SAT  UNSAT END  STOP TIME:                               
 
JPM-ANO-2-JPM-ADMIN-RWP and stay times  PAGE  4  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. 2. Power has been lost to both SFP cooling pumps and 2K11-K5 "FUEL POOL TEMP HI" is in alarm. 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. 5. Fuel Pool low level alarm is in and SF P level is lowering.
: 6. RP coverage will NOT be available.
: 6. RP coverage will NOT be available.
Initiating CUE:
Initiating CUE:
The Shift Manager directs that Service water fr om loop I must be aligned to the SFP, use the Emergency RWP and identify the ma ximum allowable time before you would be required to leave the Auxiliary Building 354' elevation SFP valve gallery, excluding entry and exit times to and from the area.
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS
 
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured. 2. Power has been lost to both SFP cooling pumps and 2K11-K5 "FUEL POOL TEMP HI" is in alarm. 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG. 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate. 5. Fuel Pool low level alarm is in and SF P level is lowering.
JPM-ANO-2-JPM-ADMIN-RWP and stay times                                               PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
: 1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
: 3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
: 4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
: 5. Fuel Pool low level alarm is in and SFP level is lowering.
: 6. RP coverage will NOT be available.
: 6. RP coverage will NOT be available.
Initiating CUE:
Initiating CUE:
The Shift Manager directs that Service water fr om loop I must be aligned to the SFP, use the Emergency RWP and identify the ma ximum allowable time before you would be required to leave the Auxiliary Building 354' elevation SFP valve gallery, excluding entry and exit times to and from the area.
The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.
 
RWP for TRAINING USE ONLY RWP                                ANO                          Page 1 of 5
______________________________________________________________________________
l                                                                              l l Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2004-0009l l______________________________________________________________________________
l l                                                                              l l SECTION I RWP DESCRIPTION l
l______________________________________________________________________________
l l                          l                        l                        l l START DATE: 01-jan-2004  l  END DATE: 31-dec-2004  l  RWP TYPE: General      l l__________________________l_________________________l_________________________l l                                                                              l
 
l DESCRIPTION:                                                                l
 
l                                                                              l
 
l Emergencies                                                                  l l                                                                              l l SYSTEM    COMPONENT                    BLDG    LOCATION                  l


l                                                                              l  
RWP for TRAINING USE ONLY RWP                                ANO                          Page 1 of 5 l                                                                              l l Status: Active          RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2004-0009l l______________________________________________________________________________l l                                                                              l l SECTION I                RWP DESCRIPTION                                      l l______________________________________________________________________________l l                          l                        l                        l l START DATE: 01-jan-2004 l END DATE: 31-dec-2004 l RWP TYPE: General          l l__________________________l_________________________l_________________________l l                                                                              l l DESCRIPTION:                                                                l l                                                                              l l Emergencies                                                                  l l                                                                              l l SYSTEM    COMPONENT                    BLDG    LOCATION                  l l                                                                              l l NA      Various                        A1/A2 Non LHRA's                    l l NA      Various                        OSCA  Non LHRA's                  l l NA      Various                        A1/A2 LHRA's                        l l                                                                              l l JOB CONTACTS..Shift Manager              ALARA CODE....C0007014              l l JOB CODE......ROS-                      ALARA CAT.....Level III            l l______________________________________________________________________________l l                                                                              l l SECTION II              TASK LIST                                            l l______________________________________________________________________________l l    l        l                                              l              l l    l        l                                              l  ESTIMATED  l l TASKl STATUS l    TASK DESCRIPTION                          l PR-HR lPER-REMl l_____l_________l______________________________________________l_______l_______l l    l        l                                              l      l      l l 1 lActive    lEmergency Response in Non LHRA's              l 1000.0l 5.000l l    l        l                                              l      l      l l 2 lActive    lEmergency Response in LHRA's                  l 200.0l 6.000l l_____l_________l______________________________________________l_______l_______l l                                                              l      l      l l                                                      TOTALS l 1200.0l 11.000l l______________________________________________________________l_______l_______l l                                                                              l l SECTION III            RWP REVIEWS AND APPROVAL                              l l______________________________________________________________________________l l                                                                              l l Originator ELLISON PW    18-dec-2003 Development ELLISON PW    19-dec-2003 l l ALARA Eval ELLISON PW    19-dec-2003 HP Supv.      DORAN GA    19-dec-2003 l l Terminated ____________ ___________ Completed      ____________ ___________ l l Withdrawn  ____________ ___________                                        l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009


l NA     Various                        A1/A2  Non LHRA's                  l  
RWP for TRAINING USE ONLY RWP                                  ANO                            Page 2 of 5 l                                                                               l l SECTION IV        PROTECTIVE REQUIREMENTS BY TASK     Rev 0    RWP 2004-0009l l______________________________________________________________________________l l                                                                                l l TASK                    TASK DESCRIPTION  ( Task# 1 )                        l l______________________________________________________________________________l l                                                                                l l 1)    Emergency Response in Non LHRA's                                         l l______________________________________________________________________________l l                                                                                l l                          RADIOLOGICAL CONDITIONS    ( Task# 1 )                l l______________________________________________________________________________l l                      l          l      l        l            l      l      l l                      l (mrem/Hr) l dpm l        l            l      l      l l Component/Location    l Gen  Max l100cm2l        l Yr/DANI# l          l      l l______________________l_____l_____l______l________l____________l_______l______l l                      l    l    l      l        l            l      l      l lUnit 1&2 Aux. Bldgs    l 1 l 200 l <1K l          lMonthly Pkg l        l      l lOutside Controlled Ac l 1 l 80 l <1K l            lMonthly Pkg l        l      l lVarious / Aux. Bldgs l 1 l1000 l <1K l            lANTICIPATED l        l      l l______________________l_____l_____l______l________l____________l_______l______l l                                                                                l l      Dosimetry    : Whole body TLD required, and Alarming Dosimeter.        l l                                                                                l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l      ALARA Actions:                                                          l l      1) Utilize low dose waiting areas whenever possible to minimize          l l          exposure.                                                            l l                                                                                l l      Monitoring:                                                              l l      1) Notify the zone coverage RP or the duty shift RP when Emergency      l l          Conditions exist.                                                    l l      2) Unless otherwise directed by RP Supervision, Electronic Alarming      l l          Dosimeter (EAD) set points will be 800 mrem dose and 800 mrem/hr      l l          dose rate.                                                            l l      3) During Emergency conditions the possibility of changing              l l          radiological conditions is increased. Radiological information        l l          should be obtained from in plant monitors, Rads Telmetry devices in l l          the field or RP personnel.                                            l l      4) Periodically check your Electronic Alarming Dosimeter (EAD). This    l l          check should be more frequent in areas where your ability to hear    l l          the alarm is diminished.                                              l l      5) If an EAD dose alarm occurs:                                          l l              1. Secure work.                                                  l l              2. Immediately leave Controlled Access.                          l l              3. Notify RP.                                                    l l      6) If an EAD dose rate alarm occurs:                                    l l              1. Secure work.                                                  l l              2. Back out of the immediate area until alarm clears.            l l              3. Notify others in work crew.                                  l l              4. Immediately contact RP for further instructions.              l l      7) Initial/Intermittent RP coverage is required for High Radiation      l l          Areas unless the individual is "Category 3 Advanced Radworker"        l l          qualified and has an appropriate radiation survey meter at all        l l          times during the entry.                                              l l          NOTE: An EAD is not an appropriate survey meter.                      l l      8) Access to the overhead >8ft. is allowed with the following            l l                                                                                l l                   --Continued on next page--                                  l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009


l NA      Various                        OSCA   Non LHRA's                   l l NA      Various                        A1/A2  LHRA's                       l l                                                                             l  
RWP for TRAINING USE ONLY RWP                                  ANO                          Page 3 of 5 l                                                                               l l SECTION IV        PROTECTIVE REQUIREMENTS BY TASK    Rev 0    RWP 2004-0009l l______________________________________________________________________________l l                                                                              l l TASK                    TASK DESCRIPTION   ( Task# 1 )                      l l______________________________________________________________________________l l                                                                              l l                  --Continued from previous page--                            l l                                                                              l l          provisions:                                                          l l            A.) Use a ladder to climb directly below the valve to be          l l                operated.                                                      l l            B.) Do not touch any interferences or components in the overhead. l l            C.) Use your survey meter to obtain dose rates of all areas        l l                entered.                                                      l l            D.) Wear rubber gloves while operating the valve but remove them l l                prior to descending the ladder.                                l l            E.) Upon completion, perform a large area masslin survey of the    l l                ladder to determine if any cross contamination has occurred. l l                                                                              l l      9) Accessing the top of partial walls separating Radiation/High        l l          Radiation areas from Locked High Radiation areas is not permitted    l l          on this RWP.                                                        l l                                                                              l l      Work Controls:                                                          l l                                                                              l l      1) Ensure the proper surveys are performed prior to removing any        l l          items from the RCA.                                                  l l                                                                              l l      Respiratory:                                                            l l                                                                              l l      1) Airborne Activity will be assessed based on process monitor's and    l l          continuous air monitor activity.                                    l l                                                                              l l      Anti-C's:                                                              l l                                                                              l l       1) Use Anti-C's appropriate for the area to be entered.                l l                                                                              l l      Additional:                                                            l l                                                                              l l      1) Radiological Conditions are ANTICIPATED and must be determined      l l         prior to beginning work in the area.                                l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009


l JOB CONTACTS..Shift Manager              ALARA CODE....C0007014              l  
RWP for TRAINING USE ONLY RWP                                  ANO                            Page 4 of 5 l                                                                               l l SECTION IV        PROTECTIVE REQUIREMENTS BY TASK      Rev 0    RWP 2004-0009l l______________________________________________________________________________l l                                                                                l l TASK                    TASK DESCRIPTION  ( Task# 2 )                        l l______________________________________________________________________________l l                                                                                l l 2)    Emergency Response in LHRA's                                            l l______________________________________________________________________________l l                                                                                l l                          RADIOLOGICAL CONDITIONS    ( Task# 2 )                l l______________________________________________________________________________l l                      l          l      l        l            l      l      l l                      l (mrem/Hr) l dpm l        l            l      l      l l Component/Location    l Gen  Max l100cm2l        l Yr/DANI# l          l      l l______________________l_____l_____l______l________l____________l_______l______l l                      l    l    l      l        l            l      l      l lUnit 1/2 Aux. Bldgs. l 1 l 200 l <1K l            lMonthly Pkg l        l      l lOutside Controlled Ac l 1 l 80 l <1K l            lMonthly Pkg l        l      l lVarious U1/2 Aux. Bld l 1 l1000 l <1K l            lANTICIPATED l        l      l l______________________l_____l_____l______l________l____________l_______l______l l                                                                                l l      Dosimetry    : Whole body TLD required, and Alarming Dosimeter.         l l                                                                                l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009


l JOB CODE......ROS-                      ALARA CAT.....Level III            l  
RWP for TRAINING USE ONLY RWP                                  ANO                          Page 5 of 5 l                                                                               l l SECTION IV        PROTECTIVE REQUIREMENTS BY TASK    Rev 0    RWP 2004-0009l l______________________________________________________________________________l l                                                                              l l TASK                    TASK DESCRIPTION  ( Task# 2 )                      l l______________________________________________________________________________l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l                                                                              l l      ALARA Actions:                                                          l l                                                                              l l      1) A pre-job-brief is required for this task.                          l l                                                                              l l      2) RP staff and or Shift Manager will conduct the pre-job-brief.        l l                                                                              l l      3) Utilize low dose waiting areas whenever possible to minimize        l l          exposure.                                                           l l                                                                              l l      Monitoring:                                                            l l                                                                              l l      1) Contiuous RP coverage is required for this task.                     l l                                                                              l l      2) Periodically check Electronic Alarming Dosimeter (EAD). This check l l          should be more frequent in areas where your ability to hear the      l l          alarm is deminished. If any (EAD) alarm is received secure work,    l l          find as low a dose rate area as possible and contact RP supervision l l          for further guidance.                                               l l                                                                              l l      3) Unless otherwise directed by RP Supervision, Electronic Alarming    l l          Dosimeter set points will be 800 mrem dose and 4000 mrem/hr dose    l l          rate.                                                               l l                                                                              l l      4) During Emergency conditions the possibility of changing              l l          radiological conditions is increased. Radiological information      l l          should be obtained from in plant radiation monitors, Rads Telemetry l l          devices in the field or RP personnel.                               l l                                                                              l l      Work Controls:                                                          l l                                                                              l l      1) Ensure the proper surveys are preformed prior to removing any        l l          items from the RCA                                                  l l                                                                              l l      Respiratory:                                                            l l                                                                              l l      1) Airborne Activity will be assessed based on process monitor's and    l l          continuous air monitor's activity.                                   l l                                                                              l l      Anti-C's:                                                              l l                                                                              l l      1) Use Anti-C's appropriate for the area to be entered.                 l l                                                                              l l      Additional:                                                            l l                                                                              l l      1) Radiological conditions are ANTICIPATED and must be determined      l l          prior to beginning work in the area.                                 l l______________________________________________________________________________l Tue Oct 19 13:59:59 2004          working                    RWP 2004-0009


l______________________________________________________________________________l
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL                                       PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:     002                   DATE:
______________________________________________________________________________
SYSTEM/DUTY AREA:       A4 Emergency Plan TASK:     Determine Emergency Action Level JTA#:
l                                                                              l l SECTION II
KA VALUE       RO:       2.3     SRO:         4.1       KA  
 
TASK LIST                                          l l______________________________________________________________________________
l l    l        l                                              l              l l    l        l                                              l  ESTIMATED  l
 
l TASKl STATUS  l  TASK DESCRIPTION                          l PR-HR lPER-REMl
 
l_____l_________l______________________________________________l_______l_______l
 
l    l        l                                              l      l      l l  1  lActive  lEmergency Response in Non LHRA's              l 1000.0l  5.000l l    l        l                                              l      l      l
 
l  2  lActive  lEmergency Response in LHRA's                  l  200.0l  6.000l
 
l_____l_________l______________________________________________l_______l_______l
 
l                                                              l      l      l l                                                      TOTALS l 1200.0l 11.000l l______________________________________________________________l_______l_______l
 
______________________________________________________________________________
l                                                                              l l SECTION III
 
RWP REVIEWS AND APPROVAL l
l______________________________________________________________________________
l l                                                                              l l Originator  ELLISON PW    18-dec-2003  Development  ELLISON PW  19-dec-2003 l
 
l ALARA Eval  ELLISON PW    19-dec-2003  HP Supv. DORAN GA    19-dec-2003 l l Terminated  ____________  ___________  Completed    ____________ ___________ l l Withdrawn  ____________  ___________                                        l
 
l______________________________________________________________________________l
 
Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009 RWP for TRAINING USE ONLY RWP                                ANO                          Page 2 of 5
_______________________________________________________________________
l                                                                              l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0    RWP 2004-0009l l______________________________________________________________________________
l l                                                                              l l TASK TASK DESCRIPTION
  ( Task# 1 )                      l l______________________________________________________________________________l l                                                                              l l  1)  Emergency Response in Non LHRA's l l______________________________________________________________________________
l l                                                                              l l
RADIOLOGICAL CONDITIONS
  ( Task# 1 )                l l______________________________________________________________________________l l                      l          l      l        l            l      l      l l                      l (mrem/Hr) l  dpm l        l            l      l      l l Component/Location  l Gen  Max l100cm2l        l  Yr/DANI#  l      l      l
 
l______________________l_____l_____l______l________l____________l_______l______l
 
l                      l    l    l      l        l            l      l      l
 
lUnit 1&2 Aux. Bldgs  l  1  l 200 l <1K  l        lMonthly Pkg l      l      l lOutside Controlled Ac l  1  l 80  l <1K  l        lMonthly Pkg l      l      l lVarious / Aux. Bldgs  l  1  l1000 l <1K  l        lANTICIPATED l      l      l
 
l______________________l_____l_____l______l________l____________l_______l______l
 
l                                                                              l l      Dosimetry 
: Whole body TLD required, and Alarming Dosimeter.        l l                                                                              l l  -------------------------  SPECIAL INSTRUCTIONS  -------------------------  l l      ALARA Actions:                                                        l l      1) Utilize low dose waiting areas whenever possible to minimize        l l          exposure.                                                          l l                                                                              l l      Monitoring:                                                            l l      1) Notify the zone coverage RP or the duty shift RP when Emergency    l l          Conditions exist.                                                  l
 
l      2) Unless otherwise directed by RP Supervision, Electronic Alarming    l l          Dosimeter (EAD) set points will be 800 mrem dose and 800 mrem/hr l l          dose rate.                                                          l l      3) During Emergency conditions the possibility of changing            l
 
l          radiological conditions is increased. Radiological information      l
 
l          should be obtained from in plant monitors, Rads Telmetry devices in l l          the field or RP personnel.                                          l l      4) Periodically check your Electronic Alarming Dosimeter (EAD). This  l
 
l          check should be more frequent in areas where your ability to hear  l
 
l          the alarm is diminished.                                            l
 
l      5) If an EAD dose alarm occurs:                                        l l              1. Secure work.                                                l l              2. Immediately leave Controlled Access.                        l
 
l              3. Notify RP.                                                  l
 
l      6) If an EAD dose rate alarm occurs:                                  l
 
l              1. Secure work.                                                l l              2. Back out of the immediate area until alarm clears.          l l              3. Notify others in work crew.                                l
 
l              4. Immediately contact RP for further instructions.            l
 
l      7) Initial/Intermittent RP coverage is required for High Radiation    l
 
l          Areas unless the individual is "Category 3 Advanced Radworker"      l l          qualified and has an appropriate radiation survey meter at all      l l          times during the entry.                                            l
 
l          NOTE: An EAD is not an appropriate survey meter.                    l l      8) Access to the overhead
>8ft. is allowed with the following          l l                                                                              l l                  --Continued on next page--                                l l______________________________________________________________________________l
 
Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009 RWP for TRAINING USE ONLY RWP                                ANO                          Page 3 of 5
______________________________________________________________________________
l                                                                              l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0    RWP 2004-0009l l______________________________________________________________________________
l l                                                                              l l TASK TASK DESCRIPTION
  ( Task# 1 )                      l l______________________________________________________________________________l l                                                                              l
 
l                  --Continued from previous page--                          l l                                                                              l l          provisions:                                                        l
 
l            A.) Use a ladder to climb directly below the valve to be          l
 
l                operated.                                                    l   
 
l            B.) Do not touch any interferences or components in the overhead. l l            C.) Use your survey meter to obtain dose rates of all areas      l l                entered.                                                      l
 
l            D.) Wear rubber gloves while operating the valve but remove them  l
 
l                prior to descending the ladder.                              l
 
l            E.) Upon completion, perform a large area masslin survey of the  l l                ladder to determine if any cross contamination has occurred. l l                                                                              l
 
l      9) Accessing the top of partial walls separating Radiation/High        l
 
l          Radiation areas from Locked High Radiation areas is not permitted  l
 
l          on this RWP.                                                        l l                                                                              l l      Work Controls:                                                        l l                                                                              l l      1) Ensure the proper surveys are performed prior to removing any      l
 
l          items from the RCA.                                                l l                                                                              l l      Respiratory:                                                          l l                                                                              l l      1) Airborne Activity will be assessed based on process monitor's and  l
 
l          continuous air monitor activity.                                    l l                                                                              l l      Anti-C's:                                                              l l                                                                              l l      1) Use Anti-C's appropriate for the area to be entered.                l
 
l                                                                              l l      Additional:                                                            l l                                                                              l l      1) Radiological Conditions are ANTICIPATED and must be determined      l
 
l          prior to beginning work in the area.                                l
 
l______________________________________________________________________________l Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009 RWP for TRAINING USE ONLY RWP                                ANO                          Page 4 of 5
______________________________________________________________________________
l                                                                              l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0    RWP 2004-0009l l______________________________________________________________________________
l l                                                                              l l TASK TASK DESCRIPTION
  ( Task# 2 )                      l l______________________________________________________________________________l l                                                                              l l  2)  Emergency Response in LHRA's l l______________________________________________________________________________
l l                                                                              l l
RADIOLOGICAL CONDITIONS
  ( Task# 2 )                l l______________________________________________________________________________l l                      l          l      l        l            l      l      l l                      l (mrem/Hr) l  dpm l        l            l      l      l l Component/Location  l Gen  Max l100cm2l        l  Yr/DANI#  l      l      l
 
l______________________l_____l_____l______l________l____________l_______l______l
 
l                      l    l    l      l        l            l      l      l
 
lUnit 1/2 Aux. Bldgs. l  1  l 200 l <1K  l        lMonthly Pkg l      l      l lOutside Controlled Ac l  1  l 80  l <1K  l        lMonthly Pkg l      l      l lVarious U1/2 Aux. Bld l  1  l1000 l <1K  l        lANTICIPATED l      l      l
 
l______________________l_____l_____l______l________l____________l_______l______l
 
l                                                                              l l      Dosimetry 
: Whole body TLD required, and Alarming Dosimeter.        l l                                                                              l l______________________________________________________________________________l
 
Tue Oct 19 13:59:58 2004          working                    RWP 2004-0009 RWP for TRAINING USE ONLY RWP                                ANO                          Page 5 of 5
______________________________________________________________________________
l                                                                              l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0    RWP 2004-0009l l______________________________________________________________________________
l l                                                                              l l TASK TASK DESCRIPTION
  ( Task# 2 )                      l l______________________________________________________________________________l l  -------------------------  SPECIAL INSTRUCTIONS  -------------------------  l
 
l                                                                              l l      ALARA Actions:                                                        l l                                                                              l l      1) A pre-job-brief is required for this task.                          l
 
l                                                                              l
 
l      2) RP staff and or Shift Manager will conduct the pre-job-brief.      l l                                                                              l l      3) Utilize low dose waiting areas whenever possible to minimize        l
 
l          exposure.                                                          l
 
l                                                                              l l      Monitoring:                                                            l l                                                                              l l      1) Contiuous RP coverage is required for this task.                    l
 
l                                                                              l
 
l      2) Periodically check Electronic Alarming Dosimeter (EAD). This check  l
 
l          should be more frequent in areas where your ability to hear the    l l          alarm is deminished. If any (EAD) alarm is received secure work,    l l          find as low a dose rate area as possible and contact RP supervision l
 
l          for further guidance.                                              l
 
l                                                                              l
 
l      3) Unless otherwise directed by RP Supervision, Electronic Alarming    l l          Dosimeter set points will be 800 mrem dose and 4000 mrem/hr dose    l l          rate.                                                              l l                                                                              l
 
l      4) During Emergency conditions the possibility of changing            l
 
l          radiological conditions is increased. Radiological information      l l          should be obtained from in plant radiation monitors, Rads Telemetry l l          devices in the field or RP personnel.                              l
 
l                                                                              l l      Work Controls:                                                        l l                                                                              l l      1) Ensure the proper surveys are preformed prior to removing any      l l          items from the RCA                                                  l
 
l                                                                              l l      Respiratory:                                                          l l                                                                              l l      1) Airborne Activity will be assessed based on process monitor's and  l l          continuous air monitor's activity.                                  l
 
l                                                                              l l      Anti-C's:                                                              l l                                                                              l l      1) Use Anti-C's appropriate for the area to be entered.                l l                                                                              l l      Additional:                                                            l l                                                                              l l      1) Radiological conditions are ANTICIPATED and must be determined      l l          prior to beginning work in the area.                                l l______________________________________________________________________________l
 
Tue Oct 19 13:59:59 2004          working                    RWP 2004-0009 JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 002 DATE:
SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#:   KA VALUE RO: 2.3 SRO: 4.1 KA  


==REFERENCE:==
==REFERENCE:==
2.4.41 APPROVED FOR ADMINISTRATION TO:          RO:            SRO:
X TASK LOCATION:          INSIDE CR:              OUTSIDE CR:            BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:                        LAB:
Perform POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME:                                              SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.4.41  APPROVED FOR ADMINISTRATION TO:
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL                                           PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
RO:    SRO:  X  TASK LOCATION:
* Plant had been operating for 150 days at 100% power.
INSIDE CR:
* A reactor trip occurred two hours ago.
OUTSIDE CR:
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
* Containment Spray Actuation Signal (CSAS) has actuated.
PLANT SITE:
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
SIMULATOR:
* Chemists have been notified to sample the RCS.
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
Plant had been operating fo r 150 days at 100% power. A reactor trip occurred two hours ago. A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. Containment Spray Actuation Signal (CSAS) has actuated. Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 ar e reading 2400 R/HR. Chemists have been notified to sample the RCS.  
 
TASK STANDARD:
TASK STANDARD:
Declared a Site Area Emergency (bas ed on EAL 1.4, Containment radi ation readings which indicate LOCA and >1% fuel cladding failure). Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classi fy the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.
Declared a Site Area Emergency (based on EAL 1.4, Containment radiation readings which indicate LOCA and >1% fuel cladding failure). Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.
TASK PERFORMANCE AIDS:      OP 1903.010  Rev. 037-02-0 SIMULATOR SETUP: N/A.


TASK PERFORMANCE AIDS:    OP 1903.010    Rev. 037-02-0                                                                   
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL                                                         PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
 
As Shift Manager, determine the EAL classification based on the given plant conditions.
SIMULATOR SETUP:
Critical Steps:    2, 3, 4 PERFORMANCE CHECKLIST                                STANDARDS                    (Circle One)
N/A. 
: 1. Review E-Plan procedure            Review 1903.010 index and EAL      N/A SAT UNSAT 1903.010 to determine              classification tabs.
 
classification.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE
(C)      2. Reviewed 1903.010 attachment      Determined that the containment    N/A SAT UNSAT 6 containment radiation EAL        radiation reading exceeds the plot to determine that            Site Area Emergency Criteria.
containment radiation levels exceed the Site area emergency criteria.
(C)      3. Reviewed initial conditions and    Determined LOCA inside              N/A SAT UNSAT determined that a LOCA inside      containment was in progress.
containment was in progress.
(C)      4. Reviewed EAL 1.4., Site Area      Classified EAL as a Site Area      N/A SAT UNSAT Emergency based on a LOCA          Emergency (SAE) based on EAL and > 1% failed fuel.              1.4, Containment Radiation readings which indicate LOCA Or and > 1% fuel cladding failure.
Also acceptable is a review of the 1903.010 paragraph 4.10,      OR Fission Product Barrier Failure    Classified EAL as a Site Area and 4.11, Fission Product          Emergency (SAE) based on EAL Barrier Challenge criteria and    9.3, Plant conditions exist that determine that two fission        warrant activation of the product barriers are challenged    Emergency Response Facility.
or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.
END


JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL                                          PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
* Plant had been operating for 150 days at 100% power.
* A reactor trip occurred two hours ago.
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
* Containment Spray Actuation Signal (CSAS) has actuated.
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
* Chemists have been notified to sample the RCS.
INITIATING CUE:
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
As Shift Manager, determine the EAL classification based on the given plant conditions.
Critical Steps:      2, 3, 4 PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. Review E-Plan procedure 1903.010 to determine classification.
Review 1903.010 index and EAL classification tabs.
N/A  SAT  UNSAT (C) 2. Reviewed 1903.010 attachment 6 containment radiation EAL plot to determine that containment radiation levels exceed the Site area emergency criteria.
Determined that the containment radiation reading exceeds the Site Area Emergency Criteria. N/A  SAT  UNSAT (C) 3. Reviewed initial conditions and determined that a LOCA inside containment was in progress.
Determined LOCA inside containment was in progress. N/A  SAT  UNSAT (C) 4. Reviewed EAL 1.4., Site Area Emergency based on a LOCA and > 1% failed fuel.
Or Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency


Response Facility.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL                                         PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
Classified EAL as a Site Area Emergency (SAE) based on EAL 1.4, Containment Radiation readings which indicate LOCA and > 1% fuel cladding failure.
* Plant had been operating for 150 days at 100% power.
OR  Classified EAL as a Site Area Emergency (SAE) based on EAL 9.3, Plant conditions exist that warrant activation of the Emergency Response Facility.
* A reactor trip occurred two hours ago.
N/A  SAT  UNSAT END JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Plant had been operating fo r 150 days at 100% power. A reactor trip occurred two hours ago. A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. Containment Spray Actuation Signal (CSAS) has actuated. Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 ar e reading 2400 R/HR. Chemists have been notified to sample the RCS.
* A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
* Containment Spray Actuation Signal (CSAS) has actuated.
* Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
* Chemists have been notified to sample the RCS.
INITIATING CUE:
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
As Shift Manager, determine the EAL classification based on the given plant conditions.
JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL  PAGE  5  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Plant had been operating fo r 150 days at 100% power. A reactor trip occurred two hours ago. A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm. Containment Spray Actuation Signal (CSAS) has actuated. Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 ar e reading 2400 R/HR. Chemists have been notified to sample the RCS.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.


JPM- ANO-2-JPM-NRC-AOP2   PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
JPM- ANO-2-JPM-NRC-AOP2                                                           PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   000                     DATE:
SYSTEM/DUTY AREA:
SYSTEM/DUTY AREA:       Containment Cooling Water System TASK:     Reset CIAS and establish cooling water to containment JTA#:
Containment Cooling Water System                      
KA VALUE       RO:       3.1       SRO:         3.2       KA  
 
TASK: Reset CIAS and establish cooling water to containment            
 
JTA#:   KA VALUE RO: 3.1 SRO: 3.2 KA  


==REFERENCE:==
==REFERENCE:==
022 A4.04 APPROVED FOR ADMINISTRATION TO:            RO:        X    SRO:    X TASK LOCATION:          INSIDE CR:        X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:            Perform      LAB:
POSITION EVALUATED:        RO:                      SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:                PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                  15 Minutes REFERENCE(S):      AOP 2203.0039    Rev 03-02-0 EXAMINEE'S NAME:                                                  SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


022 A4.04   
JPM- ANO-2-JPM-NRC-AOP2                                                                   PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
JPM INITIAL TASK CONDITIONS:         An inadvertent CIAS has occurred.
RO:  X  SRO:  X  TASK LOCATION:
Steps 1-10 of AOP 2203.039 have been completed.
INSIDE CR:
TASK STANDARD:         CIAS has been reset and containment Chilled water has been realigned.
X  OUTSIDE CR:
TASK PERFORMANCE AIDS:           Copy of AOP 2203.039 Revision 003-02-0 is available.
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
AOP 2203.039 Steps 1-10 have been completed.
PLANT SITE:
SIMULATOR SETUP: Inadvertent CIAS present. Containment parameters and RCS parameters are above setpoints, containment pressure < 18.3 psia. Verify CBO to VCT valves, 2CV-4847-2 and 2CV 4846-1 handswitches are in CLOSE.
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
AOP 2203.0039    Rev 03-02-0                                                                                 
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-AOP2   PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
 
JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred.                              
 
Steps 1-10 of AOP 2203.039 have been completed.                                                                
 
TASK STANDARD:
CIAS has been reset and containment Chilled water has been realigned.  
 
TASK PERFORMANCE AIDS:
Copy of AOP 2203.039 Revision 003-02-0 is available.      
 
AOP 2203.039 Steps 1-10 have been completed.                                                    
 
SIMULATOR SETUP:
Inadvertent CIAS present. Containm ent parameters and RCS parameters  
 
are above setpoints, contai nment pressure < 18.3 psia. Verify CBO to VCT  
 
valves, 2CV-4847-2 and 2CV 4846-1 handswitc hes are in CLOSE.                                                      
 
JPM- ANO-2-JPM-NRC-AOP2  PAGE  3  OF 7  JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform actions in I nadvertent CIAS, AOP 2203.039, steps 11 through 15."  CRITICAL ELEMENTS (C):
1, 2, 6, 7, 8                                                                               
 
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. (Proc step 11) Reset CIAS on 2C23B.
 
Examiners note:
 
Only one channel of PPS is modeled on simulator
 
completely. Correctly resetting
 
of this channel will reset CIAS
 
trip paths.
 
Examiners Cue @ Step 11.D:


JPM- ANO-2-JPM-NRC-AOP2                                                                  PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."
CRITICAL ELEMENTS (C):          1, 2, 6, 7, 8 START TIME:
PERFORMANCE CHECKLIST                                STANDARDS                  (Circle One)
(C)      1. Reset CIAS on 2C23B.                Obtained key 15 from Shift        N/A SAT UNSAT Manager.
(Proc step Examiners note:                      On panel 2C23B placed key in
: 11)                                      trip path keyswitch to UNLK.
Only one channel of PPS is modeled on simulator                Depressed CIAS pushbutton for completely. Correctly resetting      trip path.
of this channel will reset CIAS trip paths.                          Placed trip path keyswitch to LK and removed key.
Examiners Cue @ Step 11.D:
All four PPS trip path channels have been reset.
All four PPS trip path channels have been reset.
Obtained key 15 from Shift Manager.
(C)      2. Reset ESF CIAS actuation on          Depressed CIAS lockout reset      N/A SAT UNSAT 2C40.                               pushbutton on 2C40-7 and (Proc                                     observed CIAS ON light lit and step Examiners note:                     observed trip paths lights on
On panel 2C23B placed key in trip path keyswitch to UNLK.
: 12)                                      panel above 2C23 lit.
 
Only one channel of ESF actuation path is modeled on simulator completely. Correctly resetting of this channel will reset CIAS ESF actuation.
Depressed CIAS pushbutton for
 
trip path. 
 
Placed trip path keyswitch to LK
 
and removed key.
 
N/A SAT UNSAT (C) 2. (Proc step 12) Reset ESF CIAS actuation on 2C40.
Examiners note:  
 
Only one channel of ESF actuation path is modeled on  
 
simulator completely. Correctly  
 
resetting of this channel will  
 
reset CIAS ESF actuation.  
 
Examiners Cue @ Step 12.B:
Examiners Cue @ Step 12.B:
2C39 ESF CIAS actuation has been reset.
2C39 ESF CIAS actuation has been reset.
Depressed CIAS lockout reset pushbutton on 2C40-7 and  
: 3. Go to step 14.                      Using procedure 2203.039,          N/A SAT UNSAT (Proc                                      transition to step 14.
step1 2.c)
: 4. Open RCP Bleedoff to VCT            On panel 2C17, Placed              N/A SAT UNSAT valve, 2CV-4846-1.                  handswitches for RCP bleedoff to (Proc                                      VCT valve 2CV-4846-1 to OPEN.
step
: 14)                                      Observed RED light ON and GREEN light OFF above hand switch.


observed "CIAS ON "light lit and  
JPM- ANO-2-JPM-NRC-AOP2                                                      PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                        STANDARDS                  (Circle One)
: 5. Open RCP Bleedoff to VCT    On panel 2C16, Placed            N/A SAT UNSAT valve, 2CV-4847-2.          handswitches for RCP bleedoff to (Proc                              VCT valve 2CV-4847-2 to OPEN.
step
: 14)                              Observed RED light ON and GREEN light OFF above hand switch.
(C)    6. Open Chilled water to CNTMT  On panel 17, placed              N/A SAT UNSAT valve 2CV-3851-1.            handswitches for Chilled Water to (Proc                              CNTMT Isolation valve step                              2CV-3851-1 to OPEN.
15.a)
Observed RED light ON and GREEN light OFF above hand switch.
(C)    7. Open Chilled water to CNTMT  On panel 17, placed              N/A SAT UNSAT valve 2CV-3852-1.            handswitches for Chilled Water to (Proc                              CNTMT Isolation valve step                              2CV-3852-1 to OPEN.
15a)
Observed RED light ON and GREEN light OFF above hand switch.
(C)    8. Open Chilled water to CNTMT  On panel 16, placed              N/A SAT UNSAT valve 2CV-3850-2.            handswitches for Chilled Water to (Proc                              CNTMT Isolation valve step                              2CV-3850-2 to OPEN.
15a)
Observed RED light ON and GREEN light OFF above hand switch.
: 9. Verify Main Chiller (2VCH1A) On panel 22, verified hand switch N/A SAT UNSAT running.                    for 2VCH1A is in normal after (Proc                              start (RED flagged).
step 15b)
Observed RED light ON and Examiners note:            GREEN light OFF above hand The red light above hand    switch for 2VCH-1A.
switch for 2VCH-1A indicates the chiller is running.
Observed RED light ON and GREEN light OFF above label for Examiners note:            2HS-3810.
The red light label for 2HS-3810 for 2VCH-1A indicates  Observed all chilled water alarms the 2A1 breaker is closed. are clear on annunciator 2K13 (Lights slow flashing or clear).


observed trip paths lights on
JPM- ANO-2-JPM-NRC-AOP2                                                             PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARDS                       (Circle One)
 
EXAMINERs NOTE:
panel above 2C23 lit.
JPM standard does not require completion of steps past procedure step 15.
N/A  SAT  UNSAT  3. (Proc step1 2.c) Go to step 14. 
END STOP TIME:
 
Using procedure 2203.039, transition to step 14.
N/A  SAT  UNSAT  4. (Proc step 14) Open RCP Bleedoff to VCT valve, 2CV-4846-1.
 
On panel 2C17, Placed handswitches for RCP bleedoff to
 
VCT valve 2CV-4846-1 to OPEN.
 
Observed RED light ON and
 
GREEN light OFF above hand switch. N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-AOP2  PAGE  4  OF 7  JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  5. (Proc step 14) Open RCP Bleedoff to VCT valve, 2CV-4847-2.
 
On panel 2C16, Placed handswitches for RCP bleedoff to
 
VCT valve 2CV-4847-2 to OPEN.
 
Observed RED light ON and
 
GREEN light OFF above hand switch. N/A  SAT  UNSAT (C) 6. (Proc step 15.a) Open Chilled water to CNTMT valve 2CV-3851-1.
 
On panel 17, placed handswitches for Chilled Water to
 
CNTMT Isolation valve 
 
2CV-3851-1 to OPEN.
 
Observed RED light ON and
 
GREEN light OFF above hand switch. N/A  SAT  UNSAT (C) 7. (Proc step 15a) Open Chilled water to CNTMT valve 2CV-3852-1.
 
On panel 17, placed handswitches for Chilled Water to
 
CNTMT Isolation valve 
 
2CV-3852-1 to OPEN.
 
Observed RED light ON and
 
GREEN light OFF above hand switch. N/A  SAT  UNSAT (C) 8. (Proc step 15a) Open Chilled water to CNTMT valve 2CV-3850-2.
 
On panel 16, placed handswitches for Chilled Water to
 
CNTMT Isolation valve 
 
2CV-3850-2 to OPEN.
 
Observed RED light ON and
 
GREEN light OFF above hand switch. N/A  SAT  UNSAT  9. (Proc step 15b) Verify Main Chiller (2VCH1A) running.
 
Examiner's note: The red light above hand switch for 2VCH-1A indicates
 
the chiller is running.
 
Examiner's note:
 
The red light label for 2HS-3810 for 2VCH-1A indicates
 
the 2A1 breaker is closed.
On panel 22, verified hand switch for 2VCH1A is in normal after
 
start (RED flagged).
 
Observed RED light ON and GREEN light OFF above hand switch for 2VCH-1A.
 
Observed RED light ON and GREEN light OFF above label for
 
2HS-3810.
 
Observed all chilled water alarms are clear on annunciator 2K13 (Lights slow flashing or clear).
N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-AOP2   PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINER's NOTE:
JPM standard does not require completi on of steps past procedure step 15.
END STOP TIME:                              
 
JPM- ANO-2-JPM-NRC-AOP2  PAGE  6  OF 7  JOB PERFORMANCE MEASURE
 
EXAMINER'S COPY
 
JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been
 
completed.                                                                   


JPM- ANO-2-JPM-NRC-AOP2                                        PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."


The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."
JPM- ANO-2-JPM-NRC-AOP2                                       PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
 
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.
JPM- ANO-2-JPM-NRC-AOP2   PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY
 
JPM INITIAL TASK CONDITIONS:
An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been  
 
completed.                                                                  
 
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."


The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."
JPM- ANO-2-JPM-NRC-CVCS010                                                       PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:     2                     REV #:     000                     DATE:
 
SYSTEM/DUTY AREA:       Chemical and Volume Control System TASK:     Perform Emergency Boration (Alternate Success Path)
JPM- ANO-2-JPM-NRC-CVCS010   PAGE 1 OF   7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
JTA#:
SYSTEM/DUTY AREA:
KA VALUE       RO:       3.9     SRO:         3.7       KA  
Chemical and Volume Control System
 
TASK: Perform Emergency Boration (Alternate Success Path)  
 
JTA#:   KA VALUE RO: 3.9 SRO: 3.7 KA  


==REFERENCE:==
==REFERENCE:==
004 A4.07 APPROVED FOR ADMINISTRATION TO:            RO:        X    SRO:    X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:            Perform      LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                12 Minutes REFERENCE(S):      OP 2203.032 Rev. 008-06-0 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


004 A4.07
JPM- ANO-2-JPM-RO-CVCS010                                                                       PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
12 Minutes REFERENCE(S):
OP 2203.032 Rev. 008-06-0
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-RO-CVCS010 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" porti on of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Mode 3. 'B' CCP tagged out for low pressure operat ions. 'C' CCP tagged out for gear box repair.
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair.
TRM 3.1.2.4 entered for only 1 CCP availabl e with 55 hours remaining on the action.
TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
A Shutdown Margin is calculated following a reactor trip.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
Shutdown Margin is found to be less than required.
TASK STANDARD:
TASK STANDARD:  
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection MOVs. This is an alternate success path JPM>
 
TASK PERFORMANCE AIDS:
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection MOV's.
AOP 2203.032 Steps 2 through 16. OP 4104.039 section 9, Starting any HPSI pump on recirc.
This is an alternate success path JPM>
TASK PERFORMANCE AIDS:  
 
AOP 2203.032 Steps 2 through 16. OP 4104.039 secti on 9, Starting any HPSI pump on recirc.  
 
SIMULATOR SETUP:
SIMULATOR SETUP:
A mode 3 IC will be set up for this JPM. RCS cooldow n in progress, PZR pressure ~ 1200psia, RCS temp
A mode 3 IC will be set up for this JPM. RCS cooldown in progress, PZR pressure ~ 1200psia, RCS temp
~480&deg;F. 'A' CCP running. 'B' CCP t agged out for low pressure operations. 'C' CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP ava ilable with 55 hours remaining on the action.
~480&deg;F. A CCP running. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.)
Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.)
T1 = 'A' CCP plunger failure (flow out of pump ~ 30gpm).  
T1 = A CCP plunger failure (flow out of pump ~ 30gpm).


JPM- ANO-2-JPM-RO-CVCS010 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
JPM- ANO-2-JPM-RO-CVCS010                                                               PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."
CRITICAL ELEMENTS (C):       2, 5, 9, 10, 14, 15         
CRITICAL ELEMENTS (C):         2, 5, 9, 10, 14, 15 START TIME:
PERFORMANCE CHECKLIST                                STANDARD                  (Circle One)
: 1. Verify at least one charging      On panel 2C09, verified CCP(s)    N/A SAT UNSAT Pump (CCP) running with flow      running.
(Proc  greater than 40 GPM.
Step                                    Observed red light ON; green light
: 2)                                      OFF above at least one of the following handswitch(es):
2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).
(C)    2. Align boric acid supply to CCP    On panel 2C09, opened BAMT        N/A SAT UNSAT suction.                          gravity feed valves 2CV-4920-1 (Proc                                    and/or 2CV-4921-1 Step 3A1)                                      Observed red light ON and green light OFF above handswitch(es):
* 2HS-4920-1 for 2CV-4920-1
* 2HS-4921-1 for 2CV-4921-1
: 3. Close volume control tank        On panel 2C09, observed that      N/A SAT UNSAT (VCT) outlet valve (2CV-4873-    2CV-4873-1 closed.
(Proc  1).
Step                                    Observed green light ON; red light
: 4)                                      OFF above VCT Outlet valve handswitch (2HS-4873-1).
: 4. Check Reactor Makeup Water       On panel 2C09, verified 2CV-4927  N/A SAT UNSAT Flow Control valve (2CV-4927)    or 2CV-4941-2 closed.
(Proc  or 2CV 4941-2 closed.
Step                                    Observed green light ON; red light
: 5)                                      OFF above Reactor Makeup Water Flow Controller (2FIC-4927) or above 2CV-4941-2 handswitch.
(C)    5. Check charging header flow.      On panel 2C09 (upright portion),  N/A SAT UNSAT (Proc                                    observed flow about 30 gpm on Step                                    Charging Header Flow indicator
: 6)                                      (2FIS-4863).


START TIME:
JPM- ANO-2-JPM-RO-CVCS010                                                                  PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                               STANDARD                       (Circle One)
PERFORMANCE CHECKLIST STANDARD (Circle One) 1. (Proc Step 2) Verify at least one charging Pump (CCP) running with flow
: 6. GO to step 2 and verify TCBs    On panel 2C14, verifies that the    N/A SAT UNSAT open and then transition to      TCBs are open by observing the (Proc   step 8.                          green lights ON and red lights Step                                   OFF.
2)
: 7. Check RCS pressure less than    On panel 2C04, SPDS, PMS or          N/A SAT UNSAT 1265 psia.                      PDS verified that PZR pressure is (Proc                                    less than 1265 psia.
Step 8)
: 8. Verify RWT level greater than    On panel 2C16 or 2C17, verified      N/A SAT UNSAT 7.5%.                            RWT level greater than 7.5%.
(Proc Step 9A)
(C)      9. Verify 2CV-5631-2 is OPEN.      On panel 2C16 verified RWT outlet    N/A SAT UNSAT EXAMINERS CUE: When            valve 2CV-5631-2 is OPEN.
(Proc Step  asked as CRS, in step 9, 9B)    which HPSI pump to start, state that B HPSI pump is to be used. If not asked and goes to 2C17 to verify RWT outlet valve open and start A HPSI pump, state that B HPSI pump is to be started.
NOTE: If Examinee in procedure step 9C, goes to use OP2104.039 section 9.0 then give the following cue.
EXAMINERs CUE: CRS directs to start B HPSI pump first and then verify steps in appropriate section in OP 2104.039.
(C)    10. Start 2P89B, B HPSI Pump.      On panel 2C16 rotated handswitch    N/A SAT UNSAT for 2P89B to start position.
(Proc Step                                    Observed Red light ON and Green 9C)                                    light OFF.
: 11. Verify SDC secured.              On panel 2C16 and 2C17 verified      N/A SAT UNSAT LPSI (SDC) pumps secured.
(Proc Step 10)
: 12. Check RCS temperature            On panel 2C04, SPDS, PMS or          N/A SAT UNSAT greater than 450&deg;F.              PDS verified RCS temperature (Proc                                    greater than 450&deg;F.
Step 11)


greater than 40 GPM.
JPM- ANO-2-JPM-RO-CVCS010                                                           PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                             STANDARD                     (Circle One)
 
: 13. Commence RCS cooldown to       Verify conditions will allow for a N/A SAT UNSAT allow a makeup rate of 40      makeup rate of 40 gpm. (Step 12)
On panel 2C09, verified CCP(s) running.
(Proc  GPM.
 
step
Observed red light ON; green light
: 12)   Note: applicant will not perform this procedure step.
 
EXAMINERS CUE: The RCS cooldown will be controlled by another operator and the rate is sufficient to allow 40 GPM makeup rate.
OFF above at least one of the
(C)   14. Use one HPSI train B injection Throttled open ONE of the          N/A SAT UNSAT MOV to maintain PZR level.     following HPSI injection MOV:
 
(Proc step  (Note these are contingency    2CV-5016-2 13A)  action steps.)
following handswitch(es):
2CV-5036-2 2CV5056-2 2CV-5076-2 Observed Red light ON and Green light ON above handswitch.
 
(C)   15. Verified HPSI to RCS flow       Adjust valve position to maintain  N/A SAT UNSAT greater than 40 GPM using       greater than 40 GPM HPSI flow (Proc  SPDS computer.                  using indications on SPDS step                                  computer.
2HS-4832-1, "A" CCP
13B)
 
Procedure steps 14, 15 and 16 are not required to be completed.
2HS-4852-1, "C" CCP (red)
END STOP TIME:
 
2HS-4853-2, "C" CCP (green)
 
2HS-4842-2, "B" CCP
 
Observed flow greater than 40
 
gpm on Charging Header Flow
 
(2FIS-4863).
N/A  SAT  UNSAT (C) 2. (Proc Step 3A1)  Align boric acid supply to CCP suction.
 
On panel 2C09, opened BAMT gravity feed valves 2CV-4920-1 and/or 2CV-4921-1
 
Observed red light ON and green
 
light OFF above handswitch(es):
 
2HS-4920-1 for 2CV-4920-1  2HS-4921-1 for 2CV-4921-1 N/A  SAT  UNSAT  3. (Proc Step 4)  Close volume control tank (VCT) outlet valve (2CV-4873-
 
1).
 
On panel 2C09, observed that 2CV-4873-1 closed.
 
Observed green light ON; red light
 
OFF above VCT Outlet valve
 
handswitch (2HS-4873-1).
N/A  SAT  UNSAT  4. (Proc Step 5)  Check Reactor Makeup Water Flow Control valve (2CV-4927)
 
or 2CV 4941-2 closed.
 
On panel 2C09, verified 2CV-4927 or 2CV-4941-2 closed.
 
Observed green light ON; red light
 
OFF above Reactor Makeup Water
 
Flow Controller (2FIC-4927) or
 
above 2CV-4941-2 handswitch.
N/A  SAT  UNSAT (C) 5. (Proc Step 6) Check charging header flow.
On panel 2C09 (upright portion), observed flow about 30 gpm on
 
Charging Header Flow indicator
 
(2FIS-4863).
N/A  SAT  UNSAT JPM- ANO-2-JPM-RO-CVCS010 PAGE OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) 6. (Proc Step 2)  GO to step 2 and verify TCB's open and then transition to
 
step 8. On panel 2C14, verifies that the TCB's are open by observing the
 
green lights ON and red lights
 
OFF. N/A SAT UNSAT 7. (Proc Step 8) Check RCS pressure less than 1265 psia.
On panel 2C04, SPDS, PMS or PDS verified that PZR pressure is
 
less than 1265 psia.
N/A  SAT  UNSAT  8. (Proc Step 9A) Verify RWT level greater than 7.5%. On panel 2C16 or 2C17, verified RWT level greater than 7.5%.
N/A SAT  UNSAT (C) 9. (Proc Step 9B) Verify 2CV-5631-2 is OPEN.
EXAMINER'S CUE: When asked as CRS, in step 9, which HPSI pump to start, state that 'B' HPSI pump is
 
to be used. If not asked and goes to 2C17 to verify RWT outlet valve open and start
 
'A' HPSI pump, state that 'B'
 
HPSI pump is to be started.
On panel 2C16 verified RWT outlet valve 2CV-5631-2 is OPEN.
N/A  SAT  UNSAT NOTE: If Examinee in procedure step 9C, goes to use OP2104.039 section 9.0 then gi ve the following cue.
EXAMINER's CUE: CRS directs to start 'B' HPSI pump first and then verify steps in appropriate section in OP 2104.039. (C) 10. (Proc Step 9C) Start 2P89B, 'B' HPSI Pump. On panel 2C16 rotated handswitch for 2P89B to start position.
Observed Red light ON and Green light OFF.
N/A  SAT  UNSAT  11. (Proc Step 10) Verify SDC secured. On panel 2C16 and 2C17 verified LPSI (SDC) pumps secured.
N/A  SAT  UNSAT  12. (Proc Step 11) Check RCS temperature greater than 450&deg;F.
On panel 2C04, SPDS, PMS or PDS verified RCS temperature
 
greater than 450&deg;F.
N/A  SAT  UNSAT JPM- ANO-2-JPM-RO-CVCS010  PAGE  5  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)  13. (Proc step 12) Commence RCS cooldown to allow a makeup rate of 40
 
GPM. Note: applicant will not perform this procedure step.
EXAMINER'S CUE: The RCS cooldown will be controlled by another operator and the rate is sufficient to allow 40  
 
GPM makeup rate.
Verify conditions will allow for a makeup rate of 40 gpm. (Step 12)
N/A  SAT  UNSAT (C) 14. (Proc step 13A) Use one HPSI train B injection MOV to maintain PZR level. (Note these are contingency action steps.)
Throttled open ONE of the following HPSI injection MOV:
2CV-5016-2  
 
2CV-5036-2  
 
2CV5056-2  
 
2CV-5076-2  
 
Observed Red light ON and Green light ON above handswitch.
N/A  SAT  UNSAT (C) 15. (Proc step 13B) Verified HPSI to RCS flow greater than 40 GPM using SPDS computer.
Adjust valve position to maintain greater than 40 GPM HPSI flow  
 
using indications on SPDS  
 
computer.
N/A  SAT  UNSAT Procedure steps 14, 15 and 16 are not required to be completed.
END STOP TIME:                              
 
JPM- ANO-2-JPM-RO-CVCS010  PAGE  6  OF  7 JOB PERFORMANCE MEASURE EXAMINER's COPY
 
JPM INITIAL TASK CONDITIONS:
Mode 3. 'B' CCP tagged out for low pressure operations. 'C' CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required. 


JPM- ANO-2-JPM-RO-CVCS010                                      PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS:
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."


The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to
JPM- ANO-2-JPM-RO-CVCS010                                       PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS:
 
Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
Charging Pump suction beginning with AOP 2203.032, Step 2."
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.
 
JPM- ANO-2-JPM-RO-CVCS010 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEE's COPY  
 
JPM INITIAL TASK CONDITIONS:
Mode 3. 'B' CCP tagged out for low pressure operations. 'C' CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours remaining on the action.
A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.  
 
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."


The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to
JPM- ANO-2-JPM-NRC-PZR02                                                       PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   010                     DATE:
 
SYSTEM/DUTY AREA:       Pressurizer Pressure Control System TASK:     Equalize RCS and PZR Boron (ALTERNATE SUCCESS PATH)
Charging Pump suction beginning with AOP 2203.032, Step 2."
JTA#:     ANO2-RO-PZR-NORM-3 KA VALUE       RO:       3.7     SRO:         3.5       KA  
 
JPM- ANO-2-JPM-NRC-PZR02   PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:
SYSTEM/DUTY AREA:
Pressurizer Pressure Control System                    
 
TASK: Equalize RCS and PZR Boron (ALTERNATE SUCCESS PATH)  
 
JTA#: ANO2-RO-PZR-NORM-3                            
 
KA VALUE RO: 3.7 SRO: 3.5 KA  


==REFERENCE:==
==REFERENCE:==
010 A4.01 APPROVED FOR ADMINISTRATION TO:            RO:      X    SRO:    X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:            BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:          Perform      LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                15 Minutes REFERENCE(S):      OP 2103.005 Rev. 024-00-0 and AOP 2203.028 Rev 06-00-0 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


010 A4.01       
JPM- ANO-2-JPM-NRC-PZR02                                                                        PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:            100% Power Operation. A power escalation has been completed.
Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
TASK STANDARD: Spray Valve (2CV-4651) is isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS:              OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP: Run CAE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (cae file JPM03 will do all of them):
Set T5 file to GH4R651A this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2HS-4651-5 false (red light)


APPROVED FOR ADMINISTRATION TO:
JPM- ANO-2-JPM-NRC-PZR02                                                                    PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
RO: X  SRO: X  TASK LOCATION:
EXAMINERs NOTE: Do not hand out procedure until asked.
INSIDE CR:
The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."
X  OUTSIDE CR:
CRITICAL ELEMENTS (C):             2, 3, 4, 6 START TIME:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PERFORMANCE CHECKLIST                                STANDARDS                      (Circle One)
PLANT SITE:
: 1.      Verify spray valve, 2CV-4651,   On panel 2C04 verified red lights    N/A SAT UNSAT (Proc    isolation valves 2CV-4655        ON, green lights OFF for step    AND 2CV-4656 are OPEN.          2CV-4655 and 2CV-4656.
SIMULATOR:
7.1.1)
Perform  LAB:   POSITION EVALUATED:
(C)       2.      Place RCP A spray valve        On panel 2C04, rotated              N/A SAT UNSAT (Proc    MAN/AUTO select switch          2HS-4651B in the CCW direction step    (2HS-4651B) to MANUAL.          to MANUAL.
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
7.1.2)
SIMULATOR:
(C)        3.      Energize all available Backup   On panel 2C04 verified the          N/A SAT UNSAT (Proc    Heaters.                        following hand switches to ON:
PLANT SITE:
step Place 2HS-4643 to ON 7.1.3)
LAB:  TESTING METHOD:
Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater hand switches.
SIMULATE:
EXAMINERS NOTE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
15 Minutes REFERENCE(S):
(C)       4.     Partially open 2CV-4651 to      When RCS pressure starts rising,    N/A SAT UNSAT (Proc stabilize pressure within +/- 10      then on panel 2C04, throttled step    psia of desired setpoint.       open 2CV-4651 by taking the 7.1.4)                                    hand switch for 2CV-4651 to the open position.
OP 2103.005 Rev. 024-00-0 and AOP 2203.028 Rev 06-00-0                                 
EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.


EXAMINEE'S NAME:
JPM- ANO-2-JPM-NRC-PZR02                                                     PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                        STANDARDS                (Circle One)
SSN:  EVALUATOR'S NAME:
: 5. Recognizes that 2CV4651 is On panel 2C04, observed that    N/A SAT UNSAT (AOP  deenergized open.          light position indications above Proc                            2CV-4651 are out and PZR step 1) Attempts to close 2CV4651  pressure is lowering.
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
may be made, but is not necessary.
 
(C)      6. Close PZR Spray Block      On panel 2C04, placed hand-      N/A SAT UNSAT (AOP  Valves.                    switch for 2CV-4655 and 2CV-Proc                            4656 to "CLOSE".
SATISFACTORY:
step 1.B.3)                            Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
UNSATISFACTORY:
END STOP TIME:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-PZR02   PAGE OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist -
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  


JPM- ANO-2-JPM-NRC-PZR02                                              PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY NOTE: Do not hand out procedure until Examinee asks for it.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed.  
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
 
Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.                                                    
 
TASK STANDARD:
Spray Valve (2CV-4651) is isolated.
THIS IS AN ALTERNATE SUCCESS PATH JPM.
 
TASK PERFORMANCE AIDS:
OP 2103.005 section 7.0 and AOP  2203.028.                     
 
SIMULATOR SETUP:
Run CAE FILE JPM03. This will open 'A' spray valve 100% and trip the breaker when
 
the valve indicates intermediate position.                                                                                   
 
The following malfunctions/overrides need to be triggered (cae file JPM03 w ill do all of them):                     
 
Set T5 file to 'GH4R651A' this will tri gger T5 when 2CV-4651 red light is energized.
 
T5 '2CV-4651_a'  value = 1.0 
 
T5 '2HS-4651-3' false (green light)
 
T5 '2HS-4651-5' false (red light)
 
JPM- ANO-2-JPM-NRC-PZR02  PAGE  3  OF 6  JOB PERFORMANCE MEASURE INITIATING CUE:
EXAMINER's NOTE: Do not hand out procedure until asked.
The SM/CRS directs: "Equalize RCS and PZR boron c oncentration using RCP 'A' spray valve, 2CV-4651."  CRITICAL ELEMENTS (C):
2, 3, 4, 6 START TIME:
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. (Proc step 7.1.1) Verify spray valve, 2CV-4651, isolation valves 2CV-4655
 
AND 2CV-4656 are OPEN.
On panel 2C04 verified red lights ON, green lights OFF for
 
2CV-4655 and 2CV-4656.
N/A  SAT  UNSAT (C) 2. (Proc step 7.1.2) Place RCP 'A' spray valve MAN/AUTO select switch
 
(2HS-4651B) to MANUAL.
On panel 2C04, rotated 2HS-4651B in the CCW direction
 
to MANUAL.
N/A  SAT  UNSAT (C) 3. (Proc step 7.1.3) Energize all available Backup Heaters.
On panel 2C04 verified the following hand switches to ON:
Place 2HS-4643 to ON
 
Place 2HS-4644 to ON
 
Place 2HS-4645 to ON
 
Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of
 
the above backup heater hand switches.
N/A  SAT  UNSAT EXAMINER'S NOTE:
When 2CV-4651 is taken to open, the valv e will open 100% and then trip the breaker. (C) 4. (Proc step 7.1.4) Partially open 2CV-4651 to stabilize pressure within +/- 10
 
psia of desired setpoint.
When RCS pressure starts rising, then on panel 2C04, throttled
 
open 2CV-4651 by  taking the
 
hand switch for 2CV-4651 to the
 
open position.
N/A  SAT  UNSAT EXAMINER'S NOTE:
The following step may be completed after enteri ng the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM. 
 
JPM- ANO-2-JPM-NRC-PZR02  PAGE  4  OF 6  JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 5. (AOP Proc step 1) Recognizes that 2CV4651 is deenergized open.
 
Attempts to close 2CV4651
 
may be made, but is not
 
necessary.
On panel 2C04, observed that light position indications above
 
2CV-4651 are out and PZR
 
pressure is lowering.
 
N/A  SAT  UNSAT (C) 6. (AOP Proc step 1.B.3) Close PZR Spray Block Valves.
 
On panel 2C04, placed hand-switch for 2CV-4655 and 2CV-
 
4656 to "CLOSE".
 
Observed green lights ON, red
 
lights OFF for 2CV-4655 and
 
2CV-4656.
N/A  SAT  UNSAT END  STOP TIME:
 
JPM- ANO-2-JPM-NRC-PZR02  PAGE  5  OF 6  JOB PERFORMANCE MEASURE
 
EXAMINER'S COPY NOTE: Do not hand out procedure until Examinee asks for it.
 
JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
 
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs: "Equalize RCS and PZR boron concentration using RCP 'A' spray valve, 2CV-4651."
The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."
JPM- ANO-2-JPM-NRC-PZR02  PAGE  6  OF 6  JOB PERFORMANCE MEASURE EXAMINEE'S COPY
 
JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.


JPM- ANO-2-JPM-NRC-PZR02                                              PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs: "Equalize RCS and PZR boron concentration using RCP 'A' spray valve, 2CV-4651."
The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."
JPM- ANO-2-JPM-NRC-SIT05  PAGE  1  OF 6  JOB PERFORMANCE MEASURE UNIT: 2  REV #: 003  DATE:
SYSTEM/DUTY AREA:
Safety Injection System                                                                                 
 
TASK: Adjust SIT Pressure (Incr ease)    ALTERNATE SUCCESS PATH JTA#: ANO2-RO-ECCS-NORM-10                           


KA VALUE RO: 3.5 SRO: 3.7 KA  
JPM- ANO-2-JPM-NRC-SIT05                                                            PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:      2                        REV #:    003                      DATE:
SYSTEM/DUTY AREA:        Safety Injection System TASK:    Adjust SIT Pressure (Increase)    ALTERNATE SUCCESS PATH JTA#:    ANO2-RO-ECCS-NORM-10 KA VALUE       RO:         3.5       SRO:         3.7       KA  


==REFERENCE:==
==REFERENCE:==
006 A1.13 APPROVED FOR ADMINISTRATION TO:              RO:        X    SRO:      X TASK LOCATION:            INSIDE CR:        X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:            Perform      LAB:
POSITION EVALUATED:        RO:                      SRO:
ACTUAL TESTING ENVIRONMENT:              SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:                PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                    8 Minutes REFERENCE(S):      OP 2104.001 EXAMINEE'S NAME:                                                    SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time                Total Time SIGNED:                                                DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


006 A1.13       
JPM- ANO-2-JPM-NRC-SIT05                                                                     PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
JPM INITIAL TASK CONDITIONS: Safety Injection Tank (2T2A) level is between 80.1% and 87.9%.
RO:  X  SRO:  X  TASK LOCATION:
Pressure is approximately 606 psig.
INSIDE CR:
TASK STANDARD:       Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to A SIT.
X  OUTSIDE CR:
2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM.
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
TASK PERFORMANCE AIDS:             OP 2104.001 Section 11.0 SIMULATOR SETUP: Ensure A SIT pressure is ~606 psig and A SIT level is ~ 84%. Run CAE file JPM05.
PLANT SITE:
CAE file JPM05 will do the following:
SIMULATOR:
Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized)
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
8 Minutes REFERENCE(S): OP 2104.001 
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-SIT05   PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist -
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
 
JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is between 80.1% and   87.9%.
 
Pressure is approximately 606 psig.          
 
TASK STANDARD:
Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to 'A' SIT.
2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM.  
 
TASK PERFORMANCE AIDS:
OP 2104.001 Section 11.0                                                                  
 
SIMULATOR SETUP:
Ensure 'A' SIT pressure is ~606 psig and 'A
' SIT level is ~ 84%. Run CAE file JPM05.  
 
CAE file JPM05 will do the following:                                                                                        
 
Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized)  
 
Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0)
Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0)


JPM- ANO-2-JPM-NRC-SIT05   PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
JPM- ANO-2-JPM-NRC-SIT05                                                                 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Raise Safety Injection Tank (2 T2A) pressure to 615 psig using OP 2104.001 Section 11.0." CRITICAL ELEMENTS (C):
The SM/CRS directs, "Raise Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
2, 3, 6 START TIME:
CRITICAL ELEMENTS (C):       2, 3, 6 START TIME:
 
PERFORMANCE CHECKLIST                               STANDARDS                     (Circle One)
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. (Proc step 1) Verify nitrogen supply is aligned.
: 1. Verify nitrogen supply is         Using the gaitronics, plant         N/A SAT UNSAT (Proc  aligned.                          telephone system, or radio; step                                    contacted Unit-1 OR contacted
Examiner's Cue:
: 1)  Examiners Cue:                  Unit-2 operator.
Unit-1 (or Unit-2 operator)
Unit-1 (or Unit-2 operator) reports high pressure N2 is      Requested alignment of high aligned.                          pressure N2.
 
(C)       2. Open Supply Header to             On panel 2C16, placed               N/A SAT UNSAT (Proc  Containment Isolation            handswitch for 2CV-6207-2 to step  (2CV-6207-2).                    OPEN.
reports high pressure N 2 is aligned. Using the gaitronics, plant telephone system, or radio;  
2)
 
Observed red light ON above handswitch.
contacted Unit-1 OR contacted Unit-2 operator.  
EXAMINER'S NOTE:
 
2SV-5005A and B are both operated by handswitch for 2SV-5005.
Requested alignment of high  
(C)       3. Open SIT N2 Supply valves         On panel 2C33, placed              N/A SAT UNSAT (Proc  (2SV-5005A/B).                     handswitch 2SV-5005 for step                                    2SV-5005A/B to OPEN.
 
3)
pressure N
Observed red light ON; green light OFF above handswitch.
: 2. N/A  SAT  UNSAT (C) 2. (Proc step 2) Open Supply Header to Containment Isolation
: 4. Verify SIT (2T2A) at desired       Verified SIT (2T2A) pressure       N/A SAT UNSAT (Proc  pressure.                          between 615 and 620 psig.
 
step
(2CV-6207-2).
: 5)                                    Observed SIT (2T2A) pressure on any of the following:
 
2PIS-5012 (2C17) 2PI-5013 (2C17) 2PIS-5011 (2C16)
On panel 2C16, placed handswitch for 2CV-6207-2 to  
 
OPEN.  
 
Observed red light ON above  
 
handswitch.
N/A  SAT  UNSAT EXAMINER'S NOTE:
2SV-5005A and B are both operated by handswitch for 2SV-5005. (C) 3. (Proc step 3) Open SIT N 2 Supply valves (2SV-5005A/B).  
 
On panel 2C33, placed handswitch 2SV-5005 for  
 
2SV-5005A/B to OPEN.  
 
Observed red light ON; green  
 
light OFF above handswitch.
N/A  SAT  UNSAT  4. (Proc step 5) Verify SIT (2T2A) at desired pressure.
 
Verified SIT (2T2A) pressure between 615 and 620 psig.  
 
Observed SIT (2T2A) pressure  
 
on any of the following:  
 
2PIS-5012 (2C17)  
 
2PI-5013 (2C17)  
 
2PIS-5011 (2C16)  
 
OR:
OR:
Observed SIT (2T2A) pressure  
Observed SIT (2T2A) pressure on PMS or SPDS computer points/trend for 2T2A pressure.


on PMS or SPDS computer
JPM- ANO-2-JPM-NRC-SIT05                                                                     PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                 STANDARDS                     (Circle One)
 
: 5. Close SIT N2 Supply valves           On panel 2C33, placed hand          N/A SAT UNSAT (Proc  (2SV-5005A/B).                       switch 2SV-5005 for step                                        2SV-5005A/B to CLOSE.
points/trend for 2T2A pressure.
5)
 
Observed green light OFF; red light ON above handswitch.
N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-SIT05   PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 5. (Proc step 5) Close SIT N 2 Supply valves (2SV-5005A/B).  
Reports that valve hand switch will not close the valve and SIT pressure is continuing to increase.
 
EXAMINER'S NOTE:
On panel 2C33, placed hand switch 2SV-5005 for  
SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate N2 from 2C16 and pressurizes the SIT to  700psig, the following step should be considered UNSAT.
 
(C)       6. Close Supply Header to               On panel 2C16, placed              N/A SAT UNSAT (Proc  Containment Isolation valve         handswitch for 2CV-6207-2 to step  (2CV-6207-2).                        CLOSE.
2SV-5005A/B to CLOSE.  
7)
 
Observed green light ON above handswitch.
Observed green light OFF; red  
Isolated N2 from 2C16 with SIT pressure less than 700psig,
 
: 7. Isolate the nitrogen supply.         Using the gaitronics, plant         N/A SAT UNSAT (Proc                                        telephone system, or radio; step  Examiners Cue:                      contacted Unit-1 OR contacted
light ON above handswitch.
: 8)    Unit-1 (or Unit-2 operator)          Unit-2 operator.
Reports that valve hand switch will not close the valve and SIT  
reports high pressure N2 is isolated.                            Requested isolation of high pressure N2.
 
END STOP TIME:
pressure is continuing to  
 
increase.
N/A  SAT  UNSAT EXAMINER'S NOTE:
SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate N 2 from 2C16 and pressurizes the SIT to  700psig, the following step should be considered UNSAT. (C) 6. (Proc step 7) Close Supply Header to Containment Isolation valve  
 
(2CV-6207-2).
 
On panel 2C16, placed handswitch for 2CV-6207-2 to
 
CLOSE.  
 
Observed green light ON above  
 
handswitch.  
 
Isolated N 2 from 2C16 with SIT pressure less than 700psig,   N/A  SAT  UNSAT  7. (Proc step 8) Isolate the nitrogen supply.
Examiner's Cue:
Unit-1 (or Unit-2 operator)
 
reports high pressure N 2 is isolated.
Using the gaitronics, plant telephone system, or radio;  
 
contacted Unit-1 OR contacted Unit-2 operator.  
 
Requested isolation of high  
 
pressure N
: 2. N/A  SAT  UNSAT END   STOP TIME:
 
JPM- ANO-2-JPM-NRC-SIT05  PAGE  5  OF 6  JOB PERFORMANCE MEASURE
 
EXAMINER'S COPY
 
JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is betw een 80.1% and 87.9%. Pressure is approximately 606 psig.


JPM- ANO-2-JPM-NRC-SIT05                                                  PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
JPM- ANO-2-JPM-NRC-SIT05  PAGE  6  OF 6  JOB PERFORMANCE MEASURE EXAMINEE'S COPY
JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is betw een 80.1% and 87.9%. Pressure is approximately 606 psig.


JPM- ANO-2-JPM-NRC-SIT05                                                  PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."
JPM- ANO-2-JPM-NRC-EOP03  PAGE  1  OF 6 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 000  DATE:
SYSTEM/DUTY AREA:
Emergency Operating Procedures


TASK: Verify Natural Circulation Condi tions exist   (ALTERNATE SUCCESS PATH)
JPM- ANO-2-JPM-NRC-EOP03                                                          PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:      2                        REV #:    000                    DATE:
SYSTEM/DUTY AREA:          Emergency Operating Procedures TASK:     Verify Natural Circulation Conditions exist   (ALTERNATE SUCCESS PATH)
JTA#:
JTA#:
KA VALUE RO: 4.3 SRO: 4.5 KA  
KA VALUE       RO:         4.3       SRO:         4.5       KA  


==REFERENCE:==
==REFERENCE:==
002 A4.02 APPROVED FOR ADMINISTRATION TO:              RO:        X    SRO:    X TASK LOCATION:            INSIDE CR:        X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                          SIMULATOR:          Perform      LAB:
POSITION EVALUATED:          RO:                      SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:          SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                  10 Minutes REFERENCE(S):      EOP 2202.006 Rev. 006-01-0 EXAMINEE'S NAME:                                                  SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                        UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time              Stop Time              Total Time SIGNED:                                                DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


002 A4.02       
JPM- ANO-2-JPM-NRC-EOP03                                                                    PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:          A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.
TASK STANDARD:        Take required actions to restore Natural Circulation conditions per Loss of Feedwater procedure. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS:            EOP 2202.006 Step 26.
SIMULATOR SETUP: Loss of feedwater in progress. SDBCS is in auto (setpoint ~ 1000 psia).
Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500&deg;F.
Ensure MTS on SPDS is less than 30&deg;. All other steps in 26 are satisfied. PZR level ~ 40%.
All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from PZR level heater cutout. Ensure SG levels are greater than 25% and levels are slowly restoring.


APPROVED FOR ADMINISTRATION TO:
JPM- ANO-2-JPM-NRC-EOP03                                                                  PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
ROX SRO:  X  TASK LOCATION:
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.
INSIDE CR:
CRITICAL ELEMENTS (C):        3, 5 START TIME:
X  OUTSIDE CR:
PERFORMANCE CHECKLIST                                STANDARDS                    (Circle One)
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
: 1. Verify Loop T is Less than        Using SPDS SFD Screen, PMS,      N/A SAT UNSAT (Proc 50&deg;F.                              PDS or 2C04 indications, step                                    determine Loop T to be less
PLANT SITE:
: 26)                                      than 50&deg;F.
SIMULATOR:
: 2. Verify RCS loop TH and TC          Using SPDS SFD Screen, PMS,      N/A SAT UNSAT (Proc constant or lowering.              PDS or 2C04 indications, step                                    determine that RCS loop TH and
Perform  LAB:    POSITION EVALUATED:
: 26)                                      TC are constant.
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
(C)     3. Verify RCS MTS 30&deg;F or              Using SPDS SFD Screen, PMS,      N/A SAT UNSAT (Proc greater.                            PDS or 2C04 indications, step                                    determine that RCS MTS is less
SIMULATOR:
: 26)                                      than 30&deg;F.
PLANT SITE:
: 4. Contingency column step 26.A,      Using SPDS SFD Screen, PMS,      N/A SAT UNSAT (Proc verify SG levels being              PDS or 2C04 indications, step maintained 10% to 90%.              determine that Steam Generator
LAB:   TESTING METHOD:
: 26)                                      levels are above 10% and less than 90%.
SIMULATE:
If examinee asks for direction, then provide the following cue:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
EXAMINERs CUE: CRS asks why are we not meeting the >30&deg;F MTS requirement?
10 Minutes REFERENCE(S): EOP 2202.006 Rev. 006-01-
(C)      5. Contingency column step 26.B,      Refer to Attachment 1, P-T Limits  N/A SAT UNSAT (Proc verify RCS pressure within limits   and verify that MTS is less than step of Attachment 1, P-T Limits.        30&deg;F.
26.B)
Examiners note: Critical          Take PZR Backup heaters out of element is that examinee            OFF. Verify that red light ON recognizes that PZR pressure        above hand switch(es).
is LOW due to all heaters de-      Take Proportional heaters hand energized and this is causing      switches to ON. Verify that Red MTS problems. The number            light is ON above associated of heaters re-energized is          hand switch.
discretionary.                      Verify P-T limits of Attachment 1 Candidate may consider a            are restored.
plant cooldown after raising PZR pressure.


EXAMINEE'S NAME:
JPM- ANO-2-JPM-NRC-EOP03                                                PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                    STANDARDS                (Circle One)
SSN:  EVALUATOR'S NAME:
: 6. Verify  T between TH and  Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc CETs less than 10&deg;F.      PDS or 2C04 indications, step                            determine that  T between TH
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
: 26)                            and CETs is less than 10&deg;F.
END STOP TIME:


SATISFACTORY:
JPM- ANO-2-JPM-NRC-EOP03                                                   PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
UNSATISFACTORY:
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-EOP03   PAGE 2  OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist -
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
A Loss of Feedwater is in progress. EOP 2202.006 has been
 
entered and steps through step 25 have been completed.
Feed to SG's has been established via 'B' EFW.
 
TASK STANDARD:
Take required actions to restore Natu ral Circulation conditions per Loss of Feedwater procedure.
THIS IS AN ALTERNATE SUCCESS PATH JPM.
 
TASK PERFORMANCE AIDS:
EOP 2202.006 Step 26.                                                                   
 
SIMULATOR SETUP:
Loss of feedwater in progress. SDBC S is in auto (setpoint ~ 1000 psia). 
 
Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500&deg;F.   
 
Ensure MTS on SPDS is less than 30&deg;. All other steps in 26 are satisfied. PZR level ~ 40%.               
 
All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from
 
PZR level heater cutout. Ensure SG levels are gr eater than 25% and levels are slowly restoring.
 
JPM- ANO-2-JPM-NRC-EOP03  PAGE  3  OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Verify Natu ral Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26."
 
CRITICAL ELEMENTS (C):
3, 5 START TIME:
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. (Proc step 26) Verify Loop  T is Less than 50&deg;F. Using SPDS 'SFD' Screen, PMS, PDS or 2C04 indications, determine Loop  T to be less than 50&deg;F.
 
N/A  SAT  UNSAT  2. (Proc step 26) Verify RCS loop T H and T C constant or lowering.
 
Using SPDS 'SFD' Screen, PMS, PDS or 2C04 indications, determine that RCS loop T H and T C are constant.
N/A  SAT  UNSAT (C) 3. (Proc step 26) Verify RCS MTS 30&deg;F or greater.
 
Using SPDS 'SFD' Screen, PMS, PDS or 2C04 indications, determine that RCS MTS is less
 
than 30&deg;F.
N/A  SAT  UNSAT  4. (Proc step 26) Contingency column step 26.A, verify SG levels being
 
maintained 10% to 90%.
 
Using SPDS 'SFD' Screen, PMS, PDS or 2C04 indications, determine that Steam Generator
 
levels are above 10% and less
 
than 90%.
N/A  SAT  UNSAT If examinee asks for direction, then provide the following cue: EXAMINER's CUE: CRS asks why are we not meeting the >30&deg;F MTS requirement? (C) 5. (Proc step 26.B) Contingency column step 26.B, verify RCS pressure within limits
 
of Attachment 1, P-T Limits.
 
Examiner's note: Critical element is that examinee
 
recognizes that PZR pressure
 
is LOW due to all heaters de-
 
energized and this is causing
 
MTS problems. The number
 
of heaters re-energized is discretionary. Candidate may consider a plant cooldown after raising
 
PZR pressure. Refer to Attachment 1, P-T Limits and verify that MTS is less than
 
30&deg;F.
Take PZR Backup heaters out of OFF. Verify that red light ON
 
above hand switch(es).
Take Proportional heaters hand switches to ON. Verify that Red
 
light is ON above associated
 
hand switch.
Verify P-T limits of Attachment 1 are restored.
N/A  SAT  UNSAT JPM- ANO-2-JPM-NRC-EOP03  PAGE  4  OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  6. (Proc step 26) Verify  T between T H and CETs less than 10&deg;F.
 
Using SPDS 'SFD' Screen, PMS, PDS or 2C04 indications, determine that  T between T H and CETs is less than 10&deg;F.
N/A  SAT  UNSAT END  STOP TIME:
 
JPM- ANO-2-JPM-NRC-EOP03  PAGE  5 OF 6 JOB PERFORMANCE MEASURE
 
EXAMINER'S COPY  
 
JPM INITIAL TASK CONDITIONS:
A Loss of Feedwater is in progress. EO P 2202.006 has been entered and steps through step 25 have been completed. Feed to SG's has been established via 'B' EFW.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Verify Natural Circu lation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26."
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.
 
JPM- ANO-2-JPM-NRC-EOP03  PAGE  6  OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY


JPM INITIAL TASK CONDITIONS:
JPM- ANO-2-JPM-NRC-EOP03                                                  PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
A Loss of Feedwater is in progress. EO P 2202.006 has been entered and steps through step 25 have been completed. Feed to SG's has been established via 'B' EFW.
A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Verify Natural Circu lation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26."
The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.


ANO-2-JPM-NRC-ELECXT   PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:   SYSTEM/DUTY AREA:
ANO-2-JPM-NRC-ELECXT                                                                 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:       2                       REV #:     000                     DATE:
A. C. Electrical Distribution TASK: Perform Synchronized Cross Connect of 480 VAC load-centers 2B1 and 2B2 JTA#: ANO2-RO-480VAC-NORM-15 KA VALUE RO: 3.3 SRO: 3.1 KA  
SYSTEM/DUTY AREA:         A. C. Electrical Distribution TASK:     Perform Synchronized Cross Connect of 480 VAC load-centers 2B1 and 2B2 JTA#:     ANO2-RO-480VAC-NORM-15 KA VALUE       RO:       3.3       SRO:           3.1         KA  


==REFERENCE:==
==REFERENCE:==
062 A4.01 APPROVED FOR ADMINISTRATION TO:              RO:        X    SRO:    X TASK LOCATION:            INSIDE CR:          X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:              Perform      LAB:
POSITION EVALUATED:        RO:                        SRO:
ACTUAL TESTING ENVIRONMENT:              SIMULATOR:                PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:                  PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                    10 Minutes REFERENCE(S):      OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME:                                                    SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time                  Total Time SIGNED:                                                DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


062 A4.01 APPROVED FOR ADMINISTRATION TO:
ANO-2-JPM-NRC-ELECXT                                                                 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
RO:  X  SRO:  X  TASK LOCATION:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAI NST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLIC ABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-ELECXT PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed  
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.
 
on 2B2 transformer. Plant is in mode 5.  
 
TASK STANDARD:
TASK STANDARD:
Cross connect 480VAC non-vital busses 2B1 and 2B2 with 2B1 supplying and 2B2 supply breakers  
Cross connect 480VAC non-vital busses 2B1 and 2B2 with 2B1 supplying and 2B2 supply breakers open. Maintain 2B1 amperage less than 130 amps.
 
open. Maintain 2B1 amperage less than 130 amps.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 2107.001 Section 12.0.  
OP 2107.001 Section 12.0.
 
SIMULATOR SETUP:
SIMULATOR SETUP: Any power level or mode.
Any power level or mode.
All Non-Vital 4160VAC and 480VAC Busses energized.
All Non-Vital 4160VAC and 480VAC Busses energized.
Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).  
Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).


ANO-2-JPM-NRC-ELECXT PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-ELECXT                                                                     PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0." CRITICAL ELEMENTS (C): 2, 3, 4, 6, 7
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."
 
CRITICAL ELEMENTS (C): 2, 3, 4, 6, 7 PERFORMANCE CHECKLIST                               STANDARDS               (Circle One)
PERFORMANCE CHECKLIST STANDARDS (Circle One)
Examiners note:
Examiner's note:
If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.
If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.
: 1. Check that Operations Manager     Ask if Operations Manager has  N/A SAT UNSAT (Proc    approval obtained.                given approval to cross connect step                                      2B1 and 2B2 at power.
: 1. (Proc step 1) Check that Operations Manager approval obtained.  
: 1)    EXAMINERS CUE:
 
The Operations Manager has given permission to perform Cross Connect of 2B1 and 2B2.
EXAMINER'S CUE:  
Examiners note:
"The Operations Manager has given permission to perform  
The following two steps may be completed after cross-connecting the busses. The resolution on the meters is low at the low end.
 
(C)       2. Determine combined load of       On Panel 2C10, summed the       N/A SAT UNSAT (Proc    2B1 an 2B2.                      current reading of 2B1 and 2B2.
Cross Connect of 2B1 and  
step
 
: 2)                                      Observed that the summed load is greater than 130 amps.
2B2."  Ask if Operations Manager has given approval to cross connect
(C)       3. Reduce loads on 2B1 and 2B2       Direct the AO or inform CRS of  N/A SAT UNSAT (Proc    so that combined loading is less need to reduce non-essential step    than 130 amps when cross         loads on 2B1 and 2B2 so that
 
: 2)    connected.                       combined loading is less than EXAMINERS CUE:                   130 amps.
2B1 and 2B2 at power.
AO has been directed to secure non-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than 130 amps.
N/A  SAT  UNSAT Examiner's note: The following two steps may be completed after cross-connecting the busses. The resolution on the meters is low at the low end. (C) 2. (Proc step 2) Determine combined load of 2B1 an 2B2.
EXAMINERS NOTE:
 
Direct operator in simulator instructors station to reduce loading on 2B1 and 2B2 so that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1 and 480CURR2B2).
On Panel 2C10, summed the current reading of 2B1 and 2B2.  
 
Observed that the summed load  
 
is greater than 130 amps.
N/A  SAT  UNSAT (C) 3. (Proc step 2) Reduce loads on 2B1 and 2B2 so that combined loading is less  
 
than 130 amps when cross  
 
connected.
EXAMINERS CUE:  
"AO has been directed to secure non-essential loads  
 
on 2B1 and 2B2 to reduce  
 
loading on 2B1 and 2B2 to  
 
less than 130 amps."
EXAMINERS NOTE:  
 
Direct operator in simulator instructor's station to reduce  
 
loading on 2B1 and 2B2 so  
 
that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1  
 
and 480CURR2B2).
Direct the AO or inform CRS of need to reduce non-essential
 
loads on 2B1 and 2B2 so that
 
combined loading is less than
 
130 amps.
N/A  SAT  UNSAT ANO-2-JPM-NRC-ELECXT  PAGE  4  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. (Proc step 4) Synchroscope switch inserted in 2B1/2B2 cross-tie slot and
 
placed in ON.
On Panel 2C10, Placed Synchroscope switch into
 
2B1/2B2 cross-tie slot and
 
rotated clockwise to the ON
 
position.
 
N/A  SAT  UNSAT  5. (Proc step 5) Observed that the Synchroscope is at the 12
 
o'clock position.
 
On Panel 2C10, Observed that the Synchroscope is at the 12
 
o'clock position with the
 
Synchroscope switch in the ON
 
position.
 
N/A  SAT  UNSAT (C) 6. (Proc step 6) Close the 2B1/2B2 Cross Tie breaker.
On panel 2C10, rotate the Cross Tie handswitch for 2B1/2B2 clockwise. 
 
Observed that the Green light
 
turns OFF and the Red light turns
 
ON above the Cross Tie
 
handswitch.
 
N/A  SAT  UNSAT (C) 7. (Proc step 7) Open normal supply breaker on 2B2, 480VAC bus.
 
AND Open Transformer feeder
 
breaker from 2A2 to 2B2.
On Panel 2C10, rotate the normal feeder supply breaker on
 
2B2 counter clockwise to the
 
open position. (2B212)
 
Observed that the RED light went OFF and the GREEN light went


ON.  
ANO-2-JPM-NRC-ELECXT                                                                  PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                  (Circle One)
(C)    4. Synchroscope switch inserted in  On Panel 2C10, Placed            N/A SAT UNSAT (Proc  2B1/2B2 cross-tie slot and      Synchroscope switch into step  placed in ON.                    2B1/2B2 cross-tie slot and
: 4)                                    rotated clockwise to the ON position.
: 5. Observed that the                On Panel 2C10, Observed that      N/A SAT UNSAT (Proc  Synchroscope is at the 12        the Synchroscope is at the 12 step  oclock position.                oclock position with the
: 5)                                    Synchroscope switch in the ON position.
(C)    6. Close the 2B1/2B2 Cross Tie      On panel 2C10, rotate the Cross  N/A SAT UNSAT (Proc  breaker.                        Tie handswitch for 2B1/2B2 step                                    clockwise.
6)
Observed that the Green light turns OFF and the Red light turns ON above the Cross Tie handswitch.
(C)    7. Open normal supply breaker on    On Panel 2C10, rotate the        N/A SAT UNSAT (Proc  2B2, 480VAC bus.                normal feeder supply breaker on step                                    2B2 counter clockwise to the
: 7)    AND                              open position. (2B212)
Open Transformer feeder          Observed that the RED light went breaker from 2A2 to 2B2.        OFF and the GREEN light went ON.
On Panel 2C10, rotate the transformer feeder breaker on 2A2 to 2B2 counter clockwise to the open position. (2A202)
Observed that the RED light went OFF and the GREEN light went ON.
: 8. Verify that the amperage        On panel 2C10, observe that the  N/A SAT UNSAT (Proc  indicated on 2B1 is less than    current is less than 130 amps on step  130 amps.                        2B1.
8)
: 9. Turn sync switch to OFF.        On Panel 2C10, turn sync switch  N/A SAT UNSAT (Proc                                    counter clockwise to the OFF step                                    position.
9)
Examiners Note Step 12.10 in procedure is not applicable for this JPM as both busses remained energized and the loads removed to reduce amperage on 2B1 will remain deenergized.


On Panel 2C10, rotate the
ANO-2-JPM-NRC-ELECXT                                                           PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARDS               (Circle One)
 
: 10. Notified AO to monitor 2B1     Notify AO to monitor 2B1      N/A SAT UNSAT (Proc transformer during cross      transformer during cross step connected operation and        connected operation and
transformer feeder breaker on
: 11)  maintain temperature less than maintain temperature less than 220&deg;C.                        220&deg;C.
 
EXAMINERS CUE:
2A2 to 2B2 counter clockwise to
AO has been notified to monitor 2B1 transformer and notify the control room if temperature exceeds 220&deg;C during cross connected operations.
 
END
the open position. (2A202)
 
Observed that the RED light went OFF and the GREEN light went
 
ON. N/A  SAT  UNSAT  8. (Proc step 8) Verify that the amperage indicated on 2B1 is less than
 
130 amps.
On panel 2C10, observe that the current is less than 130 amps on
 
2B1.
N/A  SAT  UNSAT
: 9. (Proc step 9) Turn sync switch to OFF. On Panel 2C10, turn sync switch counter clockwise to the OFF
 
position.
 
N/A  SAT  UNSAT Examiner's Note Step 12.10 in procedure is not applicable for this JPM as both busses remained energized and the loads removed to reduce amperage on 2B1 will remain deenergized.
ANO-2-JPM-NRC-ELECXT PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  
: 10. (Proc step 11) Notified AO to monitor 2B1 transformer during cross  
 
connected operation and  
 
maintain temperature less than  
 
220&deg;C.
EXAMINER'S CUE:  
"AO has been notified to monitor 2B1 transformer and notify the control room if  
 
temperature exceeds 220&deg;C  
 
during cross connected  
 
operations."
Notify AO to monitor 2B1 transformer during cross
 
connected operation and
 
maintain temperature less than
 
220&deg;C. N/A  SAT  UNSAT END ANO-2-JPM-NRC-ELECXT  PAGE  6  OF  7 JOB PERFORMANCE MEASURE EXAMINER'S COPY
 
JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.


ANO-2-JPM-NRC-ELECXT                                                  PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."
ANO-2-JPM-NRC-ELECXT  PAGE  7  OF  7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY
JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.


ANO-2-JPM-NRC-ELECXT                                                  PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."  
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."
 
ANO-2-JPM-NRC-BMSRM  PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 002  DATE:
SYSTEM/DUTY AREA:
Process Radiation Monitoring System 


TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check  
ANO-2-JPM-NRC-BMSRM                                                            PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT:      2                      REV #:    002                    DATE:
 
SYSTEM/DUTY AREA:        Process Radiation Monitoring System TASK:     Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#:     ANO2WCOLRWBMSNORM21 KA VALUE       RO:       3.6     SRO:         3.6       KA  
JTA#: ANO2WCOLRWBMSNORM21  
 
KA VALUE RO: 3.6 SRO: 3.6 KA  


==REFERENCE:==
==REFERENCE:==
068 A3.02 APPROVED FOR ADMINISTRATION TO:          RO:        X    SRO:      X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:        Simulate      SIMULATOR:                        LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                10 Minutes REFERENCE(S):      2104.014 Rev 034-00-0 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


068 A3.02
ANO-2-JPM-NRC-BMSRM                                                                             PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
APPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
2104.014 Rev 034-00-0
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-BMSRM PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
TASK STANDARD:
Functional Test has been completed on 2RITS-2330.
TASK PERFORMANCE AIDS:
2104.014 Supplement 1 EXAMINER'S NOTE:


JPM INITIAL TASK CONDITIONS:
JPM-ANO-2-JPM-NRC-EOP02                                                               Page 1 of 7 JOB PERFORMANCE MEASURE UNIT:     2                     REV #:     000                       DATE:
 
SYSTEM/DUTY AREA:       Abnormal/Emergency Operations TASK:     Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI)
2T21A Liquid Radwaste Release Permit, 2104.014 Supplem ent 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
JTA#:     ANO2-RO-EOPAOP-OFFNORM KA VALUE       RO:       3.0     SRO:         3.1       KA  
TASK STANDARD:
 
Functional Test has been completed on 2RITS-2330.
 
TASK PERFORMANCE AIDS:
 
2104.014 Supplement 1 
 
EXAMINER'S NOTE:
 
JPM-ANO-2-JPM-NRC-EOP02 Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:
SYSTEM/DUTY AREA: Abnormal/Emergency Operations          
 
TASK: Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI)
JTA#: ANO2-RO-EOPAOP-OFFNORM  
 
KA VALUE RO: 3.0 SRO: 3.1 KA  


==REFERENCE:==
==REFERENCE:==
016 A2.01 APPROVED FOR ADMINISTRATION TO:            RO:    X        SRO:    X TASK LOCATION:          INSIDE CR:    X          OUTSIDE CR:                BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:      Perform            LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:                PLANT SITE:              LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      AOP 2203.029 EXAMINEE'S NAME:                                                  SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


016 A2.01
JPM-ANO-2-JPM-NRC-EOP02                                                             Page 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
APPROVED FOR ADMINISTRATION TO:
JPM INITIAL TASK CONDITIONS:
RO: X  SRO: X  TASK LOCATION:
AOP 2203.029 has been entered due to 2PI-4623-2 failing High. SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, has been completed up to contingency step 13.C.
INSIDE CR:
TASK STANDARD: Shutdown Cooling Flow has been restored per Loss of SDC AOP, 2203.029.
X  OUTSIDE CR:
TASK PERFORMANCE AIDS:         Loss of SDC AOP, 2203.029 SIMULATOR SETUP:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
Mode 5, SDC aligned for the A LPSI Pump through the A SDC Heat Exchanger.
PLANT SITE:
2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV-5086-2 is CLOSED.
SIMULATOR:
ACI actuation is clear due to de-energizing 2PS-4623-2 by fuse removal.
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
AOP 2203.029
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
JPM-ANO-2-JPM-NRC-EOP02 Page 2 of 7 JOB PERFORMANCE MEASURE  
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:  
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
 
JPM INITIAL TASK CONDITIONS:    
 
AOP 2203.029 has been entered due to 2PI-4623-2 failing "High". SDC pump secured, fuse for   2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, has been completed up to contingency step 13.C.
TASK STANDARD:   Shutdown Cooling Flow has been restored per Loss of SDC AOP, 2203.029.        
 
TASK PERFORMANCE AIDS:   Loss of SDC AOP, 2203.029
 
SIMULATOR SETUP:  
 
Mode 5, SDC aligned for the "A" LPSI Pu mp through the "A" SDC Heat Exchanger.
2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV-5086-2 is CLOSED. ACI actuation is clear due to de-energizing 2PS-4623-2 by fuse removal.
 
JPM-ANO-2-JPM-NRC-EOP02  Page 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
 
CRITICAL ELEMENTS (C):                2, 6, 9,10                                                               
 
START TIME:                                    PERFORMANCE CHECKLIST  STANDARDS  (Circle One)  1.    (Proc step 7.13.C) Verify SDC RCS isolation valves open.
 
On panels 2C16 and 2C17, checked indications for:
 
  - 2CV-5038-1
 
  - 2CV-5084-1
 
  - 2CV-5086-2
 
Observed 2CV-5086-2 closed by green light ON, red light OFF above hand switch.
N/A  SAT  UNSAT (C) 2. (Proc step 7.13.C) Determine that 2CV-5086-2 is shut due to the Auto-Closure
 
Initiation (ACI) and Open 2CV-
 
5086-2.
On panel 2C16, placed hand switch for 2CV-5086-2 to "OPEN".  


JPM-ANO-2-JPM-NRC-EOP02                                                            Page 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
CRITICAL ELEMENTS (C):                2, 6, 9,10 START TIME:
PERFORMANCE CHECKLIST                            STANDARDS              (Circle One)
: 1. Verify SDC RCS isolation          On panels 2C16 and 2C17,      N/A SAT UNSAT (Proc  valves open.                      checked indications for:
step                                      - 2CV-5038-1 7.13.C)                                      - 2CV-5084-1
                                                  - 2CV-5086-2 Observed 2CV-5086-2 closed by green light ON, red light OFF above hand switch.
(C)    2. Determine that 2CV-5086-2 is      On panel 2C16, placed hand    N/A SAT UNSAT (Proc  shut due to the Auto-Closure      switch for 2CV-5086-2 to step  Initiation (ACI) and Open 2CV-    "OPEN".
7.13.C)  5086-2.
Observed red light ON; green light OFF above hand switch.
Observed red light ON; green light OFF above hand switch.
N/A  SAT  UNSAT  3. (Proc step 7.14) Verify RAS has not actuated.
: 3. Verify RAS has not actuated.     On panel 2C03, verified Alarms N/A SAT UNSAT (Proc                                    cleared on Annunciator panels step                                    2K04 and 2K07 or verified red 7.14)                                    lights ON at 2C03 above the RAS placard.
On panel 2C03, verified Alarms cleared on Annunciator panels 2K04 and 2K07 or verified red lights ON at 2C03 above the  
: 4. Verify RCS indicators            Requests that CRS verify OP    N/A SAT UNSAT (Proc   functioning properly using       2103.011 Attachment M is step  OP 2103.011.                      complete.
 
7.15)
RAS placard.
EXAMINERs CUE: CRS reports that OP 2103.011 attachment M, RCS level transmitter and tygon tube alignment has been completed and all RCS level indicators are functioning properly.
N/A SAT UNSAT 4. (Proc step 7.15) Verify RCS indicators functioning properly using  
 
OP 2103.011.  
 
EXAMINER's CUE: CRS  
 
reports that OP 2103.011 attachment 'M', RCS level transmitter and tygon tube alignment has been completed and all RCS level  
 
indicators are functioning properly
 
Requests that CRS verify OP 2103.011 Attachment 'M' is
 
complete.
N/A  SAT  UNSAT JPM-ANO-2-JPM-NRC-EOP02  Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST  STANDARDS  (Circle One)  5. (Proc step 7.16) Check SDC pump running.
 
On 2C17, determined That no SDC pumps are running. 
 
Observed 2C-16 and 2C-17 that 2P-60 A & B were secured.  


JPM-ANO-2-JPM-NRC-EOP02                                                        Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARDS              (Circle One)
: 5. Check SDC pump running.          On 2C17, determined That no    N/A SAT UNSAT (Proc                                  SDC pumps are running.
step 7.16)
Observed 2C-16 and 2C-17 that 2P-60 A & B were secured.
Observed green light ON; red light OFF above hand switches.
Observed green light ON; red light OFF above hand switches.
N/A  SAT  UNSAT (C) 6. (Proc step 7.16.A) Close ALL LPSI Injection MOVs.
(C)   6. Close ALL LPSI Injection         On 2C16 & 17, placed hand     N/A SAT UNSAT (Proc  MOVs.                            switches for Safety Injection step                                  MOVs to CLOSE".
 
7.16.A) 2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red light OFF above Hand switch for all valves.
On 2C16 & 17, placed hand switches for Safety Injection MOVs to "CLOSE".  
: 7. Partially open ONE LPSI         On 2C-16 or 17, held 1 LPSI   N/A SAT UNSAT (Proc  Injection.                      Injection MOV hand switch in step                                  the open direction for about 2 7.16.B)                                  seconds.
 
2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green and red light ON above associated hand switch.
2CV-5017-1  
: 8. Verify RCS level of 40% in      Referred to Attachment A    N/A SAT UNSAT (Proc  PZR is adequate; refer to        and verified RCS Level step  Attachment A, RCS Level.        adequate for SDC, shutdown 7.16.C) (Verifies that PZR level is well cooling (Low Pressure Safety above the required level of 24  Injection), Pump restart.
 
inches above the bottom of the hot leg (40% PZR is ~
2CV-5037-1  
286 above the bottom of the hot leg.)
 
2CV-5057-2  
 
2CV-5077-2  
 
Observed green light ON; red light OFF above Hand switch for all valves.
N/A  SAT  UNSAT  7. (Proc step 7.16.B) Partially open ONE LPSI Injection.
 
On 2C-16 or 17, held 1 LPSI Injection MOV hand switch in  
 
the open direction for about 2  


seconds. 
JPM-ANO-2-JPM-NRC-EOP02                                                                 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARDS                     (Circle One)
 
NOTE:
2CV-5017-1
If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C-16 & 17 back to 2C-04 multiple times to control flow. 2CV-5091 should be monitored to ensure that it has control of flow when placed in automatic.
 
(C)       9. Start SDC pump, refer to       On 2C17 placed hand switch        N/A SAT UNSAT (Proc  2104.004, Shutdown             for 2P-60A to "START".
2CV-5037-1
step  Cooling System.
 
7.16.D)                                  Observed red light ON; green light OFF above hand switch.
2CV-5057-2
(C)       10. Raise SDC flow to greater     On 2C-16 & 17 placed hand-       N/A SAT UNSAT (Proc  than 2400 gpm by opening      switches for Safety Injection step  LPSI Injection MOVs.          MOVs to OPEN) as necessary 7.16.E)                                to achieve > 2400 gpm flow.
 
2FIC-5091 indicates > 2400 gpm.
2CV-5077-2
Examiners note/CUE: Inform candidate that the CRS and CBOR will control RCS cool down.
 
Observed green and red light ON above associated hand switch. N/A  SAT  UNSAT  8. (Proc step 7.16.C) Verify RCS level of 40% in PZR is adequate; refer to Attachment A, RCS Level.
(Verifies that PZR level is well above the required level of 24 inches above the bottom of the hot leg (40% PZR is ~
286" above the bottom of the
 
hot leg.)
 
Referred to Attachment "A" and verified RCS Level adequate for SDC, shutdown cooling (Low Pressure Safety
 
Injection), Pump restart.
N/A  SAT  UNSAT JPM-ANO-2-JPM-NRC-EOP02 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
NOTE: If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C-16 & 17 back to 2C-04 multiple times to control flow. 2CV-5091 should be monitored to ensure that it has control of flow when placed in automatic.  
(C) 9. (Proc step 7.16.D) Start SDC pump, refer to 2104.004, Shutdown Cooling System.
 
On 2C17 placed hand switch for 2P-60A to "START".  
 
Observed red light ON; green light OFF above hand switch.
N/A  SAT  UNSAT (C) 10. (Proc step 7.16.E) Raise SDC flow to greater than 2400 gpm by opening
 
LPSI Injection MOVs.
 
On 2C-16 & 17 placed hand-switches for Safety Injection MOVs to "OPEN) as necessary to achieve > 2400 gpm flow.  
 
2FIC-5091 indicates > 2400  
 
gpm. N/A  SAT  UNSAT Examiner's note/CUE: Inform candidate that the CRS and CBOR will control RCS cool down.
END STOP TIME:
END STOP TIME:
JPM-ANO-2-JPM-NRC-EOP02  Page 6 of 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, h as been entered due to 2PS-4623-2 failing "High". The resulting ACI caused 2CV-5086-2 to close. The "A" SDC pump was secured and AOP completed up to contingency step 13.C.


JPM-ANO-2-JPM-NRC-EOP02                                              Page 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to contingency step 13.C.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
JPM-ANO-2-JPM-NRC-EOP02  Page 7 of 7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing "High". The resulting ACI caused 2CV-5086-2 to close. The "A" SDC pump was secured and AOP completed up to contingency step 13.C.


JPM-ANO-2-JPM-NRC-EOP02                                                  Page 7 of 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to contingency step 13.C.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."


The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."
ANO-2-JPM-NRC-BMSRM                                                             PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   002                     DATE:
 
SYSTEM/DUTY AREA:       Process Radiation Monitoring System TASK:     Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#:     ANO2WCOLRWBMSNORM21 KA VALUE       RO:       3.6     SRO:         3.6       KA  
ANO-2-JPM-NRC-BMSRM PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
SYSTEM/DUTY AREA:
Process Radiation Monitoring System
 
TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check  
 
JTA#: ANO2WCOLRWBMSNORM21  
 
KA VALUE RO: 3.6 SRO: 3.6 KA  


==REFERENCE:==
==REFERENCE:==
068 A3.02 APPROVED FOR ADMINISTRATION TO:          RO:        X    SRO:      X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:        Simulate      SIMULATOR:                        LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                10 Minutes REFERENCE(S):      2104.014 Rev 034-00-0 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


068 A3.02
ANO-2-JPM-NRC-BMSRM                                                                             PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
APPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
2104.014 Rev 034-00-0
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-BMSRM PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
TASK STANDARD:
Functional Test has been completed on 2RITS-2330.
TASK PERFORMANCE AIDS:
2104.014 Supplement 1 EXAMINER'S NOTE:


JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-BMSRM                                                                           PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
2T21A Liquid Radwaste Release Permit, 2104.014 Supplem ent 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.
CRITICAL ELEMENTS (C):       4, 6, 11, 12 START TIME:
TASK STANDARD:
PERFORMANCE CHECKLIST                                 STANDARDS                     (Circle One)
 
: 1. Direct WCO to verify 2P-53A/B       Directed the WCO to verify        N/A SAT UNSAT (Proc  Discharge to Circ Water Flume       2LRW-13 is closed.
Functional Test has been completed on 2RITS-2330.
step  (2LRW-13) is closed.
 
7.1)
TASK PERFORMANCE AIDS:
EXAMINERs CUE:
 
WCO reports 2LRW-13 is closed.
2104.014 Supplement 1 
: 2. Direct WCO to verify 2P47A/B        Directed the WCO to verify         N/A SAT UNSAT (Proc Discharge to Circ Water Flume       2BM-35 is closed.
 
step  (2BM-35) is closed.
EXAMINER'S NOTE:
7.1)
 
EXAMINERs CUE:
ANO-2-JPM-NRC-BMSRM PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:
WCO reports 2BM-35 is closed.
The SM/CRS directs, "Perform the f unctional test of the BMS Liquid Disc harge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
: 3. Direct WCO to verify 2F11/11A        Directed the WCO to verify         N/A SAT UNSAT (Proc Disch to CW Flume (2LRW-24)         2LRW-24 is closed.
CRITICAL ELEMENTS (C):
step  is closed.
4, 6, 11, 12                                                                                        
7.1)
 
EXAMINERs CUE:
START TIME:
WCO reports 2LRW-24 is closed.
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. (Proc step 7.1) Direct WCO to verify 2P-53A/B Discharge to Circ Water Flume  
(C)     4. Hold 2RITS-2330 Selector            On panel 2C25, held 2RITS-2330    N/A SAT UNSAT (Proc  Switch in CHECK SOURCE.              Selector Switch in CHECK step                                      SOURCE.
 
7.2.1) EXAMINERs CUE:
(2LRW-13) is closed.  
 
EXAMINER's CUE:
WCO reports 2LRW-13 is  
 
closed. Directed the WCO to verify 2LRW-13 is closed.
N/A SAT UNSAT 2. (Proc step 7.1) Direct WCO to verify 2P47A/B Discharge to Circ Water Flume  
 
(2BM-35) is closed.  
 
EXAMINER's CUE:
WCO reports 2BM-35 is  
 
closed. Directed the WCO to verify 2BM-35 is closed.
N/A SAT UNSAT 3. (Proc step 7.1) Direct WCO to verify 2F11/11A Disch to CW Flume (2LRW-24)  
 
is closed.  
 
EXAMINER's CUE:
WCO reports 2LRW-24 is
 
closed. Directed the WCO to verify 2LRW-24 is closed.
N/A  SAT  UNSAT (C) 4. (Proc step 7.2.1) Hold 2RITS-2330 Selector Switch in CHECK SOURCE.  
 
EXAMINER's CUE:
Switch in CHECK SOURCE.
Switch in CHECK SOURCE.
On panel 2C25, held 2RITS-2330 Selector Switch in CHECK
: 5. Verify 2RITS-2330 meter              On panel 2C25, verified            N/A SAT UNSAT (Proc moves up scale.                     2RITS-2330 indication moved up step                                      scale.
 
7.2.1) EXAMINERs CUE:
SOURCE. N/A SAT UNSAT 5. (Proc step 7.2.1) Verify 2RITS-2330 meter moves up scale.  
 
EXAMINER's CUE:
Meter moved up scale.
Meter moved up scale.
On panel 2C25, verified 2RITS-2330 indication moved up scale. N/A SAT UNSAT (C) 6. (Proc step 7.2.3) Return 2RITS-2330 Selector Switch to OPERATE.  
(C)    6. Return 2RITS-2330 Selector          On panel 2C25, placed              N/A SAT UNSAT (Proc Switch to OPERATE.                   2RITS-2330 Selector Switch to step                                      OPERATE.
 
7.2.3) EXAMINERs CUE:
EXAMINER's CUE:
Switch to OPERATE.
Switch to OPERATE.
On panel 2C25, placed 2RITS-2330 Selector Switch to
OPERATE. N/A  SAT  UNSAT
ANO-2-JPM-NRC-BMSRM  PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)  7. (Proc step 7.2.4) Verify 2RITS-2330 meter reading returns to normal.


EXAMINER's CUE:
ANO-2-JPM-NRC-BMSRM                                                                      PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARD                    (Circle One)
: 7. (Proc Verify 2RITS-2330 meter        On panel 2C25, verified              N/A SAT UNSAT step  reading returns to normal.      2RITS-2330 meter reading 7.2.4)                                  returned to original level.
EXAMINERs CUE:
Meter returns to normal.
Meter returns to normal.
On panel 2C25, verified 2RITS-2330 meter reading
: 8. Direct WCO to open              NA step Procedure step 7.3.1          N/A SAT UNSAT LRW/BMS Discharge to Circ Water Flume valve (Proc  2CV-2330A.
step 7.3.2.A) EXAMINERs CUE:                Direct WCO to verify 2HS-2331 in WCO reports that 2HS-2331      position 1. Initial step 7.3.2.A.
is in position 1.
WCO reports that 2HS-2330      Direct WCO to verify 2HS-2330 in (Proc                                  position 1. Initial step 7.3.2.B.
is in position 1.
step 7.3.2.B)                                NA step 7.3.2.C and 7.3.2.D.
: 9. (Proc Record setpoint value from      Request alarm setpoint from          N/A SAT UNSAT step  prerelease report              prerelease report and record in 7.4.1)  EXAMINERs CUE:                  step 7.4.1.
2RE2330 alarm setpoint from Prerelease Report is "3E3".
: 10. Determine dial setting to be    From Radiation Monitor Alarm        N/A SAT UNSAT (Proc  used from Radiation Monitor    Setpoint Table determined that step  Alarm Setpoint Table using    Prerelease Report setpoint of 3E3 7.4.2)  setpoint from Prerelease        equals dial setpoint of 4.78.
Report.
(C)      11. Release 2RE-2330                On panel 2C25, released 2RE-          N/A SAT UNSAT (Proc  potentiometer stop AND          2330 potentiometer stop AND step  adjust dial to setting of 4.78. adjusted dial setting of 4.78. Locks 7.4.3)                                  potentiometer stop.
EXAMINERs CUE:
Potentiometer dial setting is set at 4.78. Potentiometer is locked.
(C)      12. Place 2RE-2330 Selector        On panel 2C25, placed 2RE-2330       N/A SAT UNSAT (Proc  Switch in PULSE CAL.            Selector Switch in PULSE CAL.
step 7.4.4)  EXAMINERs CUE:
Switch in PULSE CAL and meter deflection is above alarm setpoint.


returned to original level.
ANO-2-JPM-NRC-BMSRM                                                            PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARD                (Circle One)
N/A SAT UNSAT 8. (Proc step 7.3.2.A
: 13. Direct WCO to verify        Directed WCO to verify          N/A SAT UNSAT annunciator 2K14 B1 is      annunciator 2K14-B1, Liquid (Proc  actuated on Panel 2C112. Radwaste Discharge Radiation step  This is located on the 335 Hi, is actuated on 2C112.
(Proc step 7.3.2.B) Direct WCO to open LRW/BMS Discharge to Circ  
7.4.5) elevation of the auxiliary building.
EXAMINERs CUE:
2K14-B1, Liquid Radwaste Discharge Radiation Hi is in alarm.
: 14. Verify annunciator 2K11-J9  On panel 2C14, verified 2K11-J9  N/A SAT UNSAT BORON MGMT SYS              is actuated on Panel 2C14.
(Proc TROUBLE" is actuated on step Panel 2C14.
7.4.5) EXAMINERs CUE:
2K11-J9, BORON MGMT SYS TROUBLE", is in alarm.
: 15. Verify annunciator 2K11-C10 On panel 2C14, verified 2K11-C10 N/A SAT UNSAT "PROC LIQUID RADIATION      is actuated on Panel 2C14.
(Proc HI/LO" is actuated on Panel step 2C14.
7.4.5)
EXAMINERs CUE:
2K11-C10, "PROC LIQUID RADIATION HI/LO" is in alarm.
: 16. Direct WCO to verify        Directed WCO to verify          N/A SAT UNSAT LRW/BMS Discharge to Circ   2CV-2330A is closed.
(Proc  Water Flume (2CV-2330A) is step  closed.
7.4.5)
EXAMINERs CUE:
WCO reports 2CV-2330A is closed.
: 17. Reset 2RE-2330 and place in On panel 2C25, placed the        N/A SAT UNSAT (Proc  OPERATE.                    Operation Selector switch to step                              RESET.
7.5)
EXAMINERs CUE:            Placed the Operation Selector Switch in OPERATE.          switch to OPERATE.
: 18. Verify valve(s) tested have Directed WCO to verify 2CV-(Proc  reopened.                  2330A open.
step  EXAMINERs CUE:
7.5)  WCO reports 2CV-2330A is open.


Water Flume valve
ANO-2-JPM-NRC-BMSRM                                                             PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                           STANDARD               (Circle One)
 
: 19. Check associated alarms      On panel 2C14, verified 2K11-C10 N/A SAT UNSAT (Proc clear.                       and 2K11-J9 are in "slow flash" step                               OR NOT illuminated.
2CV-2330A.
7.5)  EXAMINERs CUE:             Directed WCO to verify 2K11-C10, 2K11-J9 and       annunciator 2K14-B1 on 2C112 is 2K14-B1 are in "slow flash". in "slow flash" OR NOT illuminated.
 
END STOP TIME:
EXAMINER's CUE:
WCO reports that 2HS-2331
 
is in position 1.
 
WCO reports that 2HS-2330 is in position 1.
NA step Procedure step 7.3.1
 
Direct WCO to verify 2HS-2331 in position 1. Initial step 7.3.2.A.
 
Direct WCO to verify 2HS-2330 in position 1. Initial step 7.3.2.B.
NA step 7.3.2.
C and 7.3.2.D.
N/A  SAT  UNSAT  9.  (Proc step 7.4.1) Record setpoint value from prerelease report EXAMINERs CUE:
2RE2330 alarm setpoint
 
from Prerelease Report is
 
"3E3". Request alarm setpoint from prerelease report and record in
 
step 7.4.1.
N/A  SAT  UNSAT  10. (Proc step 7.4.2) Determine dial setting to be used from "Radiation Monitor
 
Alarm Setpoint Table" using
 
setpoint from Prerelease
 
Report. From "Radiation Monitor Alarm Setpoint Table" determined that
 
Prerelease Report setpoint of 3E3
 
equals dial setpoint of 4.78.
N/A  SAT  UNSAT (C) 11. (Proc step 7.4.3) Release 2RE-2330 potentiometer stop AND
 
adjust dial to setting of 4.78.
 
EXAMINER's CUE:
Potentiometer dial setting is
 
set at 4.78. Potentiometer is
 
locked. On panel 2C25, released 2RE-2330 potentiometer stop AND adjusted dial setting of 4.78. Locks
 
potentiometer stop.
N/A  SAT  UNSAT (C) 12. (Proc step 7.4.4) Place 2RE-2330 Selector Switch in PULSE CAL.
 
EXAMINER's CUE:
Switch in PULSE CAL and meter deflection is above
 
alarm setpoint.
On panel 2C25, placed 2RE-2330 Selector Switch in PULSE CAL.
N/A  SAT  UNSAT ANO-2-JPM-NRC-BMSRM PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One) 13. (Proc step 7.4.5) Direct WCO to verify annunciator 2K14 B1 is
 
actuated on Panel 2C112.
 
This is located on the 335'
 
elevation of the auxiliary
 
building.
 
EXAMINER's CUE:
2K14-B1, "Liquid Radwaste
 
Discharge Radiation Hi" is
 
in alarm. Directed WCO to verify annunciator 2K14-B1, "Liquid
 
Radwaste Discharge Radiation
 
Hi", is actuated on 2C112.
N/A  SAT  UNSAT  14. (Proc step 7.4.5) Verify annunciator 2K11-J9 BORON MGMT SYS
 
TROUBLE" is actuated on
 
Panel 2C14.
EXAMINER's CUE:
2K11-J9, BORON MGMT
 
SYS TROUBLE",  is in
 
alarm. On panel 2C14, verified 2K11-J9 is actuated on Panel 2C14.
N/A SAT UNSAT 15. (Proc step 7.4.5) Verify annunciator 2K11-C10 "PROC LIQUID RADIATION
 
HI/LO" is actuated on Panel
 
2C14.
EXAMINER's CUE:
2K11-C10, "PROC LIQUID
 
RADIATION HI/LO" is in
 
alarm. On panel 2C14, verified 2K11-C10 is actuated on Panel 2C14.
N/A  SAT  UNSAT  16. (Proc step 7.4.5) Direct WCO to verify LRW/BMS Discharge to Circ
 
Water Flume (2CV-2330A) is
 
closed.
EXAMINER's CUE:
WCO reports 2CV-2330A is
 
closed. Directed WCO to verify 2CV-2330A is closed.
N/A  SAT  UNSAT  17. (Proc step 7.5) Reset 2RE-2330 and place in OPERATE.
EXAMINER's CUE:
Switch in OPERATE.
 
On panel 2C25, placed the Operation Selector switch to
 
RESET.
 
Placed the Operation Selector switch to OPERATE.
 
N/A SAT  UNSAT  18. (Proc step 7.5) Verify valve(s) tested have reopened.
EXAMINER's CUE:
WCO reports 2CV-2330A is open. Directed WCO to verify 2CV-2330A open.
 
ANO-2-JPM-NRC-BMSRM  PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)  19. (Proc step 7.5) Check associated alarms clear.
EXAMINER's CUE:
2K11-C10, 2K11-J9 and 2K14-B1 are in "slow flash".
On panel 2C14, verified 2K11-C10 and 2K11-J9 are in "slow flash" OR NOT illuminated.
Directed WCO to verify
 
annunciator 2K14-B1 on 2C112 is in "slow flash" OR NOT  
 
illuminated.
N/A  SAT  UNSAT END STOP TIME:
ANO-2-JPM-NRC-BMSRM  PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. 


ANO-2-JPM-NRC-BMSRM                                                          PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
ANO-2-JPM-NRC-BMSRM  PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. 


ANO-2-JPM-NRC-BMSRM                                                          PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."
JPM-ANO-2-JPM-NRC-EFWRS  PAGE    1  of  6 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 014  DATE:
SYSTEM/DUTY AREA: Emergency Feedwater System


TASK: Reset the EFW pump trip throttle valve  
JPM-ANO-2-JPM-NRC-EFWRS                                                          PAGE    1 of 6 JOB PERFORMANCE MEASURE UNIT:      2                      REV #:    014                    DATE:
 
SYSTEM/DUTY AREA:        Emergency Feedwater System TASK:     Reset the EFW pump trip throttle valve JTA#:     ANO2AOEFWEMERG1 KA VALUE       RO:         3.4     SRO:         3.8       KA  
JTA#: ANO2AOEFWEMERG1  
 
KA VALUE RO: 3.4 SRO: 3.8 KA  


==REFERENCE:==
==REFERENCE:==
 
061 A2.04 APPROVED FOR ADMINISTRATION TO:             RO:   X       SRO:   X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:     X       BOTH:
061 A2.04  
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
 
PLANT SITE:     Simulate         SIMULATOR:                         LAB:
APPROVED FOR ADMINISTRATION TO:
POSITION EVALUATED:         RO:                     SRO:
RO: X SRO: X   TASK LOCATION:
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:               PLANT SITE:       LAB:
INSIDE CR:
TESTING METHOD:         SIMULATE:               PERFORM:
OUTSIDE CR:
APPROXIMATE COMPLETION TIME IN MINUTES:               14 Minutes REFERENCE(S):     OP 2106.006   Rev 055-04-0 EXAMINEE'S NAME:                                                 SSN:
X BOTH:   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
EVALUATOR'S NAME:
PLANT SITE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
Simulate SIMULATOR:
SATISFACTORY:                     UNSATISFACTORY:
LAB:   POSITION EVALUATED:
PERFORMANCE CHECKLIST COMMENTS:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
Start Time             Stop Time               Total Time SIGNED:                                               DATE:
SIMULATOR:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
PLANT SITE:
LAB:   TESTING METHOD:
SIMULATE:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
14 Minutes REFERENCE(S):
OP 2106.006 Rev 055-04-0  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
 
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.  
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:


JPM-ANO-2-JPM-NRC-EFWRS PAGE   2   of   6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
JPM-ANO-2-JPM-NRC-EFWRS                                                                     PAGE     2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
: 1. EFW pump (2P7A) started automatically following a reactor trip.
: 1. EFW pump (2P7A) started automatically following a reactor trip.
: 2. During the speed ramp the Turbine for 2P-7A tripped on overspeed.
: 2. During the speed ramp the Turbine for 2P-7A tripped on overspeed.
TASK STANDARD:        The trip throttle valve for EFW pump(2P7A) has been reset and is open.
TASK PERFORMANCE AIDS:            OP 2106.006 Exhibit 1 and Exhibit 2


TASK STANDARD:
JPM-ANO-2-JPM-NRC-EFWRS                                                                             PAGE     3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The trip throttle valve for EFW pump(2P7A) has been reset and is open.
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.
 
CRITICAL ELEMENTS (C):         2, 3, 4, 6 START TIME:
TASK PERFORMANCE AIDS:    OP 2106.006 Exhibit 1 and Exhibit 2     
PERFORMANCE CHECKLIST                                 STANDARDS                         (Circle One)
 
: 1. Verify 2CV0340-2 and 2CV-205-      Called the control room to verify      N/A    SAT    UNSAT (Proc   2 are closed.                      that 2CV0340-2 and 2CV-205-2 step                                        are closed.
JPM-ANO-2-JPM-NRC-EFWRS PAGE   3   of   6 JOB PERFORMANCE MEASURE INITIATING CUE:
1)
The SM/CRS directs, "Reset the EFW pump (2P7A) overspeed trip device usi ng OP 2106.006, Exhibit 1."
EXAMINERS CUE:
CRITICAL ELEMENTS (C):     2, 3, 4, 6 START TIME:
Control room reports that 2CV034-2 and 2CV205-2 are CLOSED.
 
(C)    2. Position the latch lever to         Turned the trip throttle valve        N/A     SAT    UNSAT (Proc    engage the trip hook.               handwheel clockwise so that the step                                       rotation of the screw raised the
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. (Proc step 1) Verify 2CV0340-2 and 2CV-205-2 are closed.
: 2)                                         sliding nut and latch lever to EXAMINERS CUE:                    where it could engage with the trip hook.
EXAMINER'S CUE:
Control room reports that 2CV034-2 and 2CV205-2 are  
 
CLOSED. Called the control room to verify that 2CV0340-2 and 2CV-205-2
 
are closed.
 
N/A   SAT    UNSAT (C) 2. (Proc step 2) Position the latch lever to engage the trip hook.
EXAMINER'S CUE:
Latch lever positioned to engage with the trip hook.
Latch lever positioned to engage with the trip hook.
Turned the trip throttle valve handwheel clockwise so that the
rotation of the screw raised the
sliding nut and latch lever to
where it could engage with the trip
hook.
Observed latch lever positioned to engage with the trip hook.
Observed latch lever positioned to engage with the trip hook.
N/A    SAT    UNSAT EXAMINER's NOTE:
EXAMINERs NOTE: This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss actions using Exhibit 2 located on the wall in the A emergency feed-water pump room.
This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss acti ons using Exhibit 2 located on the wall in the 'A' emergency feed-water pump room. (C) 3. (Proc step 3) Reset the mechanical trip linkage manually.
(C)     3. Reset the mechanical trip           Locally manually, pulled the          N/A    SAT    UNSAT (Proc    linkage manually.                   spring loaded emergency step                                        connecting rod against the spring EXAMINERS CUE:
EXAMINER'S CUE:
: 3)                                        force.
Mechanical trip linkage is in TRIP RESET.
Mechanical trip linkage is in TRIP RESET.
Locally manually, pulled the spring loaded emergency  
Moved the emergency head lever away from the emergency tappet and tappet nut to allow tappet to move downward to TRIP RESET.


connecting rod against the spring force.
JPM-ANO-2-JPM-NRC-EFWRS                                                                   PAGE     4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                               STANDARDS                   (Circle One)
Moved the emergency head lever away from the emergency tappet
(C)   4. Verify emergency tappet is in       Verified the tappet is in TRIP      N/A  SAT    UNSAT (Proc TRIP RESET.                         RESET.
 
step OR 3/4)
and tappet nut to allow tappet to
EXAMINERS CUE:                     Pressed downward on the emergency tappet to place it in The tappet is in TRIP RESET.
 
TRIP RESET and; EXAMINERs Note:
move downward to TRIP RESET.
Submitted a Condition Report The emergency tappet is located on the turbine not the trip throttle valve. Failure to ensure this is in the TRIP RESET position might defeat the O/S trip device.
N/A    SAT    UNSAT JPM-ANO-2-JPM-NRC-EFWRS PAGE   4   of   6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. (Proc step 3/4) Verify emergency tappet is in TRIP RESET.
: 5. Verify tappet nut/emergency        Verified the flat side of the tappet N/A SAT    UNSAT (Proc head lever positioning.            nut is to the flat side of the step                                     emergency head lever.
EXAMINER'S CUE:
5)
The tappet is in TRIP RESET.  
EXAMINERS CUE:
 
EXAMINER's Note:
The emergency tappet is located on the turbine not the trip throttle valve. Failure to  
 
ensure this is in the TRIP  
 
RESET position might defeat the O/S trip device.
Verified the tappet is in TRIP RESET. OR Pressed downward on the emergency tappet to place it in
 
TRIP RESET and;
 
Submitted a Condition Report
 
N/A   SAT    UNSAT 5. (Proc step 5) Verify tappet nut/emergency head lever positioning.
EXAMINER'S CUE:
The flat side of the tappet nut is to the flat side of the emergency head lever.
The flat side of the tappet nut is to the flat side of the emergency head lever.
Verified the flat side of the tappet nut is to the flat side of the
(C)   6. Open the trip throttle valve.       With latch and trip hook engaged,   N/A  SAT    UNSAT (Proc                                    turned trip throttle valve step                                    handwheel CCW until valve was
 
: 6)  EXAMINERS CUE:                    full open.
emergency head lever.
The trip throttle valve is fully open.
N/A    SAT    UNSAT (C) 6. (Proc step 6) Open the trip throttle valve.
EXAMINER'S CUE:
The trip throttle valve is fully open. With latch and trip hook engaged, turned trip throttle valve  
 
handwheel CCW until valve was  
 
full open.  
 
Observed stem at full travel.
Observed stem at full travel.
N/A   SAT    UNSAT 7. (Proc step 7) Close trip throttle valve 1/4 turn.
: 7. Close trip throttle valve 1/4 turn. Turned the trip throttle valve      N/A SAT    UNSAT (Proc                                     handwheel Counter clockwise 1/4 step                                    turn.
EXAMINER'S CUE:
: 7)  EXAMINERS CUE:
The trip throttle valve is closed 1/4 turn.
The trip throttle valve is closed 1/4 turn.
Turned the trip throttle valve handwheel Counter clockwise 1/4
: 8. Verify 2P7A turbine overspeed      Contacted the control room to        N/A SAT    UNSAT (Proc trip (2K05-A9) alarm is clear       determine 2K05-A9 alarm status.
 
step 8)
turn. N/A   SAT    UNSAT 8. (Proc step 8) Verify 2P7A turbine overspeed trip (2K05-A9) alarm is clear EXAMINER'S CUE:
EXAMINERS CUE:
The control room reports 2K05-A9 is clear.
The control room reports 2K05-A9 is clear.
Contacted the control room to determine 2K05-A9 alarm status.
END STOP TIME:
N/A    SAT    UNSAT END STOP TIME:


JPM-ANO-2-JPM-NRC-EFWRS PAGE   5   of   6 JOB PERFORMANCE MEASURE Examiner's Copy
JPM-ANO-2-JPM-NRC-EFWRS                                         PAGE 5 of 6 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS:
* EFW pump (2P7A) started automatically following a reactor trip.
* During the speed ramp the Turbine for 2P-7A tripped on overspeed.
INITIATING CUE:
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.


JPM INITIAL TASK CONDITIONS
JPM-ANO-2-JPM-NRC-EFWRS                                          PAGE 6 of 6 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS:
:      EFW pump (2P7A) started automatically following a reactor trip. During the speed ramp the Turbine for 2P-7A tripped on overspeed.
* EFW pump (2P7A) started automatically following a reactor trip.
INITIATING CUE
* During the speed ramp the Turbine for 2P-7A tripped on overspeed.
:
INITIATING CUE:
The SM/CRS directs, "Reset the EFW pump (2P7A) overspeed trip device using  
The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.


OP 2106.006, Exhibit 1."
JPM-ANO-2-JPM-NRC-IA01                                                               PAGE    1 of 7 JOB PERFORMANCE MEASURE UNIT:     2                         REV #:     09                     DATE:
 
SYSTEM/DUTY AREA:           Emergency & Abnormal Operations TASK:     Isolate the instrument air supply to the MSIVs (locally)
JPM-ANO-2-JPM-NRC-EFWRS  PAGE    6  of  6 JOB PERFORMANCE MEASURE Examinee's Copy
JTA#:     ANO2-A0-EP-PAOP-OFFNORM-127 KA VALUE       RO:         3.1       SRO:         4.3       KA  
 
JPM INITIAL TASK CONDITIONS
:      EFW pump (2P7A) started automatically following a reactor trip. During the speed ramp the Turbine for 2P-7A tripped on overspeed.
INITIATING CUE
:
The SM/CRS directs, "Reset the EFW pump (2P7A) overspeed trip device using
 
OP 2106.006, Exhibit 1."
 
JPM-ANO-2-JPM-NRC-IA01         PAGE    1   of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:
SYSTEM/DUTY AREA: Emergency & Abnormal Operations  
 
TASK: Isolate the instrument air supply to the MSIV's (locally)  
 
JTA#: ANO2-A0-EP-PAOP-OFFNORM-127  
 
KA VALUE RO: 3.1 SRO: 4.3 KA  


==REFERENCE:==
==REFERENCE:==
 
067 AA2.04 APPROVED FOR ADMINISTRATION TO:               RO:     X       SRO:   X TASK LOCATION:             INSIDE CR:               OUTSIDE CR:     X       BOTH:
067 AA2.04  
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
 
PLANT SITE:     Simulate           SIMULATOR:                         LAB:
APPROVED FOR ADMINISTRATION TO:
POSITION EVALUATED:           RO:                     SRO:
RO: X SRO: X   TASK LOCATION:
ACTUAL TESTING ENVIRONMENT:             SIMULATOR:                 PLANT SITE:         LAB:
INSIDE CR:
TESTING METHOD:           SIMULATE:               PERFORM:
OUTSIDE CR:
APPROXIMATE COMPLETION TIME IN MINUTES:                   15 Minutes REFERENCE(S):       OP 2203.049, Rev. 001-01-0 EXAMINEE'S NAME:                                                     SSN:
X BOTH:   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
EVALUATOR'S NAME:
PLANT SITE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
Simulate SIMULATOR:
SATISFACTORY:                         UNSATISFACTORY:
LAB:   POSITION EVALUATED:
PERFORMANCE CHECKLIST COMMENTS:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
Start Time               Stop Time               Total Time SIGNED:                                                 DATE:
SIMULATOR:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
PLANT SITE:
LAB:   TESTING METHOD:
SIMULATE:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2203.049, Rev. 001-01-0  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
 
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.  
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:


JPM-ANO-2-JPM-NRC-IA01         PAGE   2   of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
JPM-ANO-2-JPM-NRC-IA01                                                                   PAGE     2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS: A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U).
JPM INITIAL TASK CONDITIONS:
Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
A severe fire has occurred in t he 'Corridor Behind Door 340 (Zone 2109-U)'.
TASK STANDARD:         Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the MSIVs.
Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.    
 
TASK STANDARD:
Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the MSIV's.                                                                                                          
 
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
: 1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91).  
: 1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91).
: 2) Flashlight and gloves          
: 2) Flashlight and gloves
: 3) RWP and dosimeter.            
: 3) RWP and dosimeter.
 
JPM-ANO-2-JPM-NRC-IA01        PAGE    3  of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM/CRS directs, "Perform AOP 2203.049, Fires in Ar eas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area 'Corridor Behind Door 340 (Zone 2109-U)'
to trip the main turbine generator locally and close the MSIV's locally."


CRITICAL ELEMENTS (C):   4, 5, 7, 8 START TIME:
JPM-ANO-2-JPM-NRC-IA01                                                                              PAGE        3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. (Proc step 1/2) Obtain equipment from alternate shutdown locker in the entry to the unit 2 control room.
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.
EXAMINER'S CUE:
CRITICAL ELEMENTS (C):           4, 5, 7, 8 START TIME:
Simulate obtaining the CRS bag, flashlight and radio with headset.
PERFORMANCE CHECKLIST                                       STANDARDS                         (Circle One)
 
: 1. Obtain equipment from alternate                                                 N/A SAT UNSAT (Proc  shutdown locker in the entry to the step  unit 2 control room.
Radio check is satisfactory
1/2)
 
EXAMINERS CUE:
At the remote shutdown locker, obtain Red CRS bag, Flashlight, and  
At the remote shutdown locker, Simulate obtaining the CRS bag, obtain Red CRS bag, Flashlight, and flashlight and radio with headset.
 
radio with Headset.
radio with Headset.  
Radio check is satisfactory            Perform radio check EXAMINERs NOTE: Access to platform in MSIV room requires an RWP. To save time, the examinee should be prompted to obtain dosimeter and log onto the RWP and task for outside controlled access before starting JPM. Also a flashlight will be needed.
 
: 2. Locally trip the Main Turbine          At the north end of the Main Turbine    N/A SAT UNSAT (Proc                                           at the front standard, located the red step                                           handle and simulates pulling the 3.A )   EXAMINERS CUE:                         handle.
Perform radio check N/A  SAT  UNSAT EXAMINER's NOTE: Access to platform in MSIV room requires an RWP. To save time, the examinee should be prompted to obtain dosimeter and log onto the RWP a nd task for outside controlle d access before starting JPM.
Also a flashlight will be needed. 2. (Proc step 3.A ) Locally trip the Main Turbine EXAMINER'S CUE:
Main Turbine is tripped.
Main Turbine is tripped.
At the north end of the Main Turbine at the front standard, located the red handle and simulates pulling the handle.
EXAMINERS NOTE:
N/A  SAT  UNSAT EXAMINER'S NOTE:
All valves are located in the MSIV room on the first platform above 2T-91.
All valves are located in the MSIV room on the first platform above 2T-91. Leather Gloves will be needed for climbing ladder to platform. Care should be taken around the MSIV's to prevent bumping into valves. 3. (Proc step 3.B.1) Close the IA supply from 2T91 "2F-356 I/N" valve (2MS-540)
Leather Gloves will be needed for climbing ladder to platform.
EXAMINER'S CUE: 2MS-540 valve CLOCKWISE motion stops.
Care should be taken around the MSIVs to prevent bumping into valves.
At the "A" MSIV actuator, closed 2MS-540 by rotating hand wheel CLOCKWISE.
: 3. Close the IA supply from 2T91         At the A MSIV actuator, closed       N/A SAT UNSAT (Proc   2F-356 I/N valve (2MS-540)         2MS-540 by rotating hand wheel step                                          CLOCKWISE.
 
3.B.1)
Observed valve motion stopped when valve fully closed N/A SAT UNSAT JPM-ANO-2-JPM-NRC-IA01        PAGE    4  of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. (Proc step 3.B.2) Close IA supply "IA to 2CV-1010-1" valve" (2IA-166)
EXAMINERS CUE:
EXAMINER'S CUE:
2MS-540 valve CLOCKWISE              Observed valve motion stopped when motion stops.                         valve fully closed
2IA-166 valve CLOCKWISE motion stops.
Just south of the "A" MSIV actuator, closed 2IA-166 by rotating its hand wheel CLOCKWISE.  
 
Observed valve motion stopped when valve fully closed N/A  SAT  UNSAT (C) 5. (Proc step 3.B.3) Open filter vent valve on "A" MSIV point of use air filter
 
(2F-356).
EXAMINER'S CUE:
Air bleeds off the actuator system and dies away. The 'A' MSIV is slowly closing.
At the "A" MSIV actuator, opened 2F-356 vent valve by turning the petcock valve until air escapes.
 
Observed valve motion stopped when valve fully open.
N/A  SAT  UNSAT  6. (Proc step 3.C.1) Close IA supply from 2T91 "2F-357 I/N" valve, (2MS-539)
EXAMINER'S CUE:
2MS-539 valve CLOCKWISE motion stops.
At the "B" MSIV actuator, closed 2MS-539 by rotating hand wheel CLOCKWISE.
 
Observed valve motion stopped when valve fully closed.
N/A  SAT  UNSAT (C) 7. (Proc step 3.C.2) Close IA supply "2CV-1060-2 AIR ISOL" valve, (2IA-93)
EXAMINER'S CUE:
2IA-93 valve CLOCKWISE mot


ion stops.
JPM-ANO-2-JPM-NRC-IA01                                                                        PAGE        4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                    STANDARDS                      (Circle One)
Just south of the "A" MSIV actuator, closed 2IA-93 by rotating its handwheel CLOCKWISE.  
(C)        4. Close IA supply IA to              Just south of the A MSIV actuator, N/A SAT UNSAT (Proc    2CV-1010-1 valve (2IA-166)        closed 2IA-166 by rotating its hand step                                        wheel CLOCKWISE.
3.B.2)
EXAMINERS CUE:
2IA-166 valve CLOCKWISE            Observed valve motion stopped when motion stops.                      valve fully closed (C)        5. Open filter vent valve on A      At the A MSIV actuator, opened    N/A SAT UNSAT (Proc    MSIV point of use air filter        2F-356 vent valve by turning the step    (2F-356).                          petcock valve until air escapes.
3.B.3)
EXAMINERS CUE:                    Observed valve motion stopped when Air bleeds off the actuator        valve fully open.
system and dies away. The A MSIV is slowly closing.
: 6. Close IA supply from 2T91          At the B MSIV actuator, closed    N/A SAT UNSAT (Proc    2F-357 I/N valve, (2MS-539)      2MS-539 by rotating hand wheel step                                        CLOCKWISE.
3.C.1)
EXAMINERS CUE:
2MS-539 valve CLOCKWISE            Observed valve motion stopped when motion stops.                      valve fully closed.
(C)        7. Close IA supply 2CV-1060-2        Just south of the A MSIV actuator, N/A SAT UNSAT (Proc    AIR ISOL valve, (2IA-93)          closed 2IA-93 by rotating its step                                        handwheel CLOCKWISE.
3.C.2)
EXAMINERS CUE:
2IA-93 valve CLOCKWISE mot          Observed valve motion stopped when ion stops.                          valve fully closed.
(C)        8. Open filter vent on MSIV IA        At the B MSIV actuator, opened    N/A SAT UNSAT (Proc    FILTER 2CV-1060-2 AIR              2F-357 vent valve by turning the step    CONTROL VLV valve (2F-357)        petcock valve until air escapes.
3.C.3)
(Valve on B MSIV point of use    .
air filter (2F-357))
Observed valve motion stopped when EXAMINERS CUE:                    valve fully open Air bleeds off the actuator system and dies away. The B MSIV is slowly closing.
Examiners Note: The next step is to locally secure the main feed pumps located in the basement of the turbine building. Stop the JPM before transitioning to this area.
Examiners Cue: Another operator will trip the Main Feed Pumps.


Observed valve motion stopped when valve fully closed.
JPM-ANO-2-JPM-NRC-IA01                                PAGE    5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                STANDARDS    (Circle One)
N/A  SAT  UNSAT (C) 8. (Proc step 3.C.3) Open filter vent on MSIV "IA FILTER 2CV-1060-2 AIR CONTROL VLV" valve (2F-357) (Valve on "B" MSIV point of use air filter (2F-357))
END STOP TIME: ___________________
EXAMINER'S CUE:
Air bleeds off the actuator system and dies away. The 'B' MSIV is slowly closing.
At the "B" MSIV actuator, opened 2F-357 vent valve by turning the petcock valve until air escapes. .


Observed valve motion stopped when valve fully  open N/A  SAT  UNSAT Examiner's Note: The next step is to locally secure the ma in feed pumps located in the basement of the turbine building. Stop the JPM before transitioning to this area. Examiner's Cue: Another operator will trip the Main Feed Pumps.
JPM-ANO-2-JPM-NRC-IA01                                                     PAGE    6 of 7 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:
JPM-ANO-2-JPM-NRC-IA01        PAGE    5  of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
END  STOP TIME:
___________________
JPM-ANO-2-JPM-NRC-IA01         PAGE    6   of 7 JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL CONDITIONS:
A severe fire has occurred in the 'Corridor Behind Door 340 (Zone 2109-U)'. Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform AOP 2203.049, Fire s in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area 'Co rridor Behind Door 340 (Zone 2109-U)' to trip the main turbine generator locally and close the MSIV's locally."
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.


JPM-ANO-2-JPM-NRC-IA01         PAGE   7   of 7 JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL CONDITIONS:
JPM-ANO-2-JPM-NRC-IA01                                                   PAGE     7 of 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:
A severe fire has occurred in the 'Corri dor Behind Door 340 (Zone 2109-U)'. Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform AOP 2203.049, Fire s in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area 'Co rridor Behind Door 340 (Zone 2109-U)' to trip the main turbine generator locally and close the MSIV's locally."
The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.


JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 1 of 8 SYSTEM/DUTY AREA:
JOB PERFORMANCE MEASURE JPM#     A2JPM-NRC-EDDCG                     REV     01                                   PAGE 1 of 8 SYSTEM/DUTY AREA:       Emergency Diesel Generator System TASK:   Start an emergency diesel generator without DC control power (2K-4B)
Emergency Diesel Generator System TASK: Start an emergency diesel generator wi thout DC control power (2K-4B)
JTA # : ANO2-AO-EDG-OFFNORM-5 KA VALUE         RO:       4.1       SRO:           4.5       KA  
JTA # : ANO2-AO-EDG-OFFNORM-5 KA VALUE RO: 4.1 SRO: 4.5 KA  


==REFERENCE:==
==REFERENCE:==
 
055 EA1.06 APPROVED FOR ADMINISTRATION TO:             RO:         X       SRO:       X TASK LOCATION:       INSIDE CR:                 OUTSIDE CR:           X     BOTH:
055 EA1.06 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR:
PLANT SITE:       Simulate     SIMULATOR:                         LAB:
X BOTH:   SUGGESTED TESTING ENVIRONMENT AND ME THOD  (PERFORM OR SIMULATE):
POSITION EVALUATED:       RO:             SRO:
PLANT SITE:
ACTUAL TESTING ENVIRONMENT:             SIMULATOR:                 PLANT SITE:   X   LAB:
Simulate SIMULATOR:
TESTING METHOD:       SIMULATE:         X     PERFORM:
LAB:   POSITION EVALUATED: RO: SRO:
APPROXIMATE COMPLETION TIME IN MINUTES:                       16 minutes REFERENCE(S)       OP 2104.036, Exhibit 2, 2107.001, Exhibit 9 EXAMINEES NAME:                                                 SSN:
ACTUAL TESTING ENVIRONMENT: SIMULATOR:
EVALUATORS NAME:                                               DATE THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
PLANT SITE:
SATISFACTORY:                                   UNSATISFACTORY:
X LAB:   TESTING METHOD: SIMULATE:
X PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
16 minutes REFERENCE(S)
OP 2104.036, Exhibit 2, 2107.001, Exhibit 9 EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
DATETHE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time: Stop Time: Total Time:
Start Time:               Stop Time:                   Total Time:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED: DATE:
SIGNED:                                                                   DATE:
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01  PAGE  2 of 8 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.


JOB PERFORMANCE MEASURE JPM#      A2JPM-NRC-EDDCG                    REV      01                                      PAGE 2 of 8 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
The following conditions exist:  
The following conditions exist:
: 1. The plant is in Mode 3 following an automatic reactor trip  
: 1. The plant is in Mode 3 following an automatic reactor trip
: 2. A Station Blackout exists  
: 2. A Station Blackout exists
: 3. There is no green DC power available.  
: 3. There is no green DC power available.
: 4. Fuses from alternate shutdow n locker are simulated obtained.
: 4. Fuses from alternate shutdown locker are simulated obtained.
TASK STANDARD:
TASK STANDARD:
2DG2 [2K-4B] has been started with normal voltage and frequency TASK PERFORMANCE AIDS:
2DG2 [2K-4B] has been started with normal voltage and frequency TASK PERFORMANCE AIDS:
: 1. OP 2104.036 Exhibit 2 JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 3 of 8 INITIATING CUE:
: 1. OP 2104.036 Exhibit 2
The CRS provides the following direction:  
 
: 1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2 2. Due to the timeliness of the actions required, electric al safety requirements may be waived at your discretion.
JOB PERFORMANCE MEASURE JPM#       A2JPM-NRC-EDDCG                       REV     01                                         PAGE 3 of 8 INITIATING CUE: The CRS provides the following direction:
However, use extreme caution when operat ing any energized electrical components.
: 1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2
CRITICAL ELEMENTS (C):
: 2. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion.
4, 5, 6, 8 START TIME:
However, use extreme caution when operating any energized electrical components.
EXAMINER'S NOTE:
CRITICAL ELEMENTS (C):         4, 5, 6, 8 START TIME:
EXAMINERS NOTE:
Provide examinee with OP2104.036, Exhibit 2.
Provide examinee with OP2104.036, Exhibit 2.
Have a copy of 2107.001, Exhibit 9, Electrical Safety Requirements available for examinee's review if requested. If examinee states that they will adhere to the electrical safety requirements for steps 1, 2 & 3, have them show what requirements they will be ensuri ng are satisfied then, tell them that the requirements have been satisfied and that they should continue with the JPM. Due to electrical safety concerns, do not allow the examinee to open the door to 2D24. Have them explain what they would do. PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. (Proc step 1)  Open one of the following sets of breakers:  
Have a copy of 2107.001, Exhibit 9, Electrical Safety Requirements available for examinees review if requested. If examinee states that they will adhere to the electrical safety requirements for steps 1, 2 & 3, have them show what requirements they will be ensuring are satisfied then, tell them that the requirements have been satisfied and that they should continue with the JPM.
 
Due to electrical safety concerns, do not allow the examinee to open the door to 2D24. Have them explain what they would do.
- 2C108 breaker (2D24-2)  
PERFORMANCE CHECKLIST                                   STANDARDS                       (Circle One)
- 2E21 breaker (2D24-6)  
: 1. Open one of the following sets     For the listed breaker, opened        N/A SAT UNSAT (Proc of breakers:                         panel door and moved breaker step                                      handle to OFF.
- 2C108 breaker (2D24-8)  
: 1)    - 2C108 breaker (2D24-2)
 
                  - 2E21 breaker (2D24-6)
OR
                  - 2C108 breaker (2D24-8)
- 2E21 breaker (D2E21NA6)  
OR
- 2C108 breaker (D2C108NA8)  
                  - 2E21 breaker (D2E21NA6)
- 2C108 breaker (D2C108NA2)  
                  - 2C108 breaker (D2C108NA8)
 
                  - 2C108 breaker (D2C108NA2)
POSITIVE CUE:
POSITIVE CUE:
(For each breaker)
(For each breaker)
 
Breaker indicates OPEN.
Breaker indicates OPEN.  
 
NEGATIVE CUE:
NEGATIVE CUE:
(For each breaker)
(For each breaker)
 
Breaker indicates NOT OPEN.
Breaker indicates NOT OPEN.  
TRANSITION NOTE:
 
For the listed breaker, opened panel door and moved breaker
 
handle to OFF.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to 2A4 switchgear room.
Go to 2A4 switchgear room.
EXAMINERS NOTE:
EXAMINERS NOTE:
For the 4160v breakers in Steps 2 and 3, do NOT open the breaker cubicle doors.
For the 4160v breakers in Steps 2 and 3, do NOT open the breaker cubicle doors.
For electrical safety purposes, provide candidate with picture at the end of this JPM, have the candidate explain the indications he would use to determine the following.  
For electrical safety purposes, provide candidate with picture at the end of this JPM, have the candidate explain the indications he would use to determine the following.
: 1. Breaker position  
: 1. Breaker position
: 2. Closing Spring Status  
: 2. Closing Spring Status Standard:
 
: 1. The student must use mechanical breaker position indication
Standard:  
: 1. The student must use mechanical breaker position indication  
: 2. The student must use mechanical closing spring status indication.
: 2. The student must use mechanical closing spring status indication.
Both of these indicators are located on the breaker.
Both of these indicators are located on the breaker.
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01  PAGE  4 of 8 Examiners Note:
The following breakers are listed with their respective conditions for the plant conditions that exist. For breakers 2A-402 and 2A-409, provide examinee with picture at the end of this JPM and have them indicate what they would do to open the breakers. 2. (Proc step 2)  Verify the following breakers OPEN WITH closing springs charged.
SW Pump 2P4C (2A-402)
SW Pump 2P4B (2A-403)
2DG2 Output breaker (2A-408)
NEGATIVE CUE
: 2A-402 is closed with closing
springs charged
POSITIVE CUE:
2A402 opens when the
mechanical trip button is
pushed.
At bus 2A4 at cubicle 2A411, opened cubicle door.
Observed indications for the
following. Mechanical breaker position  Mechanical closing spring indication
Operator opened any closed
breaker by pushing the
mechanical breaker trip button on
the breaker N/A  SAT  UNSAT  3. (Proc step 3)  Verify the following breakers OPEN.
CS Pump 2P35B (2A-404)
LPSI Pump 2P60B (2A-405)
HPSI Pump 2P89B (2A-406)
HPSI Pump 2P89C (2A-407)
2A4 Supply breaker (2A-409)
2A3-2A4 Tie (2A-410)


JOB PERFORMANCE MEASURE JPM#      A2JPM-NRC-EDDCG                    REV      01                                      PAGE 4 of 8 Examiners Note:
The following breakers are listed with their respective conditions for the plant conditions that exist. For breakers 2A-402 and 2A-409, provide examinee with picture at the end of this JPM and have them indicate what they would do to open the breakers.
: 2. Verify the following breakers    At bus 2A4 at cubicle 2A411,          N/A SAT UNSAT (Proc OPEN WITH closing springs          opened cubicle door.
step charged.
: 2)                                    Observed indications for the SW Pump 2P4C (2A-402)            following.
Mechanical breaker position SW Pump 2P4B (2A-403)              Mechanical closing spring indication 2DG2 Output breaker (2A-408)
Operator opened any closed NEGATIVE CUE:                    breaker by pushing the 2A-402 is closed with closing    mechanical breaker trip button on springs charged                  the breaker POSITIVE CUE:
2A402 opens when the mechanical trip button is pushed.
: 3. Verify the following breakers    For each listed breaker, verified    N/A SAT UNSAT (Proc  OPEN.                            the breaker to be open with the step                                    mechanical breaker indication.
: 3)  CS Pump 2P35B (2A-404)
Operator opened any closed LPSI Pump 2P60B (2A-405)          breaker by pushing the mechanical breaker trip button on HPSI Pump 2P89B (2A-406)          the breaker HPSI Pump 2P89C (2A-407) 2A4 Supply breaker (2A-409) 2A3-2A4 Tie (2A-410)
NEGATIVE CUE:
NEGATIVE CUE:
2A-409 indicates CLOSED  
2A-409 indicates CLOSED POSITIVE CUE:
 
2A-409 opens when the mechanical trip button is pushed.
POSITIVE CUE:
2A-409 opens when the  


mechanical trip button is
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG                   REV     01                                     PAGE 5 of 8 (C)   4. Open 2DG2 Service Water           Using radio or telephone            N/A SAT UNSAT (Proc Outlet valve (2CV-1504-2).         communications, instructed WCO step                                    to OPEN 2CV-1504-2 locally using
 
: 4)  POSITIVE CUE:                     manual operator.
pushed.
WCO reports Service Water Valve (2CV-1504-2) is OPEN.           OR Using radio or telephone communications, contacted Control Room personnel to have WCO to OPEN 2DG2 Service Water valve (2CV-1504-2) using the manual operator locally.
For each listed breaker, verified the breaker to be open with the
TRANSITION NOTE:
 
mechanical breaker indication.
 
Operator opened any closed
 
breaker by pushing the
 
mechanical breaker trip button on
 
the breaker N/A  SAT  UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 5 of 8 (C) 4. (Proc step 4)  Open 2DG2 Service Water Outlet valve (2CV-1504-2).  
 
POSITIVE CUE:
WCO reports Service Water Valve (2CV-1504-2) is OPEN.
Using radio or telephone communications, instructed WCO
 
to OPEN 2CV-1504-2 locally using
 
manual operator.
 
OR Using radio or telephone  
 
communications, contacted  
 
Control Room personnel to have  
 
WCO to OPEN 2DG2 Service  
 
Water valve (2CV-1504-2) using  
 
the manual operator locally.  
 
N/A  SAT  UNSAT TRANSITION NOTE:
Go to 2DG2 room.
Go to 2DG2 room.
(C) 5. (Proc step 5)  Place exciter regulator handswitch in LOCAL.
(C)   5. Place exciter regulator           On panel 2E22, rotated Exciter       N/A SAT UNSAT (Proc handswitch in LOCAL.               Regulator handswitch to LOCAL.
 
step
POSITIVE CUE:
: 5)  POSITIVE CUE:
The exciter regulator
The exciter regulator handswitch indicates LOCAL.
 
(C)  6. Place Engine Control              On panel 2E21, inserted key in       N/A SAT UNSAT (Proc handswitch to START.              Engine Control Switch.
handswitch indicates LOCAL.
step
 
: 6)  POSITIVE CUE:                      Rotated key clockwise to unlock.
On panel 2E22, rotated Exciter Regulator handswitch to LOCAL.
The Engine Control handswitch indicates START.                  Rotated Engine Control handswitch through LOCKOUT to START.
N/A SAT UNSAT (C) 6. (Proc step 6)  Place Engine Control handswitch to START.  
: 7. Obtain FNM 10 amp fuses from      Obtained two fuses from the          N/A SAT UNSAT (Proc Alternate Shutdown file cabinet. Alternate Shutdown file cabinet.
 
step 7.1) POSITIVE CUE:
POSITIVE CUE:
The Engine Control handswitch indicates START.  
 
On panel 2E21, inserted key in Engine Control Switch.  
 
Rotated key clockwise to unlock.  
 
Rotated Engine Control  
 
handswitch through LOCKOUT to  
 
START.
N/A SAT UNSAT 7. (Proc step 7.1)  Obtain FNM 10 amp fuses from Alternate Shutdown file cabinet.  
 
POSITIVE CUE:
Fuses are in your possession.
Fuses are in your possession.
Obtained two fuses from the Alternate Shutdown file cabinet.
(C)   8. Open either Air Start Solenoid     Rotated manual operator stem on      N/A SAT UNSAT (Proc (2SV-2829-2 or 2SV-2830-2).        either Air Start Solenoid clockwise.
N/A  SAT  UNSAT (C) 8. (Proc step 7.2)  Open either Air Start Solenoid (2SV-2829-2 or 2SV-2830-2).  
step 7.2) POSITIVE CUE:
 
Engine noise indicates start.
POSITIVE CUE:
Engine noise indicates start.  
 
NEGATIVE CUE:
NEGATIVE CUE:
Engine noise does NOT indicate start.  
Engine noise does NOT indicate start.
: 9. Close Air Start solenoid.          Upon 2DG2 start, disengaged          N/A SAT UNSAT (Proc                                    manual solenoid operator by step                                    rotating counter-clockwise.
7.3)
: 10. Verify generator 2DG2 voltage. On panel 2E21, verified 2DG2        N/A SAT UNSAT (Proc                                    voltage between 3800 and 4400 step POSITIVE CUE:                      volts on V-2DG2-3, 2DG2 local AC 7.4) 2DG2 voltage is ~ 4160 volts.      voltmeter.


Rotated manual operator stem on either Air Start Solenoid clockwise.
JOB PERFORMANCE MEASURE JPM#   A2JPM-NRC-EDDCG                 REV   01                               PAGE 6 of 8
N/A  SAT  UNSAT  9. (Proc step 7.3)  Close Air Start solenoid. Upon 2DG2 start, disengaged manual solenoid operator by
: 11. Verify generator 2DG2        On panel 2E21, verified 2DG2    N/A SAT UNSAT (Proc frequency.                    frequency between 59.5 and step                               60.5 Hz and maintained as loads 7.7) POSITIVE CUE:                 are added.
 
2DG2 frequency is ~ 60 Hz.
rotating counter-clockwise.
END STOP TIME:
 
N/A  SAT  UNSAT  10. (Proc step 7.4)  Verify generator 2DG2 voltage.
 
POSITIVE CUE:
2DG2 voltage is ~ 4160 volts.
 
On panel 2E21, verified 2DG2 voltage between 3800 and 4400
 
volts on V-2DG2-3, 2DG2 local AC
 
voltmeter.
N/A  SAT  UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 6 of 8
: 11. (Proc step 7.7) Verify generator 2DG2 frequency.
 
POSITIVE CUE:
2DG2 frequency is ~ 60 Hz.  


On panel 2E21, verified 2DG2 frequency between 59.5 and
JOB PERFORMANCE MEASURE JPM#  A2JPM-NRC-EDDCG        REV  01                          PAGE 7 of 8 Examiners Copy JPM INITIAL TASK CONDITIONS
: 1. The plant is in Mode 3 following an automatic reactor trip.
: 2. A Station Blackout exists.
: 3. There is no green DC power available.
: 5. Fuses from alternate shutdown locker are simulated obtained.
INITIATING CUE: The CRS provides the following direction:
: 1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2.
: 2. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use extreme caution when operating any energized electrical components.


60.5 Hz and maintained as loads
JOB PERFORMANCE MEASURE JPM#  A2JPM-NRC-EDDCG        REV  01                          PAGE 8 of 8 Examinees Copy JPM INITIAL TASK CONDITIONS
: 4. The plant is in Mode 3 following an automatic reactor trip.
: 5. A Station Blackout exists.
: 6. There is no green DC power available.
: 6. Fuses from alternate shutdown locker are simulated obtained.
INITIATING CUE: The CRS provides the following direction:
: 3. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2.
: 4. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use extreme caution when operating any energized electrical components.


are added.
JOB PERFORMANCE MEASURE JPM# A2JPM-RO-EDDCG REV 03                                   PAGE 9 of 9 CLOSE MANUAL TRIP CHGD MANUAL CLOSE
N/A  SAT  UNSAT END  STOP TIME:
 
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01  PAGE  7 of 8 Examiner's Copy JPM INITIAL TASK CONDITIONS
: 1. The plant is in Mode 3 following an automatic reactor trip. 2. A Station Blackout exists. 3. There is no green DC power available. 5. Fuses from alternate shutdown locker are simulated obtained.
INITIATING CUE:
The CRS provides the following direction:
: 1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2. 2. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use
 
extreme caution when operati ng any energized electrical components.
 
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01  PAGE  8 of 8 Examinee's Copy JPM INITIAL TASK CONDITIONS
: 4. The plant is in Mode 3 following an automatic reactor trip. 5. A Station Blackout exists. 6. There is no green DC power available. 6. Fuses from alternate shutdown locker are simulated obtained.
INITIATING CUE:
The CRS provides the following direction:
: 3. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2. 4. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use
 
extreme caution when operati ng any energized electrical components.
JOB PERFORMANCE MEASURE JPM# A2JPM-RO-EDDCG REV 03 PAGE 9 of 9 MANUAL CLOSE CHGDMANUAL TRIP CLOSE Appendix D                                Scenario 1 Form ES-D-1 Page 1 of 17 Facility: ANO-2  Scenario No.:  1 Op-Test No.:  2005-1 Page 1  Examiners:  Operators:
Initial Conditions:    56% MOL, All Engineered Safety Features (ESF) systems in standby. Condenser outer water box is isolated for tube plugging. 'B' circulating water pump is secured.


Appendix D                              Scenario 1                                    Form ES-D-1 Facility: ANO-2                        Scenario No.: 1                        Op-Test No.: 2005-1 Page 1 Examiners:                                        Operators:
Initial Conditions:
56% MOL, All Engineered Safety Features (ESF) systems in standby. Condenser outer water box is isolated for tube plugging. B circulating water pump is secured.
Green Train Maintenance Week.
Green Train Maintenance Week.
Turnover:   56%. 250 EFPD. Condenser outer water box is isolated for tube plugging. Estimated time to complete repairs is 12 hours. 'B' circulating water pump is secured. Equipment Out of Service Monitor (EOOS) indicates 'Minimal Risk.' Green Train Maintenance  
Turnover:
 
56%. 250 EFPD. Condenser outer water box is isolated for tube plugging. Estimated time to complete repairs is 12 hours. B circulating water pump is secured. Equipment Out of Service Monitor (EOOS) indicates Minimal Risk. Green Train Maintenance Week.
Week.
Event         Malf. No.       Event                                  Event No.                          Type*                               Description 1     NIBLINEPWR         I (CBOT)     Safety channel linear power channel B fails low.
Event No. Malf. No. Event Type* Event Description 1 NIBLINEPWR I (CBOT) Safety channel linear power channel 'B' fails low. CBOT must bypass points in Plant Protection System (PPS) channel.
CBOT must bypass points in Plant Protection System (PPS) channel.
2 CVC2P36AFAL C (CBOR) Running charging pump trips breaker. Abnormal Operating Procedures (AOP) entry start standby charging pump.
2     CVC2P36AFAL         C (CBOR)     Running charging pump trips breaker. Abnormal Operating Procedures (AOP) entry start standby charging pump.
3 SGATUBE R(CBOR) N(CBOT) 'A' Steam Generator (SG) tube leak results in power reduction to take unit off line.
3     SGATUBE             R(CBOR)       A Steam Generator (SG) tube leak results in N(CBOT)      power reduction to take unit off line.
4 SGATUBE M(ALL) 'A' Steam Generator tube rupture results in reactor trip and Reactor Coolant System (RCS) cool down.
4     SGATUBE             M(ALL)       A Steam Generator tube rupture results in reactor trip and Reactor Coolant System (RCS) cool down.
5 4162A406 C (CBOT) 'B' High Pressure Safety Injection (HPSI) pump trips breaker on start.
5     4162A406           C (CBOT)     B High Pressure Safety Injection (HPSI) pump trips breaker on start.
6 2CV50151 C (CBOT) 'A' HPSI train injection Motor Operated Valve (MOV) fails to open on actuation. 7 BUHTRS C(CBOR) Back up Heaters fail on due to relay failure and will not shut off when Pressurizer level drops less than set point. *   (N)ormal,   (R)eactivity,   (I)nstrument,    (C)omponent,   (M)ajor  
6     2CV50151           C (CBOT)     A HPSI train injection Motor Operated Valve (MOV) fails to open on actuation.
 
7     BUHTRS             C(CBOR)       Back up Heaters fail on due to relay failure and will not shut off when Pressurizer level drops less than set point.
Appendix D                                Scenario 1 Form ES-D-1 Page 2 of 17 Scenario #1 Objectives 1) Evaluate individual response to a fa ilure of an Excore nuclear instrument. 2) Evaluate individual response to a failure of a running charging pump. 3) Evaluate individual response to a small Pri-Sec leak.
* (N)ormal,     (R)eactivity, (I)nstrument,    (C)omponent,     (M)ajor Page 1 of 17
: 4) Evaluate individual ability to perform a reduction in plant power. 5) Evaluate individual ab ility to mitigate a SGTR. 6) Evaluate individual ability to monitor operation of ESF equipment. 7) Evaluate individual response to a failure of the PZR heaters.
SCENARIO #1 NARRATIVE Simulator session begins with the plant at 56%
power steady state.  'B' circulating water pump is secured and the outer main condenser water boxes are tagged out. 
 
When the crew has completed their control room walk down and brief, 'B' Excore will fail low. This will result in a CPC sensor failure alarm and the NI linear and log power instruments on 'B' channel failing to Zero.
The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will direct the CBOT to bypass points 1, 2, 3, and 4 on 'B' PPS. TS 3.3.1.1 will be entered due to the excore failure. 


About 10 minutes after the excore failure, the 'A
Appendix D                          Scenario 1                                Form ES-D-1 Scenario #1 Objectives
' CCP will trip its breaker. A CCP low flow alarm will alert the operator that the CCP has tripped. If another pump is not started quickly, letdown will be isolated due to high regenerative heat exchanger outlet temperature high (alarm).The CRS will enter the loss of chargi ng AOP, OP 2203.036, Crew will verify that the breaker tripped; then start a backup CCP. The CBOR will assess the proper operation of the pump, PZR level and letdown flow.
: 1)  Evaluate individual response to a failure of an Excore nuclear instrument.
10 minutes after the CCP trips, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leak age AOP, OP 2203.038. CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLO's to control secondary c ontamination using standar d attachment 19 and direct the chemists to sample the SG's for activity. The CRS will isolate steam to 'A' EFW pump from 'A' SG and enter TS 3.7.1.2. Crew will perform a plant shutdown.  
: 2)  Evaluate individual response to a failure of a running charging pump.
: 3)  Evaluate individual response to a small Pri-Sec leak.
: 4)  Evaluate individual ability to perform a reduction in plant power.
: 5)  Evaluate individual ability to mitigate a SGTR.
: 6)  Evaluate individual ability to monitor operation of ESF equipment.
: 7)  Evaluate individual response to a failure of the PZR heaters.
SCENARIO #1 NARRATIVE Simulator session begins with the plant at 56% power steady state. B circulating water pump is secured and the outer main condenser water boxes are tagged out.
When the crew has completed their control room walk down and brief, B Excore will fail low. This will result in a CPC sensor failure alarm and the NI linear and log power instruments on B channel failing to Zero. The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will direct the CBOT to bypass points 1, 2, 3, and 4 on B PPS. TS 3.3.1.1 will be entered due to the excore failure.
About 10 minutes after the excore failure, the A CCP will trip its breaker. A CCP low flow alarm will alert the operator that the CCP has tripped. If another pump is not started quickly, letdown will be isolated due to high regenerative heat exchanger outlet temperature high (alarm).The CRS will enter the loss of charging AOP, OP 2203.036, Crew will verify that the breaker tripped; then start a backup CCP. The CBOR will assess the proper operation of the pump, PZR level and letdown flow.
10 minutes after the CCP trips, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. Crew will perform a plant shutdown.
When cued by the lead evaluator after the CBOR has completed the required reactivity manipulation, a 500 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR recognize that the SGTR is greater than CCP capacity. The CRS will direct the CBOR will manually trip the reactor.
Post trip, the PZR backup heaters will fail to de-energize when PZR level drops below 29%, the CBOR will manually secure the heaters.
Post SIAS, the B HPSI pump Breaker will trip (green train) and one of the red train HPSI injection MOVs will fail to open on actuation. The CBOT will manually start the swing HPSI pump and open the failed injection MOV. This is Tech Spec 3.0.3 entry.
Page 2 of 17


When cued by the lead evaluator after the CBOR has completed the required reactivity manipulation, a 500 gpm SGTR on 'A' SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detec tion Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR recognize that the SGTR is greater than CCP capacity. The CRS will direct the CBOR will manually trip the reactor.
Appendix D                      Scenario 1                              Form ES-D-1 SCENARIO #1 NARRATIVE (continued)
The Crew will implement SPTAs and secure 2 RCPs when RCS pressure drops below 1400 psia. The CRS will diagnose a SGTR and enter EOP 2202.004, SGTR.
The CBOR will rapidly cool down the RCS to less than 535&deg;F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535&deg;F.
Page 3 of 17


Post trip, the PZR backup heaters will fail to de-energize when PZR level drops below 29%, the CBOR will manually secure the heaters.
Appendix D                             Scenario 1                                   Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 56% power IC stead state.
 
Post SIAS, the 'B' HPSI pump Breaker will trip (green train) and one of the red train HPSI injection MOV's will fail to open on actuation. The CBOT will manually start the swing HPSI pump and open the failed injection MOV. This is Tech Spec 3.0.3 entry.
 
Appendix D                                Scenario 1 Form ES-D-1 Page 3 of 17 SCENARIO #1 NARRATIVE (continued)
The Crew will implement SPTA's and secure 2 RCP's when RCS pressure drops below 1400 psia. The CRS will diagnose a SG TR and enter EOP 2202.004, SGTR. The CBOR will rapidly cool down the RCS to less than 535&deg;F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the
 
'A' SG using standard attachment 10 when RCS Thot is less than 535&deg;F.
Appendix D                                 Scenario 1 Form ES-D-1 Page 4 of 17 Simulator Instructions for Scenario 1 Reset simulator to MOL 56% power IC stead state.
Markup OP 2102.004, power operations up to step 9.22.
Markup OP 2102.004, power operations up to step 9.22.
Ensure that AACG is secured and annunciators clear. Ensure hotwell level is ~80%. Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
Ensure that AACG is secured and annunciators clear.
Swing ESF equipment aligned to the Green train.  
Ensure hotwell level is ~80%.
'A' CCP lead charging pump.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
Swing ESF equipment aligned to the Green train.
A CCP lead charging pump.
2PCV0231, Gland sealing steam pressure control valve failed closed.
2PCV0231, Gland sealing steam pressure control valve failed closed.
Place permissive hand switches for 2CV 303 and 2CV 0306 to OFF. T1, T2, T3, T5 set to false. T4 set to SIAS1.
Place permissive hand switches for 2CV 303 and 2CV 0306 to OFF.
T5 set to PZR Pressure < 2000 psia Event No. Malf. No. Value/
T1, T2, T3, T5 set to false.
Ramp Time Event Description 1 NIBLINEPWR Trigger = T1 0.0 Safety Channel 'B' Excore Linear instrument fails LOW. 2 CVC2P36AFAL Trigger = T2 TRUE 'A' Coolant Charging Pump trips on instantaneous Over Current due to motor fault. 3 SGATUBE Trigger = T3 5.0   'A' SG primary-secondary leak. 4 SGATUBE CUED 500 RAMP= 10 MIN 'A' Steam Generator Tube Rupture (500 gpm ramped over 10 Minutes).
T4 set to SIAS1.
5 4162A406 Trigger = T4 TRUE 'B' HPSI pump trips breaker on start.
T5 set to PZR Pressure < 2000 psia Event       Malf. No.       Value/                           Event No.                          Ramp                           Description Time 1     NIBLINEPWR             0.0     Safety Channel B Excore Linear instrument fails Trigger = T1                  LOW.
6 CV50151 Trigger = T4 TRUE Red train HPSI injection MOV fails to open on SIAS actuation. 7 RCSHTRON Trigger = T5 TRUE PZR Backup heaters fail to de-energize.       At T=0 Trigger T1 'B' excore instrument fails low Cue: Report that I & C planner will begin planning work on failed excore instrument.  
2     CVC2P36AFAL           TRUE     A Coolant Charging Pump trips on instantaneous Trigger = T2                  Over Current due to motor fault.
3     SGATUBE               5.0     A SG primary-secondary leak.
Trigger = T3 4     SGATUBE               500     A Steam Generator Tube Rupture (500 gpm ramped CUED                  RAMP=    over 10 Minutes).
10 MIN 5     4162A406             TRUE     B HPSI pump trips breaker on start.
Trigger = T4 6      CV50151              TRUE     Red train HPSI injection MOV fails to open on SIAS Trigger = T4                  actuation.
7     RCSHTRON             TRUE     PZR Backup heaters fail to de-energize.
Trigger = T5 At T=0       Trigger T1         B excore instrument fails low Cue: Report that I & C planner will begin planning work on failed excore instrument.
Page 4 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 5 of 17 At T= 10 minutes Trigger T2 'A' CCP trips breaker.
Appendix D                         Scenario 1                                     Form ES-D-1 At T= 10     Trigger T2     A CCP trips breaker.
Cue: As WCO report that the 'A' CCP breaker, 2B52-A5, is tripped and will not reset.  
minutes Cue: As WCO report that the A CCP breaker, 2B52-A5, is tripped and will not reset.
At T=20      Trigger T3      A Steam Generator 5 gpm tube leak.
minutes Cue: As Auxiliary Operator, report that standard attachment 19, control of secondary contamination is in progress.
Cue: When notified of requirement to sample SGs as Chemist, after 15 minutes report that the sample analysis is in progress and that when frisking sample A SG countrate was higher than B SG.
The CRS will direct the NLOs to and direct the chemists to sample the SGs for activity.
CUED by      T3              Raise A SG tube leak to 500 gpm ramped over 10 minutes.
Lead                        This will result in a manual reactor trip.
Examiner SIAS        T4              B high pressure safety injection,HPSI, pump trips its breaker on actuation                    start and one HPSI injection valve, 2CV5015-1 will fail to open but can be manually opened from 2C17.
PZR          T5              All backup heaters fail ON and must be manually taken to OFF.
pressure
<2000psia Page 5 of 17


At T=20 minutes Trigger T3 'A' Steam Generator 5 gpm tube leak. Cue: As Auxiliary Operator, report that standard attachment 19, control  of secondary contamination is in progress.
Appendix D                           Scenario 1                                     Form ES-D-1 Op-Test No.: 1                     Scenario No.: 1                       Event No.: 1 Event
Cue: When notified of requirement to sample SG's as Chemis t, after 15 minutes report that the sample analysis is in progress and that when frisking sample 'A' SG countrate was higher than 'B' SG.
The CRS will direct the NLO's to and dire ct the chemists to sample the SG's for activity. CUED by Lead Examiner  T3 Raise 'A' SG tube leak to 500 gpm ramped over 10 minutes. This will result in a manual reactor trip.
SIAS actuation T4 'B' high pressure safety injection,HPSI, pump trips its breaker on start and one HPSI injection valve, 2CV5015-1 will fail to open but can be manually opened from 2C17.
PZR pressure
<2000psia T5 All backup heaters fail ON and must be manually taken to OFF.
Appendix D                                 Scenario 1 Form ES-D-1 Page 6 of 17 Op-Test No.: 1                                 Scenario No.: 1                                   Event No.:   1 Event


== Description:==
== Description:==
Channel 'B' excore nuclear instrument will fail low. The CRS will enter the NI malfunction AOP, OP 2203.026.
Channel B excore nuclear instrument will fail low. The CRS will enter the NI malfunction AOP, OP 2203.026.
Time Position Applicant's Actions or Behavior ALL Crew will diagnose that 'B' Excore is the only channel that has failed. CRS Enter AOP 2203.026, NI malfunction and perform the following actions: Refer to TS 3.3.1.1 Direct the CBOT to bypass points 1,2,3 and 4 on 'B' PPS Verify that Log channel is also affected Notify maintenance of problem with 'B' Excore CBOT Will perform the following: Obtain Key 12 from SM Notify control room of potential PPS security door and Bypass alarms Open 2C23 door and unlock panel door Push bypass buttons for points :
Time       Position                       Applicant's Actions or Behavior ALL       Crew will diagnose that B Excore is the only channel that has failed.
1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on 2C03 CBOR Will perform the following: PEER check that bypass lights for points 1,2,3 and 4 are illuminated on operator inserts on 2C03 Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 'B' Excore.
CRS       Enter AOP 2203.026, NI malfunction and perform the following actions:
Termination criteria: When points 1,2,3 and 4 are bypassed on 'B' PPS or at the discretion of the lead examiner.
Refer to TS 3.3.1.1 Direct the CBOT to bypass points 1,2,3 and 4 on B PPS Verify that Log channel is also affected Notify maintenance of problem with B Excore CBOT       Will perform the following:
Appendix D                                Scenario 1 Form ES-D-1 Page 7 of 17 Op-Test No.:  1                                Scenario No.:  1                              Event No.:  2             
Obtain Key 12 from SM Notify control room of potential PPS security door and Bypass alarms Open 2C23 door and unlock panel door Push bypass buttons for points :
1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on 2C03 CBOR       Will perform the following:
PEER check that bypass lights for points 1,2,3 and 4 are illuminated on operator inserts on 2C03 Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on B Excore.
Termination criteria: When points 1,2,3 and 4 are bypassed on B PPS or at the discretion of the lead examiner.
Page 6 of 17


Event
Appendix D                              Scenario 1                                    Form ES-D-1 Op-Test No.: 1                          Scenario No.: 1                      Event No.: 2 Event


== Description:==
== Description:==
'A' CCP trip. The CCP low flow alarm will alert operators of this failure. Letdown will isolate, if backup CCP not started in timely manner.
A CCP trip. The CCP low flow alarm will alert operators of this failure.
Time Position Applicant's Actions or Behavior CBOR Announce that 'A' CCP has tripped its breaker (Red and Green lights out on 2C09)
Letdown will isolate, if backup CCP not started in timely manner.
CRS Enter loss of Charging AOP and perform the following actions: Check for proper Charging suction and discharge flow path. Check that 'A' CCP has tripped breaker Direct Starting backup CCP Direct verification of proper operation of running CCP Check for indications of CCP header rupture using control room indications Direct WCO to locally vent 'A' CCP TRM 3.1.2.4 Applicability Simulator Operator Cue: When contacted as WCO to vent 'A' CCP wait a few minutes and report that no air bubbles only water came out vent.
Time       Position                           Applicant's Actions or Behavior CBOR         Announce that A CCP has tripped its breaker (Red and Green lights out on 2C09)
CBOR Verify VCT outlet valve open Verity CCP header isolation valve open Manually start backup CCP by taking hand-switch to start Verify VCT level stable or going up CBOT /CBOR Verify CCP header not ruptured:
CRS         Enter loss of Charging AOP and perform the following actions:
Check for proper Charging suction and discharge flow path.
Check that A CCP has tripped breaker Direct Starting backup CCP Direct verification of proper operation of running CCP Check for indications of CCP header rupture using control room indications Direct WCO to locally vent A CCP TRM 3.1.2.4 Applicability Simulator Operator Cue: When contacted as WCO to vent A CCP wait a few minutes and report that no air bubbles only water came out vent.
CBOR         Verify VCT outlet valve open Verity CCP header isolation valve open Manually start backup CCP by taking hand-switch to start Verify VCT level stable or going up CBOT         Verify CCP header not ruptured:
              /CBOR
* Aux Building or CNTMT radiation level steady
* Aux Building or CNTMT radiation level steady
* Waste Tanks 2T20A/B level not rising
* Waste Tanks 2T20A/B level not rising
* CNTMT Sump level not rising
* CNTMT Sump level not rising
* Aux Building sump level not rising NOTE: Letdown may have isolated on high temperature. Letdown may be restored at this point. Termination criteria: When backup CCP started or at discretion of lead examiner.
* Aux Building sump level not rising NOTE: Letdown may have isolated on high temperature. Letdown may be restored at this point.
Appendix D                                 Scenario 1 Form ES-D-1 Page 8 of 17 Op-Test No.: 1                                   Scenario No.: 1                           Event No.:   3 Event
Termination criteria: When backup CCP started or at discretion of lead examiner.
Page 7 of 17
 
Appendix D                           Scenario 1                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                   Event No.: 3 Event


== Description:==
== Description:==
5.0 GPM primary to secondary leak on 'A' SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior CBOR Announce annunciators: 2K11-A10 Sec Sys Radiation Hi 2K11-J8 SG Tube Leak Detection Rate of Change Hi 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following: Direct CBO's to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SG's for activity  
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time       Position                       Applicant's Actions or Behavior CBOR       Announce annunciators:
 
* 2K11-A10       Sec Sys Radiation Hi
Direct CBOT to isolate steam to 'A' EFW pump from 'A' SG Direct CBOR to perform a plant shutdown using normal boration method. CBOT Close 2CV 1000-1, steam from 'A' SG to 'A' EFW pump.  
* 2K11-J8       SG Tube Leak Detection Rate of Change Hi
* 2K11-K8       SG Tube Leak Detection Trouble/LKRT Hi CRS       Implement AOP 2203.038, PRI-SEC leakage and perform the following:
Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG Direct CBOR to perform a plant shutdown using normal boration method.
CBOT       Close 2CV 1000-1, steam from A SG to A EFW pump.
Page 8 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 9 of 17 Op-Test No.: 1                                   Scenario No.: 1                           Event No.:   3 Event
Appendix D                           Scenario 1                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                   Event No.: 3 Event


== Description:==
== Description:==
5.0 GPM primary to secondary leak on 'A' SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown. Simulator Operator Cue: When contacted as AO acknowledge requirement to begin working on Standard attachment 19.
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown.
CBOR Perform a plant shutdown Use reactivity plans to determine the amount of boron required. Adjust turbine load to maintain Tave within 2&deg;F of Tref.
Simulator Operator Cue: When contacted as AO acknowledge requirement to begin working on Standard attachment 19.
Insert CEA's as directed by reactivity plan. AOP requires a 2 hour shutdown to Mode 3. The CRS may determine a rapid plant shutdown of 1 hour to be in Mode 3 is more conservative and this decision is acceptable.
CBOR         Perform a plant shutdown Use reactivity plans to determine the amount of boron required.
Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.  
Adjust turbine load to maintain Tave within 2&deg;F of Tref.
Insert CEAs as directed by reactivity plan.
AOP requires a 2 hour shutdown to Mode 3.
The CRS may determine a rapid plant shutdown of 1 hour to be in Mode 3 is more conservative and this decision is acceptable.
Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.
Page 9 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 10 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event
Appendix D                             Scenario 1                                   Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
Time Position Applicant's Actions or Behavior CBOR Report that PZR level is lowering Start all back up CCP's or report that they are running Isolate Letdown CRS Recognize SGTR has exceeded CCP capacity and the ability to maintain PZR level. Direct the CBOR to manually trip the reactor CBOR Manually trip the reactor.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions. CBOR Check reactivity control:
Time         Position                         Applicant's Actions or Behavior CBOR       Report that PZR level is lowering Start all back up CCPs or report that they are running Isolate Letdown CRS       Recognize SGTR has exceeded CCP capacity and the ability to maintain PZR level.
Direct the CBOR to manually trip the reactor CBOR       Manually trip the reactor.
CRS       Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR       Check reactivity control:
Reactor power decreasing.
Reactor power decreasing.
All CEAs inserted.  
All CEAs inserted.
 
CBOT       Check maintenance of vital auxiliaries:
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Main turbine tripped. Generator output and exciter breakers open. All 4160v and 6900 v Non-Vital busses energized. ALL 4160v and 480v vital AC bus energized.
Generator output and exciter breakers open.
All 125v vital DC bus energized.  
All 4160v and 6900 v Non-Vital busses energized.
ALL 4160v and 480v vital AC bus energized.
All 125v vital DC bus energized.
Page 10 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 11 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event
Appendix D                             Scenario 1                                 Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
Time Position Applicant's Actions or Behavior CBOR Check inventory control: PZR level 16 to 80%.
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Trend from set point. Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%. (SEE Event 7)
Time         Position                         Applicant's Actions or Behavior CBOR       Check inventory control:
CBOR Check RCS pressure control: RCS pressure 1800 to 2300 psia.
PZR level 16 to 80%.
Trend from set point Secure Two RCP's when RCS pressure is less than 1400 psia.
Trend from set point.
Place spray valve for secured RCPs in manual closed. Verify SIAS when pressure less than 1650 psia.   
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
(SEE Event 7)
CBOR       Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.
Place spray valve for secured RCPs in manual closed.
Verify SIAS when pressure less than 1650 psia.
CBOR        Check core heat removal by forced circulation:
RCP s running Loop T less than 10&deg; F.
RCS MTS 30&deg; F or greater.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
CBOT        Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated.
Maintain SW pressure greater than 85 psig.
Page 11 of 17


CBOR Check core heat removal by forced circulation:
Appendix D                             Scenario 1                                     Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 4 Event
RCP 's running Loop  T less than 10 F. RCS MTS 30 F or greater. Service water pump suction aligned to Lake. Component cooling water aligned to RCPs.
 
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated. Maintain SW pressure greater than 85 psig.
 
Appendix D                                 Scenario 1 Form ES-D-1 Page 12 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal: Report SG levels and main feed water is in RTO. Report feed water line intact. Report SG pressures (May take manual local (ML) control of SDBCS master controller (at CRS direction) and reduce set point to 950-1050 psia).
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CBOR Check CNTMT parameters: Temperature less than 140 F. Pressure less than 16 psia.
Time         Position                         Applicant's Actions or Behavior CBOT       Check RCS Heat Removal:
Status of radiation alarms:     CAMS (2K10-B6) NOT in alarm     Area radiation (2K11-B10) NOT in alarm     Process liquid (2K11-C10) NOT in alarm     Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.
Report SG levels and main feed water is in RTO.
CRS Notify SM to perform the following: SE report to control room. Announce reactor trip on plant page. Refer to Tech Specs and EALs.  
Report feed water line intact.
Report SG pressures (May take manual local (ML) control of SDBCS master controller (at CRS direction) and reduce set point to 950-1050 psia).
CBOR       Check CNTMT parameters:
Temperature less than 140&deg; F.
Pressure less than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT       Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.
CRS       Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Page 12 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 13 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event
Appendix D                             Scenario 1                                 Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                   Event No.: 4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms. Diagnose Steam Generator Tube Rupture  
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CRS       Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Diagnose Steam Generator Tube Rupture CRS      Implement Steam Generator Tube Rupture procedure and open place keeping page.
ALL      Perform crew brief and review floating steps.
CRS      Determine applicable floating steps:
* Commence cool down to less than 535&deg; F Thot.
* HPSI Override Criteria.
CRS      Direct the following actions:
Commence cool down to less than 535&deg; F Thot.
Inform SM to contact Chemistry to sample both SG for activity.
Determine ruptured SG Perform post-SIAS actions:
Verify Safety Injection flow to RCS:
Isolate A SG when RCS Thot is less than 535&deg;F Verify HPSI override criteria met:
* RCS MTS 30&deg;F or greater.
* PZR level greater than 29% and controlled.
* RVLMS LVL 03 or higher elevation indicates WET.
* At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.
Page 13 of 17


CRS Implement Steam Generator Tube Rupture procedure and open place keeping page.
Appendix D                             Scenario 1                                 Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 4 Event
ALL Perform crew brief and review floating steps.
CRS Determine applicable floating steps:  Commence cool down to less than 535 F Thot. HPSI Override Criteria.
CRS Direct the following actions: Commence cool down to less than 535 F Thot. Inform SM to contact Chemistry to sample both SG for activity.
 
Determine ruptured SG
 
Perform post-SIAS actions: Verify Safety Injection flow to RCS: Isolate 'A' SG when RCS Thot is less than 535&deg;F Verify HPSI override criteria met:  RCS MTS 30&deg;F or greater. PZR level greater than 29% and controlled. RVLMS LVL 03 or higher elevation indicates WET. At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.
 
Appendix D                                 Scenario 1 Form ES-D-1 Page 14 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
Time Position Applicant's Actions or Behavior Critical Step CBOR RCS cool down to less than 535&deg;F T-hot : (floating step)  
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
 
Time         Position                         Applicant's Actions or Behavior Critical       CBOR       RCS cool down to less than 535&deg;F T-hot : (floating step)
CBOR Reset low SG set points. Commence RCS depressurization to maintain RCS MTS 30 to 45 (When HPSI overridden) Take manual control of SDBCS bypass valves to condenser  
Step CBOR       Reset low SG set points.
 
Commence RCS depressurization to maintain RCS MTS 30 to 45&deg; (When HPSI overridden)
(2CV0302/2CV0303)
Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)
Place ALL ADV Permissive switches in OFF. Verify EFW feeding SGs.
Place ALL ADV Permissive switches in OFF.
Secure running MFW pump.  
Verify EFW feeding SGs.
 
Secure running MFW pump.
Close ALL MFW Block valves.
Close ALL MFW Block valves.
Record and plot cool down on Attachments 1 and 8.  
Record and plot cool down on Attachments 1 and 8.
 
CBOR       Verify Safety Injection flow to RCS:
CBOR /CBOT Verify Safety Injection flow to RCS: Check HPSI flow using Exhibit 2. Check LPSI flow using Exhibit 3.  
Check HPSI flow using Exhibit 2.
                /CBOT      Check LPSI flow using Exhibit 3.
Page 14 of 17


Appendix D                                 Scenario 1 Form ES-D-1 Page 15 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   4 Event
Appendix D                             Scenario 1                                 Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 4 Event


== Description:==
== Description:==
500 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate 'A' SG.
500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.
Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions: SW pumps running on each loop.  
This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
 
Time         Position                         Applicant's Actions or Behavior CBOT       Perform post-SIAS actions:
SW pumps running on each loop.
EDG SW outlet valves open.
EDG SW outlet valves open.
SW pump suction aligned to Lake.
SW pump suction aligned to Lake.
Report all non-vital buses energized. Verify SG sample valves open.  
Report all non-vital buses energized.
Verify SG sample valves open.
Critical      CBOT        Use Attachment 10 to isolate Ruptured SG Step CBOR        OVERRIDE HPSI:
CBOT        Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.
Termination criteria: RCS Cool down to less than 535&deg;F and A SG isolated or at examiners discretion.
Page 15 of 17


Critical Step CBOT Use Attachment 10 to isolate Ruptured SG
Appendix D                           Scenario 1                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                     Event No.: 5/6 Event
 
CBOR CBOT OVERRIDE HPSI: Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.
 
Termination criteria:  RCS Cool down to less than 535&deg;F and 'A' SG isolated or at examiners discretion.
 
Appendix D                                 Scenario 1 Form ES-D-1 Page 16 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   5/6 Event


== Description:==
== Description:==
  'B' HPSI pump trips on SIAS start. 2CV5015-1 fails to open on SIAS signal. This will make HPSI flow UNACCEPTABLE. 'C' HPSI pump must be started or  
B HPSI pump trips on SIAS start. 2CV5015-1 fails to open on SIAS signal. This will make HPSI flow UNACCEPTABLE. C HPSI pump must be started or 2CV5015-1 must be opened.
Time        Position                        Applicant's Actions or Behavior CBOT      2K05 E-3, B HPSI pump trip alarm announced.
Observes green light lit on pump and no discharge pressure.
CBOT      Observes 2CV 5015-1 is closed, green light on, red light off, Z-tape reading 0.
CRS      Directs starting C HPSI pump Directs opening 2CV 5015-1 Critical      CBOT      Starts C HPSI pump Step                  Verified proper discharge pressure and flow(depending on RCS pressure)
Critical                And/or Part is                  Opens 2CV 5015-1 by taking hand switch to OPEN and to                    observing red light on green light off and Z-tape reading ~
either                  100%
start 2P89C or open 2CV-5015-1 Termination criteria: When C HPSI pump started or 2CV5015-1 is opened or at discretion of lead examiner.
Page 16 of 17


2CV5015-1 must be opened.
Appendix D                             Scenario 1                                     Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                       Event No.: 7 Event
Time Position Applicant's Actions or Behavior  CBOT 2K05 E-3, 'B' HPSI pump trip alarm announced. Observes green light lit on pump and no discharge pressure.
 
CBOT Observes 2CV 5015-1 is closed, green light on, red light off, Z-tape reading 0.
 
CRS Directs starting 'C' HPSI pump Directs opening 2CV 5015-1
 
Critical Step  Critical Part is to either start 2P89C or open 2CV-5015-1 CBOT Starts 'C' HPSI pump Verified proper discharge pressure and flow(depending on RCS pressure)
 
And/or Opens 2CV 5015-1 by taking hand switch to OPEN and observing red light on green light off and Z-tape reading ~ 100%
 
Termination criteria:  When 'C' HPSI pump started or 2CV5015-1 is opened or at
 
discretion of lead examiner.
 
Appendix D                                 Scenario 1 Form ES-D-1 Page 17 of 17 Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   7 Event


== Description:==
== Description:==
Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control.
Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control.
Time Position Applicant's Actions or Behavior CBOR Observes the red light 'ON' on the backup heaters when PZR level is less than 29 %  
Time       Position                       Applicant's Actions or Behavior CBOR       Observes the red light ON on the backup heaters when PZR level is less than 29 %
Reports observation to CRS CRS      Directs taking Backup heater hand switches to OFF CBOR      Takes Backup Heater hand switches to OFF Observes green lights ON red lights OFF Termination criteria: When PZR heater hand switches are taken to OFF or at the discretion of the lead examiner.
Page 17 of 17


Reports observation to CRS
Appendix D                              Scenario 2                                  Form ES-D-1 Facility: ANO-2                        Scenario No.: 2                      Op-Test No.: 2005-1 Examiners:                                        Operators:
Initial Conditions:
100% MOL, All ESF systems in standby. C HPSI pump tagged out for oil bubbler replacement. C HPSI is aligned to green train. Green train maintenance week.
Turnover:
100%. 250 EFPD. C HPSI pump tagged out for oil bubbler replacement. EOOS indicates Minimal Risk. Green train maintenance week.
Event        Malf. No.      Event                                Event No.                          Type*                              Description 1      XRCCHAPLVL          I (CBOR)      Control Channel A Pressurizer Level fails LOW.
2      XSG2PT10412        I (CBOT)      Steam Generator safety channel pressure fails LOW.
3      FWPMPATRP          R (CBOR)      A Main Feed Pump (MFP) trips due to thrust N (CBOT)      bearing wear and results in a power reduction to less than 90%.
4      FWAFT5A            M (ALL)      Feed water line break in containment after 2FW5A, feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A SG.
5      ESCSBPMP            C (CBOT)      Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
6      ESFCSASFAIL        C (CBOR)      Fail CSAS channel 1 to actuate auto.
* (N)ormal,      (R)eactivity,  (I)nstrument,    (C)omponent,    (M)ajor Page 1 of 16


CRS Directs taking Backup heater hand switches to OFF
Appendix D                          Scenario 2                                  Form ES-D-1 Scenario #2 Objectives
: 1)  Evaluate individual response to a failure of Pressurizer level control channel failure.
: 2)  Evaluate individual response to a failure of a Plant Protection System Steam Generator Level instrument failure.
: 3)  Evaluate individual response to a Main Feed Pump Trip at 100% power.
: 4)  Evaluate individual ability to perform a reduction in plant power.
: 5)  Evaluate individual ability to mitigate an unisolatable Feed water break in containment.
: 6)  Evaluate individual ability to monitor operation of Engineered Safety Features equipment.
: 7)  Evaluate individual response to a failure of required Engineered Safety Features Actuation System actuation.
SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100% power steady state. C HPSI pump is tagged out to replace a pump oil bubbler.
When the crew has completed their control room walk down and brief, the in service Pressurizer (PZR) control channel level instrument will fail low. Alarms on control channel 1 level lo and level lo lo will come in. This will result in letdown going to minimum flow, the two backup CCPs will automatically start, all PZR heaters de-energizing and actual PZR level go up. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the letdown flow controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR low low level cutoff switch to the unaffected channel. When the auto and manual signals are matched, the CBOR will place the letdown flow controller to automatic About 10 minutes after PZR level control failure, A Steam Generator safety channel pressure instrument, 2PT1041-2, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel B operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1 and 3.3.3.6 for guidance. The CBOT will place Channel B PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.
About 10 minutes after the Steam Generator instrument failure, A MFP will trip. CRS will enter AOP 2203.037, Loss of Main Feed Pump. This will result in Steam Flow exceeding Feed flow and SG levels dropping. The crew will manually start the fourth condensate pump, reduce turbine load, and borate using emergency boration to the RCS until Feed flow is greater than Steam Flow. Then continue with a normal boration power reduction to less than 90%.
Page 2 of 16


CBOR Takes Backup Heater hand switches to OFF Observes green lights 'ON' red lights 'OFF'
Appendix D                        Scenario 2                                Form ES-D-1 SCENARIO #2 NARRATIVE (continued)
Once the Reactor operators reactivity manipulations are complete, the main feed line break will occur. This will cause containment pressure, temperature and sump level to go up. A Steam Generator level will lower. The crew will manually trip the reactor and complete SPTAs. Once feed (Main and Emergency) is secured to the SG, an Excess Steam Demand will occur on A Steam Generator.
The CRS will diagnose an Excess Steam Demand event and enter OP 2202.005, ESD.
The crew will manually control Reactor Coolant Temperature once the A SG boils dry using the upstream Atmospheric Dump Valves on B SG. The crew will manually control PZR pressure using the Auxiliary Spray valve.
When Containment pressure exceeds 23.3 psia, the crew will recognize that CSAS, Containment Spray Actuation Signal, has not automatically actuated on Channel 1 and that the Spray pump on channel 2 side did not start. The crew will manually actuate spray on Channel 1 and manually start B CSAS pump.
Page 3 of 16


Termination criteria: When PZR heater hand switches are taken to 'OFF' or at the discretion of the lead examiner.
Appendix D                            Scenario 2                                    Form ES-D-1 Simulator Instructions for Scenario 2 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
C HPSI pump is tagged out for oil bubbler replacement.
Ensure hotwell level is ~80%.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
T1, T2, T3, T4 set to false.
Event        Malf. No.        Value/                          Event No.                          Ramp                          Description Time 1      XRCCHAPLVL            0.0    Control Channel A Pressurizer Level fails LOW.
Trigger 1 2      XSG2PT10412            0.0    Steam Generator safety channel pressure fails LOW.
Trigger 2 3      FWPMPATRP            TRUE    A Main Feed Pump (MFP) trips due to thrust bearing Trigger 3                    wear and results in a power reduction to less than 90%.
4      FW2PW5AAFT            1000    Feed water line break in containment after 2FW5A, Trigger 4            Ramp    feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A 5 min  SG.
5      BS2P35BFAL          TRUE    Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
6      ESFCSASFAIL          TRUE    Fail CSAS channel 1 to actuate auto.
At T=0        Trigger T1        Control Channel A Pressurizer Level fails LOW.
Cue: Report that I & C planner will begin planning work on failed PZR level transmitter.
At T= 10      Trigger T2        Steam Generator safety channel pressure fails LOW, minutes                          2PT10412.
Cue: Report that I & C planner will begin planning work on failed Steam Generator safety channel pressure transmitter.
Page 4 of 16


Appendix D                                 Scenario 2 Form ES-D-1 Page 1 of 16 Facility: ANO-2  Scenario No.:  2 Op-Test No.:  2005-1 Examiners:  Operators:
Appendix D                         Scenario 2                                   Form ES-D-1 At T=20    Trigger T3      A Main Feed Pump (MFP) trips.
Initial Conditions:    100% MOL, All ESF systems in standby. 'C' HPSI pump tagged out for oil bubbler replacement. 'C' HPSI is aligned to green train. Green train maintenance week.
minutes Cue: As Auxiliary Operator, report that A MFP is tripped and no obvious problems noted locally.
Turnover:  100%. 250 EFPD. 'C' HPSI pump tagged out for oil bubbler replacement. EOOS indicates 'Minimal Risk.' Green train maintenance week.
CUED by    T4              A main feed line break inside containment resulting in a reactor Lead                        trip and excess steam demand event Examiner CSAS        True            B containment spray pump will fail to start on CSAS signal.
Event No. Malf. No. Event Type* Event Description 1  XRCCHAPLVL I (CBOR)  Control Channel "A" Pressurizer Level fails LOW.
actuation                    Can be manually started.
2  XSG2PT10412 I (CBOT) Steam Generator safety channel pressure fails LOW. 3  FWPMPATRP R (CBOR) N (CBOT) 'A' Main Feed Pump (MFP) trips due to thrust bearing wear and results in a power reduction to less than 90%.
CSAS       True            Red Train containment spray actuation signal, CSAS, will not actuation                    automatically actuate. Can be manually actuated.
4 FWAFT5A M (ALL)  Feed water line break in containment after 2FW5A, feed water to 'A' Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on 'A' SG. 5 ESCSBPMP C (CBOT)  Fail 'B' Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
Page 5 of 16
6 ESFCSASFAIL C (CBOR) Fail CSAS channel 1 to actuate auto.  
*  (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor


Appendix D                                 Scenario 2 Form ES-D-1 Page 2 of 16 Scenario #2 Objectives 1) Evaluate individual response to a failure of Pressurizer level cont rol channel failure. 2) Evaluate individual response to a failure of a Plant Protection S ystem Steam Generator Level instrument failure. 3) Evaluate individual response to a Main Feed Pump Trip at 100% power. 4) Evaluate individual ability to perform a reduction in plant power. 5) Evaluate individual abilit y to mitigate an unisolatable Feed water break in containment. 6) Evaluate individual abi lity to monitor operation of Engineered Safety Features equipment. 7) Evaluate individual response to a failu re of required Engineered Safety Features Actuation System actuation.
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                     Scenario No.: 2                       Event No.: 1 Event
SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100%
power steady state.  'C' HPSI pump is tagged out to replace a pump oil bubbler. 
 
When the crew has completed their control room walk down and brief, the in service
 
Pressurizer (PZR) control channel level instrument will fail low. Alarms on control channel 1 level lo and level lo lo will come in. This will result in letdown going to minimum flow, the two backup CCP's will automatically start, all PZR heaters de-energizing and actual PZR level go up. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the let down flow controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading
 
correctly and select that channel for control and place the PZR low low level cutoff switch to the unaffected channel. When the auto and m anual signals are matched, the CBOR will place the letdown flow controller to automatic
 
About 10 minutes after PZR level control fa ilure, 'A' Steam Generator safety channel pressure instrument, 2PT1041-2, will fail low. This will tr ip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel 'B' oper ator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.
3.2.1 and 3.3.3.6 for guidance. The CBOT will place Channel 'B' PPS in bypass for point 11, SG pressure low, point 19, 'A' SG delta-P for EFAS 1, and point 20, 'B' SG delta-P for EFAS 2 for maintenance and trouble shooting.
The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.
 
About 10 minutes after the Steam Generator instrum ent failure, 'A' MFP will trip. CRS will enter AOP 2203.037, Loss of Main Feed Pump. This will result in Steam Flow exceeding Feed flow and SG levels dropping. The crew will manually start the fourth condensate pump, reduce turbine load, and borate usin g emergency boration to the RCS until Feed flow is greater than Steam Flow. Then cont inue with a normal boratio n power reduction to less than 90%.
 
Appendix D                                Scenario 2 Form ES-D-1 Page 3 of 16 SCENARIO #2 NARRATIVE (continued)
Once the Reactor operator's reactivity manipulations are complete, the main feed line break will occur. This will cause containment pressure, tem perature and sump level to go up. 'A' Steam Generator level will lower. The crew will m anually trip the reactor and complete SPTA's. Once feed (Main and Emergency) is secured to the SG, an Excess Steam Demand will occur on
'A' Steam Generator. 
 
The CRS will diagnose an Excess Steam Demand event and enter OP 2202.005, ESD. The crew will manually control Reactor Coolant Temperature once the 'A' SG boils dry using the upstream Atmospheric Dump Valves on 'B' SG. The crew will manually control PZR pressure using the Auxiliary Spray valve. 
 
When Containment pressure exceeds 23.3 ps ia, the crew will recognize that CSAS, Containment Spray Actuation Signal, has not automatically actuated on Channel 1 and that the Spray pump on channel 2 side did not start. The crew will manually actuate spray on Channel 1 and manually start 'B' CSAS pump.
 
Appendix D                                Scenario 2 Form ES-D-1 Page 4 of 16 Simulator Instructions for Scenario 2 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
'C' HPSI pump is tagged out for oil bubbler replacement. Ensure hotwell level is ~80%. Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11. T1, T2, T3, T4 set to false.
 
Event No. Malf. No. Value/
Ramp Time Event Description 1 XRCCHAPLVL Trigger 1 0.0 Control Channel "A" Pressurizer Level fails LOW. 2 XSG2PT10412 Trigger 2 0.0 Steam Generator safety channel pressure fails LOW. 3 FWPMPATRP Trigger 3 TRUE  'A' Main Feed Pump (MFP) trips due to thrust bearing wear and results in a power reduction to less than 90%. 4 FW2PW5AAFT Trigger 4 1000 Ramp 5 min Feed water line break in containment after 2FW5A, feed water to 'A' Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on 'A' SG. 5 BS2P35BFAL TRUE Fail 'B' Containment Spray Actuation Signal (CSAS) pump to start on CSAS.
6 ESFCSASFAIL TRUE Fail CSAS channel 1 to actuate auto.
At T=0 Trigger T1 Control Channel "A" Pressurizer Level fails LOW.
Cue: Report that I & C planner will begin planning work on failed PZR level transmitter.
At T= 10 minutes Trigger T2 Steam Generator safety channel pressure fails LOW, 2PT10412. Cue: Report that I & C planner will begin planning work on failed Steam Generator safety channel pressure transmitter.
 
Appendix D                                Scenario 2 Form ES-D-1 Page 5 of 16 At T=20 minutes Trigger T3 'A' Main Feed Pump (MFP) trips. Cue: As Auxiliary Operator, report that
'A' MFP is tripped and no obvious problems noted locally.
CUED by Lead Examiner T4 'A' main feed line break inside containment resulting in a reactor trip and excess steam demand event CSAS actuation True 'B' containment spray pump will fail to start on CSAS signal. Can be manually started.
CSAS actuation True Red Train containment spray actuation signal, CSAS, will not automatically actuate. Can be manually actuated.
Appendix D                                Scenario 2 Form ES-D-1 Page 6 of 16 Op-Test No.: 1                                 Scenario No.: 2                                   Event No.:   1 Event


== Description:==
== Description:==
Channel A pressurizer level control channel 2LT-4627-1 fails low. The CRS will enter the PZR Systems Malfunction AOP 2203.028.
Channel A pressurizer level control channel 2LT-4627-1 fails low. The CRS will enter the PZR Systems Malfunction AOP 2203.028.
Time Position Applicant's Actions or Behavior ALL Announce alarms 2K10-G6 CNTRL CH 1 LEVEL LO.                             2K10-F6 CNTRL CH 1 LEVEL LO LO.
Time       Position                       Applicant's Actions or Behavior ALL       Announce alarms 2K10-G6 CNTRL CH 1 LEVEL LO.
Report 2LI-4627-2 and 2LR-4625 indicate normal. Report backup charging pumps started.
2K10-F6 CNTRL CH 1 LEVEL LO LO.
CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
Report 2LI-4627-2 and 2LR-4625 indicate normal.
CBOR Determine PZR level Channel A failed. Place Letdown Flow controller (2HIC-4817) in MANUAL.
Report backup charging pumps started.
Place PZR Level Channel Select switch (2HS-4628) to Channel B. Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B. Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.
CRS       Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
The CBOR will take the letdown flow controller to manual and control PZR level.  
CBOR       Determine PZR level Channel A failed.
 
Place Letdown Flow controller (2HIC-4817) in MANUAL.
CRS Enter 3.3.3.6 Post Accident Instrumentation.
Place PZR Level Channel Select switch (2HS-4628) to Channel B.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LI-4627-1.
Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B.
Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.
The CBOR will take the letdown flow controller to manual and control PZR level.
CRS       Enter 3.3.3.6 Post Accident Instrumentation.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LI-4627-1.
Termination criteria: Unaffected PZR level channel selected and letdown in automatic or at the discretion of the lead examiner.
Termination criteria: Unaffected PZR level channel selected and letdown in automatic or at the discretion of the lead examiner.
Appendix D                                Scenario 2 Form ES-D-1 Page 7 of 16 Op-Test No.:  1                                Scenario No.:  2                              Event No.:  2             
Page 6 of 16


Event
Appendix D                          Scenario 2                                  Form ES-D-1 Op-Test No.: 1                    Scenario No.: 2                    Event No.: 2 Event


== Description:==
== Description:==
2PT1041-2, Channel 'B' SG pressure transmitter fails low.
2PT1041-2, Channel B SG pressure transmitter fails low.
Time Position Applicant's Actions or Behavior CBOT Announce annunciators: 2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04 B3 PPS TRIP 2K04-E4 MSIS PRETRIP Compare all four channels and report 2PI-1041-2 indicates 0 psia.
Time       Position                       Applicant's Actions or Behavior CBOT       Announce annunciators:
CRS Implement Annunciator Corrective Action AOP 2203.012D. Refer to Tech Spec 3.3.1.1, 3.3.2.1, 3.3.3.6.  
2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04 B3 PPS TRIP 2K04-E4 MSIS PRETRIP Compare all four channels and report 2PI-1041-2 indicates 0 psia.
 
CRS       Implement Annunciator Corrective Action AOP 2203.012D.
CBOR Report 'A' SG pressure low pretrip and trip.
Refer to Tech Spec 3.3.1.1, 3.3.2.1, 3.3.3.6.
CBOT Place the following channels in bypass on Channel B: A SG pressure low - RPS (Bistable 11)
CBOR       Report A SG pressure low pretrip and trip.
CBOT       Place the following channels in bypass on Channel B:
A SG pressure low - RPS (Bistable 11)
A SG P - EFAS 1 (Bistable 19)
A SG P - EFAS 1 (Bistable 19)
B SG P - EFAS 2 (Bistable 20)  
B SG P - EFAS 2 (Bistable 20)
CBOR      Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.
CRS      Contact maintenance to repair 2PT1041-2.
Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2PT1041-2. Report that planning on repair of 2PT1041-2 is in progress.
Termination criteria: When B plant protection system points 11, 19 and 20 are bypassed or at discretion of lead examiner.
Page 7 of 16


CBOR Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                   Event No.: 3 Event
CRS Contact maintenance to repair 2PT1041-2.
Simulator Operator Cue:  When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2PT1041-2. Report that planning on repair of 2PT1041-2 is in progress. Termination criteria: When 'B' plant protection system points 11, 19 and 20 are bypassed or at discretion of lead examiner.
Appendix D                                 Scenario 2 Form ES-D-1 Page 8 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   3 Event


== Description:==
== Description:==
'A' Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
Time Position Applicant's Actions or Behavior CBOT Announce 'A' MFP trip alarms:
Time     Position                         Applicant's Actions or Behavior CBOT         Announce A MFP trip alarms:
2K03 A8, 'A' MFP trip 2K03 K8, Thrust Bearing Wear Trouble CRS Enter 2203.027, Loss of Main Feed Pump AOP and direct the  
2K03 A8, A MFP trip 2K03 K8, Thrust Bearing Wear Trouble CRS         Enter 2203.027, Loss of Main Feed Pump AOP and direct the following actions:
 
Verify Recirc valves closed (Condensate and MFP)
following actions:
Verify Main Feed water regulating valve bypasses are opening Start standby condensate pump Commence emergency boration using exhibit 1 Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7&deg;F Secure Emergency boration when Feed water Flow > Steam Flow CBOT         Check tripped MFW pump recirc and Condensate recirc closed.
Verify Recirc valves closed (Condensate and MFP)  
Check MFWRV B/P valves open.
 
Verify Main Feed water regulating valve bypasses are  
 
opening Start standby condensate pump  
 
Commence emergency boration using exhibit 1 Reduce MTG load to establish Feed water Flow > Steam Flow  
 
while maintaining T C < 554.7&deg;F Secure Emergency boration when Feed water Flow > Steam  
 
Flow  
 
CBOT Check tripped MFW pump reci rc and Condensate recirc closed.
Check MFWRV B/P valves open.  
 
Start standby Condensate Pump.
Start standby Condensate Pump.
Reduce MTG load to establish Feed water Flow > Steam Flow  
Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7&deg;F.
 
CBOR          Commence boration using Exhibit 1.
while maintaining T C < 554.7&deg;F.  
Page 8 of 16


CBOR Commence boration using Exhibit 1.
Appendix D                           Scenario 2                                 Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                 Event No.: 3 Event
 
Appendix D                                 Scenario 2 Form ES-D-1 Page 9 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   3 Event


== Description:==
== Description:==
'A' Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.
CRS When FF>SF, direct CBOR to commence down power to <
CRS         When FF>SF, direct CBOR to commence down power to <
90% using normal boration method.  
90% using normal boration method.
 
CBOR         Align normal boration to RCS.
CBOR Align normal boration to RCS.  
 
Reduce turbine load to maintain Tave within 2&deg; of Tref until power is less than 90%.
Reduce turbine load to maintain Tave within 2&deg; of Tref until power is less than 90%.
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.
Page 9 of 16


Appendix D                                 Scenario 2 Form ES-D-1 Page 10 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   4 Event
Appendix D                           Scenario 2                                     Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                   Event No.: 4 Event


== Description:==
== Description:==
Main Feed line break inside containment on 'A' SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
ALL Announce that 'A' SG level is lowering. Containment temperature and pressure are rising. Announce that radiation levels in containment are steady. Announce that containment sump level is rising quickly. Diagnose that a feed line leak is in progress inside containment.
ALL     Announce that A SG level is lowering.
CRS Direct CBOR to manually trip the reactor.
Containment temperature and pressure are rising.
CBOR CBOR manually trip the reactor.
Announce that radiation levels in containment are steady.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
Announce that containment sump level is rising quickly.
CBOR Check reactivity control:
Diagnose that a feed line leak is in progress inside containment.
CRS     Direct CBOR to manually trip the reactor.
CBOR     CBOR manually trip the reactor.
CRS     Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR     Check reactivity control:
Reactor power decreasing.
Reactor power decreasing.
All CEAs inserted. CBOT Check maintenance of vital auxiliaries:
All CEAs inserted.
Main turbine tripped. Generator output and exciter breakers open.
CBOT     Check maintenance of vital auxiliaries:
All 4160 v and 6900 v Non-Vital busses energized. ALL 4160 v and 480 v vital AC bus energized.
Main turbine tripped.
All 125 v vital DC bus energized.  
Generator output and exciter breakers open.
All 4160 v and 6900 v Non-Vital busses energized.
ALL 4160 v and 480 v vital AC bus energized.
All 125 v vital DC bus energized.
Page 10 of 16


Appendix D                                 Scenario 2 Form ES-D-1 Page 11 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   4 Event
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                   Event No.: 4 Event


== Description:==
== Description:==
Main Feed line break inside containment on 'A' SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior CBOR Check inventory control: PZR level 16 to 80%.
Time         Position                     Applicant's Actions or Behavior CBOR     Check inventory control:
Trend from set point. Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
PZR level 16 to 80%.
CBOR Check RCS pressure control: RCS pressure 1800 to 2300 psia.
Trend from set point.
Trend from set point   Secure Two RCP's when RCS pressure is less than 1400 psia. Place spray valve for secured RCPs in manual closed. Verify SIAS when pressure less than 1650 psia.
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
 
CBOR     Check RCS pressure control:
CBOR Check core heat removal by forced circulation:
RCS pressure 1800 to 2300 psia.
RCP 's running Loop  T less than 10 F. RCS MTS 30 F or greater. Service water pump suction aligned to Lake. Component cooling water aligned to RCPs.  
Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.
 
Place spray valve for secured RCPs in manual closed.
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Verify SIAS when pressure less than 1650 psia.
CBOR     Check core heat removal by forced circulation:
RCP s running Loop  T less than 10&deg; F.
RCS MTS 30&deg; F or greater.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
CBOT     Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated.
Check SIAS actuated.
Maintain SW pressure greater than 85 psig. Restore CCW to RCP's using exhibit 5 (when CIAS actuates).  
Maintain SW pressure greater than 85 psig.
Restore CCW to RCPs using exhibit 5 (when CIAS actuates).
Page 11 of 16


Appendix D                                 Scenario 2 Form ES-D-1 Page 12 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   4 Event
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                   Event No.: 4 Event


== Description:==
== Description:==
Main Feed line break inside containment on 'A' SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal: Report SG levels and main feed water is in RTO. Report feed water line is NOT intact. Report SG pressures 'A' SG lower than 'B' SG. Manually actuate EFAS, Emergency Feed water Actuation Signal if not already actuated.
Time         Position                       Applicant's Actions or Behavior CBOT     Check RCS Heat Removal:
Verify that MSIS is actuated. Verify Feed water is not aligned to 'A' SG CBOR Check CNTMT parameters:
Report SG levels and main feed water is in RTO.
Temperature greater than 140 F. Pressure greater than 16 psia. Status of radiation alarms:     CAMS (2K10-B6) NOT in alarm     Area radiation (2K11-B10) NOT in alarm     Process liquid (2K11-C10) NOT in alarm     Secondary Sys Radiation Hi (2K11-A10) NOT in alarm Secure ALL RCP's when Containment Spray Actuation Signal (CSAS) occurs.  
Report feed water line is NOT intact.
 
Report SG pressures A SG lower than B SG.
CRS Notify SM to perform the following: SE report to control room. Announce reactor trip on plant page. Refer to Tech Specs and EALs.  
Manually actuate EFAS, Emergency Feed water Actuation Signal if not already actuated.
Verify that MSIS is actuated.
Verify Feed water is not aligned to A SG CBOR     Check CNTMT parameters:
Temperature greater than 140&deg; F.
Pressure greater than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm Secure ALL RCPs when Containment Spray Actuation Signal (CSAS) occurs.
CRS     Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Page 12 of 16


Appendix D                                 Scenario 2 Form ES-D-1 Page 13 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   4 Event
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                 Event No.: 4 Event


== Description:==
== Description:==
Main Feed line break inside containment on 'A' SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms. Diagnose EXCESS STEAM DEMAND EOP.
CRS     Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
CRS Implement EXCESS STEAM DEMAND EOP procedure and open place keeping page.
Diagnose EXCESS STEAM DEMAND EOP.
ALL Perform crew brief and review floating steps.
CRS     Implement EXCESS STEAM DEMAND EOP procedure and open place keeping page.
CRS Determine applicable floating steps: Control post steam generator blow down RCS temperature and  
ALL     Perform crew brief and review floating steps.
 
CRS     Determine applicable floating steps:
pressure CRS Direct the following actions:  
Control post steam generator blow down RCS temperature and pressure CRS     Direct the following actions:
Isolate A SG using Attachment 10.
Control post steam generator blow down RCS temperature using B steam generator upstream atmospheric dump valve.
Control PZR pressure within P-T limits using Auxiliary Spray valve and Attachment 27.
Override HPSI when conditions are met.
RCS MTS 30&deg;F or greater.
PZR level greater than 29% [50%] and controlled.
RVLMS LVL 03 or higher elevation indicates WET.
At least ONE intact SG available for Heat Removal Page 13 of 16


Isolate 'A' SG using Attachment 10.
Appendix D                           Scenario 2                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 2                   Event No.: 4 Event
Control post steam generator blow down RCS temperature using 'B' steam generator upstream atmospheric dump valve.
 
Control PZR pressure within P-T limits using Auxiliary Spray valve and Attachment 27.
 
Override HPSI when conditions are met.
 
RCS MTS 30&deg;F or greater. PZR level greater than 29% [50%] and controlled. RVLMS LVL 03 or higher elevation indicates WET.
At least ONE intact SG available for Heat Removal
 
Appendix D                                 Scenario 2 Form ES-D-1 Page 14 of 16 Op-Test No.: 1                                   Scenario No.: 2                           Event No.:   4 Event


== Description:==
== Description:==
Main Feed line break inside containment on 'A' SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.
Time Position Applicant's Actions or Behavior Critical Step CBOT Control post Steam Generator blow down RCS temperature using upstream atmospheric dump valve within 25&deg;F of 'A' Steam Generator Tc when generator boiled dry.  
Time         Position                     Applicant's Actions or Behavior Critical       CBOT     Control post Steam Generator blow down RCS temperature Step                  using upstream atmospheric dump valve within 25&deg;F of A Steam Generator Tc when generator boiled dry.
Critical      CBOR      Maintain Post steam generator blow down PZR pressure using Step                    auxiliary spray valve and attachment 27 within the Pressure-Temperature limits of 200&deg;F and 30&deg;F.
CBOR    Override HPSI flow and charging flow to maintain PZR level.
                /CBOT Termination criteria: When plant temperature and pressures are stabilized after A Steam Generator boils dry or at the discretion of the lead examiner.
Page 14 of 16


Critical Step CBOR Maintain Post steam generator blow down PZR pressure using auxiliary spray valve and attachment 27 within the Pressure-
Appendix D                               Scenario 2                                 Form ES-D-1 Op-Test No.: 1                         Scenario No.: 2                     Event No.: 5 Event
 
Temperature limits of 200&deg;F and 30&deg;F.
 
CBOR /CBOT Override HPSI flow and charging flow to maintain PZR level.
 
Termination criteria:  When plant temperature and pressures are stabilized after 'A' Steam Generator boils dry or at the discretion of the lead examiner.
 
Appendix D                                 Scenario 2 Form ES-D-1 Page 15 of 16 Op-Test No.: 1                                 Scenario No.: 2                                 Event No.:   5 Event


== Description:==
== Description:==
  'B' Containment Spray pump, 2P35B fails to automatically start. CBOT will manually start the 'B' containment spray pump.
B Containment Spray pump, 2P35B fails to automatically start. CBOT will manually start the B containment spray pump.
Time Position Applicant's Actions or Behavior CBOT Reports that no flow is indicated on 2C16 for containment spray flow after actuation. Reports that 'B' containment spray pump is not running Reports that the 'B' containment spray containment isolation valve  
Time       Position                         Applicant's Actions or Behavior CBOT         Reports that no flow is indicated on 2C16 for containment spray flow after actuation.
 
Reports that B containment spray pump is not running Reports that the B containment spray containment isolation valve is open.
is open.
Reports Alarm on 2K05 A1, 2P35B failure on ESFAS, Engineered Safety Features Actuation System CRS        Directs manual start of 2P35B, B containment spray pump.
Reports Alarm on 2K05 A1, 2P35B failure on ESFAS, Engineered Safety Features Actuation System  
Critical      CBOT        Manually starts 2P35B, B containment spray pump on 2C16.
Step                        Verifies proper containment spray flow on 2C16.
(Either start of 2P35B or actuate CSAS 1)
Termination criteria: 2P35B is manually started or at the discretion of the lead examiner.
Page 15 of 16


CRS  Directs manual start of 2P35B, 'B' containment spray pump.
Appendix D                         Scenario 2                                   Form ES-D-1 Op-Test No.: 1                     Scenario No.: 2                     Event No.: 6 Event
 
Critical Step  (Either start of 2P35B or actuate CSAS 1)  CBOT Manually starts 2P35B, 'B' containment spray pump on 2C16. Verifies proper containment spray flow on 2C16.
 
Termination criteria:  2P35B is manually started or at the discretion of the lead examiner.
 
Appendix D                                 Scenario 2 Form ES-D-1 Page 16 of 16 Op-Test No.: 1                                 Scenario No.: 2                                 Event No.:   6 Event


== Description:==
== Description:==
Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate.
Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate.
Time Position Applicant's Actions or Behavior CBOR Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS)  
Time       Position                     Applicant's Actions or Behavior CBOR     Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS)
 
(Note this may be completed prior to reaching the 23.3 psia set point.)
(Note this may be completed prior to reaching the 23.3 psia set  
CRS     Directs manually actuating CSAS.
 
Critical       CBOR     On 2C03 manually actuates CSAS and verifies all four operator Step                    insert red lights are out above the CSAS label on 2C03.
point.)
(Either start of 2P35B or actuate CSAS 1)
CRS Directs manually actuating CSAS.  
Termination criteria: When CSAS is manually actuated or at discretion of lead examiner.
 
Page 16 of 16
Critical Step  (Either start of 2P35B or actuate CSAS 1) CBOR On 2C03 manually actuates CSAS and verifies all four operator insert red lights are out above the CSAS label on 2C03.  
 
Termination criteria: When CSAS is manually actuated or at discretion of lead  
 
examiner.  


Appendix D                                 Scenario 3 Form ES-D-1 Page 1 of 14 Facility: ANO-2   Scenario No.: 3 Op-Test No.: 2005-1 Page 1 Examiners: Operators:
Appendix D                             Scenario 3                                       Form ES-D-1 Facility: ANO-2                       Scenario No.: 3                         Op-Test No.: 2005-1 Page 1 Examiners:                                         Operators:
Initial Conditions:   100% MOL, All ESF systems in standby. Green Train Maintenance Week.
Initial Conditions:
Turnover:   100%. 250 EFPD. EOOS indicates 'Minimal Risk. Green Train Maintenance Week.
100% MOL, All ESF systems in standby. Green Train Maintenance Week.
Event No. Malf. No. Event Type* Event Description 1   XCV2LT4861 I (CBOR) VCT level instrument fails low resulting in RWT being aligned to CCP suction.
Turnover:
2   XFW2FIS0735 I (CBOT) 'A' MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SG's.
100%. 250 EFPD. EOOS indicates Minimal Risk. Green Train Maintenance Week.
3 CNDVACUUM R (CBOR) N (CBOT) Air leakage into condenser requiring a power reduction to maintain condenser vacuum.
Event         Malf. No.       Event                                  Event No.                            Type*                               Description 1       XCV2LT4861           I (CBOR)     VCT level instrument fails low resulting in RWT being aligned to CCP suction.
4 CNDVACUUM M (ALL) Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip.
2       XFW2FIS0735         I (CBOT)     A MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.
5   SU#3 lockout 2A111 fails to close N (CBOT)   I (CBOR) Loss of offsite power. Must energize non-vital busses. Startup #2 to 2A1 fails OPEN. Loss of power to PZR controllers must be controlled manually or transfer to automatic.
3     CNDVACUUM             R (CBOR)     Air leakage into condenser requiring a power N (CBOT)    reduction to maintain condenser vacuum.
6 2CV1503-1 fails to open  C (CBOT) #1 EDG service water outlet MOV. This will result in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.
4     CNDVACUUM             M (ALL)     Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip.
7 2CV0340-2 breaker trips C (CBOT) 'A' EFW pump steam inlet valve fails to open. This will result in a loss of all feed water.     *   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor  
5       SU#3 lockout         N (CBOT)     Loss of offsite power. Must energize non-vital 2A111 fails to                    busses.
close                              Startup #2 to 2A1 fails OPEN.
I (CBOR)    Loss of power to PZR controllers must be controlled manually or transfer to automatic.
6     2CV1503-1 fails to   C (CBOT)     #1 EDG service water outlet MOV. This will result open                              in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.
7     2CV0340-2             C (CBOT)     A EFW pump steam inlet valve fails to open. This breaker trips                      will result in a loss of all feed water.
* (N)ormal,     (R)eactivity, (I)nstrument,   (C)omponent,       (M)ajor Page 1 of 14


Appendix D                                 Scenario 3 Form ES-D-1 Page 2 of 14 Scenario #3 Objectives 1) Evaluate individual response to a failure of Volume Control Tank level transmitter. 2) Evaluate individual response to a failu re of a Main Feed Pump suction Flow transmitter. 3) Evaluate individual response to a small condenser vacuum leak. 4) Evaluate individual ability to perform a reduction in plant power. 5) Evaluate individual ability to mitigate a loss of all Feed Water. 6) Evaluate individual ability to mitigate a loss of off site power. 7) Evaluate individual response to a failure Loss of power to a vital bus.
Appendix D                             Scenario 3                               Form ES-D-1 Scenario #3 Objectives
: 1) Evaluate individual response to a failure of Volume Control Tank level transmitter.
: 2) Evaluate individual response to a failure of a Main Feed Pump suction Flow transmitter.
: 3) Evaluate individual response to a small condenser vacuum leak.
: 4) Evaluate individual ability to perform a reduction in plant power.
: 5) Evaluate individual ability to mitigate a loss of all Feed Water.
: 6) Evaluate individual ability to mitigate a loss of off site power.
: 7) Evaluate individual response to a failure Loss of power to a vital bus.
SCENARIO #3 NARRATIVE Simulator session begins with the plant at 100% power steady state.
SCENARIO #3 NARRATIVE Simulator session begins with the plant at 100% power steady state.
When the crew has completed their control room walk down and brief, one of the two volume control tank (VCT) level transmitters will fail low. The crew will respond to VCT low low level alarm, 2K12 G5. This will result in the VCT outlet valve to the charging pump suction to close and the Refueling Water tank (RWT) suction to the charging pumps to open. RCS temperature and pressure will lower until the CBOR positions the VCT outlet valve manually opened and the RWT valve manually closed.
When the crew has completed their control room walk down and brief, one of the two volume control tank (VCT) level transmitters will fail low. The crew will respond to VCT low low level alarm, 2K12 G5. This will result in the VCT outlet valve to the charging pump suction to close and the Refueling Water tank (RWT) suction to the charging pumps to open. RCS temperature and pressure will lower until the CBOR positions the VCT outlet valve manually opened and the RWT valve manually closed.
 
About 10 minutes after VCT level transmitter failure, A main feed pump suction transmitter will fail low. This will result in 2K03-D9 (A MFP SUCT FLOW LO) alarm. This will result in both the A MFP and A / C condensate pump recirc valves opening. This will reduce Main feed water flow to A Steam Generator and reduce MFP suction pressure so that the standby condensate pump will automatically start. The CBOT will recognize the instrument failure due to flow on the A MFP controller indicating zero even with the recirc valve open and flow indicated on the Feed water flow transmitters to the steam generator.
About 10 minutes after VCT level transmitte r failure, 'A' main feed pump suction transmitter will fail low. This will result in 2K03-D9 (A MFP SUCT FLOW LO) alarm. This will result in both the 'A' MFP and 'A' / 'C' condensate pump recirc valves opening. This will reduce Main feed water flow to 'A' Steam Generator and reduce MFP suction pressure so that the standby condensate pump will automatically start. The CBOT will recognize the instrument failure due to flow on the 'A' MFP c ontroller indicating zero even with the recirc valve open and flow indicated on the Feed water flow transmitters to the steam generator. The CBOT will take manual control of both the MFP and condensate pump recirc valves  
The CBOT will take manual control of both the MFP and condensate pump recirc valves and close them.
 
About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main condenser will start. This will result in condenser vacuum slowly degrading. The CRS will enter OP 2203.019, Loss of condenser vacuum. The CBOR will begin an emergency boration and the CBOT will reduce main turbine load to restore condenser vacuum. The crew will secure emergency boration and reducing turbine load when vacuum stabilizes.
and close them.
The CBOR will then commence normal boration and reduce turbine load to allow condenser vacuum to be restored to less than ~6.5 in Hg.
Once the Reactor operators reactivity manipulations are complete, the air in-leakage will be raised to beyond the vacuum pumps capacity and the plant will be manually tripped.
Upon the reactor trip, Startup transformer #3 will lock-out and startup transformer #2 feeder to 2A1 will fail resulting in a loss of off-site power. When #1 EDG starts, the service water value from the EDG will fail to open. This will result in the CRS directing the #1 EDG to be locally secured resulting in a loss of the red train vital power (2A3 and 2B5). Also, the CRS will direct selecting channel #2 PZR level and pressure control channel instrumentation due to a loss of power to the selected channel #1 instruments.
Page 2 of 14


About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main condenser will start. This will result in condenser vacuum slowly degrading. The CRS will enter OP 2203.019, Loss of condenser va cuum. The CBOR will begin an emergency boration and the CBOT will reduce main turbine load to restore condenser vacuum. The crew will secure emergency boration and reducing turbine load when vacuum stabilizes. The CBOR will then commence normal boration and reduce turbine load to allow condenser vacuum to be restored to less than ~6.5 in Hg. 
Appendix D                          Scenario 3                                    Form ES-D-1 SCENARIO #3 NARRATIVE (continued)
When an Emergency Feed water Actuation Signal (EFAS) occurs and A emergency feed water pump attempts to start automatically start, the steam inlet valve, 2CV 0340-2, will trip its breaker when it starts to open. This will result in a loss of all feed water to the steam generators. The CRS will direct that at least one RCP in each loop are secured and Steam Generator blowdown is isolated from both steam generators. When standard post trip actions, SPTAs, are complete, the CRS will diagnose and enter the Loss of Feed EOP OP2202.006. The CBOT will manually start the Alternate AC Generator from 2C14 and energize 2A3, vital 4160 bus or open the Service water valve from the #1 EDG and start
#1 EDG. Once 2A3 is energized the CBOT will manually start the emergency feed water pump, 2P7B, from 2C17 and align feed to both steam generators using the Emergency Feed water valves.
Page 3 of 14


Once the Reactor operator's reactivity manipulations are complete, the air in-leakage will be raised to beyond the vacuum pumps capacit y and the plant will be manually tripped.
Appendix D                               Scenario 3                                       Form ES-D-1 Simulator Instructions for Scenario 3 Reset simulator to MOL 100% power IC stead state.
Upon the reactor trip, Start up transformer #3 will lock-out and startup transformer #2 feeder to 2A1 will fail resulting in a loss of off-site power. When #1 ED G starts, the service water value from the EDG will fail to open. This will result in the CRS directing the #1 EDG to be locally secured resulting in a loss of th e red train vital power (2A3 and 2B5). Also, the CRS will direct selecting channel #2 PZR level and pressure control channel instrumentation due to a loss of power to the selected channel #1 instruments.
 
Appendix D                                Scenario 3 Form ES-D-1 Page 3 of 14 SCENARIO #3 NARRATIVE (continued)
When an Emergency Feed water Actuation Signal (EFAS) occurs and 'A' emergency feed water pump attempts to start automatically start, the steam inlet valve, 2CV 0340-2, will trip its breaker when it starts to open. This will result in a loss of all feed water to the steam generators. The CRS will direct that at least one RCP in each loop are secured and Steam Generator blowdown is isolat ed from both steam generators.
When standard post trip actions, SPTA's, are complete, the CRS will diagnose and enter the Loss of Feed EOP OP2202.006. The CBOT will manually start t he Alternate AC Gener ator from 2C14 and energize 2A3, vital 4160 bus or open the Servic e water valve from the #1 EDG and start #1 EDG. Once 2A3 is energized the CBOT wil l manually start the emergency feed water pump, 2P7B, from 2C17 and align feed to bo th steam generators using the Emergency Feed water valves. 
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 4 of 14 Simulator Instructions for Scenario 3 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
Ensure that AACG is secured and annunciators clear.
Ensure hotwell level is ~80%. Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11. T1, T2, T3, T4, T5 set to false.  
Ensure hotwell level is ~80%.
Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.
T1, T2, T3, T4, T5 set to false.
T4 set to RXTRP T6 set to EFAS-1 T7 set to EFAS-2 Event        Malf. No.        Value/                                Event No.                            Ramp                              Description Time 1      XCV2LT4861              0.0    VCT level instrument fails low resulting in RWT Trigger=T1                      being aligned to CCP suction.
2      XFW2FIS0735            0.0    A MFP suction flow transmitter fails low. Results in Trigger=T2                      condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.
3      CNDVACUUM                4.6    Air leakage into condenser requiring a power Trigger=T3            Ramp      reduction to maintain condenser vacuum.
4 min 4      CNDVACUUM              10.0    Air leakage into condenser results in loss of Ramp      condenser vacuum and turbine and reactor trip.
5 min 5      FailSU3                TRUE      Startup 3 lockout results in a loss of offsite power.
Causes EDGs to automatically start/ loose Aux feed water pump and non-vital loads.
416A111              Locked
                                  -Open    Loss of power to PZR controllers must be controlled manually or transfer to automatic.
Trigger=T4 6      CV15031                  0.0      #1 EDG service water outlet MOV fails to open. This Trigger=T5                      will result in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.
7      CV0340                  0.0    A EFW pump steam inlet valve fails to open. This Trigger=T6                      will result in a loss of all feed water.
Trigger=T7 Page 4 of 14


T4 set to RXTRP T6 set to EFAS-1 T7 set to EFAS-2 Event No. Malf. No. Value/
Appendix D                         Scenario 3                                   Form ES-D-1 At T=0       Trigger T1     VCT level instrument fails low, 2LT4861.
Ramp Time Event Description 1  XCV2LT4861 Trigger=T1 0.0 VCT level instrument fails low resulting in RWT being aligned to CCP suction. 2  XFW2FIS0735 Trigger=T2 0.0 'A' MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SG's. 3 CNDVACUUM Trigger=T3 4.6 Ramp  4 min  Air leakage into condenser requiring a power reduction to maintain condenser vacuum. 4 CNDVACUUM 10.0 Ramp 5 min Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip.
5 FailSU3  416A111
 
Trigger=T4 TRUE  Locked-Open Startup 3 lockout results in a loss of offsite power.
Causes EDGs to automatically start/ loose Aux feed water pump and non-vital loads. Loss of power to PZR controllers must be controlled manually or transfer to automatic.
6 CV15031 Trigger=T5 0.0  #1 EDG service water outlet MOV fails to open. This will result in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5. 7 CV0340 Trigger=T6 Trigger=T7 0.0 'A' EFW pump steam inlet valve fails to open. This will result in a loss of all feed water.
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 5 of 14 At T=0 Trigger T1 VCT level instrument fails low, 2LT4861.
Cue: Report that I & C planner will begin planning work on failed Volume control tank, VCT, level transmitter.
Cue: Report that I & C planner will begin planning work on failed Volume control tank, VCT, level transmitter.
At T= 10 minutes Trigger T2 'A' MFP suction flow transmitter fails low, 2FIS0735. Cue: Report that I & C planner will begin planning work on failed 'A' MFP suction flow transmitter.
At T= 10     Trigger T2     A MFP suction flow transmitter fails low, 2FIS0735.
At T=20 minutes Trigger T3 Air leakage into condenser requiring a power reduction to maintain condenser vacuum. Cue: As Auxiliary Operator, report that air in-leakage is from 'B' Low pressure turbine west manway cover and you will need mechanical maintenance support to seal the leak.  
minutes Cue: Report that I & C planner will begin planning work on failed A MFP suction flow transmitter.
At T=20       Trigger T3     Air leakage into condenser requiring a power reduction to minutes                      maintain condenser vacuum.
Cue: As Auxiliary Operator, report that air in-leakage is from B Low pressure turbine west manway cover and you will need mechanical maintenance support to seal the leak.
Cue: As mechanical maintenance report that it will take from 20 to 30 minutes to repair the leak.
CUED by                      Raise air leakage into condenser to 10 ramped over 5 minutes.
Lead Examiner Cue: After 5 minutes, report as mechanical maintenance report that the manway gasket on A LP turbine has catastrophically failed.
Main          T4              SU#3 lockout and failure of SU#2 feeder to 2A1 to close, turbine trip                2A111.
PZR control channel level and pressure controllers will fail to manual on power transfer to #1 EDG and must be transferred to Channel 2 on loss of #1 EDG.
#1 EDG        T5            #1 EDG service water outlet MOV fails to open, 2CV 1503-1.
start EFAS-1        T6            A EFW pump steam inlet valve fails to open, 2CV 0340-2.
Page 5 of 14


Cue: As mechanical maintenance report that it will take from 20 to 30 minutes to repair the leak.
Appendix D                           Scenario 3                                     Form ES-D-1 Op-Test No.: 1                     Scenario No.: 3                         Event No.: 1 Event
CUED by Lead Examiner Raise air leakage into condenser to 10 ramped over 5 minutes.
Cue: After 5 minutes, report as mechanical maintenance report that the manway gasket on 'A' LP turbine has catastrophically failed.
Main turbine trip T4  SU#3 lockout and failure of SU#2 feeder to 2A1 to close, 2A111.
PZR control channel level and pressure controllers will fail to manual on power transfer to #1 EDG and must be transferred to Channel 2 on loss of #1 EDG.
#1 EDG start T5 #1 EDG service water outlet MOV fails to open, 2CV 1503-1. EFAS-1 T6 'A' EFW pump steam inlet valve fails to open, 2CV 0340-2.
Appendix D                                 Scenario 3 Form ES-D-1 Page 6 of 14 Op-Test No.: 1                                 Scenario No.: 3                                   Event No.:   1 Event


== Description:==
== Description:==
VCT level transmitter 2LT4861 fails low. This causes the RWT to be aligned to CCP suction and Tave lowering.
VCT level transmitter 2LT4861 fails low. This causes the RWT to be aligned to CCP suction and Tave lowering.
Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K12-G5 VCT 2T4 LEVEL LO LO.
Time       Position                         Applicant's Actions or Behavior CBOT       Announce annunciator 2K12-G5 VCT 2T4 LEVEL LO LO.
CRS Implement Annunciator Corrective Action AOP 2203.012L.
CRS       Implement Annunciator Corrective Action AOP 2203.012L.
CBOR Report level indicates normal on 2LIS-4857 but 2LT-4861 reads 0% on computer. Reports charging pump suction swapping to RWT.
CBOR       Report level indicates normal on 2LIS-4857 but 2LT-4861 reads 0% on computer.
CBOR May secure charging to stop boration if have not determined indication is a failed instrument and VCT level is normal.                                         OR When faulty instrument identified, then manually reopen VCT outlet and close the RWT to CCP suction valve.
Reports charging pump suction swapping to RWT.
CBOT /CBOR Reduce turbine load to maintain Tave within 2 F of Tref if Tave lowered.     CRS Contact maintenance/PS liaison to troubleshoot failed instrument.  
CBOR       May secure charging to stop boration if have not determined indication is a failed instrument and VCT level is normal.
 
OR When faulty instrument identified, then manually reopen VCT outlet and close the RWT to CCP suction valve.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LT-4861.
CBOT       Reduce turbine load to maintain Tave within 2&deg; F of Tref if Tave
Termination criteria: Charging suction manually aligned to the VCT and RWT to CCP valve closed or at the discretion of the lead examiner.  
              /CBOR        lowered.
CRS       Contact maintenance/PS liaison to troubleshoot failed instrument.
Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LT-4861.
Termination criteria: Charging suction manually aligned to the VCT and RWT to CCP valve closed or at the discretion of the lead examiner.
Page 6 of 14


Appendix D                                 Scenario 3 Form ES-D-1 Page 7 of 14 Op-Test No.: 1                                 Scenario No.: 3                               Event No.:   2 Event
Appendix D                           Scenario 3                                   Form ES-D-1 Op-Test No.: 1                       Scenario No.: 3                     Event No.: 2 Event


== Description:==
== Description:==
2FIS0735, 'A' loop condensate flow fails low. Condensate and MFP recirc valves open. CBOT must take manual control of recircs and control MFP suction pressure.
2FIS0735, A loop condensate flow fails low. Condensate and MFP recirc valves open. CBOT must take manual control of recircs and control MFP suction pressure.
Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K03-D9 (A MFP SUCT FLOW LO)
Time       Position                         Applicant's Actions or Behavior CBOT         Announce annunciator 2K03-D9 (A MFP SUCT FLOW LO)
CRS Implement Annunciator corrective action 2203.012C and direct board operator actions.  
CRS         Implement Annunciator corrective action 2203.012C and direct board operator actions.
CBOT        Report auto start of condensate pump.
Determine instrument 2FIS-0735 failure by use of PMS or control board indications.
Place A condensate recirc and A main feed pump recirc valves in manual to control condensate header pressure.
Secure condensate pump that auto started.
(Examiners Note: Crew may elect to leave fourth condensate pump running until a later point in the shutdown.)
CRS        Contact maintenance/WWM to investigate failed transmitter.
Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2FIS 0735. Report that planning on repair of 2FIS0735 is in progress.
Termination criteria: When condensate and MFP recircs are in manual and secondary plant is stable or at discretion of lead examiner.
Page 7 of 14


CBOT Report auto start of condensate pump. Determine instrument 2FIS-0735 failure by use of PMS or control board indications. Place "A" condensate recirc and "A" main feed pump recirc valves in manual to control condensate header pressure. Secure condensate pump that auto started.
Appendix D                         Scenario 3                                   Form ES-D-1 Op-Test No.: 1                     Scenario No.: 3                   Event No.: 3 Event
(Examiners Note: Crew may elect to leave fourth condensate pump running until a later point in the shutdown.)
CRS Contact maintenance/WWM to investigate failed transmitter.
Simulator Operator Cue:  When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2FIS 0735. Report that planning on repair of 2FIS0735 is in progress. Termination criteria: When condensate and MFP recircs are in manual and secondary plant is stable or at discretion of lead examiner.
Appendix D                                 Scenario 3 Form ES-D-1 Page 8 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   3 Event


== Description:==
== Description:==
Condenser vacuum slowly degrades. Crew will reduce turbine load Time Position Applicant's Actions or Behavior CBOT Main Condenser lowering vacuum: 2K03 A3, 2E11A Pressure HI 2K03 B3, 2E11A Turb Hood Press HI  
Condenser vacuum slowly degrades. Crew will reduce turbine load Time     Position                       Applicant's Actions or Behavior CBOT       Main Condenser lowering vacuum:
2K03 A3, 2E11A Pressure HI 2K03 B3, 2E11A Turb Hood Press HI 2K03 E4, Vacuum pump 2C5B Auto Start 2K02 B14, Condenser Interlock CRS        Enter 2203.019, Loss of condenser vacuum and direct the following actions:
Verify both vacuum pumps running Verify adequate gland seal steam pressure Verify both circulating water pumps running Reduce MTG load to maintain Tc less than 554.7&deg;F and condenser vacuum < 6.5 inHg.
Commence emergency boration using exhibit 1 Secure Emergency boration when condenser vacuum is < 6.5 inHg.
CBOT        Reduce MTG load to maintain Tc less than 554.7&deg;F and condenser vacuum < 6.5 inHg.
CBOR        Commence boration using Exhibit 1.
Page 8 of 14


2K03 E4, Vacuum pump 2C5B Auto Start 2K02 B14, Condenser Interlock
Appendix D                         Scenario 3                                 Form ES-D-1 Op-Test No.: 1                     Scenario No.: 3                 Event No.: 3 Event
 
CRS Enter 2203.019, Loss of condenser vacuum and direct the following actions:
 
Verify both vacuum pumps running
 
Verify adequate gland seal steam pressure
 
Verify both circulating water pumps running Reduce MTG load to maintain Tc less than 554.7&deg;F and condenser vacuum < 6.5 inHg.
 
Commence emergency boration using exhibit 1 Secure Emergency boration when condenser vacuum is < 6.5
 
inHg.
 
CBOT Reduce MTG load to maintain Tc less than 554.7&deg;F and condenser vacuum < 6.5 inHg.
 
CBOR Commence boration using Exhibit 1.
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 9 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   3 Event


== Description:==
== Description:==
Condenser vacuum slowly degrades. Crew will reduce turbine load CRS When vacuum is less than 6.5 inHg. Secure emergency boration.  
Condenser vacuum slowly degrades. Crew will reduce turbine load CRS       When vacuum is less than 6.5 inHg. Secure emergency boration.
Contact Ops Management.
Simulator Operator Cue: When contacted as AO report that you can hear the air leak on the vacuum suction piping on the East heater deck under the deck floor. It is unisolatable.
Simulator Operator Cue: When contacted as Maintenance, report that it will take at least 3 hours to patch the leak.
Simulator Operator Cue: When contacted as OPS Management, tell the CRS to reduce plant power until vacuum alarms are cleared.
CRS        Direct CBOR to reduce commence a normal boration at power and reduce turbine load to < 5 inHg (to clear alarms).
CBOR        Align normal boration to RCS.
Reduce turbine load to maintain Tave within 2&deg; of Tref until condenser vacuum is less than 5 inHg.
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.
Page 9 of 14


Contact Ops Management.
Appendix D                               Scenario 3                                 Form ES-D-1 Op-Test No.: 1                           Scenario No.: 3               Event No.: 4 Event
 
Simulator Operator Cue:  When contacted as AO report that you can hear the air leak on the vacuum suction piping on the East heater deck under the deck floor. It is
 
unisolatable.
Simulator Operator Cue:  When contacted as Maintenance, report that it will take at
 
least 3 hours to patch the leak.
Simulator Operator Cue:  When contacted as OPS Management, tell the CRS to reduce plant power until vacuum alarms are cleared.
CRS Direct CBOR to reduce commence a normal boration at power and reduce turbine load to < 5 inHg (to clear alarms).
 
CBOR Align normal boration to RCS.
 
Reduce turbine load to maintain Tave within 2&deg; of Tref until condenser vacuum is less than 5 inHg.
 
Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner. 
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 10 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   4 Event


== Description:==
== Description:==
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
This results in a reactor trip.
This results in a reactor trip.
ALL Announce that condenser vacuum is degrading.
ALL         Announce that condenser vacuum is degrading.
CRS Direct CBOR to manually trip the reactor.
CRS         Direct CBOR to manually trip the reactor.
CBOR CBOR manually trip the reactor.
CBOR         CBOR manually trip the reactor.
CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CRS         Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
CBOR Check reactivity control:
CBOR         Check reactivity control:
Reactor power decreasing.
Reactor power decreasing.
All CEAs inserted. CBOT Check maintenance of vital auxiliaries:
All CEAs inserted.
Main turbine tripped. Generator output and exciter breakers open. All 4160v and 6900 v Non-Vital busses NOT energized.
CBOT         Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160v and 6900 v Non-Vital busses NOT energized.
All 4160v and 480v vital AC bus energized. (see event 6)
All 4160v and 480v vital AC bus energized. (see event 6)
All 125v vital DC bus energized.  
All 125v vital DC bus energized.
Page 10 of 14


Appendix D                                 Scenario 3 Form ES-D-1 Page 11 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   4 Event
Appendix D                           Scenario 3                                   Form ES-D-1 Op-Test No.: 1                         Scenario No.: 3                   Event No.: 4 Event


== Description:==
== Description:==
Condenser air in-leakage exceeds the capacity of the vacuum pumps. This results in a reactor trip.
Condenser air in-leakage exceeds the capacity of the vacuum pumps. This results in a reactor trip.
Time Position Applicant's Actions or Behavior CBOR Check inventory control: PZR level 16 to 80%. Trend to set point. (See event 5/6)
Time         Position                         Applicant's Actions or Behavior CBOR       Check inventory control:
CBOR Check RCS pressure control: RCS pressure 1800 to 2300 psia. Trend to set point CBOR Check core heat removal by forced circulation:
PZR level 16 to 80%.
RCP 's running Loop  T less than 10 F. RCS MTS 30 F or greater. Service water pump suction aligned to Lake.
Trend to set point.
Component cooling water aligned to RCPs. SW to aligned to CCW and ACW
(See event 5/6)
CBOR       Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend to set point CBOR       Check core heat removal by forced circulation:
RCP s running Loop  T less than 10&deg; F.
RCS MTS 30&deg; F or greater.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
SW to aligned to CCW and ACW CBOT        Check RCS Heat Removal:
Report SG levels Main feed water is secured.
Manually actuate EFW.
Report feed water line is NOT intact.
Report SG pressures Shut both MSIVs due to 2CV 0400 and 2CV 0460, Main Steam to the moisture separator reheaters, have no power and are open.
Page 11 of 14


CBOT Check RCS Heat Removal: Report SG levels  Main feed water is secured.
Appendix D                             Scenario 3                                   Form ES-D-1 Op-Test No.: 1                         Scenario No.: 3                   Event No.: 4 Event
Manually actuate EFW. Report feed water line is NOT intact. Report SG pressures Shut both MSIV's due to 2CV 0400 and 2CV 0460, Main Steam to the moisture separator reheaters, have no power and are open.
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 12 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   4 Event


== Description:==
== Description:==
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
Condenser air in-leakage exceeds the capacity of the vacuum pumps.
This results in a reactor trip.
This results in a reactor trip.
Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters: Temperature less than 140 F. Pressure less than 16 psia. Status of radiation alarms:     CAMS (2K10-B6) NOT in alarm     Area radiation (2K11-B10) NOT in alarm     Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm CRS Notify SM to perform the following: SE report to control room. Announce reactor trip on plant page. Refer to Tech Specs, 3.0.3 due to no emergency feedwater available and 3.8.1.1 action C.
Time         Position                         Applicant's Actions or Behavior CBOR         Check CNTMT parameters:
Termination criteria: CRS has diagnosed a Loss of All Feed event and transitions to EOP or at discretion of lead examiner.
Temperature less than 140&deg; F.
Pressure less than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm CRS         Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs, 3.0.3 due to no emergency feedwater available and 3.8.1.1 action C.
Termination criteria: CRS has diagnosed a Loss of All Feed event and transitions to EOP or at discretion of lead examiner.
Page 12 of 14


Appendix D                                 Scenario 3 Form ES-D-1 Page 13 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   5 and 6 Event
Appendix D                             Scenario 3                                     Form ES-D-1 Op-Test No.: 1                         Scenario No.: 3                 Event No.: 5 and 6 Event


== Description:==
== Description:==
Startup transformer #3 lockout and feeder breaker from Startup transformer #2 to 2A1, non-vital 4160VAC bus fails to open. This will result in a loss of offsite power and automatic start of both emergency diesel generators (#1 and #2 EDG).
Startup transformer #3 lockout and feeder breaker from Startup transformer #2 to 2A1, non-vital 4160VAC bus fails to open. This will result in a loss of offsite power and automatic start of both emergency diesel generators (#1 and #2 EDG).
CRS Verify Service Water is aligned to #1 EDG and #2 EDG.
CRS         Verify Service Water is aligned to #1 EDG and #2 EDG.
CBOT Report that service water is not aligned to #1 EDG and that service water is aligned to #2 EDG and is running with proper voltage.  
CBOT         Report that service water is not aligned to #1 EDG and that service water is aligned to #2 EDG and is running with proper voltage.
CRS        Direct that AO locally take #1 EDG to lockout.
CRS        Direct CBOR to select channel 2 PZR level and pressure controllers.
CBOR        Select channel 2 PZR level and pressure controllers and places them in automatic.
Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner.
Page 13 of 14


CRS Direct that AO locally take #1 EDG to lockout.
Appendix D                             Scenario 3                                   Form ES-D-1 Op-Test No.: 1                         Scenario No.: 3                   Event No.: 7 Event
CRS Direct CBOR to select channel 2 PZR level and pressure controllers. 
 
CBOR Select channel 2 PZR level and pressure controllers and places them in automatic.
 
Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner. 
 
Appendix D                                 Scenario 3 Form ES-D-1 Page 14 of 14 Op-Test No.: 1                                   Scenario No.: 3                           Event No.:   7 Event


== Description:==
== Description:==
Failure of 'A' Emergency Feed water pump to start due to a failure of the steam admission valve, 2CV-0340-2, to open. This will result in a loss of all feed water and the crew will reenergize 2A3 and start 2P7B, 'B' emergency feed water pump and restore feed to the steam generators.
Failure of A Emergency Feed water pump to start due to a failure of the steam admission valve, 2CV-0340-2, to open. This will result in a loss of all feed water and the crew will reenergize 2A3 and start 2P7B, B emergency feed water pump and restore feed to the steam generators.
Time Position Applicant's Actions or Behavior CRS Direct the following from the Loss of All Feed water EOP: Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3.  
Time       Position                         Applicant's Actions or Behavior CRS       Direct the following from the Loss of All Feed water EOP:
 
Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3.
Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed.  
Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed.
 
Simulator Operator Cue: When contacted as WCO, to open the service water from #1 EDG isolation valve. Report that the hand-wheel spins freely and valve will not move.
Simulator Operator Cue: When contacted as WCO, to open the service water from #1 EDG isolation valve. Report that the hand-wheel spins freely and valve will not move.
Critical       CBOT       Manually starts the Alternate AC Generator and energizes 2A3.
Critical Step CBOT Manually starts the Alternate AC Generator and energizes 2A3.  
Step Critical       CBOT       Manually starts B Emergency Feed Pump and restores feed Step                      water to both steam generators.
 
CBOR       Monitor control Steam generator pressures less than main steam safety valve lift set point (~1078 psig).
Critical Step CBOT Manually starts 'B' Emergency Feed Pump and restores feed water to both steam generators.  
Control PZR pressure using auxiliary spray less than 2500 psia.
 
Termination criteria: When Emergency Feed water is established to both Steam Generators or at the discretion of the lead examiner.
CBOR Monitor control Steam generator pressures less than main steam safety valve lift set point (~1078 psig). Control PZR pressure using auxiliary spray less than 2500 psia.  
Page 14 of 14}}
 
Termination criteria: When Emergency Feed water is established to both Steam Generators or at the discretion of the lead examiner.}}

Latest revision as of 02:17, 15 March 2020

01-2005 - Final Operating Exam
ML050690411
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/27/2005
From: Gody A
Operations Branch IV
To: Forbes J
Entergy Operations
References
-RFPFR, 50-368/05-301 50-368/05-301
Download: ML050690411 (188)


Text

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 1 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform offsite power availability and vital electrical availability checklist.

JTA#: ANO2-RO-ELECD-SURV-25 KA VALUE RO: 4.2 SRO: 3.9 KA

REFERENCE:

2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 2 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected.

Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.

TASK STANDARD: Supplement 4 complete and 2B5 voltage determined to be low and the bus inoperable.

TASK PERFORMANCE AIDS: Copy of OP 2107.001 Supplement 4.

SIMULATOR SETUP: Degrade Offsite voltage to ~ 490KV. Degrade 2B5 voltage to ~ 431VAC and 2B6 voltage to ~ 440VAC.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 3 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.

CRITICAL STEPS: 33, 34, 38, 39, 41 PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERS NOTE:

The steps of this surveillance may be performed in any order.

1. Verify SU-2 status. Verified only SU #2 to 2A2, 2H1, N/A SAT UNSAT 2H2 are in PTL and SU #2 to 2A1 is NOT in PULL-TO-LOCK.

On Supplement 4, step 2, initialed step 2.1and 2.3 and NAd the rest.

On Supplement 4, 3.0 table 1 circled NA for UA to 2A1 and UA to 2A2.

2. Verify SU-2 To 2A1 (2A-111) Verified 2A-111 green and white N/A SAT UNSAT status. lights lit.

On Supplement 4, Table 2 placed a check in 2A-111 "Measured Value" column.

On Supplement 4, Table 2, circled "YES" for 2A-111 WITHIN ACCEPTABLE NORMAL RANGE.

3. Verify SU-2 To 2A2 (2A-211) Verified 2A-211 green and white N/A SAT UNSAT status. lights lit.

On Supplement 4, Table 2, placed a check in 2A-211 "Measured Value" column.

On Supplement 4, Table 2, circled "YES" for 2A-211 WITHIN ACCEPTABLE NORMAL RANGE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 4 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. Verify 2A3 Supply Breaker Verified 2A-309 CLOSED. N/A SAT UNSAT (2A-309) CLOSED.

Observed red light ON for 2A-309.

On Supplement 4, Table 2, placed a check in 2A-309 "Measured Value" column.

On Supplement 4, Table 2, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.

5. Verify 2A4 Supply breaker Verified 2A-409 CLOSED. N/A SAT UNSAT (2A-409) CLOSED.

Observed red light ON for 2A-409.

On Supplement 4, Table 2, placed a check in 2A-409 "Measured Value" column.

On Supplement 4, Table 2, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.

6. Verify SU-2 voltage. Using SPDS-EST2R OR PMS N/A SAT UNSAT E4013, verified SU-2 voltage

> 154 KV.

EXAMINERs CUE:

On Supplement 4, Table 2, ER-ANO-2004-0548 is not recorded SU-2 voltage in installed. "Measured Value" column.

On Supplement 4, Table 2, circled "YES" for SU-2 voltage WITHIN ACCEPTABLE NORMAL RANGE.

Note to Examiner:

The answers to the System Dispatcher calls should be given by the Examiner.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 5 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if ANO switchyard capacitors "in determine if ANO switchyard service" or not required. capacitors "in service" or not required.

EXAMINERS CUE:

On Supplement 4, Table 2, Dispatcher reports ANO placed a check in ANO switchyard capacitors "in switchyard capacitor "Measured service".

Value" column.

On Supplement 4, Table 2, circled "YES" for ANO switchyard capacitor WITHIN ACCEPTABLE NORMAL RANGE.

8. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if Russellville East Substation determine if Russellville East capacitors "in service" or not Substation capacitors "in service" required. or not required.

EXAMINERS CUE: On Supplement 4, Table 2, placed a check in Russellville Dispatcher reports East Substation capacitor Russellville East Substation "Measured Value" column.

capacitors "in service".

On Supplement 4, Table 2, circled "YES" for Russellville East Substation capacitor status WITHIN ACCEPTABLE NORMAL RANGE.

9. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT if any other condition that could determine if any other condition degrade offsite power sources that could degrade offsite power is known. sources was known.

EXAMINERS CUE: On Supplement 4, Table 2, placed a check in "Measured Dispatcher reports NO Value" column for other conditions which could conditions known which could degrade offsite are power degrade offsite power.

known.

On Supplement 4, Table 2, circled "YES" for other conditions known which could degrade offsite power WITHIN ACCEPTABLE NORMAL RANGE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 6 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

10. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-2 automatic determine if SU-2 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required.

EXAMINERS CUE: On Supp 4 Table 2, placed check in status column for SU-2 Voltage SU-2 Automatic Voltage Regulator in service.

Regulator is in service.

On Supp 4 Table 2, circled YES for SU-2 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE.

11. Verify SU-3 To 2A1 (2A-113) Checked 2A-113 green and white N/A SAT UNSAT status. lights lit.

On Supplement 4, Table 3, placed a check in 2A-113 "Measured Value" column.

On Supplement 4, Table 3, circled "YES" for 2A-113 WITHIN ACCEPTABLE NORMAL RANGE.

12. Verify SU-3 To 2A2 (2A-213) Verified 2A-213 green and white N/A SAT UNSAT status. lights lit.

On Supplement 4, Table 3, placed a check in 2A-213 "Measured Value" column.

On Supplement 4, Table 3, circled "YES" for 2A-213 WITHIN ACCEPTABLE NORMAL RANGE.

13. Verify 2A3 Supply breaker Verified 2A-309 CLOSED. N/A SAT UNSAT (2A-309) CLOSED.

Observed red light ON for 2A-309.

On Supplement 4, Table 3, placed a check in 2A-309 "Measured Value" column.

On Supplement 4, Table 3, circled "YES" for 2A-309 WITHIN ACCEPTABLE NORMAL RANGE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 7 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

14. Verify 2A4 Supply breaker Verified 2A-409 CLOSED. N/A SAT UNSAT (2A-409) CLOSED.

Observed red light ON for 2A-409.

EXAMINERS CUE: On Supplement 4, Table 3, placed a check in 2A-409 Red light ON for 2A409 to "Measured Value" column.

2A4.

On Supplement 4, Table 3, circled "YES" for 2A-409 WITHIN ACCEPTABLE NORMAL RANGE.

15. Verify SU-3 Voltage. Using SPDS point E2ST3R, OR N/A SAT UNSAT using PMS E9664, OR on panel 2C10 using SU3 regulated voltage indication verified SU-3 voltage > 21.7 KV.

On Supplement 4, Table 3, recorded SU-3 voltage in "Measured Value" column.

On Supplement 4, Table 3, circled "YES" for SU-3 voltage WITHIN ACCEPTABLE NORMAL RANGE.

15. Contact dispatcher to determine Contacted dispatcher to N/A SAT UNSAT Auto-Transformer status. determine if Auto-Transformer 500 KV source was connected.

On Supplement 4, Table 3, EXAMINERS CUE:

placed a check in Dispatcher reports 500 KV Auto-Transformer 500 KV source source connected to AUTO "Measured Value" column.

transformer.

On Supplement 4, Table 3, circled "YES" for Auto-Transformer 500 KV source WITHIN ACCEPTABLE NORMAL RANGE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 8 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

16. Contact Dispatcher to Contacted dispatcher to N/A SAT UNSAT determine if SU-3 automatic determine if SU-3 Automatic voltage regulator is in service or Voltage Regulator is in service or not required. if it is not required.

On Supp 4 Table 3, placed check in status column for SU-3 Voltage EXAMINERS CUE:

Regulator in service.

SU-3 Automatic Voltage On Supp 4 Table 3, circled YES Regulator is in service.

for SU-3 voltage regulator WITHIN ACCEPTABLE NORMAL RANGE..

17. Verify both SU-2 and SU-3 Verified both SU-2 and SU-3 N/A SAT UNSAT operable. operable as shown in Table 2 and Table 3.

Circled "YES" in step 3.1.1.

18. Mark step 3.1.2 & 3.1.3 "N/A". Marked step 3.1.2 & 3.1.3 "N/A". N/A SAT UNSAT
19. Evaluate steps 3.1.1 through Evaluated steps 3.1.1 through N/A SAT UNSAT 3.1.3 for "NO" answers. 3.1.2 for "NO" answers.

Determined that there were no "NO" answers NAd bullets below 3.1.4.

EXAMINERs NOTE: This starts section 3.2, of electrical checklist.

20. Verify 2A3-2A4 Tie Breaker Verified 2A-310 OPEN. N/A SAT UNSAT (2A-310) OPEN.

Observed green light ON for 2A-310.

On Supplement 4, Table 4, placed a check in 2A-310 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2A-310 status agreeing with limiting condition for operability.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 9 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

21. Verify 2A3-2A4 Tie Breaker Verified 2A-410 OPEN. N/A SAT UNSAT (2A-410) OPEN.

Observed green light ON for 2A-410.

On Supplement 4, Table 4, placed a check in 2A-410 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2A-410 status agreeing with limiting condition for operability.

22. Verify 2A3 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2A3, verified 2A3 voltage

> 3640v and < 4440v.

On Supplement 4, Table 4, recorded 2A3 voltage in "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.

23. Determine 2A3 Operability Knowing the status of 2VEF-56B, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A3 operable.
24. Verify 2A3-2A4 Tie Breaker Verified 2A-310 OPEN. N/A SAT UNSAT (2A-310) OPEN.

Observed green light ON for 2A-310.

On Supplement 4, Table 5, placed a check in 2A-310 "Measured Value" column.

On Supplement 4, Table 5, circled "YES" for 2A-310 status agreeing with limiting condition for operability.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 10 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

25. Verify 2A3-2A4 Tie Breaker Verified 2A-410 OPEN. N/A SAT UNSAT (2A-410) OPEN.

Observed green light ON for 2A-410.

On Supplement 4, Table 5, placed a check in 2A-410 "Measured Value" column.

On Supplement 4, Table 5, circled "YES" for 2A-410 status agreeing with limiting condition for operability.

26. Verify 2A4 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2A4, verified 2A4 voltage

> 3640v and < 4440v.

On Supplement 4, Table 5, recorded 2A4 voltage in "Measured Value" column.

On Supplement 4, Table 5, circled "YES" for 2A3 voltage agreeing with limiting condition for operability.

27. Determine 2A4 Operability Knowing the status of 2VEF-56A, N/A SAT UNSAT weather data and Table 4 data, USED the flow chart to verify 2A4 operable.
28. Verify both 2A3 and 2A4 Verified both 2A3 and 2A4 N/A SAT UNSAT operable. operable as shown in Table 4 and Table 4.

Circled "YES" in step 3.2.1.

29. Mark step 3.2.2 "N/A". Marked step 3.2.2 "N/A". N/A SAT UNSAT
30. Evaluate steps 3.2.1 and 3.2.2 Evaluated steps 3.2.1 and 3.2.2 N/A SAT UNSAT for "NO" answers. for "NO" answers.

Determined 2A3 and 2A4 to be operable.

And NAd initialed step 3.2.3.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 11 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

31. Verify 2B5-2B6 Tie Breaker Verified 2B-513 OPEN. N/A SAT UNSAT (2B-513) OPEN.

Observed green light ON for 2B-513.

On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.

32. Verify 2B5-2B6 Tie Breaker Verified 2B-613 OPEN. N/A SAT UNSAT (2B-613) OPEN.

Observed green light ON for 2B-613.

On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.

(C) 33. Verify 2B5 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B5, verified 2B5 voltage is NOT > 436v.

On Supplement 4, Table 4, recorded 2B5 voltage in "Measured Value" column.

On Supplement 4, Table 4, circled "NO" for 2B5 voltage agreeing with limiting condition for operability.

(C) 34. Determine 2B5 Operability Using the Low voltage recorded N/A SAT UNSAT in Table 6, used flow chart to determine that 2B5 is INOPERBLE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 12 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

35. Verify 2B5-2B6 Tie Breaker Verified 2B-513 OPEN. N/A SAT UNSAT (2B-513) OPEN.

Observed green light ON for 2B-513.

On Supplement 4, Table 4, placed a check in 2B-513 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2B-513 status agreeing with limiting condition for operability.

36. Verify 2B5-2B6 Tie Breaker Verified 2B-613 OPEN. N/A SAT UNSAT (2B-613) OPEN.

Observed green light ON for 2B-613.

On Supplement 4, Table 4, placed a check in 2B-613 "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2B-613 status agreeing with limiting condition for operability.

37. Verify 2B6 voltage. On panel 2C33 OR using SPDS N/A SAT UNSAT point E2B6, verified 2B6 voltage is > 436v.

On Supplement 4, Table 4, recorded 2B6 voltage in "Measured Value" column.

On Supplement 4, Table 4, circled "YES" for 2B6 voltage agreeing with limiting condition for operability.

(C) 38. Determine 2B6 Operability Using the status of 2VEF-56A, N/A SAT UNSAT weather data, the status of ESF Switchgear Room Coolers 2VUC-2A and 2VUC-2B, and Table 5 data, used the flow chart to verify 2B6 OPERABLE.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 13 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 39. Verify 2B5 INOPERABLE and Verified 2B5 INOPERABLE and N/A SAT UNSAT 2B6 OPERABLE. 2B6 OPERABLE as shown in Table 6 and Table 7.

Circled "NO" in step 3.3.1.

40. Mark step 3.3.2 "N/A". Marked step 3.3.2 "N/A". N/A SAT UNSAT (C) 41. Evaluate steps 3.3.1 and 3.3.2 Evaluated steps 3.3.1 and 3.3.2 N/A SAT UNSAT for "NO" answers. for "NO" answers.

Determined 2B5 to be INOPERABLE and 2B6 to be EXAMINERs CUE:

operable.

Do not refer to Tech Specs the SM will perform that for you.

Inform the SM SM has been informed.

Initiate CR Initiating Condition Report has been simulated complete.

Initialed steps 3.3.3.

NOTE CRITICAL PART OF THIS STEP IS DECLARING 2B5 INOPERABLE.

END

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 14 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.

Initiating CUE:

The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.

JPM- ANO-2-JPM-NRC-ADMIN Electrical System alignment and availability check PAGE 15 OF 15 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2000 today. No further grid degradation is expected. Actions are being reviewed in OP 2107.001 for degraded offsite power voltage. 2VEF56A and B are operable.

Initiating CUE:

The SM/CRS directs, Using OP 2107.001, Supplement 4, Electrical system breaker alignment and power availability checklist, perform sections 1.0 through 3.3 due to degraded offsite voltage.

JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Review and approve offsite power availability and vital electrical availability checklist.

JTA#: ANO-SRO-ADMIN-NORM-152 KA VALUE RO: 4.2 SRO: 3.9 KA

REFERENCE:

2.1.31 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Supplement 4 Rev. 049-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS: 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted. Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.

TASK STANDARD: Review Supplement 4 data and identify the following:

1) Voltage recorded in table 3, Startup 3 for SU3 regulated voltage was less than acceptable.
2) Declared SU3 INOPERBLE.
3) Identified TS 3.8.1.1 to be applicable and performance of a complete OP 2107.001 Supplement 4 must be done within one hour.
4) Initiated Condition Report to correct problem.

TASK PERFORMANCE AIDS: Completed copy of OP 2107.001 Supplement 4.

SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)

Critical Steps: 1,2,3 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Review completed copy of OP Review Table 3, startup 3 and N/A SAT UNSAT 2107.001 Supplement 4 and identified that SU #3 voltage is identify Table3, startup 3 has lower than acceptable.

been completed incorrectly.

(C) 2. Declared SU #3 inoperable. Determined that SU #3 should be N/A SAT UNSAT declared inoperable due to low voltage.

(C) 3. Identified Technical Identified that Technical N/A SAT UNSAT Specification 3.8.1.1 is Specification 3.8.1.1 LCO is applicable. applicable and that action A.1, performance of OP 2107.001 Supplement 4 must be performed within one hour.

4. Initiate Condition report. Identified need to initiate N/A SAT UNSAT condition report.

EXAMINERs CUE:

Condition report will be initiated by Shift Engineer.

END STOP TIME:

JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.

Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.

Initiating CUE:

The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)

JPM- ANO-2-JPM-NRC-ADMIN supervisor review of 2107.001 sup. 4 PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS 100% power; 250 EFPD. All ESF systems are in normal alignment. No severe weather is forecasted.

Low grid voltage is expected to be restored to normal by 2300 today. 2VEF-56A and 2VEF56B are both operable.

Initiating CUE:

The SM directs, Perform section 4.0, Supervisor review and identify the errors in the partial completion of OP 2107.001, Supplement 4 (sections 2, 3.0, 3.1, 3.2, and 3.3.)

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#:

KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

SYSTEM/DUTY AREA:

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • SFP boron concentration is 2964 ppmb TASK STANDARD:

RO candidates should calculate required SFP makeup volume to be within 1828 to 1928 gallons, determine Boric acid volume to be within 910 gallons to 960 gallons, determine DI water volume to be within 918 gallons to 968 gallons.

TASK PERFORMANCE AIDS:

OP 2104.006, Rev 021-06-0, Attachment F

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.

CRITICAL ELEMENTS (C): 5, 7, 8 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Record initial Spent Fuel Pool On 2104.006, Attachment F N/A SAT UNSAT Level. recorded initial Spent Fuel Pool level of 401 0 given in initial conditions.

Examiners Note: It is not necessary for the candidate to fill in every blank on OP 2104.005, attachment F to arrive at the correct total volume to be added to the SFP.

2. Calculate initial Spent Fuel Pool Obtained Gal/Ft value for Fuel N/A SAT UNSAT Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft).

Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.

Multiplied 469.5 by 6 inches to obtain 2817 gallons.

Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)

Subtracted 1878 gal from 133,817 gal to obtain 131000 gallons total volume above top of racks.

Added 131000 gal and 84,255 gal to find initial pool volume of 215255 gallons.

3. Record desired Spent Fuel On 2104.006, Attachment F N/A SAT UNSAT Pool Level. recorded desired Spent Fuel Pool level of 401 4.

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

4. Calculate desired Spent Fuel Obtained Gal/Ft value for Fuel N/A SAT UNSAT Pool Volume. Pool - Top of racks to Elev 4016 (5634.4 gal/ft).

Divided 5634.4 gal/ft by 12 in/ft to obtain 469.5 gal/in.

Multiplied 469.5 by 2 inches to obtain 939 gallons.

Obtained value for Total Volume (Gal) of Fuel Pool - Top of racks to Elev 4016 (133,817 gal)

Subtracted 939 gal from 133,817 gal to obtain 132878 gallons total volume above top of racks.

Added 132878 gal and 84,255 gal to find desired pool volume of 217133 gallons.

C 5. Calculate volume of makeup Subtracted initial Spent Fuel Pool N/A SAT UNSAT required to raise Spent Fuel volume from desired Spent Fuel Pool level to desired level. Pool volume and determined amount of makeup needed to be Total Volume within 1828 to 1878 gallons.

1928.

6. Record A BAMT boron On 2104.006, Attachment F, N/A SAT UNSAT concentration. recorded value of 5950 ppm for A BAMT concentration.

C 7. Calculate feed volume of boric Inserted values into formula and N/A SAT UNSAT acid required to raise pool level. determined Boric acid volume to Volume within 910 gallons to be 935.53 gallons.

960 gallons.

C 8. Calculate the feed volume of DI Inserted values into formula and N/A SAT UNSAT water required to raise pool determined DI water volume to level. Volume within 918 be 942.47 gallons.

gallons to 968 gallons.

END STOP TIME:

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • SFP boron concentration is 2964 ppmb INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 6 of 6 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • SFP boron concentration is 2964 ppmb INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM/CRS directs, Per OP 2104.006 step 10.3, manually calculate the total volume, the amount of boric acid and the amount of DI water required to raise the Spent Fuel Pool level four (4) inches due to cask loading pit operations using OP 2104.006, Attachment F.

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 1 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1b Conduct of Operations TASK: Spent Fuel Pool Makeup JTA#:

KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.006, Rev 021-06-0, Attachment F EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

SYSTEM/DUTY AREA:

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 2 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Initial Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • Cask loading pit operations has lowered the SFP level
  • CBOT has performed actions per OP 2104.006 step 10.3.
  • Final Spent Fuel Pool Level = 401 4 TASK STANDARD:

SRO candidates should identify the following:

1) Boron Concentration of the feed source should be 5950 NOT 4950.
2) The Feed volume (F) calculated previously was transposed into the feed volumes calc as 1788 gallons not the 1878 gallons correctly calculated. Therefore both the calculated Boric acid and DI water volumes are wrong.

And calculate the following correct feed volumes:

3) Boric acid volume calculated to be within 910 gallons to 960 gallons.
4) Determine DI water volume to be within 918 gallons to 968 gallons.

TASK PERFORMANCE AIDS:

OP 2104.006, Rev 021-06-0, Attachment F

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 3 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.

CRITICAL ELEMENTS (C): 3, 4, 5, 6 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Reviewed the completed form Reviewed the completed form N/A SAT UNSAT OP 2104.006, Attachment F. OP 2104.006, Attachment F.
2. Determined the calculated Calculated the feed volume to be N/A SAT UNSAT volume of solution to be correct. added to the SFP, F, to be 1878 gallons.

C 3. Determined that the boron Recognized the boron N/A SAT UNSAT concentration of the feed concentration of the feed source source was in error. was recorded as 4950 ppm instead of the given value of 5940 ppm.

C 4. Determined the calculated Recognized that the feed volume N/A SAT UNSAT volume of solution used in the to be added to the SFP, F, was calculation of the feed volumes recorded in error as 1788 gallons of boric acid NOT the 1878 gallons calculated on the previous page.

Examiners Note: the candidate may need to be prompted to calculate the volume of Boric acid and DI water.

C 5. Determined the Boron volume Recognized the Boron volume to N/A SAT UNSAT to be added as calculated was be added as calculated was in in error and determined the error and determined the correct correct volume to be 910 volume to be 935.5 gallons.

gallons to 960 gallons.

C 6. Determined the DI water Recognized the DI water volume N/A SAT UNSAT volume to be added as to be added as calculated was in calculated was in error and error and determined the correct determined the correct volume volume to be 942.5 gallons.

to be within 918 gallons to 968 gallons.

END STOP TIME:

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 4 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Initial Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • Cask loading pit operations has lowered the SFP level
  • CBOT has performed actions per OP 2104.006 step 10.3.
  • Final Spent Fuel Pool Level = 401 4 INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.

JPM-#- ANO-2-JPM-NRC-ADMIN SFPMU PAGE 5 of 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Plant is at 100% power.
  • PMS computer is out of service.
  • Initial Spent Fuel Pool Level = 401 0
  • Tilt Pit Gate is installed
  • Cask Loading Pit Gate is installed
  • A BAM tank concentration is 5950 ppmb
  • Cask loading pit operations has lowered the SFP level
  • CBOT has performed actions per OP 2104.006 step 10.3.
  • Final Spent Fuel Pool Level = 401 4 INITIATING CUE:

Chemistry has just notified the Control Room that when SPF level is raised, we need to make a single feed solution using a combination of boric acid from the A BAM tank and DI water maintaining SFP boron concentration 2964 PPM. The SM directs, Review for accuracy and correct any errors in the completed OP 2104.006, Attachment F.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review completed 2P89B surveillance and determine 2P-89B operability JTA#:

KA VALUE RO: 3.5 SRO: 3.9 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREN side.

The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

TASK STANDARD: (Identification of three of the four errors is required and one of the three must be the Pump D/P)

  • Calculation for determining lower pump P limit is in error.
  • Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
  • Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.

TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:

The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.

CRITICAL STEPS: 2, 3, 4, 5 START TIME:

PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test

1. Perform review of the surveillance Reviews the surveillance procedure N/A procedure results. provided.

(C) 2.

Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT This calculation is below the table in supplement 2 section 3 and recorded in the table on the line for pump P.

(C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.

(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.

EXAMINERs CUE: The Shift Engineer will enter the pump data into the database.

6. Report to CRS that the results of Reports to CRS that results of the the surveillance are unsatisfactory surveillance are unsatisfactory and N/A SAT UNSAT and 2P89B is inoperable. 2P89B is inoperable.

END STOP TIME:

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

Initiating CUE:

The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREEN side. The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

Initiating CUE:

The Control Room Supervisor/Shift Manager directs determination of the operability of the B HPSI pump, 2P89B, by reviewing the completed surveillance data OP 2104.039 Supplement 2, complete all reviews for operability, calculations performed and identify all errors.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.

Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE?

Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local)

Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16)

RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO

{4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07)

Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:

1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2.

TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED?

2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following:

  • Notify Shift Manager.
  • Initiate WR/WO as applicable.

NOTE If HPSI pump 2P-89A OR 2P-89C inoperable, then 2SI-10C/2SI-10B testing may be deferred until inoperable HPSI pump restored to operable as per IST Coordinator.

3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),

THEN perform the following:

  • Initiate notification to perform test during current quarter OR as directed by IST Coordinator. N/A
  • Annotate on status board. N/A
  • Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO.

3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________

Performed By Jimmy Reactor Date TODAY_____

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.)

4.3 IF NO answered to 4.1, THEN perform the following corrective actions:

  • Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
  • Verify Condition Report initiated.

4.4 IF NO circled in 4.2, THEN perform the following corrective actions:

  • Verify WR/WO has been initiated.
  • Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.

Comments ________________________________________________________________

4.5 Are all administrative requirements of this test satisfied?

YES NO Supervisor ______________________________________________ Date __________

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A.2: Equipment Control TASK: Review and approve as a supervisor the completed 2P89B surveillance.

JTA#:

KA VALUE RO: 3.5 SRO: 3.9 KA

REFERENCE:

2.2.12 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.039 Supplement 2 Rev. 042-04-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREEN side.

The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

TASK STANDARD:

(Identification of Five of the Six errors is required and two of the six must be the Pump D/P and the tech spec applicabiltiy)

  • Calculation for determining lower pump P limit is in error.
  • Inboard Radial Bearing #1 Vibes is out of LIMITING RANGE FOR OPERABILITY.
  • Outboard Bearing AXIAL Vibes is out of LIMITING RANGE FOR OPERABILITY.
  • Yes is circled on parameters that do not meet acceptance criteria TASK PERFORMANCE AIDS: marked-up copy of Supplement 2 2P-89B quarterly test SIMULATOR SETUP: NA

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:

The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.

CRITICAL STEPS: 2, 3, 4, 5, 6, 7 START TIME:

PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide a marked-up copy of Supplement 2, 2P-89B quarterly test

1. Perform supervisor review of the Reviews the surveillance acceptance N/A surveillance procedure results and criteria provided.

determine errors.

EXAMINERs NOTE: the following are the errors in the form provided.

(C) 2. Pump P is out of LIMITING Pump D/P is out of LIMITING RANGE RANGE FOR OPERABILITY. FOR OPERABILITY. N/A SAT UNSAT (C) 3. Calculation for determining lower Calculation for determining lower pump pump P limit is in error. P limit should be 1380.81 psid. N/A SAT UNSAT This calculation is below the table in supplement 2 section 3 and recorded in the table on the line for pump P.

(C) 4. Inboard Radial Bearing #1 Vibes Inboard Radial Bearing #1 Vibes is out of is out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.

(C) 5. Outboard Bearing AXIAL Vibes is Outboard Bearing AXIAL Vibes is out of out of LIMITING RANGE FOR LIMITING RANGE FOR OPERABILITY. N/A SAT UNSAT OPERABILITY.

(C) 6. Identify the technical specification Identifies TS 3.5.2 applicability.

applicability error. N/A SAT UNSAT (C) 7. Identified that YES was circled on Identifies that YES was circled on parameters that did not meet parameters that did not meet acceptance N/A SAT UNSAT acceptance criteria. criteria.

EXAMINERs NOTE: The candidate will probably require another RO to review the data table before proceeding.

Ask the candidate to continue on with completing section 4.0 as though that review matched the same errors previously identified.

8. Inoperable equipment checklist Identifies need to perform inoperable needed. equipment checklist must be completed. N/A SAT UNSAT EXAMINERs CUE:

The SRO ADMIN will perform the inoperable equipment checklist.

9. Condition Report needed. Identifies need to generate condition report. N/A SAT UNSAT EXAMINERs CUE:

The SE will initiate the condition report.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE END STOP TIME:

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREEN side.

The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

Initiating CUE:

The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.

JPM-ANO-2-JPM-ADMIN-Surveillance review 2P89B PAGE 6 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS Plant is at 100% power and all ESF equipment is in normal alignment.

2P89C is aligned to the GREEN side.

The 2P-89B Quarterly test has been completed using OP 2104.039 Supplement 2.

Initiating CUE:

The Shift Manager directs perform supervisor review and analysis of the B HPSI pump, 2P89B, by reviewing and identifying all errors on the completed surveillance data OP 2104.039 Supplement 2.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 61 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 7 OF 9 3.0 ACCEPTANCE CRITERIA 3.1 Record values observed during 2P-89B operation below AND compare with limiting range of values for operability.

Record date and time Test begins TODAYs DATE / 0800 TABLE 1 TEST QUANTITY INSTRUMENT MEASURED ACCEPTABLE LIMITING IS DATA IN (INCLUDE VALUE NORMAL RANGE FOR LIMITING TEST INST) RANGE OPERABILITY RANGE?

Running Suct. 2PI-5100 33.5 psig 8 psig 8 psig YES NO Pressure (local) 2PI-5101 1389 psig N/A N/A N/A (local)

Discharge 2PI-5109 Pressure 1379 psig N/A N/A N/A (2C16)

RWT 2TIS-5675 Temperature (2C17) 90 °F 40 to 110°F N/A N/A Pump P 2PI-5101 - 1360.81(1)to 1355.5 psid N/A YES NO

{4.3.1} 2PI-5100 1612.8 psid Motor Running Ammeter at A 34 Amps N/A N/A N/A Amps 2A-406 B 33 Amps (CR-1-96-0272- C 35 Amps 07)

Inboard Brg VIB001 0.325 0.700 0.825 in/sec YES NO Radial #1 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.22 in/sec YES NO Radial #2 in/sec in/sec Vibes Inboard Brg VIB001 0.325 0.700 0.073 in/sec YES NO Axial Vibes in/sec in/sec Outboard Brg VIB001 0.325 0.700 0.187 in/sec YES NO Radial #1 in/sec in/sec Vibes Outboard Brg VIB001 0.325 0.700 0.207 In/sec YES NO Radial #2 in/sec in/sec Vibes Outboard Brg VIB001 0.232 0.558 0.610 In/sec YES NO Axial Vibes in/sec in/sec Record date and time Test completed TODAYs DATE 0930 Vibration Instrument Cal Due Date 7 Days from TODAY Vibration Data Collected By Eddy Electrician Note 1: For RWT temperature (T), minimum acceptable pump P is:

1372.9 + 20.41 (Instrument error) - [(T-40)/4] psid Minimum P = 1393.31 - [( 90 - 40)/4] = 1360.81 psid 3.2 Independently verify pump P calculation. JJB

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 62 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 8 OF 9 3.3 Document observation of check valve stroke in Table 2.

TABLE 2 CHECK TEST TEST CRITERIA IS PROPER VALVE VALVE DIRECTION STROKE INDICATED?

2SI-10C Closed 2P-89C NOT rotating YES NO N/A 2SI-10B Closed 2P-89B NOT rotating YES NO N/A 3.4 IF NO circled in Table 1 OR 2, THEN perform the following:

  • Notify Shift Manager. N/A

3.5 IF 2SI-10C AND/OR 2SI-10B NOT tested (N/A circled in Table 2),

THEN perform the following:

  • Initiate notification to perform test during current quarter OR as directed by IST Coordinator. N/A
  • Annotate on status board. N/A
  • Annotate in Work Exceptions section of WR/WO. N/A 3.6 Pump Data recorded in database AND reviewed by SRO. SBR 3.7 IF this surveillance performed as PMT, THEN complete Unit 2 IST Data Collection (1015.016O). N/A Comments ________________________________________________________________

Performed By Sammy Reactor Date TODAY Jimmy Reactor

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 63 of 148 2104.039 HPSI SYSTEM OPERATION CHANGE:

SUPPLEMENT 2 PAGE 9 OF 9 4.0 SUPERVISOR REVIEW AND ANALYSIS 4.1 Do all measured values recorded in ACCEPTANCE CRITERIA fall within specified LIMITING RANGE FOR OPERABILITY? YES NO 4.2 Do all measured values recorded in ACCEPTANCE CRITERIA fall within ACCEPTABLE NORMAL RANGE? (N/A if all results outside YES NO N/A normal range also outside limiting range.)

4.3 IF NO answered to 4.1, THEN perform the following corrective actions:

  • Verify Inoperable Equipment Checklist (1015.001, Conduct of Operations) completed.
  • Verify Condition Report initiated.

4.4 IF NO circled in 4.2, THEN perform the following corrective actions:

  • Verify WR/WO has been initiated.
  • Complete Surveillance Test Schedule Change Request (1000.009D) to double test frequency.

Comments ________________________________________________________________

4.5 Are all administrative requirements of this test satisfied?

YES NO Supervisor ______________________________________________ Date __________

JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A.3 Radiation Control TASK: Review the emergency RWP and determine stay time based on radiation levels expected.

JTA#:

KA VALUE RO: 2.9 SRO: 3.3 KA

REFERENCE:

2.3.10 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Perform SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): 2004-0009; emergency RWP and status board printout of Aux Building 354.

EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS

1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
5. Fuel Pool low level alarm is in and SFP level is lowering.
6. RP coverage will not be available.

TASK STANDARD:

Using Emergency RWP:

  • Identify General Area, GA, dose rates in SFP valve gallery are ~ 500 MR/HR.
  • Determine a maximum stay time of 1.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> based on EAD alarm set-points.

Using normal inspection RWP:

  • Determine appropriate dosimeter
  • Observed proper radiological controls while in RCA
  • Properly uses the PCM-1
  • Properly scans loose items in TCM JPM time is based on the review of the emergency RWP and the calculation of the stay time.

TASK PERFORMANCE AIDS: Emergency RWP 2004-0009 SIMULATOR SETUP: NA

JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE Initiating CUE:

The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency Radiological Work Permit, RWP, and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.

Critical Steps: 2, 3, 4, 5, 6 START TIME:

PERFORMANCECHECKLIST STANDARD CIRCLE ONE NOTE: Provide Emergency RWP.

EXAMINERs CUE: The candidate may attempt to check out a radiation survey meter per monitoring step 7.0. It is not a part of this JPM to check out the survey meter, but that the candidate knows one is needed.

1. Review Emergency RWP for Determines that the alarming dosimeter N/A limits. is set to alarm in an 800mr/hr field and that the Dose alarm is set at 800 mrem.

(C) 2.

Determine stay time in SFP valve Using the status board printout provided gallery to be a maximum of 1.6 determined that the General Area (GA) N/A SAT UNSAT hours. field is 500 MR/HR so the maximum stay time will be 1.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

EXAMINERs NOTE: The rest of these steps determine the candidates ability to enter and exit controlled access correctly using the Actual RWP for inspections, DO NOT allow the candidate to use the emergency RWP to enter controlled access.

(C) 3. Determined that an alarming Obtained an alarming dosimeter from dosimeter will be required for rack. N/A SAT UNSAT entry into the Radiologically Controlled Area, RCA, using the normal inspection RWP.

(C) 4. Entered appropriate information Entered the RCA under the general into the log in screen and inspection RWP. N/A SAT UNSAT successfully entered the RCA.

(C) 5. While in the RCA the examinee While in the RCA the examinee observes observes and adheres to all and adheres to all applicable postings N/A SAT UNSAT applicable postings and entry and entry requirements.

requirements.

(C) 6. When exiting the RCA the Enters and exits PCM-1.

examinee enters the control point N/A SAT UNSAT area and enters a PCM-1 monitor.

7. All loose materials will be cleared Examinee places loose items in the TCM through the tool contamination for counting. N/A SAT UNSAT monitor (TCM)
8. After clearing the PCM-1 monitor, Examinee clears the Portal Monitor the examinee exits through the N/A SAT UNSAT Portal Monitor
9. Examinee deactivates EAD at Examinee deactivates his EAD and final exit of session returns it to the Health Physics rack. N/A SAT UNSAT END STOP TIME:

JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
5. Fuel Pool low level alarm is in and SFP level is lowering.
6. RP coverage will NOT be available.

Initiating CUE:

The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.

JPM-ANO-2-JPM-ADMIN-RWP and stay times PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

1. Plant is DEFUELED and all FUEL HANDLING operations are secured.
2. Power has been lost to both SFP cooling pumps and 2K11-K5 FUEL POOL TEMP HI is in alarm.
3. A Site Area Emergency has been declared on Unit 2 due to a station blackout. Power has been restored to 2A3 and 2B5 from the Alternate AC Generator, AACG.
4. Service water must be aligned to the SFP due to boiling and loss of inventory through the tilt pit gate.
5. Fuel Pool low level alarm is in and SFP level is lowering.
6. RP coverage will NOT be available.

Initiating CUE:

The Shift Manager directs that Service water from loop I must be aligned to the SFP, use the Emergency RWP and identify the maximum allowable time before you would be required to leave the Auxiliary Building 354 elevation SFP valve gallery, excluding entry and exit times to and from the area.

RWP for TRAINING USE ONLY RWP ANO Page 1 of 5 l l l Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2004-0009l l______________________________________________________________________________l l l l SECTION I RWP DESCRIPTION l l______________________________________________________________________________l l l l l l START DATE: 01-jan-2004 l END DATE: 31-dec-2004 l RWP TYPE: General l l__________________________l_________________________l_________________________l l l l DESCRIPTION: l l l l Emergencies l l l l SYSTEM COMPONENT BLDG LOCATION l l l l NA Various A1/A2 Non LHRA's l l NA Various OSCA Non LHRA's l l NA Various A1/A2 LHRA's l l l l JOB CONTACTS..Shift Manager ALARA CODE....C0007014 l l JOB CODE......ROS- ALARA CAT.....Level III l l______________________________________________________________________________l l l l SECTION II TASK LIST l l______________________________________________________________________________l l l l l l l l l l ESTIMATED l l TASKl STATUS l TASK DESCRIPTION l PR-HR lPER-REMl l_____l_________l______________________________________________l_______l_______l l l l l l l l 1 lActive lEmergency Response in Non LHRA's l 1000.0l 5.000l l l l l l l l 2 lActive lEmergency Response in LHRA's l 200.0l 6.000l l_____l_________l______________________________________________l_______l_______l l l l l l TOTALS l 1200.0l 11.000l l______________________________________________________________l_______l_______l l l l SECTION III RWP REVIEWS AND APPROVAL l l______________________________________________________________________________l l l l Originator ELLISON PW 18-dec-2003 Development ELLISON PW 19-dec-2003 l l ALARA Eval ELLISON PW 19-dec-2003 HP Supv. DORAN GA 19-dec-2003 l l Terminated ____________ ___________ Completed ____________ ___________ l l Withdrawn ____________ ___________ l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009

RWP for TRAINING USE ONLY RWP ANO Page 2 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l 1) Emergency Response in Non LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 1 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1&2 Aux. Bldgs l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious / Aux. Bldgs l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry  : Whole body TLD required, and Alarming Dosimeter. l l l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l ALARA Actions: l l 1) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l 1) Notify the zone coverage RP or the duty shift RP when Emergency l l Conditions exist. l l 2) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter (EAD) set points will be 800 mrem dose and 800 mrem/hr l l dose rate. l l 3) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant monitors, Rads Telmetry devices in l l the field or RP personnel. l l 4) Periodically check your Electronic Alarming Dosimeter (EAD). This l l check should be more frequent in areas where your ability to hear l l the alarm is diminished. l l 5) If an EAD dose alarm occurs: l l 1. Secure work. l l 2. Immediately leave Controlled Access. l l 3. Notify RP. l l 6) If an EAD dose rate alarm occurs: l l 1. Secure work. l l 2. Back out of the immediate area until alarm clears. l l 3. Notify others in work crew. l l 4. Immediately contact RP for further instructions. l l 7) Initial/Intermittent RP coverage is required for High Radiation l l Areas unless the individual is "Category 3 Advanced Radworker" l l qualified and has an appropriate radiation survey meter at all l l times during the entry. l l NOTE: An EAD is not an appropriate survey meter. l l 8) Access to the overhead >8ft. is allowed with the following l l l l --Continued on next page-- l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009

RWP for TRAINING USE ONLY RWP ANO Page 3 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 1 ) l l______________________________________________________________________________l l l l --Continued from previous page-- l l l l provisions: l l A.) Use a ladder to climb directly below the valve to be l l operated. l l B.) Do not touch any interferences or components in the overhead. l l C.) Use your survey meter to obtain dose rates of all areas l l entered. l l D.) Wear rubber gloves while operating the valve but remove them l l prior to descending the ladder. l l E.) Upon completion, perform a large area masslin survey of the l l ladder to determine if any cross contamination has occurred. l l l l 9) Accessing the top of partial walls separating Radiation/High l l Radiation areas from Locked High Radiation areas is not permitted l l on this RWP. l l l l Work Controls: l l l l 1) Ensure the proper surveys are performed prior to removing any l l items from the RCA. l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological Conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009

RWP for TRAINING USE ONLY RWP ANO Page 4 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l l l 2) Emergency Response in LHRA's l l______________________________________________________________________________l l l l RADIOLOGICAL CONDITIONS ( Task# 2 ) l l______________________________________________________________________________l l l l l l l l l l l (mrem/Hr) l dpm l l l l l l Component/Location l Gen Max l100cm2l l Yr/DANI# l l l l______________________l_____l_____l______l________l____________l_______l______l l l l l l l l l l lUnit 1/2 Aux. Bldgs. l 1 l 200 l <1K l lMonthly Pkg l l l lOutside Controlled Ac l 1 l 80 l <1K l lMonthly Pkg l l l lVarious U1/2 Aux. Bld l 1 l1000 l <1K l lANTICIPATED l l l l______________________l_____l_____l______l________l____________l_______l______l l l l Dosimetry  : Whole body TLD required, and Alarming Dosimeter. l l l l______________________________________________________________________________l Tue Oct 19 13:59:58 2004 working RWP 2004-0009

RWP for TRAINING USE ONLY RWP ANO Page 5 of 5 l l l SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2004-0009l l______________________________________________________________________________l l l l TASK TASK DESCRIPTION ( Task# 2 ) l l______________________________________________________________________________l l ------------------------- SPECIAL INSTRUCTIONS ------------------------- l l l l ALARA Actions: l l l l 1) A pre-job-brief is required for this task. l l l l 2) RP staff and or Shift Manager will conduct the pre-job-brief. l l l l 3) Utilize low dose waiting areas whenever possible to minimize l l exposure. l l l l Monitoring: l l l l 1) Contiuous RP coverage is required for this task. l l l l 2) Periodically check Electronic Alarming Dosimeter (EAD). This check l l should be more frequent in areas where your ability to hear the l l alarm is deminished. If any (EAD) alarm is received secure work, l l find as low a dose rate area as possible and contact RP supervision l l for further guidance. l l l l 3) Unless otherwise directed by RP Supervision, Electronic Alarming l l Dosimeter set points will be 800 mrem dose and 4000 mrem/hr dose l l rate. l l l l 4) During Emergency conditions the possibility of changing l l radiological conditions is increased. Radiological information l l should be obtained from in plant radiation monitors, Rads Telemetry l l devices in the field or RP personnel. l l l l Work Controls: l l l l 1) Ensure the proper surveys are preformed prior to removing any l l items from the RCA l l l l Respiratory: l l l l 1) Airborne Activity will be assessed based on process monitor's and l l continuous air monitor's activity. l l l l Anti-C's: l l l l 1) Use Anti-C's appropriate for the area to be entered. l l l l Additional: l l l l 1) Radiological conditions are ANTICIPATED and must be determined l l prior to beginning work in the area. l l______________________________________________________________________________l Tue Oct 19 13:59:59 2004 working RWP 2004-0009

JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#:

KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 1903.010 Rev 037-02-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

  • Plant had been operating for 150 days at 100% power.
  • A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
  • Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
  • Chemists have been notified to sample the RCS.

TASK STANDARD:

Declared a Site Area Emergency (based on EAL 1.4, Containment radiation readings which indicate LOCA and >1% fuel cladding failure). Also acceptable is a review of the 1903.010 paragraph 4.10, Fission Product Barrier Failure and 4.11, Fission Product Barrier Challenge criteria and determine that two fission product barriers are challenged or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.

TASK PERFORMANCE AIDS: OP 1903.010 Rev. 037-02-0 SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

Critical Steps: 2, 3, 4 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Review E-Plan procedure Review 1903.010 index and EAL N/A SAT UNSAT 1903.010 to determine classification tabs.

classification.

(C) 2. Reviewed 1903.010 attachment Determined that the containment N/A SAT UNSAT 6 containment radiation EAL radiation reading exceeds the plot to determine that Site Area Emergency Criteria.

containment radiation levels exceed the Site area emergency criteria.

(C) 3. Reviewed initial conditions and Determined LOCA inside N/A SAT UNSAT determined that a LOCA inside containment was in progress.

containment was in progress.

(C) 4. Reviewed EAL 1.4., Site Area Classified EAL as a Site Area N/A SAT UNSAT Emergency based on a LOCA Emergency (SAE) based on EAL and > 1% failed fuel. 1.4, Containment Radiation readings which indicate LOCA Or and > 1% fuel cladding failure.

Also acceptable is a review of the 1903.010 paragraph 4.10, OR Fission Product Barrier Failure Classified EAL as a Site Area and 4.11, Fission Product Emergency (SAE) based on EAL Barrier Challenge criteria and 9.3, Plant conditions exist that determine that two fission warrant activation of the product barriers are challenged Emergency Response Facility.

or failed and classify the event as a Site Area Emergency based on criteria 9.3,Plant conditions exist that warrant activation of the Emergency Response Facility.

END

JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • Plant had been operating for 150 days at 100% power.
  • A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
  • Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
  • Chemists have been notified to sample the RCS.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

JPM- ANO-2-JPM-NRC-ADMIN Classify Event EAL PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • Plant had been operating for 150 days at 100% power.
  • A reactor trip has occurred due to Loss of Coolant Accident estimated to be 700 gpm.
  • Containment high range radiation monitors, 2RE8925-1 and 2RE8925-2 are reading 2400 R/HR.
  • Chemists have been notified to sample the RCS.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

JPM- ANO-2-JPM-NRC-AOP2 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Containment Cooling Water System TASK: Reset CIAS and establish cooling water to containment JTA#:

KA VALUE RO: 3.1 SRO: 3.2 KA

REFERENCE:

022 A4.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.0039 Rev 03-02-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-AOP2 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: An inadvertent CIAS has occurred.

Steps 1-10 of AOP 2203.039 have been completed.

TASK STANDARD: CIAS has been reset and containment Chilled water has been realigned.

TASK PERFORMANCE AIDS: Copy of AOP 2203.039 Revision 003-02-0 is available.

AOP 2203.039 Steps 1-10 have been completed.

SIMULATOR SETUP: Inadvertent CIAS present. Containment parameters and RCS parameters are above setpoints, containment pressure < 18.3 psia. Verify CBO to VCT valves, 2CV-4847-2 and 2CV 4846-1 handswitches are in CLOSE.

JPM- ANO-2-JPM-NRC-AOP2 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."

CRITICAL ELEMENTS (C): 1, 2, 6, 7, 8 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Reset CIAS on 2C23B. Obtained key 15 from Shift N/A SAT UNSAT Manager.

(Proc step Examiners note: On panel 2C23B placed key in

11) trip path keyswitch to UNLK.

Only one channel of PPS is modeled on simulator Depressed CIAS pushbutton for completely. Correctly resetting trip path.

of this channel will reset CIAS trip paths. Placed trip path keyswitch to LK and removed key.

Examiners Cue @ Step 11.D:

All four PPS trip path channels have been reset.

(C) 2. Reset ESF CIAS actuation on Depressed CIAS lockout reset N/A SAT UNSAT 2C40. pushbutton on 2C40-7 and (Proc observed CIAS ON light lit and step Examiners note: observed trip paths lights on

12) panel above 2C23 lit.

Only one channel of ESF actuation path is modeled on simulator completely. Correctly resetting of this channel will reset CIAS ESF actuation.

Examiners Cue @ Step 12.B:

2C39 ESF CIAS actuation has been reset.

3. Go to step 14. Using procedure 2203.039, N/A SAT UNSAT (Proc transition to step 14.

step1 2.c)

4. Open RCP Bleedoff to VCT On panel 2C17, Placed N/A SAT UNSAT valve, 2CV-4846-1. handswitches for RCP bleedoff to (Proc VCT valve 2CV-4846-1 to OPEN.

step

14) Observed RED light ON and GREEN light OFF above hand switch.

JPM- ANO-2-JPM-NRC-AOP2 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

5. Open RCP Bleedoff to VCT On panel 2C16, Placed N/A SAT UNSAT valve, 2CV-4847-2. handswitches for RCP bleedoff to (Proc VCT valve 2CV-4847-2 to OPEN.

step

14) Observed RED light ON and GREEN light OFF above hand switch.

(C) 6. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3851-1. handswitches for Chilled Water to (Proc CNTMT Isolation valve step 2CV-3851-1 to OPEN.

15.a)

Observed RED light ON and GREEN light OFF above hand switch.

(C) 7. Open Chilled water to CNTMT On panel 17, placed N/A SAT UNSAT valve 2CV-3852-1. handswitches for Chilled Water to (Proc CNTMT Isolation valve step 2CV-3852-1 to OPEN.

15a)

Observed RED light ON and GREEN light OFF above hand switch.

(C) 8. Open Chilled water to CNTMT On panel 16, placed N/A SAT UNSAT valve 2CV-3850-2. handswitches for Chilled Water to (Proc CNTMT Isolation valve step 2CV-3850-2 to OPEN.

15a)

Observed RED light ON and GREEN light OFF above hand switch.

9. Verify Main Chiller (2VCH1A) On panel 22, verified hand switch N/A SAT UNSAT running. for 2VCH1A is in normal after (Proc start (RED flagged).

step 15b)

Observed RED light ON and Examiners note: GREEN light OFF above hand The red light above hand switch for 2VCH-1A.

switch for 2VCH-1A indicates the chiller is running.

Observed RED light ON and GREEN light OFF above label for Examiners note: 2HS-3810.

The red light label for 2HS-3810 for 2VCH-1A indicates Observed all chilled water alarms the 2A1 breaker is closed. are clear on annunciator 2K13 (Lights slow flashing or clear).

JPM- ANO-2-JPM-NRC-AOP2 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERs NOTE:

JPM standard does not require completion of steps past procedure step 15.

END STOP TIME:

JPM- ANO-2-JPM-NRC-AOP2 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.

INITIATING CUE:

The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."

JPM- ANO-2-JPM-NRC-AOP2 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

An inadvertent CIAS has occurred. Steps 1-10 of AOP 2203.039 have been completed.

INITIATING CUE:

The SM/CRS directs, "Perform actions in Inadvertent CIAS, AOP 2203.039, steps 11 through 15."

JPM- ANO-2-JPM-NRC-CVCS010 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)

JTA#:

KA VALUE RO: 3.9 SRO: 3.7 KA

REFERENCE:

004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 12 Minutes REFERENCE(S): OP 2203.032 Rev. 008-06-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-RO-CVCS010 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair.

TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.

A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.

TASK STANDARD:

Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using HPSI pump and HPSI injection MOVs. This is an alternate success path JPM>

TASK PERFORMANCE AIDS:

AOP 2203.032 Steps 2 through 16. OP 4104.039 section 9, Starting any HPSI pump on recirc.

SIMULATOR SETUP:

A mode 3 IC will be set up for this JPM. RCS cooldown in progress, PZR pressure ~ 1200psia, RCS temp

~480°F. A CCP running. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.

Set T1=2CV-4873-1a < 75% (this will trigger T1 when the VCT outlet gets to 75% open.)

T1 = A CCP plunger failure (flow out of pump ~ 30gpm).

JPM- ANO-2-JPM-RO-CVCS010 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."

CRITICAL ELEMENTS (C): 2, 5, 9, 10, 14, 15 START TIME:

PERFORMANCE CHECKLIST STANDARD (Circle One)

1. Verify at least one charging On panel 2C09, verified CCP(s) N/A SAT UNSAT Pump (CCP) running with flow running.

(Proc greater than 40 GPM.

Step Observed red light ON; green light

2) OFF above at least one of the following handswitch(es):

2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).

(C) 2. Align boric acid supply to CCP On panel 2C09, opened BAMT N/A SAT UNSAT suction. gravity feed valves 2CV-4920-1 (Proc and/or 2CV-4921-1 Step 3A1) Observed red light ON and green light OFF above handswitch(es):

3. Close volume control tank On panel 2C09, observed that N/A SAT UNSAT (VCT) outlet valve (2CV-4873- 2CV-4873-1 closed.

(Proc 1).

Step Observed green light ON; red light

4) OFF above VCT Outlet valve handswitch (2HS-4873-1).
4. Check Reactor Makeup Water On panel 2C09, verified 2CV-4927 N/A SAT UNSAT Flow Control valve (2CV-4927) or 2CV-4941-2 closed.

(Proc or 2CV 4941-2 closed.

Step Observed green light ON; red light

5) OFF above Reactor Makeup Water Flow Controller (2FIC-4927) or above 2CV-4941-2 handswitch.

(C) 5. Check charging header flow. On panel 2C09 (upright portion), N/A SAT UNSAT (Proc observed flow about 30 gpm on Step Charging Header Flow indicator

6) (2FIS-4863).

JPM- ANO-2-JPM-RO-CVCS010 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

6. GO to step 2 and verify TCBs On panel 2C14, verifies that the N/A SAT UNSAT open and then transition to TCBs are open by observing the (Proc step 8. green lights ON and red lights Step OFF.

2)

7. Check RCS pressure less than On panel 2C04, SPDS, PMS or N/A SAT UNSAT 1265 psia. PDS verified that PZR pressure is (Proc less than 1265 psia.

Step 8)

8. Verify RWT level greater than On panel 2C16 or 2C17, verified N/A SAT UNSAT 7.5%. RWT level greater than 7.5%.

(Proc Step 9A)

(C) 9. Verify 2CV-5631-2 is OPEN. On panel 2C16 verified RWT outlet N/A SAT UNSAT EXAMINERS CUE: When valve 2CV-5631-2 is OPEN.

(Proc Step asked as CRS, in step 9, 9B) which HPSI pump to start, state that B HPSI pump is to be used. If not asked and goes to 2C17 to verify RWT outlet valve open and start A HPSI pump, state that B HPSI pump is to be started.

NOTE: If Examinee in procedure step 9C, goes to use OP2104.039 section 9.0 then give the following cue.

EXAMINERs CUE: CRS directs to start B HPSI pump first and then verify steps in appropriate section in OP 2104.039.

(C) 10. Start 2P89B, B HPSI Pump. On panel 2C16 rotated handswitch N/A SAT UNSAT for 2P89B to start position.

(Proc Step Observed Red light ON and Green 9C) light OFF.

11. Verify SDC secured. On panel 2C16 and 2C17 verified N/A SAT UNSAT LPSI (SDC) pumps secured.

(Proc Step 10)

12. Check RCS temperature On panel 2C04, SPDS, PMS or N/A SAT UNSAT greater than 450°F. PDS verified RCS temperature (Proc greater than 450°F.

Step 11)

JPM- ANO-2-JPM-RO-CVCS010 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

13. Commence RCS cooldown to Verify conditions will allow for a N/A SAT UNSAT allow a makeup rate of 40 makeup rate of 40 gpm. (Step 12)

(Proc GPM.

step

12) Note: applicant will not perform this procedure step.

EXAMINERS CUE: The RCS cooldown will be controlled by another operator and the rate is sufficient to allow 40 GPM makeup rate.

(C) 14. Use one HPSI train B injection Throttled open ONE of the N/A SAT UNSAT MOV to maintain PZR level. following HPSI injection MOV:

(Proc step (Note these are contingency 2CV-5016-2 13A) action steps.)

2CV-5036-2 2CV5056-2 2CV-5076-2 Observed Red light ON and Green light ON above handswitch.

(C) 15. Verified HPSI to RCS flow Adjust valve position to maintain N/A SAT UNSAT greater than 40 GPM using greater than 40 GPM HPSI flow (Proc SPDS computer. using indications on SPDS step computer.

13B)

Procedure steps 14, 15 and 16 are not required to be completed.

END STOP TIME:

JPM- ANO-2-JPM-RO-CVCS010 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERs COPY JPM INITIAL TASK CONDITIONS:

Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.

A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.

INITIATING CUE:

The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."

JPM- ANO-2-JPM-RO-CVCS010 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY JPM INITIAL TASK CONDITIONS:

Mode 3. B CCP tagged out for low pressure operations. C CCP tagged out for gear box repair. TRM 3.1.2.4 entered for only 1 CCP available with 55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> remaining on the action.

A Shutdown Margin is calculated following a reactor trip. Shutdown Margin is found to be less than required.

INITIATING CUE:

The SM/CRS directs, "Initiate Emergency Boration using BAMT gravity feed to Charging Pump suction beginning with AOP 2203.032, Step 2."

JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:

SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron (ALTERNATE SUCCESS PATH)

JTA#: ANO2-RO-PZR-NORM-3 KA VALUE RO: 3.7 SRO: 3.5 KA

REFERENCE:

010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2103.005 Rev. 024-00-0 and AOP 2203.028 Rev 06-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.

Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.

TASK STANDARD: Spray Valve (2CV-4651) is isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.

SIMULATOR SETUP: Run CAE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.

The following malfunctions/overrides need to be triggered (cae file JPM03 will do all of them):

Set T5 file to GH4R651A this will trigger T5 when 2CV-4651 red light is energized.

T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)

T5 2HS-4651-5 false (red light)

JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

EXAMINERs NOTE: Do not hand out procedure until asked.

The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."

CRITICAL ELEMENTS (C): 2, 3, 4, 6 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT (Proc isolation valves 2CV-4655 ON, green lights OFF for step AND 2CV-4656 are OPEN. 2CV-4655 and 2CV-4656.

7.1.1)

(C) 2. Place RCP A spray valve On panel 2C04, rotated N/A SAT UNSAT (Proc MAN/AUTO select switch 2HS-4651B in the CCW direction step (2HS-4651B) to MANUAL. to MANUAL.

7.1.2)

(C) 3. Energize all available Backup On panel 2C04 verified the N/A SAT UNSAT (Proc Heaters. following hand switches to ON:

step Place 2HS-4643 to ON 7.1.3)

Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater hand switches.

EXAMINERS NOTE:

When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.

(C) 4. Partially open 2CV-4651 to When RCS pressure starts rising, N/A SAT UNSAT (Proc stabilize pressure within +/- 10 then on panel 2C04, throttled step psia of desired setpoint. open 2CV-4651 by taking the 7.1.4) hand switch for 2CV-4651 to the open position.

EXAMINERS NOTE:

The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.

JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

5. Recognizes that 2CV4651 is On panel 2C04, observed that N/A SAT UNSAT (AOP deenergized open. light position indications above Proc 2CV-4651 are out and PZR step 1) Attempts to close 2CV4651 pressure is lowering.

may be made, but is not necessary.

(C) 6. Close PZR Spray Block On panel 2C04, placed hand- N/A SAT UNSAT (AOP Valves. switch for 2CV-4655 and 2CV-Proc 4656 to "CLOSE".

step 1.B.3) Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.

END STOP TIME:

JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY NOTE: Do not hand out procedure until Examinee asks for it.

JPM INITIAL TASK CONDITIONS:

100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.

INITIATING CUE:

The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."

JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 500 PPM and PZR boron is 575 PPM.

INITIATING CUE:

The SM/CRS directs: Equalize RCS and PZR boron concentration using RCP A spray valve, 2CV-4651."

JPM- ANO-2-JPM-NRC-SIT05 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:

SYSTEM/DUTY AREA: Safety Injection System TASK: Adjust SIT Pressure (Increase) ALTERNATE SUCCESS PATH JTA#: ANO2-RO-ECCS-NORM-10 KA VALUE RO: 3.5 SRO: 3.7 KA

REFERENCE:

006 A1.13 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 8 Minutes REFERENCE(S): OP 2104.001 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-SIT05 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Safety Injection Tank (2T2A) level is between 80.1% and 87.9%.

Pressure is approximately 606 psig.

TASK STANDARD: Safety Injection Tank (2T2A) pressure raised to 615 psig. Nitrogen Isolated to A SIT.

2T2A pressure is < 700 psig. THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS: OP 2104.001 Section 11.0 SIMULATOR SETUP: Ensure A SIT pressure is ~606 psig and A SIT level is ~ 84%. Run CAE file JPM05.

CAE file JPM05 will do the following:

Set trigger T5=PD4R5005 (trigger when 2SV-5005 red light energized)

Set 2SV5005 to stick open (Hand switch for the valve faulty) (IMF CV5005_(5 0) 1.0 0 0.0)

JPM- ANO-2-JPM-NRC-SIT05 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Raise Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."

CRITICAL ELEMENTS (C): 2, 3, 6 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify nitrogen supply is Using the gaitronics, plant N/A SAT UNSAT (Proc aligned. telephone system, or radio; step contacted Unit-1 OR contacted
1) Examiners Cue: Unit-2 operator.

Unit-1 (or Unit-2 operator) reports high pressure N2 is Requested alignment of high aligned. pressure N2.

(C) 2. Open Supply Header to On panel 2C16, placed N/A SAT UNSAT (Proc Containment Isolation handswitch for 2CV-6207-2 to step (2CV-6207-2). OPEN.

2)

Observed red light ON above handswitch.

EXAMINER'S NOTE:

2SV-5005A and B are both operated by handswitch for 2SV-5005.

(C) 3. Open SIT N2 Supply valves On panel 2C33, placed N/A SAT UNSAT (Proc (2SV-5005A/B). handswitch 2SV-5005 for step 2SV-5005A/B to OPEN.

3)

Observed red light ON; green light OFF above handswitch.

4. Verify SIT (2T2A) at desired Verified SIT (2T2A) pressure N/A SAT UNSAT (Proc pressure. between 615 and 620 psig.

step

5) Observed SIT (2T2A) pressure on any of the following:

2PIS-5012 (2C17) 2PI-5013 (2C17) 2PIS-5011 (2C16)

OR:

Observed SIT (2T2A) pressure on PMS or SPDS computer points/trend for 2T2A pressure.

JPM- ANO-2-JPM-NRC-SIT05 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

5. Close SIT N2 Supply valves On panel 2C33, placed hand N/A SAT UNSAT (Proc (2SV-5005A/B). switch 2SV-5005 for step 2SV-5005A/B to CLOSE.

5)

Observed green light OFF; red light ON above handswitch.

Reports that valve hand switch will not close the valve and SIT pressure is continuing to increase.

EXAMINER'S NOTE:

SIT high and high-high pressure alarms may come in. These will not influence the passing of the following step. If the operator does not isolate N2 from 2C16 and pressurizes the SIT to 700psig, the following step should be considered UNSAT.

(C) 6. Close Supply Header to On panel 2C16, placed N/A SAT UNSAT (Proc Containment Isolation valve handswitch for 2CV-6207-2 to step (2CV-6207-2). CLOSE.

7)

Observed green light ON above handswitch.

Isolated N2 from 2C16 with SIT pressure less than 700psig,

7. Isolate the nitrogen supply. Using the gaitronics, plant N/A SAT UNSAT (Proc telephone system, or radio; step Examiners Cue: contacted Unit-1 OR contacted
8) Unit-1 (or Unit-2 operator) Unit-2 operator.

reports high pressure N2 is isolated. Requested isolation of high pressure N2.

END STOP TIME:

JPM- ANO-2-JPM-NRC-SIT05 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.

INITIATING CUE:

The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."

JPM- ANO-2-JPM-NRC-SIT05 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Safety Injection Tank (2T2A) level is between 80.1% and 87.9%. Pressure is approximately 606 psig.

INITIATING CUE:

The SM/CRS directs, "RAISE Safety Injection Tank (2T2A) pressure to 615 psig using OP 2104.001 Section 11.0."

JPM- ANO-2-JPM-NRC-EOP03 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Emergency Operating Procedures TASK: Verify Natural Circulation Conditions exist (ALTERNATE SUCCESS PATH)

JTA#:

KA VALUE RO: 4.3 SRO: 4.5 KA

REFERENCE:

002 A4.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): EOP 2202.006 Rev. 006-01-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-EOP03 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.

TASK STANDARD: Take required actions to restore Natural Circulation conditions per Loss of Feedwater procedure. THIS IS AN ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS: EOP 2202.006 Step 26.

SIMULATOR SETUP: Loss of feedwater in progress. SDBCS is in auto (setpoint ~ 1000 psia).

Ensure that actions completed in EOP 2202.006 up to step 26 have been completed. RCS Tc < 500°F.

Ensure MTS on SPDS is less than 30°. All other steps in 26 are satisfied. PZR level ~ 40%.

All Backup Heater hand switches are in OFF. Both banks of proportional heaters have NOT been reset from PZR level heater cutout. Ensure SG levels are greater than 25% and levels are slowly restoring.

JPM- ANO-2-JPM-NRC-EOP03 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.

CRITICAL ELEMENTS (C): 3, 5 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify Loop T is Less than Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc 50°F. PDS or 2C04 indications, step determine Loop T to be less
26) than 50°F.
2. Verify RCS loop TH and TC Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc constant or lowering. PDS or 2C04 indications, step determine that RCS loop TH and
26) TC are constant.

(C) 3. Verify RCS MTS 30°F or Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc greater. PDS or 2C04 indications, step determine that RCS MTS is less

26) than 30°F.
4. Contingency column step 26.A, Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc verify SG levels being PDS or 2C04 indications, step maintained 10% to 90%. determine that Steam Generator
26) levels are above 10% and less than 90%.

If examinee asks for direction, then provide the following cue:

EXAMINERs CUE: CRS asks why are we not meeting the >30°F MTS requirement?

(C) 5. Contingency column step 26.B, Refer to Attachment 1, P-T Limits N/A SAT UNSAT (Proc verify RCS pressure within limits and verify that MTS is less than step of Attachment 1, P-T Limits. 30°F.

26.B)

Examiners note: Critical Take PZR Backup heaters out of element is that examinee OFF. Verify that red light ON recognizes that PZR pressure above hand switch(es).

is LOW due to all heaters de- Take Proportional heaters hand energized and this is causing switches to ON. Verify that Red MTS problems. The number light is ON above associated of heaters re-energized is hand switch.

discretionary. Verify P-T limits of Attachment 1 Candidate may consider a are restored.

plant cooldown after raising PZR pressure.

JPM- ANO-2-JPM-NRC-EOP03 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

6. Verify T between TH and Using SPDS SFD Screen, PMS, N/A SAT UNSAT (Proc CETs less than 10°F. PDS or 2C04 indications, step determine that T between TH
26) and CETs is less than 10°F.

END STOP TIME:

JPM- ANO-2-JPM-NRC-EOP03 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.

INITIATING CUE:

The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.

JPM- ANO-2-JPM-NRC-EOP03 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

A Loss of Feedwater is in progress. EOP 2202.006 has been entered and steps through step 25 have been completed. Feed to SGs has been established via B EFW.

INITIATING CUE:

The SM/CRS directs, "Verify Natural Circulation Conditions are met using EOP 2202.006, Loss of Feedwater Step 26.

ANO-2-JPM-NRC-ELECXT PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A. C. Electrical Distribution TASK: Perform Synchronized Cross Connect of 480 VAC load-centers 2B1 and 2B2 JTA#: ANO2-RO-480VAC-NORM-15 KA VALUE RO: 3.3 SRO: 3.1 KA

REFERENCE:

062 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2107.001 Revision 049-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-ELECXT PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.

TASK STANDARD:

Cross connect 480VAC non-vital busses 2B1 and 2B2 with 2B1 supplying and 2B2 supply breakers open. Maintain 2B1 amperage less than 130 amps.

TASK PERFORMANCE AIDS:

OP 2107.001 Section 12.0.

SIMULATOR SETUP:

Any power level or mode.

All Non-Vital 4160VAC and 480VAC Busses energized.

Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).

ANO-2-JPM-NRC-ELECXT PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."

CRITICAL ELEMENTS (C): 2, 3, 4, 6, 7 PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiners note:

If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.

1. Check that Operations Manager Ask if Operations Manager has N/A SAT UNSAT (Proc approval obtained. given approval to cross connect step 2B1 and 2B2 at power.
1) EXAMINERS CUE:

The Operations Manager has given permission to perform Cross Connect of 2B1 and 2B2.

Examiners note:

The following two steps may be completed after cross-connecting the busses. The resolution on the meters is low at the low end.

(C) 2. Determine combined load of On Panel 2C10, summed the N/A SAT UNSAT (Proc 2B1 an 2B2. current reading of 2B1 and 2B2.

step

2) Observed that the summed load is greater than 130 amps.

(C) 3. Reduce loads on 2B1 and 2B2 Direct the AO or inform CRS of N/A SAT UNSAT (Proc so that combined loading is less need to reduce non-essential step than 130 amps when cross loads on 2B1 and 2B2 so that

2) connected. combined loading is less than EXAMINERS CUE: 130 amps.

AO has been directed to secure non-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than 130 amps.

EXAMINERS NOTE:

Direct operator in simulator instructors station to reduce loading on 2B1 and 2B2 so that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1 and 480CURR2B2).

ANO-2-JPM-NRC-ELECXT PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Synchroscope switch inserted in On Panel 2C10, Placed N/A SAT UNSAT (Proc 2B1/2B2 cross-tie slot and Synchroscope switch into step placed in ON. 2B1/2B2 cross-tie slot and

4) rotated clockwise to the ON position.
5. Observed that the On Panel 2C10, Observed that N/A SAT UNSAT (Proc Synchroscope is at the 12 the Synchroscope is at the 12 step oclock position. oclock position with the
5) Synchroscope switch in the ON position.

(C) 6. Close the 2B1/2B2 Cross Tie On panel 2C10, rotate the Cross N/A SAT UNSAT (Proc breaker. Tie handswitch for 2B1/2B2 step clockwise.

6)

Observed that the Green light turns OFF and the Red light turns ON above the Cross Tie handswitch.

(C) 7. Open normal supply breaker on On Panel 2C10, rotate the N/A SAT UNSAT (Proc 2B2, 480VAC bus. normal feeder supply breaker on step 2B2 counter clockwise to the

7) AND open position. (2B212)

Open Transformer feeder Observed that the RED light went breaker from 2A2 to 2B2. OFF and the GREEN light went ON.

On Panel 2C10, rotate the transformer feeder breaker on 2A2 to 2B2 counter clockwise to the open position. (2A202)

Observed that the RED light went OFF and the GREEN light went ON.

8. Verify that the amperage On panel 2C10, observe that the N/A SAT UNSAT (Proc indicated on 2B1 is less than current is less than 130 amps on step 130 amps. 2B1.

8)

9. Turn sync switch to OFF. On Panel 2C10, turn sync switch N/A SAT UNSAT (Proc counter clockwise to the OFF step position.

9)

Examiners Note Step 12.10 in procedure is not applicable for this JPM as both busses remained energized and the loads removed to reduce amperage on 2B1 will remain deenergized.

ANO-2-JPM-NRC-ELECXT PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

10. Notified AO to monitor 2B1 Notify AO to monitor 2B1 N/A SAT UNSAT (Proc transformer during cross transformer during cross step connected operation and connected operation and
11) maintain temperature less than maintain temperature less than 220°C. 220°C.

EXAMINERS CUE:

AO has been notified to monitor 2B1 transformer and notify the control room if temperature exceeds 220°C during cross connected operations.

END

ANO-2-JPM-NRC-ELECXT PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.

INITIATING CUE:

The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."

ANO-2-JPM-NRC-ELECXT PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized. Maintenance must be performed on 2B2 transformer. Plant is in mode 5.

INITIATING CUE:

The SM/CRS directs, "Cross Connect 2B1 and 2B2 and separate 2B2 from 2A2 using OP 2107.001 section 12.0."

ANO-2-JPM-NRC-BMSRM PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Process Radiation Monitoring System TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#: ANO2WCOLRWBMSNORM21 KA VALUE RO: 3.6 SRO: 3.6 KA

REFERENCE:

068 A3.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2104.014 Rev 034-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-BMSRM PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.

TASK STANDARD:

Functional Test has been completed on 2RITS-2330.

TASK PERFORMANCE AIDS:

2104.014 Supplement 1 EXAMINER'S NOTE:

JPM-ANO-2-JPM-NRC-EOP02 Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Restore SDC Flow following an instrument failure - inadvertent Auto-Closure Initiation (ACI)

JTA#: ANO2-RO-EOPAOP-OFFNORM KA VALUE RO: 3.0 SRO: 3.1 KA

REFERENCE:

016 A2.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.029 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-NRC-EOP02 Page 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

AOP 2203.029 has been entered due to 2PI-4623-2 failing High. SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, has been completed up to contingency step 13.C.

TASK STANDARD: Shutdown Cooling Flow has been restored per Loss of SDC AOP, 2203.029.

TASK PERFORMANCE AIDS: Loss of SDC AOP, 2203.029 SIMULATOR SETUP:

Mode 5, SDC aligned for the A LPSI Pump through the A SDC Heat Exchanger.

2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV-5086-2 is CLOSED.

ACI actuation is clear due to de-energizing 2PS-4623-2 by fuse removal.

JPM-ANO-2-JPM-NRC-EOP02 Page 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."

CRITICAL ELEMENTS (C): 2, 6, 9,10 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify SDC RCS isolation On panels 2C16 and 2C17, N/A SAT UNSAT (Proc valves open. checked indications for:

step - 2CV-5038-1 7.13.C) - 2CV-5084-1

- 2CV-5086-2 Observed 2CV-5086-2 closed by green light ON, red light OFF above hand switch.

(C) 2. Determine that 2CV-5086-2 is On panel 2C16, placed hand N/A SAT UNSAT (Proc shut due to the Auto-Closure switch for 2CV-5086-2 to step Initiation (ACI) and Open 2CV- "OPEN".

7.13.C) 5086-2.

Observed red light ON; green light OFF above hand switch.

3. Verify RAS has not actuated. On panel 2C03, verified Alarms N/A SAT UNSAT (Proc cleared on Annunciator panels step 2K04 and 2K07 or verified red 7.14) lights ON at 2C03 above the RAS placard.
4. Verify RCS indicators Requests that CRS verify OP N/A SAT UNSAT (Proc functioning properly using 2103.011 Attachment M is step OP 2103.011. complete.

7.15)

EXAMINERs CUE: CRS reports that OP 2103.011 attachment M, RCS level transmitter and tygon tube alignment has been completed and all RCS level indicators are functioning properly.

JPM-ANO-2-JPM-NRC-EOP02 Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

5. Check SDC pump running. On 2C17, determined That no N/A SAT UNSAT (Proc SDC pumps are running.

step 7.16)

Observed 2C-16 and 2C-17 that 2P-60 A & B were secured.

Observed green light ON; red light OFF above hand switches.

(C) 6. Close ALL LPSI Injection On 2C16 & 17, placed hand N/A SAT UNSAT (Proc MOVs. switches for Safety Injection step MOVs to CLOSE".

7.16.A) 2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red light OFF above Hand switch for all valves.

7. Partially open ONE LPSI On 2C-16 or 17, held 1 LPSI N/A SAT UNSAT (Proc Injection. Injection MOV hand switch in step the open direction for about 2 7.16.B) seconds.

2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green and red light ON above associated hand switch.

8. Verify RCS level of 40% in Referred to Attachment A N/A SAT UNSAT (Proc PZR is adequate; refer to and verified RCS Level step Attachment A, RCS Level. adequate for SDC, shutdown 7.16.C) (Verifies that PZR level is well cooling (Low Pressure Safety above the required level of 24 Injection), Pump restart.

inches above the bottom of the hot leg (40% PZR is ~

286 above the bottom of the hot leg.)

JPM-ANO-2-JPM-NRC-EOP02 Page 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

NOTE:

If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C-16 & 17 back to 2C-04 multiple times to control flow. 2CV-5091 should be monitored to ensure that it has control of flow when placed in automatic.

(C) 9. Start SDC pump, refer to On 2C17 placed hand switch N/A SAT UNSAT (Proc 2104.004, Shutdown for 2P-60A to "START".

step Cooling System.

7.16.D) Observed red light ON; green light OFF above hand switch.

(C) 10. Raise SDC flow to greater On 2C-16 & 17 placed hand- N/A SAT UNSAT (Proc than 2400 gpm by opening switches for Safety Injection step LPSI Injection MOVs. MOVs to OPEN) as necessary 7.16.E) to achieve > 2400 gpm flow.

2FIC-5091 indicates > 2400 gpm.

Examiners note/CUE: Inform candidate that the CRS and CBOR will control RCS cool down.

END STOP TIME:

JPM-ANO-2-JPM-NRC-EOP02 Page 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to contingency step 13.C.

INITIATING CUE:

The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."

JPM-ANO-2-JPM-NRC-EOP02 Page 7 of 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Loss of Shutdown Cooling AOP, 2203.029, has been entered due to 2PS-4623-2 failing High. The resulting ACI caused 2CV-5086-2 to close. The A SDC pump was secured and AOP completed up to contingency step 13.C.

INITIATING CUE:

The SM/CRS directs, "The fuse has been removed for failed RCS pressure instrument 2PI-4623-2; Restore Shutdown Cooling Flow using AOP 2203.029 beginning with contingency step 13.C."

ANO-2-JPM-NRC-BMSRM PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Process Radiation Monitoring System TASK: Perform BMS Liquid Discharge Radiation Monitor Functional Check JTA#: ANO2WCOLRWBMSNORM21 KA VALUE RO: 3.6 SRO: 3.6 KA

REFERENCE:

068 A3.02 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 2104.014 Rev 034-00-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-BMSRM PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

2T21A Liquid Radwaste Release Permit, 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112. Use 2CV2330A to perform release.

TASK STANDARD:

Functional Test has been completed on 2RITS-2330.

TASK PERFORMANCE AIDS:

2104.014 Supplement 1 EXAMINER'S NOTE:

ANO-2-JPM-NRC-BMSRM PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."

CRITICAL ELEMENTS (C): 4, 6, 11, 12 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Direct WCO to verify 2P-53A/B Directed the WCO to verify N/A SAT UNSAT (Proc Discharge to Circ Water Flume 2LRW-13 is closed.

step (2LRW-13) is closed.

7.1)

EXAMINERs CUE:

WCO reports 2LRW-13 is closed.

2. Direct WCO to verify 2P47A/B Directed the WCO to verify N/A SAT UNSAT (Proc Discharge to Circ Water Flume 2BM-35 is closed.

step (2BM-35) is closed.

7.1)

EXAMINERs CUE:

WCO reports 2BM-35 is closed.

3. Direct WCO to verify 2F11/11A Directed the WCO to verify N/A SAT UNSAT (Proc Disch to CW Flume (2LRW-24) 2LRW-24 is closed.

step is closed.

7.1)

EXAMINERs CUE:

WCO reports 2LRW-24 is closed.

(C) 4. Hold 2RITS-2330 Selector On panel 2C25, held 2RITS-2330 N/A SAT UNSAT (Proc Switch in CHECK SOURCE. Selector Switch in CHECK step SOURCE.

7.2.1) EXAMINERs CUE:

Switch in CHECK SOURCE.

5. Verify 2RITS-2330 meter On panel 2C25, verified N/A SAT UNSAT (Proc moves up scale. 2RITS-2330 indication moved up step scale.

7.2.1) EXAMINERs CUE:

Meter moved up scale.

(C) 6. Return 2RITS-2330 Selector On panel 2C25, placed N/A SAT UNSAT (Proc Switch to OPERATE. 2RITS-2330 Selector Switch to step OPERATE.

7.2.3) EXAMINERs CUE:

Switch to OPERATE.

ANO-2-JPM-NRC-BMSRM PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

7. (Proc Verify 2RITS-2330 meter On panel 2C25, verified N/A SAT UNSAT step reading returns to normal. 2RITS-2330 meter reading 7.2.4) returned to original level.

EXAMINERs CUE:

Meter returns to normal.

8. Direct WCO to open NA step Procedure step 7.3.1 N/A SAT UNSAT LRW/BMS Discharge to Circ Water Flume valve (Proc 2CV-2330A.

step 7.3.2.A) EXAMINERs CUE: Direct WCO to verify 2HS-2331 in WCO reports that 2HS-2331 position 1. Initial step 7.3.2.A.

is in position 1.

WCO reports that 2HS-2330 Direct WCO to verify 2HS-2330 in (Proc position 1. Initial step 7.3.2.B.

is in position 1.

step 7.3.2.B) NA step 7.3.2.C and 7.3.2.D.

9. (Proc Record setpoint value from Request alarm setpoint from N/A SAT UNSAT step prerelease report prerelease report and record in 7.4.1) EXAMINERs CUE: step 7.4.1.

2RE2330 alarm setpoint from Prerelease Report is "3E3".

10. Determine dial setting to be From Radiation Monitor Alarm N/A SAT UNSAT (Proc used from Radiation Monitor Setpoint Table determined that step Alarm Setpoint Table using Prerelease Report setpoint of 3E3 7.4.2) setpoint from Prerelease equals dial setpoint of 4.78.

Report.

(C) 11. Release 2RE-2330 On panel 2C25, released 2RE- N/A SAT UNSAT (Proc potentiometer stop AND 2330 potentiometer stop AND step adjust dial to setting of 4.78. adjusted dial setting of 4.78. Locks 7.4.3) potentiometer stop.

EXAMINERs CUE:

Potentiometer dial setting is set at 4.78. Potentiometer is locked.

(C) 12. Place 2RE-2330 Selector On panel 2C25, placed 2RE-2330 N/A SAT UNSAT (Proc Switch in PULSE CAL. Selector Switch in PULSE CAL.

step 7.4.4) EXAMINERs CUE:

Switch in PULSE CAL and meter deflection is above alarm setpoint.

ANO-2-JPM-NRC-BMSRM PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

13. Direct WCO to verify Directed WCO to verify N/A SAT UNSAT annunciator 2K14 B1 is annunciator 2K14-B1, Liquid (Proc actuated on Panel 2C112. Radwaste Discharge Radiation step This is located on the 335 Hi, is actuated on 2C112.

7.4.5) elevation of the auxiliary building.

EXAMINERs CUE:

2K14-B1, Liquid Radwaste Discharge Radiation Hi is in alarm.

14. Verify annunciator 2K11-J9 On panel 2C14, verified 2K11-J9 N/A SAT UNSAT BORON MGMT SYS is actuated on Panel 2C14.

(Proc TROUBLE" is actuated on step Panel 2C14.

7.4.5) EXAMINERs CUE:

2K11-J9, BORON MGMT SYS TROUBLE", is in alarm.

15. Verify annunciator 2K11-C10 On panel 2C14, verified 2K11-C10 N/A SAT UNSAT "PROC LIQUID RADIATION is actuated on Panel 2C14.

(Proc HI/LO" is actuated on Panel step 2C14.

7.4.5)

EXAMINERs CUE:

2K11-C10, "PROC LIQUID RADIATION HI/LO" is in alarm.

16. Direct WCO to verify Directed WCO to verify N/A SAT UNSAT LRW/BMS Discharge to Circ 2CV-2330A is closed.

(Proc Water Flume (2CV-2330A) is step closed.

7.4.5)

EXAMINERs CUE:

WCO reports 2CV-2330A is closed.

17. Reset 2RE-2330 and place in On panel 2C25, placed the N/A SAT UNSAT (Proc OPERATE. Operation Selector switch to step RESET.

7.5)

EXAMINERs CUE: Placed the Operation Selector Switch in OPERATE. switch to OPERATE.

18. Verify valve(s) tested have Directed WCO to verify 2CV-(Proc reopened. 2330A open.

step EXAMINERs CUE:

7.5) WCO reports 2CV-2330A is open.

ANO-2-JPM-NRC-BMSRM PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

19. Check associated alarms On panel 2C14, verified 2K11-C10 N/A SAT UNSAT (Proc clear. and 2K11-J9 are in "slow flash" step OR NOT illuminated.

7.5) EXAMINERs CUE: Directed WCO to verify 2K11-C10, 2K11-J9 and annunciator 2K14-B1 on 2C112 is 2K14-B1 are in "slow flash". in "slow flash" OR NOT illuminated.

END STOP TIME:

ANO-2-JPM-NRC-BMSRM PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112.

INITIATING CUE:

The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."

ANO-2-JPM-NRC-BMSRM PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

2T21A Liquid Radwaste Release Permit, OP 2104.014 Supplement 1, is completed through step 7.0. A Waste Control Operator (WCO) is available at 2C112.

INITIATING CUE:

The SM/CRS directs, "Perform the functional test of the BMS Liquid Discharge Radiation Monitor beginning with 2104.014 Supplement 1, Step 7.1 and use 2CV 2330A only."

JPM-ANO-2-JPM-NRC-EFWRS PAGE 1 of 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 014 DATE:

SYSTEM/DUTY AREA: Emergency Feedwater System TASK: Reset the EFW pump trip throttle valve JTA#: ANO2AOEFWEMERG1 KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

061 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 14 Minutes REFERENCE(S): OP 2106.006 Rev 055-04-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

JPM-ANO-2-JPM-NRC-EFWRS PAGE 2 of 6 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

1. EFW pump (2P7A) started automatically following a reactor trip.
2. During the speed ramp the Turbine for 2P-7A tripped on overspeed.

TASK STANDARD: The trip throttle valve for EFW pump(2P7A) has been reset and is open.

TASK PERFORMANCE AIDS: OP 2106.006 Exhibit 1 and Exhibit 2

JPM-ANO-2-JPM-NRC-EFWRS PAGE 3 of 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.

CRITICAL ELEMENTS (C): 2, 3, 4, 6 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify 2CV0340-2 and 2CV-205- Called the control room to verify N/A SAT UNSAT (Proc 2 are closed. that 2CV0340-2 and 2CV-205-2 step are closed.

1)

EXAMINERS CUE:

Control room reports that 2CV034-2 and 2CV205-2 are CLOSED.

(C) 2. Position the latch lever to Turned the trip throttle valve N/A SAT UNSAT (Proc engage the trip hook. handwheel clockwise so that the step rotation of the screw raised the

2) sliding nut and latch lever to EXAMINERS CUE: where it could engage with the trip hook.

Latch lever positioned to engage with the trip hook.

Observed latch lever positioned to engage with the trip hook.

EXAMINERs NOTE: This linkage and the indications for steps 2, 3, and 4 are underneath a walkway. Have the examinee point to the lever and tappet then discuss actions using Exhibit 2 located on the wall in the A emergency feed-water pump room.

(C) 3. Reset the mechanical trip Locally manually, pulled the N/A SAT UNSAT (Proc linkage manually. spring loaded emergency step connecting rod against the spring EXAMINERS CUE:

3) force.

Mechanical trip linkage is in TRIP RESET.

Moved the emergency head lever away from the emergency tappet and tappet nut to allow tappet to move downward to TRIP RESET.

JPM-ANO-2-JPM-NRC-EFWRS PAGE 4 of 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Verify emergency tappet is in Verified the tappet is in TRIP N/A SAT UNSAT (Proc TRIP RESET. RESET.

step OR 3/4)

EXAMINERS CUE: Pressed downward on the emergency tappet to place it in The tappet is in TRIP RESET.

TRIP RESET and; EXAMINERs Note:

Submitted a Condition Report The emergency tappet is located on the turbine not the trip throttle valve. Failure to ensure this is in the TRIP RESET position might defeat the O/S trip device.

5. Verify tappet nut/emergency Verified the flat side of the tappet N/A SAT UNSAT (Proc head lever positioning. nut is to the flat side of the step emergency head lever.

5)

EXAMINERS CUE:

The flat side of the tappet nut is to the flat side of the emergency head lever.

(C) 6. Open the trip throttle valve. With latch and trip hook engaged, N/A SAT UNSAT (Proc turned trip throttle valve step handwheel CCW until valve was

6) EXAMINERS CUE: full open.

The trip throttle valve is fully open.

Observed stem at full travel.

7. Close trip throttle valve 1/4 turn. Turned the trip throttle valve N/A SAT UNSAT (Proc handwheel Counter clockwise 1/4 step turn.
7) EXAMINERS CUE:

The trip throttle valve is closed 1/4 turn.

8. Verify 2P7A turbine overspeed Contacted the control room to N/A SAT UNSAT (Proc trip (2K05-A9) alarm is clear determine 2K05-A9 alarm status.

step 8)

EXAMINERS CUE:

The control room reports 2K05-A9 is clear.

END STOP TIME:

JPM-ANO-2-JPM-NRC-EFWRS PAGE 5 of 6 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS:

INITIATING CUE:

The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.

JPM-ANO-2-JPM-NRC-EFWRS PAGE 6 of 6 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS:

INITIATING CUE:

The SM/CRS directs, Reset the EFW pump (2P7A) overspeed trip device using OP 2106.006, Exhibit 1.

JPM-ANO-2-JPM-NRC-IA01 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:

SYSTEM/DUTY AREA: Emergency & Abnormal Operations TASK: Isolate the instrument air supply to the MSIVs (locally)

JTA#: ANO2-A0-EP-PAOP-OFFNORM-127 KA VALUE RO: 3.1 SRO: 4.3 KA

REFERENCE:

067 AA2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2203.049, Rev. 001-01-0 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

JPM-ANO-2-JPM-NRC-IA01 PAGE 2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U).

Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.

TASK STANDARD: Main Turbine Generator has been locally tripped and Instrument air has been isolated and air bled off the MSIVs.

TASK PERFORMANCE AIDS:

1) OP 2203.049 EOP actions for Corridor Behind Door 340 (Zone 2109-U) pages 1-3 (page 31 of 91).
2) Flashlight and gloves
3) RWP and dosimeter.

JPM-ANO-2-JPM-NRC-IA01 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.

CRITICAL ELEMENTS (C): 4, 5, 7, 8 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Obtain equipment from alternate N/A SAT UNSAT (Proc shutdown locker in the entry to the step unit 2 control room.

1/2)

EXAMINERS CUE:

At the remote shutdown locker, Simulate obtaining the CRS bag, obtain Red CRS bag, Flashlight, and flashlight and radio with headset.

radio with Headset.

Radio check is satisfactory Perform radio check EXAMINERs NOTE: Access to platform in MSIV room requires an RWP. To save time, the examinee should be prompted to obtain dosimeter and log onto the RWP and task for outside controlled access before starting JPM. Also a flashlight will be needed.

2. Locally trip the Main Turbine At the north end of the Main Turbine N/A SAT UNSAT (Proc at the front standard, located the red step handle and simulates pulling the 3.A ) EXAMINERS CUE: handle.

Main Turbine is tripped.

EXAMINERS NOTE:

All valves are located in the MSIV room on the first platform above 2T-91.

Leather Gloves will be needed for climbing ladder to platform.

Care should be taken around the MSIVs to prevent bumping into valves.

3. Close the IA supply from 2T91 At the A MSIV actuator, closed N/A SAT UNSAT (Proc 2F-356 I/N valve (2MS-540) 2MS-540 by rotating hand wheel step CLOCKWISE.

3.B.1)

EXAMINERS CUE:

2MS-540 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed

JPM-ANO-2-JPM-NRC-IA01 PAGE 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Close IA supply IA to Just south of the A MSIV actuator, N/A SAT UNSAT (Proc 2CV-1010-1 valve (2IA-166) closed 2IA-166 by rotating its hand step wheel CLOCKWISE.

3.B.2)

EXAMINERS CUE:

2IA-166 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed (C) 5. Open filter vent valve on A At the A MSIV actuator, opened N/A SAT UNSAT (Proc MSIV point of use air filter 2F-356 vent valve by turning the step (2F-356). petcock valve until air escapes.

3.B.3)

EXAMINERS CUE: Observed valve motion stopped when Air bleeds off the actuator valve fully open.

system and dies away. The A MSIV is slowly closing.

6. Close IA supply from 2T91 At the B MSIV actuator, closed N/A SAT UNSAT (Proc 2F-357 I/N valve, (2MS-539) 2MS-539 by rotating hand wheel step CLOCKWISE.

3.C.1)

EXAMINERS CUE:

2MS-539 valve CLOCKWISE Observed valve motion stopped when motion stops. valve fully closed.

(C) 7. Close IA supply 2CV-1060-2 Just south of the A MSIV actuator, N/A SAT UNSAT (Proc AIR ISOL valve, (2IA-93) closed 2IA-93 by rotating its step handwheel CLOCKWISE.

3.C.2)

EXAMINERS CUE:

2IA-93 valve CLOCKWISE mot Observed valve motion stopped when ion stops. valve fully closed.

(C) 8. Open filter vent on MSIV IA At the B MSIV actuator, opened N/A SAT UNSAT (Proc FILTER 2CV-1060-2 AIR 2F-357 vent valve by turning the step CONTROL VLV valve (2F-357) petcock valve until air escapes.

3.C.3)

(Valve on B MSIV point of use .

air filter (2F-357))

Observed valve motion stopped when EXAMINERS CUE: valve fully open Air bleeds off the actuator system and dies away. The B MSIV is slowly closing.

Examiners Note: The next step is to locally secure the main feed pumps located in the basement of the turbine building. Stop the JPM before transitioning to this area.

Examiners Cue: Another operator will trip the Main Feed Pumps.

JPM-ANO-2-JPM-NRC-IA01 PAGE 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

END STOP TIME: ___________________

JPM-ANO-2-JPM-NRC-IA01 PAGE 6 of 7 JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL CONDITIONS:

A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.

INITIATING CUE:

The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.

JPM-ANO-2-JPM-NRC-IA01 PAGE 7 of 7 JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL CONDITIONS:

A severe fire has occurred in the Corridor Behind Door 340 (Zone 2109-U). Control room supervisor has entered AOP 2203.049, Fires in Areas Affecting Safe Shutdown.

INITIATING CUE:

The SM/CRS directs, Perform AOP 2203.049, Fires in Areas Affecting Safe Shutdown, EOP ACTIONS section for severe fire in area Corridor Behind Door 340 (Zone 2109-U) to trip the main turbine generator locally and close the MSIVs locally.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 1 of 8 SYSTEM/DUTY AREA: Emergency Diesel Generator System TASK: Start an emergency diesel generator without DC control power (2K-4B)

JTA # : ANO2-AO-EDG-OFFNORM-5 KA VALUE RO: 4.1 SRO: 4.5 KA

REFERENCE:

055 EA1.06 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:

TESTING METHOD: SIMULATE: X PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 16 minutes REFERENCE(S) OP 2104.036, Exhibit 2, 2107.001, Exhibit 9 EXAMINEES NAME: SSN:

EVALUATORS NAME: DATE THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time: Stop Time: Total Time:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 2 of 8 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. The plant is in Mode 3 following an automatic reactor trip
2. A Station Blackout exists
3. There is no green DC power available.
4. Fuses from alternate shutdown locker are simulated obtained.

TASK STANDARD:

2DG2 [2K-4B] has been started with normal voltage and frequency TASK PERFORMANCE AIDS:

1. OP 2104.036 Exhibit 2

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 3 of 8 INITIATING CUE: The CRS provides the following direction:

1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2
2. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion.

However, use extreme caution when operating any energized electrical components.

CRITICAL ELEMENTS (C): 4, 5, 6, 8 START TIME:

EXAMINERS NOTE:

Provide examinee with OP2104.036, Exhibit 2.

Have a copy of 2107.001, Exhibit 9, Electrical Safety Requirements available for examinees review if requested. If examinee states that they will adhere to the electrical safety requirements for steps 1, 2 & 3, have them show what requirements they will be ensuring are satisfied then, tell them that the requirements have been satisfied and that they should continue with the JPM.

Due to electrical safety concerns, do not allow the examinee to open the door to 2D24. Have them explain what they would do.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Open one of the following sets For the listed breaker, opened N/A SAT UNSAT (Proc of breakers: panel door and moved breaker step handle to OFF.
1) - 2C108 breaker (2D24-2)

- 2E21 breaker (2D24-6)

- 2C108 breaker (2D24-8)

OR

- 2E21 breaker (D2E21NA6)

- 2C108 breaker (D2C108NA8)

- 2C108 breaker (D2C108NA2)

POSITIVE CUE:

(For each breaker)

Breaker indicates OPEN.

NEGATIVE CUE:

(For each breaker)

Breaker indicates NOT OPEN.

TRANSITION NOTE:

Go to 2A4 switchgear room.

EXAMINERS NOTE:

For the 4160v breakers in Steps 2 and 3, do NOT open the breaker cubicle doors.

For electrical safety purposes, provide candidate with picture at the end of this JPM, have the candidate explain the indications he would use to determine the following.

1. Breaker position
2. Closing Spring Status Standard:
1. The student must use mechanical breaker position indication
2. The student must use mechanical closing spring status indication.

Both of these indicators are located on the breaker.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 4 of 8 Examiners Note:

The following breakers are listed with their respective conditions for the plant conditions that exist. For breakers 2A-402 and 2A-409, provide examinee with picture at the end of this JPM and have them indicate what they would do to open the breakers.

2. Verify the following breakers At bus 2A4 at cubicle 2A411, N/A SAT UNSAT (Proc OPEN WITH closing springs opened cubicle door.

step charged.

2) Observed indications for the SW Pump 2P4C (2A-402) following.

Mechanical breaker position SW Pump 2P4B (2A-403) Mechanical closing spring indication 2DG2 Output breaker (2A-408)

Operator opened any closed NEGATIVE CUE: breaker by pushing the 2A-402 is closed with closing mechanical breaker trip button on springs charged the breaker POSITIVE CUE:

2A402 opens when the mechanical trip button is pushed.

3. Verify the following breakers For each listed breaker, verified N/A SAT UNSAT (Proc OPEN. the breaker to be open with the step mechanical breaker indication.
3) CS Pump 2P35B (2A-404)

Operator opened any closed LPSI Pump 2P60B (2A-405) breaker by pushing the mechanical breaker trip button on HPSI Pump 2P89B (2A-406) the breaker HPSI Pump 2P89C (2A-407) 2A4 Supply breaker (2A-409) 2A3-2A4 Tie (2A-410)

NEGATIVE CUE:

2A-409 indicates CLOSED POSITIVE CUE:

2A-409 opens when the mechanical trip button is pushed.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 5 of 8 (C) 4. Open 2DG2 Service Water Using radio or telephone N/A SAT UNSAT (Proc Outlet valve (2CV-1504-2). communications, instructed WCO step to OPEN 2CV-1504-2 locally using

4) POSITIVE CUE: manual operator.

WCO reports Service Water Valve (2CV-1504-2) is OPEN. OR Using radio or telephone communications, contacted Control Room personnel to have WCO to OPEN 2DG2 Service Water valve (2CV-1504-2) using the manual operator locally.

TRANSITION NOTE:

Go to 2DG2 room.

(C) 5. Place exciter regulator On panel 2E22, rotated Exciter N/A SAT UNSAT (Proc handswitch in LOCAL. Regulator handswitch to LOCAL.

step

5) POSITIVE CUE:

The exciter regulator handswitch indicates LOCAL.

(C) 6. Place Engine Control On panel 2E21, inserted key in N/A SAT UNSAT (Proc handswitch to START. Engine Control Switch.

step

6) POSITIVE CUE: Rotated key clockwise to unlock.

The Engine Control handswitch indicates START. Rotated Engine Control handswitch through LOCKOUT to START.

7. Obtain FNM 10 amp fuses from Obtained two fuses from the N/A SAT UNSAT (Proc Alternate Shutdown file cabinet. Alternate Shutdown file cabinet.

step 7.1) POSITIVE CUE:

Fuses are in your possession.

(C) 8. Open either Air Start Solenoid Rotated manual operator stem on N/A SAT UNSAT (Proc (2SV-2829-2 or 2SV-2830-2). either Air Start Solenoid clockwise.

step 7.2) POSITIVE CUE:

Engine noise indicates start.

NEGATIVE CUE:

Engine noise does NOT indicate start.

9. Close Air Start solenoid. Upon 2DG2 start, disengaged N/A SAT UNSAT (Proc manual solenoid operator by step rotating counter-clockwise.

7.3)

10. Verify generator 2DG2 voltage. On panel 2E21, verified 2DG2 N/A SAT UNSAT (Proc voltage between 3800 and 4400 step POSITIVE CUE: volts on V-2DG2-3, 2DG2 local AC 7.4) 2DG2 voltage is ~ 4160 volts. voltmeter.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 6 of 8

11. Verify generator 2DG2 On panel 2E21, verified 2DG2 N/A SAT UNSAT (Proc frequency. frequency between 59.5 and step 60.5 Hz and maintained as loads 7.7) POSITIVE CUE: are added.

2DG2 frequency is ~ 60 Hz.

END STOP TIME:

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 7 of 8 Examiners Copy JPM INITIAL TASK CONDITIONS

1. The plant is in Mode 3 following an automatic reactor trip.
2. A Station Blackout exists.
3. There is no green DC power available.
5. Fuses from alternate shutdown locker are simulated obtained.

INITIATING CUE: The CRS provides the following direction:

1. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2.
2. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use extreme caution when operating any energized electrical components.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-EDDCG REV 01 PAGE 8 of 8 Examinees Copy JPM INITIAL TASK CONDITIONS

4. The plant is in Mode 3 following an automatic reactor trip.
5. A Station Blackout exists.
6. There is no green DC power available.
6. Fuses from alternate shutdown locker are simulated obtained.

INITIATING CUE: The CRS provides the following direction:

3. Perform a loss of DC start of 2DG2 using OP 2104.036, Exhibit 2.
4. Due to the timeliness of the actions required, electrical safety requirements may be waived at your discretion. However, use extreme caution when operating any energized electrical components.

JOB PERFORMANCE MEASURE JPM# A2JPM-RO-EDDCG REV 03 PAGE 9 of 9 CLOSE MANUAL TRIP CHGD MANUAL CLOSE

Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 Op-Test No.: 2005-1 Page 1 Examiners: Operators:

Initial Conditions:

56% MOL, All Engineered Safety Features (ESF) systems in standby. Condenser outer water box is isolated for tube plugging. B circulating water pump is secured.

Green Train Maintenance Week.

Turnover:

56%. 250 EFPD. Condenser outer water box is isolated for tube plugging. Estimated time to complete repairs is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. B circulating water pump is secured. Equipment Out of Service Monitor (EOOS) indicates Minimal Risk. Green Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 NIBLINEPWR I (CBOT) Safety channel linear power channel B fails low.

CBOT must bypass points in Plant Protection System (PPS) channel.

2 CVC2P36AFAL C (CBOR) Running charging pump trips breaker. Abnormal Operating Procedures (AOP) entry start standby charging pump.

3 SGATUBE R(CBOR) A Steam Generator (SG) tube leak results in N(CBOT) power reduction to take unit off line.

4 SGATUBE M(ALL) A Steam Generator tube rupture results in reactor trip and Reactor Coolant System (RCS) cool down.

5 4162A406 C (CBOT) B High Pressure Safety Injection (HPSI) pump trips breaker on start.

6 2CV50151 C (CBOT) A HPSI train injection Motor Operated Valve (MOV) fails to open on actuation.

7 BUHTRS C(CBOR) Back up Heaters fail on due to relay failure and will not shut off when Pressurizer level drops less than set point.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 17

Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives

1) Evaluate individual response to a failure of an Excore nuclear instrument.
2) Evaluate individual response to a failure of a running charging pump.
3) Evaluate individual response to a small Pri-Sec leak.
4) Evaluate individual ability to perform a reduction in plant power.
5) Evaluate individual ability to mitigate a SGTR.
6) Evaluate individual ability to monitor operation of ESF equipment.
7) Evaluate individual response to a failure of the PZR heaters.

SCENARIO #1 NARRATIVE Simulator session begins with the plant at 56% power steady state. B circulating water pump is secured and the outer main condenser water boxes are tagged out.

When the crew has completed their control room walk down and brief, B Excore will fail low. This will result in a CPC sensor failure alarm and the NI linear and log power instruments on B channel failing to Zero. The CRS will enter the Nuclear Instrument Malfunction AOP, AOP 2203.026. The CRS will direct the CBOT to bypass points 1, 2, 3, and 4 on B PPS. TS 3.3.1.1 will be entered due to the excore failure.

About 10 minutes after the excore failure, the A CCP will trip its breaker. A CCP low flow alarm will alert the operator that the CCP has tripped. If another pump is not started quickly, letdown will be isolated due to high regenerative heat exchanger outlet temperature high (alarm).The CRS will enter the loss of charging AOP, OP 2203.036, Crew will verify that the breaker tripped; then start a backup CCP. The CBOR will assess the proper operation of the pump, PZR level and letdown flow.

10 minutes after the CCP trips, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. Crew will perform a plant shutdown.

When cued by the lead evaluator after the CBOR has completed the required reactivity manipulation, a 500 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR recognize that the SGTR is greater than CCP capacity. The CRS will direct the CBOR will manually trip the reactor.

Post trip, the PZR backup heaters will fail to de-energize when PZR level drops below 29%, the CBOR will manually secure the heaters.

Post SIAS, the B HPSI pump Breaker will trip (green train) and one of the red train HPSI injection MOVs will fail to open on actuation. The CBOT will manually start the swing HPSI pump and open the failed injection MOV. This is Tech Spec 3.0.3 entry.

Page 2 of 17

Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued)

The Crew will implement SPTAs and secure 2 RCPs when RCS pressure drops below 1400 psia. The CRS will diagnose a SGTR and enter EOP 2202.004, SGTR.

The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F.

Page 3 of 17

Appendix D Scenario 1 Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 56% power IC stead state.

Markup OP 2102.004, power operations up to step 9.22.

Ensure that AACG is secured and annunciators clear.

Ensure hotwell level is ~80%.

Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.

Swing ESF equipment aligned to the Green train.

A CCP lead charging pump.

2PCV0231, Gland sealing steam pressure control valve failed closed.

Place permissive hand switches for 2CV 303 and 2CV 0306 to OFF.

T1, T2, T3, T5 set to false.

T4 set to SIAS1.

T5 set to PZR Pressure < 2000 psia Event Malf. No. Value/ Event No. Ramp Description Time 1 NIBLINEPWR 0.0 Safety Channel B Excore Linear instrument fails Trigger = T1 LOW.

2 CVC2P36AFAL TRUE A Coolant Charging Pump trips on instantaneous Trigger = T2 Over Current due to motor fault.

3 SGATUBE 5.0 A SG primary-secondary leak.

Trigger = T3 4 SGATUBE 500 A Steam Generator Tube Rupture (500 gpm ramped CUED RAMP= over 10 Minutes).

10 MIN 5 4162A406 TRUE B HPSI pump trips breaker on start.

Trigger = T4 6 CV50151 TRUE Red train HPSI injection MOV fails to open on SIAS Trigger = T4 actuation.

7 RCSHTRON TRUE PZR Backup heaters fail to de-energize.

Trigger = T5 At T=0 Trigger T1 B excore instrument fails low Cue: Report that I & C planner will begin planning work on failed excore instrument.

Page 4 of 17

Appendix D Scenario 1 Form ES-D-1 At T= 10 Trigger T2 A CCP trips breaker.

minutes Cue: As WCO report that the A CCP breaker, 2B52-A5, is tripped and will not reset.

At T=20 Trigger T3 A Steam Generator 5 gpm tube leak.

minutes Cue: As Auxiliary Operator, report that standard attachment 19, control of secondary contamination is in progress.

Cue: When notified of requirement to sample SGs as Chemist, after 15 minutes report that the sample analysis is in progress and that when frisking sample A SG countrate was higher than B SG.

The CRS will direct the NLOs to and direct the chemists to sample the SGs for activity.

CUED by T3 Raise A SG tube leak to 500 gpm ramped over 10 minutes.

Lead This will result in a manual reactor trip.

Examiner SIAS T4 B high pressure safety injection,HPSI, pump trips its breaker on actuation start and one HPSI injection valve, 2CV5015-1 will fail to open but can be manually opened from 2C17.

PZR T5 All backup heaters fail ON and must be manually taken to OFF.

pressure

<2000psia Page 5 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Event

Description:

Channel B excore nuclear instrument will fail low. The CRS will enter the NI malfunction AOP, OP 2203.026.

Time Position Applicant's Actions or Behavior ALL Crew will diagnose that B Excore is the only channel that has failed.

CRS Enter AOP 2203.026, NI malfunction and perform the following actions:

Refer to TS 3.3.1.1 Direct the CBOT to bypass points 1,2,3 and 4 on B PPS Verify that Log channel is also affected Notify maintenance of problem with B Excore CBOT Will perform the following:

Obtain Key 12 from SM Notify control room of potential PPS security door and Bypass alarms Open 2C23 door and unlock panel door Push bypass buttons for points :

1 - Hi Linear Power 2 - Hi Log Power 3 - High LPD 4 - Low DNBR Verify that bypass lights illuminated on operator inserts on 2C03 CBOR Will perform the following:

PEER check that bypass lights for points 1,2,3 and 4 are illuminated on operator inserts on 2C03 Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on B Excore.

Termination criteria: When points 1,2,3 and 4 are bypassed on B PPS or at the discretion of the lead examiner.

Page 6 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Event

Description:

A CCP trip. The CCP low flow alarm will alert operators of this failure.

Letdown will isolate, if backup CCP not started in timely manner.

Time Position Applicant's Actions or Behavior CBOR Announce that A CCP has tripped its breaker (Red and Green lights out on 2C09)

CRS Enter loss of Charging AOP and perform the following actions:

Check for proper Charging suction and discharge flow path.

Check that A CCP has tripped breaker Direct Starting backup CCP Direct verification of proper operation of running CCP Check for indications of CCP header rupture using control room indications Direct WCO to locally vent A CCP TRM 3.1.2.4 Applicability Simulator Operator Cue: When contacted as WCO to vent A CCP wait a few minutes and report that no air bubbles only water came out vent.

CBOR Verify VCT outlet valve open Verity CCP header isolation valve open Manually start backup CCP by taking hand-switch to start Verify VCT level stable or going up CBOT Verify CCP header not ruptured:

/CBOR

  • Aux Building or CNTMT radiation level steady
  • Waste Tanks 2T20A/B level not rising
  • CNTMT Sump level not rising
  • Aux Building sump level not rising NOTE: Letdown may have isolated on high temperature. Letdown may be restored at this point.

Termination criteria: When backup CCP started or at discretion of lead examiner.

Page 7 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior CBOR Announce annunciators:

  • 2K11-J8 SG Tube Leak Detection Rate of Change Hi
  • 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following:

Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG Direct CBOR to perform a plant shutdown using normal boration method.

CBOT Close 2CV 1000-1, steam from A SG to A EFW pump.

Page 8 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown.

Simulator Operator Cue: When contacted as AO acknowledge requirement to begin working on Standard attachment 19.

CBOR Perform a plant shutdown Use reactivity plans to determine the amount of boron required.

Adjust turbine load to maintain Tave within 2°F of Tref.

Insert CEAs as directed by reactivity plan.

AOP requires a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> shutdown to Mode 3.

The CRS may determine a rapid plant shutdown of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to be in Mode 3 is more conservative and this decision is acceptable.

Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.

Page 9 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOR Report that PZR level is lowering Start all back up CCPs or report that they are running Isolate Letdown CRS Recognize SGTR has exceeded CCP capacity and the ability to maintain PZR level.

Direct the CBOR to manually trip the reactor CBOR Manually trip the reactor.

CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.

CBOR Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160v and 6900 v Non-Vital busses energized.

ALL 4160v and 480v vital AC bus energized.

All 125v vital DC bus energized.

Page 10 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOR Check inventory control:

PZR level 16 to 80%.

Trend from set point.

Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.

(SEE Event 7)

CBOR Check RCS pressure control:

RCS pressure 1800 to 2300 psia.

Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.

Place spray valve for secured RCPs in manual closed.

Verify SIAS when pressure less than 1650 psia.

CBOR Check core heat removal by forced circulation:

RCP s running Loop T less than 10° F.

RCS MTS 30° F or greater.

Service water pump suction aligned to Lake.

Component cooling water aligned to RCPs.

CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)

Check SIAS actuated.

Maintain SW pressure greater than 85 psig.

Page 11 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:

Report SG levels and main feed water is in RTO.

Report feed water line intact.

Report SG pressures (May take manual local (ML) control of SDBCS master controller (at CRS direction) and reduce set point to 950-1050 psia).

CBOR Check CNTMT parameters:

Temperature less than 140° F.

Pressure less than 16 psia.

Status of radiation alarms:

CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.

CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs and EALs.

Page 12 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose Steam Generator Tube Rupture CRS Implement Steam Generator Tube Rupture procedure and open place keeping page.

ALL Perform crew brief and review floating steps.

CRS Determine applicable floating steps:

  • Commence cool down to less than 535° F Thot.
  • HPSI Override Criteria.

CRS Direct the following actions:

Commence cool down to less than 535° F Thot.

Inform SM to contact Chemistry to sample both SG for activity.

Determine ruptured SG Perform post-SIAS actions:

Verify Safety Injection flow to RCS:

Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met:

  • PZR level greater than 29% and controlled.
  • RVLMS LVL 03 or higher elevation indicates WET.
  • At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.

Page 13 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior Critical CBOR RCS cool down to less than 535°F T-hot : (floating step)

Step CBOR Reset low SG set points.

Commence RCS depressurization to maintain RCS MTS 30 to 45° (When HPSI overridden)

Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)

Place ALL ADV Permissive switches in OFF.

Verify EFW feeding SGs.

Secure running MFW pump.

Close ALL MFW Block valves.

Record and plot cool down on Attachments 1 and 8.

CBOR Verify Safety Injection flow to RCS:

Check HPSI flow using Exhibit 2.

/CBOT Check LPSI flow using Exhibit 3.

Page 14 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

500 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes.

This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions:

SW pumps running on each loop.

EDG SW outlet valves open.

SW pump suction aligned to Lake.

Report all non-vital buses energized.

Verify SG sample valves open.

Critical CBOT Use Attachment 10 to isolate Ruptured SG Step CBOR OVERRIDE HPSI:

CBOT Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.

Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion.

Page 15 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5/6 Event

Description:

B HPSI pump trips on SIAS start. 2CV5015-1 fails to open on SIAS signal. This will make HPSI flow UNACCEPTABLE. C HPSI pump must be started or 2CV5015-1 must be opened.

Time Position Applicant's Actions or Behavior CBOT 2K05 E-3, B HPSI pump trip alarm announced.

Observes green light lit on pump and no discharge pressure.

CBOT Observes 2CV 5015-1 is closed, green light on, red light off, Z-tape reading 0.

CRS Directs starting C HPSI pump Directs opening 2CV 5015-1 Critical CBOT Starts C HPSI pump Step Verified proper discharge pressure and flow(depending on RCS pressure)

Critical And/or Part is Opens 2CV 5015-1 by taking hand switch to OPEN and to observing red light on green light off and Z-tape reading ~

either 100%

start 2P89C or open 2CV-5015-1 Termination criteria: When C HPSI pump started or 2CV5015-1 is opened or at discretion of lead examiner.

Page 16 of 17

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Event

Description:

Backup heaters fail to de-energize on PZR pressure control signal or PZR level less than 29%. Failure to turn backup heaters off will cause them to fail and potential for loss of PZR pressure control.

Time Position Applicant's Actions or Behavior CBOR Observes the red light ON on the backup heaters when PZR level is less than 29 %

Reports observation to CRS CRS Directs taking Backup heater hand switches to OFF CBOR Takes Backup Heater hand switches to OFF Observes green lights ON red lights OFF Termination criteria: When PZR heater hand switches are taken to OFF or at the discretion of the lead examiner.

Page 17 of 17

Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 Op-Test No.: 2005-1 Examiners: Operators:

Initial Conditions:

100% MOL, All ESF systems in standby. C HPSI pump tagged out for oil bubbler replacement. C HPSI is aligned to green train. Green train maintenance week.

Turnover:

100%. 250 EFPD. C HPSI pump tagged out for oil bubbler replacement. EOOS indicates Minimal Risk. Green train maintenance week.

Event Malf. No. Event Event No. Type* Description 1 XRCCHAPLVL I (CBOR) Control Channel A Pressurizer Level fails LOW.

2 XSG2PT10412 I (CBOT) Steam Generator safety channel pressure fails LOW.

3 FWPMPATRP R (CBOR) A Main Feed Pump (MFP) trips due to thrust N (CBOT) bearing wear and results in a power reduction to less than 90%.

4 FWAFT5A M (ALL) Feed water line break in containment after 2FW5A, feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A SG.

5 ESCSBPMP C (CBOT) Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.

6 ESFCSASFAIL C (CBOR) Fail CSAS channel 1 to actuate auto.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 16

Appendix D Scenario 2 Form ES-D-1 Scenario #2 Objectives

1) Evaluate individual response to a failure of Pressurizer level control channel failure.
2) Evaluate individual response to a failure of a Plant Protection System Steam Generator Level instrument failure.
3) Evaluate individual response to a Main Feed Pump Trip at 100% power.
4) Evaluate individual ability to perform a reduction in plant power.
5) Evaluate individual ability to mitigate an unisolatable Feed water break in containment.
6) Evaluate individual ability to monitor operation of Engineered Safety Features equipment.
7) Evaluate individual response to a failure of required Engineered Safety Features Actuation System actuation.

SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100% power steady state. C HPSI pump is tagged out to replace a pump oil bubbler.

When the crew has completed their control room walk down and brief, the in service Pressurizer (PZR) control channel level instrument will fail low. Alarms on control channel 1 level lo and level lo lo will come in. This will result in letdown going to minimum flow, the two backup CCPs will automatically start, all PZR heaters de-energizing and actual PZR level go up. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the letdown flow controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR low low level cutoff switch to the unaffected channel. When the auto and manual signals are matched, the CBOR will place the letdown flow controller to automatic About 10 minutes after PZR level control failure, A Steam Generator safety channel pressure instrument, 2PT1041-2, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel B operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1 and 3.3.3.6 for guidance. The CBOT will place Channel B PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.

About 10 minutes after the Steam Generator instrument failure, A MFP will trip. CRS will enter AOP 2203.037, Loss of Main Feed Pump. This will result in Steam Flow exceeding Feed flow and SG levels dropping. The crew will manually start the fourth condensate pump, reduce turbine load, and borate using emergency boration to the RCS until Feed flow is greater than Steam Flow. Then continue with a normal boration power reduction to less than 90%.

Page 2 of 16

Appendix D Scenario 2 Form ES-D-1 SCENARIO #2 NARRATIVE (continued)

Once the Reactor operators reactivity manipulations are complete, the main feed line break will occur. This will cause containment pressure, temperature and sump level to go up. A Steam Generator level will lower. The crew will manually trip the reactor and complete SPTAs. Once feed (Main and Emergency) is secured to the SG, an Excess Steam Demand will occur on A Steam Generator.

The CRS will diagnose an Excess Steam Demand event and enter OP 2202.005, ESD.

The crew will manually control Reactor Coolant Temperature once the A SG boils dry using the upstream Atmospheric Dump Valves on B SG. The crew will manually control PZR pressure using the Auxiliary Spray valve.

When Containment pressure exceeds 23.3 psia, the crew will recognize that CSAS, Containment Spray Actuation Signal, has not automatically actuated on Channel 1 and that the Spray pump on channel 2 side did not start. The crew will manually actuate spray on Channel 1 and manually start B CSAS pump.

Page 3 of 16

Appendix D Scenario 2 Form ES-D-1 Simulator Instructions for Scenario 2 Reset simulator to MOL 100% power IC stead state.

Ensure that AACG is secured and annunciators clear.

C HPSI pump is tagged out for oil bubbler replacement.

Ensure hotwell level is ~80%.

Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.

T1, T2, T3, T4 set to false.

Event Malf. No. Value/ Event No. Ramp Description Time 1 XRCCHAPLVL 0.0 Control Channel A Pressurizer Level fails LOW.

Trigger 1 2 XSG2PT10412 0.0 Steam Generator safety channel pressure fails LOW.

Trigger 2 3 FWPMPATRP TRUE A Main Feed Pump (MFP) trips due to thrust bearing Trigger 3 wear and results in a power reduction to less than 90%.

4 FW2PW5AAFT 1000 Feed water line break in containment after 2FW5A, Trigger 4 Ramp feed water to A Steam Generator (SG) check valve, which results in Excess Steam Demand (ESD) on A 5 min SG.

5 BS2P35BFAL TRUE Fail B Containment Spray Actuation Signal (CSAS) pump to start on CSAS.

6 ESFCSASFAIL TRUE Fail CSAS channel 1 to actuate auto.

At T=0 Trigger T1 Control Channel A Pressurizer Level fails LOW.

Cue: Report that I & C planner will begin planning work on failed PZR level transmitter.

At T= 10 Trigger T2 Steam Generator safety channel pressure fails LOW, minutes 2PT10412.

Cue: Report that I & C planner will begin planning work on failed Steam Generator safety channel pressure transmitter.

Page 4 of 16

Appendix D Scenario 2 Form ES-D-1 At T=20 Trigger T3 A Main Feed Pump (MFP) trips.

minutes Cue: As Auxiliary Operator, report that A MFP is tripped and no obvious problems noted locally.

CUED by T4 A main feed line break inside containment resulting in a reactor Lead trip and excess steam demand event Examiner CSAS True B containment spray pump will fail to start on CSAS signal.

actuation Can be manually started.

CSAS True Red Train containment spray actuation signal, CSAS, will not actuation automatically actuate. Can be manually actuated.

Page 5 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 1 Event

Description:

Channel A pressurizer level control channel 2LT-4627-1 fails low. The CRS will enter the PZR Systems Malfunction AOP 2203.028.

Time Position Applicant's Actions or Behavior ALL Announce alarms 2K10-G6 CNTRL CH 1 LEVEL LO.

2K10-F6 CNTRL CH 1 LEVEL LO LO.

Report 2LI-4627-2 and 2LR-4625 indicate normal.

Report backup charging pumps started.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

CBOR Determine PZR level Channel A failed.

Place Letdown Flow controller (2HIC-4817) in MANUAL.

Place PZR Level Channel Select switch (2HS-4628) to Channel B.

Place PZR Low Low Level Cutoff select switch (2HS-4642) to Channel B.

Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.

The CBOR will take the letdown flow controller to manual and control PZR level.

CRS Enter 3.3.3.6 Post Accident Instrumentation.

Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LI-4627-1.

Termination criteria: Unaffected PZR level channel selected and letdown in automatic or at the discretion of the lead examiner.

Page 6 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Event

Description:

2PT1041-2, Channel B SG pressure transmitter fails low.

Time Position Applicant's Actions or Behavior CBOT Announce annunciators:

2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04 B3 PPS TRIP 2K04-E4 MSIS PRETRIP Compare all four channels and report 2PI-1041-2 indicates 0 psia.

CRS Implement Annunciator Corrective Action AOP 2203.012D.

Refer to Tech Spec 3.3.1.1, 3.3.2.1, 3.3.3.6.

CBOR Report A SG pressure low pretrip and trip.

CBOT Place the following channels in bypass on Channel B:

A SG pressure low - RPS (Bistable 11)

A SG P - EFAS 1 (Bistable 19)

B SG P - EFAS 2 (Bistable 20)

CBOR Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.

CRS Contact maintenance to repair 2PT1041-2.

Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2PT1041-2. Report that planning on repair of 2PT1041-2 is in progress.

Termination criteria: When B plant protection system points 11, 19 and 20 are bypassed or at discretion of lead examiner.

Page 7 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event

Description:

A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.

Time Position Applicant's Actions or Behavior CBOT Announce A MFP trip alarms:

2K03 A8, A MFP trip 2K03 K8, Thrust Bearing Wear Trouble CRS Enter 2203.027, Loss of Main Feed Pump AOP and direct the following actions:

Verify Recirc valves closed (Condensate and MFP)

Verify Main Feed water regulating valve bypasses are opening Start standby condensate pump Commence emergency boration using exhibit 1 Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F Secure Emergency boration when Feed water Flow > Steam Flow CBOT Check tripped MFW pump recirc and Condensate recirc closed.

Check MFWRV B/P valves open.

Start standby Condensate Pump.

Reduce MTG load to establish Feed water Flow > Steam Flow while maintaining TC < 554.7°F.

CBOR Commence boration using Exhibit 1.

Page 8 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 3 Event

Description:

A Main Feed Pump Trip. The CRS will enter the loss of MFP AOP, 2203.027.

CRS When FF>SF, direct CBOR to commence down power to <

90% using normal boration method.

CBOR Align normal boration to RCS.

Reduce turbine load to maintain Tave within 2° of Tref until power is less than 90%.

Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.

Page 9 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event

Description:

Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.

ALL Announce that A SG level is lowering.

Containment temperature and pressure are rising.

Announce that radiation levels in containment are steady.

Announce that containment sump level is rising quickly.

Diagnose that a feed line leak is in progress inside containment.

CRS Direct CBOR to manually trip the reactor.

CBOR CBOR manually trip the reactor.

CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.

CBOR Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160 v and 6900 v Non-Vital busses energized.

ALL 4160 v and 480 v vital AC bus energized.

All 125 v vital DC bus energized.

Page 10 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event

Description:

Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.

Time Position Applicant's Actions or Behavior CBOR Check inventory control:

PZR level 16 to 80%.

Trend from set point.

Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.

CBOR Check RCS pressure control:

RCS pressure 1800 to 2300 psia.

Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.

Place spray valve for secured RCPs in manual closed.

Verify SIAS when pressure less than 1650 psia.

CBOR Check core heat removal by forced circulation:

RCP s running Loop T less than 10° F.

RCS MTS 30° F or greater.

Service water pump suction aligned to Lake.

Component cooling water aligned to RCPs.

CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)

Check SIAS actuated.

Maintain SW pressure greater than 85 psig.

Restore CCW to RCPs using exhibit 5 (when CIAS actuates).

Page 11 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event

Description:

Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.

Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:

Report SG levels and main feed water is in RTO.

Report feed water line is NOT intact.

Report SG pressures A SG lower than B SG.

Manually actuate EFAS, Emergency Feed water Actuation Signal if not already actuated.

Verify that MSIS is actuated.

Verify Feed water is not aligned to A SG CBOR Check CNTMT parameters:

Temperature greater than 140° F.

Pressure greater than 16 psia.

Status of radiation alarms:

CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm Secure ALL RCPs when Containment Spray Actuation Signal (CSAS) occurs.

CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs and EALs.

Page 12 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event

Description:

Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose EXCESS STEAM DEMAND EOP.

CRS Implement EXCESS STEAM DEMAND EOP procedure and open place keeping page.

ALL Perform crew brief and review floating steps.

CRS Determine applicable floating steps:

Control post steam generator blow down RCS temperature and pressure CRS Direct the following actions:

Isolate A SG using Attachment 10.

Control post steam generator blow down RCS temperature using B steam generator upstream atmospheric dump valve.

Control PZR pressure within P-T limits using Auxiliary Spray valve and Attachment 27.

Override HPSI when conditions are met.

RCS MTS 30°F or greater.

PZR level greater than 29% [50%] and controlled.

RVLMS LVL 03 or higher elevation indicates WET.

At least ONE intact SG available for Heat Removal Page 13 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Event

Description:

Main Feed line break inside containment on A SG. This will result in a reactor trip, SIAS, CCAS, CIAS and CSAS engineered safety features actuations.

Time Position Applicant's Actions or Behavior Critical CBOT Control post Steam Generator blow down RCS temperature Step using upstream atmospheric dump valve within 25°F of A Steam Generator Tc when generator boiled dry.

Critical CBOR Maintain Post steam generator blow down PZR pressure using Step auxiliary spray valve and attachment 27 within the Pressure-Temperature limits of 200°F and 30°F.

CBOR Override HPSI flow and charging flow to maintain PZR level.

/CBOT Termination criteria: When plant temperature and pressures are stabilized after A Steam Generator boils dry or at the discretion of the lead examiner.

Page 14 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Event

Description:

B Containment Spray pump, 2P35B fails to automatically start. CBOT will manually start the B containment spray pump.

Time Position Applicant's Actions or Behavior CBOT Reports that no flow is indicated on 2C16 for containment spray flow after actuation.

Reports that B containment spray pump is not running Reports that the B containment spray containment isolation valve is open.

Reports Alarm on 2K05 A1, 2P35B failure on ESFAS, Engineered Safety Features Actuation System CRS Directs manual start of 2P35B, B containment spray pump.

Critical CBOT Manually starts 2P35B, B containment spray pump on 2C16.

Step Verifies proper containment spray flow on 2C16.

(Either start of 2P35B or actuate CSAS 1)

Termination criteria: 2P35B is manually started or at the discretion of the lead examiner.

Page 15 of 16

Appendix D Scenario 2 Form ES-D-1 Op-Test No.: 1 Scenario No.: 2 Event No.: 6 Event

Description:

Channel 1 Containment Spray actuation signal (CSAS-1) fails to automatically actuate.

Time Position Applicant's Actions or Behavior CBOR Observes that containment pressure is greater than 23.3. psia and containment spray actuation signal (CSAS)

(Note this may be completed prior to reaching the 23.3 psia set point.)

CRS Directs manually actuating CSAS.

Critical CBOR On 2C03 manually actuates CSAS and verifies all four operator Step insert red lights are out above the CSAS label on 2C03.

(Either start of 2P35B or actuate CSAS 1)

Termination criteria: When CSAS is manually actuated or at discretion of lead examiner.

Page 16 of 16

Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2005-1 Page 1 Examiners: Operators:

Initial Conditions:

100% MOL, All ESF systems in standby. Green Train Maintenance Week.

Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. Green Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 XCV2LT4861 I (CBOR) VCT level instrument fails low resulting in RWT being aligned to CCP suction.

2 XFW2FIS0735 I (CBOT) A MFP suction flow transmitter fails low. Results in condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.

3 CNDVACUUM R (CBOR) Air leakage into condenser requiring a power N (CBOT) reduction to maintain condenser vacuum.

4 CNDVACUUM M (ALL) Air leakage into condenser results in loss of condenser vacuum and turbine and reactor trip.

5 SU#3 lockout N (CBOT) Loss of offsite power. Must energize non-vital 2A111 fails to busses.

close Startup #2 to 2A1 fails OPEN.

I (CBOR) Loss of power to PZR controllers must be controlled manually or transfer to automatic.

6 2CV1503-1 fails to C (CBOT) #1 EDG service water outlet MOV. This will result open in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.

7 2CV0340-2 C (CBOT) A EFW pump steam inlet valve fails to open. This breaker trips will result in a loss of all feed water.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 14

Appendix D Scenario 3 Form ES-D-1 Scenario #3 Objectives

1) Evaluate individual response to a failure of Volume Control Tank level transmitter.
2) Evaluate individual response to a failure of a Main Feed Pump suction Flow transmitter.
3) Evaluate individual response to a small condenser vacuum leak.
4) Evaluate individual ability to perform a reduction in plant power.
5) Evaluate individual ability to mitigate a loss of all Feed Water.
6) Evaluate individual ability to mitigate a loss of off site power.
7) Evaluate individual response to a failure Loss of power to a vital bus.

SCENARIO #3 NARRATIVE Simulator session begins with the plant at 100% power steady state.

When the crew has completed their control room walk down and brief, one of the two volume control tank (VCT) level transmitters will fail low. The crew will respond to VCT low low level alarm, 2K12 G5. This will result in the VCT outlet valve to the charging pump suction to close and the Refueling Water tank (RWT) suction to the charging pumps to open. RCS temperature and pressure will lower until the CBOR positions the VCT outlet valve manually opened and the RWT valve manually closed.

About 10 minutes after VCT level transmitter failure, A main feed pump suction transmitter will fail low. This will result in 2K03-D9 (A MFP SUCT FLOW LO) alarm. This will result in both the A MFP and A / C condensate pump recirc valves opening. This will reduce Main feed water flow to A Steam Generator and reduce MFP suction pressure so that the standby condensate pump will automatically start. The CBOT will recognize the instrument failure due to flow on the A MFP controller indicating zero even with the recirc valve open and flow indicated on the Feed water flow transmitters to the steam generator.

The CBOT will take manual control of both the MFP and condensate pump recirc valves and close them.

About 10 minutes after the MFP suction flow instrument failure, air in-leakage into the main condenser will start. This will result in condenser vacuum slowly degrading. The CRS will enter OP 2203.019, Loss of condenser vacuum. The CBOR will begin an emergency boration and the CBOT will reduce main turbine load to restore condenser vacuum. The crew will secure emergency boration and reducing turbine load when vacuum stabilizes.

The CBOR will then commence normal boration and reduce turbine load to allow condenser vacuum to be restored to less than ~6.5 in Hg.

Once the Reactor operators reactivity manipulations are complete, the air in-leakage will be raised to beyond the vacuum pumps capacity and the plant will be manually tripped.

Upon the reactor trip, Startup transformer #3 will lock-out and startup transformer #2 feeder to 2A1 will fail resulting in a loss of off-site power. When #1 EDG starts, the service water value from the EDG will fail to open. This will result in the CRS directing the #1 EDG to be locally secured resulting in a loss of the red train vital power (2A3 and 2B5). Also, the CRS will direct selecting channel #2 PZR level and pressure control channel instrumentation due to a loss of power to the selected channel #1 instruments.

Page 2 of 14

Appendix D Scenario 3 Form ES-D-1 SCENARIO #3 NARRATIVE (continued)

When an Emergency Feed water Actuation Signal (EFAS) occurs and A emergency feed water pump attempts to start automatically start, the steam inlet valve, 2CV 0340-2, will trip its breaker when it starts to open. This will result in a loss of all feed water to the steam generators. The CRS will direct that at least one RCP in each loop are secured and Steam Generator blowdown is isolated from both steam generators. When standard post trip actions, SPTAs, are complete, the CRS will diagnose and enter the Loss of Feed EOP OP2202.006. The CBOT will manually start the Alternate AC Generator from 2C14 and energize 2A3, vital 4160 bus or open the Service water valve from the #1 EDG and start

  1. 1 EDG. Once 2A3 is energized the CBOT will manually start the emergency feed water pump, 2P7B, from 2C17 and align feed to both steam generators using the Emergency Feed water valves.

Page 3 of 14

Appendix D Scenario 3 Form ES-D-1 Simulator Instructions for Scenario 3 Reset simulator to MOL 100% power IC stead state.

Ensure that AACG is secured and annunciators clear.

Ensure hotwell level is ~80%.

Place MINIMAL RISK and Green Train Maintenance Week signs on 2C11.

T1, T2, T3, T4, T5 set to false.

T4 set to RXTRP T6 set to EFAS-1 T7 set to EFAS-2 Event Malf. No. Value/ Event No. Ramp Description Time 1 XCV2LT4861 0.0 VCT level instrument fails low resulting in RWT Trigger=T1 being aligned to CCP suction.

2 XFW2FIS0735 0.0 A MFP suction flow transmitter fails low. Results in Trigger=T2 condensate and MFP recircs to condenser opening fully and reducing feed water to SGs.

3 CNDVACUUM 4.6 Air leakage into condenser requiring a power Trigger=T3 Ramp reduction to maintain condenser vacuum.

4 min 4 CNDVACUUM 10.0 Air leakage into condenser results in loss of Ramp condenser vacuum and turbine and reactor trip.

5 min 5 FailSU3 TRUE Startup 3 lockout results in a loss of offsite power.

Causes EDGs to automatically start/ loose Aux feed water pump and non-vital loads.

416A111 Locked

-Open Loss of power to PZR controllers must be controlled manually or transfer to automatic.

Trigger=T4 6 CV15031 0.0 #1 EDG service water outlet MOV fails to open. This Trigger=T5 will result in deenergizing red train vital 4160VAC, 2A3, and 480VAC, 2B5.

7 CV0340 0.0 A EFW pump steam inlet valve fails to open. This Trigger=T6 will result in a loss of all feed water.

Trigger=T7 Page 4 of 14

Appendix D Scenario 3 Form ES-D-1 At T=0 Trigger T1 VCT level instrument fails low, 2LT4861.

Cue: Report that I & C planner will begin planning work on failed Volume control tank, VCT, level transmitter.

At T= 10 Trigger T2 A MFP suction flow transmitter fails low, 2FIS0735.

minutes Cue: Report that I & C planner will begin planning work on failed A MFP suction flow transmitter.

At T=20 Trigger T3 Air leakage into condenser requiring a power reduction to minutes maintain condenser vacuum.

Cue: As Auxiliary Operator, report that air in-leakage is from B Low pressure turbine west manway cover and you will need mechanical maintenance support to seal the leak.

Cue: As mechanical maintenance report that it will take from 20 to 30 minutes to repair the leak.

CUED by Raise air leakage into condenser to 10 ramped over 5 minutes.

Lead Examiner Cue: After 5 minutes, report as mechanical maintenance report that the manway gasket on A LP turbine has catastrophically failed.

Main T4 SU#3 lockout and failure of SU#2 feeder to 2A1 to close, turbine trip 2A111.

PZR control channel level and pressure controllers will fail to manual on power transfer to #1 EDG and must be transferred to Channel 2 on loss of #1 EDG.

  1. 1 EDG T5 #1 EDG service water outlet MOV fails to open, 2CV 1503-1.

start EFAS-1 T6 A EFW pump steam inlet valve fails to open, 2CV 0340-2.

Page 5 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Event

Description:

VCT level transmitter 2LT4861 fails low. This causes the RWT to be aligned to CCP suction and Tave lowering.

Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K12-G5 VCT 2T4 LEVEL LO LO.

CRS Implement Annunciator Corrective Action AOP 2203.012L.

CBOR Report level indicates normal on 2LIS-4857 but 2LT-4861 reads 0% on computer.

Reports charging pump suction swapping to RWT.

CBOR May secure charging to stop boration if have not determined indication is a failed instrument and VCT level is normal.

OR When faulty instrument identified, then manually reopen VCT outlet and close the RWT to CCP suction valve.

CBOT Reduce turbine load to maintain Tave within 2° F of Tref if Tave

/CBOR lowered.

CRS Contact maintenance/PS liaison to troubleshoot failed instrument.

Simulator Operator Cue: When contacted as IC or Work Week Manager, report that you will begin planning work on 2LT-4861.

Termination criteria: Charging suction manually aligned to the VCT and RWT to CCP valve closed or at the discretion of the lead examiner.

Page 6 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 2 Event

Description:

2FIS0735, A loop condensate flow fails low. Condensate and MFP recirc valves open. CBOT must take manual control of recircs and control MFP suction pressure.

Time Position Applicant's Actions or Behavior CBOT Announce annunciator 2K03-D9 (A MFP SUCT FLOW LO)

CRS Implement Annunciator corrective action 2203.012C and direct board operator actions.

CBOT Report auto start of condensate pump.

Determine instrument 2FIS-0735 failure by use of PMS or control board indications.

Place A condensate recirc and A main feed pump recirc valves in manual to control condensate header pressure.

Secure condensate pump that auto started.

(Examiners Note: Crew may elect to leave fourth condensate pump running until a later point in the shutdown.)

CRS Contact maintenance/WWM to investigate failed transmitter.

Simulator Operator Cue: When contacted as WWM, work week manager, of I&C need to troubleshoot and repair 2FIS 0735. Report that planning on repair of 2FIS0735 is in progress.

Termination criteria: When condensate and MFP recircs are in manual and secondary plant is stable or at discretion of lead examiner.

Page 7 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event

Description:

Condenser vacuum slowly degrades. Crew will reduce turbine load Time Position Applicant's Actions or Behavior CBOT Main Condenser lowering vacuum:

2K03 A3, 2E11A Pressure HI 2K03 B3, 2E11A Turb Hood Press HI 2K03 E4, Vacuum pump 2C5B Auto Start 2K02 B14, Condenser Interlock CRS Enter 2203.019, Loss of condenser vacuum and direct the following actions:

Verify both vacuum pumps running Verify adequate gland seal steam pressure Verify both circulating water pumps running Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg.

Commence emergency boration using exhibit 1 Secure Emergency boration when condenser vacuum is < 6.5 inHg.

CBOT Reduce MTG load to maintain Tc less than 554.7°F and condenser vacuum < 6.5 inHg.

CBOR Commence boration using Exhibit 1.

Page 8 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Event

Description:

Condenser vacuum slowly degrades. Crew will reduce turbine load CRS When vacuum is less than 6.5 inHg. Secure emergency boration.

Contact Ops Management.

Simulator Operator Cue: When contacted as AO report that you can hear the air leak on the vacuum suction piping on the East heater deck under the deck floor. It is unisolatable.

Simulator Operator Cue: When contacted as Maintenance, report that it will take at least 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to patch the leak.

Simulator Operator Cue: When contacted as OPS Management, tell the CRS to reduce plant power until vacuum alarms are cleared.

CRS Direct CBOR to reduce commence a normal boration at power and reduce turbine load to < 5 inHg (to clear alarms).

CBOR Align normal boration to RCS.

Reduce turbine load to maintain Tave within 2° of Tref until condenser vacuum is less than 5 inHg.

Termination criteria: When CBOR has completed reactivity manipulations or at discretion of lead examiner.

Page 9 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event

Description:

Condenser air in-leakage exceeds the capacity of the vacuum pumps.

This results in a reactor trip.

ALL Announce that condenser vacuum is degrading.

CRS Direct CBOR to manually trip the reactor.

CBOR CBOR manually trip the reactor.

CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.

CBOR Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160v and 6900 v Non-Vital busses NOT energized.

All 4160v and 480v vital AC bus energized. (see event 6)

All 125v vital DC bus energized.

Page 10 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event

Description:

Condenser air in-leakage exceeds the capacity of the vacuum pumps. This results in a reactor trip.

Time Position Applicant's Actions or Behavior CBOR Check inventory control:

PZR level 16 to 80%.

Trend to set point.

(See event 5/6)

CBOR Check RCS pressure control:

RCS pressure 1800 to 2300 psia.

Trend to set point CBOR Check core heat removal by forced circulation:

RCP s running Loop T less than 10° F.

RCS MTS 30° F or greater.

Service water pump suction aligned to Lake.

Component cooling water aligned to RCPs.

SW to aligned to CCW and ACW CBOT Check RCS Heat Removal:

Report SG levels Main feed water is secured.

Manually actuate EFW.

Report feed water line is NOT intact.

Report SG pressures Shut both MSIVs due to 2CV 0400 and 2CV 0460, Main Steam to the moisture separator reheaters, have no power and are open.

Page 11 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Event

Description:

Condenser air in-leakage exceeds the capacity of the vacuum pumps.

This results in a reactor trip.

Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:

Temperature less than 140° F.

Pressure less than 16 psia.

Status of radiation alarms:

CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) NOT in alarm CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs, 3.0.3 due to no emergency feedwater available and 3.8.1.1 action C.

Termination criteria: CRS has diagnosed a Loss of All Feed event and transitions to EOP or at discretion of lead examiner.

Page 12 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 5 and 6 Event

Description:

Startup transformer #3 lockout and feeder breaker from Startup transformer #2 to 2A1, non-vital 4160VAC bus fails to open. This will result in a loss of offsite power and automatic start of both emergency diesel generators (#1 and #2 EDG).

CRS Verify Service Water is aligned to #1 EDG and #2 EDG.

CBOT Report that service water is not aligned to #1 EDG and that service water is aligned to #2 EDG and is running with proper voltage.

CRS Direct that AO locally take #1 EDG to lockout.

CRS Direct CBOR to select channel 2 PZR level and pressure controllers.

CBOR Select channel 2 PZR level and pressure controllers and places them in automatic.

Termination criteria: When CBOR has selected channel 2 PZR level and pressure controllers or at discretion of lead examiner.

Page 13 of 14

Appendix D Scenario 3 Form ES-D-1 Op-Test No.: 1 Scenario No.: 3 Event No.: 7 Event

Description:

Failure of A Emergency Feed water pump to start due to a failure of the steam admission valve, 2CV-0340-2, to open. This will result in a loss of all feed water and the crew will reenergize 2A3 and start 2P7B, B emergency feed water pump and restore feed to the steam generators.

Time Position Applicant's Actions or Behavior CRS Direct the following from the Loss of All Feed water EOP:

Refer to Standard attachment 11 and direct the CBOT to manually start the Alternate AC Generator and energize 2A3.

Direct the CBOT to manually start 2P7B and restore feed water to both steam generators at < 150 GPM for five minutes or until level rise is observed.

Simulator Operator Cue: When contacted as WCO, to open the service water from #1 EDG isolation valve. Report that the hand-wheel spins freely and valve will not move.

Critical CBOT Manually starts the Alternate AC Generator and energizes 2A3.

Step Critical CBOT Manually starts B Emergency Feed Pump and restores feed Step water to both steam generators.

CBOR Monitor control Steam generator pressures less than main steam safety valve lift set point (~1078 psig).

Control PZR pressure using auxiliary spray less than 2500 psia.

Termination criteria: When Emergency Feed water is established to both Steam Generators or at the discretion of the lead examiner.

Page 14 of 14