CPSES-200501942, Comments on Unit 2 Operating License: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 33: Line 33:
* Wolf Creek
* Wolf Creek


- - .
TXX-05177 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units I and 2. Should you have any questions, please contact Carl B. Corbin at (254) 897-0121 or email at ccorbinletxu.com.
TXX-05177 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units I and 2. Should you have any questions, please contact Carl B. Corbin at (254) 897-0121 or email at ccorbinletxu.com.
Sincerely, TXU Generation Company LP By:    TXU Generation Management Company LLC Its General Partner Mike Blevins By: 491      2K Fred W. Madden 292j&
Sincerely, TXU Generation Company LP By:    TXU Generation Management Company LLC Its General Partner Mike Blevins By: 491      2K Fred W. Madden 292j&
Line 56: Line 55:
G. TXU Generation Company shall implement an                    aintain in effect all provisions of the approv lire protection program as scribed in the Final Safety Analysis Repo hrough Amendment 78 and as ap oved in the SER (NUREG-0797) ants supplements through SSER 24, subje to the following provision:
G. TXU Generation Company shall implement an                    aintain in effect all provisions of the approv lire protection program as scribed in the Final Safety Analysis Repo hrough Amendment 78 and as ap oved in the SER (NUREG-0797) ants supplements through SSER 24, subje to the following provision:
T    Generation Company LP may make changes to the approvfire tA                otection program without prior approval of the Commission only imose changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.                                                -
T    Generation Company LP may make changes to the approvfire tA                otection program without prior approval of the Commission only imose changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.                                                -
                                                                                                    -
IH            TXU Generation Company LP shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: 'Comanche Peak Steam Electric Station Physical
IH            TXU Generation Company LP shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: 'Comanche Peak Steam Electric Station Physical
                                                                                                               -I Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan" and was submitted on October 11, 2004, and supplemented on
                                                                                                               -I Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan" and was submitted on October 11, 2004, and supplemented on October 13, 2004.
            -
October 13, 2004.
The licensee shall have and maintain financial protection of such type and' uounts as the Commission shall require in accordance with 'G on 170 of the Argy                Act of 1954, as amended, to cover pul            ity claims.
The licensee shall have and maintain financial protection of such type and' uounts as the Commission shall require in accordance with 'G on 170 of the Argy                Act of 1954, as amended, to cover pul            ity claims.
J. NOT USED Amendment I,6 Revised by letter dated October}}
J. NOT USED Amendment I,6 Revised by letter dated October}}

Latest revision as of 15:09, 14 March 2020

Comments on Unit 2 Operating License
ML052650373
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 09/15/2005
From: Madden F
TXU Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
235, CPSES-200501942, TXX-05177
Download: ML052650373 (4)


Text

YA TXU Power TXU Power Mike Blevins Comanche Peak Steam Senior Vice President &

Electric Station Chief Nuclear Officer P.O. Box 1002 (E01)

Glen Rose, TX 76043 Ref: #I0CFR50.57 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevins~txu.com CPSES-200501942 Log # 235 September 15, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM.ELECTRIC STATION (CPSES)

DOCKET NO. 50-446 COMMENTS ON UNIT 2 OPERATING LICENSE REF: 1) NRC Letter, from John A. Nakoski to Mike Blevins dated October 28, 2004 (TAC NOS. MC2606 and MC2907).

2) NRC Letter, from David H. Jaffe to Mike Blevins dated January 1, 2002 (TAC NOS. MB2203 and MB2204).

Gentlemen:

In Reference 1 the NRC issued an administrative change to TXU Generation Company LP (TXU Power) Facility Operating License (FOL) No. NPF-89 for Unit 2.

Replacement page 7 of the Unit 2 FOL as issued by Reference 1 is missing information. It appears this was an administrative oversight due to pagination differences between the Unit I and Unit 2 FOLs. Page 7 of the Unit 2 FOL as previously issued by Reference 2 has been marked up to include the intended change from Reference 1. TXU Power is requesting that page 7 of the Unit 2 FOL be reissued as marked up in the Attachment.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon . Palo Verde
  • Wolf Creek

TXX-05177 Page 2 of 2 This communication contains no new licensing basis commitments regarding CPSES Units I and 2. Should you have any questions, please contact Carl B. Corbin at (254) 897-0121 or email at ccorbinletxu.com.

Sincerely, TXU Generation Company LP By: TXU Generation Management Company LLC Its General Partner Mike Blevins By: 491 2K Fred W. Madden 292j&

Director, Regulatory Affairs CBC Attachment c - B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES

Attachment to TXX-05 177 Page I of 2 r-TXU Generation Company LP may make changes to the approved fire I,)

protection program without prior approval of the Commission only If those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

U Generation Company LP shall fully implement and maintaioInPhffect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all Ramendments made pursuant to the authority of 1m0 CFR 50.90 and 1 CFR E0 t50.54(p). The plans, which contain safeguards information protected under 10 MaCFR 73.21, are entitled:

" Comanche Peak Steam Electric Station Physicalrd onSecurity Plan" with revisions submitted through August 30, 2000, with limited approvals as provided for in the Safety Evaluation by the Office of Nuclearl Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan' with revisions submitted through/

\ May 18, 2000; and "Comanche Peak Steam Electric Station Safeguards Em nencyPlat wih reisins sbmited hrouh Aril 9, 1999. _

The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

J. NOT USED K. This license is effective as of the date of issuance and shall expire at Midnight on February 2, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments/Appendices:

1. Appendix A - Technical Specifications (NUREG-1468)
1. Appendix B - Environmental Protection Plan
3. Appendix C - Antitrust Conditions Date of Issuance: April 6, 1993 IRevised by letter dated October 28, 1994 I Amendment No. 66, 82,69 90

Attachment to TXX-05177 Page 2 of 2 (2) For the unowned subsurface mineral rights within the exclusion area n covered in item (1), TXU Generation Company LP will prohibit the exploration and/or exercise of mineral rights until and unless the ensee and the owners bf the mineral rights enter into an agreement ich gives TXU Generation Company LP absolute authority to deter e all ivities -- including times of arrival and locations of pe onnel and the authty to remove personnel and equipment -- in e t of emergency.

If the m rights owners attempt to exercise th i rights within this Iral area witho rst entering into such an agreemrt, TXU Generation Company LP t institute immediately eff ve condemnation proceedings to ob the mineral rights i his area.

(3) TXU Generation Compan P shal omptly notify the NRC of any attempts by subsurface mine hts owners to exercise mineral rights, including any legal proceedin ted by mineral rights owners against TXU Generation Compan ?P.

G. TXU Generation Company shall implement an aintain in effect all provisions of the approv lire protection program as scribed in the Final Safety Analysis Repo hrough Amendment 78 and as ap oved in the SER (NUREG-0797) ants supplements through SSER 24, subje to the following provision:

T Generation Company LP may make changes to the approvfire tA otection program without prior approval of the Commission only imose changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. -

IH TXU Generation Company LP shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: 'Comanche Peak Steam Electric Station Physical

-I Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan" and was submitted on October 11, 2004, and supplemented on October 13, 2004.

The licensee shall have and maintain financial protection of such type and' uounts as the Commission shall require in accordance with 'G on 170 of the Argy Act of 1954, as amended, to cover pul ity claims.

J. NOT USED Amendment I,6 Revised by letter dated October