Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*>,it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*>,it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
After providing the initiating cue, ask the individual "Do you understand the task?"
Line 244: Line 243:
Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 7 minutes Evaluation Results:
Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 7 minutes Evaluation Results:
Performance: PASS - FAIL -                Time Required:
Performance: PASS - FAIL -                Time Required:
Prepared by:          I _  _  I
Prepared by:          I _  _  I Operari oils Yraj ning inst:uctor                      DAW Reviewed by:
_  _                                    -
Operari oils Yraj ning inst:uctor                      DAW Reviewed by:
SRO LicensedCertified Reviewer                          Date Approved by:
SRO LicensedCertified Reviewer                          Date Approved by:
Operations Training Superintendent                      Date
Operations Training Superintendent                      Date
Line 270: Line 267:
DGOSB DGOSA ED17 Using softpanels select 3V breaker to TRIP (ED18B)
DGOSB DGOSA ED17 Using softpanels select 3V breaker to TRIP (ED18B)


Evaluation          Performance Steps
Evaluation          Performance Steps TIME START:
                                                                              .    -
TIME START:
SATAJNSAT            Step 1:      Obtain OT 3122. Review entry conditions, immediate operator actions, and follow-up actions.
SATAJNSAT            Step 1:      Obtain OT 3122. Review entry conditions, immediate operator actions, and follow-up actions.
Standard:    OT 3 122, appendix A obtained, entry conditions, immediate operator actions and follow-up actions reviewed.
Standard:    OT 3 122, appendix A obtained, entry conditions, immediate operator actions and follow-up actions reviewed.
Line 283: Line 278:


SAT/UNSAT        *Step 6:      Close the selected bus tie breaker 3V(4V)
SAT/UNSAT        *Step 6:      Close the selected bus tie breaker 3V(4V)
                                                                          .
Standard:      Breaker handswitch on CRP 9-8 for 4V taken to CLOSED Observe closure of breaker 4V by observing red indicating light ON and green light OFF above breaker control switch on CRP 9-8 SATNNSAT          Step 7:        Check voltage and current on Bus 4      ,
Standard:      Breaker handswitch on CRP 9-8 for 4V taken to CLOSED Observe closure of breaker 4V by observing red indicating light ON and green light OFF above breaker control switch on CRP 9-8 SATNNSAT          Step 7:        Check voltage and current on Bus 4      ,
Standard:      Observes voltage and current meters on CRP 9-8 SAT/UNSAT        Step 8:        Place Keepinp and STAR used consistentlv throughout.
Standard:      Observes voltage and current meters on CRP 9-8 SAT/UNSAT        Step 8:        Place Keepinp and STAR used consistentlv throughout.
Line 344: Line 338:


'?valuators Comments:
'?valuators Comments:
                      . -


VERMONT YANKEE                  .
VERMONT YANKEE                  .
Line 369: Line 362:


Wrections:
Wrections:
                                                                                    . -
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.
After providing the initiating cue, ask the individual "Do you understand the task?"
After providing the initiating cue, ask the individual "Do you understand the task?"
Line 410: Line 402:


Standard:      Operator maintains test parameters.
Standard:      Operator maintains test parameters.
                                                                              .  -
Interim Cue:        Provide data sheet completed thru step C.5.a. AND advise operator that testing is complete and the surveillance can continue at step C.5.b.
Interim Cue:        Provide data sheet completed thru step C.5.a. AND advise operator that testing is complete and the surveillance can continue at step C.5.b.
SAT/UNSAT          *Step 13:      Close FULL FLOW TEST CS-26A. Continue to hold the control switch for approximately 5 seconds after valve closure.
SAT/UNSAT          *Step 13:      Close FULL FLOW TEST CS-26A. Continue to hold the control switch for approximately 5 seconds after valve closure.
Line 463: Line 454:
RCS& ii  IC SG7
RCS& ii  IC SG7


Evaluation          Performance Steps
Evaluation          Performance Steps TIME START:
                                                                              .  -
TIME START:
SATAJNSAT            Step 1:        Obtain and review OP 2114 Appendix B Standard:      OP 21 14 Appendix B obtained and reviewed Interim Cue: If asked, all prerequisites are SAT SATAJNSAT            *§tep 2:        Unlock SLC Switch by positioning the kev to the two o'clock position Standard:      Key positioned to the two o'clock positon SATAJNSAT            *Step 3:        Turn SLC switch to SYS 1or SYS 2.
SATAJNSAT            Step 1:        Obtain and review OP 2114 Appendix B Standard:      OP 21 14 Appendix B obtained and reviewed Interim Cue: If asked, all prerequisites are SAT SATAJNSAT            *§tep 2:        Unlock SLC Switch by positioning the kev to the two o'clock position Standard:      Key positioned to the two o'clock positon SATAJNSAT            *Step 3:        Turn SLC switch to SYS 1or SYS 2.
Standard:      SLC Switch turned to the SYS 1 or SYS 2 position SAT/UNSAT            Step 4:        Verify that the "A/B" SLC Pump starts Standard:      Operator verifies that the "A" or "B" SLC Pump is running by observing the Red light On and Green light Off SATAJNSAT            Step 5:        SLC discharge pressure increases as indicated on PI-11-65 Standard:      Operator observes rising pressure indicated on PI 11-65 on CPR 9-5 SATAJNSAT            *Step 6:        On CRP 9-4, RWCU system isolation valves automatically close:
Standard:      SLC Switch turned to the SYS 1 or SYS 2 position SAT/UNSAT            Step 4:        Verify that the "A/B" SLC Pump starts Standard:      Operator verifies that the "A" or "B" SLC Pump is running by observing the Red light On and Green light Off SATAJNSAT            Step 5:        SLC discharge pressure increases as indicated on PI-11-65 Standard:      Operator observes rising pressure indicated on PI 11-65 on CPR 9-5 SATAJNSAT            *Step 6:        On CRP 9-4, RWCU system isolation valves automatically close:
Line 474: Line 463:
Evaluation          Performance Steps
Evaluation          Performance Steps


QT/UNSAT *Step 7:  Manually close CU-15                        L
QT/UNSAT *Step 7:  Manually close CU-15                        L Standard: Operator places the CU-15 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU- 15 SAT/UNSAT *Step 8:  Manually close CU-18 Standard: Operator places the CU-18 control switch on CRP 9-4 to CLOSE and verifies i t closes by observing the Green lisht On md Red light Off fnr-CU- 18 SAT/UNSAT *Step 9:  Manually close CU-68 Standard: Operator places the CU-68 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU-68 SATrUNSAT Step 10:  Squib valve SLC-l4A(B) fires, as indicated by:
                                                                  .  -
Standard: Operator places the CU-15 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU- 15 SAT/UNSAT *Step 8:  Manually close CU-18 Standard: Operator places the CU-18 control switch on CRP 9-4 to CLOSE and verifies i t closes by observing the Green lisht On md Red light Off fnr-CU- 18 SAT/UNSAT *Step 9:  Manually close CU-68 Standard: Operator places the CU-68 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU-68 SATrUNSAT Step 10:  Squib valve SLC-l4A(B) fires, as indicated by:
Red flow indicator light on (flow greater than 30 gpm).
Red flow indicator light on (flow greater than 30 gpm).
Standard: Operator observes the following:
Standard: Operator observes the following:
Line 509: Line 496:
Required Materials:              OP 41 11 Control Rod Drive System Surveillance VYOPF 41 11.02 Simulator Setup:                Reset to IC 868, ERFIS Printer energized, Ensure CRD flows are in the Green Band.
Required Materials:              OP 41 11 Control Rod Drive System Surveillance VYOPF 41 11.02 Simulator Setup:                Reset to IC 868, ERFIS Printer energized, Ensure CRD flows are in the Green Band.


Eva1uation                  Performance Steps
Eva1uation                  Performance Steps TIME START:
                                                                  . -
TIME START:
SAT/UNSAT    Step 1:      Obtain Procedure OP 41 11 and VYOPF 41 11.02 review admin limits, precautions and prerequisites reviewed.
SAT/UNSAT    Step 1:      Obtain Procedure OP 41 11 and VYOPF 41 11.02 review admin limits, precautions and prerequisites reviewed.
Standard:    OP 41 11 obtained section A, VYOPF 41 11.02 form obtained, admin limits, precautions and prerequisites reviewed.
Standard:    OP 41 11 obtained section A, VYOPF 41 11.02 form obtained, admin limits, precautions and prerequisites reviewed.
Line 561: Line 546:


Directions:
Directions:
                                                                                      .
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.
After providing the initiating cue, ask the operator "Do you understand the task?"
After providing the initiating cue, ask the operator "Do you understand the task?"
Line 619: Line 603:


Standard:      Operator depresses the Fuel Oil Transfer Pump START button at the Diesel generator control panel.
Standard:      Operator depresses the Fuel Oil Transfer Pump START button at the Diesel generator control panel.
                                                                                  .  -
Interim Cue: STAR? pushbutton is depressedRed light on SAT/UNSAT              Step 13:        Verify that the diesel day tank level alarms are clear.
Interim Cue: STAR? pushbutton is depressedRed light on SAT/UNSAT              Step 13:        Verify that the diesel day tank level alarms are clear.
Standard:      Operator observes diesel day tank level alarms are clear.
Standard:      Operator observes diesel day tank level alarms are clear.
Line 654: Line 637:
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.
Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.
After providing the initiating cue, ask the operator "Do you understand the task?"
After providing the initiating cue, ask the operator "Do you understand the task?"
-
Read to the person being evaluated:
Read to the person being evaluated:
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.
Line 671: Line 653:
Evaluation              Performance Steps
Evaluation              Performance Steps


4
4 TIME START:
                                                                        . .
TIME START:
SATNNSAT    Step 1:      Obtain Procedure, review Appendix C.
SATNNSAT    Step 1:      Obtain Procedure, review Appendix C.
Standard:    OP 3 126 obtained, Appendix C reviewed.
Standard:    OP 3 126 obtained, Appendix C reviewed.
Line 745: Line 725:
OP 4203, Maintenance and Testing of SLC Squib Valves
OP 4203, Maintenance and Testing of SLC Squib Valves


Evaluation          Performance Steps
Evaluation          Performance Steps TIME START:
                                                                              ..  -
TIME START:
SAT/UNSAT            Step 1:        Obtain the procedure, review prerequisites.
SAT/UNSAT            Step 1:        Obtain the procedure, review prerequisites.
Standard:      OE 3 IO7 Appendix I obtained; prerequisites reviewed.
Standard:      OE 3 IO7 Appendix I obtained; prerequisites reviewed.

Latest revision as of 16:09, 13 March 2020

Draft - Section B Operating Exam (Folder 2)
ML071350563
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/12/2007
From:
Entergy Nuclear Vermont Yankee
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
Shared Package
ML062050096 List:
References
Download: ML071350563 (53)


Text

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Rx Startup to Criticality Failure Mode: Short period during startup

Reference:

OP 0105, Reactor Operations Task Number: 2xxxx Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No 3 Time Critical: Yes - No 3 Individual Performing Task:

Examiner:

Date. of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom __ Simulator X Plant -

Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by: I SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evahated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person beinp evaluated:

Before starticg, I will explain the initial conditions, pro\*idethe initiatinz cues and a n s er~ any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is starting up.

OP 0105 Phase 1A is complete through step A.26.

Initiating Cues:

Continue the startup and take the reactor critical.

Task Standards:

While pulling control rods to take the reactor critical, a high worth rod takes reactor period to shorter than 30 seconds. The student takes action to take the reactor subcritical per OP 0105.

Required Materials:

OP 0105, Phase A Reactor Operations (latest revision)

VYOPF 0105.03 with doubling count rates filled in.

Reset to IC 861 (just before critical).

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain procedure; review administrative limits, precautions, and prerequisites Standard: OP 0105 Phase 1A obtained; administrative limits, precautions, and prerequisites reviewed.

Interim Cue: Inform Operator that all prerequisites are SAT.

SATKNSAT *Step 2: Continue to withdraw control rods in such a manner as to avoid having a sustained period shorter than 30 seconds (desired 100 to 200 seconds).

Standard: Pulls correct control rod, otherwise a reactivity mismanagement issue.

Examiner NOTE: Just prior to critically the short period alarm will come in. (about 4 movements on control rod)

SAT/UNSAT *Step 3: If the sustained period becomes shorter than 30 seconds Standard: Recognizes short period along with annunciator 5-P-5.

Simulator Operator Note: Upon receiving cue (going from notch 18 to 20) that the next notch of rod 18-31 will cause a high period, INSERT KEY 1 following notching out.

SAT/UNSAT *Step 4: Use EMERGENCY IN switch to turn the period Standard: uses the EMERGENCY IN switch to reduce period.

Cimulator Operator Note: Upon receiving cue from evaluator OR by observing operator using EMERGENCY IN, INSERT KEY 2 after rod moves in 2 notches.

SATNNSAT *Step 5: Insert Control Rods until the reactor is subcritical

Standard: Continues to insert control rods with EMERGENCY IN until the reactor is subcritical.

SATKJNSAT Step 6: Notify the SM, OM and RE Standard: Notifies appropriate management.

SATKJNSAT Step 7: Place Keeping and STAR used consistentlv throughout.

Standard: Steps are circled as performed, crossed out as completed and N/A'd as appropriate. STAR used consistently for each manipulation.

  • Critical Step TIME F'INISH:

'erminating Cue: The reactor is subcritical and management is notified.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Secure Standby Gas Treatment Failure Mode: NIA

Reference:

OP 21 17, Standby Gas Treatment Rev-17 LPC-03 Task Number: 2610060101 Task Performance: AO/RO/SRO - ROISRO Only X SE Only -

Sequence Critical: Yes __ No Time Critical: Yes - No Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRT) Li ccn sei!/Cer?i fi ed Revi eiwr Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each perfohance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Siniulator and you are to perform the actions.

You are requested to "talk-throuph" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Both trains of SBGT are running as a result of auto initiation An operator has verified and backed up the initiation.

Initiating signals are clear.

Reactor Building ventilation is operating normally.

Initiating Cues:

You have been directed by the CRS to return both trains of SBGT to a normal lineup, in accordance with OP 21 17, Section D.

Task Standards:

Both SBGT Trains in Standby mode, with torus vent path aligned through SBGT Train "A".

Required Materials:

OP 21 17, Standby Gas Treatment (latest revision)

Reset to IC 862 Ensure RB Ventilation is running Ensure both trains of SBGT are running

Evaluation Performance Steps L

TIME START: . -

SATAJNSAT Step 1: Obtain procedure: review administrative limits, precautions, and prerequisites Standard: OP 21 17 Section D obtained; administrative limits, precautions, and prerequisites reviewed.

Interim Cue: Inform Operator that all prerequisites are SAT.

Procedure Step Step 2: SecureKheck secure the first train as follows:

SATKJNSAT Step 3: Verify initiating signal has cleared Standard: Verifies initiating signal cleared based on initial conditions.

Interim Cue: If asked, restate the initiating signal has cleared.

SATAJNSAT Step 4: Ensure either reactor building HVAC is running per OP 2192, Heatinp Ventilating and Air Conditioning System or the other train of SBGT is running.

Standard: Ensures reactor building W A C is running based on initial conditions.

Interim Cue: If asked, restate the initial conditions and reactor building HVAC is operating SATKJNSAT *Step 5: Momentarilv place SBGT Fan A REF-2A (SBGT Fan B REF-2B) control switch on CRP 9-26 to STOP Standard: Operator momentarily places SBGT FAN A(B) REF 2-A@)

control switch oil CKV 9-26 to STOP.

Verify SBGT A/B stopped Observc red light Off and green light On for SBGT A@) on CRP 9-26.

Evaluation Performance Steps Note: Step 6 is not critical because SGT-2A and 3A are reopened later in the procedure.

SATAJNSAT Step 6: Closeherify closed the following valves SGT-2A(B)

SGT-3A(B)

Standard: Operator closes SGT-2A(B) by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

Operator closes SGT-_?A(B)by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

SAT/UNSAT *Step 7: Close/Check closed SGT-1A(B)

Standard: Operator takes control switch on CRP 9-26 to CLOSE AUTO-OP.

Verifies SGT-lA(B) closed by observing red light Off and green light On for SGT-1A(B) on CRP 9-26..

Procedure Step Step 8: Secure the second train as follows:

SATKJNSAT Step 9:Ensure reactor buildinp HVAC is running per OP 2192 Heating, Ventilating and Air Conditioning System Standard: Ensures reactor building WAC is running based on initial conditions.

Interim Cue: If asked, restate the initial conditions SAT/UNSAT *Step 10: Momentarily place SBGT Fan A REF-2A (SBGT Fan BREF-2B) control switch on CRP 9-26 to STOP Standard: Operator momentarily places SBGT FAN B(A) REF 2-B(A) control switch to STOP on CRP 9-26.

Evaluation Performance Steps ATKJNSAT *Step 11: If SGT Train B is secured, close/verifytlosed the following valves:

SGT-2B SGT-3B Standard: Operator closes SGT-2B by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

Operator closes SGT-3B by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

SATKJNSAT Step 12: CloseKheck closed SGT-1B Standard: Operator takes SGT-1B control switch on CRP 9-26 to CLOSE AUTO-OP, then verifies SGT-1B closed by red light off, green light on on CRP 9-26 SATNNSAT *Step 13: If SGT Train A is secured, establish torus vent path through the following valves by opening or checking open:

0 SGT-2A.and SGT-3A Standard: Operator opens SGT-2A and SGT-3A on CRP 9-26 by taking associated control switch to OPEN.

Operator verifies SGT-2A and SGT-3A are open by, observing red light On and green light Off for SGT-2A and SGT-3A on CRP 9-26.

SATAJNSAT Step 14: Closekheck closed SGT-1A Standard: Operator checks closed SGT-1A on CRP 9-26 by verifying red light On, green light Off.

Evaluation Performance Steps SATAJNSAT Step 15: When both SBGT are secured, verify the following normal valve lineup.

0 SGT-lA(B), SGT-2B. SGT-3B1SGT-4A (B), and S G T 5 are closed.

0 SGT-2A and SGT-3A are open.

0 SBGT Fan A (B) control switches are in Auto.

9KW heaters SBGT-A Elect HTR EUH-2 and SBGT-B Elect HTR EUH-4 control switches are in auto.

Standard: Operator verifies the following on CRP 9-26:

SGT- 1A(B), SGT-2B, SGT-3B, SGT-4A(B) and SGT-5 are closed SGT-2A and SGT-3A open SBGT Fan A(B) control switches in AUTO 9 KW heaters SBGT-A Elec Htr EUH-2 and SBGT-B Elec Htr EUH-4 control switches are in AUTO SATKJNSAT Step 16: Place KeepinP and STAR used consistently throuphout.

Standard: Steps are circled as performed, crossed out as completed and N/Ad as appropriate. STAR used consistently for each manipulation.

  • Critical Step TlME FINISH:

Terminating Cue: SBGT System in Standby Mode, with torus vent path established through SBGT Train A

VEKMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Transfer Pressure Control From MPR to EPR Failure Mode: N/A

Reference:

OP 2160, Turbine Generator Support Systems Operation (Rev. 23)

Task Number: 2490020101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 12 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date RL3 i2.r 2d I.,: ______I_____ - ____.__l_l_

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*>,it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is operating at 100% power with the MPR controlling pressure. The EPR Cutout Switch has been in NORMAL for the past 30 minutes.

Initiating Cues:

The CRS has directed you to transfer pressure control to the EPR in accordance with OP 2160, Section B.2.

Task Standards:

Plant operating normally with pressure control transferred to the EPR Required Materials:

OP 2160, Turbine Generator Support Systems Operation (latest revision)

Simulator Setup:

Reset to IC 862 0 Pressure control transferred to the MPR 0 EPR Cutout Switch in NORMAL 0 Annunciators reset Evaluation Performance Steps

TIME START:

SATAJNSAT Step 1: Obtain Procedure; review Precautions, Admin Limits, Prerequisites, and Section B.2 Standard: Procedure obtained, Precautions, Admin Limits, Prerequisites and Section B.2 reviewed.

Interim Cue: If asked, all prerequisites are met.

SATKJNSAT Step 2: Verify EYK is ready for service:

0 EPR CUTOUT SWITCH in NORMAL (ON) 0 EPR CONTROL PWR LOSS annunciator 7-G-2 clear Standard: Opcrator verifies that the EPR Cutout Switch is in NORMAL and that annunciator 7-G-2 is clear.

CATAJNSAT Step 3: Verify bulb for oncoming pressure regulator is sound Standard: Operator removes EPR white light bulb and places bulb in a known-energized lamp socket to verify that the bulb is good, then replaces bulb in the EPR white light socket, OR verifies it is sound by observing the intact filament.

SATAJNSAT *Step 4: Using EPR SETPOINT switch, slowlv lower the EPR setpoint by going to LOWER until the EPR OUTPUT STROKE bepins to move Standard: Operator places the EPR Setpoint control switch to LOWER until the EPR Output Stroke begins to move.

SATAJNSAT Step 5: As the EPR OUTPUT STROKE increases, control the rate bv adiusting the EPR SETPOINT switch such that it continues to increase slowlv.

Standard: Operator intermittently manipulates the EPR Setpoint Control Switch to effect a slow rate of EPR Output Stroke increase.

Svaluation Performance Steps SATAJNSAT *Step 6: Continue to slowly lower the EPR SETPOINT until the EPR begins to take control

Standard: Operator continues to observe the slowly psing stroke, watching for the EPR white light to energize, adjusting the'setpbint as necessary.

SAT/UNSAT Step 7: Verify that the EPR is in control of pressure by observing:

1) Verify white light above EPR SETPOINT switch is illuminated.
2) Verify white light above MPR SETPOINT switch is extinguished.
3) On CRP 9-5, verify stable reactor pressure.

Standard: Operator verifies that the EPR is in control of pressure by observing the above-listed indications.

SATPJNSAT *Step 8: If either pressure regulator fails to control pressure, refer to OT 3115 for immediate actions.

Standard: Operator observes pressure is under control.

4T/UNSAT *Step 9: Using MPR SETPOINT switch, slowly RAISE the MPR SETPOINT, by going to RAISE, until the MPR OUTPUT STROKE is 10%

below the EPR.

Standard: Operator places the MPR Setpoint Control Switch to RAISE as necessary to adjust the MPR Output Stroke to a setting 10%below the EPR.

SAT/UNSAT Step 10: Ad-justreactor pressure as necessary Standard: Operator uses the EPR Setpoint Control Switch to adjust reactor pressure as necessary.

Interim Cue: Inform Operator that no pressure adjustment is necessary.

Evaluation Performance Steps AT/UNSAT Step 11: Place Keepinp and STAR used consistently throughout.

Standard: Steps are circled as performed, crossed out as completed and N/A'd as appropriate. STAR used consistently for each manipulation.

TIME FINISH:

Terminating Cue: Pressure control transferred to the EPR with the MPR stroke 10% below that of the EPR and reactor pressure stable.

Evaluator Comments:

System: 241000 WA's: K1.02, K4.01, A1.O1, A4.16, A4.19 System Generic WA's: 2.1.20, 2.1.21

VERMONT YANKEE JOB PERFORMANCE MEASURE -

WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Energize Bus 4 From the Vernon Tie Line During a Station Blackout Failure Mode: Breaker 3V Does Not Close

Reference:

OT 31211, Loss of Normal Power, -4ppendix A Task Number: 2000030501 Task Performance: AO/RO/SRO __ RO/SRO X SRO Only Sequence Critical: Yes X No -

Time Critical: Yes- N o 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 7 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by: I _ _ I Operari oils Yraj ning inst:uctor DAW Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

A turbine trip has occurred following a loss of all offsite power, both diesels have failed to start. A station Blackout has been declared.

Initiating Cues:

You are directed to restore AC power to Bus 3 or Bus 4 from the Vernon Tie LAW OT-3122 app A.

Bus 3 is preferred.

Task Standards:

Bus 4 energized from Vernon Tie Line IAW OT 3122 appendix A.

Required Materials:

OT 3122, Appendix A Si mu1at o r S t: t-UP:

Reset to IC 864 Ensure following malfunctions are inserted:

DGOSB DGOSA ED17 Using softpanels select 3V breaker to TRIP (ED18B)

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain OT 3122. Review entry conditions, immediate operator actions, and follow-up actions.

Standard: OT 3 122, appendix A obtained, entry conditions, immediate operator actions and follow-up actions reviewed.

SATPUNSAT *Step 2: Place the service water pump control switches to STOP, then NORMAL.

Standard: At CRP 9-6, take each SW pp control switch to STOP and then to NORMAL. Observe the green light on and red light off for each pump.

SAT/UNSAT Step 3: Place all ECCS pumps in PULL-TO-LOCK Standard: At CRP 9-3 place the control switches for each of the four RHR pumps and both Core Spray pumps in PULL-TO-LOCK.

SATAJNSAT *Step 4: Energize Bus 3 from Vernon tie:

Close 3V4 and the selected bus feeder breaker.

Standard: Breaker handswitch on CRP 9-3 for 3V4 taken to CLOSE Check breaker 3V4 closed by observing red light ON and green light OFF above breaker control switch on CRP 9-8 SATNJNSAT *Step 5: Close the selected bus tie breaker 3V Standard: Breaker handswitch on CRP 9-8 for 3V taken to CLOSED Observe failure of breaker 3V by observing green indicating light ON and red light OFF above breaker control switch on CRP 9-8 Interim Cue: If informed as CRS that the 3V breaker failed, repeat the request to restore power from Vernon Tie.

SAT/UNSAT *Step 6: Close the selected bus tie breaker 3V(4V)

Standard: Breaker handswitch on CRP 9-8 for 4V taken to CLOSED Observe closure of breaker 4V by observing red indicating light ON and green light OFF above breaker control switch on CRP 9-8 SATNNSAT Step 7: Check voltage and current on Bus 4 ,

Standard: Observes voltage and current meters on CRP 9-8 SAT/UNSAT Step 8: Place Keepinp and STAR used consistentlv throughout.

Standard: Steps are circled as performed, crossed out as completed and N/Ad as appropriate. STAR used consistently for each manipulation.

  • Critical Step TIME FINISH:

Terminating Cue: Bus 4 energized from Vernon Tie line.

Evaluators Comments:

System: 295003 WAS: AK1.03 AK2.02 AK3.01 AA1.O1 AKl.04 AK2.03 AK 1.06 System: 226001 WAS: K2.01 K4.06 A2.03 A4.01 A2.07 A4.03 System Generic WAS: 2.1.1 2.4.11 2.1.2 2.4.48 2.1.20 2.1.23 2.1.28 2.1.30

VERMONT YANKEE * -

JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Manual RCIC Start With Injection to the Rx Vessel Failure Mode Failure of the Flow Controller in Auto

Reference:

OP 2i21 Appendix C, Reactor Core Isolation cool in,^ System R e v 2 Task Number: 2170030101 Task Performance: AO/RO/SRO __ RO/SRO & SRO Only Sequence Critical: Yes - No Time Critical: Yes- N o 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation __ Performance Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Manager Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is slupped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, 1 will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

There has been a spurious Group I isolation and resulting Rx scram (simulated). All three feed pumps are unavailable. Actions have been taken IAW OT 3 100 and EOP-1.

Initiatine Cues:

The CRS directs you to start RCIC and inject to the vessel to raise level to the normal band (150" -

160") IAW OP 2121 Appendix C.

Task Standards:

Operator starts RCIC and injects to the vessel. Reactor vessel level is increasing.

Required Materials:

OP 2121, Reactor Core Isolation Cooling System, Appendix C Siniula tor §et -Up:

Reset to IC 865; Ensure Malf KC03 @ 0% is entered.

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain OP 2121, Review Administrative Limits, Precautions, and Prerequisites Standard: OP 2121, Section D MAY be obtained. Admin. limits, precautions and prerequisites reviewed. However, Appendix C, the mini-procedure is expected to be used.

Interim Cue: If asked, inform operator that all prerequisites are satisfied.

SAT/UNSAT *Step 2: Open lube oil COOLING WATER RCIC-132 Standard: RCIC-132 handswitch on CRP 9-4 positioned to OPEN. Observe red light ON, green light OFF SATAJNSAT *Step 3: Start the GLAND SEAL VACUUM PUMP Standard: Vacuum pump switch on CRP 9-4 positioned to ON. Observe red light ON, green light OFF SATrCTNSAT *Step 4: Open MINIMUM FLOW RCIC-27 Standard: RCIC-27 handswitch positioned to OPEN Observe RCIC-27 red light ON, green light OFF SAT/UNSA T *Step 5: Open STEAM SUPPLY RCIC-131 Standard: RCIC-131 handswitch positioned to OPEN Observe RCIC-131 red light ON, green light OFF SATNNSAT Step 6: Confirm turbine start by observing TURBINE SPEED SI 13-2 and PUMP DISCHARGE PRESSURE PI 13-93 increasing Standard: Observes turbine RPM. SI 13-2, and pump discharge presrure, PI 13-93, incre:xing (CRP 9-4 vertical display)

Evaluation Performance Steps AT/UNSAT *Step 7: Open PUMP DISCHARGE, RCIC-21 Standard: RCIC-2 1 handswitch positioned to OPEN Observe RCIC-21 red light ON, green light OFF SATKJNSAT Step 8: Operator notes the failure of RCIC flow to increase to 400 GPM.

Standard: Operator observes flow <400 GPM on FI-91-1 Interim Cue: If operator requests additional guidance from SCRO, instruct h i m to take the necessary actions to inject with RCIC at 400 GPM or as necessary to return level to the normal band.

SATKJNSAT *Step 9: Shift RCIC controller to manual to control level 150 to 160 Standard: Operator shifts RCIC controller knob into manual position on FIC-91 at CRP 9-4.

SAT/UNSAT *Step 10: Verify that Minimum Flow RCIC-27 closes (automatic) at approximately 80 GPM Standard: Operator verifies auto closure of RCIC -27 when flow reaches approx. 80 gPm SATKJNSAT Step 11: Monitor the following parameters:

EXHAUST PRESSURE 0-20 psig SUCTION PRESSURE 6-30 psig STM SUPPLY PRESSURE 50-1120 psig TURBINE SPEED >2200-5000 rpm Standard: Observes Exhaust pressure, suction pressure, supply pressure and turbine speed on the indicators on CRP 9-4 SAT/UNSAT Step 13: Place KeepinP and STAR used consistently through out Stmdard: Steps are circled as performed, crossed out as complete and N/Ad as appropriate. STAR us,d consistently for each simulated manipulation.

  • Critical Step TIME FINISH:

Terminating Cue: RCIC started and injecting to the vessel.

'?valuators Comments:

VERMONT YANKEE .

JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Perform Core Spray "A" Ouarterly Full Flow Test Failure Mode: Minimum Flow Valve Fails Shut

Reference:

OP 4123, Core Spray System Surveillance, Rev. 34 Task Number: 209001020~

Task Performance: AO/RO/SRO __ KO/SRO Only X SI5 Only -

Sequence Critical: Yes - No Time Critical: Yes __ No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS __ FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Rcviewer Date lpproved by:

Operations Training Supervisor Date

Wrections:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer arly questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Tnitial Conditions:

The plant is operating at power during normal operations.

Initiating Cues:

You have been directed by the CRS to perform the Core Spray Quarterly Full Flow Test on the "A" Core Spray Pump IAW OP 4123. Document results on Form VYOPF 4123.01A.

Task Standards:

"A" Core Spray Quarterly Full Flow Test performed satisfactorily.

Required Materials:

OP 4123, Core Spray System Surveillance (latest revision)

Form VYOPF 4123.01 (latest revision) with Steps 1 & 2 data filled in Reset t o IC 866

TIME START: . .

SATRJNSAT Step 1: Obtain Procedure, review administrative limits, precautions and pre-requisites Standard: OP 4123 obtained including VYOPF 4123.01A, administrative limits, precautions, and prerequisites reviewed Interim Cue: If asked, inform operatar that prerequisites are done.

SATAJNSAT Step 2: Notify RP that the system testinp will be performed and test gapes will be installed Standard: Operator notifies RP of pump testing and gage installation.

Interim Cue: Inform Operator that RP has been notified.

SATKJNSAT Step 3: Direct A 0 to install safety class temporary test gauges on selected Core Spray suction and discharge piping per OP 4123, step C.2.

Standard: Operator directs that temporary test gauges be installed and verified IAW procedure Steps C.2 Interim Cue: Inform Operator that the A 0 has completed step C.2.

SATRJNSAT Step 4: Prompts SCRO to deciare Core Spray Subsystem "A" inoperable, and to enter either LCO 3.5.A.2 or 3.5.A.6 per step C.3.c.

Standard: Operator prompts SCRO to declare Core Spray "A"inop, and to enter appropriate LCOs Interim Cue: As SCKO, acknowledge prompt to declare Core Spray "A" inop and to enter appropriate LCO.

3ATAJNSAT *Step 5: Start Core Spray Pump "A" (step C.3.d)

Standard: Operator places Core Spray Pump "A" hand switch to START on CRP

9-3 horizontal panel, and observes red ligFt On, green light Off above pump start switch. I .

SATKJNSAT Step 6: Verify Core Spray Pump "A" running (step C.3.d)

Standard: Operator observes running amps approximately 90 SATPUNSAT *Step 7: Verify Minimum Flow Valve CS-SA remains open (step C.3.e)

Standard: Operator identifies that CS-SA opens when pump is started SATmSAT Step 8: Verify that annunciator 3-A-7 'ADS PERMISSIVE RHR?CS RUNNING' energizes Standard: Operator verifies annunciator 3-A-7energizes.

qAT/UNSAT Step 9: Check that the appropriate RRU started automatically Standard: Operator contacts A 0 to check RRU auto started (or checks back panel).

Interim Cue: As AO, acknowledge appropriate RRU has started automatically. Can also be checked on control room back panel RP 9-25 (RRU-7)

SATAJNSAT *Step 10: Throttle FULL FLOW TEST CS-26A to obtain 3100-3150 gpm as read on PUMP FLOW FI 14-50A.

Standard: Operator throttles flow to obtain 3100-3150 gpm.

SATAJNSAT *Step 11: Verify valve MINIMUM FLOW CS-SA closes as flow increases Standard: Operator verifies valve MINTMUM FLOW CS-SA closes by observing GREEN light ON, RED Light OFF.

aAT/UNSAT Step 12: Maintain test parameters until all readings and measurements have been taken

Standard: Operator maintains test parameters.

Interim Cue: Provide data sheet completed thru step C.5.a. AND advise operator that testing is complete and the surveillance can continue at step C.5.b.

SAT/UNSAT *Step 13: Close FULL FLOW TEST CS-26A. Continue to hold the control switch for approximately 5 seconds after valve closure.

Standard: Operator closes FULL FLOW TEST CS-2614 and holds control switch for appr-ox. 5 seconds after valve closure.

SATKJNSAT *Step 14: Verify Minimum Flow Valve CS-SA remains open Standard: Operator identifies that CS-SA did not open; informs SCRO Interim Cue: If informed as SCRO that valve has failed shut, acknowledge report.

SATKINSAT *Step 15: Secure Core Spray Pump "A" Standard: Operator secures pump by taking control switch at CRP 9-3 to STOP.

This step is required to prevent pump damage by running pump dead headed. See CAUTION prior to step C.3.e.

SATKINSAT Step 16: Place Keeping and STAR used consistently throughout.

Standard: Steps are circled as performed, crossed out as completed and N/A'd as appropriate. STAR used consistently for each manipulation.

  • Critical Step TIME FINISH:

Terrninatiiig Cue: "A" Core Spray Pump secured ilfter once it is noted that the Minimum Flow Valve fails shut.

valuator Comments:

VERMONT YANKEE JOB PERFORMANCE MEASURE -

WORKSHEET NRC EXAM 2007 Task Identification:

Title:

PCIS Group V Failure Failure Mode: RWCU Fails to Isolate Upon SLC Initiation

Reference:

OP 21 14LOperation of the Standhv Liquid Control Svstem (Rev. 22)

Task Number: 2110050101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No Time Critical: Yes - No 3 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom __ Simulator X Plant Performance Expected Completion Time: 5 minutes Evaluation Results:

Performance: PASS - FAIL. - Time Required:

Prepared by:

Ope7 atjo:.ik Tnnining lnsiructor Dale Reviewed by:

SRO LicensedKertified Reviewer Date

?proved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the simulator and you are to perform all actions.

-You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is experiencing an ATWS.

Initiating Cues:

You have been directed by the CRS to initiate and verify SLC injection to the reactor vessel OP 21 14, App.B.

Task Standards:

Boron injected to the reactor vessel IAW OP 21 14 Required Materials:

OP 21 14, Operation of the Standby Liquid Control System (latest revision)

Simulator Setup:

RCS& ii IC SG7

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain and review OP 2114 Appendix B Standard: OP 21 14 Appendix B obtained and reviewed Interim Cue: If asked, all prerequisites are SAT SATAJNSAT *§tep 2: Unlock SLC Switch by positioning the kev to the two o'clock position Standard: Key positioned to the two o'clock positon SATAJNSAT *Step 3: Turn SLC switch to SYS 1or SYS 2.

Standard: SLC Switch turned to the SYS 1 or SYS 2 position SAT/UNSAT Step 4: Verify that the "A/B" SLC Pump starts Standard: Operator verifies that the "A" or "B" SLC Pump is running by observing the Red light On and Green light Off SATAJNSAT Step 5: SLC discharge pressure increases as indicated on PI-11-65 Standard: Operator observes rising pressure indicated on PI 11-65 on CPR 9-5 SATAJNSAT *Step 6: On CRP 9-4, RWCU system isolation valves automatically close:

CU-15 (Outlet Isolation)

CU-18 (Inlet Isolation)

CU-68 (Return Isolation)

St::ndard: Operator recognizes that thc RIYCU Sjstem did NOT isolate NOTE: Operator may elect to take SLC switch to the other position (per step 4 of Appendix B) before manually closing the RWCU valves.

Evaluation Performance Steps

QT/UNSAT *Step 7: Manually close CU-15 L Standard: Operator places the CU-15 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU- 15 SAT/UNSAT *Step 8: Manually close CU-18 Standard: Operator places the CU-18 control switch on CRP 9-4 to CLOSE and verifies i t closes by observing the Green lisht On md Red light Off fnr-CU- 18 SAT/UNSAT *Step 9: Manually close CU-68 Standard: Operator places the CU-68 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light On and Red light Off for CU-68 SATrUNSAT Step 10: Squib valve SLC-l4A(B) fires, as indicated by:

Red flow indicator light on (flow greater than 30 gpm).

Standard: Operator observes the following:

Operator observes Red Flow Indicator light is energized on CRP 9-5 SLC tank level decreases as indicated on LI-11-66.

Standard: Operator observes SLC Tank Level indicator (LI 11-66) and verifies that level indication is lowering SAT/UNSAT Step 11: Place Keeping and STAR used consistently throughout.

Standard: Steps are circled as performed, crossed out as completed and N/A'd as appropriate. STAR used consistently for each maipulation.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 20Q7 Task Identification:

Title:

Perform Weeklv Operable Control Rod Check

Reference:

OP 41 11 Control Rod Drive System Surveillance Task Number: 20 10020201 Task Performance: AO/RO/SRO - RO/SRO SRO Only Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Method of Testing: Simulation - Performance Discuss Setting: Classroom _. Simulator X Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Approved by:

Operations Training Supervisor Date

Trections: Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person beinq evaluated:

I Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

ritial Conditions: Normal Full power Rx operation I nitiating Cues: The CRS directs you to complete the Weekly Operable Control Rod Check per OP 41 11.

Task Standards: Control rod 18-43 satisfactory cycled.

Required Materials: OP 41 11 Control Rod Drive System Surveillance VYOPF 41 11.02 Simulator Setup: Reset to IC 868, ERFIS Printer energized, Ensure CRD flows are in the Green Band.

Eva1uation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure OP 41 11 and VYOPF 41 11.02 review admin limits, precautions and prerequisites reviewed.

Standard: OP 41 11 obtained section A, VYOPF 41 11.02 form obtained, admin limits, precautions and prerequisites reviewed.

Interim Cue: Prerequisites are complete.

SAT/UNSAT Step 2: Demand and print control rod positions display (CRD) to document initial control rod positions Standard: Select "PSRP" display on ERFIS, ensure printer is ON, and print display.

iterim Cue: Once the operator brings up the PSRP screen, inform the operator that the printout was completed successfully.

SATNNSAT Step 3: If Reactor power is > 30%, verifv both RBM channels are operable.

Standard: Select a non edge control rod and verify RBM is operable on CRP 9-5. (verifies no RBM high, downscale, inop, or bypassed indicating lights are lit). May check RBM local indication on back panel.

SAT/UNSAT *Step 4: Select rod 18-43.

Standard: Energize rod select power, depress rod select pushbutton for 18-43.

SAT/U NSAT Step 5: Verifv rod 18-43 selected.

Standard: Verify rod select pushbutton is illuminated or full core display or RWM indicates 18-43 was selected..

SAT/UNSAT Step 6: Verify no adjacent control rod to rod 18-43 is presently at position 46.

Standard: Verify rods 22-03, 22-07, 18-07, and 14-07 are not at position 46 using full core display or ERFlS printout. -

SAT/UNSAT *Step 7: Drive rod 18-43 to position 46.

Standard: Momentarily place rod movement control switch to the "Rod in" position.

SATNNSAT Step 8: Verifv rod 18-43 position decreases to position 46.

Standard: Verify rod 18-43 position is at 46 using full core or 4 rod position display on CRP 9-5.

SAT/U NSAT *Step 9: Withdraw rod 18-43 to position 48.

Standard: Momentarily place rod movement control switch to the "rod out notch" position.

SAT/U NSAT Step 10: Ensure Rod 18-43 is at position 48.

Standard: Verify rod 18-43 position is at 48 using full core or 4 rod display on CRP9-5.

SAT/UNSAT Step 11: If oriqinal rod position was 48 perform a coupling check at position 48.

Standard: Verify rod 18-43 position is at 48 using full core display and indicates RED on full core display. Provides continuous W/D signal for 3 to 5 seconds by simultaneously going to NOTCH OVERRIDE and ROD OUT, verifying:

0 The 4 rod display window continues to show 48 0 Verify control rod remains RED on full core display 0 The computer printout indicates coupling check SAT 0 The ROD OVER TRAVEL 5-D-4 .annunciator does not alarm SAT/UNSAT *Step 12: Initial VYOPF 4111.02 for rod 18-43.

Skmdard: IqitIals reccpc'Dd o n fow: for rod 18-43..

~~

'rlterim Cue: No further actions are required for this JPM.

TIME FINISH:

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Shutdown the Diesel Generator Locally Failure Mode: NIA

Reference:

OP 2126, Diesel Generators Task Number: 2647230101,2640090104 Task Performance: AOIROISRO X RO/SRO - SRO Only- A 0 Only -

Sequence Critical: Yes No Time Critical: Yes - No Operator Performing Task:

Examiner :

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss -

Setting: Classroom __ Simulator __ Plant Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the plant and you are to simulate the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The "A" DG has been running for 30 minutes, paralleled to the bus, loaded to 2500 KW for post maintenance testing of the local control panel. All Operator rounds have been completed satisfactorily, and the diesel is ready to be secured.

Initiating Cues:

You have been directed by the CRS to shutdown the diesel generator locally, per OP 2126, Section D.

Task Standards:

The local shutdown of the diesel generator is complete and satisfactory.

Required Materials:

OP 2126, Diesel Generators (latest revision)

Simu 1ator S 4 t h N/A

Evaluation Performance Steps TIME START: . -

SATANSAT Step 1: Obtain Procedure OP 2126 and review Precautions/Limitations.

Standard: OP 2126 obtained, reviewed the precautions/limitations Interim Cue: Inform operator the precautions/limitations are SAT.

Note: All steps are performed in the DG A Room.

SATAJNSAT *Step 2: On generator panel DG-l-lA(B), using the GOVERNOR control switch, gradually reduce load to approximately 50%.

Standard: On DG A, the operator intermittently positions diesel governor control switch to LOWER until generator unloads to 50% on Diesel Control Panel.

Interim Cue: DG unloaded to 1250 KW SATAJNSAT Step 3: Using the AUTO VOLTAGE REG ADJUST switch, adjust reactive load to as close to zero KVARs as possible Standard: Reactive load reads approximately zero KVARs.

Interim Cue: When asked, KVARs are reading approximately zero SATAJNSAT Step 4: Run unit at 50% load for 5 minutes.

Standard: Operator allows unit to run for 5 minutes at 50% load.

Tntcrim Cue: Tnform oi)er:ifvr that usin; Iime,-con;?ression. diese.1 hns beer, runninp at 50% load fc,r 5 minutes.

Evaluation Performance Steps SATAJNSAT *Step 4: On penerator panel DG-l-lA(B), using the GOVERNOR control

switch, unload unit to < 200 kw.

L Standard: Operator intermittently positions diesel governor control switch to LOWER until generator unloads to < 200KW, as indicated on the Diesel Control Panel.

Interim Cue: DG unloaded to 180 KW SATKJNSAT Step 5: On CRP 9-8 open diesel output breaker 4KV BREAKER DIESEL GENERATOR lA(B).

Standard: Operator directs another operator to open the DG 4 output breaker from CRP 9-8.

Interim Cue: Inform Operator that the output breaker has been opened, and DG KW is zero.

SATLJNSAT Step 6: Run unloaded for approximately 1 minute.

Standard: Operator allows diesel to run unloaded for approximately one minute.

Interim Cue: Inform Operator that using time-compression, the diesel has been running unloadedfor one minute.

SATLJNSAT *Step 7: Reset the SPEED DROOP to Zero Standard: Operator resets the speed droop to zero at the Diesel Goiernor. (Top left knob on governor.)

Interim Cue: Inform Operator that the speed droop is at zero.

valuation Performance Steps SAT/UNS A T Step 8: Check the voltage remlator maintaining approximately 4160V and the governor maintaining 60 Ilz.

Standard: Operator observes voltage and adjusts voltage regulator as necessary to maintain 4160V, and observes frequency meter and adjusts governor as necessary to maintain 60 HZ.

Interim Cue: Voltage indicates 4160V. Frequency is 60 Hz.

SATKJNSAT Step 9: Have a second operator independently verifv the governor is maintaining diesel generator frequency at 60 Hz.

Standard: Operator contacts another operator to perform independcnt vzrification of Diesel frequency.

Interim Cue: Second operator has performed independent verification.

SATKJNSAT *Step 10: Stop the diesel from the DG-l-lA(B) GENERATOR panel by depressing: the MANUAL ENG. STOP pushbutton.

Standard: Operator depresses the MANUAL ENG. STOP pushbutton on the Diesel Generator Control panel.

Interim Cue: DG slows, noise level is reduced to normal background.

SAT/UNSAT Step 11: Locally verify the following cycle on after the diesel has stopped.

a. Lube oil pump
b. Cooling water pumE
c. Heaters Standard: Operator observes breaker lights, pressures and amps, to verify lube oil pump, cooling water pump, and heater breakers cycle on as diesel speed decreases.

Interim Cue: If asked, inform Operator that the lube oil pump, cooling water pump, and heater breakers are oIer.:+r?g 2: d e s i p A.

Evaluation Performance Steps CATAJNSAT Step 12: Refill the diesel day tank to the automatic hiph level cutout bv depressing the FUEL OIL TRANSFER PUMP START button at the DG-1-A GENERATOR Panel.

Standard: Operator depresses the Fuel Oil Transfer Pump START button at the Diesel generator control panel.

Interim Cue: STAR? pushbutton is depressedRed light on SAT/UNSAT Step 13: Verify that the diesel day tank level alarms are clear.

Standard: Operator observes diesel day tank level alarms are clear.

Interim Cue: Inform the Operator that both Diesel Day tank alarms are clear. (DG-D-1, High level alarm and DG-D-2, Low level alarm)

SATAJNSAT Step 14: Close DLO-lOA(B),LO DAY TANK SUPPLY VALVE if previously opened to make up oil.

a. Verify lube oil makeup tank is a t least 5/8 full.
b. If lube oil tank level is < 518 full submit a WR Standard: Operator observes DLO-1OA position and if open, rotates valve hand wheel fully clockwise to the SHUT position.

Interim Cue: When Operator indicates he will check valve shut by rotating clockwise, inform Operator that the valve is closed and the lube oil tank level is > 5 / 8 full.

SATKJNSAT Step 15: Reset all relay targets.

Standard: Operator observes all relay targets on Diesel Control Panel.

Terminating Cue: All relays are reset, the EDG is shutdown. The JPM is complete S1TNNSA T Step 16: Pce-keeping and STAR riwd consistently through$

Standard: Steps are circled as performed crossed out as complete and WAd as appropriate. STAR used consistently for each simulated manipulation Critical Step TIME FINISH:

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Lineup to Operate SRV-71 A and B From The RCIC Room Failure Mode: NJA

Reference:

OP 3126, Appendix C, Shutdown Using Alternate Shutdown Methods, Task Number: 2007170501 Task Performance: AO/RO/SRO __ RO/SRO SRO Only __

Sequence Critical: Yes - No 3 Time Critical: Yes - No 2 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance __ Discuss -

Setting: Classroom - Simulator - Plant 3 Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed 'i;~!: ___

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Supervisor Date

lirections:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checkmg and the steps you are performing.

Inform me upon completion of this task.

,iitial Conditions:

Plant Shutdown is in progress from outside the Control Room, and reactor depressurization is required.

All OP 3126 Initial Actions are complete. Maintenance Electricians are not available to perform this procedure.

Initiating Cues:

The SM directs you to energize the Alt SD panels for RCIC and SRV in the RCIC room per OP 3126, Appendix C and report when available for operation, starting at step 4..Steps 1, 2 & 3 of Appendix C are complete.

Task Standards:

OP 3126. Appendix C (Steps 4 t!irough 6) prooyerly cornpl,oted.

Required Materials:

OP 3 126 (Shutdown Using Alternate Shutdown Methods) Appendix C (latest revision)

Evaluation Performance Steps

4 TIME START:

SATNNSAT Step 1: Obtain Procedure, review Appendix C.

Standard: OP 3 126 obtained, Appendix C reviewed.

SAT/UNSAT Step 2: At the RCIC Corner Room (RxBldg. 213' level) on ALTERNATE SHUTDOWN STATION ADS SAFETY RELIEF VALVES panel B1300SiI perform the following:

ChecWplace SAFETY RELIEF VALVE RV2-71A control switch to CLOSE Standard: Operator indicates switch closed Interim Cue: Inform Operator that switch is in CLOSE ATNNSAT Step 3: ChecWplace Safety Relief Valve RV2-71B control switch to CLOSE Standard: Operator indicates switch closed Interim Cue: Inform Operator that switch is in CLOSE SATRJNSAT *Step 4: At the APPENDIX R SRV ALT SHUTDOWN PANEL (RCIC Corner Room 232' level), Place ADS Transfer Switch (SS-752) to EMERGENCY.

Standard: Operator places the switch is in the EMERGENCY position.

Interim Cue: When operator indicates he will reposition the switch, inform him the switch moves sharply th, ? 2 E l ? G I 5 C Y psi1inn.

aAT/UNSAT *Step 5: At the RCIC Corner Room (Rx Bldg. 213' level) perform the following:

Transfer 125VDC Manual RCIC Transfer Switch (MTS-13-1) to EMERGENCY by turning counter-clockwise.

Standard: Operator turns switch counter-clockwise to the EMERGENCY position.

Interim Cue: Inform Operator that the switch moves smartly counter-clockwise to the EMERGENCY position.

SATKJNSAT *Step 6: At CP-82-1 RCIC ALTERNATE SHUTDOWN SYSTEM; place the three RCIC ALTERRNATE SHUTDOWN TRANSFER switches to EMER in the followinp sequence:

1) SS1178A
2) SS1178B
3) SS1178C Standard: The operator indicates that the transfer switches on the RCIC shutdown panel are placed in EMER in the following order: SS 1178A, SS 1178B, ss 1178c.

Interim Cue: When operator indicates he is placing the transfer switches in EMER, inform him that each switch moves counter-clockwise to the EMER position.

SATRJNSAT *Step 7: In panel B1300SI1, transfer the SRV control Dower knifeswitch to EMER.

Standard: Operator indicates the SRV control power knife switch is in EMER.

InteriE; Cur: Provide the opcmtor with the picture of the jnsidc of the panel. W h e n the cpzitor indicates that he is placing the knife switch in EMER, inform him the switch moves and then comes to a hard stop.

4T/UNSAT Step 8: If the power is not available on the panel, or to some valves, replace the fuses as described in Appendix E. ' ~

Standard: Operator indicates he would check the lights and meters for power.

Interim Cue: When the operator indicates that he is checking for power, inform him everything appears to be energized.

SAT/UNSAT Step 9: Notify SM that SRV Operation is Now Possible Standard: Operator notifies SR4 that SRV-71A or SRV-71B is ready for operation.

~~~

Interim Cue: When operator says he will call SM, inform him SM is informed.

SATPUNSAT Step 10: Place Keeping and STAR used consistently throuphout.

Standard: Steps are circled as performed, crossed out as completed and N/A'd as appropriate. STAR used consistently for each simulated manipulation.

Lritical Step TIME FINISH:

Terminating Cue: OP 3126, Appendix C, Steps 4 through 7 properly completed.

Evaluator Comments:

System: -295016- WA's: K2.01

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Perform Local Firing of Squib Valves Failure Mode: NIA

Reference:

OE 3107, Rev 17, OE Appendices, Appendix I Task Number: 20070705 Task Performance: AO/RO/SRO X RO/SRO - SRO Only A 0 Only -

Sequence Critical: Yes - No Time Critical: Yes - No Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss Setting: Classroom - Simulator- Plant 2 Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date

e i L \ t i o ?)iV
-- ______I___

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsd'. Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before stdrting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Scram condition exists. Reactor is not shutdown, steps are being taken per EOP-2. Torus temperature is approaching 110°F and normal squib valve firing did not function. SLC keylock switch on CRP 9-5 is in OFF position.

Initiatinp Cues:

CRS directs you to assist the crew with Alternate SLC Injection by local firing of the squib valves using OE 3107, Appendix I starting at Step 4.

Task Standards:

SLC squib valve fired locally in accordance with OE 3107, Appendix I.

Required Materials:

OE 3 107, OE Appendices, Appendix I SLC System (G191171)

OP 4203, Maintenance and Testing of SLC Squib Valves

Evaluation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain the procedure, review prerequisites.

Standard: OE 3 IO7 Appendix I obtained; prerequisites reviewed.

SATAJNSAT *Step 2: Obtain a Firing Battery with an alligator clip on each end.

Standard: Firing Battery obtained from SLC EOP tool box.

Note: EOP toolbox should not be opened for this JPM.

Interim Cue: When the operator locates EOP Toolbox and indicates he will get battery firing device, inform him he has the battery firing device. Other prerequisites are satisfied.

SATAJNSAT *Step 3: Turn SLC switch (kevlock) to OFF.

Standard: Contacts control room to verify switch is in off.

Interim Cue: When the operator calls inform the operator that the switch is in OFF.

SATAJNSAT *Step 4: At SLC-l4A(B) SLC Injection Squib Valve: unscrew amphenol connector from the squib valve Standard: Squib Valve amphenol connector removed from SLC- 14A(B).

Interim Cue: When the operator locates squib valve and describes method to remove connector, inform him that the amphenol connector is disconnected.

SATAJNSAT *Step 5: Clip one of the leads from the batterv to Pin A.

Str,r?rlard: Jumper connccted from hattxy termin:il to Pin A; ?in .4 is the thicker pr; fc: T-i<-t c

1)

Interim Cue: When the operator indicates he will clip one lead from the battery to Pin A (using Figure 1 if necessary), inform him that the lead is connected.

Evaluation Performance Steps 4T/UNSAT *Step 6: Touch the other batterv lead to Pin B1 (next clockwise terminal).

Standard: Other lead from battery touched to Pin B (see Figure 1).

Interim Cue: When the operator indicates he will touch the other lead to the next clockwise terminal, inform operator that a pop was heard when terminal B was contacted.

SATNNSAT Step 7: Remove the Battery Standard: Battery and leads unclipped from amphenol terminals.

Interim Cue: When the operator indicates he will remove the battery and leads, inform him they are removed.

SAT/UNSAT Step 8: Turn SLC Switch (Keylock) to SYS 1 or SYS 2.

Standard: Contacts the Control Room to start a SLC pump.

Interim Cue: When the operator indicates that he will call to start the Control Room SLC pump, inform operator that the CRO started A SLC pump. The sound of a running pump can be heard.

Interim Cue: When the Control Room is contacted, inform the operator that they will perform the remainder of Appendix I.

SAT/UNSAT Step 9: Place-keeping and STAR used consistently throughout.

Standard: Steps are circled as performed crossed out as complete and N/Ad as appropriate. STAR used consistently for each simulated manipulation SAT/UNSAT Step 10: Industrial Safety Standards were followed consistcntly throughout.

Standard: Safety Standards followcrJ :e . c d.