{{#Wiki_filter:Appendix D Scenario 1Form ES-D-1Page 1 of 20Facility: ANO-2Scenario No.: 1 (Modified)Op-Test No.: 2008-1Examiners:Operators:Initial Conditions:100% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motortagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.Turnover:100%. 250 EFPD. EOOS indicates 'Minimal Risk.' MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED TrainMaintenance Week.EventNo.Malf. No.EventType*EventDescription 1N (CBOT)Start 'B' Component Cooling Water pump 'B' andsecure 'C' Component Cooling Water pump.
{{#Wiki_filter:Appendix D                               Scenario 1                                        Form ES-D-1 Facility: ANO-2                      Scenario No.: 1 (Modified)               Op-Test No.: 2008-1 Examiners:                                           Operators:
2XRCCHAPCNTI (ATC)Pressurizer control channel pressure fails high.
Initial Conditions:
32CV4652C (ATC)'B' normal spray valve sticks open 4XSG2PT10411I (CBOT)'A' Steam Generator pressure safety channel fails low.Tech Spec for CRS.
100% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.
5SGATUBEN (CBOT)R (ATC)5 gpm tube leak on 'A' Steam Generator. Tech Spec for CRS 6SGATUBEM (ALL)'A' Steam Generator tube leakage ramps up to 300 gpmover 10 minutes. Manual reactor trip criteria whengreater than 44 gpm.
Turnover:
7 2K11_C2 2K11_C4C (ATC)Reverse rotation alarm for the reactor coolant pumpattempted to stop.
100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.
8XMSHDRPRSI (CBOT)Steam Dump and Bypass Control System fails toautomatically open bypass and dump valves to controlSteam Generator pressure.
Event          Malf. No.         Event                                  Event No.                             Type*                               Description 1                            N (CBOT)     Start B Component Cooling Water pump B and secure C Component Cooling Water pump.
9 2SI10A HPI2P89BC (CBOT) 2P89A, 'A' High Pressure Safety Injection pumpcoupling failure (no discharge pressure).2P89B, 'B' High Pressure Safety Injection pump fails tostart automatically.*   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor Appendix D Scenario 1Form ES-D-1Page 2 of 20Scenario #1 Objectives 1)Evaluate individual ability to operate safety related equipment.
2      XRCCHAPCNT            I (ATC)       Pressurizer control channel pressure fails high.
2)Evaluate individual response to a failure of a pressurizer pressure control channel failure.
3      2CV4652                C (ATC)       B normal spray valve sticks open 4      XSG2PT10411            I (CBOT)     A Steam Generator pressure safety channel fails low.
3)Evaluate individual response to a failure of a pressurizer spray valve to automatically close.
Tech Spec for CRS.
4)Evaluate individual response to a small Pri-Sec leak.
5      SGATUBE                N (CBOT)     5 gpm tube leak on A Steam Generator. Tech Spec for R (ATC)      CRS 6      SGATUBE                M (ALL)       A Steam Generator tube leakage ramps up to 300 gpm over 10 minutes. Manual reactor trip criteria when greater than 44 gpm.
5)Evaluate individual ability to perform a reduction in plant power.
7     2K11_C2               C (ATC)       Reverse rotation alarm for the reactor coolant pump 2K11_C4                              attempted to stop.
6)Evaluate individual ability to mitigate a SGTR.
8      XMSHDRPRS              I (CBOT)     Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.
7)Evaluate individual response to a failure of a reactor coolant pump reverse rotation device.
9     2SI10A                 C (CBOT)     2P89A, A High Pressure Safety Injection pump HPI2P89B                            coupling failure (no discharge pressure).
8)Evaluate individual response to a failure of the steam dump and bypass control system.
2P89B, B High Pressure Safety Injection pump fails to start automatically.
9)Evaluate individual ability to monitor operation of emergency core cooling equipment.
* (N)ormal,     (R)eactivity, (I)nstrument, (C)omponent,     (M)ajor Page 1 of 20
SCENARIO #1 NARRATIVESimulator session begins with the plant at 100% power steady state. Main turbine generator turninggear is tagged out. Gland seal regulator, 2PCV0231 is jacked closed.When the crew has completed their control room walk down and brief, the CBOT will start 'B'Component Cooling Water (CCW) Pump and secure 'C' Component Cooling Water Pump (CCW)using OP 2104.028 section 18.2.After the 'B' CCW pump is placed in serve and 'C' CCW is secured and cued by lead examiner, the'A' channel Pressurizer (PZR) control channel will fail high. This will result in both main sprayvalves to automatically open and both proportional heater banks to go to minimum fire. Actual PZRpressure will drop and will result in an automatic reactor trip, if actions are not taken to mitigate theevent. The Control Room Supervisor (CRS) will enter Abnormal operating procedure OP 2203.028,PZR systems malfunctions will be entered. The CRS will direct selecting the opposite controlchannel. The ATC will report that one of the spray valves, 2CV4652 did not close. The CRS willdirect the failed spray valve to be isolated.After the 'B' PZR control channel is placed in service and 2CV 4652 is isolated and cued by leadexaminer, 'A' Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. Thiswill trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSISpre-trip, RPS channel trip/pre-trip, and channel 'A' operator insert (2C03) trip and pre-trip lightswill be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1, 3.3.3.5 and3.3.3.6 for guidance. The CBOT will place Channel 'A' PPS in bypass for point 11, SG pressurelow, point 19, 'A' SG delta-P for EFAS 1, and point 20, 'B' SG delta-P for EFAS 2 formaintenance and trouble shooting. The crew will have one hour to place these points in bypassbefore exceeding the tech spec LCO.After the 'A' PPS channel is placed in bypass and cued by lead examiner, a 5.0 gpm primary tosecondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038.CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec3.4.6.2. The CRS will direct the NLO's to control secondary contamination using standardattachment 19 and direct the chemists to sample the SG's for activity. The CRS will isolate steamto 'A' EFW pump from 'A' SG and enter TS 3.7.1.2. The crew will perform a plant shutdown. CRSwill declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.
 
Appendix D Scenario 1Form ES-D-1Page 3 of 20SCENARIO #1 NARRATIVE (continued)After the CBOR has completed the required reactivity manipulation and cued by lead examiner, a300 gpm SGTR on 'A' SG will start with a ramp of 10 minutes. Secondary System Radiation Hi,SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators willalarm. The CBOR/ATC recognizes that the SGTR is greater than 44gpm. The CRS will direct theCBOR will manually trip the reactor.Post trip, when PZR pressure drops less than 1400psia, the ATC should secure 'B' and 'D' RCP'sand receive a reverse rotation alarm on 'B' RCP. The CRS will direct all RCP's to be secured. Thiswill result in natural circulation conditions in the Reactor Coolant System.Also post trip, the steam dump and bypass control system (SDBCS) main steam pressure instrumentwill fail low. This will result in SDBCS not automatically controlling main steam header pressurecausing the main steam safety valves to lift on both Steam Generators. The CRS will direct theCBOT to manually control one of the bypass valves to the condenser to stop the offsite release fromthe ruptured steam generator.The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001.The CRS will diagnose a steam Generator tube rupture greater than charging pump capacity andenter EOP 2202.004, Steam Generator Tube Rupture (SGTR).The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to thecondenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the 'A' SGusing standard attachment 10 when RCS Thot is less than 535°F. CRS will declare an ALERT EALbased on 2.2, RCS leakage greater than 44 gpm.Post SIAS, the 'B' High Pressure Safety Injection (HPSI) pump Breaker will fail to startautomatically (green train) and the 'A' high pressure safety injection pump will experience a failedcoupling so it will not develop any discharge pressure. The CBOT will place the 'A' HPSI pumphandswitch in Pull-to-Lock (PTL) and manually start the 'B' HPSI pump and/or manually start the'C' HPSI pump on the Red train to satisfy the required HSPI flow requirements.
Appendix D                             Scenario 1                                      Form ES-D-1 Scenario #1 Objectives
Appendix D Scenario 1Form ES-D-1Page 4 of 20Simulator Instructions for Scenario 1Reset simulator to MOL 100% power IC stead state.Ensure that AACG is secured and annunciators clear.Ensure hotwell level is ~80%.Place MINIMAL RISK and RED Train Maintenance Week signs on 2C11.Swing ESF equipment aligned to the RED train.'B' CCP lead charging pump.2PCV0231, Gland sealing steam pressure control valve failed closed.T1, T2, T3 set to false.T5 set to Reactor trip.T6 set to SIAS1.EventNo.Malf. No.Value/RampTimeEventDescription 1 0.0Place 'B' CCW pump in service, secure 'C' CCW pump.
: 1) Evaluate individual ability to operate safety related equipment.
2XRCCHAPCNTTrigger = T12500 'A' PZR control channel fails HIGH.
: 2) Evaluate individual response to a failure of a pressurizer pressure control channel failure.
3CV4652Trigger = T1 1.0Ramp =10 secs'B' spray valve fails open; 4XSG2PT10411Trigger = T2 0'A' Steam generator safety channel pressure transmitterfails low.
: 3) Evaluate individual response to a failure of a pressurizer spray valve to automatically close.
5SGATUBETrigger = T35.0    'A' SG primary-secondary leak.
: 4) Evaluate individual response to a small Pri-Sec leak.
6SGATUBE CUED 300RAMP=10 MIN'A' Steam Generator Tube Rupture (300 gpm rampedover 10 Minutes).
: 5) Evaluate individual ability to perform a reduction in plant power.
7RCP2P32AREVRCP2P32BREVTrigger = T5TRUEWhen 'A' or 'B' RCP secured, reverse rotationannunciator will alarm.
: 6) Evaluate individual ability to mitigate a SGTR.
8XMSHDRPRSTrigger = T5 650SDBCS main steam header pressure fails low.
: 7) Evaluate individual response to a failure of a reactor coolant pump reverse rotation device.
9 2SI10 A HPI2P89BTrigger = T6 0.0TRUE'A' HPSI pump coupling failure.'B' HPSI pump fails to automatically start on SIAS.
: 8) Evaluate individual response to a failure of the steam dump and bypass control system.
Appendix D Scenario 1Form ES-D-1Page 5 of 20Simulator Operator CUEsAt T=0CBOT will place 'B' CCW pump inservice and secure 'C' CCWpump.CUE: Report as AO that 'B' CCW pump has been vented at 2CCW-1029 and a solid stream ofwater was observed.Cued byleadexaminerTrigger T1'A' PZR pressure control channel fails High.Cue: Report that I & C planner will begin planning work on failed pressure instrument.Trigger T1PZR 'B' main spray valve fails to close when openedCued byleadexaminerTrigger T2'A' Steam Generator Pressure safety channel fails low.Cue: Report that I & C planner will begin planning work on failed pressure instrument.Cued byleadexaminerTrigger T3'A' Steam Generator 5 gpm tube leak.Cue: As Auxiliary Operator, report thatstandard attachment 19, control of secondarycontamination is in progress.Cue: When notified of requirement to sample SG's as Chemist, after 15 minutes reportthat the sample analysis is in progress and that when frisking sample 'A' SG countrate washigher than 'B' SG.The CRS will direct the NLO's to and direct the chemists to sample the SG's for activity.Cued byleadexaminerRaise 'A' SG tube leak to 500 gpm ramped over 10 minutes. This willresult in a manual reactor trip.Cue: As Auxiliary operator, report that actions for standard attachment 10 for 'A' steam generatorisolation outside the control room actions have been completed.Tripping 'A'or 'B'ReactorCoolantPumpTrigger T5Reverse rotation alarm when pump is secured. This will result insecuring all reactor coolant pumps.Reactor Trip Trigger T5 Steam dump and bypass control system pressure input will fail low.This results in no automatic response to control main steam pressurepost reactor trip.SIAS1Trigger T62SI10 is closed. This will result in 'A' HPSI pump not developingdischarge pressure.'B' HPSI pump will not start automatically must be manually started.Cue: As waste control operator report that the coupling on 'A' HPSI pump is damaged andseparated from the motor.
: 9) Evaluate individual ability to monitor operation of emergency core cooling equipment.
Appendix D Scenario 1Form ES-D-1Page 6 of 20Op-Test No.: 1                                 Scenario No.: 1                                   Event No.:   1Event
SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power steady state. Main turbine generator turning gear is tagged out. Gland seal regulator, 2PCV0231 is jacked closed.
When the crew has completed their control room walk down and brief, the CBOT will start B Component Cooling Water (CCW) Pump and secure C Component Cooling Water Pump (CCW) using OP 2104.028 section 18.2.
After the B CCW pump is placed in serve and C CCW is secured and cued by lead examiner, the A channel Pressurizer (PZR) control channel will fail high. This will result in both main spray valves to automatically open and both proportional heater banks to go to minimum fire. Actual PZR pressure will drop and will result in an automatic reactor trip, if actions are not taken to mitigate the event. The Control Room Supervisor (CRS) will enter Abnormal operating procedure OP 2203.028, PZR systems malfunctions will be entered. The CRS will direct selecting the opposite control channel. The ATC will report that one of the spray valves, 2CV4652 did not close. The CRS will direct the failed spray valve to be isolated.
After the B PZR control channel is placed in service and 2CV 4652 is isolated and cued by lead examiner, A Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel A operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1, 3.3.3.5 and 3.3.3.6 for guidance. The CBOT will place Channel A PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.
After the A PPS channel is placed in bypass and cued by lead examiner, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038.
CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. The crew will perform a plant shutdown. CRS will declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.
Page 2 of 20
 
Appendix D                               Scenario 1                                  Form ES-D-1 SCENARIO #1 NARRATIVE (continued)
After the CBOR has completed the required reactivity manipulation and cued by lead examiner, a 300 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR/ATC recognizes that the SGTR is greater than 44gpm. The CRS will direct the CBOR will manually trip the reactor.
Post trip, when PZR pressure drops less than 1400psia, the ATC should secure B and D RCPs and receive a reverse rotation alarm on B RCP. The CRS will direct all RCPs to be secured. This will result in natural circulation conditions in the Reactor Coolant System.
Also post trip, the steam dump and bypass control system (SDBCS) main steam pressure instrument will fail low. This will result in SDBCS not automatically controlling main steam header pressure causing the main steam safety valves to lift on both Steam Generators. The CRS will direct the CBOT to manually control one of the bypass valves to the condenser to stop the offsite release from the ruptured steam generator.
The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001.
The CRS will diagnose a steam Generator tube rupture greater than charging pump capacity and enter EOP 2202.004, Steam Generator Tube Rupture (SGTR).
The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F. CRS will declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.
Post SIAS, the B High Pressure Safety Injection (HPSI) pump Breaker will fail to start automatically (green train) and the A high pressure safety injection pump will experience a failed coupling so it will not develop any discharge pressure. The CBOT will place the A HPSI pump handswitch in Pull-to-Lock (PTL) and manually start the B HPSI pump and/or manually start the C HPSI pump on the Red train to satisfy the required HSPI flow requirements.
Page 3 of 20
 
Appendix D                             Scenario 1                                      Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 100% power IC stead state.
Ensure that AACG is secured and annunciators clear.
Ensure hotwell level is ~80%.
Place MINIMAL RISK and RED Train Maintenance Week signs on 2C11.
Swing ESF equipment aligned to the RED train.
B CCP lead charging pump.
2PCV0231, Gland sealing steam pressure control valve failed closed.
T1, T2, T3 set to false.
T5 set to Reactor trip.
T6 set to SIAS1.
Event          Malf. No.     Value/                                 Event No.                          Ramp                              Description Time 1                             0.0    Place B CCW pump in service, secure C CCW pump.
2      XRCCHAPCNT            2500    A PZR control channel fails HIGH.
Trigger = T1 3      CV4652                1.0    B spray valve fails open; Trigger = T1        Ramp =
10 secs 4      XSG2PT10411            0     A Steam generator safety channel pressure transmitter Trigger = T2                  fails low.
5      SGATUBE                5.0    A SG primary-secondary leak.
Trigger = T3 6      SGATUBE              300      A Steam Generator Tube Rupture (300 gpm ramped CUED                RAMP=      over 10 Minutes).
10 MIN 7      RCP2P32AREV          TRUE      When A or B RCP secured, reverse rotation RCP2P32BREV                    annunciator will alarm.
Trigger = T5 8      XMSHDRPRS            650      SDBCS main steam header pressure fails low.
Trigger = T5 9       2SI10 A               0.0    A HPSI pump coupling failure.
HPI2P89B            TRUE      B HPSI pump fails to automatically start on SIAS.
Trigger = T6 Page 4 of 20
 
Appendix D                               Scenario 1                                        Form ES-D-1 Simulator Operator CUEs At T=0                            CBOT will place B CCW pump inservice and secure C CCW pump.
CUE: Report as AO that B CCW pump has been vented at 2CCW-1029 and a solid stream of water was observed.
Cued by        Trigger T1       A PZR pressure control channel fails High.
lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.
Trigger T1        PZR B main spray valve fails to close when opened Cued by        Trigger T2       A Steam Generator Pressure safety channel fails low.
lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.
Cued by        Trigger T3       A Steam Generator 5 gpm tube leak.
lead examiner Cue: As Auxiliary Operator, report that standard attachment 19, control of secondary contamination is in progress.
Cue: When notified of requirement to sample SGs as Chemist, after 15 minutes report that the sample analysis is in progress and that when frisking sample A SG countrate was higher than B SG.
The CRS will direct the NLOs to and direct the chemists to sample the SGs for activity.
Cued by                          Raise A SG tube leak to 500 gpm ramped over 10 minutes. This will lead                              result in a manual reactor trip.
examiner Cue: As Auxiliary operator, report that actions for standard attachment 10 for A steam generator isolation outside the control room actions have been completed.
Tripping A   Trigger T5        Reverse rotation alarm when pump is secured. This will result in or B                            securing all reactor coolant pumps.
Reactor Coolant Pump Reactor Trip   Trigger T5         Steam dump and bypass control system pressure input will fail low.
This results in no automatic response to control main steam pressure post reactor trip.
SIAS1          Trigger T6        2SI10 is closed. This will result in A HPSI pump not developing discharge pressure.
B HPSI pump will not start automatically must be manually started.
Cue: As waste control operator report that the coupling on A HPSI pump is damaged and separated from the motor.
Page 5 of 20
 
Appendix D                             Scenario 1                                    Form ES-D-1 Op-Test No.: 1                   Scenario No.: 1                       Event No.: 1 Event


== Description:==
== Description:==
CBOT places 'B' component cooling water pump in service and secures 'C'component cooling water pump.TimePositionApplicant's Actions or Behavior CRSDirect the CBOT to secure 'B' CCW pump and secure 'C' CCW pump.
CBOT places B component cooling water pump in service and secures C component cooling water pump.
CBOTReview OP 2104.028 section 8.2.
Time        Position                          Applicant's Actions or Behavior CRS        Direct the CBOT to secure B CCW pump and secure C CCW pump.
CBOTWill perform the following:Verify open 2P-33C/B Suction Crossover (2CV-5221).Verify open 2P-33C/B Discharge Crossover (2CV-5232).Direct AO to throttle open 2P-33B Casing Vent (2CCW-1029).Place 2P-33B handswitch (2HS-5228) to START.Observe the following:
CBOT        Review OP 2104.028 section 8.2.
oNormal flow 1000 to 3000 gpm (2FIS-5202) o2P-33B discharge pressure 100 to 120 psig (2PI-5234)Place 2P-33C handswitch (2HS-5234) in Pull To Lock.Termination criteria: When 'B' CCW pump is secured and 'C' CCW is secured or at leadexaminer's descretion.
CBOT        Will perform the following:
Appendix D Scenario 1Form ES-D-1Page 7 of 20Op-Test No.: 1                                 Scenario No.: 1                                   Event No.:   2Event
Verify open 2P-33C/B Suction Crossover (2CV-5221).
Verify open 2P-33C/B Discharge Crossover (2CV-5232).
Direct AO to throttle open 2P-33B Casing Vent (2CCW-1029).
Place 2P-33B handswitch (2HS-5228) to START.
Observe the following:
o Normal flow 1000 to 3000 gpm (2FIS-5202) o 2P-33B discharge pressure 100 to 120 psig (2PI-5234)
Place 2P-33C handswitch (2HS-5234) in Pull To Lock.
Termination criteria: When B CCW pump is secured and C CCW is secured or at lead examiners descretion.
Page 6 of 20
 
Appendix D                             Scenario 1                                      Form ES-D-1 Op-Test No.: 1                     Scenario No.: 1                       Event No.: 2 Event


== Description:==
== Description:==
Channel '1' Pressurizer Pressure instrument will fail High.TimePositionApplicant's Actions or BehaviorATCAnnounce annunciator 2K10-E6 Pressurizer Pressure Control Channel 1Pressure HI / LO alarm is due to High pressure.
Channel 1 Pressurizer Pressure instrument will fail High.
CRSRefer to PZR Systems Malfunctions AOP 2203.028 and direct boardoperators actions.Refer toTS 3.2.8 if pressure not 2025 to 2275 psia.Could direct placing SDBCS valves in manual closedATCCompare channels and determine Channel 1 failed High.Place PZR Pressure Channel Select switch (2HS-4626) toChannel 2.Restore heaters to automatic control, if secured.Verify that PZR heaters respond as designed.Verify that 'B' PZR spray valve closed.Announce that 'A' PZR spray valve did not close as expected.
Time        Position                            Applicant's Actions or Behavior ATC        Announce annunciator 2K10-E6 Pressurizer Pressure Control Channel 1 Pressure HI / LO alarm is due to High pressure.
CBOTPlace SDBCS Master controller in AUTO local and adjust set-point to1000 psia. Termination Criteria: PZR pressure control selected to channel 2 in auto control or at leadexaminer's discretion.
CRS        Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
Appendix D Scenario 1Form ES-D-1Page 8 of 20Op-Test No.: 1                                 Scenario No.: 1                                   Event No.:   3Event
Refer to TS 3.2.8 if pressure not 2025 to 2275 psia.
Could direct placing SDBCS valves in manual closed ATC        Compare channels and determine Channel 1 failed High.
Place PZR Pressure Channel Select switch (2HS-4626) to Channel 2.
Restore heaters to automatic control, if secured.
Verify that PZR heaters respond as designed.
Verify that B PZR spray valve closed.
Announce that A PZR spray valve did not close as expected.
CBOT        Place SDBCS Master controller in AUTO local and adjust set-point to 1000 psia.
Termination Criteria: PZR pressure control selected to channel 2 in auto control or at lead examiner's discretion.
Page 7 of 20
 
Appendix D                           Scenario 1                                        Form ES-D-1 Op-Test No.: 1                   Scenario No.: 1                         Event No.: 3 Event


== Description:==
== Description:==
2CV4652, 'B' spray valve sticks OPEN.TimePositionApplicant's Actions or BehaviorATCAnnounce 2CV4652 did not close.
2CV4652, B spray valve sticks OPEN.
CRSRefer to PZR Systems Malfunctions AOP 2203.028 and direct boardoperators actions.Direct ATC to close 2CV4652 per the AOP.Direct the ATC to close 2CV4652 isolation valve.ATCAttempt to close 2CV4652 by placing the control switch to MAN androtating the hand switch to the OPEN direction for 1 second then afterwaiting 5 seconds rotating the hand switch to the CLOSE position.Report that 2CV4652 did not close.ATCClose 2CV4652 isolation valves by rotation hand switch to CLOSE.Report that Pressurizer Pressure is restoring to set point. Termination Criteria: When 2CV4652 is isolated or at lead examiner's discretion.
Time        Position                          Applicant's Actions or Behavior ATC      Announce 2CV4652 did not close.
Appendix D Scenario 1Form ES-D-1Page 9 of 20Op-Test No.: 1                                   Scenario No.: 1                           Event No.:   4Event
CRS      Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
Direct ATC to close 2CV4652 per the AOP.
Direct the ATC to close 2CV4652 isolation valve.
ATC      Attempt to close 2CV4652 by placing the control switch to MAN and rotating the hand switch to the OPEN direction for 1 second then after waiting 5 seconds rotating the hand switch to the CLOSE position.
Report that 2CV4652 did not close.
ATC      Close 2CV4652 isolation valves by rotation hand switch to CLOSE.
Report that Pressurizer Pressure is restoring to set point.
Termination Criteria: When 2CV4652 is isolated or at lead examiners discretion.
Page 8 of 20
 
Appendix D                               Scenario 1                                      Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                 Event No.: 4 Event


== Description:==
== Description:==
'A' Steam Generator pressure transmitter, 2PT1041-1, on Channel 'A' fails low.TimePositionApplicant's Actions or BehaviorATCAnnounce annunciators:2K04-A4 CH A RPS/ESF/PRETRIP/TRIP2K04-B3 PPS Channel TRIP2K04-E4 MSIS PRETRIPCompare all safety channels four channels and report 2PI-1041-1 hasfailed low.
A Steam Generator pressure transmitter, 2PT1041-1, on Channel A fails low.
CRSImplement Annunciator Corrective Action AOP 2203.012D.ATCReport A SG low pressure pretrip/trip on PPS insert.
Time        Position                            Applicant's Actions or Behavior ATC          Announce annunciators:
CBOTCompare all four channels and report 2PI-1041-1 indicates zero.
2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04-B3 PPS Channel TRIP 2K04-E4 MSIS PRETRIP Compare all safety channels four channels and report 2PI-1041-1 has failed low.
CRSEnter Tech Spec3.3.1.1 and 3.3.2.1, 3.3.3.5 and 3.3.3.6.
CRS          Implement Annunciator Corrective Action AOP 2203.012D.
CBOTPlace the following channels in bypass on Channel A:A SG PRESS low (Bistable 11)A SGP - EFAS 1 (Bistable 19)A SGP - EFAS 2 (Bistable 20)ATCVerify annunciator 2K04-C3 PPS CHANNEL BYPASSEDVerify correct channels in bypass.
ATC          Report A SG low pressure pretrip/trip on PPS insert.
CRSContact maintenance/PS liaison. Termination Criteria: Affected channel points placed in bypassor at lead examiner'sdiscretion.
CBOT          Compare all four channels and report 2PI-1041-1 indicates zero.
Appendix D Scenario 1Form ES-D-1Page 10 of 20Op-Test No.: 1                                   Scenario No.: 1                           Event No.:   5Event
CRS          Enter Tech Spec 3.3.1.1 and 3.3.2.1, 3.3.3.5 and 3.3.3.6.
CBOT          Place the following channels in bypass on Channel A:
A SG PRESS low (Bistable 11)
A SG P - EFAS 1 (Bistable 19)
A SG P - EFAS 2 (Bistable 20)
ATC          Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.
CRS          Contact maintenance/PS liaison.
Termination Criteria: Affected channel points placed in bypass or at lead examiner's discretion.
Page 9 of 20
 
Appendix D                             Scenario 1                                      Form ES-D-1 Op-Test No.: 1                     Scenario No.: 1                 Event No.: 5 Event


== Description:==
== Description:==
5.0 GPM primary to secondary leak on 'A' SG.The CRS will enter the primaryto secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdownTimePositionApplicant's Actions or BehaviorATCAnnounce annunciators:2K11-A10Sec Sys Radiation Hi 2K11-J8SG Tube Leak Detection Rate of Change Hi2K11-K8SG Tube Leak Detection Trouble/LKRT Hi CRSImplement AOP 2203.038, PRI-SEC leakage and perform the following:Direct CBO's to perform RCS leak ratesEnter TS 3.4.6.2Direct AO to perform standardattachment 19, control of secondarycontaminationDirect the chemists to sample the SG's for activityDirect CBOT to isolate steam to 'A' EFW pump from 'A' SG andenter Tech Spec 3.7.1.2Determine Action level 3 of AOP 2203.038 is applicable and a shutdownto less than 50% in one hour and to be in mode 3 within 2 hours isapplicable.Direct CBOR to perform a plant shutdown using normal boration method.Declare and NUE EAL based on criteria 3.2, S/G Tube Leak greaterthan Tech. Spec. Limits.
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time      Position                          Applicant's Actions or Behavior ATC        Announce annunciators:
CBOTClose 2CV 1000-1, steam from 'A' SG to 'A' EFW pump.Announce 2K04-F2 annunciator as expected due to INOP of 2P7A.
2K11-A10      Sec Sys Radiation Hi 2K11-J8        SG Tube Leak Detection Rate of Change Hi 2K11-K8        SG Tube Leak Detection Trouble/LKRT Hi CRS        Implement AOP 2203.038, PRI-SEC leakage and perform the following:
Appendix D Scenario 1Form ES-D-1Page 11 of 20Op-Test No.: 1                                   Scenario No.: 1                           Event No.:   5Event
Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG and enter Tech Spec 3.7.1.2 Determine Action level 3 of AOP 2203.038 is applicable and a shutdown to less than 50% in one hour and to be in mode 3 within 2 hours is applicable.
Direct CBOR to perform a plant shutdown using normal boration method.
Declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.
CBOT        Close 2CV 1000-1, steam from A SG to A EFW pump.
Announce 2K04-F2 annunciator as expected due to INOP of 2P7A.
Page 10 of 20
 
Appendix D                             Scenario 1                                        Form ES-D-1 Op-Test No.: 1                     Scenario No.: 1                   Event No.: 5 Event


== Description:==
== Description:==
5.0 GPM primary to secondary leak on 'A' SG.The CRS will enter the primaryto secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdownATCPerform a plant shutdownUse reactivity plans to determine the amount of boron required.Adjust turbine load to maintain Tave within 2°F of Tref.Insert CEA's as directed by reactivity plan.AOP requires a 2 hour shutdown to Mode 3.The CRS may determine a rapid plant shutdown of 1 hour to be in Mode 3is more conservative and this decision is acceptable.Termination criteria: When reactivity manipulations are satisfied or at the discretion of the leadexaminer.
5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown ATC        Perform a plant shutdown Use reactivity plans to determine the amount of boron required.
Appendix D Scenario 1Form ES-D-1Page 12 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   6Event
Adjust turbine load to maintain Tave within 2°F of Tref.
Insert CEAs as directed by reactivity plan.
AOP requires a 2 hour shutdown to Mode 3.
The CRS may determine a rapid plant shutdown of 1 hour to be in Mode 3 is more conservative and this decision is acceptable.
Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.
Page 11 of 20
 
Appendix D                                 Scenario 1                                      Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a natural circulationcool down of the RCS and manually Isolate 'A' SG.TimePositionApplicant's Actions or BehaviorATCReport that PZR level is loweringStart all back up CCP's or report that they are running.Isolate Letdown as required.
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a natural circulation cool down of the RCS and manually Isolate A SG.
CRSRecognize SGTR is greater than 44 gpm and meets the AOP trip criteria.Direct the CBOR to manually trip the reactorATCManually trip the reactor.
Time        Position                            Applicant's Actions or Behavior ATC          Report that PZR level is lowering Start all back up CCPs or report that they are running.
CRSImplement Standard Post Trip Actions, track safety functions, and directboard operators actions.ATCCheck reactivity control:Reactor power decreasing.All CEAs inserted.
Isolate Letdown as required.
CBOTCheck maintenance of vital auxiliaries:Main turbine tripped.Generator output and exciter breakers open.All 4160v and 6900 v Non-Vital busses energized.All 4160v and 480v vital AC bus energized.All 125v vital DC bus energized.
CRS          Recognize SGTR is greater than 44 gpm and meets the AOP trip criteria.
Appendix D Scenario 1Form ES-D-1Page 13 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   6Event
Direct the CBOR to manually trip the reactor ATC          Manually trip the reactor.
CRS          Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.
ATC          Check reactivity control:
Reactor power decreasing.
All CEAs inserted.
CBOT          Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160v and 6900 v Non-Vital busses energized.
All 4160v and 480v vital AC bus energized.
All 125v vital DC bus energized.
Page 12 of 20
 
Appendix D                                 Scenario 1                                      Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                       Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBORCheck inventory control:PZR level 10 to 80%.Trending from set point.Report SIAS actuated or manually actuate and verify all PZR heaters offwhen PZR level less than 29%.
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CBORCheck RCS pressure control:RCS pressure 1800 to 2250 psia.Trend from set pointSecure Two RCP's when RCS pressure is less than 1400 psia.Place spray valve for secured RCPs in manual closed.Verify SIAS when pressure less than 1650 psia.(See event 7 for actions on reverse rotation alarm.)
Time        Position                            Applicant's Actions or Behavior CBOR          Check inventory control:
CBORCheck core heat removal by forced circulation:RCP 's runningLoop T less than 10 F.RCS MTS 30 F or greater.Service water pump suction aligned to Lake.Component cooling water aligned to RCPs.
PZR level 10 to 80%.
CBOTRestore SW to ACW per Exhibit 5. (NOTE: This action requires severalminutes)Check SIAS actuated.Maintain SW pressure greater than 85 psig.
Trending from set point.
Appendix D Scenario 1Form ES-D-1Page 14 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.: 6Event
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
CBOR          Check RCS pressure control:
RCS pressure 1800 to 2250 psia.
Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.
Place spray valve for secured RCPs in manual closed.
Verify SIAS when pressure less than 1650 psia.
(See event 7 for actions on reverse rotation alarm.)
CBOR          Check core heat removal by forced circulation:
RCP s running Loop    T less than 10 F.
RCS MTS 30 F or greater.
Service water pump suction aligned to Lake.
Component cooling water aligned to RCPs.
CBOT          Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS actuated.
Maintain SW pressure greater than 85 psig.
Page 13 of 20
 
Appendix D                                 Scenario 1                                        Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                       Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBOTCheck RCS Heat Removal:Report SG levels and main feed water is in RTO.Report feed water line intact.Report SG pressures. Report that SG pressure is high and SDBCS isnot responding in AUTO.(See event 8 for actions due to SDBCS failure)
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CBORCheck CNTMT parameters:Temperature less than 140 F.Pressure less than 16 psia.Status of radiation alarms:     CAMS (2K10-B6) NOT in alarm     Area radiation (2K11-B10) NOT in alarm     Process liquid (2K11-C10) NOT in alarm     Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOTWill open 2CV0233, bypass around 2PCV0231 which is simulated closedto match condition of valve at plant. This is in response to low gland sealpressure.CRSNotify SM to perform the following:SE report to control room.Announce reactor trip on plant page.Refer to Tech Specs and EALs.
Time        Position                              Applicant's Actions or Behavior CBOT          Check RCS Heat Removal:
Appendix D Scenario 1Form ES-D-1Page 15 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   6Event
Report SG levels and main feed water is in RTO.
Report feed water line intact.
Report SG pressures. Report that SG pressure is high and SDBCS is not responding in AUTO.
(See event 8 for actions due to SDBCS failure)
CBOR          Check CNTMT parameters:
Temperature less than 140 F.
Pressure less than 16 psia.
Status of radiation alarms:
CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT          Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.
CRS          Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
Page 14 of 20
 
Appendix D                                 Scenario 1                                      Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
CRSDirect CBOs to acknowledge all control room annunciators and announceall significant alarms.Diagnose Steam Generator Tube Rupture CRSImplement Steam Generator Tube Rupture procedure and open placekeeping page.ALLPerform crew brief and review floating steps.
CRS          Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
CRSDetermine applicable floating steps:Commence natural circulation using bypass valves to thecondenser cool down to less than 535 F Thot.HPSI Override Criteria.
Diagnose Steam Generator Tube Rupture CRS          Implement Steam Generator Tube Rupture procedure and open place keeping page.
CRSDirect the following actions:Commence cool down to less than 535 F Thot.Inform SM to contact Chemistry to sample both SG for activity.Determine ruptured SGPerform post-SIAS actions:Verify Safety Injection flow to RCS:Isolate 'A' SG when RCS Thot is less than 535°FVerify HPSI override criteria met:RCS MTS 30°F or greater.PZR level greater than 29% and controlled.RVLMS LVL 03 or higher elevation indicates WET.At least ONE intact SG available for Heat RemovalLevel 10 to 90% with FW available.Declare an ALERT EAL based on 2.2, RCS leakage greater than 44gpm.
ALL          Perform crew brief and review floating steps.
Appendix D Scenario 1Form ES-D-1Page 16 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   6Event
CRS          Determine applicable floating steps:
Commence natural circulation using bypass valves to the condenser cool down to less than 535 F Thot.
HPSI Override Criteria.
CRS          Direct the following actions:
Commence cool down to less than 535 F Thot.
Inform SM to contact Chemistry to sample both SG for activity.
Determine ruptured SG Perform post-SIAS actions:
Verify Safety Injection flow to RCS:
Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met:
RCS MTS 30°F or greater.
PZR level greater than 29% and controlled.
RVLMS LVL 03 or higher elevation indicates WET.
At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.
Declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.
Page 15 of 20
 
Appendix D                               Scenario 1                                      Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                       Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or BehaviorCriticalStep ATCRCS cool down to less than 535°F T-hot : (floating step)ATCReset low SG set points.Commence RCS depressurization to maintain RCS MTS 30 to 45 (WhenHPSI overridden)Take manual control of SDBCS bypass valves to condenser(2CV0302/2CV0303)Place ALL ADV Permissive switches in OFF.Verify EFW feeding SGs.Secure running MFW pump.Close ALL MFW Block valves.Record and plot cool down on Attachments 1 and 8.ATC /CBOT Verify Safety Injection flow to RCS:Check HPSI flow using Exhibit 2.(SEE event 9 on actions due to HPSI failures)Check LPSI flow using Exhibit 3.
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Appendix D Scenario 1Form ES-D-1Page 17 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   6Event
Time        Position                            Applicant's Actions or Behavior Critical      ATC          RCS cool down to less than 535°F T-hot : (floating step)
Step ATC          Reset low SG set points.
Commence RCS depressurization to maintain RCS MTS 30 to 45 (When HPSI overridden)
Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)
Place ALL ADV Permissive switches in OFF.
Verify EFW feeding SGs.
Secure running MFW pump.
Close ALL MFW Block valves.
Record and plot cool down on Attachments 1 and 8.
ATC /CBOT       Verify Safety Injection flow to RCS:
Check HPSI flow using Exhibit 2.
(SEE event 9 on actions due to HPSI failures)
Check LPSI flow using Exhibit 3.
Page 16 of 20
 
Appendix D                                 Scenario 1                                    Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                     Event No.: 6 Event


== Description:==
== Description:==
300 gpm Tube Rupture on 'A' Steam Generator ramped over 10 Minutes. This willresult in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCSand manually Isolate 'A' SG.TimePositionApplicant's Actions or Behavior CBOTPerform post-SIAS actions:SW pumps running on each loop.EDG SW outlet valves open.SW pump suction aligned to Lake.Report all non-vital buses energized.Verify SG sample valves open.CriticalStep CBOTUse Attachment 10 to isolate Ruptured SGATC /CBOTOVERRIDE HPSI:Throttle HPSI flow OR place HPSI pumps in PTL as needed to controlRCS pressure, inventory, and heat removal.Termination criteria: RCS Cool down to less than 535°F and 'A' SG isolated or at examinersdiscretion.
300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.
Appendix D Scenario 1Form ES-D-1Page 18 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   7Event
Time        Position                            Applicant's Actions or Behavior CBOT          Perform post-SIAS actions:
SW pumps running on each loop.
EDG SW outlet valves open.
SW pump suction aligned to Lake.
Report all non-vital buses energized.
Verify SG sample valves open.
Critical      CBOT          Use Attachment 10 to isolate Ruptured SG Step ATC /         OVERRIDE HPSI:
CBOT          Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.
Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion.
Page 17 of 20
 
Appendix D                                 Scenario 1                                      Form ES-D-1 Op-Test No.: 1                         Scenario No.: 1                       Event No.: 7 Event


== Description:==
== Description:==
Reverse rotation alarm when Reactor Coolant Pump 'A' or 'B' secured whichresults in securing all reactor coolant pumps.TimePositionApplicant's Actions or BehaviorATCAnnounces 2K11-C2 or 2K11-C4 annunciator for reverse rotation ofassociated reactor coolant pump.
Reverse rotation alarm when Reactor Coolant Pump A or B secured which results in securing all reactor coolant pumps.
CRSRefers to annunciator corrective actions OP 2203.012K and directs ATC tosecure ALL Reactor Coolant Pumps.ATCSecures remaining reactor coolant pumps and places associated sprayvalves to Manual.Verifies pumps secured (amperages, delta 'P' and Green light forassociated breaker lit).Termination criteria: When ALL RCP's are secured or at discretion of lead examiner.
Time          Position                            Applicant's Actions or Behavior ATC        Announces 2K11-C2 or 2K11-C4 annunciator for reverse rotation of associated reactor coolant pump.
Appendix D Scenario 1Form ES-D-1Page 19 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   8Event
CRS        Refers to annunciator corrective actions OP 2203.012K and directs ATC to secure ALL Reactor Coolant Pumps.
ATC        Secures remaining reactor coolant pumps and places associated spray valves to Manual.
Verifies pumps secured (amperages, delta P and Green light for associated breaker lit).
Termination criteria: When ALL RCPs are secured or at discretion of lead examiner.
Page 18 of 20
 
Appendix D                             Scenario 1                                      Form ES-D-1 Op-Test No.: 1                     Scenario No.: 1                     Event No.: 8 Event


== Description:==
== Description:==
Steam Dump and Bypass Control System fails to automatically open bypass anddump valves to control Steam Generator pressure.TimePositionApplicant's Actions or Behavior CBOTRecognize and announce that SDBCS is NOT maintaining steamGenerator pressure.
Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.
CRSDirect CBOT to manually control Steam Generator pressure by eithertaking manual control of a SDBCS bypass valve or place the SDBCSmaster controller in manual and adjust output to open SDBCS bypassvalve(s) to maintain Steam Generator pressure 950 to 1000 psia.
Time        Position                            Applicant's Actions or Behavior CBOT        Recognize and announce that SDBCS is NOT maintaining steam Generator pressure.
CBOTManually control SDBCS valves to control Steam Generator pressure.Termination criteria: SDBCS is controlled manually or at the discretion of the lead examiner.
CRS        Direct CBOT to manually control Steam Generator pressure by either taking manual control of a SDBCS bypass valve or place the SDBCS master controller in manual and adjust output to open SDBCS bypass valve(s) to maintain Steam Generator pressure 950 to 1000 psia.
Appendix D Scenario 1Form ES-D-1Page 20 of 20Op-Test No.: 1                                 Scenario No.: 1                                 Event No.:   9Event
CBOT        Manually control SDBCS valves to control Steam Generator pressure.
Termination criteria: SDBCS is controlled manually or at the discretion of the lead examiner.
Page 19 of 20
 
Appendix D                               Scenario 1                                      Form ES-D-1 Op-Test No.: 1                       Scenario No.: 1                     Event No.: 9 Event


== Description:==
== Description:==
2P89B, 'B' High Pressure Safety Injection pump (HPSI) fails to auto-start and 'A'High Pressure Safety Injection Pump fails to develop discharge pressure.TimePositionApplicant's Actions or Behavior CBOTRecognizes and announces failure of 'B' HPSI pump to automaticallystart.Announces failure of 'A' HPSI CRSDirect CBOT start 'C' HPSI pump (2P89C) and/or start 'B' HPSI pump(2P89B).Direct WCO to investigate 'A' HPSI pump operation.CriticalStepCriticalPart is toeitherstart2P89Bor Start2P89C.CBOTOn 2C17, took hand switch for 'A' HPSI pump (2P89A) to pull-to-lock and took hand switch for 'C' HPSI pump (2P89C) to start andverified discharge pressure (if pressure < 1450psia, verified flow toRCS).AND/OROn 2C16, took hand switch for 'B' HPSI pump (2P89B) to start andverified discharge pressure (if pressure < 1450psia, verified flow toRCS).Termination criteria: When 'B' HPSI pump is started or when 'C' HPSI pump is started or atthe discretion of the lead examiner.
2P89B, B High Pressure Safety Injection pump (HPSI) fails to auto-start and A High Pressure Safety Injection Pump fails to develop discharge pressure.
Appendix D                                 Scenario 2 Form ES-D-1 Facility: ANO-2   Scenario No.: 2 (Modified) Op-Test No.: 2008-1 Page 1 Examiners: Operators:
Time        Position                          Applicant's Actions or Behavior CBOT        Recognizes and announces failure of B HPSI pump to automatically start.
Initial Conditions: 85% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. 'A' MFP offline to repair Electro-Hydraulic leak. RED Train Maintenance Week.
Announces failure of A HPSI CRS        Direct CBOT start C HPSI pump (2P89C) and/or start B HPSI pump (2P89B).
Direct WCO to investigate A HPSI pump operation.
Critical      CBOT        On 2C17, took hand switch for A HPSI pump (2P89A) to pull-to-Step                      lock and took hand switch for C HPSI pump (2P89C) to start and verified discharge pressure (if pressure < 1450psia, verified flow to Critical                    RCS).
Part is to                      AND/OR either start                    On 2C16, took hand switch for B HPSI pump (2P89B) to start and 2P89B                      verified discharge pressure (if pressure < 1450psia, verified flow to or Start                    RCS).
2P89C.
Termination criteria: When B HPSI pump is started or when C HPSI pump is started or at the discretion of the lead examiner.
Page 20 of 20
 
Appendix D                                   Scenario 2                                             Form ES-D-1 Facility: ANO-2                           Scenario No.: 2 (Modified)                 Op-Test No.: 2008-1 Page 1 Examiners:                                                 Operators:
Initial Conditions: 85% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. A MFP offline to repair Electro-Hydraulic leak. RED Train Maintenance Week.
Turnover:
Turnover:
85%. 250 EFPD. EOOS indicates 'Acceptable Risk (9.3)'. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. 'A' Main feed pump Electro-Hydraulic leak repaired and ready to be placed in service. OP 2106.007 is complete up to section 10.0 for placing 'A' MFP in service. RED Train Maintenance Week.
85%. 250 EFPD. EOOS indicates Acceptable Risk (9.3). MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. A Main feed pump Electro-Hydraulic leak repaired and ready to be placed in service. OP 2106.007 is complete up to section 10.0 for placing A MFP in service. RED Train Maintenance Week.
Event No. Malf. No. Event Type* Event Description 1   N (CBOT)
Event           Malf. No.         Event                                      Event No.                                Type*                                   Description 1                               N (CBOT)       Place A Main Feed Pump in service.
Place 'A' Main Feed Pump in service. 2 XFW2TE0361 I (CBOT) Temperature indicator to Main Feed Pump oil cooler fails low.
2     XFW2TE0361               I (CBOT)       Temperature indicator to Main Feed Pump oil cooler fails low.
3 CVC2P36BFAL C (ATC) 'B' Coolant Charging Pump motor fault. TRM for CRS.
3     CVC2P36BFAL               C (ATC)         B Coolant Charging Pump motor fault. TRM for CRS.
4 BKR1205 BKR1218  Startup transformer #2 lockout. Tech Spec for CRS.
4     BKR1205                                   Startup transformer #2 lockout. Tech Spec for CRS.
5 CEA24DROP N (CBOT)
BKR1218 5     CEA24DROP                 N (CBOT)       Control Element Assembly #24 drops to bottom of core.
R (ATC) Control Element Assembly #24 drops to bottom of core.
R (ATC)        Tech Spec for CRS.
Tech Spec for CRS.
6     500LOSE500               M (ALL)         Loss of Off-Site Power.
6 500LOSE500 500LOSE161 M (ALL) Loss of Off-Site Power.
500LOSE161 7     MTGTRPLOCKO               C (ATC)         Main turbine lockout.
7 MTGTRPLOCKO RPSRXMAN RPSRXAUTO C (ATC) Main turbine lockout. Failure of the reactor protection system to automatically or manually trip the reactor. Tech Spec for CRS. 8 EDGDG1OIL CV0332 C (CBOT) Loss of both Emergency Feed Water pumps resulting in loss of all Feed water to steam generators.
RPSRXMAN                                  Failure of the reactor protection system to automatically RPSRXAUTO                                or manually trip the reactor. Tech Spec for CRS.
9 Loss of instrument air  C (ATC) Loss of instrument air results in using upstream atmospheric dump valve isolation valves to control steaming rate. *   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,   (M)ajor  
8     EDGDG1OIL                 C (CBOT)       Loss of both Emergency Feed Water pumps resulting in CV0332                                    loss of all Feed water to steam generators.
9     Loss of instrument       C (ATC)         Loss of instrument air results in using upstream air                                      atmospheric dump valve isolation valves to control steaming rate.
* (N)ormal,       (R)eactivity, (I)nstrument,     (C)omponent,     (M)ajor


Appendix D                                 Scenario 3 Form ES-D-1 Facility: ANO-2   Scenario No.: 3                                         Op-Test No.: 2008-1 Examiners: Operators:
Appendix D                               Scenario 3                                       Form ES-D-1 Facility: ANO-2                       Scenario No.: 3                           Op-Test No.: 2008-1 Examiners:                                         Operators:
Initial Conditions: 100 % MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.
Initial Conditions: 100 % MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.
Turnover:
Turnover:
100%. 250 EFPD. EOOS indicates 'Minimal Risk.' MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.
100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.
Event No. Malf. No. Event Type* Event Description 1 XRCCHAPLVL I (ATC)  
Event         Malf. No.         Event                                  Event No.                            Type*                               Description 1       XRCCHAPLVL             I (ATC)       A Pressurizer level channel fails High.
'A' Pressurizer level channel fails High. 2 2SV8263-2 C (CBOT) Containment Isolation Valve for containment air monitoring system 2RITS8271, fails closed. Tech Spec for CRS. 3 NIBLINEPWR I (CBOT) 'B' channel nuclear instrument fails low. Tech Spec for CRS. 4 FWPMPATRP N (CBOT)
2       2SV8263-2             C (CBOT)     Containment Isolation Valve for containment air monitoring system 2RITS8271, fails closed. Tech Spec for CRS.
R (ATC) 'A' main feed water pump trips due to thrust bearing wear. 5 FWAFT5A M (ALL)
3       NIBLINEPWR             I (CBOT)     B channel nuclear instrument fails low. Tech Spec for CRS.
Unisolable main feed water rupture inside containment.
4       FWPMPATRP             N (CBOT)       A main feed water pump trips due to thrust bearing R (ATC)      wear.
6 BUHTRS CHV2P36LOLVL C (ATC) Backup heaters fail to deenergize when pressurizer level drops below 29%. Backup CCPs fail to auto start on low PZR level. 7 Containment cooling fails C (CBOT) 'B' containment cooling fails to actuate. *   (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,    (M)ajor  
5       FWAFT5A               M (ALL)       Unisolable main feed water rupture inside containment.
 
6       BUHTRS                 C (ATC)       Backup heaters fail to deenergize when pressurizer level CHV2P36LOLVL                        drops below 29%.
JPM- ANO-2-JPM-NRC-SU2LOADSRO  PAGE  1  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2  REV #: 000  DATE:
Backup CCPs fail to auto start on low PZR level.
SYSTEM/DUTY AREA: A1a Conduct of Operations
7       Containment           C (CBOT)     B containment cooling fails to actuate.
cooling fails
* (N)ormal,     (R)eactivity, (I)nstrument, (C)omponent,    (M)ajor


TASK: Perform Transferring Unit Auxiliaries from SU3 or Unit Aux to SU2 JTA#: ANOROELECDNORM-026 KA VALUE RO: 3.4 SRO: 3.8 KA  
JPM- ANO-2-JPM-NRC-SU2LOADSRO                                                                PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:      2                        REV #:      000                      DATE:
SYSTEM/DUTY AREA:          A1a Conduct of Operations TASK:     Perform Transferring Unit Auxiliaries from SU3 or Unit Aux to SU2 JTA#:     ANOROELECDNORM-026 KA VALUE         RO:         3.4       SRO:           3.8       KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.32 APPROVED FOR ADMINISTRATION TO:                 RO:               SRO:       X TASK LOCATION:             INSIDE CR:                   OUTSIDE CR:               BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
2.1.32 APPROVED FOR ADMINISTRATION TO:
PLANT SITE:           Perform         SIMULATOR:             Perform         LAB:
RO:   SRO: X   TASK LOCATION:
POSITION EVALUATED:           RO:                       SRO:
INSIDE CR:
ACTUAL TESTING ENVIRONMENT:               SIMULATOR:                 PLANT SITE:         LAB:
OUTSIDE CR:
TESTING METHOD:         SIMULATE:                   PERFORM:
BOTH: X   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
APPROXIMATE COMPLETION TIME IN MINUTES:                       15 Minutes REFERENCE(S):       OP 2107.001 Attachment P EXAMINEE'S NAME:                                                       SSN:
PLANT SITE:
EVALUATOR'S NAME:
Perform SIMULATOR:
Perform LAB:   POSITION EVALUATED:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:   TESTING METHOD:
SIMULATE:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2107.001 Attachment P EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                         UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLIC ABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Start Time             Stop Time                   Total Time SIGNED:                                                   DATE:
 
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-SU2LOADSRO  PAGE  2  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
Mode 4; 250 EFPD. All ESF systems are in normal alignment.         
 
Startup Transformer #3 is supplying all AC electrical busses.
  'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.
  'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.
  'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
 
Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.  


JPM- ANO-2-JPM-NRC-SU2LOADSRO                                                                                    PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
Mode 4; 250 EFPD. All ESF systems are in normal alignment.
Startup Transformer #3 is supplying all AC electrical busses.
A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
B and D Reactor Coolant Pumps are running and A and C Reactor Coolant Pumps are secured.
Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
Unit 1 SU#2 feeder to A1(A111) is in normal after stop.
Unit 1 SU#2 feeder to A1(A111) is in normal after stop.
2H2 loading is 4MVA, 2H1 loading is 5 MVA
2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps TASK STANDARD: Identify at least 4 of the following 5 errors in OP 2107.001 section 11.0:
 
Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps TASK STANDARD:   Identify at least 4 of the following 5 errors in OP 2107.001 section 11.0:
: 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
: 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
: 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
: 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
: 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lo ck but in normal after stop.
: 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
: 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
: 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
: 5) Procedure step 11.8.5 was marked as complete when the load ing of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct)
: 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)
And Identified the error that SU#2 can not be placed in service in current configuration.
And Identified the error that SU#2 can not be placed in service in current configuration.
TASK PERFORMANCE AIDS: OP 2107.001 limits and precautions (section 5), completed section 11.0, and completed Attachment P.
SIMULATOR SETUP: N/A.


TASK PERFORMANCE AIDS:    OP 2107.001 limits and precautions (section 5), completed section 11.0, and completed Attachment 'P'.                         
JPM- ANO-2-JPM-NRC-SU2LOADSRO                                                                                   PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.
SIMULATOR SETUP:
N/A.
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
START TIME:
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Reviewed procedure OP 2107.001 section 11.0 and Attachment 'P' for errors.
PERFORMANCE CHECKLIST                                       STANDARDS                       (Circle One)
Identified 4 of the following 5 errors:
(C)       1.     Reviewed procedure OP 2107.001         Identified 4 of the following 5 errors:  N/A SAT UNSAT section 11.0 and Attachment P for
: 1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
: 1) Procedure step 11.6 was errors.
marked as NA when the initial conditions stated that the auto-transformer was out of service.
: 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
: 2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
: 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
: 3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
: 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running. 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment 'P is correct)
: 4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
N/A  SAT  UNSAT (C) 2. Determined that SU#2 availability.
: 5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)
Determined that and that SU#2 could not be placed in service in current configuration.
(C)       2.     Determined that SU#2 availability. Determined that and that SU#2 could     N/A SAT UNSAT not be placed in service in current configuration.
N/A  SAT  UNSAT END   STOP TIME:
END STOP TIME:
JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Mode 4; 250 EFPD. All ESF systems are in normal alignment.
 
Startup Transformer #3 is supplying all AC electrical busses.
JPM- ANO-2-JPM-NRC-SU2LOADSRO                                                                                     PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
  'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.  
* Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.  
* Startup Transformer #3 is supplying all AC electrical busses.
  'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
* A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.
* B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
* B and D Reactor Coolant Pumps are running and A and C Reactor Coolant Pumps are secured.
Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
* Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.
2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
* Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
* Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
* 2H2 loading is 4MVA, 2H1 loading is 5 MVA
* Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
* Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
* Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
* Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3) 4)
: 3)
Can Startup Transformer #2 be placed in service given the initial condition information? _____________
: 4)                                                                                                                            
 
Can Startup Transformer #2 be placed in service given the initial condition information? _____________  


JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Mode 4; 250 EFPD. All ESF systems are in normal alignment.
JPM- ANO-2-JPM-NRC-SU2LOADSRO                                                                                     PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
Startup Transformer #3 is supplying all AC electrical busses.
* Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  'A', 'C' and 'B' Condensate Pump are running for post maintenance testing and 'D' Condensate Pump is in pull to lock.  
* Startup Transformer #3 is supplying all AC electrical busses.
  'B' Circulating Water Pump is running and 'A' Circulating Water Pump is in pull to lock.  
* A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
  'B' and 'D' Reactor Coolant Pumps are running and 'A' and 'C' Reactor Coolant Pumps are secured.
* B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.
* B and D Reactor Coolant Pumps are running and A and C Reactor Coolant Pumps are secured.
Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
* Auto-transformer is out of service for the next 12 hours due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours.
Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
* Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
* Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
The SM directs, "Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed i n service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service." Current Plant Conditio ns are the same as the initial plant conditions.
* 2H2 loading is 4MVA, 2H1 loading is 5 MVA
* Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
* Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
* Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
* Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:
The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3) 4)
: 3)
: 4)                                                                                                                            
 
Can Startup Transformer #2 be placed in service given the initial condition information? _____________
Can Startup Transformer #2 be placed in service given the initial condition information? _____________


ANO-2-JPM-NRC-TTBCSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:
ANO-2-JPM-NRC-TTBCSRO                                                             PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   002                     DATE:
SYSTEM/DUTY AREA: Conduct of Operations (A.1) TASK: Calculate Time to Boil using computer program JTA#: ANO2RONORM4 KA VALUE RO: 3.9 SRO: 4.0 KA  
SYSTEM/DUTY AREA:         Conduct of Operations (A.1)
TASK:     Calculate Time to Boil using computer program JTA#:     ANO2RONORM4 KA VALUE       RO:         3.9       SRO:       4.0       KA  


==REFERENCE:==
==REFERENCE:==
2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:
2.1.23 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:     X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:         BOTH:         X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
TESTING METHOD: SIMULATE: PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.008 Attachment E EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
PLANT SITE:                         SIMULATOR:         Perform       Classroom:     Perform POSITION EVALUATED:         RO:                     SRO:         X ACTUAL TESTING ENVIRONMENT:         SIMULATOR:             PLANT SITE:         Classroom:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
TESTING METHOD:         SIMULATE:               PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:               10 Minutes REFERENCE(S):       1015.008 Attachment E EXAMINEE'S NAME:                                               SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                       UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time   SIGNED: DATE:
Start Time             Stop Time             Total Time SIGNED:                                           DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
AND IS CURRENT WITH THAT REVISION.  


ANO-2-JPM-NRC-TTBCSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ANO-2-JPM-NRC-TTBCSRO                                                                           PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Line 276: Line 494:
TASK STANDARD:
TASK STANDARD:
Identify Three (3) of the following four (4) errors in the original Time to boil calculation :
Identify Three (3) of the following four (4) errors in the original Time to boil calculation :
: 1) 2 code safety valves were recorded as remo ved and only one was removed in initial conditions.
: 1) 2 code safety valves were recorded as removed and only one was removed in initial conditions.
: 2) Initial RCS water level was recorded as 42" above the bottom of the hot leg instead of the correct 24".
: 2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
: 3) Current RCS temperature was recorded as 80&deg;F in stead of 105&deg;F as stated in the initial conditions.
: 3) Current RCS temperature was recorded as 80&deg;F instead of 105&deg;F as stated in the initial conditions.
: 4) Time after shutdown was recorded as 3 days 5 hour s instead of the correct 1 day and 11 hours (35 hours).
: 4) Time after shutdown was recorded as 3 days 5 hours instead of the correct 1 day and 11 hours (35 hours).
AND Identify that the RCS cannot be drained to reduc ed inventory due to TTTCU is less than 2 hours.
AND Identify that the RCS cannot be drained to reduced inventory due to TTTCU is less than 2 hours.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
1015.008 attachment E, Computer operational with the current revision of LOSDC2 installed. (SP-94-C-0001-01, Rev. 13), set up s hortcut to program on the desktop.
1015.008 attachment E, Computer operational with the current revision of LOSDC2 installed.
(SP-94-C-0001-01, Rev. 13), set up shortcut to program on the desktop.
SIMULATOR SETUP:
SIMULATOR SETUP:
NA EXAMINER'S NOTES:  
NA EXAMINER'S NOTES:


ANO-2-JPM-NRC-TTBCSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-TTBCSRO                                                                     PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.
 
PERFORMANCE CHECKLIST                                 STANDARDS                   (Circle One)
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. Compare time to boil (TTB) calculation using LOSDC2  
: 1. Compare time to boil (TTB)       Computer program independently      N/A SAT UNSAT calculation using LOSDC2         run and calculations compared to program.
 
(C)     2. Identified 3 of the 4 errors                                           N/A SAT UNSAT
program.
: 1) 2 code safety valves were recorded as removed instead of 1 code safety valve removed.
Computer program independently run and calculations compared to N/A  SAT  UNSAT (C) 2. Identified 3 of the 4 errors
: 2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
: 1) 2 code safety valves were recorded as removed instead of  
: 3) Current RCS temperature was recorded as 80&deg;F instead of the correct 105&deg;F.
 
: 4) Time after shutdown was recorded as 3 days 5 hours instead of the correct 1 day 11 hours (35 hours).
1 code safety valve removed.
(C)       3. Determined that the actual       Determined that the RCS cannot      N/A SAT UNSAT Time until core uncovery:         be drained to reduced inventory.
: 2) Initial RCS water level was recorded as 42" above the  
is 1 hour 50 min 36 sec EXAMINERS NOTE:
 
bottom of the hot leg instead of  
 
the correct 24".
: 3) Current RCS temperature was recorded as 80&deg;F instead of the  
 
correct 105&deg;F.
: 4) Time after shutdown was recorded as 3 days 5 hours  
 
instead of the correct 1 day 11  
 
hours (35 hours).
N/A  SAT  UNSAT (C) 3. Determined that the actual Time until core uncovery:
is 1 hour 50 min 36 sec Determined that the RCS cannot be drained to reduced inventory.
N/A  SAT  UNSAT EXAMINER'S NOTE:
Prompt the Examinee that the file should not be printed or saved.
Prompt the Examinee that the file should not be printed or saved.
END ANO-2-JPM-NRC-TTBCSRO  PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
END
Given the following Plant conditions:  Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams. PZR level is 40%. Time after shutdown = 35 hours;  One (1) PZR code safety valve is removed;  PZR manway is installed;  ECCS vent valves are de-energized OPEN;  NO RCP seal work in progress;  NO RCS cold or hot leg openings;  RCS Temperature is 105&deg;F.


ANO-2-JPM-NRC-TTBCSRO                                                                PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions:
* Plant shutdown for repair of Steam Generator Tube Leak.
* Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
* PZR level is 40%.
* Time after shutdown = 35 hours;
* One (1) PZR code safety valve is removed;
* PZR manway is installed;
* ECCS vent valves are de-energized OPEN;
* NO RCP seal work in progress;
* NO RCS cold or hot leg openings;
* RCS Temperature is 105&deg;F.
INITIATING CUE:
INITIATING CUE:
CRS/SM directs: "CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.
Do not print data or save LOSCD2 file.
Do not print data or save LOSCD2 file.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3)
: 3)                                                                                                                            
 
Answer the following question Yes or No:
Answer the following question Yes or No:
Can the RCS be drained to reduced inventory given the initial condition information?


Can the RCS be drained to reduced inventory gi ven the initial condition information?
ANO-2-JPM-NRC-TTBCSRO                                                                       PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-TTBCSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions:
Given the following Plant conditions: Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams. PZR level is 40%. Time after shutdown = 35 hours; One (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work in progress; NO RCS cold or hot leg openings; RCS Temperature is 105&deg;F.  
* Plant shutdown for repair of Steam Generator Tube Leak.
 
* Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
CRS/SM directs: "CRS/SM directs: "Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory."
* PZR level is 40%.
* Time after shutdown = 35 hours;
* One (1) PZR code safety valve is removed;
* PZR manway is installed;
* ECCS vent valves are de-energized OPEN;
* NO RCP seal work in progress;
* NO RCS cold or hot leg openings;
* RCS Temperature is 105&deg;F.
CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.
Do not print data or save LOSCD2 file.
Do not print data or save LOSCD2 file.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3)
: 3)                                                                                                                            
Can the RCS be drained to reduced inventory given the initial condition information? _____________


Can the RCS be drained to reduced inventory given the initial condition information? _____________
ANO-2-JPM-NRC-MAINTSRO                                                             PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                       REV #:   001                     DATE:
 
SYSTEM/DUTY AREA:         Conduct of Operations (A.2)
ANO-2-JPM-NRC-MAINTSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:
TASK:     Supervisory review of maintenance activities JTA#:     ANO-SRO-ADMIN-NORM-48 KA VALUE     RO:         2.1     SRO:         3.1       KA  
SYSTEM/DUTY AREA: Conduct of Operations (A.2) TASK: Supervisory review of maintenance activities JTA#: ANO-SRO-ADMIN-NORM-48 KA VALUE RO: 2.1 SRO: 3.1 KA  


==REFERENCE:==
==REFERENCE:==
2.2.19 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:
2.2.19 APPROVED FOR ADMINISTRATION TO:           RO:             SRO:     X TASK LOCATION:           INSIDE CR:               OUTSIDE CR:         BOTH:         X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
TESTING METHOD: SIMULATE: PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1025.003, Conduct of Maintenance EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
PLANT SITE:                       SIMULATOR:         Perform       Classroom:     Perform POSITION EVALUATED:         RO:                     SRO:         X ACTUAL TESTING ENVIRONMENT:       SIMULATOR:             PLANT SITE:         Classroom:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
TESTING METHOD:         SIMULATE:             PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:               10 Minutes REFERENCE(S):     1025.003, Conduct of Maintenance EXAMINEE'S NAME:                                               SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                     UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time   SIGNED: DATE:
Start Time             Stop Time             Total Time SIGNED:                                           DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
AND IS CURRENT WITH THAT REVISION.  


ANO-2-JPM-NRC-MAINTSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ANO-2-JPM-NRC-MAINTSRO                                                                       PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-
Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2.
: 2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.
* The clearance has been removed.
* There are currently no Equipment Status Log (ESL) entries.
TASK STANDARD:
TASK STANDARD:
Identified 3 of the following 4 errors.
Identified 3 of the following 4 errors.
: 1) 2SW-1514A 'As Found' and 'Restoration' positions are listed as CLOSED when required to be OPEN.
: 1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
: 2) 2SW-1514C 'Restoration' position is lis ted as OPEN when required to be CLOSED.
: 2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
: 3) 2SW-1514L 'Restoration' position is list ed as OPEN when required to be CLOSED.
: 3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
: 4) 2SW-1514L Restorer and Verifier initials are the same.
: 4) 2SW-1514L Restorer and Verifier initials are the same.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
Marked up copy of form 1025.003C, Main tenance Configuration Tracking Log Copy of OP 2104.019 Attachment D.
Marked up copy of form 1025.003C, Maintenance Configuration Tracking Log Copy of OP 2104.019 Attachment D.
SIMULATOR SETUP:
SIMULATOR SETUP:
NA EXAMINER'S NOTES:  
NA EXAMINER'S NOTES:
 
ANO-2-JPM-NRC-MAINTSRO  PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
CRS/SM directs: "Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)
Evaluator's Note: Provide examinee with a copy of 1025.003, Maintenance Configuration Tracking Log Sheet. 1. Review the Maintenance Configuration Tracking Log
 
Sheet Examinee reviewed the Maintenance Configuration
 
Tracking Log Sheet and
 
compared it to the normal lineup
 
in 2104.029, Attachment D.
N/A  SAT  UNSAT (C) 2. Identified 3 of the 4 errors.
Identified 3 of the following 4 errors. 1) 2SW-1514A 'As Found' and
'Restoration' positions are listed
 
as CLOSED when required to
 
be OPEN. 2) 2SW-1514C 'Restoration' position is listed as OPEN when
 
required to be CLOSED.
: 3) 2SW-1514L 'Restoration' position is listed as OPEN when


required to be CLOSED.
ANO-2-JPM-NRC-MAINTSRO                                                                    PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.
PERFORMANCE CHECKLIST                              STANDARDS                    (Circle One)
Evaluators Note: Provide examinee with a copy of 1025.003, Maintenance Configuration Tracking Log Sheet.
: 1. Review the Maintenance        Examinee reviewed the                N/A SAT UNSAT Configuration Tracking Log    Maintenance Configuration Sheet                        Tracking Log Sheet and compared it to the normal lineup in 2104.029, Attachment D.
(C)        2. Identified 3 of the 4 errors.                                      N/A SAT UNSAT Identified 3 of the following 4 errors.
: 1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
: 2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
: 3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
: 4) 2SW-1514L Restorer and Verifier initials are the same.
: 4) 2SW-1514L Restorer and Verifier initials are the same.
N/A  SAT  UNSAT END ANO-2-JPM-NRC-MAINTSRO  PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
END
Given the following Plant conditions:  Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.


ANO-2-JPM-NRC-MAINTSRO                                                    PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions:
* Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2.
* The clearance has been removed.
* There are currently no Equipment Status Log (ESL) entries.
INITIATING CUE:
INITIATING CUE:
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3)
: 3)                                                                                                                            
 
ANO-2-JPM-NRC-MAINTSRO  PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions:  Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2. The clearance has been removed. There are currently no Equipm ent Status Log (ESL) entries.


ANO-2-JPM-NRC-MAINTSRO                                                    PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Given the following Plant conditions:
* Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2.
* The clearance has been removed.
* There are currently no Equipment Status Log (ESL) entries.
INITIATING CUE:
INITIATING CUE:
CRS/SM directs: "Perform an Operations ve rification of the given 1025.003C form, Maintenance Configuration Tracking Log follo wing maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors."
CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3)
: 3)                                                                                                                            


JPM-ANO-2-JPM-ADMIN-PURGESRO   PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 001 DATE:
JPM-ANO-2-JPM-ADMIN-PURGESRO                                                         PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   001                   DATE:
SYSTEM/DUTY AREA: A.3: Radiation Control TASK: Review and approve Containment Purge Gaseous Release JTA#: ANOSROADMINNORM189 KA VALUE RO: 2.5 SRO: 3.4 KA  
SYSTEM/DUTY AREA:       A.3: Radiation Control TASK:     Review and approve Containment Purge Gaseous Release JTA#:     ANOSROADMINNORM189 KA VALUE       RO:       2.5     SRO:         3.4       KA  


==REFERENCE:==
==REFERENCE:==
2.3.9 APPROVED FOR ADMINISTRATION TO:          RO:            SRO:
X TASK LOCATION:          INSIDE CR:              OUTSIDE CR:            BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:                      CLASSROOM:
Perform                    Perform POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:            PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      OP 2104.033 EXAMINEE'S NAME:                                              SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.3.9    APPROVED FOR ADMINISTRATION TO:
JPM-ANO-2-JPM-ADMIN-PURGESRO                                                                                 PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is in Mode 5.
RO:    SRO:  X  TASK LOCATION:
Todays date is 03/10/2005.
INSIDE CR:
Chemistry has completed Containment atmosphere radioactivity analysis.
OUTSIDE CR:
Purge Exhaust Filter Unit doors have been verified closed and dogged.
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM.
PLANT SITE:
Initial count rate on 2RITS-8233, Containment Purge, is 60 cpm.
SIMULATOR:
Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
Perform  CLASSROOM:
Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
Perform  POSITION EVALUATED:
Last test reading run-time from engineering programs group is 7532.5 hrs.
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
Current run-time reading from 2B85-C7 is 8284.9 hrs.
SIMULATOR:
A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2104.033 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM-ANO-2-JPM-ADMIN-PURGESRO   PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS
 
Plant is in Mode 5. Today's date is 03/10/2005.
Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit doors have been verified closed and dogged.
Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60 cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Particulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from engineering programs group is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs.
A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.  
 
TASK STANDARD:
TASK STANDARD:
Four of the following Five errors must be identified:
Four of the following Five errors must be identified:
Since data recorded in step 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
* Since data recorded in step 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
Step 4.3 calculated count rate limits are wrong.
* Step 4.3 calculated count rate limits are wrong.
Step 4.4 since current CAMS radiation readings exceed the calculated limits, the permit should have been resubmitted to chemistry.  
* Step 4.4 since current CAMS radiation readings exceed the calculated limits, the permit should have been resubmitted to chemistry.
 
* Step 4.8 2RITS-8233 set point is recorded incorrectly.
Step 4.8 2RITS-8233 set point is recorded incorrectly.
* Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233.
Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233.
AND The release permit must not be approved, but returned to chemistry for reanalysis.
AND The release permit must not be approved, but returned to chemistry for reanalysis.
TASK PERFORMANCE AIDS:             A marked-up copy of Supplement 1 Containment Purge Gaseous Release Permit through section 4 and chemistry release data.
TASK PERFORMANCE AIDS:   A marked-up copy of Supplement 1 Containment Purge Gaseous Release Permit through section 4 and chemistry release data.                                                                                                            
SIMULATOR SETUP: NA
 
SIMULATOR SETUP:
NA  
 
JPM-ANO-2-JPM-ADMIN-PURGESRO  PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The Shift Manager directs "Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement."


JPM-ANO-2-JPM-ADMIN-PURGESRO                                                                          PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.
START TIME:
START TIME:
PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINER'S NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1.
PERFORMANCECHECKLIST                                   STANDARD                     CIRCLE ONE EXAMINERS NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1.
: 1. Perform supervisor review for approval of the Containment purge gaseous release permit and determine errors. Reviews the containment purge gaseous release permit.
: 1. Perform supervisor review for         Reviews the containment purge          N/A approval of the Containment purge     gaseous release permit.
N/A  EXAMINER'S NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors.
gaseous release permit and determine errors.
(C) 2. Data recorded in section 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
EXAMINERS NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors.
Step 4.3 calculated count rate limits are wrong.  
* Data recorded in section 1.4.5
* Filter run-time is beyond 720 hrs; was incorrect the filter run-time       this should be evaluated by should have been given to               engineering programs before Engineering programs for               proceeding with release.
evaluation.
* Step 4.3 calculated count rate
* Calculated count rate limits were limits are wrong.                       given to be particulate 542 CPM and gaseous 464 CPM but should have been Particulate2168 CPM and gaseous 1856 CPM.
* Step 4.4 since current CAMS
* The Purge permit should be radiation readings exceed the          resubmitted to chemistry but the (C)    2.
allowable limits, the permit            steps were marked as NA due        N/A SAT UNSAT should have been resubmitted to        current radiation readings chemistry.                              exceeding calculated limits.
* Step 4.8 2RITS-8233 set point is
* Set point for 2RITS-8233 is recorded incorrectly.                  recorded as 15000 CPM not 150 CPM as specified in Chemistry report.
* Potentiometer dial set point circled is incorrect due to
* Potentiometer dial set point should recording the set point                be 3.84, but 5.68 is circled.
incorrectly; this results in a non-conservative trip value for 2RITS-8233.
EXAMINERS NOTE: The Examinee should discuss that the release will be resubmitted to chemistry and Engineering programs should evaluate the runtime on the exhaust filter.
: 3. The release should not be approved Would not approve the release to (C)        and should be resubmitted to          begin.                                N/A SAT UNSAT chemistry.
END STOP TIME:


Step 4.4 since current CAMS radiation readings exceed the allowable limits, the permit should have been resubmitted to chemistry.
JPM-ANO-2-JPM-ADMIN-PURGESRO                                                               PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
Step 4.8 2RITS-8233 set point is recorded incorrectly.
* Plant is in Mode 5.
 
* Todays date is 03/10/2005.
Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233. Filter run-time is beyond 720 hrs; this should be evaluated by engineering programs before proceeding with release.
* Chemistry has completed Containment atmosphere radioactivity analysis.
 
* Purge Exhaust Filter Unit doors have been verified closed and dogged.
Calculated count rate limits were given to be particulate 542 CPM and gaseous 464 CPM but should have been Particulate2168 CPM and gaseous 1856 CPM.
* Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM.
The Purge permit should be resubmitted to chemistry but the steps were marked as NA due current radiation readings exceeding calculated limits.
* Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
Set point for 2RITS-8233 is recorded as 15000 CPM not 150 CPM as specified in Chemistry report. Potentiometer dial set point should be 3.84, but 5.68 is circled.
* Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
N/A  SAT  UNSAT
* Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
 
* Last test reading run-time from engineering programs group is 7532.5 hrs.
EXAMINER'S NOTE: The Examinee should discuss that the release will be resubmitted to chemistry and Engineering programs should evaluate the runtime on the exhaust filter. (C) 3. The release should not be approved and should be resubmitted to chemistry. Would not approve the release to begin. N/A  SAT  UNSAT END  STOP TIME:                           
* Current run-time reading from 2B85-C7 is 8284.9 hrs.
 
* A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.
JPM-ANO-2-JPM-ADMIN-PURGESRO   PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS Plant is in Mode 5. Today's date is 03/10/2005. Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit door s have been verified closed and dogged. Initial flow from 2RITS-8233, Co ntainment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Partic ulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from en gineering programs gr oup is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs. A reactor Operator has completed the request and containment purge verification section of OP 2104.
033 Supplement 1.
Initiating CUE:
Initiating CUE:
The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemis try report. Identify at least 4 errors in the supplement."
The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3) 4)
: 3)
: 4)
Can this release permit be approved given the initial condition information? _____________
Can this release permit be approved given the initial condition information? _____________
JPM-ANO-2-JPM-ADMIN-PURGESRO   PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS Plant is in Mode 5. Today's date is 03/10/2005. Chemistry has completed Containment atmosphere radioactivity analysis. Purge Exhaust Filter Unit door s have been verified closed and dogged. Initial flow from 2RITS-8233, Co ntainment Purge, is 8.5 SCFM. Initial count rate on 2RITS-8233, Containment Purge, is 60cpm. Initial CAM's Particulate reading is 1084 CPM and Gaseous is 928 CPM. Current four hour average CAM's Partic ulate reading is 2452 CPM and Gaseous is 1921 CPM. Last test reading run-time from en gineering programs gr oup is 7532.5 hrs. Current run-time reading from 2B85-C7 is 8284.9 hrs. A reactor Operator has completed the r equest and containment purge verification section of OP 2104.
 
033 Supplement 1.
JPM-ANO-2-JPM-ADMIN-PURGESRO                                                               PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
* Plant is in Mode 5.
* Todays date is 03/10/2005.
* Chemistry has completed Containment atmosphere radioactivity analysis.
* Purge Exhaust Filter Unit doors have been verified closed and dogged.
* Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM.
* Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
* Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
* Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
* Last test reading run-time from engineering programs group is 7532.5 hrs.
* Current run-time reading from 2B85-C7 is 8284.9 hrs.
* A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.
Initiating CUE:
Initiating CUE:
The Shift Manager directs "Review and approv e OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the complet ed supplement and chemistry report. Identify at least 4 errors in the supplement."
The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.
 
List the errors identified below:
List the errors identified below:
: 1)
1) 2)
: 2)
3) 4)
: 3)
Can this release permit be approved given the initial condition information? _____________
: 4)
Can this release permit be approved given the initial condition information? _____________  


JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO   PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2   REV #: 002 DATE:
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO                                               PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   002                   DATE:
SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#: ANO-SM-EOPAOP-EMERG-301 KA VALUE RO: 2.3 SRO: 4.1 KA  
SYSTEM/DUTY AREA:       A4 Emergency Plan TASK:     Determine Emergency Action Level JTA#:     ANO-SM-EOPAOP-EMERG-301 KA VALUE       RO:       2.3     SRO:         4.1       KA  


==REFERENCE:==
==REFERENCE:==
2.4.41 APPROVED FOR ADMINISTRATION TO:          RO:            SRO:
X TASK LOCATION:          INSIDE CR:            OUTSIDE CR:            BOTH:
X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:                      LAB:
Perform POSITION EVALUATED:        RO:                  SRO:          X ACTUAL TESTING ENVIRONMENT:          SIMULATOR:            PLANT SITE:      LAB:
TESTING METHOD:        SIMULATE:            PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              15 Minutes REFERENCE(S):      OP 1903.010 EXAMINEE'S NAME:                                              SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time            Total Time SIGNED:                                            DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


2.4.41  APPROVED FOR ADMINISTRATION TO:
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO                                                                   PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
RO:    SRO:  X  TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
BOTH: X  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:  X  ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 1903.010 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO   PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
A plant trip has occurred 1 hour ago due to a loss of all feedwater. Feedwater flow can not be rest ored to either Steam Generator. Steam Generator levels are:
* A plant trip has occurred 1 hour ago due to a loss of all feedwater.
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.  
* Feedwater flow can not be restored to either Steam Generator.
 
* Steam Generator levels are:
o A S/G = 47 wide range o B S/G = 52 wide range.
* The crew has initiated Once Thru Cooling using the ECCS Vents.
* RCS leakage is estimated to be 875 gpm.
* Containment temperature, pressure and sump level are rapidly rising.
* SIAS, CCAS and CIAS have actuated.
* Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
TASK STANDARD:
TASK STANDARD:
Declared a Site Area Emergency based on EAL 6.9, Loss of Both S/Gs as a Heat Removal Method  
Declared a Site Area Emergency based on EAL 6.9, Loss of Both S/Gs as a Heat Removal Method TASK PERFORMANCE AIDS: OP 1903.010 SIMULATOR SETUP: N/A.


TASK PERFORMANCE AIDS:    OP 1903.010                                                                       
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO                                                               PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:
 
As Shift Manager, determine the EAL classification based on the given plant conditions.
SIMULATOR SETUP:
PERFORMANCE CHECKLIST                                  STANDARDS                (Circle One)
N/A.
: 1. Review E-Plan procedure            Review 1903.010 index and EAL    N/A SAT UNSAT 1903.010 to determine              classification tabs.
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO   PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE
classification.
(C)    4. Reviewed EAL 6.9., Site Area        Site Area Emergency declared      N/A SAT UNSAT Emergency based Loss of Both        based Loss of Both S/Gs as a S/Gs as a Heat Removal              Heat Removal Method Method END


JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO                                                  PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS
* A plant trip has occurred 1 hour ago due to a loss of all feedwater.
* Feedwater flow can not be restored to either Steam Generator.
* Steam Generator levels are:
o A S/G = 47 wide range o B S/G = 52 wide range.
* The crew has initiated Once Thru Cooling using the ECCS Vents.
* RCS leakage is estimated to be 875 gpm.
* Containment temperature, pressure and sump level are rapidly rising.
* SIAS, CCAS and CIAS have actuated.
* Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
INITIATING CUE:
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
As Shift Manager, determine the EAL classification based on the given plant conditions.
PERFORMANCE CHECKLIST STANDARDS (Circle One)  1. Review E-Plan procedure 1903.010 to determine classification. Review 1903.010 index and EAL classification tabs.
N/A  SAT  UNSAT (C) 4. Reviewed EAL 6.9., Site Area Emergency based Loss of Both S/Gs as a Heat Removal


Method Site Area Emergency declared based Loss of Both S/Gs as a Heat Removal Method  N/A  SAT  UNSAT END JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO   PAGE OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINER's COPY INITIAL PLANT CONDITIONS A plant trip has occurred 1 hour ago due to a loss of all feedwater. Feedwater flow can not be restor ed to either Steam Generator. Steam Generator levels are:
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO                                                   PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
* A plant trip has occurred 1 hour ago due to a loss of all feedwater.
* Feedwater flow can not be restored to either Steam Generator.
* Steam Generator levels are:
o A S/G = 47 wide range o B S/G = 52 wide range.
* The crew has initiated Once Thru Cooling using the ECCS Vents.
* RCS leakage is estimated to be 875 gpm.
* Containment temperature, pressure and sump level are rapidly rising.
* SIAS, CCAS and CIAS have actuated.
* Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
INITIATING CUE:
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.
As Shift Manager, determine the EAL classification based on the given plant conditions.
JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO  PAGE  5  OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEE's COPY INITIAL PLANT CONDITIONS A plant trip has occurred 1 hour ago due to a loss of all feedwater. Feedwater flow can not be rest ored to either Steam Generator. Steam Generator levels are:
o "A" S/G = 47" wide range o "B" S/G = 52" wide range. The crew has initiated Once Thru Cooling using t he ECCS Vents. RCS leakage is estimated to be 875 gpm. Containment temperature, pressure and sump level are rapidly rising. SIAS, CCAS and CIAS have actuated. Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.
INITIATING CUE:
As Shift Manager, determine the EAL classification based on the given plant conditions.


ANO-2-JPM-NRC-CVCS2   PAGE 1 OF   6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 004 DATE:   SYSTEM/DUTY AREA:
ANO-2-JPM-NRC-CVCS2                                                               PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:       2                     REV #:   004                     DATE:
Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)
SYSTEM/DUTY AREA:         Chemical and Volume Control System TASK:     Perform Emergency Boration (Alternate Success Path)
JTA#: ANO2-RO-EOPAOP-OFFNORM-193 KA VALUE RO: 3.9 SRO: 3.7 KA  
JTA#:     ANO2-RO-EOPAOP-OFFNORM-193 KA VALUE       RO:       3.9     SRO:         3.7       KA  


==REFERENCE:==
==REFERENCE:==
004 A4.07 APPROVED FOR ADMINISTRATION TO:            RO:        X    SRO:    X TASK LOCATION:            INSIDE CR:      X      OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:          Perform      LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:                15 Minutes REFERENCE (S):      OP 2203.032, OP 2103.015 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


004 A4.07 APPROVED FOR ADMINISTRATION TO:
ANO-2-JPM-NRC-CVCS2                                                                         PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
RO:  X  SRO:  X  TASK LOCATION:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
INSIDE CR:
JPM INITIAL TASK CONDITIONS:
X  OUTSIDE CR:
Mode 3, A Shutdown Margin is calculated following a reactor trip.
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
TASK STANDARD:
PLANT SITE:
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using BAM Pumps via Emergency Borate Valve (2CV-4916-2). This is an alternate success path JPM.
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE (S):
OP 2203.032, OP 2103.015 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAI NST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLIC ABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-CVCS2 PAGE 2 OF   6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:  
 
Mode 3, A Shutdown Margin is calculated following a reactor trip.
 
TASK STANDARD:  
 
Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using
 
BAM Pumps via Emergency Borate Valve (2CV-4916-2). This is an alternate success path JPM.
 
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin, OP 2103.015 Worksheet 4, showing SDM not met.
AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin, OP 2103.015 Worksheet 4, showing SDM not met.
 
SIMULATOR SETUP:
SIMULATOR SETUP:  
 
A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.
A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.
The elements of this file are:
The elements of this file are:
Trigger 5 = 2CV-4873-1a = 75%. 2CV-4873-1a (VCT Outlet) malfunction set to 75%; Then overrides 2HS-4873-2 are set to false and 2HS-4873-3 set to false to turn lights off.  
Trigger 5 = 2CV-4873-1a = 75%. 2CV-4873-1a (VCT Outlet) malfunction set to 75%;
 
Then overrides 2HS-4873-2 are set to false and 2HS-4873-3 set to false to turn lights off.
This case file will simulate the VCT Outlet valve tri pping its output breaker due to a motor fault as it tries to shut.
This case file will simulate the VCT Outlet valve tripping its output breaker due to a motor fault as it tries to shut.
 
ANO-2-JPM-NRC-CVCS2  PAGE 3 OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:


ANO-2-JPM-NRC-CVCS2                                                                      PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
PERFORMANCE CHECKLIST STANDARD (Circle One) (C) 1. Review SDM calculation and recognize SDM is not met for
PERFORMANCE CHECKLIST                               STANDARD                   (Circle One)
 
(C)       1. Review SDM calculation and         Recognize that SDM is not met       N/A SAT UNSAT recognize SDM is not met for        and that emergency boration is current conditions.                required.
current conditions.
EXAMINERS NOTE:
 
Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.
Recognize that SDM is not met and that emergency boration is  
 
required.
N/A  SAT  UNSAT EXAMINERS NOTE: Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.
 
EXAMINERS CUE:
EXAMINERS CUE:
When the examinee determines emergency boration is required, provide the following information, even if the examinee does not ask for direction: "Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2.2. Step 2 Verify at least one Charging Pump (CCP) running with flow greater  
When the examinee determines emergency boration is required, provide the following information, even if the examinee does not ask for direction:
 
Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2.
than 40 GPM.  
: 2. Verify at least one Charging Pump   On Panel 2C09, verified CCP(s)      N/A SAT UNSAT (CCP) running with flow greater     running.
 
Step  than 40 GPM.
POSITIVE CUE:
2                                        Observed red light ON; green light POSITIVE CUE:                      OFF above at least one of the Red light(s) ON.                    following handswitch(es):
 
Flow is greater than 40 gpm.          2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).
Red light(s) ON.
: 3. Align Boric Acid Supply To CCP      On Panel 2C09, opened BAMT          N/A SAT UNSAT Suction.                           Gravity Feed Valves 2CV-4920-1 Step                                       and/or 2CV-4921-1 3.A   POSITIVE CUE:
 
Red light(s) ON.                   Observed red light ON and green light OFF above handswitch(es):
Flow is greater than 40 gpm.
NEGATIVE CUE:
On Panel 2C09, verified CCP(s) running.
 
Observed red light ON; green light  
 
OFF above at least one of the  
 
following handswitch(es):  
 
2HS-4832-1, "A" CCP  
 
2HS-4852-1, "C" CCP (red)  
 
2HS-4853-2, "C" CCP (green)  
 
2HS-4842-2, "B" CCP  
 
Observed flow greater than 40  
 
gpm on Charging Header Flow  
 
(2FIS-4863).
N/A SAT UNSAT 3. Step 3.A Align Boric Acid Supply To CCP Suction.
 
POSITIVE CUE:  
 
Red light(s) ON.  
 
NEGATIVE CUE:  
 
Green light(s) ON.
Green light(s) ON.
On Panel 2C09, opened BAMT Gravity Feed Valves 2CV-4920-1
* 2HS-4920-1 for 2CV-4920-1
 
* 2HS-4921-1 for 2CV-4921-1 EXAMINERS NOTE:
and/or 2CV-4921-1
In the following step the VCT Outlet Valve will NOT close requiring an alternate success path.
 
Observed red light ON and green
 
light OFF above handswitch(es):
 
2HS-4920-1 for 2CV-4920-1   2HS-4921-1 for 2CV-4921-1 N/A  SAT  UNSAT EXAMINER'S NOTE: In the following step the VCT Outlet Valve will NOT close requiring an alternate success path.
ANO-2-JPM-NRC-CVCS2  PAGE 4 OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)  4. Step 4 Close Volume Control Tank (VCT)
Outlet Valve (2CV-4873-1).
 
POSITIVE CUE:
 
Green light OFF.
 
Red light OFF.
 
NEGATIVE CUE:


ANO-2-JPM-NRC-CVCS2                                                              PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                            STANDARD                  (Circle One)
: 4. Close Volume Control Tank (VCT)  On Panel 2C09, observed that      N/A SAT UNSAT Outlet Valve (2CV-4873-1).      2CV-4873-1 did NOT go closed.
Step 4  POSITIVE CUE:                    Observed green light OFF; red Green light OFF.                light OFF above VCT Outlet Valve Red light OFF.                  handswitch (2HS-4873-1).
NEGATIVE CUE:
Red light ON.
Red light ON.
On Panel 2C09, observed that 2CV-4873-1 did NOT go closed.
(C)     5. Start at least ONE BAM Pump. On Panel 2C09, start 2P39A        N/A SAT UNSAT and/or 2P39B.
 
Step POSITIVE CUE:
Observed green light OFF; red
4.A  Red light ON.                   Observed RED light ON above the BAM pump started, 2HS-4919-2 NEGATIVE CUE:                   (2P39A) or 2HS-4910-2 (2P39B).
 
light OFF above VCT Outlet Valve
 
handswitch (2HS-4873-1).
N/A  SAT  UNSAT (C) 5. Step 4.A Start at least ONE BAM Pump.
POSITIVE CUE:  
 
Red light ON.  
 
NEGATIVE CUE:  
 
Green light ON.
Green light ON.
On Panel 2C09, start 2P39A and/or 2P39B.
(C)    6. Open Emergency Borate From      On Panel 2C09, opened 2CV-         N/A SAT UNSAT BAM Pumps Valve (2CV-4916-2). 4916-2.
Observed RED light ON above the BAM pump started, 2HS-4919-2
Step 4.B  POSITIVE CUE:
 
Red light ON.                   Observed red light ON; green light OFF above Emergency Borate NEGATIVE CUE:                   Valve, 2CV-4916-2.
(2P39A) or 2HS-4910-2 (2P39B).
N/A SAT UNSAT (C) 6. Step 4.B Open Emergency Borate From BAM Pumps Valve (2CV-4916-2).  
 
POSITIVE CUE:  
 
Red light ON.  
 
NEGATIVE CUE:  
 
Green light ON.
Green light ON.
On Panel 2C09, opened 2CV-4916-2.
: 7. Verify Boric Acid Makeup Flow    On Panel 2C09, verified 2CV-       N/A SAT UNSAT Control Valve (2CV-4926) closed. 4926 closed.
Observed red light ON; green light OFF above Emergency Borate
Step 4.C  POSITIVE CUE:                   Observed green light ON; red light Green light ON.                 OFF above Boric Acid Makeup Flow Controller (2FIC-4926).
 
NEGATIVE CUE:
Valve, 2CV-4916-2.
N/A SAT UNSAT 7. Step 4.C Verify Boric Acid Makeup Flow Control Valve (2CV-4926) closed.
POSITIVE CUE:  
 
Green light ON.  
 
NEGATIVE CUE:  
 
Red light ON.
Red light ON.
On Panel 2C09, verified 2CV-4926 closed.
: 8. Check Reactor Makeup Water Flow  On Panel 2C09, verified 2CV-       N/A SAT UNSAT Control Valve (2CV-4927) or VCT 4927 or 2CV-4941 closed.
 
Step  Makeup Isol valve (2CV-4941) closed.                         Observed green light ON; red light OFF above Reactor Makeup POSITIVE CUE:                   Water Flow Controller (2FIC-4927)
Observed green light ON; red light
Green light ON.                 or above 2CV-4941 handswitch.
 
NEGATIVE CUE:
OFF above Boric Acid Makeup
 
Flow Controller (2FIC-4926).
N/A SAT UNSAT 8. Step 5 Check Reactor Makeup Water Flow Control Valve (2CV-4927) or VCT  
 
Makeup Isol valve (2CV-4941)  
 
closed.  
 
POSITIVE CUE:  
 
Green light ON.  
 
NEGATIVE CUE:  
 
Red light ON.
Red light ON.
On Panel 2C09, verified 2CV-4927 or 2CV-4941 closed.
: 9. Check Charging Header Flow      On Panel 2C09 (upright portion)N/A SAT UNSAT (2FIS-4863) greater than 40 gpm. observed flow greater than 40 Step                                  gpm on Charging Header Flow 6  POSITIVE CUE:                   indicator (2FIS-4863).
 
Observed green light ON; red light
 
OFF above Reactor Makeup
 
Water Flow Controller (2FIC-4927)  
 
or above 2CV-4941 handswitch.
N/A SAT UNSAT 9. Step 6 Check Charging Header Flow (2FIS-4863) greater than 40 gpm.  
 
POSITIVE CUE:  
 
Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)
Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)
On Panel 2C09 (upright portion), observed flow greater than 40
END


gpm on Charging Header Flow
ANO-2-JPM-NRC-CVCS2                                                    PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINER COPY JPM INITIAL TASK CONDITIONS:
Mode 3. A Shutdown Margin has been calculated following a reactor trip.
INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."


indicator (2FIS-4863).
ANO-2-JPM-NRC-CVCS2                                                   PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:
N/A  SAT  UNSAT END ANO-2-JPM-NRC-CVCS2 PAGE 5 OF   6 JOB PERFORMANCE MEASURE EXAMINER COPY JPM INITIAL TASK CONDITIONS:  
Mode 3. A Shutdown Margin has been calculated following a reactor trip.
INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."


Mode 3. A Shutdown Margin has been calculated following a reactor trip. 
PROC./WORK PLAN N


INITIATING CUE:  
==O. PROCEDURE==
/WORK PLAN TITLE:               PAGE:  2 of 21 2103.015                REACTIVITY BALANCE CALCULATION CHANGE: 035-04-0


The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
ANO-2-JPM-NRC-EOP01                                                           PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:     2                     REV #:   09                     DATE:
 
SYSTEM/DUTY AREA:       Abnormal/Emergency Operations TASK:     Secure Containment Spray JTA#:     ANO2-RO-EOPAOP-EMERG-13 KA VALUE       RO:       3.2     SRO:     3.7       KA  
ANO-2-JPM-NRC-CVCS2  PAGE 6 OF  6 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:
 
Mode 3. A Shutdown Margin has been calculated following a reactor trip. 
 
INITIATING CUE:
 
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."
 
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE:
REACTIVITY BALANCE CALCULATION PAGE: 2 of 21  CHANGE: 035-04-0 ANO-2-JPM-NRC-EOP01                             PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:   SYSTEM/DUTY AREA:
Abnormal/Emergency Operations  
 
TASK: Secure Containment Spray
 
JTA#: ANO2-RO-EOPAOP-EMERG-13  
 
KA VALUE RO: 3.2 SRO: 3.7 KA  


==REFERENCE:==
==REFERENCE:==
026 A2.03 APPROVED FOR ADMINISTRATION TO:          RO:  X        SRO:  X TASK LOCATION:          INSIDE CR:  X        OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                      SIMULATOR:    Perform          LAB:
POSITION EVALUATED:        RO:                  SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:            PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:            PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:            15 Minutes REFERENCE(S):      OP 2202.003 EXAMINEE'S NAME:                                              SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                    UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time            Total Time SIGNED:                                          DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


026  A2.03       
ANO-2-JPM-NRC-EOP01                                                                       PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
JPM INITIAL TASK CONDITIONS:         Containment spray actuation signal has actuated inadvertently and 2K04 D-1, CSAS ACT, is in Alarm. I&C has corrected the problem. No testing is currently in progress.
RO: X  SRO: X  TASK LOCATION:
TASK STANDARD:       CSAS is reset and CSAS actuated components are secured.
INSIDE CR:
TASK PERFORMANCE AIDS:         EOP 2203.012D Annunciator 2K04 D1, CSAS ACT SIMULATOR SETUP: Inadvertent containment spray actuated. Containment Temperature. < 140 &deg; F, Pressure < 22.5 psia.
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
OP 2202.003
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-EOP01                             PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
 
JPM INITIAL TASK CONDITIONS:
Containment spray actuation signal has actuated inadvertently and  
 
2K04 D-1, CSAS ACT, is in Alarm. I&C has corrected the problem. No testing is currently in progress.      
 
TASK STANDARD:
CSAS is reset and CSAS actuated components ar e secured.                                      
 
TASK PERFORMANCE AIDS:
EOP 2203.012D Annunciator 2K04 D1, CSAS ACT  
 
SIMULATOR SETUP:
Inadvertent containment spray actuated.
Containment Temperature. < 140 &deg; F, Pressure < 22.5 psia.                        
 
ANO-2-JPM-NRC-EOP01                            PAGE  3  OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator 2D1, CSAS ACT. 


ANO-2-JPM-NRC-EOP01                                                                              PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator 2D1, CSAS ACT.
START TIME:
START TIME:
PERFORMANCE CHECKLIST                                STANDARDS                            (Circle One)
: 1. Verify CSAS NOT valid.            Determined that Containment                N/A SAT UNSAT pressure less than 22.5 PSIA Step                                      (PMS, SPDS or control board 2.1                                      indication).
Determined that Containment temperature less than 140&deg;.
EXAMINERS NOTE:
There is only one channel available on the simulator. Resetting B trip path will reset all the other channels also.
: 2. Place Spray Pumps in PTL.          On panels 2C16/17, placed                  N/A SAT UNSAT handswitches for Containment Step                                      Spray Pumps (2P35A and 2.3                                      2P35B) in Pull To Lock (PTL).
Examiners CUE:                    Observed green lights ON above handswitches.
CRS acknowledges TS entry into 3.0.3.                        Enter TS 3.0.3.
(C)      3. Reset CSAS on 2C23.                On panel 2C23B, obtained key                N/A SAT UNSAT and placed it in trip path to be Step                                      reset.
Examiners Note:
Give examinee Key #15 when        Placed trip path key switch to 2.6.1  asked.                            UNLK.
Depressed CSAS pushbutton for 2.6.2                                      trip path.
Verified Trip Path lights reset (on 2.6.3                                      2C03) (Not a critical item) 2.6.4                                      Placed trip path key switch to LK.
EXAMINERS NOTE:
There is only one channel available on the simulator. Resetting 2C40 actuation path will reset all the other channels also.


PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. Step 2.1 Verify CSAS NOT valid.  
ANO-2-JPM-NRC-EOP01                                                              PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                         STANDARDS                     (Circle One)
 
(C)    3. Reset CSAS on 2C40            On 2C40, depressed CSAS            N/A SAT UNSAT lockout reset pushbutton.
Determined that Containment pressure less than 22.5 PSIA (PMS, SPDS or control board
Step On 2C40 verify reset lights are 2.6.6                                ON.
 
2.6.7 (C)     4. Close Containment Spray      On panels 2C16/17, placed          N/A SAT UNSAT Header Isolation Valves.     handswitches for Containment Step                                Spray Header Isolation valves 2.6.8                                (2CV-5612-1 and 2CV-5613-2) in CLOSE.
indication).  
Observed green lights ON above handswitches.
 
(C)    5. Stop Containment Spray        On panels 2C16/17, removed        N/A SAT UNSAT Pumps.                        handswitches for Containment Step                                Spray Pumps (2P35A and 2.6.9                                2P35B) from PTL and placed in normal after stop.
Determined that Containment  
 
temperature less than 140&deg;.
 
N/A SAT UNSAT EXAMINERS NOTE:
 
There is only one channel available on the simulator. Rese tting 'B' trip path will reset all the other channels also. 2. Step 2.3  Place Spray Pumps in PTL.  
 
Examiner's CUE:
CRS acknowledges TS entry into 3.0.3.
On panels' 2C16/17, placed handswitches for Containment  
 
Spray Pumps (2P35A and  
 
2P35B) in Pull To Lock (PTL).  
 
Observed green lights ON above handswitches.
Observed green lights ON above handswitches.
Enter TS 3.0.3.
: 6. Exit Tech Spec 3.0.3.         Notify CRS to exit tech spec 3.0.3 N/A SAT UNSAT when both spray pumps are Step                               taken out of PTL.
N/A  SAT  UNSAT (C) 3. Step  2.6.1  2.6.2 2.6.3 2.6.4 Reset CSAS on 2C23.
EXAMINERs CUE: Exiting 2.6.10 Tech Spec 3.0.3 has been entered into the station log.
 
END STOP TIME:
Examiner's Note:
Give examinee Key #15 when
 
asked. 
 
On panel 2C23B, obtained key and placed it in trip path to be reset.
 
Placed trip path key switch to
 
UNLK.
 
Depressed CSAS pushbutton for
 
trip path.
 
Verified Trip Path lights reset (on
 
2C03) (Not a critical item)
 
Placed trip path key switch to LK.
 
N/A SAT UNSAT EXAMINERS NOTE:
There is only one channel available on the simulator.
Resetting 2C40 actuation path will reset all the other channels also.
ANO-2-JPM-NRC-EOP01                            PAGE  4  OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 3. Step 2.6.6 2.6.7 Reset CSAS on 2C40
 
On 2C40, depressed CSAS lockout reset pushbutton.
 
On 2C40 verify reset lights are  
 
ON.
N/A  SAT  UNSAT (C) 4. Step 2.6.8  Close Containment Spray Header Isolation Valves.
 
On panels' 2C16/17, placed handswitches for Containment
 
Spray Header Isolation valves 
 
(2CV-5612-1 and 2CV-5613-2) in
 
CLOSE.
 
Observed green lights ON above
 
handswitches.
N/A  SAT  UNSAT (C) 5. Step 2.6.9 Stop Containment Spray Pumps.
 
On panels' 2C16/17, removed handswitches for Containment
 
Spray Pumps (2P35A and
 
2P35B) from PTL and placed in
 
normal after stop.  
 
Observed green lights ON above
 
handswitches.
N/A  SAT  UNSAT  6. Step 2.6.10 Exit Tech Spec 3.0.3.
EXAMINER's CUE: Exiting Tech Spec 3.0.3 has been  
 
entered into the station log.
Notify CRS to exit tech spec 3.0.3 when both spray pumps are
 
taken out of PTL.
N/A  SAT  UNSAT END   STOP TIME:
ANO-2-JPM-NRC-EOP01                            PAGE  5  OF  6 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation si gnal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm. 
 
I&C has corrected the problem.
 
No Testing is currently in progress.


ANO-2-JPM-NRC-EOP01                                              PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation signal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm.
I&C has corrected the problem.
No Testing is currently in progress.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.
 
ANO-2-JPM-NRC-EOP01                            PAGE  6  OF  6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation si gnal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm. 
 
I&C has corrected the problem.
 
No Testing is currently in progress.  


ANO-2-JPM-NRC-EOP01                                              PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Containment spray actuation signal has actuated inadvertently.
2K04 D-1, CSAS ACT, is in alarm.
I&C has corrected the problem.
No Testing is currently in progress.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.  
The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.
 
ANO-2-JPM-NRC-CREV01                            PAGE  1  OF  7 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 00 DATE:    SYSTEM/DUTY AREA:
Abnormal/Emergency Operations
 
TASK:  Manually actuate Control Room Vent ilation    ALTERNATE SUCCESS PATH JTA#:  ANO2-RO-EOPAOP-EMERG-13


KA VALUE RO: 2.9 SRO: 3.1 KA  
ANO-2-JPM-NRC-CREV01                                                            PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:      2                      REV #:  00                      DATE:
SYSTEM/DUTY AREA:        Abnormal/Emergency Operations TASK:    Manually actuate Control Room Ventilation  ALTERNATE SUCCESS PATH JTA#:    ANO2-RO-EOPAOP-EMERG-13 KA VALUE     RO:         2.9     SRO:         3.1       KA  


==REFERENCE:==
==REFERENCE:==
073 A301 APPROVED FOR ADMINISTRATION TO:          RO:    X        SRO:  X TASK LOCATION:            INSIDE CR:  X          OUTSIDE CR:              BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                        SIMULATOR:      Perform          LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:              PLANT SITE:        LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              20 Minutes REFERENCE(S):      OP 2104.007 EXAMINEE'S NAME:                                                SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


073 A301       
ANO-2-JPM-NRC-CREV01                                                                     PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
JPM INITIAL TASK CONDITIONS:           Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid 2RITS-8750-1A is in alarm. ALTERNATE SUCCESS PATH JPM TASK STANDARD:         All Control room ventilation components have been actuated and 2VSF 9 secured and outside air damper has been closed and air reserve aligned.
RO: X  SRO: X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE(S):
OP 2104.007
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-CREV01                             PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
 
JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and  
 
Annunciator 2K08 A-4 are in. A valid 2RITS-8750-1A is in alarm. ALTERNATE SUCCESS PATH JPM              
 
TASK STANDARD:
All Control room ventilation com ponents have been actuated and 2VSF 9 secured and  
 
outside air damper has been closed and air reserve aligned.
 
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
Marked up copy of OP 2104.007 section 7.0, Radiation and Chlorine detector alarm response actions. Steps 7.1 and 7.2 are complete.  
Marked up copy of OP 2104.007 section 7.0, Radiation and Chlorine detector alarm response actions. Steps 7.1 and 7.2 are complete.
 
SIMULATOR SETUP: Alarm 2K11 D10 in alarm. Control room ventilation radiation monitor above alarm setpoint.
SIMULATOR SETUP:
Alarm 2K11 D10 in alarm. Control room vent ilation radiation monitor above alarm setpoint.  
 
Insert the following malfunctions:
Insert the following malfunctions:
XRI2RITS8750-1; value = 2000 (Control room radiation monitor in alarm)  
XRI2RITS8750-1; value = 2000 (Control room radiation monitor in alarm)
X_RM8750; value = TRUE (Control room ventilation components will not actuate)
Insert the following overrides for 2C33:
* DO_CI_8603_A; value = OFF
* DO_CI_8603_R; value = OFF


X_RM8750; value = TRUE (Control room v entilation components will not actuate) 
ANO-2-JPM-NRC-CREV01                                                                       PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
 
Insert the following overrides for 2C33:
DO_CI_8603_A; value = OFF  DO_CI_8603_R; value = OFF ANO-2-JPM-NRC-CREV01                             PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm.
The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm.
Perform actions in OP 2104.007 starting with step 7.1.
Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.
2, Radiation and Chlorine alarm response actions."
START TIME:
START TIME:
 
PERFORMANCE CHECKLIST                                 STANDARDS                     (Circle One)
PERFORMANCE CHECKLIST STANDARDS (Circle One)
EXAMINERS NOTE:
EXAMINERS NOTE:
 
Do not allow examinee to go to unit 1. Provide cue when determining unit 1 control room component status.
Do not allow examinee to go to unit 1. Provide cue when determining unit 1 control room component  
: 1. Verify Unit 1 control room is       On C141 on unit 1, verify          N/A SAT UNSAT isolated.                          CV7905 and CV7907 dampers step                                        are closed.
 
7.1.2 Examiners CUE:
status. 1. step 7.1.2 Verify Unit 1 control room is isolated.  
Unit 1 control room supply damper CV7905 and Unit 1 control room return damper CV7907 have been closed.
 
(C)     2. Verify unit 2 control room is       On 2C33, verify 2UCD 8683, unit   N/A SAT UNSAT isolated.                          2 supply damper is closed by step                                        taking handswitch to the closed 7.1.2                                        position and verifying green light is ON above handswitch.
Examiner's CUE:
On 2C33, verify 2UCD 8685, unit 2 return damper is closed by taking handswitch to the closed position and verifying green light is ON above handswitch.
Unit 1 control room supply  
: 3. Verify Unit 1 control room         At breaker B1544 on Unit 1,         N/A SAT UNSAT supply fans are stopped.            verify VSF-8A handswitch in stop step                                        and green light ON.
 
7.1.3    Examiners CUE:                    At breaker B4161 on Unit 1, Unit 1 control room supply          verify VSF-8B handswitch in stop fans VSF8A and VSF8B                and green light ON.
damper CV7905 and Unit 1  
handswitches are in stop and green lights ON.
 
Examiners note:
control room return damper CV7907 have been closed.  
 
On C141 on unit 1, verify CV7905 and CV7907 dampers
 
are closed.
 
N/A  SAT  UNSAT (C) 2. step 7.1.2 Verify unit 2 control room is isolated.
 
On 2C33, verify 2UCD 8683, unit 2 supply damper is closed by  
 
taking handswitch to the closed  
 
position and verifying green light  
 
is ON above handswitch.  
 
On 2C33, verify 2UCD 8685, unit  
 
2 return damper is closed by  
 
taking handswitch to the closed  
 
position and verifying green light  
 
is ON above handswitch.  
 
N/A  SAT  UNSAT  3. step 7.1.3 Verify Unit 1 control room supply fans are stopped.
 
Examiner's CUE:
Unit 1 control room supply
 
fans VSF8A and VSF8B handswitches are in stop and
 
green lights ON.
At breaker B1544 on Unit 1, verify VSF-8A handswitch in stop  
 
and green light ON.
At breaker B4161 on Unit 1, verify VSF-8B handswitch in stop  
 
and green light ON.
N/A  SAT  UNSAT Examiner's note:
Transition to back of control room to panel 2C22.
Transition to back of control room to panel 2C22.
ANO-2-JPM-NRC-CREV01                            PAGE  4  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. step 7.1.3 Verify Unit 2 control room supply fans are stopped.
On panel 2C22, took handswitch for 2VSF8A and 2VSF8B to stop
and verified Green light ON
above handswitch.
N/A  SAT  UNSAT (C) 5. step 7.1.3 Verify Unit 2 control room exhaust fans are stopped.
On panel 2C22, took handswitch for 2VSF43A and 2VSF43B to
stop and verified Green light ON
above handswitch.
N/A  SAT  UNSAT  6. step 7.1.3 Verify Unit 1 control room smoke exhaust fan is stopped.
Examiner's CUE:
Unit 1 control room smoke
exhauster fan VEF43 handswitch is in stop and


green light ON.
ANO-2-JPM-NRC-CREV01                                                                PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                STANDARDS                  (Circle One)
On unit 1 panel C19, verified VEF 43 fan in stop and green light ON.
(C)    4. Verify Unit 2 control room          On panel 2C22, took handswitch    N/A SAT UNSAT supply fans are stopped.            for 2VSF8A and 2VSF8B to stop step                                      and verified Green light ON 7.1.3                                      above handswitch.
N/A  SAT  UNSAT Examiner's note:
(C)    5. Verify Unit 2 control room          On panel 2C22, took handswitch    N/A SAT UNSAT exhaust fans are stopped.            for 2VSF43A and 2VSF43B to step                                      stop and verified Green light ON 7.1.3                                      above handswitch.
: 6. Verify Unit 1 control room          On unit 1 panel C19, verified VEF N/A SAT UNSAT smoke exhaust fan is stopped.        43 fan in stop and green light ON.
step 7.1.3 Examiners CUE:
Unit 1 control room smoke exhauster fan VEF43 handswitch is in stop and green light ON.
Examiners note:
Transition to front of control room to panel 2C33.
Transition to front of control room to panel 2C33.
Examiner's Note: The following is the alternate success path step. 7. step 7.1.4 Verify 2VSF9 running with insufficient air flow.  
Examiners Note:
 
The following is the alternate success path step.
On panel 2C33 rotated handswitch for 2VSF9 to start.
: 7. Verify 2VSF9 running with           On panel 2C33 rotated              N/A SAT UNSAT insufficient air flow.               handswitch for 2VSF9 to start.
On panel 2C33 verified RED light ON above handswitch for 2VSF9.  
step                                      On panel 2C33 verified RED light 7.1.4                                      ON above handswitch for 2VSF9.
 
On panel 2C33 verified PCD-8607B red light ON.
On panel 2C33 verified PCD-8607B red light ON.  
On panel 2C33 recognized low air flow by Amber light ON and Red light OFF above 2VSF9 handswitch.
 
On panel 2C33 recognized low air flow by Amber light ON and  
 
Red light OFF above 2VSF9  
 
handswitch.
N/A  SAT  UNSAT ANO-2-JPM-NRC-CREV01                            PAGE  5  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 8. step 7.1.5 Close 2VSF9 outside Air damper 2PCD8607B.
EXAMINER's CUE: When asked, report 2 nd person verification of handswitch  
 
2PCD8607B is complete.
EXAMINER's CUE: When asked to go to Unit 1 and


ANO-2-JPM-NRC-CREV01                                                                PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                  (Circle One)
(C)    8. Close 2VSF9 outside Air          On panel 2C33 placed              N/A SAT UNSAT damper 2PCD8607B.                handswitch for 2PCD8607B to step                                    RESERVE.
7.1.5 EXAMINERs CUE: When              On panel 2C33, secured 2VSF 9 asked, report 2nd person          by taking handswitch to STOP.
verification of handswitch 2PCD8607B is complete.
EXAMINERs CUE: When asked to go to Unit 1 and        Contacts unit 1 to start VSF 9.
start VSF9, report that VSF 9 is running with proper discharge flow.
start VSF9, report that VSF 9 is running with proper discharge flow.
On panel 2C33 placed handswitch for 2PCD8607B to
EXAMINERs NOTE:
 
This JPM does not examine the examinees use of Tech Specs, JPM can be ended at this step.
RESERVE.
: 10. Initiate condition report and     Discuss writing a condition report N/A SAT UNSAT determine tech spec              and entry into Tech Spec due to step  applicability due to 2VSF 9      2VSF9 inoperability. Attempt to 7.1.5  inoperability.                    access OP 2104.007 attachment B component/tech spec cross-reference, to determine tech spec applicability.
On panel 2C33, secured 2VSF 9 by taking handswitch to STOP.
END STOP TIME:
 
Contacts unit 1 to start VSF 9.
 
N/A  SAT  UNSAT EXAMINER's NOTE:
This JPM does not examine the examinee's use of Tech Specs, JPM can be ended at this step.
: 10. step 7.1.5 Initiate condition report and determine tech spec
 
applicability due to 2VSF 9
 
inoperability.
 
Discuss writing a condition report and entry into Tech Spec due to  
 
2VSF9 inoperability. Attempt to  
 
access OP 2104.007 attachment  
 
B component/tech spec cross-
 
reference, to determine tech spec  
 
applicability.  
 
N/A  SAT  UNSAT END   STOP TIME:
ANO-2-JPM-NRC-CREV01                            PAGE  6  OF  7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiati on HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation al arm, 2RITS-8750-1A, is in alarm and not bypassed.                 


ANO-2-JPM-NRC-CREV01                                                        PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Verify proper system actuat ion following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.
The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.
1.2, Radiation and Chlorine alarm response actions."
ANO-2-JPM-NRC-CREV01                            PAGE  7  OF  7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiati on HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation al arm, 2RITS-8750-1A, is in alarm and not bypassed.                 


ANO-2-JPM-NRC-CREV01                                                        PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Verify proper system actuat ion following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions."
The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.


ANO-2-JPM-NRC-IA02 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:   SYSTEM/DUTY AREA: Instrument Air System TASK: Perform actions required by low Instrument Air Header Pressure JTA#: ANO2-RO-EOPAOP-EMER-157                                                         KA VALUE RO:
ANO-2-JPM-NRC-IA02                                                       PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT:     2                   REV #:   001                   DATE:
3.1 SRO: 3.2 KA  
SYSTEM/DUTY AREA:         Instrument Air System TASK:   Perform actions required by low Instrument Air Header Pressure JTA#:   ANO2-RO-EOPAOP-EMER-157 KA VALUE     RO:       3.1     SRO:         3.2     KA  


==REFERENCE:==
==REFERENCE:==
078 A3.01 APPROVED FOR ADMINISTRATION TO:            RO:      X    SRO:    X TASK LOCATION:          INSIDE CR:      X      OUTSIDE CR:          BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:                    SIMULATOR:          Perform    LAB:
POSITION EVALUATED:        RO:                  SRO:
ACTUAL TESTING ENVIRONMENT:          SIMULATOR:            PLANT SITE:      LAB:
TESTING METHOD:      SIMULATE:            PERFORM:        X APPROXIMATE COMPLETION TIME IN MINUTES:            15 Minutes REFERENCE(S):      AOP 2203.021 EXAMINEE'S NAME:                                            SSN:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                  UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time          Stop Time            Total Time SIGNED:                                          DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


078 A3.01          APPROVED FOR ADMINISTRATION TO: RO:
ANO-2-JPM-NRC-IA02                                                                         PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
X SRO: X  TASK LOCATION: INSIDE CR:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
X OUTSIDE CR:  BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE:  SIMULATOR:
Perform LAB:  POSITION EVALUATED: RO:  SRO:  ACTUAL TESTING ENVIRONMENT: SIMULATOR:  PLANT SITE:  LAB:  TESTING METHOD: SIMULATE:  PERFORM:
X  APPROXIMATE COMPLETION TIME IN MINUTES:
15 Minutes REFERENCE(S):
AOP 2203.021 EXAMINEE'S NAME:  SSN:  EVALUATOR'S NAME:  THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY:  UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time  Stop Time  Total Time  SIGNED:  DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-IA02 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist -
System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.
Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.
TASK STANDARD:  
TASK STANDARD:
 
Unit 2 fully isolated from Unit 1 instrument air.
Unit 2 fully isolated from Unit 1 instrument air.
TASK PERFORMANCE AIDS:  
TASK PERFORMANCE AIDS:
 
AOP 2203.021; AOP 2203.012K SIMULATOR SETUP:
AOP 2203.021; AOP 2203.012K  
T1= IAINSTAIR, value = 13, Ramp = 1:00 minute.
 
Set trigger T2 to qh3c315 (closed position indication for 2CV3015)
SIMULATOR SETUP:
T1= IAINSTAIR, value = 13, Ramp = 1:00 minute.  
 
Set trigger T2 to qh3c315 (closed position indication for 2CV3015)  
 
T2=IAINSTAIR, value = 7.
T2=IAINSTAIR, value = 7.
Full power IC, Trigger T1 when candidate ready to start JPM
Full power IC, Trigger T1 when candidate ready to start JPM
 
ANO-2-JPM-NRC-IA02  PAGE  3  OF  7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Perform the ac tions for Loss of Instrument Air us ing AOP 2203.021 starting with step 2." 


ANO-2-JPM-NRC-IA02                                                                        PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.
START TIME:
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) EXAMINER'S NOTE:
PERFORMANCE CHECKLIST                               STANDARDS                       (Circle One)
EXAMINER'S NOTE:
AO and WCO duties are already in progress.
(C)      1. Open Instrument Air header          On panel 2C14, placed              N/A SAT UNSAT cross-connect valves with          handswitches for 2CV-3004 and Step Unit 1.                            2CV-3015 to OPEN.
2.a Observed red lights ON and green lights OFF above handswitches for 2CV-3004 and 2CV-3015.
: 2. Notify Unit-1 of intent to          Notified Unit-1 of intent to        N/A SAT UNSAT cross-connect instrument air.      cross-connect instrument air.
Step 2.b Examiners CUE:
Unit-1 personnel acknowledge cross-connecting instrument air.
EXAMINERs NOTE:
Provide the CUE below after the examinee identifies IA header pressure is less than 60 psig from indication on 2C14.
: 3. Monitor Instrument Air header      On panel 2C14, monitored            N/A SAT UNSAT pressure.                          Instrument Air header pressure Step on 2PIS-3013 for results of 4
Examiners CUE:                    actions.
Unit 1 SM reports that Unit 1 IA pressure is 55 psig and going down.


AO and WCO duties are already in progress. (C) 1. Step 2.a Open Instrument Air header cross-connect valves with
ANO-2-JPM-NRC-IA02                                                                    PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                    (Circle One)
(C)   4    Close Instrument Air header      On panel 2C14, placed              N/A SAT UNSAT cross-connect valve with Unit    handswitches for 2CV-3004 and Step
: 1.                               2CV-3015 to CLOSED.
4.A Observed green lights ON and red lights OFF above handswitches for 2CV-3004 and 2CV-3015.
Examiners Note:
When Unit 2 instrument air header is isolated from Unit 1 provide the following cue:
A large IA leak exists on the instrument air piping and can be isolated by closing 2IA-99.
5    Direct Auxiliary Operator to      Direct Auxiliary Operator to      N/A SAT UNSAT CLOSE manual Instrument Air       CLOSE manual Instrument Air Step header cross-connect valves.      header cross-connect valves 4.B 2IA-47, 2IA-48, and 2IA-192.
NOTE: candidate may elect to close 2IA99 before closing manual valves.
6    Check IA header pressure          Monitors IA header pressure on    N/A SAT UNSAT greater than 35 psig.            2C14 to verify pressure stays Step above 25 psig.
5
: 6. Direct AO to check IA header      Direct AO to check IA header      N/A SAT UNSAT pressure and air receivers      pressure locally.
Step pressure.
6                                      Direct AO to check IA air receivers.
Examiners Cue:
AO reports IA header pressure as indicated on 2C14.
Examiners note:
AO reports that the IA A air receiver pressure is as indicated on 2C14 and the B IA receiver pressure is
              +5 # as indicated on 2C14.


Unit 1.  
ANO-2-JPM-NRC-IA02                                                                      PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                              STANDARDS                    (Circle One)
: 7. Check IA header flow locally. Direct AO to report IA header    N/A SAT UNSAT flow locally.
Step 8
Examiners Cue:
IA Header Flow is 700 SCFM.
(C)    8. Direct AO to close 2 IA-99.                                        N/A SAT UNSAT Step 8
Examiners Cue:
AO has been directed to          Direct AO to close 2IA-99 or close 2IA-99.                    inform CRS to direct AO to close 2IA-99. Refer to OP Examiners note:                2203.021 Attachment E to Notify simulator operator to    determine that 2CV-0427 and take IA leak to 0.              2CV-0437 will fail OPEN when IA is isolated to them.
Simulator operator: When direction given to close 2IA-99, take IA leak malfunction to 0.
END STOP TIME:


On panel 2C14, placed handswitches for 2CV-3004 and
ANO-2-JPM-NRC-IA02                                                      PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.
INITIATING CUE:
The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.


2CV-3015 to OPEN.
ANO-2-JPM-NRC-IA02                                                       PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
 
Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.
Observed red lights ON and
 
green lights OFF above
 
handswitches for 2CV-3004 and
 
2CV-3015.
N/A  SAT  UNSAT  2. Step 2.b Notify Unit-1 of intent to cross-connect instrument air.
Examiner's CUE:
 
Unit-1 personnel acknowledge
 
cross-connecting
 
instrument air.
Notified Unit-1 of intent to cross-connect instrument air.
N/A  SAT  UNSAT EXAMINER's NOTE: Provide the CUE below after the examinee identifies IA header pressure is less than 60 psig from indication on 2C14.
: 3. Step 4 Monitor Instrument Air header pressure.
 
Examiner's CUE:
Unit 1 SM reports that Unit 1
 
IA pressure is 55 psig and going down.
 
On panel 2C14, monitored Instrument Air header pressure
 
on 2PIS-3013 for results of
 
actions. N/A  SAT  UNSAT ANO-2-JPM-NRC-IA02 PAGE 4  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4 Step 4.A Close Instrument Air header cross-connect valve with Unit
: 1.
On panel 2C14, placed handswitches for 2CV-3004 and
 
2CV-3015 to CLOSED.
 
Observed green lights ON and red lights OFF above
 
handswitches for 2CV-3004 and
 
2CV-3015.
N/A  SAT  UNSAT Examiner's Note: When Unit 2 instrument air header is isolated from Unit 1 provide the following cue:
"A large IA leak exists on the instrument air piping and can be isolated by closing 2IA-99."
5 Step 4.B Direct Auxiliary Operator to CLOSE manual Instrument Air
 
header cross-connect valves. NOTE: candidate may elect to close 2IA99 before
 
closing manual valves.
Direct Auxiliary Operator to CLOSE manual Instrument Air
 
header cross-connect valves
 
2IA-47, 2IA-48, and 2IA-192.
N/A  SAT  UNSAT  6 Step 5 Check IA header pressure greater than 35 psig.
Monitors IA header pressure on 2C14 to verify pressure stays
 
above 25 psig.
N/A  SAT  UNSAT  6. Step 6  Direct AO to check IA header pressure and air receivers'
 
pressure.
Examiner's Cue: 
 
AO reports IA header pressure as indicated on
 
2C14.
Examiner's note: 
 
AO reports that the IA 'A' air receiver pressure is as
 
indicated on 2C14 and the
 
'B' IA receiver pressure is
 
+5 # as indicated on 2C14.
Direct AO to check IA header pressure locally.
Direct AO to check IA air receivers.
N/A  SAT  UNSAT ANO-2-JPM-NRC-IA02  PAGE  5  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  7. Step 8  Check IA header flow locally.
Examiner's Cue:
IA Header Flow is 700 SCFM. Direct AO to report IA header flow locally.
 
N/A  SAT  UNSAT (C) 8. Step 8  Direct AO to close 2 IA-99.
Examiner's Cue: 
 
AO has been directed to close 2IA-99.
Examiner's note:
Notify simulator operator to take IA leak to 0.
 
Direct AO to close 2IA-99 or inform CRS to direct AO to
 
close 2IA-99. Refer to OP
 
2203.021 Attachment E to
 
determine that 2CV-0427 and
 
2CV-0437 will fail OPEN when
 
IA is isolated to them.
N/A  SAT  UNSAT Simulator operator: When direction given to close 2IA-99, take IA leak malfunction to 0.
END  STOP TIME:                               
 
ANO-2-JPM-NRC-IA02  PAGE  6  OF 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "I NSTR AIR PRESS HI/LO" is in alarm.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2."
The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.
ANO-2-JPM-NRC-IA02  PAGE  7  OF  7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Normal full power operation. Alarm 2K12-A8 "I NSTR AIR PRESS HI/LO" is in alarm.
INITIATING CUE:
The SM/CRS directs, "Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2." 


ANO-2-JPM-NRC-MTG05 PAGE 1 of 8 Job Performance Measure UNIT: 2 REV #: 007 DATE:
ANO-2-JPM-NRC-MTG05                                                         PAGE 1 of 8 Job Performance Measure UNIT:     2                     REV #:   007                   DATE:
SYSTEM/DUTY AREA:
SYSTEM/DUTY AREA:         Main Turbine Generator System TASK:   Perform a Manual Synchronization of the Main Turbine Generator to the System (Alternate Success Path)
Main Turbine Generator System                                                                
JTA#:   ANO2-RO-TURBC-NORM-12 KA VALUE     RO:       2.9     SRO:       3.2     KA  
 
TASK: Perform a Manual Synchronization of the Main Turbine Generator to the System (Alternate Success Path)                                                               JTA#: ANO2-RO-TURBC-NORM-12 KA VALUE RO: 2.9 SRO: 3.2 KA  


==REFERENCE:==
==REFERENCE:==
045 K3.01       APPROVED FOR ADMINISTRATION TO: RO:
045 K3.01 X            X APPROVED FOR ADMINISTRATION TO:           RO:           SRO:
X SRO: X TASK LOCATION: INSIDE CR:
X TASK LOCATION:         INSIDE CR:           OUTSIDE CR:           BOTH:
X OUTSIDE CR:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
BOTH:   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
Perform PLANT SITE:                     SIMULATOR:                     LAB POSITION EVALUATED:       RO:                 SRO:
PLANT SITE:
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:           PLANT SITE:         LAB:
SIMULATOR:
TESTING METHOD:       SIMULATE:           PERFORM:       X 15 Minutes APPROXIMATE COMPLETION TIME IN MINUTES:
Perform LABPOSITION EVALUATED: RO: SRO:   ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES:
REFERENCE(S):       OP 2106.009 EXAMINEE'S NAME:                                           SSN:
15 Minutes REFERENCE(S): OP 2106.009 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
PERFORMANCE CHECKLIST COMMENTS:  
SATISFACTORY:                   UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time          Stop Time            Total Time SIGNED:                                        DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE


Start Time  Stop Time  Total Time  SIGNED:  DATE:
ANO-2-JPM-NRC-MTG05                                                                     PAGE 2 of 8 Job Performance Measure BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE ANO-2-JPM-NRC-MTG05 PAGE 2 of 8 Job Performance Measure BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:  
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.
 
JPM INITIAL TASK CONDITIONS: Plant startup is in progress. OP 2106.009 is completed through step 16.2.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
TASK STANDARD: Turbine Generator tripped. Uncontrolled MTG load increase stopped.
 
TASK PERFORMANCE AIDS:           OP 2106.009 Step 16.0 SIMULATOR SETUP:         Startup in progress. Reactor power ~ 5%. Main transformer Cooling Group Breaker Lineup is complete (ATT. E). Turbine first stage pressure feedback is in auto.
JPM INITIAL TASK CONDITIONS
Trigger 1 to component malfunction 2CV0242 value = 1.00 ramp = 2:00 delay 10 sec; Trigger 2 to component malfunction 2CV208 value = 1.00 ramp = 2:00 delay 10 sec; T1 set to ce4r9728 (BKR 5130) and T2 set to ce4r9731 (BKR 5134).
:   Plant startup is in progress. OP 2106.009 is completed through step      
 
16.2.                                                                                                                        
 
TASK STANDARD:
Turbine Generator tripped. Uncontrolled MTG load increase stopped.  
 
TASK PERFORMANCE AIDS
:     OP 2106.009 Step 16.0                                                                    
 
SIMULATOR SETUP:
Startup in progress. Reactor power
~ 5%. Main transformer Cooling Group Breaker  
 
Lineup is complete (ATT. E). Turbine first stage pressure feedback is in auto.                                              
 
Trigger 1 to component malfunction 2CV0242 value =
1.00 ramp = 2:00 delay 10 sec; Trigger 2 to  
 
component malfunction 2CV208 value = 1.00 ramp = 2:00 del ay 10 sec; T1 set to ce4r9728 (BKR 5130) and T2  
 
set to ce4r9731 (BKR 5134).          
 
ANO-2-JPM-NRC-MTG05  PAGE 3 of 8 Job Performance Measure INITIATING CUE:
 
The CRS directs, "Synchronize the Main Turbine Generator to the grid and load to about 50 Mwe using OP 2106.009 beginning with step 16.3."


ANO-2-JPM-NRC-MTG05                                                              PAGE 3 of 8 Job Performance Measure INITIATING CUE:
The CRS directs, Synchronize the Main Turbine Generator to the grid and load to about 50 Mwe using OP 2106.009 beginning with step 16.3.
START TIME:
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1. step 16.3.1 Notify Pine Bluff Dispatcher of intent to sync to system.  
PERFORMANCE CHECKLIST                         STANDARDS                   (Circle One)
: 1. Notify Pine Bluff Dispatcher Using dedicated dispatcher        N/A SAT UNSAT of intent to sync to system. telephone, notified Pine Bluff step                                dispatcher of intent to sync to 16.3.1  POSITIVE CUE:                system.
Pine Bluff dispatcher notified.
(C)    2. Place synchronizing hand    On panel 2C01, placed            N/A SAT UNSAT switch for EITHER Breaker    synchronizing hand switch for step    5130 OR Breaker 5134 to      EITHER Breaker 5130 16.3.2  MANUAL.                      (2HS-9727) OR Breaker 5134 (2HS-9730) in MANUAL.
POSITIVE CUE:                Observed EITHER hand switch Hand switch 2HS-9727 OR      2HS-9727 OR 2HS-9730 in 2HS-9730 in MANUAL.          MANUAL.
(C)    3. Verify Synchroscope          On panel 2C01, pressed            N/A SAT UNSAT rotating slowly in the      INCREASE or DECREASE step    CLOCKWISE direction.        pushbutton on Load Selector 16.3.3                                until synchroscope is rotating slowly in CLOCKWISE POSITIVE CUE:                direction.
Synchroscope rotating slowly in CLOCKWISE          On panel 2C10, observed direction.                  synchroscope rotating slowly in CLOCKWISE direction.


POSITIVE CUE:
ANO-2-JPM-NRC-MTG05                                                       PAGE 4 of 8 Job Performance Measure PERFORMANCE CHECKLIST                         STANDARDS               (Circle One)
Pine Bluff dispatcher
(C)     4. Verify Generator Voltage     On panel 2C10, verified        N/A SAT UNSAT slightly higher than System generator voltage slightly step  Voltage AND check           higher than system voltage.
 
16.3.4 Generator Voltage phase to 16.3.5 phase.                       AND POSITIVE CUE:               On panel 2C01, checked Voltage slightly higher than generator voltage phase to system voltage.              phase using installed indications and handswitch 2HS-9733.
notified.
On panel 2C10, observed voltages on Incoming slightly higher than Running voltmeters.
 
: 5. Announce to the control      Announced to the control      N/A SAT UNSAT room the intention to       room the intention to step  synchronize to system.      synchronize to system.
Using dedicated dispatcher telephone, notified Pine Bluff dispatcher of intent to sync to system. N/A  SAT  UNSAT (C) 2. step 16.3.2 Place synchronizing hand switch for EITHER Breaker 5130 OR Breaker 5134 to MANUAL.
16.3.6 POSITIVE CUE:
 
Control room personnel notified.
POSITIVE CUE:
(C)    6. Close Generator Output      On panel 2C01, closed          N/A SAT UNSAT Breaker and check turbine    Generator Output Breaker step picked up load.             selected so that Breaker 16.3.7                             CLOSES with synchroscope in 16.3.8 POSITIVE CUE:               the 12 OCLOCK position.
Hand switch 2HS-9727 OR 2HS-9730 in MANUAL.
Red light ON.
 
Load increase indicated. Observed load increase indicated on Load (2JI-9625)
On panel 2C01, placed synchronizing hand switch for
OR PMS or SPDS computers.
 
On panel 2C01, observed breaker closed indication (red light ON, green light OFF) for operated breaker.
EITHER Breaker 5130 (2HS-9727) OR Breaker 5134 (2HS-9730) in MANUAL.
OR On panel 2C10 mimic, observed red light ON and green light OFF for breaker just closed (5130 or 5134).
 
Observed EITHER hand switch 2HS-9727 OR 2HS-9730 in MANUAL.
N/A  SAT  UNSAT (C) 3. step 16.3.3 Verify Synchroscope rotating slowly in the
 
CLOCKWISE direction.
 
POSITIVE CUE:
Synchroscope rotating slowly in CLOCKWISE
 
direction.
 
On panel 2C01, pressed INCREASE or DECREASE
 
pushbutton on Load Selector until synchroscope is rotating slowly in CLOCKWISE
 
direction.
 
On panel 2C10, observed synchroscope rotating slowly
 
in CLOCKWISE direction.
N/A  SAT  UNSAT ANO-2-JPM-NRC-MTG05 PAGE 4 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 4. step 16.3.4 16.3.5 Verify Generator Voltage slightly higher than System  
 
Voltage AND check Generator Voltage phase to  
 
phase.  
 
POSITIVE CUE:
Voltage slightly higher than system voltage.
 
On panel 2C10, verified generator voltage slightly higher than system voltage. 
 
AND On panel 2C01, checked generator voltage phase to  
 
phase using installed indications and handswitch  
 
2HS-9733.  
 
On panel 2C10, observed voltages on Incoming slightly  
 
higher than Running voltmeters.  
 
N/A SAT UNSAT 5. step 16.3.6 Announce to the control room the intention to synchronize to system.  
 
POSITIVE CUE:
Control room personnel  
 
notified.
Announced to the control room the intention to synchronize to system.  
 
N/A SAT  UNSAT (C) 6. step 16.3.7 16.3.8 Close Generator Output Breaker and check turbine picked up load.
 
POSITIVE CUE:
Red light ON.  
 
Load increase indicated.  
 
On panel 2C01, closed Generator Output Breaker
 
selected so that Breaker CLOSES with synchroscope in
 
the 12 O'CLOCK position.
 
Observed load increase  
 
indicated on Load (2JI-9625)  
 
OR PMS or SPDS computers.  
 
On panel 2C01, observed  
 
breaker closed indication (red  
 
light ON, green light OFF) for  
 
operated breaker.  
 
OR On panel 2C10 mimic, observed red light ON and  
 
green light OFF for breaker  
 
just closed (5130 or 5134).
N/A  SAT  UNSAT ANO-2-JPM-NRC-MTG05  PAGE 5 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 7. step 16.3.9 Adjust load to ~ 10 Mwe.
 
POSITIVE CUE:
Load ~ 10 Mwe.
 
On panel 2C01, adjusted load to ~ 10 Mwe by pressing
 
INCREASE OR DECREASE pushbutton on Load Select.
 
Observed load at ~ 10 Mwe as
 
indicated on LOAD (2JI-9625)
 
or on PMS or SPDS computers.
N/A  SAT  UNSAT  8. step 16.3.10 Verify SDBCS response
 
POSITIVE CUE:
SDBCS valves are closing.
 
On panel 2C04, Verify 2CV0303 is responding to load increase by closing (HIC demand signal lowering).
 
N/A  SAT  UNSAT  9. step 16.4 Select Load Rate Limit of 1/2 % per minute.
 
POSITIVE CUE:
1/2 % per minute illuminated.
 
On panel 2C01, Verify  Load Rate Limit of  1/2 % per minute
 
light illuminated
 
N/A  SAT  UNSAT EXAMINER'S AND SIMULATOR  OPERATOR NOTE:
Trigger T-1, #1 control valve opening if BRK5130 closed or Trigger T-2, #2 control valve opening if BRK5134 closed with 10 sec delay. (C) 10. Recognize that turbine load is still increasing.       


ANO-2-JPM-NRC-MTG05                                                                        PAGE 5 of 8 Job Performance Measure PERFORMANCE CHECKLIST                                STANDARDS                      (Circle One)
(C)      7.      Adjust load to ~ 10 Mwe.        On panel 2C01, adjusted load          N/A SAT UNSAT to ~ 10 Mwe by pressing step                                      INCREASE OR DECREASE 16.3.9    POSITIVE CUE:                    pushbutton on Load Select.
Load ~ 10 Mwe.
Observed load at ~ 10 Mwe as indicated on LOAD (2JI-9625) or on PMS or SPDS computers.
: 8.      Verify SDBCS response            On panel 2C04, Verify 2CV0303        N/A SAT UNSAT is responding to load increase step                                      by closing (HIC demand signal 16.3.10    POSITIVE CUE:                    lowering).
SDBCS valves are closing.
: 9.      Select Load Rate Limit of 1/2      On panel 2C01, Verify Load            N/A SAT UNSAT
                    % per minute.                    Rate Limit of 1/2 % per minute step                                      light illuminated 16.4 POSITIVE CUE:
1/2 % per minute illuminated.
EXAMINERS AND SIMULATOR OPERATOR NOTE:
Trigger T-1, #1 control valve opening if BRK5130 closed or Trigger T-2, #2 control valve opening if BRK5134 closed with 10 sec delay.
(C)      10. Recognize that turbine load is    On panel 2C01, observed              N/A SAT UNSAT still increasing.                  turbine load still increasing on LOAD (2JI-9625) or on PMS or SPDS Computers.
NEGATIVE CUE:
NEGATIVE CUE:
Turbine load is increasing uncontrollably.  
Turbine load is increasing uncontrollably.
 
On panel 2C01, observed turbine load still increasing on
 
LOAD (2JI-9625) or on PMS or
 
SPDS Computers.
N/A  SAT  UNSAT ANO-2-JPM-NRC-MTG05  PAGE 6 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 11. Attempts to lower load using decrease pushbutton
 
AND/OR Manually trips Main Turbine
 
Generator using trip
 
pushbutton


ANO-2-JPM-NRC-MTG05                                                        PAGE 6 of 8 Job Performance Measure PERFORMANCE CHECKLIST                        STANDARDS              (Circle One)
(C)    11. Attempts to lower load using    On panel 2C01, attempted to  N/A SAT UNSAT decrease pushbutton            reduce turbine load using the decrease pushbutton AND/OR AND/OR Manually trips Main Turbine Generator using trip          Manually tripped Main Turbine pushbutton                    Generator by depressing the trip pushbutton.
POSITIVE CUE:
POSITIVE CUE:
Main Turbine Generator is  
Main Turbine Generator is     Verified MTG tripped, tripped.                       Generator Output Breakers open, Exciter Field Breaker NOTE:                         open, all valves closed, and Attempting to decrease load   electrical loads shifted to SU using the decrease            #3.
 
pushbutton is not critical and does not need to be performed. Tripping the turbine is critical.
tripped.  
END STOP TIME:
 
NOTE: Attempting to decrease load  


using the decrease
ANO-2-JPM-NRC-MTG05                                                  PAGE 7 of 8 Job Performance Measure EXAMINER S COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
The CRS directs:
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."


pushbutton is not critical and  
ANO-2-JPM-NRC-MTG05                                                  PAGE 8 of 8 Job Performance Measure EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
The CRS directs:
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."


does not need to be
ANO-2-JPM-NRC-SIT01                                                                   PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:     2                       REV #:     010                       DATE:
 
SYSTEM/DUTY AREA:         Safety Injection System TASK:     Perform a high pressure fill of a SIT (SIT "A") (Alternate Success Path)
performed. Tripping the
JTA#:     ANO2ROECCSNORM2 KA VALUE       RO:         3.3       SRO:           3.7       KA  
 
turbine is critical. On panel 2C01, attempted to reduce turbine load using the
 
decrease pushbutton
 
AND/OR Manually tripped Main Turbine Generator by depressing the
 
trip pushbutton.
 
Verified MTG tripped, Generator Output Breakers
 
open, Exciter Field Breaker open, all valves closed, and
 
electrical loads shifted to SU
 
#3. N/A  SAT  UNSAT END  STOP TIME:                               
 
ANO-2-JPM-NRC-MTG05  PAGE 7 of 8 Job Performance Measure EXAMINER 'S COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
 
The CRS directs: 
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."
ANO-2-JPM-NRC-MTG05  PAGE 8 of 8 Job Performance Measure EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Plant startup is in progress. OP 2106.009 is completed through step 16.2.
 
The CRS directs: 
"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."
 
ANO-2-JPM-NRC-SIT01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:
SYSTEM/DUTY AREA: Safety Injection System TASK: Perform a high pressure fill of a SI T (SIT "A") (Alternate Success Path)
JTA#: ANO2ROECCSNORM2 KA VALUE RO: 3.3 SRO: 3.7 KA  


==REFERENCE:==
==REFERENCE:==
006 A2.03 APPROVED FOR ADMINISTRATION TO: RO:
006 A2.03 APPROVED FOR ADMINISTRATION TO:               RO:   X         SRO:   X TASK LOCATION:           INSIDE CR:     X           OUTSIDE CR:               BOTH:
X SRO: X TASK LOCATION: INSIDE CR:
X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
PLANT SITE:                         SIMULATOR:         Perform           LAB:
SIMULATOR:
POSITION EVALUATED:         RO:                       SRO:
Perform LAB:   POSITION EVALUATED: RO: SRO:   ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
ACTUAL TESTING ENVIRONMENT:             SIMULATOR:                 PLANT SITE:         LAB:
APPROXIMATE COMPLETION TIME IN MINUTES:
TESTING METHOD:         SIMULATE:                 PERFORM:
10 Minutes REFERENCE(S): OP-2104.001 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME:
APPROXIMATE COMPLETION TIME IN MINUTES:                   10 Minutes REFERENCE(S):     OP-2104.001 EXAMINEE'S NAME:                                                     SSN:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                       UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time   SIGNED: DATE:
Start Time             Stop Time                 Total Time SIGNED:                                                 DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
AND IS CURRENT WITH THAT REVISION.  


ANO-2-JPM-NRC-SIT01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ANO-2-JPM-NRC-SIT01                                                                         PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS: HPSI pump (2P89A) is running on minimum recirculation TASK STANDARD:         Safety Injection Tank (2T2A) level has been increased ~0.3% and fill is secured prior to 2T2A pressure exceeding 624psig (Hi Hi pressure) or level exceeding 89.5% (Hi Hi level)
JPM INITIAL TASK CONDITIONS:
THIS IS AN ALTERNATE SUCCESS PATH JPM TASK PERFORMANCE AIDS:             OP 2104.001 Section 8.0 SIMULATOR SETUP: SIT A level low enough to accept a 0.3% water addition and Safety Injection Tank (2T2A) pressure is <608 psig.
HPSI pump (2P89A) is running on minimum recirculation                  
Setup overrides to deenergize the red and green lights for 2CV 5015-1 when the handswitch is is taken to the open position and have the valve open 1%. HPSI pump (2P89A) is running on minimum recirculation. RCS PRESSURE > 1500psia.
 
Set trigger T4= of4r0151 (triggered when 2HS5015-1 red light is energized).
TASK STANDARD:
Safety Injection Tank (2T2A) level has been increased ~0.3% and fill is secured prior to
 
2T2A pressure exceeding 624psig (Hi Hi pressure) or level exceeding 89.5% (Hi Hi level)    
 
THIS IS AN ALTERNATE SUCCESS PATH JPM                                    
 
TASK PERFORMANCE AIDS:
OP 2104.001 Section 8.0                                                                  
 
SIMULATOR SETUP: SIT 'A' level low enough to accept a 0.3% water addition and Safety Injection Tank (2T2A) pressure is <608 psig.
Setup overrides to deenergize the red and gr een lights for 2CV 5015-1 when the handswitch is is taken to the open position and have the valve open 1%. HPSI pump (2P89A) is running on minimum recirculation. RCS PRESSURE > 1500psia.  
 
Set trigger T4= 'of4r0151' (triggered w hen 2HS5015-1 red light is energized).
T4 - CV50151 = 0.1; fail HPSI injection MOV partially open.
T4 - CV50151 = 0.1; fail HPSI injection MOV partially open.
T4 - DO_HS_5015_G = OFF Time delay = 2 sec; HPSI injection MOV green light off.
T4 - DO_HS_5015_G = OFF Time delay = 2 sec; HPSI injection MOV green light off.
T4 - DO_HS_5015_R = OFF Time delay =2 sec; HPSI injection MOV red light off.
T4 - DO_HS_5015_R = OFF Time delay =2 sec; HPSI injection MOV red light off.


ANO-2-JPM-NRC-SIT01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-SIT01                                                                     PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2 A) level 0.3% using OP 2104.001, beginning with step 8.3." START TIME:
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."
 
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. Step 8.4.1 Open SIT (2T2A) Drain Valve (2SV-5001-1).  
PERFORMANCE CHECKLIST                                 STANDARDS                   (Circle One)
 
(C)     1.     Open SIT (2T2A) Drain Valve     On panel 2C17, placed                N/A SAT UNSAT (2SV-5001-1).                   handswitch for 2SV-5001-1 to Step                                    OPEN.
On panel 2C17, placed handswitch for 2SV-5001-1 to  
8.4.1 Observed red light ON above handswitch.
 
(C)       2. Open SIT (2T2A) Check           On panel 2C33, placed                N/A SAT UNSAT Valve Bypass (2SV-5004).       handswitch for 2SV-5004 to Step                                    OPEN.
OPEN.  
8.4.1 Observed red light ON above handswitch.
 
: 3. Monitor SIT level and           While filling SIT A, monitored       N/A SAT UNSAT pressure during fill.          level to ensure level maintained Step 8.3                                    < 87.9%.
Observed red light ON above  
While filling SIT A, monitored SIT pressure closely to ensure pressure maintained < 624 psig.
 
(C)       4. Throttle open HPSI Header 1     On panel 2C17, throttled            N/A SAT UNSAT Injection to RCP A Discharge   2CV-5015-1 OPEN by placing Step    (2CV-5015-1).                  handswitch to OPEN 8.4.2                                    momentarily as required to establish an SIT fill rate.
handswitch.
Observed red and green lights ON above handswitch.
N/A  SAT  UNSAT (C) 2. Step 8.4.1 Open SIT (2T2A) Check Valve Bypass (2SV-5004).  
Observed SIT (2T2A) control board level instrument(s):
 
2LIS-5008 (2C17) 2LI-5010 (2C17) 2LIS-5009 (2C16)
On panel 2C33, placed handswitch for 2SV-5004 to  
OR Observed SIT (2T2A) level on PMS, or SPDS computer point/trend display.
 
OPEN.  
 
Observed red light ON above  
 
handswitch.
N/A  SAT  UNSAT  3. Step 8.3  Monitor SIT level and pressure during fill.
While filling SIT A, monitored level to ensure level maintained
< 87.9%.
While filling SIT A, monitored SIT  
 
pressure closely to ensure  
 
pressure maintained < 624 psig.
N/A  SAT  UNSAT (C) 4. Step 8.4.2 Throttle open HPSI Header 1 Injection to RCP A Discharge  
 
(2CV-5015-1).
 
On panel 2C17, throttled 2CV-5015-1 OPEN by placing
 
handswitch to OPEN  
 
momentarily as required to  
 
establish an SIT fill rate.  
 
Observed red and green lights  
 
ON above handswitch.  
 
Observed SIT (2T2A) control  
 
board level instrument(s):  
 
2LIS-5008 (2C17)  
 
2LI-5010 (2C17)  
 
2LIS-5009 (2C16)  
 
OR Observed SIT (2T2A) level on PMS, or SPDS computer  
 
point/trend display.
N/A  SAT  UNSAT ANO-2-JPM-NRC-SIT01  PAGE  4  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 5. Step 8.4.3.A Attempts to close HPSI Header 1 Injection to RCP A
 
Discharge valve.
 
On panel 2C17, placed handswitch for 2CV-5015-1 to
 
CLOSE.
 
Recognized that 2CV-5015-1
 
would NOT close and both red
 
and green lights are deenergized.
N/A  SAT  UNSAT (C) 6. 
 
Step 8.4.3.B Step 8.4.3.C Stop the level increase in 2T2A SIT.
 
On panel 2C17, placed handswitch for A HPSI pump
 
(2P-89A) in stop Observed 2P89A stopped.
OR On panel 2C17 placed handswitch for SIT A Drain Valve
 
(2SV-5001-1) to CLOSED.
 
Observed green light ON above
 
handswitch.
 
OR On panel 2C33, placed handswitch for SIT A Check
 
Valve Bypass (2SV-5004) to
 
CLOSED.
 
Observed green light ON above
 
handswitch.
 
N/A  SAT  UNSAT  7. Inform CRS of failure of 2CV-5015-1 to close.
 
Examiner's Cue:
Acknowledge communication as CRS. 
 
Direct Examinee to secure
 
from filling A SIT.
Informed CRS that 2CV-5015-1 failed to close.
 
N/A  SAT  UNSAT  8. Step 8.4.3.B Close SIT (2T2A) Drain Valve.
(if not closed previously.)
 
On panel 2C17, placed handswitch for SIT A Drain Valve
 
(2SV-5001-1) to CLOSE.
 
Observed green light ON above
 
handswitch.
N/A  SAT  UNSAT  9. Step 8.4.3.C Close SIT (2T2A) Check Valve Bypass.
(if not closed previously.)
 
On panel 2C33, placed handswitch for SIT A Check
 
Valve Bypass (2SV-5004) to
 
CLOSE.
 
Observed green light ON above
 
handswitch.
N/A  SAT  UNSAT ANO-2-JPM-NRC-SIT01  PAGE  5  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 10. On panel 2K07, Alarms C3, SIT Press Hi Hi or C4 Level Hi Hi NOT received.
 
2T2A SIT High High Pressure alarm NOT received (SIT
 
pressure > 624 psig) or High
 
High level alarm NOT received


(87.5%). N/A SAT UNSAT END   STOP TIME:
ANO-2-JPM-NRC-SIT01                                                          PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
(C)    5. Attempts to close HPSI      On panel 2C17, placed            N/A SAT UNSAT Header 1 Injection to RCP A handswitch for 2CV-5015-1 to Step  Discharge valve.            CLOSE.
8.4.3.A Recognized that 2CV-5015-1 would NOT close and both red and green lights are deenergized.
(C)    6. Stop the level increase in  On panel 2C17, placed            N/A SAT UNSAT 2T2A SIT.                   handswitch for A HPSI pump (2P-89A) in stop Observed 2P89A stopped.
OR On panel 2C17 placed Step                              handswitch for SIT A Drain Valve 8.4.3.B                            (2SV-5001-1) to CLOSED.
Step 8.4.3.C                            Observed green light ON above handswitch.
OR On panel 2C33, placed handswitch for SIT A Check Valve Bypass (2SV-5004) to CLOSED.
Observed green light ON above handswitch.
: 7. Inform CRS of failure of    Informed CRS that 2CV-5015-1      N/A SAT UNSAT 2CV-5015-1 to close.        failed to close.
Examiners Cue:
Acknowledge communication as CRS.
Direct Examinee to secure from filling A SIT.
: 8. Close SIT (2T2A) Drain      On panel 2C17, placed            N/A SAT UNSAT Valve.                      handswitch for SIT A Drain Valve Step   (if not closed previously.) (2SV-5001-1) to CLOSE.
8.4.3.B Observed green light ON above handswitch.
: 9. Close SIT (2T2A) Check      On panel 2C33, placed            N/A SAT UNSAT Valve Bypass.              handswitch for SIT A Check Step  (if not closed previously.) Valve Bypass (2SV-5004) to 8.4.3.C                            CLOSE.
Observed green light ON above handswitch.


ANO-2-JPM-NRC-SIT01 PAGE OF 7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-SIT01                                                     PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                      STANDARDS              (Circle One)
HPSI pump (2P89A) is running on minimum recirculation.  
(C)   10. On panel 2K07, Alarms C3,  2T2A SIT High High Pressure  N/A SAT UNSAT SIT Press Hi Hi or C4 Level alarm NOT received (SIT Hi Hi NOT received.        pressure > 624 psig) or High High level alarm NOT received (87.5%).
END STOP TIME:


ANO-2-JPM-NRC-SIT01                                                      PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculation.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."  
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."
 
ANO-2-JPM-NRC-SIT01  PAGE  7  OF  7 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculat ion.                                           


ANO-2-JPM-NRC-SIT01                                                      PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculation.
INITIATING CUE:
INITIATING CUE:
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."  
The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."
 
ANO-2-JPM-NRC-ELEC001  PAGE  1  OF  7 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 008  DATE:  SYSTEM/DUTY AREA: AC Electrical Distribution System TASK: Perform backfeed of a non-vital bus (2A1 from 2A3) , Respond to a Loss of Offsite Power JTA#: ANO2-RO-EOPAOP-EMER-32                     


KA VALUE RO:
ANO-2-JPM-NRC-ELEC001                                                              PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT:      2                    REV #:      008                    DATE:
3.7 SRO: 4.1 KA  
SYSTEM/DUTY AREA:        AC Electrical Distribution System TASK:    Perform backfeed of a non-vital bus (2A1 from 2A3) , Respond to a Loss of Offsite Power JTA#:    ANO2-RO-EOPAOP-EMER-32 KA VALUE     RO:       3.7       SRO:           4.1     KA  


==REFERENCE:==
==REFERENCE:==
 
062 A2.11 APPROVED FOR ADMINISTRATION TO:               RO:       X     SRO:     X TASK LOCATION:         INSIDE CR:         X       OUTSIDE CR:             BOTH:
062 A2.11           APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X SRO: X TASK LOCATION: INSIDE CR:
PLANT SITE:                     SIMULATOR:             Perform     LAB:
X OUTSIDE CR: BOTH:
POSITION EVALUATED:       RO:                       SRO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR:
ACTUAL TESTING ENVIRONMENT:             SIMULATOR:             PLANT SITE:             LAB:
Perform LAB:   POSITION EVALUATED: RO: SRO:   ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
TESTING METHOD:       SIMULATE:                 PERFORM:         X APPROXIMATE COMPLETION TIME IN MINUTES:                 15 Minutes REFERENCE(S):     EOP 2202.007 EXAMINEE'S NAME:                                                 SSN:
X APPROXIMATE COMPLETION TIME IN MINUTES:
EVALUATOR'S NAME:
15 Minutes REFERENCE(S):
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
EOP 2202.007 EXAMINEE'S NAME: SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
SATISFACTORY:                   UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time           Stop Time                 Total Time SIGNED:                                             DATE:
Start Time Stop Time Total Time   SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-ELEC001  PAGE  2  OF  7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:


ANO-2-JPM-NRC-ELEC001                                                                      PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023  with the examinee.
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.
A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.        
EOP 2202.007 steps have been completed through step 30.
 
TASK STANDARD:
TASK STANDARD:  
Non-vital bus 2A1 has been powered from vital bus 2A3.
 
Non-vital bus 2A1 has been powered fr om vital bus 2A3.                      
 
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
EOP 2202.007 steps 28 through 34.    
EOP 2202.007 steps 28 through 34.
SIMULATOR SETUP:
IC with loss of offsite power. Open feeder breakers for 2B 1, 2, 7. Close 2CV 0400 & 2CV0460.
Verify Remote function 4162A1strip value = TRUE is triggered. Complete SPTAs and EOP 2202.007 through step 31.


SIMULATOR SETUP:
ANO-2-JPM-NRC-ELEC001                                                                 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
 
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
IC with loss of offsite power. Open feeder breaker s for 2B 1, 2, 7. Close 2CV 0400 & 2CV0460.
START TIME:
Verify Remote function 4162A1strip value = T RUE is triggered. Complete SPTA's and EOP 2202.007 through step 31.
PERFORMANCE CHECKLIST                         STANDARDS                           (Circle One) 1     Check 2A1 lockout relay reset. On annunciator panel 2K01, verified N/A SAT UNSAT 2K01-B7 "L.O. RELAY TRIP" for Step                                  2A1 in "slow flash" OR NOT 31.A                                  illuminated.
 
2     Place "SU 2 to 2A1" (2A111) in On panel 2C10, placed 2A111 in       N/A SAT UNSAT PTL and verify breaker open. PTL.
ANO-2-JPM-NRC-ELEC001 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:
Step 31.B                                  Observed green light ON; red light OFF over hand switch.
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31." START TIME:
3     Place "Unit Aux to 2A1" (2A112) On panel 2C10, placed 2A112 in      N/A SAT UNSAT in PTL and verify breaker open. PTL.
PERFORMANCE CHECKLIST STANDARDS (Circle One) 1 Step 31.A  Check 2A1 lockout relay reset.  
Step 31.B                                  Observed green light ON; red light OFF over hand switch.
 
4     Place "SU 3 to 2A1" (2A113) in On panel 2C10, placed 2A113 in       N/A SAT UNSAT PTL and verify breaker open. PTL.
On annunciator panel 2K01, verified 2K01-B7 "L.O. RELAY TRIP" for 2A1 in "slow flash" OR NOT illuminated.
Step 31.B                                  Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT  2 Step 31.B  Place "SU 2 to 2A1" (2A111) in PTL and verify breaker open.
(C)   5     Place "2A1 to 2B3" (2A103) in   On panel 2C10, placed 2A103 in       N/A SAT UNSAT PTL and verify breaker open. PTL.
 
Step 31.B                                  Observed green light ON; red light OFF over hand switch.
On panel 2C10, placed 2A111 in PTL.  
(C)   6     Place "2A1 to 2B9" (2A109) in   On panel 2C10, placed 2A109 in       N/A SAT UNSAT PTL and verify breaker open. PTL.
 
Step 31.B                                  Observed green light ON; red light OFF over hand switch.
Observed green light ON; red light OFF over hand switch.
7      Place condensate pump (2P2A) in On panel 2C02, placed 2P2A in       N/A SAT UNSAT PTL and verify breaker open. PTL.
N/A  SAT  UNSAT  3 Step 31.B  Place "Unit Aux to 2A1" (2A112) in PTL and verify breaker open.  
Step 31.C                                  Observed green light ON; red light OFF over hand switch.
 
8      Place condensate pump (2P2C) in On panel 2C02, placed 2P2C in       N/A SAT UNSAT PTL and verify breaker open. PTL.
On panel 2C10, placed 2A112 in PTL.  
Step 31.C                                  Observed green light ON; red light OFF over hand switch.
 
Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT  4 Step 31.B  Place "SU 3 to 2A1" (2A113) in PTL and verify breaker open.
 
On panel 2C10, placed 2A113 in PTL.  
 
Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT (C) 5 Step 31.B  Place "2A1 to 2B3" (2A103) in PTL and verify breaker open.
 
On panel 2C10, placed 2A103 in PTL.  
 
Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT (C) 6 Step 31.B  Place "2A1 to 2B9" (2A109) in PTL and verify breaker open.
 
On panel 2C10, placed 2A109 in PTL.
 
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT 7 Step 31.C  Place condensate pump (2P2A) in PTL and verify breaker open.  
 
On panel 2C02, placed 2P2A in PTL.  
 
Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT  8 Step 31.C  Place condensate pump (2P2C) in PTL and verify breaker open.
 
On panel 2C02, placed 2P2C in PTL.
 
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT ANO-2-JPM-NRC-ELEC001  PAGE  4  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  9 Step 31.C  Place heater drain pump (2P8A) in PTL and verify breaker open.  
 
On panel 2C02, placed 2P8A in PTL.  
 
Observed green light ON; red light OFF over hand switch.
N/A  SAT  UNSAT 10 Step 31.C  Place auxiliary feed pump (2P75) in PTL and verify breaker open.
 
On panel 2C02, placed 2P75 in PTL.
 
Observed green light ON; red light OFF over hand switch.
N/A SAT UNSAT Examiner's note: Transition to back of control room to panel 2C22  11 Step 31.D  Place main chiller (2VCH-1A) handswitch (2HS-3810) in PTL and verify breaker open.  
 
On panel 2C22, placed 2HS-3810 for 2VCH-1A in PTL.  
 
Observed green lights ON; red lights OFF over hand switch.
N/A  SAT  UNSAT  EXAMINER'S NOTE:
Transition to front of control room panel 2C10 Provide the following cue when the n eed for local actions is identified: CUE: Local actions for EOP 2202.007 step 30.E using Attachment 24 have been completed. (C) 12 Step 33  Energize non-vital bus (2A1).
 
On panel 2C33, installed the synchronizer selector switch for
 
2A309 and placed switch in ON.
 
Placed 2A3 supply breaker (2A309) to CLOSE.  


ANO-2-JPM-NRC-ELEC001                                                                          PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                                  STANDARDS                            (Circle One) 9        Place heater drain pump (2P8A) in    On panel 2C02, placed 2P8A in        N/A SAT UNSAT PTL and verify breaker open.          PTL.
Step 31.C                                          Observed green light ON; red light OFF over hand switch.
10      Place auxiliary feed pump (2P75)      On panel 2C02, placed 2P75 in PTL. N/A SAT UNSAT in PTL and verify breaker open.
Step                                          Observed green light ON; red light 31.C                                          OFF over hand switch.
Examiners note:
Transition to back of control room to panel 2C22 11      Place main chiller (2VCH-1A)          On panel 2C22, placed 2HS-3810        N/A SAT UNSAT handswitch (2HS-3810) in PTL          for 2VCH-1A in PTL.
Step    and verify breaker open.
31.D                                          Observed green lights ON; red lights OFF over hand switch.
EXAMINER'S NOTE:
Transition to front of control room panel 2C10 Provide the following cue when the need for local actions is identified:
CUE: Local actions for EOP 2202.007 step 30.E using Attachment 24 have been completed.
(C)    12      Energize non-vital bus (2A1).        On panel 2C33, installed the          N/A SAT UNSAT synchronizer selector switch for Step                                          2A309 and placed switch in ON.
33 Placed 2A3 supply breaker (2A309) to CLOSE.
Observed red light ON; green light OFF over 2A309 hand switch.
Observed red light ON; green light OFF over 2A309 hand switch.
N/A  SAT  UNSAT (C) 13 Step 34  Check diesel generator load.  
(C)   13       Check diesel generator load.         On panel 2C33, verified 2DG1 load     N/A SAT UNSAT
 
                                                        < 2850 KW, whenever load is Step                                          changed.
On panel 2C33, verified 2DG1 load < 2850 KW, whenever load is  
34 Observed 2DG1 load on Wattmeter W2DG1 and verified or was aware of 2DG1 load change after energizing 2A1.
 
14       Energize non-vital 480v bus 2B1.     On panel 2C10, placed 2A1 to 2B1     N/A SAT UNSAT Feeder (2A102) in CLOSE.
changed.  
Step 35                                            Observed red light ON; green light OFF above hand switch.
 
Observed 2DG1 load on Wattmeter W2DG1 and verified or was aware  
 
of 2DG1 load change after energizing 2A1.
N/A  SAT  UNSAT  14 Step 35  Energize non-vital 480v bus 2B1.  
 
On panel 2C10, placed 2A1 to 2B1 Feeder (2A102) in CLOSE.  
 
Observed red light ON; green light OFF above hand switch.
N/A  SAT  UNSAT ANO-2-JPM-NRC-ELEC001  PAGE  5  OF  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  15 Step 35  Energize non-vital 480v bus 2B7.
 
On panel 2C10, placed 2A1 to 2B7 Feeder (2A104) in CLOSE.  


Observed red light ON; green light OFF above hand switch.
ANO-2-JPM-NRC-ELEC001                                                                PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                          (Circle One) 15  Energize non-vital 480v bus 2B7. On panel 2C10, placed 2A1 to 2B7    N/A SAT UNSAT Feeder (2A104) in CLOSE.
N/A  SAT  UNSAT Examiner's note: When 480VAC busses 2B1 and 2B7 are energized the JPM can be ended.
Step 35                                      Observed red light ON; green light OFF above hand switch.
END STOP TIME:                              
Examiners note:
When 480VAC busses 2B1 and 2B7 are energized the JPM can be ended.
END STOP TIME:


ANO-2-JPM-NRC-ELEC001 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY:
ANO-2-JPM-NRC-ELEC001                                                     PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY:
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG' s are operating supplying their respective busses.
A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.
EOP 2202.007 steps have been completed through step 30.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
ANO-2-JPM-NRC-ELEC001 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY:
 
ANO-2-JPM-NRC-ELEC001                                                     PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY:
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
A loss of offsite power has occurred. Both EDG' s are operating supplying their respective busses.
A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.
EOP 2202.007 steps have been completed through step 30.
EOP 2202.007 steps have been completed through step 30.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 1 of 7 SYSTEM/DUTY AREA:
 
Diesel Generator System (Alternate Success Path)
JOB PERFORMANCE MEASURE JPM#     A2JPM-NRC-AACGLS                   REV     06                                     PAGE 1 of 7 SYSTEM/DUTY AREA:         Diesel Generator System (Alternate Success Path)
TASK: Start up the AAC diesel generator manually locally during a Loss of Offsite Power JTA # : ANO2-AO-AACDG-OFFNORM-18 KA VALUE RO: 3.9 SRO: 4.0 KA  
TASK:     Start up the AAC diesel generator manually locally during a Loss of Offsite Power JTA # :   ANO2-AO-AACDG-OFFNORM-18 KA VALUE         RO:         3.9       SRO:           4.0         KA  


==REFERENCE:==
==REFERENCE:==
 
2.1.23 APPROVED FOR ADMINISTRATION TO:               RO:         X       SRO:         X TASK LOCATION:         INSIDE CR:               OUTSIDE CR:             X         BOTH:
2.1.23 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR:
PLANT SITE:         Simulate     SIMULATOR:                           LAB:
X BOTH:   SUGGESTED TESTING ENVIRONMENT AND ME THOD  (PERFORM OR SIMULATE):
POSITION EVALUATED:         RO:             SRO:
PLANT SITE:
ACTUAL TESTING ENVIRONMENT:             SIMULATOR:                   PLANT SITE:       X LAB:
Simulate SIMULATOR:
TESTING METHOD:         SIMULATE:         X   PERFORM:
LAB:   POSITION EVALUATED: RO: SRO:
APPROXIMATE COMPLETION TIME IN MINUTES:                         20 minutes REFERENCE(S)       OP 2104.037, Exhibit 1 EXAMINEES NAME:                                                   SSN:
ACTUAL TESTING ENVIRONMENT: SIMULATOR:
EVALUATORS NAME:                                                 DATE THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
PLANT SITE:
SATISFACTORY:                                   UNSATISFACTORY:
X LAB:   TESTING METHOD: SIMULATE:
X PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
20 minutes REFERENCE(S)
OP 2104.037, Exhibit 1 EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
DATETHE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time: Stop Time: Total Time:
Start Time:                 Stop Time:                 Total Time:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
SIGNED: DATE:
SIGNED:                                                                     DATE:


JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 2 of 7 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE JPM#       A2JPM-NRC-AACGLS                     REV     06                                     PAGE 2 of 7 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
This is an alternate success path JPM.
This is an alternate success path JPM.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
The following conditions exist:
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators ar e tied to their respective buses. 3. An attempt to start the AACDG from the Control R oom to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 1. The reactor has tripped due to a loss of off-site power.
: 2. Both emergency diesel generators are tied to their respective buses.
: 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD:
: 4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD:
The AAC Diesel has been started and is at 4160 V and 900 rp m with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator.
The AAC Diesel has been started and is at 4160 V and 900 rpm with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
: 1. OP 2104.037 Exhibit 1  
: 1. OP 2104.037 Exhibit 1


JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE:
JOB PERFORMANCE MEASURE JPM#       A2JPM-NRC-AACGLS                     REV     06                                           PAGE 3 of 7 INITIATING CUE:
The CRS provides the following direction:
The CRS provides the following direction:
: 1. Start the AAC Diesel Generat or using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
: 2. Bring the unit up to rated speed and voltage carrying house loads.
START TIME:
START TIME:
EXAMINER'S NOTE:
EXAMINERS NOTE:
Provide examinee with copy of 2104.037, Exhibit 1 If asked if 125 VDC is available, tell them that the indications for bus availability are as seen.
Provide examinee with copy of 2104.037, Exhibit 1 If asked if 125 VDC is available, tell them that the indications for bus availability are as seen.
PERFORMANCE CHECKLIST STANDARDS (Circle One) (C) 1. (Step 1.1) Place "Local/Remote" switch in LOCAL. (2HS-7118)
PERFORMANCE CHECKLIST                                 STANDARDS                       (Circle One)
EXAMINER'S CUE:
(C)     1. Place Local/Remote switch in     On panel 2C-440, placed the           N/A SAT UNSAT LOCAL. (2HS-7118)                  Local/Remote switch in LOCAL.
"Local/Remote" switch indicates LOCAL.
(Step (2HS-7118) 1.1)
On panel 2C-440, placed the "Local/Remote" switch in LOCAL.  
EXAMINERS CUE:
 
Local/Remote switch indicates LOCAL.
(2HS-7118)
EXAMINERS NOTE:
N/A  SAT  UNSAT EXAMINER'S NOTE:
The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START.
The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START. Provide the following cue after  35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG)
Provide the following cue after  35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG)
: 2. (Step 1.2) Start the AAC Diesel using the local start switch. (2HS-7117)
: 2. Start the AAC Diesel using the     On panel 2C-440 turned the local      N/A SAT UNSAT local start switch. (2HS-7117)     control switch CW to start.
EXAMINER'S CUE:
(Step 1.2)
The local start switch is in start, but the engine does not  
EXAMINERS CUE:
 
The local start switch is in start, but the engine does not start.
start. On panel 2C-440 turned the local control switch CW to start.
TRANSITION NOTE:
N/A  SAT  UNSAT TRANSITION NOTE:
Go to the AAC diesel engine room.
Go to the AAC diesel engine room.
: 3. (Step 2.1) Open the pre-lube pump solenoid (2SV-7224) for >10  
: 3. Open the pre-lube pump             On the south side of the engine at    N/A SAT UNSAT solenoid (2SV-7224) for >10         the generator end, rotated the (Step seconds.                            manual operator of 2SV-7224 2.1)
 
seconds. EXAMINER'S CUE:
2SV-7224 manual operating stem has been rotated and air
 
noise is heard.
On the south side of the engine at the generator end, rotated the  
 
manual operator of 2SV-7224  
 
CW to open for >10 seconds.
CW to open for >10 seconds.
N/A  SAT  UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06  PAGE  4 of 7 (C) 4. (Step 2.2) Open EITHER of the air start solenoid valves: - 2SV-7222 OR
EXAMINERS CUE:
  - 2SV-7223
2SV-7224 manual operating stem has been rotated and air noise is heard.


EXAMINER'S CUE:
JOB PERFORMANCE MEASURE JPM#  A2JPM-NRC-AACGLS                  REV    06                                    PAGE 4 of 7 (C)   4. Open EITHER of the air start    On the south side of the engine at N/A SAT UNSAT solenoid valves:                the generator end, rotated the (Step manual operator of one of the air 2.2)  - 2SV-7222 OR start solenoid valves CW to open.
2SV-7222 (2SV-7223) manual operating stem has been
            - 2SV-7223                      2SV-7222 OR 2SV-7223 EXAMINERS CUE:
 
2SV-7222 (2SV-7223) manual      Looked for an increase in engine operating stem has been          noise and/or discharge of oil and rotated and engine speed and    air from the air start motors.
rotated and engine speed and noise level increases.
noise level increases.
On the south side of the engine at the generator end, rotated the  
: 5. Close the air start solenoid    On the south side of the engine at N/A SAT UNSAT valve that was opened.           the generator end, rotated the (Step manual operator for the air start 2.3) solenoid valve CCW to close.
 
EXAMINERS CUE:
manual operator of one of the air  
 
start solenoid valves CW to open.  
 
2SV-7222 OR 2SV-7223  
 
Looked for an increase in engine noise and/or discharge of oil and  
 
air from the air start motors.
N/A SAT UNSAT 5. (Step 2.3) Close the air start solenoid valve that was opened.
EXAMINER'S CUE:
Manual operator rotated CCW to its original position.
Manual operator rotated CCW to its original position.
On the south side of the engine at the generator end, rotated the  
: 6. Close the pre-lube solenoid      After > 10 seconds on the south   N/A SAT UNSAT (2SV-7224).                      side of the engine at the (Step generator end, rotated the 2.3) manual operator of 2SV-7224 EXAMINERS CUE:                 CCW to close.
 
manual operator for the air start
 
solenoid valve CCW to close.
N/A  SAT  UNSAT  6. (Step 2.3) Close the pre-lube solenoid (2SV-7224).
EXAMINER'S CUE:
No more air noise is heard.
No more air noise is heard.
After > 10 seconds on the south side of the engine at the
: 7. Verify the AAC Diesel            On panel 2C-440, observed          N/A SAT UNSAT Generator is at rated speed and generator frequency at 60 Hz and (Step voltage.                        voltage at 4160V.
 
3.0)
generator end, rotated the
EXAMINERS CUE:
 
manual operator of 2SV-7224 CCW to close.
N/A SAT UNSAT  7. (Step 3.0) Verify the AAC Diesel Generator is at rated speed and
 
voltage. EXAMINER'S CUE:
Frequency indicates 60 Hz and voltage indicates 4160V.
Frequency indicates 60 Hz and voltage indicates 4160V.
On panel 2C-440, observed generator frequency at 60 Hz and


voltage at 4160V.
JOB PERFORMANCE MEASURE JPM#     A2JPM-NRC-AACGLS                   REV     06                                     PAGE 5 of 7 EXAMINERS NOTE:
N/A  SAT  UNSAT JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 5 of 7 EXAMINER'S NOTE:
When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide the POSITIVE CUE.
When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide  
(C)     8. Verify the AAC Generator           Observed breaker position          N/A SAT UNSAT Output Breaker (2A-1001) is       indication on the door of 2A-1001.
 
(Step CLOSED 4.1)
the POSITIVE CUE.
EXAMINERS CUE:
(C) 8. (Step 4.1) Verify the AAC Generator Output Breaker (2A-1001) is  
The green breaker OPEN light is lit.
 
AND Rotated breaker local control The white breaker spring           switch for 2A-1001 to the CLOSE charging light is lit.            position.
CLOSED EXAMINER'S CUE:
EXAMINERS CUE:
The green breaker OPEN light is lit. AND The white breaker spring charging light is lit.  
 
EXAMINER'S CUE:
The Red breaker CLOSED light is lit.
The Red breaker CLOSED light is lit.
Observed breaker position indication on the door of 2A-1001.
TRANSITION NOTE:
 
Rotated breaker local control switch for 2A-1001 to the CLOSE
 
position.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to the upstairs area of the switchgear room.
Go to the upstairs area of the switchgear room.
: 9. (Step 4.2) Verify the London Feed to MCC 2B161 breaker 2B16-A1 is  
: 9. Verify the London Feed to MCC     Verifies 2B16-A1 is Open.           N/A SAT UNSAT 2B161 breaker 2B16-A1 is (Step                                    Observes the mechanical OPEN.
 
4.2)                                    position indicator breaker for 2B16-A1 to show green open and the green breaker position EXAMINERS CUE:
OPEN. EXAMINER'S CUE:
indication light is lit.
Green OPEN light is lit on 2B16-A1 and mechanical position indicator showing
Green OPEN light is lit on 2B16-A1 and mechanical position indicator showing green open
 
: 10. Verify Load Center 2B16 Supply    Verifies 2B16-B1 is Open.           N/A SAT UNSAT from the AAC diesel (2B16-B1)
green open Verifies 2B16-A1 is Open.
(Step                                    Observes the mechanical is CLOSED.
Observes the mechanical position indicator breaker for  
4.3)                                    position indicator breaker for 2B16-B1 to show red closed and the red breaker position indication EXAMINERS CUE:
 
light is lit.
2B16-A1 to show green open and  
Red CLOSED light is lit on 2B16-B1 and mechanical position indicator showing red closed.
 
END STOP TIME: ________________
the green breaker position  
 
indication light is lit.  
 
N/A  SAT  UNSAT  10. (Step 4.3) Verify Load Center 2B16 Supply from the AAC diesel (2B16-B1) is CLOSED.
EXAMINER'S CUE:
Red CLOSED light is lit on 2B16-B1 and mechanical  
 
position indicator showing red
 
closed. Verifies 2B16-B1 is Open.
Observes the mechanical position indicator breaker for  
 
2B16-B1 to show red closed and  
 
the red breaker position indication  
 
light is lit.  


N/A  SAT  UNSAT END  STOP TIME:
JOB PERFORMANCE MEASURE JPM#   A2JPM-NRC-AACGLS         REV   06                       PAGE 6 of 7 Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
________________
: 1. The reactor has tripped due to a loss of off-site power.
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
: 2. Both emergency diesel generators are tied to their respective buses.
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 4. The PC on 2C14 AND 2C435 have both failed.
: 4. The PC on 2C14 AND 2C435 have both failed.
INITIATING CUE:
INITIATING CUE:
The CRS provides the following direction:
The CRS provides the following direction:
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.  
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
: 2. Bring the unit up to rated speed and voltage carrying house loads.


JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS         REV   06                       PAGE 7 of 7 Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
: 1. The reactor has tripped due to a loss of off-site power. 2. Both emergency diesel generators are tied to their respective buses. 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 1. The reactor has tripped due to a loss of off-site power.
: 2. Both emergency diesel generators are tied to their respective buses.
: 3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
: 4. The PC on 2C14 AND 2C435 have both failed.
: 4. The PC on 2C14 AND 2C435 have both failed.
INITIATING CUE:
INITIATING CUE:
The CRS provides the following direction:
The CRS provides the following direction:
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1. 2. Bring the unit up to rated speed and voltage carrying house loads.  
: 1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
 
: 2. Bring the unit up to rated speed and voltage carrying house loads.
ANO-2-JPM-NRC-FPEM1        PAGE  1 of  7 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 009  DATE:
SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK:  Perform service water emergency makeup to the SFP (with Loop 1 service water)
 
JTA#:  ANO2-WCO-SFP-EMER1


KA VALUE RO: 3.1 SRO: 3.5 KA  
ANO-2-JPM-NRC-FPEM1                                                              PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT:      2                      REV #:  009                      DATE:
SYSTEM/DUTY AREA:        Spent Fuel Pool Cooling System TASK:    Perform service water emergency makeup to the SFP (with Loop 1 service water)
JTA#:      ANO2-WCO-SFP-EMER1 KA VALUE       RO:         3.1     SRO:         3.5       KA  


==REFERENCE:==
==REFERENCE:==
033 A2.03 APPROVED FOR ADMINISTRATION TO:            RO:    X        SRO:  X TASK LOCATION:            INSIDE CR:              OUTSIDE CR:    X        BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:    Simulate          SIMULATOR:                        LAB:
POSITION EVALUATED:        RO:                    SRO:
ACTUAL TESTING ENVIRONMENT:            SIMULATOR:              PLANT SITE:            LAB:
TESTING METHOD:        SIMULATE:              PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:              20 Minutes REFERENCE (S):    OP 2104.006 EXAMINEES NAME:                                                SSN:
EVALUATORS NAME:
THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:                      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time            Stop Time              Total Time SIGNED:                                              DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


033 A2.03
ANO-2-JPM-NRC-FPEM1                                                                     PAGE 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
 
The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.
APPROVED FOR ADMINISTRATION TO:
RO: X  SRO: X  TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X  BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
OP 2104.006
 
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-FPEM1       PAGE 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
The following conditions exist:
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
: 1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
: 2. Neither fuel pool cooling pump is available.
: 3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level
: 4. Fuel pool level is low.
: 5. 2P66 is aligned to the RWT and running.
TASK STANDARD:
TASK STANDARD:
: 1. Emergency SFP makeup from Loop 1 service water has been initiated.
: 1. Emergency SFP makeup from Loop 1 service water has been initiated.
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
: 1. OP 2104.006 Section 14.2  
: 1. OP 2104.006 Section 14.2


ANO-2-JPM-NRC-FPEM1       PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
ANO-2-JPM-NRC-FPEM1                                                                       PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE: The CRS provides the following direction:
The CRS provides the following direction:  
Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool usi ng OP 2104.006, Section 14.2."
START TIME:
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
PERFORMANCE CHECKLIST                                   STANDARDS                     (Circle One)
TRANSITION NOTE:
TRANSITION NOTE:
Go to elevation 335' RAB, north end of hallway.
Go to elevation 335 RAB, north end of hallway.
: 1. Step 14.2.1 Secure Spent Fuel Pool Purification Pump (2P66).
: 1. Secure Spent Fuel Pool             Locally rotated 2P66 handswitch      N/A SAT UNSAT Purification Pump (2P66).          (2HS-5411) to STOP and released.
Examiner's Cue:
Step 14.2.1 Examiners Cue:                   Observed green light ON, red light OFF.
Green light ON, red light OFF.
Green light ON, red light OFF.
Locally rotated 2P66 handswitch (2HS-5411) to STOP and released.
TRANSITION NOTE:
 
Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.
Observed green light ON, red light OFF. N/A  SAT  UNSAT TRANSITION NOTE:
(C)     2. Verify Borated MU or RWT to       Closed 2FP-32 by turning            N/A SAT UNSAT 2P-66 (2FP-32) closed.          handwheel clockwise and Step observing valve stem insertion 14.2.2 until resistance felt.
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.
Examiners Cue:
(C) 2. Step 14.2.2 Verify Borated MU or RWT to 2P-66 (2FP-32) closed.
Examiner's Cue:
2FP-32 stem is fully inserted and resistance is felt.
2FP-32 stem is fully inserted and resistance is felt.
Closed 2FP-32 by turning handwheel clockwise and
TRANSITION NOTE:
 
observing valve stem insertion
 
until resistance felt.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 335' RAB just off elevator (if local verification is performed)
Go to elevation 335' RAB just off elevator (if local verification is performed)
(C) 3. Step 14.2.2 Verify RWT Recirculation Isolation (2CV-5637-1) closed.
(C)     3. Verify RWT Recirculation           Contacted Control Room to close      N/A SAT UNSAT Isolation (2CV-5637-1) closed. 2CV-5637-1.
Examiner's Cue:
Step 14.2.2  Examiners Cue:                   And When Control Room is               Locally at 2CV-5637-1, verify that contacted, then Control room       valve stem is in the down (closed) reports 2CV-5637-1 has been       position and closed limit switch is taken to Closed.                   actuated after the valve is closed by the Control Room. (if local Or                                verification performed)
When Control Room is contacted, then Control room  
After the Control Room Closes 2CV-5637-1, then 2CV-5637-1 is Closed (if local verification is performed)
 
reports 2CV-5637-1 has been  
 
taken to Closed.
Or After the Control Room Closes 2CV-5637-1, then 2CV-
 
5637-1 is Closed (if local verification is performed)
Contacted Control Room to close 2CV-5637-1.
And Locally at 2CV-5637-1, verify that valve stem is in the down (closed)
 
position and closed limit switch is
 
actuated after the valve is closed
 
by the Control Room. (if local


ANO-2-JPM-NRC-FPEM1                                                                  PAGE 4 of 7 JOB PERFORMANCE MEASURE (C)    4. Verify RWT Recirculation          Contacted Control Room to close        N/A SAT UNSAT Isolation (2CV-5638-2) closed. 2CV-5638-2.
Step 14.2.2                                    And Examiners Cue:                    Locally at 2CV-5638-2, verify that valve stem is in the down (closed)
When Control Room is position and closed limit switch is contacted, then Control room actuated after the valve is closed reports 2CV-5638-2 has been by the Control Room. (if local taken to Closed.
verification performed)
verification performed)
N/A  SAT  UNSAT ANO-2-JPM-NRC-FPEM1        PAGE  4 of  7 JOB PERFORMANCE MEASURE (C) 4. Step 14.2.2 Verify RWT Recirculation Isolation (2CV-5638-2) closed.
Or After the Control Room Closes 2CV-5638-2, then 2CV-5638-2 is Closed (if local verification is performed)
Examiner's Cue:
TRANSITION NOTE:
When Control Room is contacted, then Control room
Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.
 
(C)   5. Open Borated MU, RWT, SW           Opened 2FP-31 by turning              N/A SAT UNSAT to Fuel Pool (2FP-31).            handwheel CCW.
reports 2CV-5638-2 has been
Step 14.2.3 Examiners Cue:                   Observed valve stem fully withdrawn out of the valve.
 
taken to Closed.
Or After the Control Room Closes 2CV-5638-2, then 2CV-
 
5638-2 is Closed (if local verification is performed)
Contacted Control Room to close 2CV-5638-2.
And Locally at 2CV-5638-2, verify that valve stem is in the down (closed)
 
position and closed limit switch is
 
actuated after the valve is closed
 
by the Control Room. (if local
 
verification performed)
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. (C) 5. Step 14.2.3 Open Borated MU, RWT, SW to Fuel Pool (2FP-31).
Examiner's Cue:
2FP-31 stem is fully extended.
2FP-31 stem is fully extended.
Opened 2FP-31 by turning handwheel CCW.
(C)    6. Open RWT to Fuel Pool              Opened 2FP-46 by turning               N/A SAT UNSAT Isolation (2FP-46).               handwheel CCW.
 
Step 14.2.4 Examiners Cue:                   Observed valve stem fully withdrawn out of the valve.
Observed valve stem fully withdrawn out of the valve.
N/A SAT UNSAT (C) 6. Step 14.2.4 Open RWT to Fuel Pool Isolation (2FP-46).
Examiner's Cue:
2FP-46 stem is fully extended.
2FP-46 stem is fully extended.
Opened 2FP-46 by turning handwheel CCW.
TRANSITION NOTE:
 
Observed valve stem fully withdrawn out of the valve.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 335' RAB just off elevator.
Go to elevation 335' RAB just off elevator.
(C) 7. Step 14.2.5 Close SW Header 1 Telltale Drain (2SW-8401).
(C)   7. Close SW Header 1 Telltale         Closed 2SW-8401 by turning            N/A SAT UNSAT Drain (2SW-8401).                  handwheel CW.
Examiner's Cue:
Step 14.2.5 Examiners Cue:                   Observed valve stem fully inserted into the valve.
2SW-8401 has stem inserted into handwheel.
2SW-8401 has stem inserted into handwheel.
Closed 2SW-8401 by turning handwheel CW.
: 8. Ensure position of 2SW-57 is      Logged position of 2SW-57 by:          N/A SAT UNSAT logged in Category "E" Log.
 
Step                                     Using a plant telephone, Gaitronics, 14.2.6                                   OR radio; contacted Control Room and directed entry in Category "E" Examiners Cue:
Observed valve stem fully inserted into the valve.
Log.
N/A SAT UNSAT 8. Step 14.2.6 Ensure position of 2SW-57 is logged in Category "E" Log.
Examiner's Cue:
Valve position is logged.
Valve position is logged.
Logged position of 2SW-57 by:
OR Ensured Category "E" log entry made upon completion of evolution.
Using a plant telephone, Gaitronics, OR radio; contacted Control Room
 
and directed entry in Category "E" Log. OR Ensured Category "E" log entry made upon completion of  
 
evolution.
N/A  SAT  UNSAT ANO-2-JPM-NRC-FPEM1        PAGE  5 of  7 JOB PERFORMANCE MEASURE (C) 9. Step 14.2.6 Open SW Header 1 Emergency Feed Isolation (2SW-57).
Examiner's Cue:
2SW-57 valve stem is fully extended.
Unlocked locking device on 2SW-57 using category "E" valve key. Opened 2SW-57 by turning handwheel CCW.
Observed valve stem fully withdrawn out of the valve.
N/A  SAT  UNSAT  10. Step 14.2.7 Station an Operator to monitor SFP level in communication
 
with Operator at SW Header 1
 
Emergency Feed Isolation to


SF Pool (2SW-138)
ANO-2-JPM-NRC-FPEM1                                                                  PAGE 5 of 7 JOB PERFORMANCE MEASURE (C)    9. Open SW Header 1 Emergency        Unlocked locking device on          N/A SAT UNSAT Feed Isolation (2SW-57).          2SW-57 using category "E" valve Step key.
Examiner's Cue:
14.2.6 Opened 2SW-57 by turning Examiners Cue:
handwheel CCW.
2SW-57 valve stem is fully Observed valve stem fully extended.
withdrawn out of the valve.
: 10. Station an Operator to monitor    Verified that an Operator was        N/A SAT UNSAT SFP level in communication        stationed to monitor SFP level in Step with Operator at SW Header 1      communication with Operator at 14.2.7 Emergency Feed Isolation to      SW Header 1 Emergency Feed SF Pool (2SW-138)                Isolation to SF Pool (2SW-138)
Examiners Cue:
Operator responds to radio communications.
Operator responds to radio communications.
Verified that an Operator was stationed to monitor SFP level in
EXAMINERS NOTE:
 
      - Final valve position is at discretion of examinee to ensure level is raised / maintained.
communication with Operator at
      - Operator stationed to monitor SFP level in accordance with initial conditions.
 
(C)   11. Throttle open SW Header 1         Throttled open 2SW-138 by            N/A SAT UNSAT Emergency Feed Isolation to       turning handwheel CCW.
SW Header 1 Emergency Feed
Step SF Pool (2SW-138).
 
14.2.9 Observed valve stem withdrawn Examiners Cue:                   out of the valve commensurate with valves throttling.
Isolation to SF Pool (2SW-138)
N/A  SAT  UNSAT EXAMINERS NOTE:
- Final valve position is at discretion of examinee to ensure level is raised / maintained. - Operator stationed to monitor SFP level in accordance with initial conditions.
(C) 11. Step 14.2.9 Throttle open SW Header 1 Emergency Feed Isolation to  
 
SF Pool (2SW-138).
Examiner's Cue:
Operator stationed at SFP reports level rising slowly.
Operator stationed at SFP reports level rising slowly.
Throttled open 2SW-138 by turning handwheel CCW.
END STOP TIME:


Observed valve stem withdrawn out of the valve commensurate with valves throttling.
ANO-2-JPM-NRC-FPEM1                                                         PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
N/A  SAT  UNSAT END  STOP TIME:
: 1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
 
: 2. Neither fuel pool cooling pump is available.
ANO-2-JPM-NRC-FPEM1       PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiner's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
: 3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
: 4. Fuel pool level is low.
: 5. 2P66 is aligned to the RWT and running.
INITIATING CUE:
INITIATING CUE:
The CRS provides the following direction:  
The CRS provides the following direction:
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2."
Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.


ANO-2-JPM-NRC-FPEM1       PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinee's Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
ANO-2-JPM-NRC-FPEM1                                                         PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:
: 1. (2K11-K5) "FUEL POOL TEMP HI" is in alarm. 2. Neither fuel pool cooling pump is available. 3. An operator is stationed at the spent f uel pool to monitor spent fuel pool level. 4. Fuel pool level is low. 5. 2P66 is aligned to the RWT and running.
: 1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
: 2. Neither fuel pool cooling pump is available.
: 3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
: 4. Fuel pool level is low.
: 5. 2P66 is aligned to the RWT and running.
INITIATING CUE:
INITIATING CUE:
The CRS provides the following direction:  
The CRS provides the following direction:
"Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2."
Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.
 
ANO-2-JPM-NRC-LOF01                    PAGE    1 of  7 JOB PERFORMANCE MEASURE UNIT: 2  REV #: 003  DATE:
SYSTEM/DUTY AREA: Condensate and Feed Water System TASK:  Align Condensate pump for start during a loss of all Feed Water event


JTA#:   ANO2-RO-EOPAOP-EMER-28  
ANO-2-JPM-NRC-LOF01                                                                PAGE  1 of 7 JOB PERFORMANCE MEASURE UNIT:      2                      REV #:    003                        DATE:
 
SYSTEM/DUTY AREA:        Condensate and Feed Water System TASK:    Align Condensate pump for start during a loss of all Feed Water event JTA#:     ANO2-RO-EOPAOP-EMER-28 KA VALUE       RO:         4.0     SRO:         3.9         KA  
KA VALUE RO: 4.0 SRO: 3.9 KA  


==REFERENCE:==
==REFERENCE:==
 
CE E06 EA1.1 APPROVED FOR ADMINISTRATION TO:           RO:   X         SRO:   X TASK LOCATION:           INSIDE CR:             OUTSIDE CR:       X       BOTH:
CE E06 EA1.1  
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
 
PLANT SITE:     Simulate         SIMULATOR:                           LAB:
APPROVED FOR ADMINISTRATION TO:
POSITION EVALUATED:         RO:                     SRO:
RO: X SRO: X   TASK LOCATION:
ACTUAL TESTING ENVIRONMENT:           SIMULATOR:                 PLANT SITE:         LAB:
INSIDE CR:
TESTING METHOD:         SIMULATE:             PERFORM:
OUTSIDE CR:
APPROXIMATE COMPLETION TIME IN MINUTES:               20 Minutes REFERENCE (S):     OP 2202.006 EXAMINEES NAME:                                                   SSN:
X BOTH:   SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
EVALUATORS NAME:
PLANT SITE:
THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
Simulate SIMULATOR:
SATISFACTORY:                     UNSATISFACTORY:
LAB:   POSITION EVALUATED:
PERFORMANCE CHECKLIST COMMENTS:
RO:   SRO:   ACTUAL TESTING ENVIRONMENT:
Start Time             Stop Time             Total Time SIGNED:                                             DATE:
SIMULATOR:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
PLANT SITE:
LAB:   TESTING METHOD:
SIMULATE:
PERFORM:   APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
OP 2202.006  
 
EXAMINEE'S NAME:
SSN:   EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WA S EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:  
 
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
 
Start Time Stop Time Total Time SIGNED:   DATE:   SIGNATURE INDICATES THIS JPM HAS BEEN CO MPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE)
AND IS CURRENT WITH THAT REVISION.  
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:


ANO-2-JPM-NRC-LOF01                     PAGE   2 of   7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.  
ANO-2-JPM-NRC-LOF01                                                                     PAGE     2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
 
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:
: 1. Equipment Out OF Service: 2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% power due to an inadvertent CSAS.
: 1. Equipment Out OF Service:
: 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).  
* 2P-7A for Outboard Pump Bearing Replacement.
 
: 2. The plant has tripped from 100% power due to an inadvertent CSAS.
TASK STANDARD:
: 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
    "D" Condensate Pump has been prepared for restart and the actions of 2202.006, Loss of  
TASK STANDARD:       "D" Condensate Pump has been prepared for restart and the actions of 2202.006, Loss of Feedwater EOP through Step 16F has been completed.
 
TASK PERFORMANCE AIDS:           OP 2202.006 Step 16
Feedwater EOP through Step 16F has been completed.    
 
TASK PERFORMANCE AIDS:   OP 2202.006 Step 16    
 
ANO-2-JPM-NRC-LOF01                    PAGE    3 of  7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Prepare "D" Condensate Pump fo r start using OP 2202.006 Step 16 contingency actions."


ANO-2-JPM-NRC-LOF01                                                                    PAGE      3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.
START TIME:
START TIME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
PERFORMANCE CHECKLIST                                 STANDARDS                   (Circle One)
Transition Note:
Transition Note:
Go to elevation 370' Turbine Building, east of the elevator, to the 2A-1 / 2 Bus area.
Go to elevation 370 Turbine Building, east of the elevator, to the 2A-1 / 2 Bus area.
Examiner's Note:
Examiners Note:
When in front of breaker, give picture of inside breaker cubicle (DC control power breaker). The candidate may want to read MIS placard on the DC breaker. If so, show the candidate the close up picture of the DC Breaker. (C) 1. Step 16.A Locally open "DC CONTROL POWER" breakers in breaker  
When in front of breaker, give picture of inside breaker cubicle (DC control power breaker).
 
The candidate may want to read MIS placard on the DC breaker. If so, show the candidate the close up picture of the DC Breaker.
cubicles 2A106.
(C)   1. Locally open "DC CONTROL            Points to the DC Control Power    N/A  SAT    UNSAT POWER" breakers in breaker          Molded Case Circuit Breaker.
Examiner's Cue:
Step   cubicles 2A106.
Once the candidate has located the breaker cubicle, Show the picture of the inside  
16.A                                       Positions the DC Control Power Examiners Cue:                      Breaker located in 2A106 in the down (open) position.
 
Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A106 breaker cubicle Positive Cue:
of the 2A106 breaker cubicle  Positive Cue:  
Molded Case DC Control Power breaker for 2A106 switch positioned down.
(C)    2. Locally open "DC CONTROL             Points to the DC Control Power    N/A  SAT    UNSAT POWER" breakers in breaker           Molded Case Circuit Breaker.
Step  cubicle 2A205.
16.A                                        Positions the DC Control Power Examiners Cue:                     Breaker located in 2A205 in the down (open) position.
Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A205 breaker cubicle Positive CUE:
Molded Case DC Control Power breaker for 2A205 switch positioned down.
(C)    3. Verify Hotwell level greater than    Hotwell is checked > 38% by        N/A SAT    UNSAT 38%.                                observing the remote Hotwell Step                                        level instrument above Breaker 16.B  Examiners Cue:                     Cubicle 2A205.
Hotwell level is greater than 38%.                                                OR By Contacting the Control Room


Molded Case DC Control Power breaker for 2A106 switch positioned down. Points to the DC Control Power Molded Case Circuit Breaker.
ANO-2-JPM-NRC-LOF01                                                                   PAGE     4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                               STANDARDS                   (Circle One)
Positions the DC Control Power Breaker located in 2A106 in the
 
down (open) position.
N/A    SAT    UNSAT (C) 2. Step 16.A Locally open "DC CONTROL POWER" breakers in breaker
 
cubicle 2A205.
Examiner's Cue:
Once the candidate has located the breaker cubicle, Show the picture of the inside
 
of the 2A205 breaker cubicle  Positive CUE:
Molded Case DC Control Power breaker for 2A205 switch positioned down. Points to the DC Control Power Molded Case Circuit Breaker.
Positions the DC Control Power Breaker located in 2A205 in the
 
down (open) position.
N/A    SAT    UNSAT (C) 3. Step 16.B Verify Hotwell level greater than 38%. Examiner's Cue: Hotwell level is greater than 38%. Hotwell is checked > 38% by observing the remote Hotwell
 
level instrument above Breaker
 
Cubicle 2A205.
OR By Contacting the Control Room N/A    SAT    UNSAT ANO-2-JPM-NRC-LOF01                     PAGE   4 of   7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
Transition Note:
Transition Note:
Go to elevation 335' Turbine Building, south of the Main Condenser on platform. (C) 4. Step 16.C Verify both Condensate Pump Recirc valves closed.
Go to elevation 335 Turbine Building, south of the Main Condenser on platform.
Examiner's Cue:
(C)   4. Verify both Condensate Pump       Both Condensate Pump Recirc        N/A  SAT    UNSAT Recirc valves closed.             Valves, 2CV0662 and 2CV-0663, Step                                      are checked closed by observing 16.C    Examiners Cue:                   valve position indication on valve Both Condensate Pump             stem. Indicator should be down Recirc Valves indicate closed. and in contact with switch for both valves.
Both Condensate Pump Recirc Valves indicate closed.
OR By Contacting the Control Room TRANSITION NOTE:
Both Condensate Pump Recirc Valves, 2CV0662 and 2CV-0663, are checked closed by observing
Go to elevation 330 Turbine Building, west side walkway to check valve position locally.
: 5. Verify both Main Feedwater        Both Main Feed water Pump          N/A  SAT    UNSAT Pump Recirc valves closed.        Recirc Valves, 2CV-0741 and Step                                      2CV-0749, are checked closed by 16.D    Examiners Cue:                  checking valve position locally.
Both Main Feedwater Pump                          OR Recirc Valves indicate closed.
By Contacting the Control Room Transition Note Go to elevation 330 Turbine Building, near southwest stairwell and west of the Condensate Pumps in the Turbine Building Basement to check valve position locally.
Examiners Note:
The procedure being used does not specify which valves to use to isolate the SU/BD DI Pressure Regulating Control Valve. The Candidate could close 2CS-12 (throttled isolation upstream and this one valve would isolate the DI flow OR a combination of the inlet (2CS-57) and bypass (2CS-59) OR outlet (2CS-58) and bypass (2CS-59)
: 6. Locally verify condensate to      The SU/BD DI is verified isolated  N/A  SAT    UNSAT SU/BD DI isolated.                locally by checking the manual Step                                      isolation valves, 2CS-57 Inlet to 16.E    Examiners Cue:                  pressure regulator, 2PCV4505, 2CS-12 is closed (if used)        or 2CS-58 Outlet from pressure regulator 2PCV4505 and 2CS-2CS-58 is closed (if used)        59, regulator bypass, by rotating handwheel(s) in CW direction 2CS-57 is closed. (if used)      until resistance is felt.
2CS-59 is closed. (if used)                      OR Close Combined Isolation 2CS-12 by rotating handwheel in CW direction until resistance is felt.
Transition Note Go to elevation 335 Turbine Building, southwest corner to check valve position locally.
Candidate will need climb to platform for valve operation.


valve position indication on valve
ANO-2-JPM-NRC-LOF01                                                            PAGE      5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
: 7. Locally open D Condensate    The D Condensate Pump            N/A  SAT    UNSAT Pump Discharge Valve 10 turns. Discharge Valve is rotated in CW Step                                direction until resistance is felt 16.F Examiners Cue:                and then rotated in the CCW D Condensate Pump            direction until valve is 10 turns Discharge Valve is opened 10  open.
turns.
END STOP TIME:


stem. Indicator should be down
ANO-2-JPM-NRC-LOF01                                                      PAGE 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:
: 1. Equipment Out OF Service:
* 2P-7A for Outboard Pump Bearing Replacement.
: 2. The plant has tripped from 100% power due to an inadvertent CSAS.
: 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
INITIATING CUE:
The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.


and in contact with switch for both valves. OR By Contacting the Control Room N/A    SAT    UNSAT TRANSITION NOTE:
ANO-2-JPM-NRC-LOF01                                                      PAGE 7 of 7 JOB PERFORMANCE MEASURE CANDIDATES COPY JPM INITIAL TASK CONDITIONS:
Go to elevation 330' Turbine Building, west side walkway to check valve position locally. 5. Step 16.D Verify both Main Feedwater Pump Recirc valves closed.
: 1. Equipment Out OF Service:
Examiner's Cue:
* 2P-7A for Outboard Pump Bearing Replacement.
Both Main Feedwater Pump Recirc Valves indicate closed.
: 2. The plant has tripped from 100% power due to an inadvertent CSAS.
Both Main Feed water Pump Recirc Valves, 2CV-0741 and
: 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
 
INITIATING CUE:
2CV-0749, are checked closed by
The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.
 
checking valve position locally.
OR By Contacting the Control Room N/A    SAT    UNSAT Transition Note Go to elevation 330' Turbine Building, near southwest stairwell and west of the Condensate Pumps in the Turbine Building Basement to check valve position locally.
Examiner's Note:
The procedure being used does not specify which valves to use to isolate the SU/BD DI Pressure Regulating Control Valve. The Candida te could close 2CS-12 (throttled isolation upstream and this one valve would isolate the DI flow OR a combination of the inlet (2CS-57) and bypass (2CS-59) OR outlet (2CS-58) and bypass (2CS-59)  6. Step 16.E Locally verify condensate to SU/BD DI isolated.
Examiner's Cue:
2CS-12 is closed (if used)
 
2CS-58 is closed (if used)
 
2CS-57 is closed. (if used)
 
2CS-59 is closed. (if used)
The SU/BD DI is verified isolated locally by checking the manual
 
isolation valves, 2CS-57 Inlet to  
 
pressure regulator, 2PCV4505, or 2CS-58 Outlet from pressure
 
regulator 2PCV4505 and 2CS-
 
59, regulator bypass, by rotating
 
handwheel(s) in CW direction
 
until resistance is felt.
OR Close Combined Isolation 2CS-12 by rotating handwheel in
 
CW direction until resistance is
 
felt. N/A    SAT    UNSAT Transition Note Go to elevation 335' Turbine Building, southwest corner to check valve position locally. Candidate will need climb to platform for valve operation.
ANO-2-JPM-NRC-LOF01                    PAGE    5 of  7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)  7. Step 16.F Locally open 'D' Condensate Pump Discharge Valve 10 turns.
Examiner's Cue:
'D' Condensate Pump Discharge Valve is opened 10
 
turns. The 'D' Condensate Pump Discharge Valve is rotated in CW
 
direction until resistance is felt
 
and then rotated in the CCW
 
direction until valve is 10 turns


open. N/A    SAT    UNSAT END  STOP TIME:
ANO-2-JPM-NRC-LOF01                              PAGE 8 of 7 JOB PERFORMANCE MEASURE 2A205 CONDENSATE PUMP 2P-2CB 152-205 CS


ANO-2-JPM-NRC-LOF01                     PAGE   6 of   7 JOB PERFORMANCE MEASURE EXAMINER'S COPY JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-LOF01                                 PAGE 9 of 7 JOB PERFORMANCE MEASURE 2A106 CONDENSATE PUMP 2P-2C 152-106 CS
: 1. Equipment Out OF Service:  2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% pow er due to an inadvertent CSAS. 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).


INITIATING CUE:
ANO-2-JPM-NRC-LOF01                        PAGE 10 of 7 JOB PERFORMANCE MEASURE
The SM/CRS directs, "Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions."


ANO-2-JPM-NRC-LOF01                    PAGE    7 of  7 JOB PERFORMANCE MEASURE CANDIDATE'S COPY JPM INITIAL TASK CONDITIONS:
ANO-2-JPM-NRC-LTOP                                                       PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT:     2                 REV #:   001                   DATE:
: 1. Equipment Out OF Service:  2P-7A for Outboard Pump Bearing Replacement. 2. The plant has tripped from 100% pow er due to an inadvertent CSAS. 3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).
SYSTEM/DUTY AREA:       Pressurizer Pressure Control System TASK:   Respond to Annunciator for LTOP valve misalignment JTA#:   ANO2-RO-PZR-OFFNORM-11 KA VALUE     RO:       3.8     SRO:         4.1     KA  
 
INITIATING CUE:
The SM/CRS directs, "Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions."
ANO-2-JPM-NRC-LOF01                    PAGE    8 of  7 JOB PERFORMANCE MEASURE 2A205 CONDENSATE PUMP 2P-2CB 152-205CS ANO-2-JPM-NRC-LOF01                    PAGE    9 of  7 JOB PERFORMANCE MEASURE 2A106 CONDENSATE PUMP 2P-2C 152-106 CS ANO-2-JPM-NRC-LOF01                    PAGE    10 of  7 JOB PERFORMANCE MEASURE
 
ANO-2-JPM-NRC-LTOP PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:   SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Respond to Annunciator for LTOP valve misalignment JTA#: ANO2-RO-PZR-OFFNORM-11 KA VALUE RO:
3.8 SRO: 4.1 KA  


==REFERENCE:==
==REFERENCE:==
 
010 K4.03 APPROVED FOR ADMINISTRATION TO:           RO:       X   SRO:   X TASK LOCATION:         INSIDE CR:       X     OUTSIDE CR:         BOTH:
010 K4.03 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X SRO: X TASK LOCATION: INSIDE CR:
PLANT SITE:                   SIMULATOR:           Perform   LAB:
X OUTSIDE CR: BOTH:
POSITION EVALUATED:       RO:                   SRO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR:
ACTUAL TESTING ENVIRONMENT:         SIMULATOR:           PLANT SITE:     LAB:
Perform LAB:   POSITION EVALUATED: RO: SRO:   ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB: TESTING METHOD: SIMULATE: PERFORM:
TESTING METHOD:     SIMULATE:             PERFORM:       X APPROXIMATE COMPLETION TIME IN MINUTES:           10 Minutes REFERENCE(S):     OP 2203.012J EXAMINEE'S NAME:                                           SSN:
X APPROXIMATE COMPLETION TIME IN MINUTES:
EVALUATOR'S NAME:
10 Minutes REFERENCE(S):
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
OP 2203.012J EXAMINEE'S NAME: SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE: SATISFACTORY: UNSATISFACTORY:
SATISFACTORY:                 UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:  
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time         Stop Time             Total Time SIGNED:                                         DATE:
Start Time Stop Time Total Time   SIGNED: DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ANO-2-JPM-NRC-LTOP  PAGE 2 OF 6 JOB PERFORMANCE MEASURE
THE EXAMINER SHALL R EVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
A loss of off site power has occurred. 


ANO-2-JPM-NRC-LTOP                                                                      PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023  with the examinee.
JPM INITIAL TASK CONDITIONS:
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress.
A Natural Circulation Reactor Coolant System cool down is in progress.
2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
TASK STANDARD:  
TASK STANDARD:
 
Placed both loop 1 and loop 2 LTOPs in service.
Placed both loop 1 and loop 2 LTOP's in service.  
 
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS:
OP 2203.012J, Annunciator 2K10 Corrective Action  
OP 2203.012J, Annunciator 2K10 Corrective Action SIMULATOR SETUP:
 
SIMULATOR SETUP:
RCS and PZR cool down in progress.
RCS and PZR cool down in progress.
RCS pressure less than 400 psia.  
RCS pressure less than 400 psia.
 
Power available to LTOP Isolation valves.
Power available to LTOP Isolation valves.  
 
RCS Thot (both 2TIS4614-1 and 2TIS4714-2) indicate < 280&deg;F Annunciators 2K10 C4 and C5 are in alarm.
RCS Thot (both 2TIS4614-1 and 2TIS4714-2) indicate < 280&deg;F Annunciators 2K10 C4 and C5 are in alarm.
ANO-2-JPM-NRC-LTOP  PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: 
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."
PERFORMANCE CHECKLIST  STANDARDS  (Circle One) Examiner note: Valves may be opened in any order and either alarm window may be mitigated first.
: 1. (Step 2.1) Determined misalignment not directed by a procedure step.
Examiner's cue: 


ANO-2-JPM-NRC-LTOP                                                                      PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.
PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
Examiner note: Valves may be opened in any order and either alarm window may be mitigated first.
: 1. Determined misalignment not    Determined that the LTOPs        N/A SAT    UNSAT (Step  directed by a procedure step. should be in service for given 2.1)                                  conditions.
Examiners cue:
CRS reports that RCS cool down is controlled by Natural Circulation cool down AOP.
CRS reports that RCS cool down is controlled by Natural Circulation cool down AOP.
Determined that the LTOP's should be in service for given
: 2. Determine RCS T-Hot            Using PMS, SPDS or 2C04          N/A SAT    UNSAT (Step  temperature is less than 280&deg;F. control board indications 2.2)                                  determined that 2TIS-4614-1 is less than 280&deg;F and N/Ad step to isolate LTOPs.
: 3. Determine RCS T-Hot            Using PMS, SPDS or 2C04          N/A SAT    UNSAT (Step  temperature is less than 270&deg;F. control board indications 2.3)                                  determined that 2TIS-4614-1 is less than 270&deg;F and implemented step.
(C)    4. Opened 2CV-4730-1, LTOP        On 2C09, took hand switch for    N/A SAT    UNSAT (Step  isolation valve.                2CV-4730-1 to clockwise direction 2.3)                                  and observed that Green light OFF and Red light ON.
(C)    5. Opened 2CV-4741-1, LTOP         On 2C09, took hand switch for     N/A SAT    UNSAT (Step  isolation valve.                2CV-4741-1 to clockwise direction 2.3)                                  and observed that Green light OFF and Red light ON.
(C)    6. Opened 2CV-4731-2, LTOP        On 2C09, took hand switch for    N/A SAT    UNSAT (Step  isolation valve.                2CV-4731-2 to clockwise direction 2.3)                                  and observed that Green light OFF and Red light ON.
(C)    7. Opened 2CV-4740-2, LTOP        On 2C09, took hand switch for    N/A SAT    UNSAT (Step  isolation valve.                2CV-4741-1 to clockwise direction 2.3)                                  and observed that Green light OFF and Red light ON.


conditions.
ANO-2-JPM-NRC-LTOP                                                                  PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST                          STANDARDS                  (Circle One)
N/A   SAT    UNSAT 2. (Step 2.2) Determine RCS T-Hot temperature is less than 280&deg;F. Using PMS, SPDS or 2C04 control board indications
: 8. Verified Alarms 2K10-C4 and    On 2K10, verified that alarm      N/A SAT    UNSAT (Step 2K10-C5 alarms cleared.        window C4 and C5 light are in 3.1)                                 slow flash and acknowledged alarm lights to verify that alarm windows clear.
END


determined that 2TIS-4614-1 is
ANO-2-JPM-NRC-LTOP                                                        PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY:
INITIAL CONDITIONS:
* A loss of off site power has occurred.
* A Natural Circulation Reactor Coolant System cool down is in progress.
* 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
INITIATING CUE:
The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.


less than 280&deg;F and N/A'd step to
ANO-2-JPM-NRC-LTOP                                                       PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY:
 
INITIAL CONDITIONS:
isolate LTOP's.
* A loss of off site power has occurred.
N/A    SAT    UNSAT  3. (Step 2.3) Determine RCS T-Hot temperature is less than 270&deg;F. Using PMS, SPDS or 2C04 control board indications
* A Natural Circulation Reactor Coolant System cool down is in progress.
 
* 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
determined that 2TIS-4614-1 is
INITIATING CUE:
 
The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.}}
less than 270&deg;F and implemented
 
step. N/A    SAT    UNSAT (C) 4. (Step 2.3) Opened 2CV-4730-1, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4730-1 to clockwise direction
 
and observed that Green light
 
OFF and Red light ON.
N/A    SAT    UNSAT (C) 5. (Step 2.3) Opened 2CV-4741-1, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4741-1 to clockwise direction
 
and observed that Green light
 
OFF and Red light ON.
N/A    SAT    UNSAT (C) 6. (Step 2.3) Opened 2CV-4731-2, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4731-2 to clockwise direction
 
and observed that Green light
 
OFF and Red light ON.
N/A    SAT    UNSAT (C) 7. (Step 2.3) Opened 2CV-4740-2, LTOP isolation valve.
On 2C09, took hand switch for 2CV-4741-1 to clockwise direction
 
and observed that Green light
 
OFF and Red light ON.
N/A    SAT    UNSAT ANO-2-JPM-NRC-LTOP  PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST  STANDARDS  (Circle One)  8. (Step 3.1) Verified Alarms 2K10-C4 and 2K10-C5 alarms cleared.
On 2K10, verified that alarm window C4 and C5 light are in
 
'slow flash' and acknowledged
 
alarm lights to verify that alarm
 
windows clear.
N/A    SAT    UNSAT END ANO-2-JPM-NRC-LTOP PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY:
 
INITIAL CONDITIONS:
 
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress. 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
INITIATING CUE:
 
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."
ANO-2-JPM-NRC-LTOP  PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY:  
 
INITIAL CONDITIONS:  
 
A loss of off site power has occurred.
A Natural Circulation Reactor Coolant System cool down is in progress. 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.
INITIATING CUE:  
 
The Control Room Supervisor directs "R espond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J."}}

Latest revision as of 05:01, 13 March 2020

AN2-2008-02 - Draft Operating Exam
ML080700342
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-D-1 50-313/08-301, 50-368/08-301
Download: ML080700342 (126)


Text

Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 (Modified) Op-Test No.: 2008-1 Examiners: Operators:

Initial Conditions:

100% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 N (CBOT) Start B Component Cooling Water pump B and secure C Component Cooling Water pump.

2 XRCCHAPCNT I (ATC) Pressurizer control channel pressure fails high.

3 2CV4652 C (ATC) B normal spray valve sticks open 4 XSG2PT10411 I (CBOT) A Steam Generator pressure safety channel fails low.

Tech Spec for CRS.

5 SGATUBE N (CBOT) 5 gpm tube leak on A Steam Generator. Tech Spec for R (ATC) CRS 6 SGATUBE M (ALL) A Steam Generator tube leakage ramps up to 300 gpm over 10 minutes. Manual reactor trip criteria when greater than 44 gpm.

7 2K11_C2 C (ATC) Reverse rotation alarm for the reactor coolant pump 2K11_C4 attempted to stop.

8 XMSHDRPRS I (CBOT) Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.

9 2SI10A C (CBOT) 2P89A, A High Pressure Safety Injection pump HPI2P89B coupling failure (no discharge pressure).

2P89B, B High Pressure Safety Injection pump fails to start automatically.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 20

Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives

1) Evaluate individual ability to operate safety related equipment.
2) Evaluate individual response to a failure of a pressurizer pressure control channel failure.
3) Evaluate individual response to a failure of a pressurizer spray valve to automatically close.
4) Evaluate individual response to a small Pri-Sec leak.
5) Evaluate individual ability to perform a reduction in plant power.
6) Evaluate individual ability to mitigate a SGTR.
7) Evaluate individual response to a failure of a reactor coolant pump reverse rotation device.
8) Evaluate individual response to a failure of the steam dump and bypass control system.
9) Evaluate individual ability to monitor operation of emergency core cooling equipment.

SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power steady state. Main turbine generator turning gear is tagged out. Gland seal regulator, 2PCV0231 is jacked closed.

When the crew has completed their control room walk down and brief, the CBOT will start B Component Cooling Water (CCW) Pump and secure C Component Cooling Water Pump (CCW) using OP 2104.028 section 18.2.

After the B CCW pump is placed in serve and C CCW is secured and cued by lead examiner, the A channel Pressurizer (PZR) control channel will fail high. This will result in both main spray valves to automatically open and both proportional heater banks to go to minimum fire. Actual PZR pressure will drop and will result in an automatic reactor trip, if actions are not taken to mitigate the event. The Control Room Supervisor (CRS) will enter Abnormal operating procedure OP 2203.028, PZR systems malfunctions will be entered. The CRS will direct selecting the opposite control channel. The ATC will report that one of the spray valves, 2CV4652 did not close. The CRS will direct the failed spray valve to be isolated.

After the B PZR control channel is placed in service and 2CV 4652 is isolated and cued by lead examiner, A Steam Generator safety channel pressure instrument, 2PT1041-1, will fail low. This will trip one of the four PPS trip channels for low SG pressure trip and MSIS. Alarms for MSIS pre-trip, RPS channel trip/pre-trip, and channel A operator insert (2C03) trip and pre-trip lights will be lit. The CRS will refer to the ACA 2203.012D and tech specs 3.3.1.1, 3.3.2.1, 3.3.3.5 and 3.3.3.6 for guidance. The CBOT will place Channel A PPS in bypass for point 11, SG pressure low, point 19, A SG delta-P for EFAS 1, and point 20, B SG delta-P for EFAS 2 for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the tech spec LCO.

After the A PPS channel is placed in bypass and cued by lead examiner, a 5.0 gpm primary to secondary leak will start. The CRS will enter the primary to secondary leakage AOP, OP 2203.038.

CBOR and CBOT will perform RCS Leak rate determinations. The CRS will enter Tech Spec 3.4.6.2. The CRS will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The CRS will isolate steam to A EFW pump from A SG and enter TS 3.7.1.2. The crew will perform a plant shutdown. CRS will declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.

Page 2 of 20

Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued)

After the CBOR has completed the required reactivity manipulation and cued by lead examiner, a 300 gpm SGTR on A SG will start with a ramp of 10 minutes. Secondary System Radiation Hi, SG tube leak detection Rate of change Hi, and SG tube leak detection leak rate Hi annunciators will alarm. The CBOR/ATC recognizes that the SGTR is greater than 44gpm. The CRS will direct the CBOR will manually trip the reactor.

Post trip, when PZR pressure drops less than 1400psia, the ATC should secure B and D RCPs and receive a reverse rotation alarm on B RCP. The CRS will direct all RCPs to be secured. This will result in natural circulation conditions in the Reactor Coolant System.

Also post trip, the steam dump and bypass control system (SDBCS) main steam pressure instrument will fail low. This will result in SDBCS not automatically controlling main steam header pressure causing the main steam safety valves to lift on both Steam Generators. The CRS will direct the CBOT to manually control one of the bypass valves to the condenser to stop the offsite release from the ruptured steam generator.

The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001.

The CRS will diagnose a steam Generator tube rupture greater than charging pump capacity and enter EOP 2202.004, Steam Generator Tube Rupture (SGTR).

The CBOR will rapidly cool down the RCS to less than 535°F using the bypass valves to the condenser. The CBOT will override SW to CCW and ACW. The CBOT will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F. CRS will declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.

Post SIAS, the B High Pressure Safety Injection (HPSI) pump Breaker will fail to start automatically (green train) and the A high pressure safety injection pump will experience a failed coupling so it will not develop any discharge pressure. The CBOT will place the A HPSI pump handswitch in Pull-to-Lock (PTL) and manually start the B HPSI pump and/or manually start the C HPSI pump on the Red train to satisfy the required HSPI flow requirements.

Page 3 of 20

Appendix D Scenario 1 Form ES-D-1 Simulator Instructions for Scenario 1 Reset simulator to MOL 100% power IC stead state.

Ensure that AACG is secured and annunciators clear.

Ensure hotwell level is ~80%.

Place MINIMAL RISK and RED Train Maintenance Week signs on 2C11.

Swing ESF equipment aligned to the RED train.

B CCP lead charging pump.

2PCV0231, Gland sealing steam pressure control valve failed closed.

T1, T2, T3 set to false.

T5 set to Reactor trip.

T6 set to SIAS1.

Event Malf. No. Value/ Event No. Ramp Description Time 1 0.0 Place B CCW pump in service, secure C CCW pump.

2 XRCCHAPCNT 2500 A PZR control channel fails HIGH.

Trigger = T1 3 CV4652 1.0 B spray valve fails open; Trigger = T1 Ramp =

10 secs 4 XSG2PT10411 0 A Steam generator safety channel pressure transmitter Trigger = T2 fails low.

5 SGATUBE 5.0 A SG primary-secondary leak.

Trigger = T3 6 SGATUBE 300 A Steam Generator Tube Rupture (300 gpm ramped CUED RAMP= over 10 Minutes).

10 MIN 7 RCP2P32AREV TRUE When A or B RCP secured, reverse rotation RCP2P32BREV annunciator will alarm.

Trigger = T5 8 XMSHDRPRS 650 SDBCS main steam header pressure fails low.

Trigger = T5 9 2SI10 A 0.0 A HPSI pump coupling failure.

HPI2P89B TRUE B HPSI pump fails to automatically start on SIAS.

Trigger = T6 Page 4 of 20

Appendix D Scenario 1 Form ES-D-1 Simulator Operator CUEs At T=0 CBOT will place B CCW pump inservice and secure C CCW pump.

CUE: Report as AO that B CCW pump has been vented at 2CCW-1029 and a solid stream of water was observed.

Cued by Trigger T1 A PZR pressure control channel fails High.

lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.

Trigger T1 PZR B main spray valve fails to close when opened Cued by Trigger T2 A Steam Generator Pressure safety channel fails low.

lead examiner Cue: Report that I & C planner will begin planning work on failed pressure instrument.

Cued by Trigger T3 A Steam Generator 5 gpm tube leak.

lead examiner Cue: As Auxiliary Operator, report that standard attachment 19, control of secondary contamination is in progress.

Cue: When notified of requirement to sample SGs as Chemist, after 15 minutes report that the sample analysis is in progress and that when frisking sample A SG countrate was higher than B SG.

The CRS will direct the NLOs to and direct the chemists to sample the SGs for activity.

Cued by Raise A SG tube leak to 500 gpm ramped over 10 minutes. This will lead result in a manual reactor trip.

examiner Cue: As Auxiliary operator, report that actions for standard attachment 10 for A steam generator isolation outside the control room actions have been completed.

Tripping A Trigger T5 Reverse rotation alarm when pump is secured. This will result in or B securing all reactor coolant pumps.

Reactor Coolant Pump Reactor Trip Trigger T5 Steam dump and bypass control system pressure input will fail low.

This results in no automatic response to control main steam pressure post reactor trip.

SIAS1 Trigger T6 2SI10 is closed. This will result in A HPSI pump not developing discharge pressure.

B HPSI pump will not start automatically must be manually started.

Cue: As waste control operator report that the coupling on A HPSI pump is damaged and separated from the motor.

Page 5 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Event

Description:

CBOT places B component cooling water pump in service and secures C component cooling water pump.

Time Position Applicant's Actions or Behavior CRS Direct the CBOT to secure B CCW pump and secure C CCW pump.

CBOT Review OP 2104.028 section 8.2.

CBOT Will perform the following:

Verify open 2P-33C/B Suction Crossover (2CV-5221).

Verify open 2P-33C/B Discharge Crossover (2CV-5232).

Direct AO to throttle open 2P-33B Casing Vent (2CCW-1029).

Place 2P-33B handswitch (2HS-5228) to START.

Observe the following:

o Normal flow 1000 to 3000 gpm (2FIS-5202) o 2P-33B discharge pressure 100 to 120 psig (2PI-5234)

Place 2P-33C handswitch (2HS-5234) in Pull To Lock.

Termination criteria: When B CCW pump is secured and C CCW is secured or at lead examiners descretion.

Page 6 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Event

Description:

Channel 1 Pressurizer Pressure instrument will fail High.

Time Position Applicant's Actions or Behavior ATC Announce annunciator 2K10-E6 Pressurizer Pressure Control Channel 1 Pressure HI / LO alarm is due to High pressure.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

Refer to TS 3.2.8 if pressure not 2025 to 2275 psia.

Could direct placing SDBCS valves in manual closed ATC Compare channels and determine Channel 1 failed High.

Place PZR Pressure Channel Select switch (2HS-4626) to Channel 2.

Restore heaters to automatic control, if secured.

Verify that PZR heaters respond as designed.

Verify that B PZR spray valve closed.

Announce that A PZR spray valve did not close as expected.

CBOT Place SDBCS Master controller in AUTO local and adjust set-point to 1000 psia.

Termination Criteria: PZR pressure control selected to channel 2 in auto control or at lead examiner's discretion.

Page 7 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Event

Description:

2CV4652, B spray valve sticks OPEN.

Time Position Applicant's Actions or Behavior ATC Announce 2CV4652 did not close.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

Direct ATC to close 2CV4652 per the AOP.

Direct the ATC to close 2CV4652 isolation valve.

ATC Attempt to close 2CV4652 by placing the control switch to MAN and rotating the hand switch to the OPEN direction for 1 second then after waiting 5 seconds rotating the hand switch to the CLOSE position.

Report that 2CV4652 did not close.

ATC Close 2CV4652 isolation valves by rotation hand switch to CLOSE.

Report that Pressurizer Pressure is restoring to set point.

Termination Criteria: When 2CV4652 is isolated or at lead examiners discretion.

Page 8 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Event

Description:

A Steam Generator pressure transmitter, 2PT1041-1, on Channel A fails low.

Time Position Applicant's Actions or Behavior ATC Announce annunciators:

2K04-A4 CH A RPS/ESF/PRETRIP/TRIP 2K04-B3 PPS Channel TRIP 2K04-E4 MSIS PRETRIP Compare all safety channels four channels and report 2PI-1041-1 has failed low.

CRS Implement Annunciator Corrective Action AOP 2203.012D.

ATC Report A SG low pressure pretrip/trip on PPS insert.

CBOT Compare all four channels and report 2PI-1041-1 indicates zero.

CRS Enter Tech Spec 3.3.1.1 and 3.3.2.1, 3.3.3.5 and 3.3.3.6.

CBOT Place the following channels in bypass on Channel A:

A SG PRESS low (Bistable 11)

A SG P - EFAS 1 (Bistable 19)

A SG P - EFAS 2 (Bistable 20)

ATC Verify annunciator 2K04-C3 PPS CHANNEL BYPASSED Verify correct channels in bypass.

CRS Contact maintenance/PS liaison.

Termination Criteria: Affected channel points placed in bypass or at lead examiner's discretion.

Page 9 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown Time Position Applicant's Actions or Behavior ATC Announce annunciators:

2K11-A10 Sec Sys Radiation Hi 2K11-J8 SG Tube Leak Detection Rate of Change Hi 2K11-K8 SG Tube Leak Detection Trouble/LKRT Hi CRS Implement AOP 2203.038, PRI-SEC leakage and perform the following:

Direct CBOs to perform RCS leak rates Enter TS 3.4.6.2 Direct AO to perform standard attachment 19, control of secondary contamination Direct the chemists to sample the SGs for activity Direct CBOT to isolate steam to A EFW pump from A SG and enter Tech Spec 3.7.1.2 Determine Action level 3 of AOP 2203.038 is applicable and a shutdown to less than 50% in one hour and to be in mode 3 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is applicable.

Direct CBOR to perform a plant shutdown using normal boration method.

Declare and NUE EAL based on criteria 3.2, S/G Tube Leak greater than Tech. Spec. Limits.

CBOT Close 2CV 1000-1, steam from A SG to A EFW pump.

Announce 2K04-F2 annunciator as expected due to INOP of 2P7A.

Page 10 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Event

Description:

5.0 GPM primary to secondary leak on A SG. The CRS will enter the primary to secondary leakage AOP, OP 2203.038. Crew will perform a plant shutdown ATC Perform a plant shutdown Use reactivity plans to determine the amount of boron required.

Adjust turbine load to maintain Tave within 2°F of Tref.

Insert CEAs as directed by reactivity plan.

AOP requires a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> shutdown to Mode 3.

The CRS may determine a rapid plant shutdown of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to be in Mode 3 is more conservative and this decision is acceptable.

Termination criteria: When reactivity manipulations are satisfied or at the discretion of the lead examiner.

Page 11 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a natural circulation cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior ATC Report that PZR level is lowering Start all back up CCPs or report that they are running.

Isolate Letdown as required.

CRS Recognize SGTR is greater than 44 gpm and meets the AOP trip criteria.

Direct the CBOR to manually trip the reactor ATC Manually trip the reactor.

CRS Implement Standard Post Trip Actions, track safety functions, and direct board operators actions.

ATC Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160v and 6900 v Non-Vital busses energized.

All 4160v and 480v vital AC bus energized.

All 125v vital DC bus energized.

Page 12 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOR Check inventory control:

PZR level 10 to 80%.

Trending from set point.

Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.

CBOR Check RCS pressure control:

RCS pressure 1800 to 2250 psia.

Trend from set point Secure Two RCPs when RCS pressure is less than 1400 psia.

Place spray valve for secured RCPs in manual closed.

Verify SIAS when pressure less than 1650 psia.

(See event 7 for actions on reverse rotation alarm.)

CBOR Check core heat removal by forced circulation:

RCP s running Loop T less than 10 F.

RCS MTS 30 F or greater.

Service water pump suction aligned to Lake.

Component cooling water aligned to RCPs.

CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)

Check SIAS actuated.

Maintain SW pressure greater than 85 psig.

Page 13 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Check RCS Heat Removal:

Report SG levels and main feed water is in RTO.

Report feed water line intact.

Report SG pressures. Report that SG pressure is high and SDBCS is not responding in AUTO.

(See event 8 for actions due to SDBCS failure)

CBOR Check CNTMT parameters:

Temperature less than 140 F.

Pressure less than 16 psia.

Status of radiation alarms:

CAMS (2K10-B6) NOT in alarm Area radiation (2K11-B10) NOT in alarm Process liquid (2K11-C10) NOT in alarm Secondary Sys Radiation Hi (2K11-A10) IN ALARM CBOT Will open 2CV0233, bypass around 2PCV0231 which is simulated closed to match condition of valve at plant. This is in response to low gland seal pressure.

CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs and EALs.

Page 14 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose Steam Generator Tube Rupture CRS Implement Steam Generator Tube Rupture procedure and open place keeping page.

ALL Perform crew brief and review floating steps.

CRS Determine applicable floating steps:

Commence natural circulation using bypass valves to the condenser cool down to less than 535 F Thot.

HPSI Override Criteria.

CRS Direct the following actions:

Commence cool down to less than 535 F Thot.

Inform SM to contact Chemistry to sample both SG for activity.

Determine ruptured SG Perform post-SIAS actions:

Verify Safety Injection flow to RCS:

Isolate A SG when RCS Thot is less than 535°F Verify HPSI override criteria met:

RCS MTS 30°F or greater.

PZR level greater than 29% and controlled.

RVLMS LVL 03 or higher elevation indicates WET.

At least ONE intact SG available for Heat Removal Level 10 to 90% with FW available.

Declare an ALERT EAL based on 2.2, RCS leakage greater than 44 gpm.

Page 15 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior Critical ATC RCS cool down to less than 535°F T-hot : (floating step)

Step ATC Reset low SG set points.

Commence RCS depressurization to maintain RCS MTS 30 to 45 (When HPSI overridden)

Take manual control of SDBCS bypass valves to condenser (2CV0302/2CV0303)

Place ALL ADV Permissive switches in OFF.

Verify EFW feeding SGs.

Secure running MFW pump.

Close ALL MFW Block valves.

Record and plot cool down on Attachments 1 and 8.

ATC /CBOT Verify Safety Injection flow to RCS:

Check HPSI flow using Exhibit 2.

(SEE event 9 on actions due to HPSI failures)

Check LPSI flow using Exhibit 3.

Page 16 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Event

Description:

300 gpm Tube Rupture on A Steam Generator ramped over 10 Minutes. This will result in a manual reactor trip, SIAS and CCAS actuations. Crew will perform a cool down of the RCS and manually Isolate A SG.

Time Position Applicant's Actions or Behavior CBOT Perform post-SIAS actions:

SW pumps running on each loop.

EDG SW outlet valves open.

SW pump suction aligned to Lake.

Report all non-vital buses energized.

Verify SG sample valves open.

Critical CBOT Use Attachment 10 to isolate Ruptured SG Step ATC / OVERRIDE HPSI:

CBOT Throttle HPSI flow OR place HPSI pumps in PTL as needed to control RCS pressure, inventory, and heat removal.

Termination criteria: RCS Cool down to less than 535°F and A SG isolated or at examiners discretion.

Page 17 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Event

Description:

Reverse rotation alarm when Reactor Coolant Pump A or B secured which results in securing all reactor coolant pumps.

Time Position Applicant's Actions or Behavior ATC Announces 2K11-C2 or 2K11-C4 annunciator for reverse rotation of associated reactor coolant pump.

CRS Refers to annunciator corrective actions OP 2203.012K and directs ATC to secure ALL Reactor Coolant Pumps.

ATC Secures remaining reactor coolant pumps and places associated spray valves to Manual.

Verifies pumps secured (amperages, delta P and Green light for associated breaker lit).

Termination criteria: When ALL RCPs are secured or at discretion of lead examiner.

Page 18 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 8 Event

Description:

Steam Dump and Bypass Control System fails to automatically open bypass and dump valves to control Steam Generator pressure.

Time Position Applicant's Actions or Behavior CBOT Recognize and announce that SDBCS is NOT maintaining steam Generator pressure.

CRS Direct CBOT to manually control Steam Generator pressure by either taking manual control of a SDBCS bypass valve or place the SDBCS master controller in manual and adjust output to open SDBCS bypass valve(s) to maintain Steam Generator pressure 950 to 1000 psia.

CBOT Manually control SDBCS valves to control Steam Generator pressure.

Termination criteria: SDBCS is controlled manually or at the discretion of the lead examiner.

Page 19 of 20

Appendix D Scenario 1 Form ES-D-1 Op-Test No.: 1 Scenario No.: 1 Event No.: 9 Event

Description:

2P89B, B High Pressure Safety Injection pump (HPSI) fails to auto-start and A High Pressure Safety Injection Pump fails to develop discharge pressure.

Time Position Applicant's Actions or Behavior CBOT Recognizes and announces failure of B HPSI pump to automatically start.

Announces failure of A HPSI CRS Direct CBOT start C HPSI pump (2P89C) and/or start B HPSI pump (2P89B).

Direct WCO to investigate A HPSI pump operation.

Critical CBOT On 2C17, took hand switch for A HPSI pump (2P89A) to pull-to-Step lock and took hand switch for C HPSI pump (2P89C) to start and verified discharge pressure (if pressure < 1450psia, verified flow to Critical RCS).

Part is to AND/OR either start On 2C16, took hand switch for B HPSI pump (2P89B) to start and 2P89B verified discharge pressure (if pressure < 1450psia, verified flow to or Start RCS).

2P89C.

Termination criteria: When B HPSI pump is started or when C HPSI pump is started or at the discretion of the lead examiner.

Page 20 of 20

Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 (Modified) Op-Test No.: 2008-1 Page 1 Examiners: Operators:

Initial Conditions: 85% MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. A MFP offline to repair Electro-Hydraulic leak. RED Train Maintenance Week.

Turnover:

85%. 250 EFPD. EOOS indicates Acceptable Risk (9.3). MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. A Main feed pump Electro-Hydraulic leak repaired and ready to be placed in service. OP 2106.007 is complete up to section 10.0 for placing A MFP in service. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 N (CBOT) Place A Main Feed Pump in service.

2 XFW2TE0361 I (CBOT) Temperature indicator to Main Feed Pump oil cooler fails low.

3 CVC2P36BFAL C (ATC) B Coolant Charging Pump motor fault. TRM for CRS.

4 BKR1205 Startup transformer #2 lockout. Tech Spec for CRS.

BKR1218 5 CEA24DROP N (CBOT) Control Element Assembly #24 drops to bottom of core.

R (ATC) Tech Spec for CRS.

6 500LOSE500 M (ALL) Loss of Off-Site Power.

500LOSE161 7 MTGTRPLOCKO C (ATC) Main turbine lockout.

RPSRXMAN Failure of the reactor protection system to automatically RPSRXAUTO or manually trip the reactor. Tech Spec for CRS.

8 EDGDG1OIL C (CBOT) Loss of both Emergency Feed Water pumps resulting in CV0332 loss of all Feed water to steam generators.

9 Loss of instrument C (ATC) Loss of instrument air results in using upstream air atmospheric dump valve isolation valves to control steaming rate.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 Op-Test No.: 2008-1 Examiners: Operators:

Initial Conditions: 100 % MOL, All Engineered Safety Features systems are in standby. Main Turbine turning gear motor tagged out. 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. MTG will need to be jacked manually IAW OP-2106.009 Section 7.3. 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 XRCCHAPLVL I (ATC) A Pressurizer level channel fails High.

2 2SV8263-2 C (CBOT) Containment Isolation Valve for containment air monitoring system 2RITS8271, fails closed. Tech Spec for CRS.

3 NIBLINEPWR I (CBOT) B channel nuclear instrument fails low. Tech Spec for CRS.

4 FWPMPATRP N (CBOT) A main feed water pump trips due to thrust bearing R (ATC) wear.

5 FWAFT5A M (ALL) Unisolable main feed water rupture inside containment.

6 BUHTRS C (ATC) Backup heaters fail to deenergize when pressurizer level CHV2P36LOLVL drops below 29%.

Backup CCPs fail to auto start on low PZR level.

7 Containment C (CBOT) B containment cooling fails to actuate.

cooling fails

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 000 DATE:

SYSTEM/DUTY AREA: A1a Conduct of Operations TASK: Perform Transferring Unit Auxiliaries from SU3 or Unit Aux to SU2 JTA#: ANOROELECDNORM-026 KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

2.1.32 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Perform SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2107.001 Attachment P EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

Mode 4; 250 EFPD. All ESF systems are in normal alignment.

Startup Transformer #3 is supplying all AC electrical busses.

A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.

B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.

B and D Reactor Coolant Pumps are running and A and C Reactor Coolant Pumps are secured.

Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.

Unit 1 SU#2 feeder to A1(A111) is in normal after stop.

2H2 loading is 4MVA, 2H1 loading is 5 MVA Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps TASK STANDARD: Identify at least 4 of the following 5 errors in OP 2107.001 section 11.0:

1) Procedure step 11.6 was marked as NA when the initial conditions stated that the auto-transformer was out of service.
2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)

And Identified the error that SU#2 can not be placed in service in current configuration.

TASK PERFORMANCE AIDS: OP 2107.001 limits and precautions (section 5), completed section 11.0, and completed Attachment P.

SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Reviewed procedure OP 2107.001 Identified 4 of the following 5 errors: N/A SAT UNSAT section 11.0 and Attachment P for

1) Procedure step 11.6 was errors.

marked as NA when the initial conditions stated that the auto-transformer was out of service.

2) Procedure step 11.8.1 was marked as complete when the initial conditions stated that the auto-transformer was out of service.
3) Procedure step 11.8.2 was marked as complete when initial conditions stated that unit 1 breaker A111 (A1) was not in pull to lock but in normal after stop.
4) Procedure step 11.8.3 was marked as complete when initial conditions stated that 3 condensate pumps were running.
5) Procedure step 11.8.5 was marked as complete when the loading of 2A1 and 2A2 exceeded the limit and precaution value for 4160VAC winding loading of 21 MVA with forced air and oil available (Calculation done on Attachment P is correct)

(C) 2. Determined that SU#2 availability. Determined that and that SU#2 could N/A SAT UNSAT not be placed in service in current configuration.

END STOP TIME:

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  • Startup Transformer #3 is supplying all AC electrical busses.
  • A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
  • B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
  • Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
  • Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
  • Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
  • 2H2 loading is 4MVA, 2H1 loading is 5 MVA
  • Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
  • Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

List the errors identified below:

1) 2)

3) 4)

Can Startup Transformer #2 be placed in service given the initial condition information? _____________

JPM- ANO-2-JPM-NRC-SU2LOADSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • Mode 4; 250 EFPD. All ESF systems are in normal alignment.
  • Startup Transformer #3 is supplying all AC electrical busses.
  • A, C and B Condensate Pump are running for post maintenance testing and D Condensate Pump is in pull to lock.
  • B Circulating Water Pump is running and A Circulating Water Pump is in pull to lock.
  • Auto-transformer is out of service for the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> due to emergency forced outage, design engineering expects to finish evaluation in the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
  • Unit 1 is at 100% and all busses energized from their Unit Auxiliary Transformer and with no equipment out of service.
  • Unit 1 SU#2 feeder to A1 (A111) is in normal after stop.
  • 2H2 loading is 4MVA, 2H1 loading is 5 MVA
  • Data from Feeder breaker 2A112: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A113: Ia=1810amps; Ib=1820amps; Ic=1810amps
  • Data from Feeder breaker 2A212: Vab = 4102VAC; Vbc=4150VAC; Vca=4120VAC
  • Data from Feeder breaker 2A213: Ia=1600amps, Ib=1610amps;Ic=1620amps Initiating CUE:

The SM directs, Maintenance on Startup transformer #3 is planned and must be removed from service. Startup #2 must be placed in service with load shed bypassed. OP 2107.001 section 11.0 has been completed up to step 11.8.6. Perform verification of steps completed, identify at least 4 errors and determine if Startup transformer #2 may be placed in service. Current Plant Conditions are the same as the initial plant conditions.

List the errors identified below:

1) 2)

3) 4)

Can Startup Transformer #2 be placed in service given the initial condition information? _____________

ANO-2-JPM-NRC-TTBCSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: Conduct of Operations (A.1)

TASK: Calculate Time to Boil using computer program JTA#: ANO2RONORM4 KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1015.008 Attachment E EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-TTBCSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Plant shutdown for repair of Steam Generator Tube Leak. Making preparations for draining the RCS to 24 inches above the bottom of the hotleg to install nozzle dams. PZR level is 40%.

Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />; one (1) PZR code safety valve is removed; PZR manway is installed; ECCS vent valves are de-energized OPEN; NO RCP seal work inprogress; NO RCS cold or hot leg openings; RCS Temperature is 105°F.

TASK STANDARD:

Identify Three (3) of the following four (4) errors in the original Time to boil calculation :

1) 2 code safety valves were recorded as removed and only one was removed in initial conditions.
2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
3) Current RCS temperature was recorded as 80°F instead of 105°F as stated in the initial conditions.
4) Time after shutdown was recorded as 3 days 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> instead of the correct 1 day and 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).

AND Identify that the RCS cannot be drained to reduced inventory due to TTTCU is less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

TASK PERFORMANCE AIDS:

1015.008 attachment E, Computer operational with the current revision of LOSDC2 installed.

(SP-94-C-0001-01, Rev. 13), set up shortcut to program on the desktop.

SIMULATOR SETUP:

NA EXAMINER'S NOTES:

ANO-2-JPM-NRC-TTBCSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Compare time to boil (TTB) Computer program independently N/A SAT UNSAT calculation using LOSDC2 run and calculations compared to program.

(C) 2. Identified 3 of the 4 errors N/A SAT UNSAT

1) 2 code safety valves were recorded as removed instead of 1 code safety valve removed.
2) Initial RCS water level was recorded as 42 above the bottom of the hot leg instead of the correct 24.
3) Current RCS temperature was recorded as 80°F instead of the correct 105°F.
4) Time after shutdown was recorded as 3 days 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> instead of the correct 1 day 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> (35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />).

(C) 3. Determined that the actual Determined that the RCS cannot N/A SAT UNSAT Time until core uncovery: be drained to reduced inventory.

is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 50 min 36 sec EXAMINERS NOTE:

Prompt the Examinee that the file should not be printed or saved.

END

ANO-2-JPM-NRC-TTBCSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
  • PZR level is 40%.
  • Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />;
  • One (1) PZR code safety valve is removed;
  • PZR manway is installed;
  • ECCS vent valves are de-energized OPEN;
  • NO RCP seal work in progress;
  • NO RCS cold or hot leg openings;
  • RCS Temperature is 105°F.

INITIATING CUE:

CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

Do not print data or save LOSCD2 file.

List the errors identified below:

1) 2)

3)

Answer the following question Yes or No:

Can the RCS be drained to reduced inventory given the initial condition information?

ANO-2-JPM-NRC-TTBCSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • Making preparations for draining the RCS to 24 inches above the bottom of the hot leg to install nozzle dams.
  • PZR level is 40%.
  • Time after shutdown = 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br />;
  • One (1) PZR code safety valve is removed;
  • PZR manway is installed;
  • ECCS vent valves are de-energized OPEN;
  • NO RCP seal work in progress;
  • NO RCS cold or hot leg openings;
  • RCS Temperature is 105°F.

CRS/SM directs: CRS/SM directs: Perform a supervisory review of the given time to boil and time to core uncovery calculation using LOSDC2 program and identify at least 3 errors and determine if conditions are met to drain the RCS to reduced inventory.

Do not print data or save LOSCD2 file.

List the errors identified below:

1) 2)

3)

Can the RCS be drained to reduced inventory given the initial condition information? _____________

ANO-2-JPM-NRC-MAINTSRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Conduct of Operations (A.2)

TASK: Supervisory review of maintenance activities JTA#: ANO-SRO-ADMIN-NORM-48 KA VALUE RO: 2.1 SRO: 3.1 KA

REFERENCE:

2.2.19 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH: X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform Classroom: Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: Classroom:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1025.003, Conduct of Maintenance EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-MAINTSRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Maintenance work order 00087000-01 has been completed on Spent Fuel Cooling radiation monitor 2RE-1513-2.

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

TASK STANDARD:

Identified 3 of the following 4 errors.

1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
4) 2SW-1514L Restorer and Verifier initials are the same.

TASK PERFORMANCE AIDS:

Marked up copy of form 1025.003C, Maintenance Configuration Tracking Log Copy of OP 2104.019 Attachment D.

SIMULATOR SETUP:

NA EXAMINER'S NOTES:

ANO-2-JPM-NRC-MAINTSRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Evaluators Note: Provide examinee with a copy of 1025.003, Maintenance Configuration Tracking Log Sheet.

1. Review the Maintenance Examinee reviewed the N/A SAT UNSAT Configuration Tracking Log Maintenance Configuration Sheet Tracking Log Sheet and compared it to the normal lineup in 2104.029, Attachment D.

(C) 2. Identified 3 of the 4 errors. N/A SAT UNSAT Identified 3 of the following 4 errors.

1) 2SW-1514A As Found and Restoration positions are listed as CLOSED when required to be OPEN.
2) 2SW-1514C Restoration position is listed as OPEN when required to be CLOSED.
3) 2SW-1514L Restoration position is listed as OPEN when required to be CLOSED.
4) 2SW-1514L Restorer and Verifier initials are the same.

END

ANO-2-JPM-NRC-MAINTSRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

List the errors identified below:

1) 2)

3)

ANO-2-JPM-NRC-MAINTSRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Given the following Plant conditions:

  • The clearance has been removed.
  • There are currently no Equipment Status Log (ESL) entries.

INITIATING CUE:

CRS/SM directs: Perform an Operations verification of the given 1025.003C form, Maintenance Configuration Tracking Log following maintenance on SFP cooling radiation monitor 2RE-1513-2. Review the form and identify at least 3 errors.

List the errors identified below:

1) 2)

3)

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: A.3: Radiation Control TASK: Review and approve Containment Purge Gaseous Release JTA#: ANOSROADMINNORM189 KA VALUE RO: 2.5 SRO: 3.4 KA

REFERENCE:

2.3.9 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: CLASSROOM:

Perform Perform POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2104.033 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIAL PLANT CONDITIONS Plant is in Mode 5.

Todays date is 03/10/2005.

Chemistry has completed Containment atmosphere radioactivity analysis.

Purge Exhaust Filter Unit doors have been verified closed and dogged.

Initial flow from 2RITS-8233, Containment Purge, is 8.5 SCFM.

Initial count rate on 2RITS-8233, Containment Purge, is 60 cpm.

Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.

Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.

Last test reading run-time from engineering programs group is 7532.5 hrs.

Current run-time reading from 2B85-C7 is 8284.9 hrs.

A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

TASK STANDARD:

Four of the following Five errors must be identified:

  • Since data recorded in step 1.4.5 was incorrect the filter run-time should have been given to Engineering programs for evaluation.
  • Step 4.3 calculated count rate limits are wrong.
  • Step 4.4 since current CAMS radiation readings exceed the calculated limits, the permit should have been resubmitted to chemistry.
  • Step 4.8 2RITS-8233 set point is recorded incorrectly.
  • Potentiometer dial set point circled is incorrect due to recording the set point incorrectly; this results in a non-conservative trip value for 2RITS-8233.

AND The release permit must not be approved, but returned to chemistry for reanalysis.

TASK PERFORMANCE AIDS: A marked-up copy of Supplement 1 Containment Purge Gaseous Release Permit through section 4 and chemistry release data.

SIMULATOR SETUP: NA

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

START TIME:

PERFORMANCECHECKLIST STANDARD CIRCLE ONE EXAMINERS NOTE: Provide a marked-up copy of OP 2104.033 Supplement 1.

1. Perform supervisor review for Reviews the containment purge N/A approval of the Containment purge gaseous release permit.

gaseous release permit and determine errors.

EXAMINERS NOTE: The following list identify errors in the supplement 1 provided. The acceptance criterion is given in the task standard. Examinee must identify 4 of the 5 errors.

  • Data recorded in section 1.4.5
  • Filter run-time is beyond 720 hrs; was incorrect the filter run-time this should be evaluated by should have been given to engineering programs before Engineering programs for proceeding with release.

evaluation.

  • Step 4.3 calculated count rate
  • Calculated count rate limits were limits are wrong. given to be particulate 542 CPM and gaseous 464 CPM but should have been Particulate2168 CPM and gaseous 1856 CPM.
  • Step 4.4 since current CAMS
  • The Purge permit should be radiation readings exceed the resubmitted to chemistry but the (C) 2.

allowable limits, the permit steps were marked as NA due N/A SAT UNSAT should have been resubmitted to current radiation readings chemistry. exceeding calculated limits.

  • Set point for 2RITS-8233 is recorded incorrectly. recorded as 15000 CPM not 150 CPM as specified in Chemistry report.
  • Potentiometer dial set point should recording the set point be 3.84, but 5.68 is circled.

incorrectly; this results in a non-conservative trip value for 2RITS-8233.

EXAMINERS NOTE: The Examinee should discuss that the release will be resubmitted to chemistry and Engineering programs should evaluate the runtime on the exhaust filter.

3. The release should not be approved Would not approve the release to (C) and should be resubmitted to begin. N/A SAT UNSAT chemistry.

END STOP TIME:

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • Plant is in Mode 5.
  • Todays date is 03/10/2005.
  • Chemistry has completed Containment atmosphere radioactivity analysis.
  • Purge Exhaust Filter Unit doors have been verified closed and dogged.
  • Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
  • Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
  • Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
  • Last test reading run-time from engineering programs group is 7532.5 hrs.
  • Current run-time reading from 2B85-C7 is 8284.9 hrs.
  • A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

Initiating CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

List the errors identified below:

1) 2)

3) 4)

Can this release permit be approved given the initial condition information? _____________

JPM-ANO-2-JPM-ADMIN-PURGESRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • Plant is in Mode 5.
  • Todays date is 03/10/2005.
  • Chemistry has completed Containment atmosphere radioactivity analysis.
  • Purge Exhaust Filter Unit doors have been verified closed and dogged.
  • Initial count rate on 2RITS-8233, Containment Purge, is 60cpm.
  • Initial CAMs Particulate reading is 1084 CPM and Gaseous is 928 CPM.
  • Current four hour average CAMs Particulate reading is 2452 CPM and Gaseous is 1921 CPM.
  • Last test reading run-time from engineering programs group is 7532.5 hrs.
  • Current run-time reading from 2B85-C7 is 8284.9 hrs.
  • A reactor Operator has completed the request and containment purge verification section of OP 2104.033 Supplement 1.

Initiating CUE:

The Shift Manager directs Review and approve OP-2104.033 supplement 1, Containment Purge Gaseous Release Permit using the completed supplement and chemistry report. Identify at least 4 errors in the supplement.

List the errors identified below:

1) 2)

3) 4)

Can this release permit be approved given the initial condition information? _____________

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 1 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2 REV #: 002 DATE:

SYSTEM/DUTY AREA: A4 Emergency Plan TASK: Determine Emergency Action Level JTA#: ANO-SM-EOPAOP-EMERG-301 KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

X SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: LAB:

Perform POSITION EVALUATED: RO: SRO: X ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 1903.010 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 2 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

TASK STANDARD:

Declared a Site Area Emergency based on EAL 6.9, Loss of Both S/Gs as a Heat Removal Method TASK PERFORMANCE AIDS: OP 1903.010 SIMULATOR SETUP: N/A.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 3 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Review E-Plan procedure Review 1903.010 index and EAL N/A SAT UNSAT 1903.010 to determine classification tabs.

classification.

(C) 4. Reviewed EAL 6.9., Site Area Site Area Emergency declared N/A SAT UNSAT Emergency based Loss of Both based Loss of Both S/Gs as a S/Gs as a Heat Removal Heat Removal Method Method END

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 4 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINERs COPY INITIAL PLANT CONDITIONS

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

JPM- ANO-2-JPM-NRC-ADMIN EPLAN SRO PAGE 5 OF 5 ADMINISTRATIVE JOB PERFORMANCE MEASURE EXAMINEEs COPY INITIAL PLANT CONDITIONS

  • A plant trip has occurred 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago due to a loss of all feedwater.

o A S/G = 47 wide range o B S/G = 52 wide range.

  • The crew has initiated Once Thru Cooling using the ECCS Vents.
  • RCS leakage is estimated to be 875 gpm.
  • Containment temperature, pressure and sump level are rapidly rising.
  • SIAS, CCAS and CIAS have actuated.
  • Valid High Range Containment Radiation Monitors readings indicate 25 R/hr.

INITIATING CUE:

As Shift Manager, determine the EAL classification based on the given plant conditions.

ANO-2-JPM-NRC-CVCS2 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 004 DATE:

SYSTEM/DUTY AREA: Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)

JTA#: ANO2-RO-EOPAOP-OFFNORM-193 KA VALUE RO: 3.9 SRO: 3.7 KA

REFERENCE:

004 A4.07 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE (S): OP 2203.032, OP 2103.015 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CVCS2 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 3, A Shutdown Margin is calculated following a reactor trip.

TASK STANDARD:

Greater than or equal to 40 gallons per minute boric acid solution being injected into the RCS using BAM Pumps via Emergency Borate Valve (2CV-4916-2). This is an alternate success path JPM.

TASK PERFORMANCE AIDS:

AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin, OP 2103.015 Worksheet 4, showing SDM not met.

SIMULATOR SETUP:

A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.

The elements of this file are:

Trigger 5 = 2CV-4873-1a = 75%. 2CV-4873-1a (VCT Outlet) malfunction set to 75%;

Then overrides 2HS-4873-2 are set to false and 2HS-4873-3 set to false to turn lights off.

This case file will simulate the VCT Outlet valve tripping its output breaker due to a motor fault as it tries to shut.

ANO-2-JPM-NRC-CVCS2 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

PERFORMANCE CHECKLIST STANDARD (Circle One)

(C) 1. Review SDM calculation and Recognize that SDM is not met N/A SAT UNSAT recognize SDM is not met for and that emergency boration is current conditions. required.

EXAMINERS NOTE:

Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.

EXAMINERS CUE:

When the examinee determines emergency boration is required, provide the following information, even if the examinee does not ask for direction:

Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2.

2. Verify at least one Charging Pump On Panel 2C09, verified CCP(s) N/A SAT UNSAT (CCP) running with flow greater running.

Step than 40 GPM.

2 Observed red light ON; green light POSITIVE CUE: OFF above at least one of the Red light(s) ON. following handswitch(es):

Flow is greater than 40 gpm. 2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-4853-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40 gpm on Charging Header Flow (2FIS-4863).

3. Align Boric Acid Supply To CCP On Panel 2C09, opened BAMT N/A SAT UNSAT Suction. Gravity Feed Valves 2CV-4920-1 Step and/or 2CV-4921-1 3.A POSITIVE CUE:

Red light(s) ON. Observed red light ON and green light OFF above handswitch(es):

NEGATIVE CUE:

Green light(s) ON.

In the following step the VCT Outlet Valve will NOT close requiring an alternate success path.

ANO-2-JPM-NRC-CVCS2 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

4. Close Volume Control Tank (VCT) On Panel 2C09, observed that N/A SAT UNSAT Outlet Valve (2CV-4873-1). 2CV-4873-1 did NOT go closed.

Step 4 POSITIVE CUE: Observed green light OFF; red Green light OFF. light OFF above VCT Outlet Valve Red light OFF. handswitch (2HS-4873-1).

NEGATIVE CUE:

Red light ON.

(C) 5. Start at least ONE BAM Pump. On Panel 2C09, start 2P39A N/A SAT UNSAT and/or 2P39B.

Step POSITIVE CUE:

4.A Red light ON. Observed RED light ON above the BAM pump started, 2HS-4919-2 NEGATIVE CUE: (2P39A) or 2HS-4910-2 (2P39B).

Green light ON.

(C) 6. Open Emergency Borate From On Panel 2C09, opened 2CV- N/A SAT UNSAT BAM Pumps Valve (2CV-4916-2). 4916-2.

Step 4.B POSITIVE CUE:

Red light ON. Observed red light ON; green light OFF above Emergency Borate NEGATIVE CUE: Valve, 2CV-4916-2.

Green light ON.

7. Verify Boric Acid Makeup Flow On Panel 2C09, verified 2CV- N/A SAT UNSAT Control Valve (2CV-4926) closed. 4926 closed.

Step 4.C POSITIVE CUE: Observed green light ON; red light Green light ON. OFF above Boric Acid Makeup Flow Controller (2FIC-4926).

NEGATIVE CUE:

Red light ON.

8. Check Reactor Makeup Water Flow On Panel 2C09, verified 2CV- N/A SAT UNSAT Control Valve (2CV-4927) or VCT 4927 or 2CV-4941 closed.

Step Makeup Isol valve (2CV-4941) 5 closed. Observed green light ON; red light OFF above Reactor Makeup POSITIVE CUE: Water Flow Controller (2FIC-4927)

Green light ON. or above 2CV-4941 handswitch.

NEGATIVE CUE:

Red light ON.

9. Check Charging Header Flow On Panel 2C09 (upright portion), N/A SAT UNSAT (2FIS-4863) greater than 40 gpm. observed flow greater than 40 Step gpm on Charging Header Flow 6 POSITIVE CUE: indicator (2FIS-4863).

Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)

END

ANO-2-JPM-NRC-CVCS2 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINER COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin has been calculated following a reactor trip.

INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

ANO-2-JPM-NRC-CVCS2 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin has been calculated following a reactor trip.

INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."

PROC./WORK PLAN N

O. PROCEDURE

/WORK PLAN TITLE: PAGE: 2 of 21 2103.015 REACTIVITY BALANCE CALCULATION CHANGE: 035-04-0

ANO-2-JPM-NRC-EOP01 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 09 DATE:

SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Secure Containment Spray JTA#: ANO2-RO-EOPAOP-EMERG-13 KA VALUE RO: 3.2 SRO: 3.7 KA

REFERENCE:

026 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): OP 2202.003 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-EOP01 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Containment spray actuation signal has actuated inadvertently and 2K04 D-1, CSAS ACT, is in Alarm. I&C has corrected the problem. No testing is currently in progress.

TASK STANDARD: CSAS is reset and CSAS actuated components are secured.

TASK PERFORMANCE AIDS: EOP 2203.012D Annunciator 2K04 D1, CSAS ACT SIMULATOR SETUP: Inadvertent containment spray actuated. Containment Temperature. < 140 ° F, Pressure < 22.5 psia.

ANO-2-JPM-NRC-EOP01 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator 2D1, CSAS ACT.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify CSAS NOT valid. Determined that Containment N/A SAT UNSAT pressure less than 22.5 PSIA Step (PMS, SPDS or control board 2.1 indication).

Determined that Containment temperature less than 140°.

EXAMINERS NOTE:

There is only one channel available on the simulator. Resetting B trip path will reset all the other channels also.

2. Place Spray Pumps in PTL. On panels 2C16/17, placed N/A SAT UNSAT handswitches for Containment Step Spray Pumps (2P35A and 2.3 2P35B) in Pull To Lock (PTL).

Examiners CUE: Observed green lights ON above handswitches.

CRS acknowledges TS entry into 3.0.3. Enter TS 3.0.3.

(C) 3. Reset CSAS on 2C23. On panel 2C23B, obtained key N/A SAT UNSAT and placed it in trip path to be Step reset.

Examiners Note:

Give examinee Key #15 when Placed trip path key switch to 2.6.1 asked. UNLK.

Depressed CSAS pushbutton for 2.6.2 trip path.

Verified Trip Path lights reset (on 2.6.3 2C03) (Not a critical item) 2.6.4 Placed trip path key switch to LK.

EXAMINERS NOTE:

There is only one channel available on the simulator. Resetting 2C40 actuation path will reset all the other channels also.

ANO-2-JPM-NRC-EOP01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 3. Reset CSAS on 2C40 On 2C40, depressed CSAS N/A SAT UNSAT lockout reset pushbutton.

Step On 2C40 verify reset lights are 2.6.6 ON.

2.6.7 (C) 4. Close Containment Spray On panels 2C16/17, placed N/A SAT UNSAT Header Isolation Valves. handswitches for Containment Step Spray Header Isolation valves 2.6.8 (2CV-5612-1 and 2CV-5613-2) in CLOSE.

Observed green lights ON above handswitches.

(C) 5. Stop Containment Spray On panels 2C16/17, removed N/A SAT UNSAT Pumps. handswitches for Containment Step Spray Pumps (2P35A and 2.6.9 2P35B) from PTL and placed in normal after stop.

Observed green lights ON above handswitches.

6. Exit Tech Spec 3.0.3. Notify CRS to exit tech spec 3.0.3 N/A SAT UNSAT when both spray pumps are Step taken out of PTL.

EXAMINERs CUE: Exiting 2.6.10 Tech Spec 3.0.3 has been entered into the station log.

END STOP TIME:

ANO-2-JPM-NRC-EOP01 PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Containment spray actuation signal has actuated inadvertently.

2K04 D-1, CSAS ACT, is in alarm.

I&C has corrected the problem.

No Testing is currently in progress.

INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.

ANO-2-JPM-NRC-EOP01 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Containment spray actuation signal has actuated inadvertently.

2K04 D-1, CSAS ACT, is in alarm.

I&C has corrected the problem.

No Testing is currently in progress.

INITIATING CUE:

The CRS directs, "Reset CSAS and secure Containment Spray using ACA 2203.012D for annunciator D1, CSAS ACT.

ANO-2-JPM-NRC-CREV01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 00 DATE:

SYSTEM/DUTY AREA: Abnormal/Emergency Operations TASK: Manually actuate Control Room Ventilation ALTERNATE SUCCESS PATH JTA#: ANO2-RO-EOPAOP-EMERG-13 KA VALUE RO: 2.9 SRO: 3.1 KA

REFERENCE:

073 A301 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE(S): OP 2104.007 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CREV01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid 2RITS-8750-1A is in alarm. ALTERNATE SUCCESS PATH JPM TASK STANDARD: All Control room ventilation components have been actuated and 2VSF 9 secured and outside air damper has been closed and air reserve aligned.

TASK PERFORMANCE AIDS:

Marked up copy of OP 2104.007 section 7.0, Radiation and Chlorine detector alarm response actions. Steps 7.1 and 7.2 are complete.

SIMULATOR SETUP: Alarm 2K11 D10 in alarm. Control room ventilation radiation monitor above alarm setpoint.

Insert the following malfunctions:

XRI2RITS8750-1; value = 2000 (Control room radiation monitor in alarm)

X_RM8750; value = TRUE (Control room ventilation components will not actuate)

Insert the following overrides for 2C33:

  • DO_CI_8603_A; value = OFF
  • DO_CI_8603_R; value = OFF

ANO-2-JPM-NRC-CREV01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm.

Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINERS NOTE:

Do not allow examinee to go to unit 1. Provide cue when determining unit 1 control room component status.

1. Verify Unit 1 control room is On C141 on unit 1, verify N/A SAT UNSAT isolated. CV7905 and CV7907 dampers step are closed.

7.1.2 Examiners CUE:

Unit 1 control room supply damper CV7905 and Unit 1 control room return damper CV7907 have been closed.

(C) 2. Verify unit 2 control room is On 2C33, verify 2UCD 8683, unit N/A SAT UNSAT isolated. 2 supply damper is closed by step taking handswitch to the closed 7.1.2 position and verifying green light is ON above handswitch.

On 2C33, verify 2UCD 8685, unit 2 return damper is closed by taking handswitch to the closed position and verifying green light is ON above handswitch.

3. Verify Unit 1 control room At breaker B1544 on Unit 1, N/A SAT UNSAT supply fans are stopped. verify VSF-8A handswitch in stop step and green light ON.

7.1.3 Examiners CUE: At breaker B4161 on Unit 1, Unit 1 control room supply verify VSF-8B handswitch in stop fans VSF8A and VSF8B and green light ON.

handswitches are in stop and green lights ON.

Examiners note:

Transition to back of control room to panel 2C22.

ANO-2-JPM-NRC-CREV01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Verify Unit 2 control room On panel 2C22, took handswitch N/A SAT UNSAT supply fans are stopped. for 2VSF8A and 2VSF8B to stop step and verified Green light ON 7.1.3 above handswitch.

(C) 5. Verify Unit 2 control room On panel 2C22, took handswitch N/A SAT UNSAT exhaust fans are stopped. for 2VSF43A and 2VSF43B to step stop and verified Green light ON 7.1.3 above handswitch.

6. Verify Unit 1 control room On unit 1 panel C19, verified VEF N/A SAT UNSAT smoke exhaust fan is stopped. 43 fan in stop and green light ON.

step 7.1.3 Examiners CUE:

Unit 1 control room smoke exhauster fan VEF43 handswitch is in stop and green light ON.

Examiners note:

Transition to front of control room to panel 2C33.

Examiners Note:

The following is the alternate success path step.

7. Verify 2VSF9 running with On panel 2C33 rotated N/A SAT UNSAT insufficient air flow. handswitch for 2VSF9 to start.

step On panel 2C33 verified RED light 7.1.4 ON above handswitch for 2VSF9.

On panel 2C33 verified PCD-8607B red light ON.

On panel 2C33 recognized low air flow by Amber light ON and Red light OFF above 2VSF9 handswitch.

ANO-2-JPM-NRC-CREV01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 8. Close 2VSF9 outside Air On panel 2C33 placed N/A SAT UNSAT damper 2PCD8607B. handswitch for 2PCD8607B to step RESERVE.

7.1.5 EXAMINERs CUE: When On panel 2C33, secured 2VSF 9 asked, report 2nd person by taking handswitch to STOP.

verification of handswitch 2PCD8607B is complete.

EXAMINERs CUE: When asked to go to Unit 1 and Contacts unit 1 to start VSF 9.

start VSF9, report that VSF 9 is running with proper discharge flow.

EXAMINERs NOTE:

This JPM does not examine the examinees use of Tech Specs, JPM can be ended at this step.

10. Initiate condition report and Discuss writing a condition report N/A SAT UNSAT determine tech spec and entry into Tech Spec due to step applicability due to 2VSF 9 2VSF9 inoperability. Attempt to 7.1.5 inoperability. access OP 2104.007 attachment B component/tech spec cross-reference, to determine tech spec applicability.

END STOP TIME:

ANO-2-JPM-NRC-CREV01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.

INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

ANO-2-JPM-NRC-CREV01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Annunciator 2K11 D-10, Process Gas Radiation HI/LO alarm and Annunciator 2K08 A-4 are in. A valid control room radiation alarm, 2RITS-8750-1A, is in alarm and not bypassed.

INITIATING CUE:

The CRS directs, "Verify proper system actuation following 2K11 D10 control room radiation monitor in alarm. Perform actions in OP 2104.007 starting with step 7.1.2, Radiation and Chlorine alarm response actions.

ANO-2-JPM-NRC-IA02 PAGE 1 OF 5 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Instrument Air System TASK: Perform actions required by low Instrument Air Header Pressure JTA#: ANO2-RO-EOPAOP-EMER-157 KA VALUE RO: 3.1 SRO: 3.2 KA

REFERENCE:

078 A3.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): AOP 2203.021 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-IA02 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

TASK STANDARD:

Unit 2 fully isolated from Unit 1 instrument air.

TASK PERFORMANCE AIDS:

AOP 2203.021; AOP 2203.012K SIMULATOR SETUP:

T1= IAINSTAIR, value = 13, Ramp = 1:00 minute.

Set trigger T2 to qh3c315 (closed position indication for 2CV3015)

T2=IAINSTAIR, value = 7.

Full power IC, Trigger T1 when candidate ready to start JPM

ANO-2-JPM-NRC-IA02 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

EXAMINER'S NOTE:

AO and WCO duties are already in progress.

(C) 1. Open Instrument Air header On panel 2C14, placed N/A SAT UNSAT cross-connect valves with handswitches for 2CV-3004 and Step Unit 1. 2CV-3015 to OPEN.

2.a Observed red lights ON and green lights OFF above handswitches for 2CV-3004 and 2CV-3015.

2. Notify Unit-1 of intent to Notified Unit-1 of intent to N/A SAT UNSAT cross-connect instrument air. cross-connect instrument air.

Step 2.b Examiners CUE:

Unit-1 personnel acknowledge cross-connecting instrument air.

EXAMINERs NOTE:

Provide the CUE below after the examinee identifies IA header pressure is less than 60 psig from indication on 2C14.

3. Monitor Instrument Air header On panel 2C14, monitored N/A SAT UNSAT pressure. Instrument Air header pressure Step on 2PIS-3013 for results of 4

Examiners CUE: actions.

Unit 1 SM reports that Unit 1 IA pressure is 55 psig and going down.

ANO-2-JPM-NRC-IA02 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4 Close Instrument Air header On panel 2C14, placed N/A SAT UNSAT cross-connect valve with Unit handswitches for 2CV-3004 and Step

1. 2CV-3015 to CLOSED.

4.A Observed green lights ON and red lights OFF above handswitches for 2CV-3004 and 2CV-3015.

Examiners Note:

When Unit 2 instrument air header is isolated from Unit 1 provide the following cue:

A large IA leak exists on the instrument air piping and can be isolated by closing 2IA-99.

5 Direct Auxiliary Operator to Direct Auxiliary Operator to N/A SAT UNSAT CLOSE manual Instrument Air CLOSE manual Instrument Air Step header cross-connect valves. header cross-connect valves 4.B 2IA-47, 2IA-48, and 2IA-192.

NOTE: candidate may elect to close 2IA99 before closing manual valves.

6 Check IA header pressure Monitors IA header pressure on N/A SAT UNSAT greater than 35 psig. 2C14 to verify pressure stays Step above 25 psig.

5

6. Direct AO to check IA header Direct AO to check IA header N/A SAT UNSAT pressure and air receivers pressure locally.

Step pressure.

6 Direct AO to check IA air receivers.

Examiners Cue:

AO reports IA header pressure as indicated on 2C14.

Examiners note:

AO reports that the IA A air receiver pressure is as indicated on 2C14 and the B IA receiver pressure is

+5 # as indicated on 2C14.

ANO-2-JPM-NRC-IA02 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Check IA header flow locally. Direct AO to report IA header N/A SAT UNSAT flow locally.

Step 8

Examiners Cue:

IA Header Flow is 700 SCFM.

(C) 8. Direct AO to close 2 IA-99. N/A SAT UNSAT Step 8

Examiners Cue:

AO has been directed to Direct AO to close 2IA-99 or close 2IA-99. inform CRS to direct AO to close 2IA-99. Refer to OP Examiners note: 2203.021 Attachment E to Notify simulator operator to determine that 2CV-0427 and take IA leak to 0. 2CV-0437 will fail OPEN when IA is isolated to them.

Simulator operator: When direction given to close 2IA-99, take IA leak malfunction to 0.

END STOP TIME:

ANO-2-JPM-NRC-IA02 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

ANO-2-JPM-NRC-IA02 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Normal full power operation. Alarm 2K12-A8 "INSTR AIR PRESS HI/LO" is in alarm.

INITIATING CUE:

The SM/CRS directs, Perform the actions for Loss of Instrument Air using AOP 2203.021 starting with step 2.

ANO-2-JPM-NRC-MTG05 PAGE 1 of 8 Job Performance Measure UNIT: 2 REV #: 007 DATE:

SYSTEM/DUTY AREA: Main Turbine Generator System TASK: Perform a Manual Synchronization of the Main Turbine Generator to the System (Alternate Success Path)

JTA#: ANO2-RO-TURBC-NORM-12 KA VALUE RO: 2.9 SRO: 3.2 KA

REFERENCE:

045 K3.01 X X APPROVED FOR ADMINISTRATION TO: RO: SRO:

X TASK LOCATION: INSIDE CR: OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

Perform PLANT SITE: SIMULATOR: LAB POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X 15 Minutes APPROXIMATE COMPLETION TIME IN MINUTES:

REFERENCE(S): OP 2106.009 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE

ANO-2-JPM-NRC-MTG05 PAGE 2 of 8 Job Performance Measure BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant startup is in progress. OP 2106.009 is completed through step 16.2.

TASK STANDARD: Turbine Generator tripped. Uncontrolled MTG load increase stopped.

TASK PERFORMANCE AIDS: OP 2106.009 Step 16.0 SIMULATOR SETUP: Startup in progress. Reactor power ~ 5%. Main transformer Cooling Group Breaker Lineup is complete (ATT. E). Turbine first stage pressure feedback is in auto.

Trigger 1 to component malfunction 2CV0242 value = 1.00 ramp = 2:00 delay 10 sec; Trigger 2 to component malfunction 2CV208 value = 1.00 ramp = 2:00 delay 10 sec; T1 set to ce4r9728 (BKR 5130) and T2 set to ce4r9731 (BKR 5134).

ANO-2-JPM-NRC-MTG05 PAGE 3 of 8 Job Performance Measure INITIATING CUE:

The CRS directs, Synchronize the Main Turbine Generator to the grid and load to about 50 Mwe using OP 2106.009 beginning with step 16.3.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Notify Pine Bluff Dispatcher Using dedicated dispatcher N/A SAT UNSAT of intent to sync to system. telephone, notified Pine Bluff step dispatcher of intent to sync to 16.3.1 POSITIVE CUE: system.

Pine Bluff dispatcher notified.

(C) 2. Place synchronizing hand On panel 2C01, placed N/A SAT UNSAT switch for EITHER Breaker synchronizing hand switch for step 5130 OR Breaker 5134 to EITHER Breaker 5130 16.3.2 MANUAL. (2HS-9727) OR Breaker 5134 (2HS-9730) in MANUAL.

POSITIVE CUE: Observed EITHER hand switch Hand switch 2HS-9727 OR 2HS-9727 OR 2HS-9730 in 2HS-9730 in MANUAL. MANUAL.

(C) 3. Verify Synchroscope On panel 2C01, pressed N/A SAT UNSAT rotating slowly in the INCREASE or DECREASE step CLOCKWISE direction. pushbutton on Load Selector 16.3.3 until synchroscope is rotating slowly in CLOCKWISE POSITIVE CUE: direction.

Synchroscope rotating slowly in CLOCKWISE On panel 2C10, observed direction. synchroscope rotating slowly in CLOCKWISE direction.

ANO-2-JPM-NRC-MTG05 PAGE 4 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Verify Generator Voltage On panel 2C10, verified N/A SAT UNSAT slightly higher than System generator voltage slightly step Voltage AND check higher than system voltage.

16.3.4 Generator Voltage phase to 16.3.5 phase. AND POSITIVE CUE: On panel 2C01, checked Voltage slightly higher than generator voltage phase to system voltage. phase using installed indications and handswitch 2HS-9733.

On panel 2C10, observed voltages on Incoming slightly higher than Running voltmeters.

5. Announce to the control Announced to the control N/A SAT UNSAT room the intention to room the intention to step synchronize to system. synchronize to system.

16.3.6 POSITIVE CUE:

Control room personnel notified.

(C) 6. Close Generator Output On panel 2C01, closed N/A SAT UNSAT Breaker and check turbine Generator Output Breaker step picked up load. selected so that Breaker 16.3.7 CLOSES with synchroscope in 16.3.8 POSITIVE CUE: the 12 OCLOCK position.

Red light ON.

Load increase indicated. Observed load increase indicated on Load (2JI-9625)

OR PMS or SPDS computers.

On panel 2C01, observed breaker closed indication (red light ON, green light OFF) for operated breaker.

OR On panel 2C10 mimic, observed red light ON and green light OFF for breaker just closed (5130 or 5134).

ANO-2-JPM-NRC-MTG05 PAGE 5 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 7. Adjust load to ~ 10 Mwe. On panel 2C01, adjusted load N/A SAT UNSAT to ~ 10 Mwe by pressing step INCREASE OR DECREASE 16.3.9 POSITIVE CUE: pushbutton on Load Select.

Load ~ 10 Mwe.

Observed load at ~ 10 Mwe as indicated on LOAD (2JI-9625) or on PMS or SPDS computers.

8. Verify SDBCS response On panel 2C04, Verify 2CV0303 N/A SAT UNSAT is responding to load increase step by closing (HIC demand signal 16.3.10 POSITIVE CUE: lowering).

SDBCS valves are closing.

9. Select Load Rate Limit of 1/2 On panel 2C01, Verify Load N/A SAT UNSAT

% per minute. Rate Limit of 1/2 % per minute step light illuminated 16.4 POSITIVE CUE:

1/2 % per minute illuminated.

EXAMINERS AND SIMULATOR OPERATOR NOTE:

Trigger T-1, #1 control valve opening if BRK5130 closed or Trigger T-2, #2 control valve opening if BRK5134 closed with 10 sec delay.

(C) 10. Recognize that turbine load is On panel 2C01, observed N/A SAT UNSAT still increasing. turbine load still increasing on LOAD (2JI-9625) or on PMS or SPDS Computers.

NEGATIVE CUE:

Turbine load is increasing uncontrollably.

ANO-2-JPM-NRC-MTG05 PAGE 6 of 8 Job Performance Measure PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 11. Attempts to lower load using On panel 2C01, attempted to N/A SAT UNSAT decrease pushbutton reduce turbine load using the decrease pushbutton AND/OR AND/OR Manually trips Main Turbine Generator using trip Manually tripped Main Turbine pushbutton Generator by depressing the trip pushbutton.

POSITIVE CUE:

Main Turbine Generator is Verified MTG tripped, tripped. Generator Output Breakers open, Exciter Field Breaker NOTE: open, all valves closed, and Attempting to decrease load electrical loads shifted to SU using the decrease #3.

pushbutton is not critical and does not need to be performed. Tripping the turbine is critical.

END STOP TIME:

ANO-2-JPM-NRC-MTG05 PAGE 7 of 8 Job Performance Measure EXAMINER S COPY JPM INITIAL TASK CONDITIONS:

Plant startup is in progress. OP 2106.009 is completed through step 16.2.

The CRS directs:

"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."

ANO-2-JPM-NRC-MTG05 PAGE 8 of 8 Job Performance Measure EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

Plant startup is in progress. OP 2106.009 is completed through step 16.2.

The CRS directs:

"Synchronize the Main Turbine Generator to the grid and load to about 50 MWe using OP 2106.009 beginning with step 16.3."

ANO-2-JPM-NRC-SIT01 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 010 DATE:

SYSTEM/DUTY AREA: Safety Injection System TASK: Perform a high pressure fill of a SIT (SIT "A") (Alternate Success Path)

JTA#: ANO2ROECCSNORM2 KA VALUE RO: 3.3 SRO: 3.7 KA

REFERENCE:

006 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP-2104.001 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-SIT01 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: HPSI pump (2P89A) is running on minimum recirculation TASK STANDARD: Safety Injection Tank (2T2A) level has been increased ~0.3% and fill is secured prior to 2T2A pressure exceeding 624psig (Hi Hi pressure) or level exceeding 89.5% (Hi Hi level)

THIS IS AN ALTERNATE SUCCESS PATH JPM TASK PERFORMANCE AIDS: OP 2104.001 Section 8.0 SIMULATOR SETUP: SIT A level low enough to accept a 0.3% water addition and Safety Injection Tank (2T2A) pressure is <608 psig.

Setup overrides to deenergize the red and green lights for 2CV 5015-1 when the handswitch is is taken to the open position and have the valve open 1%. HPSI pump (2P89A) is running on minimum recirculation. RCS PRESSURE > 1500psia.

Set trigger T4= of4r0151 (triggered when 2HS5015-1 red light is energized).

T4 - CV50151 = 0.1; fail HPSI injection MOV partially open.

T4 - DO_HS_5015_G = OFF Time delay = 2 sec; HPSI injection MOV green light off.

T4 - DO_HS_5015_R = OFF Time delay =2 sec; HPSI injection MOV red light off.

ANO-2-JPM-NRC-SIT01 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Open SIT (2T2A) Drain Valve On panel 2C17, placed N/A SAT UNSAT (2SV-5001-1). handswitch for 2SV-5001-1 to Step OPEN.

8.4.1 Observed red light ON above handswitch.

(C) 2. Open SIT (2T2A) Check On panel 2C33, placed N/A SAT UNSAT Valve Bypass (2SV-5004). handswitch for 2SV-5004 to Step OPEN.

8.4.1 Observed red light ON above handswitch.

3. Monitor SIT level and While filling SIT A, monitored N/A SAT UNSAT pressure during fill. level to ensure level maintained Step 8.3 < 87.9%.

While filling SIT A, monitored SIT pressure closely to ensure pressure maintained < 624 psig.

(C) 4. Throttle open HPSI Header 1 On panel 2C17, throttled N/A SAT UNSAT Injection to RCP A Discharge 2CV-5015-1 OPEN by placing Step (2CV-5015-1). handswitch to OPEN 8.4.2 momentarily as required to establish an SIT fill rate.

Observed red and green lights ON above handswitch.

Observed SIT (2T2A) control board level instrument(s):

2LIS-5008 (2C17) 2LI-5010 (2C17) 2LIS-5009 (2C16)

OR Observed SIT (2T2A) level on PMS, or SPDS computer point/trend display.

ANO-2-JPM-NRC-SIT01 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Attempts to close HPSI On panel 2C17, placed N/A SAT UNSAT Header 1 Injection to RCP A handswitch for 2CV-5015-1 to Step Discharge valve. CLOSE.

8.4.3.A Recognized that 2CV-5015-1 would NOT close and both red and green lights are deenergized.

(C) 6. Stop the level increase in On panel 2C17, placed N/A SAT UNSAT 2T2A SIT. handswitch for A HPSI pump (2P-89A) in stop Observed 2P89A stopped.

OR On panel 2C17 placed Step handswitch for SIT A Drain Valve 8.4.3.B (2SV-5001-1) to CLOSED.

Step 8.4.3.C Observed green light ON above handswitch.

OR On panel 2C33, placed handswitch for SIT A Check Valve Bypass (2SV-5004) to CLOSED.

Observed green light ON above handswitch.

7. Inform CRS of failure of Informed CRS that 2CV-5015-1 N/A SAT UNSAT 2CV-5015-1 to close. failed to close.

Examiners Cue:

Acknowledge communication as CRS.

Direct Examinee to secure from filling A SIT.

8. Close SIT (2T2A) Drain On panel 2C17, placed N/A SAT UNSAT Valve. handswitch for SIT A Drain Valve Step (if not closed previously.) (2SV-5001-1) to CLOSE.

8.4.3.B Observed green light ON above handswitch.

9. Close SIT (2T2A) Check On panel 2C33, placed N/A SAT UNSAT Valve Bypass. handswitch for SIT A Check Step (if not closed previously.) Valve Bypass (2SV-5004) to 8.4.3.C CLOSE.

Observed green light ON above handswitch.

ANO-2-JPM-NRC-SIT01 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 10. On panel 2K07, Alarms C3, 2T2A SIT High High Pressure N/A SAT UNSAT SIT Press Hi Hi or C4 Level alarm NOT received (SIT Hi Hi NOT received. pressure > 624 psig) or High High level alarm NOT received (87.5%).

END STOP TIME:

ANO-2-JPM-NRC-SIT01 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

HPSI pump (2P89A) is running on minimum recirculation.

INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

ANO-2-JPM-NRC-SIT01 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

HPSI pump (2P89A) is running on minimum recirculation.

INITIATING CUE:

The CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3."

ANO-2-JPM-NRC-ELEC001 PAGE 1 OF 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 008 DATE:

SYSTEM/DUTY AREA: AC Electrical Distribution System TASK: Perform backfeed of a non-vital bus (2A1 from 2A3) , Respond to a Loss of Offsite Power JTA#: ANO2-RO-EOPAOP-EMER-32 KA VALUE RO: 3.7 SRO: 4.1 KA

REFERENCE:

062 A2.11 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 15 Minutes REFERENCE(S): EOP 2202.007 EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-ELEC001 PAGE 2 OF 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

TASK STANDARD:

Non-vital bus 2A1 has been powered from vital bus 2A3.

TASK PERFORMANCE AIDS:

EOP 2202.007 steps 28 through 34.

SIMULATOR SETUP:

IC with loss of offsite power. Open feeder breakers for 2B 1, 2, 7. Close 2CV 0400 & 2CV0460.

Verify Remote function 4162A1strip value = TRUE is triggered. Complete SPTAs and EOP 2202.007 through step 31.

ANO-2-JPM-NRC-ELEC001 PAGE 3 OF 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One) 1 Check 2A1 lockout relay reset. On annunciator panel 2K01, verified N/A SAT UNSAT 2K01-B7 "L.O. RELAY TRIP" for Step 2A1 in "slow flash" OR NOT 31.A illuminated.

2 Place "SU 2 to 2A1" (2A111) in On panel 2C10, placed 2A111 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

3 Place "Unit Aux to 2A1" (2A112) On panel 2C10, placed 2A112 in N/A SAT UNSAT in PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

4 Place "SU 3 to 2A1" (2A113) in On panel 2C10, placed 2A113 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

(C) 5 Place "2A1 to 2B3" (2A103) in On panel 2C10, placed 2A103 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

(C) 6 Place "2A1 to 2B9" (2A109) in On panel 2C10, placed 2A109 in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.B Observed green light ON; red light OFF over hand switch.

7 Place condensate pump (2P2A) in On panel 2C02, placed 2P2A in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

8 Place condensate pump (2P2C) in On panel 2C02, placed 2P2C in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

ANO-2-JPM-NRC-ELEC001 PAGE 4 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 9 Place heater drain pump (2P8A) in On panel 2C02, placed 2P8A in N/A SAT UNSAT PTL and verify breaker open. PTL.

Step 31.C Observed green light ON; red light OFF over hand switch.

10 Place auxiliary feed pump (2P75) On panel 2C02, placed 2P75 in PTL. N/A SAT UNSAT in PTL and verify breaker open.

Step Observed green light ON; red light 31.C OFF over hand switch.

Examiners note:

Transition to back of control room to panel 2C22 11 Place main chiller (2VCH-1A) On panel 2C22, placed 2HS-3810 N/A SAT UNSAT handswitch (2HS-3810) in PTL for 2VCH-1A in PTL.

Step and verify breaker open.

31.D Observed green lights ON; red lights OFF over hand switch.

EXAMINER'S NOTE:

Transition to front of control room panel 2C10 Provide the following cue when the need for local actions is identified:

CUE: Local actions for EOP 2202.007 step 30.E using Attachment 24 have been completed.

(C) 12 Energize non-vital bus (2A1). On panel 2C33, installed the N/A SAT UNSAT synchronizer selector switch for Step 2A309 and placed switch in ON.

33 Placed 2A3 supply breaker (2A309) to CLOSE.

Observed red light ON; green light OFF over 2A309 hand switch.

(C) 13 Check diesel generator load. On panel 2C33, verified 2DG1 load N/A SAT UNSAT

< 2850 KW, whenever load is Step changed.

34 Observed 2DG1 load on Wattmeter W2DG1 and verified or was aware of 2DG1 load change after energizing 2A1.

14 Energize non-vital 480v bus 2B1. On panel 2C10, placed 2A1 to 2B1 N/A SAT UNSAT Feeder (2A102) in CLOSE.

Step 35 Observed red light ON; green light OFF above hand switch.

ANO-2-JPM-NRC-ELEC001 PAGE 5 OF 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) 15 Energize non-vital 480v bus 2B7. On panel 2C10, placed 2A1 to 2B7 N/A SAT UNSAT Feeder (2A104) in CLOSE.

Step 35 Observed red light ON; green light OFF above hand switch.

Examiners note:

When 480VAC busses 2B1 and 2B7 are energized the JPM can be ended.

END STOP TIME:

ANO-2-JPM-NRC-ELEC001 PAGE 6 OF 7 JOB PERFORMANCE MEASURE EXAMINERS COPY:

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

ANO-2-JPM-NRC-ELEC001 PAGE 7 OF 7 JOB PERFORMANCE MEASURE EXAMINEES COPY:

JPM INITIAL TASK CONDITIONS:

A loss of offsite power has occurred. Both EDG's are operating supplying their respective busses.

EOP 2202.007 steps have been completed through step 30.

INITIATING CUE:

The SM/CRS directs, "Back feed 2A1 from 2A3 using EOP 2202.007 beginning with step 31."

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 1 of 7 SYSTEM/DUTY AREA: Diesel Generator System (Alternate Success Path)

TASK: Start up the AAC diesel generator manually locally during a Loss of Offsite Power JTA # : ANO2-AO-AACDG-OFFNORM-18 KA VALUE RO: 3.9 SRO: 4.0 KA

REFERENCE:

2.1.23 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: X LAB:

TESTING METHOD: SIMULATE: X PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 minutes REFERENCE(S) OP 2104.037, Exhibit 1 EXAMINEES NAME: SSN:

EVALUATORS NAME: DATE THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time: Stop Time: Total Time:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 2 of 7 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

This is an alternate success path JPM.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed TASK STANDARD:

The AAC Diesel has been started and is at 4160 V and 900 rpm with the output breaker (2A-1001) closed. The 480V bus 2B16 has been powered from the AAC diesel generator.

TASK PERFORMANCE AIDS:

1. OP 2104.037 Exhibit 1

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 3 of 7 INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

START TIME:

EXAMINERS NOTE:

Provide examinee with copy of 2104.037, Exhibit 1 If asked if 125 VDC is available, tell them that the indications for bus availability are as seen.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Place Local/Remote switch in On panel 2C-440, placed the N/A SAT UNSAT LOCAL. (2HS-7118) Local/Remote switch in LOCAL.

(Step (2HS-7118) 1.1)

EXAMINERS CUE:

Local/Remote switch indicates LOCAL.

EXAMINERS NOTE:

The failure of the AAC diesel to start by the local handswitch will cause the examinee to start the AAC diesel by an alternate means. There will be no change in AAC diesel generator frequency or noise level when the local start switch is taken to START.

Provide the following cue after 35 seconds when the local start switch is taken to START. (35 seconds is the delay time to allow for the lube oil pressure to build up on the EDG)

2. Start the AAC Diesel using the On panel 2C-440 turned the local N/A SAT UNSAT local start switch. (2HS-7117) control switch CW to start.

(Step 1.2)

EXAMINERS CUE:

The local start switch is in start, but the engine does not start.

TRANSITION NOTE:

Go to the AAC diesel engine room.

3. Open the pre-lube pump On the south side of the engine at N/A SAT UNSAT solenoid (2SV-7224) for >10 the generator end, rotated the (Step seconds. manual operator of 2SV-7224 2.1)

CW to open for >10 seconds.

EXAMINERS CUE:

2SV-7224 manual operating stem has been rotated and air noise is heard.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 4 of 7 (C) 4. Open EITHER of the air start On the south side of the engine at N/A SAT UNSAT solenoid valves: the generator end, rotated the (Step manual operator of one of the air 2.2) - 2SV-7222 OR start solenoid valves CW to open.

- 2SV-7223 2SV-7222 OR 2SV-7223 EXAMINERS CUE:

2SV-7222 (2SV-7223) manual Looked for an increase in engine operating stem has been noise and/or discharge of oil and rotated and engine speed and air from the air start motors.

noise level increases.

5. Close the air start solenoid On the south side of the engine at N/A SAT UNSAT valve that was opened. the generator end, rotated the (Step manual operator for the air start 2.3) solenoid valve CCW to close.

EXAMINERS CUE:

Manual operator rotated CCW to its original position.

6. Close the pre-lube solenoid After > 10 seconds on the south N/A SAT UNSAT (2SV-7224). side of the engine at the (Step generator end, rotated the 2.3) manual operator of 2SV-7224 EXAMINERS CUE: CCW to close.

No more air noise is heard.

7. Verify the AAC Diesel On panel 2C-440, observed N/A SAT UNSAT Generator is at rated speed and generator frequency at 60 Hz and (Step voltage. voltage at 4160V.

3.0)

EXAMINERS CUE:

Frequency indicates 60 Hz and voltage indicates 4160V.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 5 of 7 EXAMINERS NOTE:

When the examinee inspects the condition of 2A-1001, provide the NEGATIVE CUE first to indicate that the breaker has not automatically closed. Once the action has been taken to close the breaker, provide the POSITIVE CUE.

(C) 8. Verify the AAC Generator Observed breaker position N/A SAT UNSAT Output Breaker (2A-1001) is indication on the door of 2A-1001.

(Step CLOSED 4.1)

EXAMINERS CUE:

The green breaker OPEN light is lit.

AND Rotated breaker local control The white breaker spring switch for 2A-1001 to the CLOSE charging light is lit. position.

EXAMINERS CUE:

The Red breaker CLOSED light is lit.

TRANSITION NOTE:

Go to the upstairs area of the switchgear room.

9. Verify the London Feed to MCC Verifies 2B16-A1 is Open. N/A SAT UNSAT 2B161 breaker 2B16-A1 is (Step Observes the mechanical OPEN.

4.2) position indicator breaker for 2B16-A1 to show green open and the green breaker position EXAMINERS CUE:

indication light is lit.

Green OPEN light is lit on 2B16-A1 and mechanical position indicator showing green open

10. Verify Load Center 2B16 Supply Verifies 2B16-B1 is Open. N/A SAT UNSAT from the AAC diesel (2B16-B1)

(Step Observes the mechanical is CLOSED.

4.3) position indicator breaker for 2B16-B1 to show red closed and the red breaker position indication EXAMINERS CUE:

light is lit.

Red CLOSED light is lit on 2B16-B1 and mechanical position indicator showing red closed.

END STOP TIME: ________________

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 6 of 7 Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed.

INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

JOB PERFORMANCE MEASURE JPM# A2JPM-NRC-AACGLS REV 06 PAGE 7 of 7 Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. The reactor has tripped due to a loss of off-site power.
2. Both emergency diesel generators are tied to their respective buses.
3. An attempt to start the AACDG from the Control Room to energize 4160v Non-vital bus 2A1 was unsuccessful.
4. The PC on 2C14 AND 2C435 have both failed.

INITIATING CUE:

The CRS provides the following direction:

1. Start the AAC Diesel Generator using OP 2104.037 Exhibit 1.
2. Bring the unit up to rated speed and voltage carrying house loads.

ANO-2-JPM-NRC-FPEM1 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 009 DATE:

SYSTEM/DUTY AREA: Spent Fuel Pool Cooling System TASK: Perform service water emergency makeup to the SFP (with Loop 1 service water)

JTA#: ANO2-WCO-SFP-EMER1 KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

033 A2.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE (S): OP 2104.006 EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-FPEM1 PAGE 2 of 7 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

TASK STANDARD:

1. Emergency SFP makeup from Loop 1 service water has been initiated.

TASK PERFORMANCE AIDS:

1. OP 2104.006 Section 14.2

ANO-2-JPM-NRC-FPEM1 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE: The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

TRANSITION NOTE:

Go to elevation 335 RAB, north end of hallway.

1. Secure Spent Fuel Pool Locally rotated 2P66 handswitch N/A SAT UNSAT Purification Pump (2P66). (2HS-5411) to STOP and released.

Step 14.2.1 Examiners Cue: Observed green light ON, red light OFF.

Green light ON, red light OFF.

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 2. Verify Borated MU or RWT to Closed 2FP-32 by turning N/A SAT UNSAT 2P-66 (2FP-32) closed. handwheel clockwise and Step observing valve stem insertion 14.2.2 until resistance felt.

Examiners Cue:

2FP-32 stem is fully inserted and resistance is felt.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator (if local verification is performed)

(C) 3. Verify RWT Recirculation Contacted Control Room to close N/A SAT UNSAT Isolation (2CV-5637-1) closed. 2CV-5637-1.

Step 14.2.2 Examiners Cue: And When Control Room is Locally at 2CV-5637-1, verify that contacted, then Control room valve stem is in the down (closed) reports 2CV-5637-1 has been position and closed limit switch is taken to Closed. actuated after the valve is closed by the Control Room. (if local Or verification performed)

After the Control Room Closes 2CV-5637-1, then 2CV-5637-1 is Closed (if local verification is performed)

ANO-2-JPM-NRC-FPEM1 PAGE 4 of 7 JOB PERFORMANCE MEASURE (C) 4. Verify RWT Recirculation Contacted Control Room to close N/A SAT UNSAT Isolation (2CV-5638-2) closed. 2CV-5638-2.

Step 14.2.2 And Examiners Cue: Locally at 2CV-5638-2, verify that valve stem is in the down (closed)

When Control Room is position and closed limit switch is contacted, then Control room actuated after the valve is closed reports 2CV-5638-2 has been by the Control Room. (if local taken to Closed.

verification performed)

Or After the Control Room Closes 2CV-5638-2, then 2CV-5638-2 is Closed (if local verification is performed)

TRANSITION NOTE:

Go to elevation 354 RAB, just north of the elevator, to the SFP valve gallery.

(C) 5. Open Borated MU, RWT, SW Opened 2FP-31 by turning N/A SAT UNSAT to Fuel Pool (2FP-31). handwheel CCW.

Step 14.2.3 Examiners Cue: Observed valve stem fully withdrawn out of the valve.

2FP-31 stem is fully extended.

(C) 6. Open RWT to Fuel Pool Opened 2FP-46 by turning N/A SAT UNSAT Isolation (2FP-46). handwheel CCW.

Step 14.2.4 Examiners Cue: Observed valve stem fully withdrawn out of the valve.

2FP-46 stem is fully extended.

TRANSITION NOTE:

Go to elevation 335' RAB just off elevator.

(C) 7. Close SW Header 1 Telltale Closed 2SW-8401 by turning N/A SAT UNSAT Drain (2SW-8401). handwheel CW.

Step 14.2.5 Examiners Cue: Observed valve stem fully inserted into the valve.

2SW-8401 has stem inserted into handwheel.

8. Ensure position of 2SW-57 is Logged position of 2SW-57 by: N/A SAT UNSAT logged in Category "E" Log.

Step Using a plant telephone, Gaitronics, 14.2.6 OR radio; contacted Control Room and directed entry in Category "E" Examiners Cue:

Log.

Valve position is logged.

OR Ensured Category "E" log entry made upon completion of evolution.

ANO-2-JPM-NRC-FPEM1 PAGE 5 of 7 JOB PERFORMANCE MEASURE (C) 9. Open SW Header 1 Emergency Unlocked locking device on N/A SAT UNSAT Feed Isolation (2SW-57). 2SW-57 using category "E" valve Step key.

14.2.6 Opened 2SW-57 by turning Examiners Cue:

handwheel CCW.

2SW-57 valve stem is fully Observed valve stem fully extended.

withdrawn out of the valve.

10. Station an Operator to monitor Verified that an Operator was N/A SAT UNSAT SFP level in communication stationed to monitor SFP level in Step with Operator at SW Header 1 communication with Operator at 14.2.7 Emergency Feed Isolation to SW Header 1 Emergency Feed SF Pool (2SW-138) Isolation to SF Pool (2SW-138)

Examiners Cue:

Operator responds to radio communications.

EXAMINERS NOTE:

- Final valve position is at discretion of examinee to ensure level is raised / maintained.

- Operator stationed to monitor SFP level in accordance with initial conditions.

(C) 11. Throttle open SW Header 1 Throttled open 2SW-138 by N/A SAT UNSAT Emergency Feed Isolation to turning handwheel CCW.

Step SF Pool (2SW-138).

14.2.9 Observed valve stem withdrawn Examiners Cue: out of the valve commensurate with valves throttling.

Operator stationed at SFP reports level rising slowly.

END STOP TIME:

ANO-2-JPM-NRC-FPEM1 PAGE 6 of 7 JOB PERFORMANCE MEASURE Examiners Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

INITIATING CUE:

The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

ANO-2-JPM-NRC-FPEM1 PAGE 7 of 7 JOB PERFORMANCE MEASURE Examinees Copy JPM INITIAL TASK CONDITIONS The following conditions exist:

1. (2K11-K5) FUEL POOL TEMP HI is in alarm.
2. Neither fuel pool cooling pump is available.
3. An operator is stationed at the spent fuel pool to monitor spent fuel pool level.
4. Fuel pool level is low.
5. 2P66 is aligned to the RWT and running.

INITIATING CUE:

The CRS provides the following direction:

Align Loop 1 service water to provide emergency makeup to the spent fuel pool using OP 2104.006, Section 14.2.

ANO-2-JPM-NRC-LOF01 PAGE 1 of 7 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 003 DATE:

SYSTEM/DUTY AREA: Condensate and Feed Water System TASK: Align Condensate pump for start during a loss of all Feed Water event JTA#: ANO2-RO-EOPAOP-EMER-28 KA VALUE RO: 4.0 SRO: 3.9 KA

REFERENCE:

CE E06 EA1.1 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 20 Minutes REFERENCE (S): OP 2202.006 EXAMINEES NAME: SSN:

EVALUATORS NAME:

THE EXAMINEES PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

ANO-2-JPM-NRC-LOF01 PAGE 2 of 7 JOB PERFORMANCE MEASURE The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

TASK STANDARD: "D" Condensate Pump has been prepared for restart and the actions of 2202.006, Loss of Feedwater EOP through Step 16F has been completed.

TASK PERFORMANCE AIDS: OP 2202.006 Step 16

ANO-2-JPM-NRC-LOF01 PAGE 3 of 7 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Transition Note:

Go to elevation 370 Turbine Building, east of the elevator, to the 2A-1 / 2 Bus area.

Examiners Note:

When in front of breaker, give picture of inside breaker cubicle (DC control power breaker).

The candidate may want to read MIS placard on the DC breaker. If so, show the candidate the close up picture of the DC Breaker.

(C) 1. Locally open "DC CONTROL Points to the DC Control Power N/A SAT UNSAT POWER" breakers in breaker Molded Case Circuit Breaker.

Step cubicles 2A106.

16.A Positions the DC Control Power Examiners Cue: Breaker located in 2A106 in the down (open) position.

Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A106 breaker cubicle Positive Cue:

Molded Case DC Control Power breaker for 2A106 switch positioned down.

(C) 2. Locally open "DC CONTROL Points to the DC Control Power N/A SAT UNSAT POWER" breakers in breaker Molded Case Circuit Breaker.

Step cubicle 2A205.

16.A Positions the DC Control Power Examiners Cue: Breaker located in 2A205 in the down (open) position.

Once the candidate has located the breaker cubicle, Show the picture of the inside of the 2A205 breaker cubicle Positive CUE:

Molded Case DC Control Power breaker for 2A205 switch positioned down.

(C) 3. Verify Hotwell level greater than Hotwell is checked > 38% by N/A SAT UNSAT 38%. observing the remote Hotwell Step level instrument above Breaker 16.B Examiners Cue: Cubicle 2A205.

Hotwell level is greater than 38%. OR By Contacting the Control Room

ANO-2-JPM-NRC-LOF01 PAGE 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

Transition Note:

Go to elevation 335 Turbine Building, south of the Main Condenser on platform.

(C) 4. Verify both Condensate Pump Both Condensate Pump Recirc N/A SAT UNSAT Recirc valves closed. Valves, 2CV0662 and 2CV-0663, Step are checked closed by observing 16.C Examiners Cue: valve position indication on valve Both Condensate Pump stem. Indicator should be down Recirc Valves indicate closed. and in contact with switch for both valves.

OR By Contacting the Control Room TRANSITION NOTE:

Go to elevation 330 Turbine Building, west side walkway to check valve position locally.

5. Verify both Main Feedwater Both Main Feed water Pump N/A SAT UNSAT Pump Recirc valves closed. Recirc Valves, 2CV-0741 and Step 2CV-0749, are checked closed by 16.D Examiners Cue: checking valve position locally.

Both Main Feedwater Pump OR Recirc Valves indicate closed.

By Contacting the Control Room Transition Note Go to elevation 330 Turbine Building, near southwest stairwell and west of the Condensate Pumps in the Turbine Building Basement to check valve position locally.

Examiners Note:

The procedure being used does not specify which valves to use to isolate the SU/BD DI Pressure Regulating Control Valve. The Candidate could close 2CS-12 (throttled isolation upstream and this one valve would isolate the DI flow OR a combination of the inlet (2CS-57) and bypass (2CS-59) OR outlet (2CS-58) and bypass (2CS-59)

6. Locally verify condensate to The SU/BD DI is verified isolated N/A SAT UNSAT SU/BD DI isolated. locally by checking the manual Step isolation valves, 2CS-57 Inlet to 16.E Examiners Cue: pressure regulator, 2PCV4505, 2CS-12 is closed (if used) or 2CS-58 Outlet from pressure regulator 2PCV4505 and 2CS-2CS-58 is closed (if used) 59, regulator bypass, by rotating handwheel(s) in CW direction 2CS-57 is closed. (if used) until resistance is felt.

2CS-59 is closed. (if used) OR Close Combined Isolation 2CS-12 by rotating handwheel in CW direction until resistance is felt.

Transition Note Go to elevation 335 Turbine Building, southwest corner to check valve position locally.

Candidate will need climb to platform for valve operation.

ANO-2-JPM-NRC-LOF01 PAGE 5 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Locally open D Condensate The D Condensate Pump N/A SAT UNSAT Pump Discharge Valve 10 turns. Discharge Valve is rotated in CW Step direction until resistance is felt 16.F Examiners Cue: and then rotated in the CCW D Condensate Pump direction until valve is 10 turns Discharge Valve is opened 10 open.

turns.

END STOP TIME:

ANO-2-JPM-NRC-LOF01 PAGE 6 of 7 JOB PERFORMANCE MEASURE EXAMINERS COPY JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

ANO-2-JPM-NRC-LOF01 PAGE 7 of 7 JOB PERFORMANCE MEASURE CANDIDATES COPY JPM INITIAL TASK CONDITIONS:

1. Equipment Out OF Service:
  • 2P-7A for Outboard Pump Bearing Replacement.
2. The plant has tripped from 100% power due to an inadvertent CSAS.
3. Busses 2A1 & 2A3 are locked out due to fire in 2A3 feeder breaker (2A309).

INITIATING CUE:

The SM/CRS directs, Prepare "D" Condensate Pump for start using OP 2202.006 Step 16 contingency actions.

ANO-2-JPM-NRC-LOF01 PAGE 8 of 7 JOB PERFORMANCE MEASURE 2A205 CONDENSATE PUMP 2P-2CB 152-205 CS

ANO-2-JPM-NRC-LOF01 PAGE 9 of 7 JOB PERFORMANCE MEASURE 2A106 CONDENSATE PUMP 2P-2C 152-106 CS

ANO-2-JPM-NRC-LOF01 PAGE 10 of 7 JOB PERFORMANCE MEASURE

ANO-2-JPM-NRC-LTOP PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE:

SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Respond to Annunciator for LTOP valve misalignment JTA#: ANO2-RO-PZR-OFFNORM-11 KA VALUE RO: 3.8 SRO: 4.1 KA

REFERENCE:

010 K4.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): OP 2203.012J EXAMINEE'S NAME: SSN:

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-LTOP PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

A loss of off site power has occurred.

A Natural Circulation Reactor Coolant System cool down is in progress.

2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

TASK STANDARD:

Placed both loop 1 and loop 2 LTOPs in service.

TASK PERFORMANCE AIDS:

OP 2203.012J, Annunciator 2K10 Corrective Action SIMULATOR SETUP:

RCS and PZR cool down in progress.

RCS pressure less than 400 psia.

Power available to LTOP Isolation valves.

RCS Thot (both 2TIS4614-1 and 2TIS4714-2) indicate < 280°F Annunciators 2K10 C4 and C5 are in alarm.

ANO-2-JPM-NRC-LTOP PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiner note: Valves may be opened in any order and either alarm window may be mitigated first.

1. Determined misalignment not Determined that the LTOPs N/A SAT UNSAT (Step directed by a procedure step. should be in service for given 2.1) conditions.

Examiners cue:

CRS reports that RCS cool down is controlled by Natural Circulation cool down AOP.

2. Determine RCS T-Hot Using PMS, SPDS or 2C04 N/A SAT UNSAT (Step temperature is less than 280°F. control board indications 2.2) determined that 2TIS-4614-1 is less than 280°F and N/Ad step to isolate LTOPs.
3. Determine RCS T-Hot Using PMS, SPDS or 2C04 N/A SAT UNSAT (Step temperature is less than 270°F. control board indications 2.3) determined that 2TIS-4614-1 is less than 270°F and implemented step.

(C) 4. Opened 2CV-4730-1, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4730-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 5. Opened 2CV-4741-1, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4741-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 6. Opened 2CV-4731-2, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4731-2 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

(C) 7. Opened 2CV-4740-2, LTOP On 2C09, took hand switch for N/A SAT UNSAT (Step isolation valve. 2CV-4741-1 to clockwise direction 2.3) and observed that Green light OFF and Red light ON.

ANO-2-JPM-NRC-LTOP PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

8. Verified Alarms 2K10-C4 and On 2K10, verified that alarm N/A SAT UNSAT (Step 2K10-C5 alarms cleared. window C4 and C5 light are in 3.1) slow flash and acknowledged alarm lights to verify that alarm windows clear.

END

ANO-2-JPM-NRC-LTOP PAGE 5 OF 6 JOB PERFORMANCE MEASURE EXAMINERS COPY:

INITIAL CONDITIONS:

  • A loss of off site power has occurred.
  • 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.

ANO-2-JPM-NRC-LTOP PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY:

INITIAL CONDITIONS:

  • A loss of off site power has occurred.
  • 2K10-C4, Loop 1 LTOP Valve Align Incorrect and 2 K10-C5, Loop 2 LTOP Valve Align Incorrect are in alarm.

INITIATING CUE:

The Control Room Supervisor directs Respond to annunciators 2K10-C4 and 2K10-C5 using OP 2203.012J.