ML083020488: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000321/2008007]]
{{Adams
| number = ML083020488
| issue date = 10/28/2008
| title = B.5.b Inspection Report 2008007 W/O Enclosure - OUO Removed
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRP/RPB2
| addressee name = Madison D
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| license number = DPR-057, NPF-005
| contact person =
| document type = Letter
| page count = 5
}}
 
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 October 28, 2008 Mr. Dennis R. Madison Vice President - Hatch Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
 
==SUBJECT:==
HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321/2008007 AND 05000366/2008007
 
==Dear Mr. Madison:==
 
On September 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Hatch Nuclear Plant. The enclosed report documents the results of the inspection, which were discussed on September 18, 2008, with Mr. John Lewis and other members of your staff.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
Based on the results of the inspection, one NRC-identified finding of very low safety significance was identified. However, because this violation was of very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Hatch.
DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC                                            2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Sincerely,
                                                /RA/
Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5
 
==Enclosure:==
Inspection Report 05000321, 05000366/2008007 w/
 
==Attachment:==
Supplemental Information cc w/encl: (See page 3)
DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED
 
_________________________                      X SUNSI REVIEW COMPLETE CWR OFFICE              RII:DRP        RII:DRP          RII:DRP        RII:DRS        RII:DRS        NRR:PSPB SIGNATURE          CWR /RA/        SMS /RA?        via email      via email      via email      via email NAME                CRapp*          SShaeffer        PNiebaum        GLaska          JMiller        DNelson DATE                  10/28/2008      10/27/2008      10/16/2008      10/15/2008      10/15/2008      10/21/2008 E-MAIL COPY?          YES        NO  YES        NO  YES        NO  YES        NO  YES        NO  YES        NO YES NO OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC                                      3 cc w/encl:                                  Laurence Bergen L. Mike Stinson                            Oglethorpe Power Corporation Vice President                              2100 East Exchange Place Fleet Operations Support                    Tucker, GA 30085-1349 Southern Nuclear Operating Company, Inc. Dr. Carol Couch P.O. Box 1295                              Director Birmingham, AL 35201-1295                  Environmental Protection Department of Natural Resources Moanica Caston                              2 Martin Luther King Drive, S.E.
Vice President and General Counsel          Suite 1152 East Tower Southern Nuclear Operating Company, Inc. Atlanta, GA 30334 Bin B-022 P.O. Box 1295                              Cynthia Sanders Birmingham, AL 35201-1295                  Program Manager Radioactive Materials Program Raymond D. Baker                            Department of Natural Resources Licensing Manager                          4220 International Parkway Licensing-Hatch                            Suite 110 Southern Nuclear Operating Company, Inc. Atlanta, GA 30354 P.O. Box 1295 Birmingham, AL 35201-1295                  Chairman Appling County Commissioners cc w/Inspection Summary:                    County Courthouse Jeffrey T. Gasser                          69 Tippins Street, Suite 201 Executive Vice President                    Baxley, GA 31513 Southern Nuclear Operating Company, Inc.
P.O. Box 1295                              Mr. K. Rosanski Birmingham, AL 35201-1295                  Resident Manager Oglethorpe Power Corporation David H. Jones                              Hatch Nuclear Plant Vice President                              P.O. Box 2010 Engineering                                Baxley, GA 31515 Southern Nuclear Operating Company, Inc.
P.O. Box 1295                              Senior Engineer Birmingham, AL 35201-1295                  Power Supply Municipal Electric Authority of Georgia cc w/o encl:                                1470 Riveredge Parkway NW Arthur H. Domby, Esq.                      Atlanta, GA 30328-4684 Troutman Sanders Nations Bank Plaza                          Reece McAlister 600 Peachtree Street, NE, Suite 5200        Executive Secretary Atlanta, GA 30308-2216                      Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC                                        4 Letter to Dennis R. Madison from Scott M. Shaeffer dated October 28, 2008
 
==SUBJECT:==
HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321, 05000366/2008007 Distribution w/encl:
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC R. Martin, NRR DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED}}

Latest revision as of 20:13, 12 March 2020

B.5.b Inspection Report 2008007 W/O Enclosure - OUO Removed
ML083020488
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/28/2008
From: Scott Shaeffer
NRC/RGN-II/DRP/RPB2
To: Madison D
Southern Nuclear Operating Co
References
Download: ML083020488 (5)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 October 28, 2008 Mr. Dennis R. Madison Vice President - Hatch Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321/2008007 AND 05000366/2008007

Dear Mr. Madison:

On September 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Hatch Nuclear Plant. The enclosed report documents the results of the inspection, which were discussed on September 18, 2008, with Mr. John Lewis and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of the inspection, one NRC-identified finding of very low safety significance was identified. However, because this violation was of very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Hatch.

DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

Enclosure:

Inspection Report 05000321, 05000366/2008007 w/

Attachment:

Supplemental Information cc w/encl: (See page 3)

DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED

_________________________ X SUNSI REVIEW COMPLETE CWR OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRS NRR:PSPB SIGNATURE CWR /RA/ SMS /RA? via email via email via email via email NAME CRapp* SShaeffer PNiebaum GLaska JMiller DNelson DATE 10/28/2008 10/27/2008 10/16/2008 10/15/2008 10/15/2008 10/21/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC 3 cc w/encl: Laurence Bergen L. Mike Stinson Oglethorpe Power Corporation Vice President 2100 East Exchange Place Fleet Operations Support Tucker, GA 30085-1349 Southern Nuclear Operating Company, Inc. Dr. Carol Couch P.O. Box 1295 Director Birmingham, AL 35201-1295 Environmental Protection Department of Natural Resources Moanica Caston 2 Martin Luther King Drive, S.E.

Vice President and General Counsel Suite 1152 East Tower Southern Nuclear Operating Company, Inc. Atlanta, GA 30334 Bin B-022 P.O. Box 1295 Cynthia Sanders Birmingham, AL 35201-1295 Program Manager Radioactive Materials Program Raymond D. Baker Department of Natural Resources Licensing Manager 4220 International Parkway Licensing-Hatch Suite 110 Southern Nuclear Operating Company, Inc. Atlanta, GA 30354 P.O. Box 1295 Birmingham, AL 35201-1295 Chairman Appling County Commissioners cc w/Inspection Summary: County Courthouse Jeffrey T. Gasser 69 Tippins Street, Suite 201 Executive Vice President Baxley, GA 31513 Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Mr. K. Rosanski Birmingham, AL 35201-1295 Resident Manager Oglethorpe Power Corporation David H. Jones Hatch Nuclear Plant Vice President P.O. Box 2010 Engineering Baxley, GA 31515 Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Senior Engineer Birmingham, AL 35201-1295 Power Supply Municipal Electric Authority of Georgia cc w/o encl: 1470 Riveredge Parkway NW Arthur H. Domby, Esq. Atlanta, GA 30328-4684 Troutman Sanders Nations Bank Plaza Reece McAlister 600 Peachtree Street, NE, Suite 5200 Executive Secretary Atlanta, GA 30308-2216 Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC 4 Letter to Dennis R. Madison from Scott M. Shaeffer dated October 28, 2008

SUBJECT:

HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321, 05000366/2008007 Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC R. Martin, NRR DOCUMENT TRANSMITTED HEREWITH CONTAINS OFFICIAL USE ONLY - SECURITY RELATED INFORMATION. WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED