IR 05000321/2008007

From kanterella
Jump to navigation Jump to search

Download: ML083020488

Text

DOCUMENT TRANSMITTED HEREWITH CONTAINS . WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED October 28, 2008 Mr. Dennis Vice President - Hatch Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321/2008007 AND 05000366/2008007

Dear Mr. Madison:

On September 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Hatch Nuclear Plant. The enclosed report documents the results of the inspection, which were discussed on September 18, 2008, with Mr. John Lewis and other members of your staff. The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Based on the results of the inspection, one NRC-identified finding of very low safety significance was identified. However, because this violation was of very low safety significance and because it was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Hatch. SNC 2 DOCUMENT TRANSMITTED HEREWITH CONTAINS . WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

Enclosure:

Inspection Report 05000321, 05000366/2008007

w/Attachment:

Supplemental Information cc w/encl: (See page 3) SNC 2 DOCUMENT TRANSMITTED HEREWITH CONTAINS . WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5

Enclosure:

Inspection Report 05000321, 05000366/2008007

w/Attachment:

Supplemental Information cc w/encl: (See page 3)

G PUBLICLY AVAILABLE X NON-PUBLICLY AVAILABLE X SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________ X SUNSI REVIEW COMPLETE CWR OFFICE RII:DRP RII:DRP RII:DRP RII:DRS RII:DRS NRR:PSPB SIGNATURE CWR /RA/ SMS /RA? via email via email via email via email NAME CRapp* SShaeffer PNiebaum GLaska JMiller DNelson DATE 10/28/2008 10/27/2008 10/16/2008 10/15/2008 10/15/2008 10/21/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: S:\DRP\RPB7\B.5.B\HATCH\HATCH B5B 2008007 W-O ENCL.DOC *Administrative processing only. No technical review. SNC 3 DOCUMENT TRANSMITTED HEREWITH CONTAINS . WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED cc w/encl: L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Bin B-022 P.O. Box 1295 Birmingham, AL 35201-1295 Raymond D. Baker Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 cc w/Inspection Summary: Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL 35201-1295 cc w/o encl: Arthur H. Domby, Esq. Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE, Suite 5200 Atlanta, GA 30308-2216 Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place Tucker, GA 30085-1349 Dr. Carol Couch Director Environmental Protection Department of Natural Resources 2 Martin Luther King Drive, S.E.

Suite 1152 East Tower Atlanta, GA 30334 Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources 4220 International Parkway Suite 110 Atlanta, GA 30354 Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Hatch Nuclear Plant P.O. Box 2010 Baxley, GA 31515 Senior Engineer Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway NW Atlanta, GA 30328-4684 Reece McAlister Executive Secretary Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 SNC 4 DOCUMENT TRANSMITTED HEREWITH CONTAINS . WHEN SEPARATED FROM ENCLOSURE, THIS DOCUMENT IS DECONTROLLED Letter to Dennis from Scott M. Shaeffer dated October 28, 2008

SUBJECT: HATCH NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000321, 05000366/2008007 Distribution w/encl: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC R. Martin, NRR