ML091030679: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091030679
| number = ML091030679
| issue date = 03/27/2009
| issue date = 03/27/2009
| title = Fort Calhoun-2009-03-Final Written Exam - Site-Specific RO and SRO Written Examinations
| title = 2009-03-Final Written Exam - Site-Specific RO and SRO Written Examinations
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-401, Page 30 of 33 ES-401 Site-Specific RO Written Examination Form ES-401-7 lCover Sheet U.S. Nuclear Regulatory Commission Site-Specific RO Written Examination lApplicant Information Name:Date:Facility/Unit:
{{#Wiki_filter:l ES-401                       Site-Specific RO Written Examination                       Form ES-401-7 Cover Sheet U.S. Nuclear Regulatory Commission l                            Site-Specific RO Written Examination Applicant Information Name:
Region:I       II       III       IV lReactor Type: W     CE        BW    GE llStart Time:
Date: 03/27/2009                                    Facility/Unit:   Fort Calhoun l  Region:           I   II     III   IV X            Reactor Type: W           CE X BW       GE l
Finish Time:
Start Time:                                         Finish Time:
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade lof at least 80.00 percent. Examination papers w ill be collected 6 hours after the examination begins.
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours after the examination begins.
Applicant CertificationAll work done on this examination is my own. I have neither given nor received aid.
Applicant Certification All work done on this examination is my own. I have neither given nor received aid.
______________________________________
Applicants Signature Results Examination Value                                                                 __________ Points Applicants Score                                                                __________ Points Applicants Grade                                                                __________ Percent ES-401, Page 30 of 33
Applicant's Signature ResultsExamination Value __________   Points Applicant's Score__________  Points Applicant's Grade__________ Percent  


2009 FORT CALHOUN RO EXAM (1)A reactor trip has just occurred and the St andard Post Trip Actions are being performed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.
2009 FORT CALHOUN RO EXAM (1)
Which of the following par ameters requires you to take contingency actions?
A reactor trip has just occurred and the Standard Post Trip Actions are being performed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.
All trippable control element assemblies are fully insert ed except for B-15. All non-trippable control element assemblies are fully withdrawn.
Which of the following parameters requires you to take contingency actions?
Instrument air pressure is 85 psig and stable.
A. All trippable control element assemblies are fully inserted except for B-15. All non-trippable control element assemblies are fully withdrawn.
Both steam generator wide rang e levels are 85% and stable.
B. Instrument air pressure is 85 psig and stable.
Pressurizer pressure is 2060 psia and increasing.
C. Both steam generator wide range levels are 85% and stable.
A.B.C.D.page 1 2009 FORT CALHOUN RO EXAM (2)Given the following plant conditions:A loss of load event resulted in a high pressure reactor tripBoth of the Power-Operated Relief Valves (PORVs) openedOne of the PORVs failed to close when pressurizer pressure lowered below it's               setpoint Power was not available to t he open PORV's block valve during performance of Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was enteredPower has now been restored to the open PORV's block valve The PORV block valve associated with the open PORV should NOT be closed if:
D. Pressurizer pressure is 2060 psia and increasing.
Pressurizer level is at 100%.
page 1
Pressurizer pressure is 2010 psia.
 
Reactor vessel level is 83%.
2009 FORT CALHOUN RO EXAM (2)
RCS subcooling is 0°F.
Given the following plant conditions:
A.B.C.D.page 2 2009 FORT CALHOUN RO EXAM (3)Given the following plant conditions:The plant is in hot shutdownCharging and letdown were isolat ed in response to RCS leakageIsolation of charging and letdow n terminated the RCS leakagePressurizer heaters have just lost powe r due to the low level cutoutAll Reactor Coolant Pumps are operating as designed How much time do the operators have to r eestablish charging fl ow to the RCS before the pressurizer empties assuming RCS cold leg temperature stays steady at 532°F?
A loss of load event resulted in a high pressure reactor trip Both of the Power-Operated Relief Valves (PORVs) opened One of the PORVs failed to close when pressurizer pressure lowered below it's setpoint Power was not available to the open PORV's block valve during performance of Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was entered Power has now been restored to the open PORV's block valve The PORV block valve associated with the open PORV should NOT be closed if:
3.5 - 4.5 hours 5.0 - 6.0 hours 6.5 - 7.5 hours 8.0 - 9.0 hours A.B.C.D.page 3 2009 FORT CALHOUN RO EXAM (4)The following plant conditions exist during a RCS heatup:
A. Pressurizer level is at 100%.
B. Pressurizer pressure is 2010 psia.
C. Reactor vessel level is 83%.
D. RCS subcooling is 0°F.
page 2
 
2009 FORT CALHOUN RO EXAM (3)
Given the following plant conditions:
The plant is in hot shutdown Charging and letdown were isolated in response to RCS leakage Isolation of charging and letdown terminated the RCS leakage Pressurizer heaters have just lost power due to the low level cutout All Reactor Coolant Pumps are operating as designed How much time do the operators have to reestablish charging flow to the RCS before the pressurizer empties assuming RCS cold leg temperature stays steady at 532°F?
A. 3.5 - 4.5 hours B. 5.0 - 6.0 hours C. 6.5 - 7.5 hours D. 8.0 - 9.0 hours page 3
 
2009 FORT CALHOUN RO EXAM (4)
The following plant conditions exist during a RCS heatup:
T-cold is 410°F.
T-cold is 410°F.
T-hot is 411°F.
T-hot is 411°F.
Core Exit Thermocouples ar e reading between 410°F and 415°F.
Core Exit Thermocouples are reading between 410°F and 415°F.
Pressurizer pressure indicates 955 psia.
Pressurizer pressure indicates 955 psia.
No operations are in effect that could cause a RCS dilution.
No operations are in effect that could cause a RCS dilution.
Which one of the following R eactor Coolant Pump operatin g conditions is NOT allowed by the requirements of T.S. 2.1.1?
Which one of the following Reactor Coolant Pump operating conditions is NOT allowed by the requirements of T.S. 2.1.1?
RC-3A and RC-3C are operable, but not o perating. RC-3B and RC-3D are not operable. RC-3A has been s hutdown for 35 minutes.
A. RC-3A and RC-3C are operable, but not operating. RC-3B and RC-3D are not operable. RC-3A has been shutdown for 35 minutes.
RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.
B. RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.
RC-3B and RC-3D are operable, but not o perating. RC-3A and RC-3C are not operable. RC-3D has been s hutdown for 35 minutes.
C. RC-3B and RC-3D are operable, but not operating. RC-3A and RC-3C are not operable. RC-3D has been shutdown for 35 minutes.
RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B are not operable. RC-3D has been shutdown for 75 minutes.
D. RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B are not operable. RC-3D has been shutdown for 75 minutes.
A.B.C.D.page 4 2009 FORT CALHOUN RO EXAM (5)Given the following plant conditions:
page 4
RCS temperature is 105°F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1 , SHUTDOWN COOLING                    INITIATION


LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designed What action (if any) should you perform after the Emergen cy Diesel Generators start and their output breakers close?
2009 FORT CALHOUN RO EXAM (5)
Manually restart the LPSI pumps.Un-isolate the LPSI system from the RCS and restart the LPSI pumps.
Given the following plant conditions:
No action is necessary; the Emergency Diesel Generators will pick up the LPSI pumps as dead bus loads.
RCS temperature is 105°F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1, SHUTDOWN COOLING INITIATION LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designed What action (if any) should you perform after the Emergency Diesel Generators start and their output breakers close?
A. Manually restart the LPSI pumps.
B. Un-isolate the LPSI system from the RCS and restart the LPSI pumps.
C. No action is necessary; the Emergency Diesel Generators will pick up the LPSI pumps as dead bus loads.
D. No action is necessary; the sequencers will restart LPSI pumps within one minute of the breaker closing.
page 5


No action is necessary; the sequencers w ill restart LPSI pump s within one minute of the breaker closing.
2009 FORT CALHOUN RO EXAM (6)
A.B.C.D.page 5 2009 FORT CALHOUN RO EXAM (6)The following plant conditions exist:
The following plant conditions exist:
The plant was operating at 65% power with all systems are aligned for normal operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from       the operating CCW pump, AC-3A  
The plant was operating at 65% power with all systems are aligned for normal operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from the operating CCW pump, AC-3A You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank level is 8 inches and lowering The reactor was manually tripped two minutes after the AUXILIARY COOLANT FROM CRDM FLOW LO alarm was received What action should be performed in addition to Standard Post Trip Actions in accordance with AOP-11?
A. Trip one RCP in each loop within 3 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.
B. Trip one RCP in each loop within 5 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.
C. Shutdown all RCP's within 3 minutes.
D. Shutdown all RCP's within 5 minutes.
page 6


You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank leve l is 8 inches and lowering The reactor wa s manually tripped two minutes after the AUXILIARY COOLANT FROM CRDM FLOW LO alarm was received What action should be performe d in addition to Standar d Post Trip Actions in accordance with AOP-11?
2009 FORT CALHOUN RO EXAM (7)
Trip one RCP in each loop within 3 minutes. Tr ip the remaining RCPs if high bearing temperature alarms are received.
Given the following sequence of events:
Trip one RCP in each loop within 5 minutes. Tr ip the remaining RCPs if high bearing temperature alarms are received.
The plant was operating at full power Pressurizer level channel "Y" was selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%
Shutdown all RCP's within 3 minutes.
Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.
The Operator then took manual control of charging and letdown and restored level to 60%
The operator then selected channel "X" as the controlling channel Pressurizer pressure control remained in automatic Current plant conditions are:
Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia Pressurizer steam temperature indicates 632°F Pressurizer liquid temperature indicates 620°F How will pressurizer pressure respond?
A. Pressurizer pressure will steadily increase to 2100 psia.
B. Pressurizer pressure will remain at approximately1950 psia until the Level Control Bistables, LC-101-1 and LC-101-2, located behind CB-1/2/3 are reset.
C. Pressurizer pressure will remain at approximately1950 psia until Channel "X" is selected on PZR Heater Cutout Channel Select Switch, HC-101-1.
D. Pressurizer pressure will remain at approximately1950 psia until the water in the pressurizer reaches saturation temperature.
page 7


Shutdown all RCP's within 5 minutes.
2009 FORT CALHOUN RO EXAM (8)
A.B.C.D.page 6 2009 FORT CALHOUN RO EXAM (7)Given the following sequence of events:
The plant experiences an ATWS event where both the reactor and turbine failed to trip.
The plant was oper ating at full power Pressurizer level channel "Y" wa s selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%
What action does EOP-00 direct you to perform to limit reactor power?
Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.
A. Trip all Reactor Coolant Pumps.
The Operator then took manual control of charging and letdown and restored level          to 60%   
B. Transfer charging pump suction to the SIRWT.
C. Insert the non-trippable CEAs.
D. Close the MSIVs.
page 8


The operator then selected cha nnel "X" as the controlling channel Pressurizer pressure control remained in automatic Current plant conditions are:
2009 FORT CALHOUN RO EXAM (9)
Given the following plant conditions:
The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressure is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steady Which one of the following actions will occur automatically with these plant conditions?
A. Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow will continue from RC-2A.
B. Blowdown flow from both Steam Generators will be isolated.
C. RCV-978, 6th Stage Extraction Isolation Valve, will close.
D. A Ventilation Isolation Actuation Signal (VIAS) will be generated page 9


Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia
2009 FORT CALHOUN RO EXAM (10)
Given the following plant conditions:
A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Generator, RC-2B, has ruptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVERY PROCEDURE, has been entered In mitigating this event, which steam generator(s), if any, should be isolated?
A. Neither Steam Generator should be isolated.
B. Only RC-2A should be isolated.
C. Only RC-2B should be isolated.
D. Both steam generators should be isolated.
page 10


Pressurizer steam tem perature indicates 632°F Pressurizer liquid temperature indicates 620°F How will pressurizer pressure respond?
2009 FORT CALHOUN RO EXAM (11)
Pressurizer pressure will stea dily increase to 2100 psia. Pressurizer pressure will re main at approximately1950 ps ia until the Level Control Bistables, LC-101-1 and LC-101-2, lo cated behind CB-1/2/3 are reset.
A break on the feedwater line to Steam Generator, RC-2B, inside containment has occurred.
Pressurizer pressure will re main at approximately1950 psia until Ch annel "X"  is selected on PZR Heater Cutout Channel Select Switch, HC-101-1.
The following plant conditions exist:
Pressurizer pressure will re main at approximately1950 ps ia until the water in thepressurizer reaches sa turation temperature.
SGIS has actuated Heat removal has been established using Steam Generator, RC-2A.
A.B.C.D.page 7 2009 FORT CALHOUN RO EXAM (8)The plant experiences an ATWS event where both the reactor and turbine failed to trip.
AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available AFW pump.
What action does EOP-00 direct you to perform to limit reactor power?
Steam Generator, RC-2B, has dried out.
Trip all Reactor Coolant Pumps.
No Reactor Coolant Pumps are running.
Transfer charging pump suction to the SIRWT.
In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of the following actions should be taken and for what reason?
Insert the non-trippable CEAs.Close the MSIVs.
A. AFW flow should be established to RC-2B to help promote natural circulation flow in both RCS loops.
A.B.C.D.page 8 2009 FORT CALHOUN RO EXAM (9)Given the following plant conditions:
B. AFW flow should be established to RC-2B to increase decay heat removal.
The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressu re is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steady Which one of the following actions will occur automatically with thes e plant conditions?
C. AFW flow should NOT be established to RC-2B because it would result in a positive reactivity addition.
Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow will continue from RC-2A. Blowdown flow from both St eam Generators will be isolated.
D. AFW flow should NOT be established to RC-2B because FW-6 does not have the capacity to feed both S/Gs simultaneously.
RCV-978, 6th Stage Extraction Isolation Valve, will close.
page 11
A Ventilation Isolation Actuation Signal (VIAS) will be generated A.B.C.D.page 9 2009 FORT CALHOUN RO EXAM (10)Given the following plant conditions:
A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Gener ator, RC-2B, has r uptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVER Y PROCEDURE, has been entered In mitigating this event, which steam generator(s), if any, should be isolated?
Neither Steam Generat or should be isolated.
Only RC-2A should be isolated.
Only RC-2B should be isolated.
Both steam generators should be isolated.
A.B.C.D.page 10 2009 FORT CALHOUN RO EXAM (11)A break on the feedwa ter line to Steam Generator, RC-2B, inside containment has occurred. The following plan t conditions exist:
SGIS has actuated Heat removal has be en established using Steam Generator, RC-2A.
AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available             AFW pump.
Steam Generator, RC
-2B, has dried out.
No Reactor Coolant Pumps are running.In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of the following actions should be taken and for what reason?
AFW flow should be established to RC-2B to help promote natural circulation flow in both RCS loops.
AFW flow should be established to RC
-2B to increase decay heat removal.
AFW flow should NOT be est ablished to RC-2B because it would result in a positive reactivity addition.


AFW flow should NOT be established to RC-2B because FW-6 does not have the capacity to feed both S/Gs simultaneously.
2009 FORT CALHOUN RO EXAM (12)
A.B.C.D.page 11 2009 FORT CALHOUN RO EXAM (12)The following plant conditions exist:
The following plant conditions exist:
A loss of 161 KV to the pl ant resulted in fast transfe r of vital buses 1A3 and 1A4 to       345 KV This was followed by a loss of load that re sulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station                   blackout
A loss of 161 KV to the plant resulted in fast transfer of vital buses 1A3 and 1A4 to 345 KV This was followed by a loss of load that resulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station blackout Breakers 1A11, 1A13, 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energized Which one of the following actions must be taken to allow disconnect, DS-T1, to be opened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?
A. Breakers 1A13 and 1A24 must be closed.
B. The generator field breaker must be opened.
C. The Kirk key Interlock must be disengaged.
D. An isolated phase bus duct cooling unit must be started.
page 12


Breakers 1A11, 1A13 , 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned
2009 FORT CALHOUN RO EXAM (13)
The plant tripped from 100% power following a loss of all offsite power. The following conditions exist:
RCS pressure is 2000 psia.
Pressurizer level is 40%.
Steam Generator Pressures are 900 psia.
Steam Generator Wide Range levels are 40%.
Hot leg temperatures are 575F.
Cold leg temperatures are 532F.
Which of the following actions would be most effective in enhancing natural circulation?
A. Raise RCS pressure.
B. Raise Pressurizer level.
C. Raise Steam Generator pressures.
D. Raise Steam Generator levels.
page 13


he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energized Which one of the following actions must be taken to allow disc onnect, DS-T1, to be opened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?
2009 FORT CALHOUN RO EXAM (14)
Breakers 1A13 and 1A24 must be closed.
Given the following plant conditions:
The generator field breaker must be opened.
The plant was operating at full power Power was lost to Instrument bus AI-40A AOP-16, LOSS OF INSTRUMENT BUS POWER, was entered AOP-16, Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closing BOTH of the PORV (Power-Operated Relief Valves) Block Valves" What is the purpose of this step?
The Kirk key Interlock must be disengaged.
A. An additional vital instrument bus failure will result in opening ONE of the PORVs.
An isolated phase bus duct coo ling unit must be started.
B. An additional vital instrument bus failure will result in opening BOTH of the PORVs.
A.B.C.D.page 12 2009 FORT CALHOUN RO EXAM (13)The plant tripped from 100% power following a loss of all offsite power. The following conditions exist:RCS pressure is 2000 psia.Pressurizer level is 40%.Steam Generator Pressures are 900 psia.Steam Generator Wide Range levels are 40%.Hot leg temperatures are 575 F.Cold leg temperatures are 532 F.Which of the following actions would be most effective in enhancing natural circulation?Raise RCS pressure.
C. An additional vital instrument bus failure will result in the inability to close ONE of the PORV Block Valves.
Raise Pressurizer level.
D. An additional vital instrument bus failure will result in the inability to close BOTH of the PORV Block Valves.
Raise Steam Generator pressures.
page 14
Raise Steam Generator levels.
A.B.C.D.page 13 2009 FORT CALHOUN RO EXAM (14)Given the following plant conditions:The plant was operating at full powerPower was lost to Instrument bus AI-40AAOP-16, LOSS OF INSTRUMENT BUS POWER, was enteredAOP-16, Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closing BOTH of the PORV (P ower-Operated Relief Valves) Block Valves" What is the purpose of this step?
An additional vital instrum ent bus failure will result in opening ONE of the PORVs.
An additional vital instrument bus failure will result in opening BOTH of the PORVs.
An additional vital instrument bus failure will result in the inability to close ONE of


the PORV Block Valves.
2009 FORT CALHOUN RO EXAM (15)
An additional vital instrument bus failure will result in the inability to close BOTH of the PORV Block Valves.
The following plant indications were noted following a reactor trip.
A.B.C.D.page 14 2009 FORT CALHOUN RO EXAM (15)The following plant indications were noted following a reactor trip.
Bus Power Failure DC Distribution Panel 1 Light is off.
Bus Power Failure DC Distribution Panel 1 Light is off.
Bus Power Failure DC Distri bution Panel 2 Light is on.
Bus Power Failure DC Distribution Panel 2 Light is on.
The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.
The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.
All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.
All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.
FW-6 can NOT be star ted from CB-10,11.
FW-6 can NOT be started from CB-10,11.
In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of the following actions is required to be able to start FW-6?
In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of the following actions is required to be able to start FW-6?
Place the 43/FW Switch in the AUTO position.
A. Place the 43/FW Switch in the AUTO position.
Start FW-6 from AI-66A a fter placing the NORMAL/OVERRIDE switches on AI-66Ato OVERRIDE.
B. Start FW-6 from AI-66A after placing the NORMAL/OVERRIDE switches on AI-66A to OVERRIDE.
Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to theemergency DC source.
C. Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to the emergency DC source.
D. Start FW-6 from the Alternate Shutdown Panel, AI-179.
page 15


Start FW-6 from the Altern ate Shutdown Panel, AI-179.
2009 FORT CALHOUN RO EXAM (16)
A.B.C.D.page 15 2009 FORT CALHOUN RO EXAM (16)One of the two 20 inch unde rground Raw Water headers from the intake structure to the auxiliary building completely ruptured.
One of the two 20 inch underground Raw Water headers from the intake structure to the auxiliary building completely ruptured.
How does isolating the ruptur ed header affect the ability to provide cooling to the RW/CCW heat exchangers?
How does isolating the ruptured header affect the ability to provide cooling to the RW/CCW heat exchangers?
Raw Water can be supplied to all of the RW/CCW heat exchangers but only two ofthe Raw Water Pumps can be used.
A. Raw Water can be supplied to all of the RW/CCW heat exchangers but only two of the Raw Water Pumps can be used.
Raw Water can only be supplied to two of the RW/CCW heat exchangers and only two of the Raw Water Pumps can be used.
B. Raw Water can only be supplied to two of the RW/CCW heat exchangers and only two of the Raw Water Pumps can be used.
C. Raw Water can be supplied to all of the RW/CCW heat exchangers but only three of the Raw Water Pumps can be used.
D. Raw Water can only be supplied to three of the RW/CCW heat exchangers and only three of the Raw Water Pumps can be used.
page 16


Raw Water can be supplied to all of the RW/CCW heat exchanger s but only three ofthe Raw Water Pumps can be used.
2009 FORT CALHOUN RO EXAM (17)
The reactor has been manually tripped following a sudden loss of instrument air pressure.
According to AOP-17, Loss of Instrument Air, which of the following actions should be taken to prevent RCS cooldown?
A. Close FCV-1101 and FCV-1102 using DCS.
B. Maximize S/G blowdown flow.
C. Initiate a Steam Generator Isolation Signal (SGIS).
D. Manually trip all Main Feedwater Pumps.
page 17


Raw Water can only be suppli ed to three of the RW/CCW heat exchangers and only three of the Raw Water Pumps can be used.
2009 FORT CALHOUN RO EXAM (18)
A.B.C.D.page 16 2009 FORT CALHOUN RO EXAM (17)The reactor has been manually tripped followi ng a sudden loss of instrument airpressure.
Given the following plant conditions:
According to AOP-17, Loss of Instrument Air, which of t he following actions should be taken to prevent RCS cooldown?
The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator water cooling have been unsuccessful Stator cooling water outlet temperature has risen to 83°C What action is required by AOP-27, GENERATOR MALFUNCTIONS?
Close FCV-1101 and FCV-1102 using DCS.
A. Manually trip the reactor.
Maximize S/G blowdown flow.
B. Manually trip the turbine.
Initiate a Steam Generator Isolation Signal (SGIS).Manually trip all Main Feedwater Pumps.
C. Manually trip the main generator output breakers.
A.B.C.D.page 17 2009 FORT CALHOUN RO EXAM (18)Given the following plant conditions:
D. Manually open the main generator field breaker.
The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator wa ter cooling have been unsuccessful Stator cooling water outlet te mperature has risen to 83°C What action is required by AOP-27, GENERATOR MALFUNCTIONS?
page 18
Manually trip the reactor.
 
Manually trip the turbine.
2009 FORT CALHOUN RO EXAM (19)
Manually trip the main generator output breakers.
Given the following plant conditions:
Manually open the main generator field breaker.
A reactor startup is being performed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode.
A.B.C.D.page 18 2009 FORT CALHOUN RO EXAM (19)Given the following plant conditions:
A reactor startup is being perfo rmed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode.
When will a SCEAPIS (DCS) rod block signal be generated?
When will a SCEAPIS (DCS) rod block signal be generated?
When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.
A. When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.
When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.
B. When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.
When any CEA in group 1 re aches the upper rod stop.
C. When any CEA in group 1 reaches the upper rod stop.
When any CEA in group 3 begins to withdraw.
D. When any CEA in group 3 begins to withdraw.
A.B.C.D.page 19 2009 FORT CALHOUN RO EXAM (20)Given the following plant conditions:
page 19
A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL                  POWER OPERATION


The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn.
2009 FORT CALHOUN RO EXAM (20)
Using the attached PDIL curve, determine w hat action must be taken as a result of these conditions?
Given the following plant conditions:
Immediately commenc e emergency boration.
A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL POWER OPERATION The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn.
Withdraw group 4 CEAs to above the short term in sertion limit.
Using the attached PDIL curve, determine what action must be taken as a result of these conditions?
Withdraw group 4 CEAs until proper group overlap is achieved.
A. Immediately commence emergency boration.
Place the plant in ho t shutdown within 6 hours.
B. Withdraw group 4 CEAs to above the short term insertion limit.
A.B.C.D.page 20 2009 FORT CALHOUN RO EXAM (21)Given the following:
C. Withdraw group 4 CEAs until proper group overlap is achieved.
The AI-149 FIRE DETECTION ALARM OR TROUBLE ala rm was received The Control Room Fire Detection Co mputer, PC-66, indicates that multiple detectors in the Cable Spread Room are in alarm The EONT was dispatched and reports that Halon is being discharged into the Cable Spread Room In accordance with AOP-06, FIRE EMERGENCY, what action should be taken by the Control Room Operators?
D. Place the plant in hot shutdown within 6 hours.
Trip the reactor, open clutch power supp ly breakers, close the PORV block valves and evacuate the Control Room.
page 20
Trip the reactor, close t he PORV block valves, start both Fire pumps, FP-1A and FP-1B, and evacuate the Control Room.


Trip the reactor, open clutch power supp ly breakers, close the PORV block valves and place the Control Room HV AC in Recirculation Mode.
2009 FORT CALHOUN RO EXAM (21)
Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and place the Control Room HVAC in Recirculation Mode.
Given the following:
A.B.C.D.page 21 2009 FORT CALHOUN RO EXAM (22)The following power indications are obse rved 10 minutes after a reactor trip:
The AI-149 FIRE DETECTION ALARM OR TROUBLE alarm was received The Control Room Fire Detection Computer, PC-66, indicates that multiple detectors in the Cable Spread Room are in alarm The EONT was dispatched and reports that Halon is being discharged into the Cable Spread Room In accordance with AOP-06, FIRE EMERGENCY, what action should be taken by the Control Room Operators?
All four WR NI Channels are indicating 3 x 10
A. Trip the reactor, open clutch power supply breakers, close the PORV block valves and evacuate the Control Room.
-3% Power and lowering.All four WR NI Channels are indicating a startup rate of  
B. Trip the reactor, close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and evacuate the Control Room.
-0.1 DPM and steady.
C. Trip the reactor, open clutch power supply breakers, close the PORV block valves and place the Control Room HVAC in Recirculation Mode.
D. Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and place the Control Room HVAC in Recirculation Mode.
page 21
 
2009 FORT CALHOUN RO EXAM (22)
The following power indications are observed 10 minutes after a reactor trip:
All four WR NI Channels are indicating 3 x 10-3% Power and lowering.
All four WR NI Channels are indicating a startup rate of -0.1 DPM and steady.
All four Power Range NI Channels are indicating 0% power and steady.
All four Power Range NI Channels are indicating 0% power and steady.
All four Delta-T Power Channels are indicating 2% power and lowering.
All four Delta-T Power Channels are indicating 2% power and lowering.
A miscalibration of which of the fo llowing could cause these indications?
A miscalibration of which of the following could cause these indications?
Wide Range NI power indication channels.
Assume trip from full power.
Wide Range NI startup rate channels.
A. Wide Range NI power indication channels.
Power Range NI channels.
B. Wide Range NI startup rate channels.
Delta-T Power Channels.
C. Power Range NI channels.
A.B.C.D.page 22 2009 FORT CALHOUN RO EXAM (23)Radioactive liquid t hat leaks inside containment will co llect in the containment sump.
D. Delta-T Power Channels.
page 22
 
2009 FORT CALHOUN RO EXAM (23)
Radioactive liquid that leaks inside containment will collect in the containment sump.
The containment sump pumps will normally pump this radioactive water to the:
The containment sump pumps will normally pump this radioactive water to the:
Reactor Coolant Drain Tank.Waste Holdup Tanks.
A. Reactor Coolant Drain Tank.
Waste Monitor Tanks.
B. Waste Holdup Tanks.
Spent Regenerant Tanks.
C. Waste Monitor Tanks.
A.B.C.D.page 23 2009 FORT CALHOUN RO EXAM (24)The radioactive gases released following a waste gas decay tank rupture will consist mostly of isotopes of:
D. Spent Regenerant Tanks.
Xenon and Krypton.
page 23
Iodine and Cesium.
Tritium and Carbon.
Argon and Neon.
A.B.C.D.page 24 2009 FORT CALHOUN RO EXAM (25)Given the following sequence of events:Condenser vacuum was lostThe turbine and reactor trippedImmediately following the trip, a sm all LOCA occurred inside containmentPPLS and CPHS have actuated  All HPSI pumps failed to startRCS pressure is steady at 1000 psiaReactor Vessel Level is at 43%
Which of the following valves can be us ed by the Balance of Plant Operator to immediately begin a RCS cooldown in acco rdance with EOP-03?
Steam Dump Valves , TCV-909-1,2,3,4.
Steam Bypass Valve, PCV-910.
Atmospheric Dump Valve, HCV-1040.
Air Assisted Main Steam Safe ty Valves, MS-291, MS-292.
A.B.C.D.page 25 2009 FORT CALHOUN RO EXAM (26)FC-214, REACTOR COOLANT DAILY SUMM ARY REPORT, contains the following information:Fuel Reliability Indicator (FRI): 1.1 x 10-4  uCi/gmDose Equivalent Iodine: 0.8 uCi/gmXe-133 Activity: 2.8 uCi/gmRCS Total Activity: 5.5 uCi/gmE-bar: 0.68 Mev Which one of the following actions is required?AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel ReliabilityIndicator. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 Activity AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to Dose Equivalent Iodine.


AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due tothe RCS Total Activity.
2009 FORT CALHOUN RO EXAM (24)
A.B.C.D.page 26 2009 FORT CALHOUN RO EXAM (27)The "REACTOR VESSEL FLANGE LEAK" ala rm was received due to leakage past the Reactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.
The radioactive gases released following a waste gas decay tank rupture will consist mostly of isotopes of:
A. Xenon and Krypton.
B. Iodine and Cesium.
C. Tritium and Carbon.
D. Argon and Neon.
page 24
 
2009 FORT CALHOUN RO EXAM (25)
Given the following sequence of events:
Condenser vacuum was lost The turbine and reactor tripped Immediately following the trip, a small LOCA occurred inside containment PPLS and CPHS have actuated All HPSI pumps failed to start RCS pressure is steady at 1000 psia Reactor Vessel Level is at 43%
Which of the following valves can be used by the Balance of Plant Operator to immediately begin a RCS cooldown in accordance with EOP-03?
A. Steam Dump Valves, TCV-909-1,2,3,4.
B. Steam Bypass Valve, PCV-910.
C. Atmospheric Dump Valve, HCV-1040.
D. Air Assisted Main Steam Safety Valves, MS-291, MS-292.
page 25
 
2009 FORT CALHOUN RO EXAM (26)
FC-214, REACTOR COOLANT DAILY
 
==SUMMARY==
REPORT, contains the following information:
Fuel Reliability Indicator (FRI): 1.1 x 10-4 uCi/gm Dose Equivalent Iodine: 0.8 uCi/gm Xe-133 Activity: 2.8 uCi/gm RCS Total Activity: 5.5 uCi/gm E-bar: 0.68 Mev Which one of the following actions is required?
A. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel Reliability Indicator.
B. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 Activity C. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to Dose Equivalent Iodine.
D. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to the RCS Total Activity.
page 26
 
2009 FORT CALHOUN RO EXAM (27)
The "REACTOR VESSEL FLANGE LEAK" alarm was received due to leakage past the Reactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.
What one of the following parameters would cause an alarm if leakage occurs past the outer O-Ring?
What one of the following parameters would cause an alarm if leakage occurs past the outer O-Ring?
Increasing pressure.
A. Increasing pressure.
Increasing temperature.Decreasing pressure.
B. Increasing temperature.
Decreasing temperature.
C. Decreasing pressure.
A.B.C.D.page 27 2009 FORT CALHOUN RO EXAM (28)Given the following:You have been directed to s hutdown Reactor Coolant Pump, RC-3A in accordance with OI-RC-9 You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START"       position and that th e Oil Lift Pump is not operating Which one of the following actions, if any, is required to ensure proper lubrication of the RCP bearings?
D. Decreasing temperature.
Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.
page 27
If the Oil Lift Pump does not start automatically after tripping RC-3A, then momentarily place the Oil Lift Pump Control Switch in the "STOP" position then back to the "START" position to reset it. If the Oil Lift Pump does not start automatica lly after tripping RC
 
-3A, then hold theOil Lift Pump Control switch in the "START" position until the "ZERO SPEED" lightcomes on.No action is required. T he Oil Lift Pump is only needed when starting a Reactor Coolant Pump.
2009 FORT CALHOUN RO EXAM (28)
A.B.C.D.page 28 2009 FORT CALHOUN RO EXAM (29)Given the following plant conditions:Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been discovered The leaking PORV has been isolated by closing its block valve, HCV-151   HCV-151 also leaks throughVCT makeup is in its normal alignmentAssuming no operator action is taken, how will the VCT level control system first respond?FCV-269, FCV-269X and FCV-26 9Y will open automat ically to supply water to the VCT at the neutral bl end boron concentration.
Given the following:
FCV-269, FCV-269X and FCV-26 9Y will open automat ically to supply water to thecharging pump suction at the neutral blend boron concentration.
You have been directed to shutdown Reactor Coolant Pump, RC-3A in accordance with OI-RC-9 You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START" position and that the Oil Lift Pump is not operating Which one of the following actions, if any, is required to ensure proper lubrication of the RCP bearings?
LCV-218-3 will open and LCV-218-2 will close aut omatically to supply water to the VCT at the SIRWT boron concentration.
A. Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.
LCV-218-3 will open and LCV-218-2 will close aut omatically to supply water to thecharging pump suction at the SIRWT boron concentration.
B. If the Oil Lift Pump does not start automatically after tripping RC-3A, then momentarily place the Oil Lift Pump Control Switch in the "STOP" position then back to the "START" position to reset it.
A.B.C.D.page 29 2009 FORT CALHOUN RO EXAM (30)A plant shutdown and cooldown are being perform ed. One hour afte r placing shutdown cooling in service, the followi ng plant indications are observed:
C. If the Oil Lift Pump does not start automatically after tripping RC-3A, then hold the Oil Lift Pump Control switch in the "START" position until the "ZERO SPEED" light comes on.
D. No action is required. The Oil Lift Pump is only needed when starting a Reactor Coolant Pump.
page 28
 
2009 FORT CALHOUN RO EXAM (29)
Given the following plant conditions:
Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been discovered The leaking PORV has been isolated by closing its block valve, HCV-151 HCV-151 also leaks through VCT makeup is in its normal alignment Assuming no operator action is taken, how will the VCT level control system first respond?
A. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the VCT at the neutral blend boron concentration.
B. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the charging pump suction at the neutral blend boron concentration.
C. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the VCT at the SIRWT boron concentration.
D. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the charging pump suction at the SIRWT boron concentration.
page 29
 
2009 FORT CALHOUN RO EXAM (30)
A plant shutdown and cooldown are being performed. One hour after placing shutdown cooling in service, the following plant indications are observed:
Pressurizer pressure and level are lowering.
Pressurizer pressure and level are lowering.
Containment sump level is steady.
Containment sump level is steady.
CCW surge tank level and pressure are increasing.
CCW surge tank level and pressure are increasing.
Steam Generator levels are steady.
Steam Generator levels are steady.
Steam Generator pressure s are lowering slowly.
Steam Generator pressures are lowering slowly.
RM-053 is in alarm.
RM-053 is in alarm.
All other process radiation monitors are reading normal.
All other process radiation monitors are reading normal.
Which one of the following could cause these indications?
Which one of the following could cause these indications?
A raw water/CCW heat exchanger tube leak A regenerative heat ex changer tube leak.
A. A raw water/CCW heat exchanger tube leak B. A regenerative heat exchanger tube leak.
A shutdown cooling heat exchanger tube leak.
C. A shutdown cooling heat exchanger tube leak.
A steam generator tube leak.
D. A steam generator tube leak.
A.B.C.D.page 30 2009 FORT CALHOUN RO EXAM (31)Given the following:EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant Accident A RCS cooldown is being conducted using shutdown cooling   The RCS cold leg temperat ures are currently 170°F.
page 30
What is the maximum allowable cool down rate under these conditions?
 
25°F/hr.50°F/hr.100°F/hr.200°F/hr.A.B.C.D.page 31 2009 FORT CALHOUN RO EXAM (32)The plant is operating at fu ll power. HPSI pump, SI-2A, has been t agged out of servicedue to a breaker problem.
2009 FORT CALHOUN RO EXAM (31)
How does this affect the oper ability of the HPSI trai n associated with SI-2A per Technical Specifications?
Given the following:
The HPSI train is considered o perable if SI-2B is operable.
EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant Accident A RCS cooldown is being conducted using shutdown cooling The RCS cold leg temperatures are currently 170°F.
The HPSI train is considered operable if SI-2C is operable.
What is the maximum allowable cooldown rate under these conditions?
One train of HPSI is ino perable, SI-2A must be made operable within 24 hours.
A. 25°F/hr.
One train of HPSI is in operable, SI-2A must be made operable within 7 days.
B. 50°F/hr.
A.B.C.D.page 32 2009 FORT CALHOUN RO EXAM (33)How is a steam bubble formed in the pr essurizer following a refueling outage per OP-2A, PLANT STARTUP?
C. 100°F/hr.
With the pressurizer leve l at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensabl e gases are allowed to dissolve in the water.With the pressurizer leve l at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensabl e gases are allowed to dissolve in the water.
D. 200°F/hr.
With the pressurizer leve l at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensabl e gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTRO L TANK, Attachment 5 or 6.
page 31
With the pressurizer leve l at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensabl e gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTRO L TANK, Attachment 5 or 6.
 
A.B.C.D.page 33 2009 FORT CALHOUN RO EXAM (34)Given the following plant conditions:
2009 FORT CALHOUN RO EXAM (32)
The plant is operating at full power. HPSI pump, SI-2A, has been tagged out of service due to a breaker problem. Normal actions have been taken.
How does this affect the operability of the HPSI train associated with SI-2A per Technical Specifications?
A. The HPSI train is considered operable if SI-2B is operable.
B. The HPSI train is considered operable if SI-2C is operable.
C. One train of HPSI is inoperable, SI-2A must be made operable within 24 hours.
D. One train of HPSI is inoperable, SI-2A must be made operable within 7 days.
page 32
 
2009 FORT CALHOUN RO EXAM (33)
How is a steam bubble formed in the pressurizer following a refueling outage per OP-2A, PLANT STARTUP?
A. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.
B. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.
C. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.
D. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.
page 33
 
2009 FORT CALHOUN RO EXAM (34)
Given the following plant conditions:
The plant is operating at 100% power.
The plant is operating at 100% power.
Pressurizer Safety Valve, RC-142, has seat leakage.
Pressurizer Safety Valve, RC-142, has seat leakage.
Line 251: Line 361:
Quench Tank pressure is 8 psig and increasing slowly.
Quench Tank pressure is 8 psig and increasing slowly.
Which one of the following automatic actions will occur assuming no operator actions are taken?
Which one of the following automatic actions will occur assuming no operator actions are taken?
Quench Tank relief valve, RC-125, will op en resulting in increasing containmentpressure.Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.
A. Quench Tank relief valve, RC-125, will open resulting in increasing containment pressure.
Quench Tank vent valve, HCV-155, will open and vent to t he containment vent header and the RCDT out let containment isolat ion valve will close.
B. Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.
Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk will rupture resulting in increas ing containment pressure.
C. Quench Tank vent valve, HCV-155, will open and vent to the containment vent header and the RCDT outlet containment isolation valve will close.
A.B.C.D.page 34 2009 FORT CALHOUN RO EXAM (35)Given the following:
D. Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk will rupture resulting in increasing containment pressure.
page 34
 
2009 FORT CALHOUN RO EXAM (35)
Given the following:
The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off.
The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off.
What action will you direct the EONA to take before st arting the first CCW pump, AC-3A?Ensure CCW Surge tank pressu re is greater than 60 psig.
What action will you direct the EONA to take before starting the first CCW pump, AC-3A?
Vent AC-3A using its casing vent valve.
A. Ensure CCW Surge tank pressure is greater than 60 psig.
Fully open the discharge valve for AC-3A.
B. Vent AC-3A using its casing vent valve.
Fully close the discharge valves for AC-3B and AC-3C.
C. Fully open the discharge valve for AC-3A.
A.B.C.D.page 35 2009 FORT CALHOUN RO EXAM (36)Given the following:
D. Fully close the discharge valves for AC-3B and AC-3C.
page 35


plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in 40 seconds ago
2009 FORT CALHOUN RO EXAM (36)
Given the following:
plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in 40 seconds ago CCW Header Pressure, PI-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are running Which one of the following conditions could cause these indications?
A. PI-499, CCW header pressure, has failed low.
B. CCW Pressure Switches, PCS-412 and PCS-413, have failed low.
C. PIC-2802, CCW Surge Tank Pressure indication, has failed low.
D. HCV-438A/B/C/D have inadvertently closed resulting in low CCW pressure to the RCPs.
page 36


CCW Header Pressure, PI
2009 FORT CALHOUN RO EXAM (37)
-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are running Which one of the following conditi ons could cause these indications?PI-499, CCW header pre ssure, has failed low.CCW Pressure Switches, PCS-412 and PCS-413, have failed low.PIC-2802, CCW Surge Tank Pressure indication, has failed low.
Given the following plant conditions:
HCV-438A/B/C/D have inadvertently closed re sulting in low CCW pressure to theRCPs.A.B.C.D.page 36 2009 FORT CALHOUN RO EXAM (37)Given the following plant conditions:
A Reactor Coolant System cooldown is in progress for a refueling outage S
A Reactor Coolant System cooldown is in progress for a refueling outage Shutdown cooling is in operation per OI-SC-1 RCS temperature is 120°F RCS pressure is 235 psia Reactor Coolant Pump s, RC-3A and RC-3B, are operating.
hutdown cooling is in operation per OI-SC-1 R
Pressure is being controlled manually us ing Main pressurizer spray and heaters.
CS temperature is 120°F R
What actions should be ta ken before shutting down Reactor Coolant Pumps, RC-3A and RC-3B, in accordance with OI-RC-9?
CS pressure is 235 psia R
RCS pressure should be lowe red to less than 215 psia.
eactor Coolant Pumps, RC-3A and RC-3B, are operating.
RCS temperature should be lo wered to less than 110°F.The RCS should be borated to t he refueling boron concentration.
P ressure is being controlled manually using Main pressurizer spray and heaters.
RCS pressure control using Auxiliary spray should be established.
What actions should be taken before shutting down Reactor Coolant Pumps, RC-3A and RC-3B, in accordance with OI-RC-9?
A.B.C.D.page 37 2009 FORT CALHOUN RO EXAM (38)Given the following plant conditions:
A. RCS pressure should be lowered to less than 215 psia.
Bus Power Failure DC Distribution Panel 1 Light is off DC BUS#1 LOW VOLT annu nciator is in alarm DC Bus #1 voltage indicates 0 volts Power has been lost to the "A" DSS 86-Relay How will operation of the Diverse Scram System (DSS) be affected?The DSS will initiate a reactor trip.The DSS will go to a "1 of 3" trip logic.
B. RCS temperature should be lowered to less than 110°F.
The "A" DSS 86-Relay will not be c apable of generating a reactor trip.
C. The RCS should be borated to the refueling boron concentration.
The DSS will not be capable of generating a reactor trip.
D. RCS pressure control using Auxiliary spray should be established.
A.B.C.D.page 38 2009 FORT CALHOUN RO EXAM (39)Given the following:
page 37
The power supply to RPS Clutch Power Supply Breaker, CB-AB,  will be                          transferred from Instrument Bus "B" to Instrument Bus "A".
nverter "A" is supplying powe r to Instrument Bus "A" and Swing Inverter, EE-8U, is supplying power to Instrument Bus "B".
Which one of the following actions will be taken before placing the Clutch Power SupplyTransfer Switch, RPS/TS-AB, in the Instrume nt Bus A (#1) position in accordance withOI-EE-4?Cross-tie Instrument Bus "A" to Instrument Bus "C".Bypass Inverter "A".
Transfer Instrument Bus "B" supply to Inverter "B".
Bypass Swing Inverter 8-U.
A.B.C.D.page 39 2009 FORT CALHOUN RO EXAM (40)Given the following:    The plant was operating at 50%
power when a LOCA occured    The reactor tripped automatically      PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated    The sequencers begin starting safeguards motors      During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased bel ow the OPLS setpoint How will the OPLS relays res pond and what action, if any , should be taken by the Operators to ensure safeg uards equipment actuates?
OPLS will not actuate. Operators should trip both 86A/
OPLS and 86B/OPLS.
86A/OPLS will actuate. Oper ators should trip 86B/OPLS.
86B/OPLS will actuate. Oper ators should trip 86A/OPLS.
86A/OPLS and 86B/OPLS will both actuate.
No operator action is required.
A.B.C.D.page 40 2009 FORT CALHOUN RO EXAM (41)From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?
Directly from the containment coolers. From the seismic skirt area.
Directly from the containment atmosphere.From the nuclear detector well cooling system.
A.B.C.D.page 41 2009 FORT CALHOUN RO EXAM (42)Given the following:
ECCS actuation has occurred due to a PPLS EOP-03, LOSS OF COOLANT ACCIDENT, has been entered Step 33 has been reached Step 33 says, "Verify that the Containment Sump level rises as the SIRWT level lowers."
SIRWT level is 95 inches and lowering Containment sump level is low and not risingWhat action should be taken per EOP-03?
Minimize ECCS flow to the minimu m required to remove decay heat.
Initiate containment sp ray to ensure adequate containment sump level.Begin blended makeup to the SIRWT to increase SIRWT inventory.
Trip the LPSI pumps to reduce SIRWT depletion rate.
A.B.C.D.page 42 2009 FORT CALHOUN RO EXAM (43)In order to maintain steam generator pressu re below 1100 psia fo llowing a loss of loadfrom 100% power, Technical Specificat ions require that
_________ be operable in modes 1 and 2.All 10 Main Steam Safety Valves.
9 of 10 Main Steam Safety Valves.
4 of 5 Main Steam Safety Valves on each Steam Generator.
3 of 5 Main Steam Safety Valves on each Steam Generator.
A.B.C.D.page 43 2009 FORT CALHOUN RO EXAM (44)Given the following plant conditions:
The plant is opera ting at full power All Feedwater Reg valves and By pass valves are in AUTO on DCS The Bypass valves are closed Both DCS level controll ers are in AUTO on DCS Narrow range level in both St eam Generators is at 63%
How should the Feedwater Reg valves and By pass valves respond to a reactor trip?
The Feedwater Reg valves will ramp cl osed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 63%  The Feedwater Reg valves will ramp cl osed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 35%
The Feedwater Reg valves will initially ramp down to 8% and control narrow rangewater level at 63%. The Feedwater Bypass valves will remain closed.
The Feedwater Reg valves will initially ramp down to 8% and control narrow rangewater level at 35%. The Feedwater Bypass valves will remain closed.
A.B.C.D.page 44 2009 FORT CALHOUN RO EXAM (45)To prevent a loss of RCS heat removal foll owing a total loss of feedwater, either AFW flow must be initiated or once-throu gh-cooling must be established when:
Wide Range level in either S/G falls below 32%.
Wide Range levels in both S/G's fall below 32%.
An uncontrolled rise in RCS T-cold of 6°F.
An uncontrolled rise in RCS pressure of 50 psi.
A.B.C.D.page 45 2009 FORT CALHOUN RO EXAM (46)Given the following plant conditions:
The plant was operating at full power An electrical grid disturbance results in degraded grid voltage AOP-31, 161 KV GRID MALFUNCTIONS, was entered The voltage on all 4160 V buses is less than the minimum required per AOP-31 The voltage on all 480 volt buses is le ss than the minimum required per AOP-31 The reactor was tripped and EOP-00, STANDA RED POST TRIP ACTIONS, was entered What actions are directed by AOP-31 after tripping the reacto r and entering EOP-00?
Trip all pumps fed by 4160 V buses and m anually initia te a 480 volt load shed.
Trip all pumps fed by 4160 V buses, para llel Diesel Generators to buses 1A4 and 1A3 and open their respective feeder breakers.
Deenergize buses 1A4 and 1A3 by opening th eir respective feeder breakers and allowing the Diesel Generators to power th e buses, manually init iate the sequencers to start required loads.


Deenergize buses 1A4 and 1A3 by opening th eir respective feeder breakers and allowing the Diesel Generators to power the buses, manually st art required loads.
2009 FORT CALHOUN RO EXAM (38)
A.B.C.D.page 46 2009 FORT CALHOUN RO EXAM (47)Given the following:   The plant was operat ing at full power    The DC BUS #1 GROUND annunc iator came into alarm   The EONT has been dispatched to 125 VDC Bus 1 EE-8F    You have been directed to ch eck the DC Bus at AI-41A fo r indications of a ground          in accord ance with ARP-CB-20/A15.
Given the following plant conditions:
Which one of the following is an indicato r of a severe ground on 125V DC Bus #1 at AI-41A?Both white lights  will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.One white light will be bright ly lit and one Grou nd Fault Voltmeter will indicate low voltage.Both white lights will be brightly lit and both Ground Fa ult Voltmeters will indicate low voltage.
B us Power Failure DC Distribution Panel 1 Light is off D
One white light will be bright ly lit and both Ground Fault Voltmeters will indicate low voltage.A.B.C.D.page 47 2009 FORT CALHOUN RO EXAM (48)The timer on battery charger
C BUS#1 LOW VOLT annunciator is in alarm D
#1, EE-8C, is being used to place an equalizing charge onbattery #1.
C Bus #1 voltage indicates 0 volts P
What voltage would be expect ed to be indicated on DC bus
ower has been lost to the "A" DSS 86-Relay How will operation of the Diverse Scram System (DSS) be affected?
#1 during this operation and when the timer times out?
A. The DSS will initiate a reactor trip.
133-137 volts dropping to 123-127 volts.
B. The DSS will go to a "1 of 3" trip logic.
138-142 volts dropping to 123-127 volts.
C. The "A" DSS 86-Relay will not be capable of generating a reactor trip.
133-137 volts dropping to 128-132 volts.
D. The DSS will not be capable of generating a reactor trip.
138-142 volts dropping to 128-132 volts.
page 38
A.B.C.D.page 48 2009 FORT CALHOUN RO EXAM (49)Given the following plant conditions:
A large break LOCA occurred in containment Offsite power was lost at the same time Both Diesel Generators started DG-1's speed only increased to 700 rp m due to a problem with its governor How would the ECCS pumps normally powered by DG-1 be affected?
The output breaker from DG-1 would not close and there would be no power to the pumps.The output breaker from DG-1 would close, but the se quencers would not close the individual pump breakers.


The output breaker from DG-1 would cl ose and the sequencers would close the individual pump breakers, but the DG-1 output breaker woul d soon open due to an overcurrent condition.
2009 FORT CALHOUN RO EXAM (39)
The output breaker from DG-1 would cl ose and the sequencers would close the individual pump breakers, but the pumps would run at reduced speed and flow.
Given the following:
A.B.C.D.page 49 2009 FORT CALHOUN RO EXAM (50)Given the following plant conditions:
T he power supply to RPS Clutch Power Supply Breaker, CB-AB, will be transferred from Instrument Bus "B" to Instrument Bus "A".
The plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service Letdown temperature transmitter, TE
nverter "A" is supplying power to Instrument Bus "A" and Swing Inverter, EE-8U, is supplying power to Instrument Bus "B".
-2897, has just been recalibrated Atmospheric dump valve, HCV
Which one of the following actions will be taken before placing the Clutch Power Supply Transfer Switch, RPS/TS-AB, in the Instrument Bus A (#1) position in accordance with OI-EE-4?
-1040, was just unisolated New fluid has just been added to the EHC system Power range NI power is ri sing slowly on all channels Delta T power is rising slowly on all channels All hot and cold leg temper atures are rising slowly What action should be taken based on these indications?
A. Cross-tie Instrument Bus "A" to Instrument Bus "C".
Bypass the ion exchangers using OI-CH-2.
B. Bypass Inverter "A".
Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.
C. Transfer Instrument Bus "B" supply to Inverter "B".
Isolate the atmospheric dump valve using OI-MS-1A.
D. Bypass Swing Inverter 8-U.
page 39


Check the EHC fluid for ai r bubbles using OI-ST-12.
2009 FORT CALHOUN RO EXAM (40)
A.B.C.D.page 50 2009 FORT CALHOUN RO EXAM (51)Given the following plant conditions:
Given the following:
There is high activity in the RCS A steam generator tube leak exists in RC-2B RM-064 has been placed in servic e with the se lector switch placed in the "auto" position The indicated radiatio n level on RM-064 will:
The plant was operating at 50% power when a LOCA occured The reactor tripped automatically PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated The sequencers begin starting safeguards motors During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased below the OPLS setpoint How will the OPLS relays respond and what action, if any, should be taken by the Operators to ensure safeguards equipment actuates?
Read background radiation only.
A. OPLS will not actuate. Operators should trip both 86A/OPLS and 86B/OPLS.
Peg high and stay that way.
B. 86A/OPLS will actuate. Operators should trip 86B/OPLS.
Alternate between high and low readings.
C. 86B/OPLS will actuate. Operators should trip 86A/OPLS.
Slowly continue to rise.
D. 86A/OPLS and 86B/OPLS will both actuate. No operator action is required.
A.B.C.D.page 51 2009 FORT CALHOUN RO EXAM (52)Given the following conditions:
page 40
A steam line has ruptur ed inside containment The CCW surge tank has ruptured.
All other Engineered Safeguards Feat ures are operating as designed River level is 990 feet Containment pressure is 40 psia Containment temperature is 190°F Should Raw Water backup cooling be s upplied to the Containment Coolers in accordance with AOP-11, LOSS OF CO MPONENT COOLING WATER and why?
Yes, because both Containment temperature and pressure are high.
No, because they are not needed with Contai nment Spray operating.
No, because Containment temperature is too high.
No, because river level is too low.
A.B.C.D.page 52 2009 FORT CALHOUN RO EXAM (53)Given the following plant conditions:
The plant was operating at 100% power Raw Water pumps, AC-10A and AC-10B were running A Loss of Coolant Accident occurred coincident with a loss of offsite power Diesel Generator, DG
-2, failed to start Which Raw Water pumps will be running after sequencer operation?
AC-10A and AC-10B.
AC-10A and AC-10C.
AC-10B and AC-10D.
AC-10C and AC-10D.
A.B.C.D.page 53 2009 FORT CALHOUN RO EXAM (54)Given the following plant conditions:
The plant is operating at full power The PLANT AIR PRESS LO annunciator alarmed Soon after, the INSTRUMENT AI R PRESS LO annunciator alarmed On CB-10,11, PI-1750, Instru ment Air Pressure, is cycling between 80 and 85 psig Which one of the following failures could cause these indications?
A leak in an instrument air line inside containment.
A stuck open relief va lve on an air receiver.
A clogged or flooded air dryer.


A leak in the turbine building service air header.
2009 FORT CALHOUN RO EXAM (41)
A.B.C.D.page 54 2009 FORT CALHOUN RO EXAM (55)A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that: The Inner PAL door c annot be opened with a high differen tial pressure across it.
From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?
The Inner PAL door cannot be opened unless the outer PAL door is closed.
A. Directly from the containment coolers.
The Outer PAL door cannot be opened from the outsi de with a Containment Isolation Actuation Si gnal (CIAS) present.
B. From the seismic skirt area.
The Outer PAL door cannot be opened from the outsi de with a ContainmentRadiation High Signal (CRHS) present.
C. Directly from the containment atmosphere.
A.B.C.D.page 55 2009 FORT CALHOUN RO EXAM (56)Given the following plant conditions:
D. From the nuclear detector well cooling system.
A steam line break has occurred in Room 81 PPLS and SGIS have actuated The affected steam generator has blown dry Pressurizer level is 60% and rising Pressurizer pressure is at 1650 psia and risingIn accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdow n isolation valves, HCV-204 and TCV-202 to be opened?
page 41
Reset Engineered Safeguards relays.
Block PPLS, reset PPLS and CIAS lockout relays.
Place CIAS override switches fo r HCV-204 and TCV-202 in override.
Place Defeat switch for HC V-204 in the defeat position.
A.B.C.D.page 56 2009 FORT CALHOUN RO EXAM (57)How could inoperability of the Containment Purge Exhaust Fans affect a refueling outage?Containment entry could be delayed du e to higher airborne activity.
Containment entry could be delayed due to higher temperatures in containment.
Fuel movement could be delayed because Tech Specs require operability of the purge fans.
Plant restart could be delay ed because Tech Specs require operability of the purge fans.A.B.C.D.page 57 2009 FORT CALHOUN RO EXAM (58)Given the following plant conditions:
The plant is in a refueling outage Shutdown Cooling is in service The Refueling Cavity is flooded The core has been offloaded to the Spent Fuel Pool Spent Fuel Pool Cooling pum p, AC-5A, has just tri pped and cannot be restarted Spent Fuel Pool Cooling pump, AC-5B, will not start How will alternate spent fuel pool coo ling be established per AOP-36, LOSS OFSPENT FUEL POOL COOLING?
The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B , will be aligned to circulate water through the Spent Fuel Pool.
The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B , will be aligned to circulate water between the Re fueling Cavity and Spent Fuel Pool , back through the Fuel Transfer Tube.The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water through the Spent Fuel Pool.The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water between the Re fueling Cavity and Spent Fuel Pool , back through the Fuel Transfer Tube.
A.B.C.D.page 58 2009 FORT CALHOUN RO EXAM (59)How will the Steam Dump and Bypass valves respond to an uncomplicated reactor tripfrom full power if the output from pressure controller PIC-910 fails low?(Assume all systems are in automatic.)
The Steam Dump Valves, TCV-909s, will open fully and then reclose. The Bypass Valve, PCV-910, will open fully and remain open.
The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530°F and 535°F. Th e Bypass Valve, PCV-910, will remain fully closed.
The Steam Dump Valves, TCV-909s, an d the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 530°F and 535°F.
The Steam Dump Valves, TCV-909s, an d the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 535°F and 540°F.A.B.C.D.page 59 2009 FORT CALHOUN RO EXAM (60)Given the following:
Condenser Evacuation pumps, FW-8 A and FW-8C, are operating FW-8B is the standby pump The "43/FW" switch is in the "OFF" position.What will happen if FW-8A trips due to high seal water temperature?FW-8B will start immediatel
: y. Condenser vacuum w ill be maintained steady.FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.FW-8B will continue to run af ter automatica lly starting.FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.FW-8B will then cycle on and off to maintain condenser vacuum between 24.5 and 25.5 inches of vacuum.FW-8B will not start aut omatically unless the "43/FW" switch is placed in the"AUTO" position.
A.B.C.D.page 60 2009 FORT CALHOUN RO EXAM (61)Given the following plant conditions:
The plant is operating at 40% power Condensate pump, FW-2A is out of service Condensate pump, FW-2B, is operating FW-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2 What action, if any, should be taken in accordance with OI-FW-1 and for what reason?The selected pump should be changed to FW-2C to ensure t hat FW-2C will startautomatically if FW-2B trips following a SIAS or CSAS actuation.
The selected pump should be changed to FW-2C to ensur e that FW-2B will continue to run following a SIAS or CSAS actuation.FW-2B should remain as the selected pump to ensure t hat FW-2B will trip following a SIAS or CSAS actuation.


FW-2B should remain as the selected pump to ensur e that FW-2B will continue to run following a SIAS or CSAS actuation.
2009 FORT CALHOUN RO EXAM (42)
A.B.C.D.page 61 2009 FORT CALHOUN RO EXAM (62)Given the following:
Given the following:
The plant is operating at full power
E CCS actuation has occurred due to a PPLS E
OP-03, LOSS OF COOLANT ACCIDENT, has been entered S
tep 33 has been reached S
tep 33 says, "Verify that the Containment Sump level rises as the SIRWT level lowers."
S IRWT level is 95 inches and lowering C
ontainment sump level is low and not rising What action should be taken per EOP-03?
A. Minimize ECCS flow to the minimum required to remove decay heat.
B. Initiate containment spray to ensure adequate containment sump level.
C. Begin blended makeup to the SIRWT to increase SIRWT inventory.
D. Trip the LPSI pumps to reduce SIRWT depletion rate.
page 42


REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annuncia tor is in alarm
2009 FORT CALHOUN RO EXAM (43)
In order to maintain steam generator pressure below 1100 psia following a loss of load from 100% power, Technical Specifications require that _________ be operable in modes 1 and 2.
A. All 10 Main Steam Safety Valves.
B. 9 of 10 Main Steam Safety Valves.
C. 4 of 5 Main Steam Safety Valves on each Steam Generator.
D. 3 of 5 Main Steam Safety Valves on each Steam Generator.
page 43


REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annuncia tor is in alarm
2009 FORT CALHOUN RO EXAM (44)
Given the following plant conditions:
T he plant is operating at full power A
ll Feedwater Reg valves and Bypass valves are in AUTO on DCS T
he Bypass valves are closed B
oth DCS level controllers are in AUTO on DCS N
arrow range level in both Steam Generators is at 63%
How should the Feedwater Reg valves and Bypass valves respond to a reactor trip?
A. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 63%
B. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 35%
C. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 63%. The Feedwater Bypass valves will remain closed.
D. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 35%. The Feedwater Bypass valves will remain closed.
page 44


The T-ref (black) pens on both of the TAVG/TRE F Recorders (TR-111/TR-121)              indicate 532°F Which one of the following woul d produce these indications?
2009 FORT CALHOUN RO EXAM (45)
One of the Power R ange Control Ch annels output failed low.
To prevent a loss of RCS heat removal following a total loss of feedwater, either AFW flow must be initiated or once-through-cooling must be established when:
Both of the Power Range Cont rol Channels output failed low.
A. Wide Range level in either S/G falls below 32%.
The Main Generator out put transmitter failed low.
B. Wide Range levels in both S/G's fall below 32%.
The Turbine first stage pre ssure transmitte r failed low.
C. An uncontrolled rise in RCS T-cold of 6°F.
A.B.C.D.page 62 2009 FORT CALHOUN RO EXAM (63)Given the following plant conditions:
D. An uncontrolled rise in RCS pressure of 50 psi.
Waste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank, WD-29B
page 45


The Control Switch for WD-28A is in the "HAND" Position.
2009 FORT CALHOUN RO EXAM (46)
The Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control valve, PCV-514B, is in the "HAND" position.
Given the following plant conditions:
If vent header pressure is su fficient, which one of the fo llowing will act first to prevent overpressurizing WD-29B?
T he plant was operating at full power A
WD-28A will trip on high discharge pressure.
n electrical grid disturbance results in degraded grid voltage A
PCV-514B will close on high tank pressure.
OP-31, 161 KV GRID MALFUNCTIONS, was entered T
WD-29B's rupture disk will br eak relieving to the room.
he voltage on all 4160 V buses is less than the minimum required per AOP-31 T
WD-29B's relief valve will open relieving to the Auxiliary Buil ding Exhaust Duct.
he voltage on all 480 volt buses is less than the minimum required per AOP-31 T
A.B.C.D.page 63 2009 FORT CALHOUN RO EXAM (64)The Distributed Control System (DCS) core mimic moni tor provides color graphic displays for each CEDM. Green squares are us ed to indicate that the CEDM is fully inserted. The DCS input that results in the green square display comes from the:
he reactor was tripped and EOP-00, STANDARED POST TRIP ACTIONS, was entered What actions are directed by AOP-31 after tripping the reactor and entering EOP-00?
Synchro-transmitters.
A. Trip all pumps fed by 4160 V buses and manually initiate a 480 volt load shed.
ERF computer.
B. Trip all pumps fed by 4160 V buses, parallel Diesel Generators to buses 1A4 and 1A3 and open their respective feeder breakers.
Magnet actuated reed switches.
C. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually initiate the sequencers to start required loads.
Cam actuated limit switches.
D. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually start required loads.
A.B.C.D.page 64 2009 FORT CALHOUN RO EXAM (65)Which of the following descr ibes the response of the Switchgear Room HVAC toFire Protection System detector alarms in the East Switchgear Room?
page 46
After a detector has actuated in either zo ne 7 or 8, the ventil ation dampers for onlythe East Switchgear Room shut. After a detector has actuated in both zones 7 and 8, the ventilat ion dampers for onlythe East Switchgear Room shut.  


After a detector has actuated in either zo ne 7 or 8, the ventil ation dampers for both Switchgear Rooms shut.
2009 FORT CALHOUN RO EXAM (47)
After detectors have actuated in both zones 7 and 8, the ventilation dampers in both Switchgear Rooms shut.
Given the following:
A.B.C.D.page 65 2009 FORT CALHOUN RO EXAM (66)For what procedures are you al lowed to use the Indexes on the Document Control Web page to verify that the most current revi sion of a procedure is being used per SO-G-7, OPERATING MANUAL?
The plant was operating at full power The DC BUS #1 GROUND annunciator came into alarm The EONT has been dispatched to 125 VDC Bus 1 EE-8F You have been directed to check the DC Bus at AI-41A for indications of a ground in accordance with ARP-CB-20/A15.
For all plant procedures.
Which one of the following is an indicator of a severe ground on 125V DC Bus #1 at AI-41A?
Only for procedures designat ed as "Information Use." Only for procedures designa ted as "Information Us e" or "Reference Use." Cannot be used to verify current revision for any procedures.
A. Both white lights will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.
A.B.C.D.page 66 2009 FORT CALHOUN RO EXAM (67)Spent fuel is being moved in the Spent Fuel Pool using S pent Fuel Handling Machine, FH-12. Which one of the following plant HVAC configurations is required in accordancewith OP-12, FUELING OPERATIONS?
B. One white light will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.
One Auxiliary Building Supp ly and two Auxiliary Exhaus t Fans must be running.
C. Both white lights will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.
All Auxiliary Building Exhaus t Fans must be running.
D. One white light will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.
Spent Fuel Pool Area Filt er, VA-66, must be in t he Filtered Mode position and Control Room Ventilation mu st be operating in the F iltered Air Makeup Mode.
page 47
Spent Fuel Pool Area Filt er, VA-66, must be in t he Filtered Mode position and Control Room Ventilation must be op erating in the Re circulation Mode.
 
A.B.C.D.page 67 2009 FORT CALHOUN RO EXAM (68)Given the following:
2009 FORT CALHOUN RO EXAM (48)
The timer on battery charger #1, EE-8C, is being used to place an equalizing charge on battery #1.
What voltage would be expected to be indicated on DC bus #1 during this operation and when the timer times out?
A. 133-137 volts dropping to 123-127 volts.
B. 138-142 volts dropping to 123-127 volts.
C. 133-137 volts dropping to 128-132 volts.
D. 138-142 volts dropping to 128-132 volts.
page 48
 
2009 FORT CALHOUN RO EXAM (49)
Given the following plant conditions:
A large break LOCA occurred in containment O
ffsite power was lost at the same time B
oth Diesel Generators started D
G-1's speed only increased to 700 rpm due to a problem with its governor How would the ECCS pumps normally powered by DG-1 be affected?
A. The output breaker from DG-1 would not close and there would be no power to the pumps.
B. The output breaker from DG-1 would close, but the sequencers would not close the individual pump breakers.
C. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the DG-1 output breaker would soon open due to an overcurrent condition.
D. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the pumps would run at reduced speed and flow.
page 49
 
2009 FORT CALHOUN RO EXAM (50)
Given the following plant conditions:
T he plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service L etdown temperature transmitter, TE-2897, has just been recalibrated A tmospheric dump valve, HCV-1040, was just unisolated N ew fluid has just been added to the EHC system P ower range NI power is rising slowly on all channels D elta T power is rising slowly on all channels A ll hot and cold leg temperatures are rising slowly What action should be taken based on these indications?
A. Bypass the ion exchangers using OI-CH-2.
B. Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.
C. Isolate the atmospheric dump valve using OI-MS-1A.
D. Check the EHC fluid for air bubbles using OI-ST-12.
page 50
 
2009 FORT CALHOUN RO EXAM (51)
Given the following plant conditions:
T here is high activity in the RCS A
steam generator tube leak exists in RC-2B R
M-064 has been placed in service with the selector switch placed in the "auto" position The indicated radiation level on RM-064 will:
A. Read background radiation only.
B. Peg high and stay that way.
C. Alternate between high and low readings.
D. Slowly continue to rise.
page 51
 
2009 FORT CALHOUN RO EXAM (52)
Given the following conditions:
A steam line has ruptured inside containment T
he CCW surge tank has ruptured.
A ll other Engineered Safeguards Features are operating as designed R
iver level is 990 feet C
ontainment pressure is 40 psia C
ontainment temperature is 190°F Should Raw Water backup cooling be supplied to the Containment Coolers in accordance with AOP-11, LOSS OF COMPONENT COOLING WATER and why?
A. Yes, because both Containment temperature and pressure are high.
B. No, because they are not needed with Containment Spray operating.
C. No, because Containment temperature is too high.
D. No, because river level is too low.
page 52
 
2009 FORT CALHOUN RO EXAM (53)
Given the following plant conditions:
T he plant was operating at 100% power R
aw Water pumps, AC-10A and AC-10B were running A
Loss of Coolant Accident occurred coincident with a loss of offsite power D
iesel Generator, DG-2, failed to start Which Raw Water pumps will be running after sequencer operation?
A. AC-10A and AC-10B.
B. AC-10A and AC-10C.
C. AC-10B and AC-10D.
D. AC-10C and AC-10D.
page 53
 
2009 FORT CALHOUN RO EXAM (54)
Given the following plant conditions:
T he plant is operating at full power T
he PLANT AIR PRESS LO annunciator alarmed S
oon after, the INSTRUMENT AIR PRESS LO annunciator alarmed O
n CB-10,11, PI-1750, Instrument Air Pressure, is cycling between 80 and 85 psig Which one of the following failures could cause these indications?
A. A leak in an instrument air line inside containment.
B. A stuck open relief valve on an air receiver.
C. A clogged or flooded air dryer.
D. A leak in the turbine building service air header.
page 54
 
2009 FORT CALHOUN RO EXAM (55)
A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that:
A. The Inner PAL door cannot be opened with a high differential pressure across it.
B. The Inner PAL door cannot be opened unless the outer PAL door is closed.
C. The Outer PAL door cannot be opened from the outside with a Containment Isolation Actuation Signal (CIAS) present.
D. The Outer PAL door cannot be opened from the outside with a Containment Radiation High Signal (CRHS) present.
page 55
 
2009 FORT CALHOUN RO EXAM (56)
Given the following plant conditions:
A steam line break has occurred in Room 81 P
PLS and SGIS have actuated T
he affected steam generator has blown dry P
ressurizer level is 60% and rising P
ressurizer pressure is at 1650 psia and rising In accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdown isolation valves, HCV-204 and TCV-202 to be opened?
A. Reset Engineered Safeguards relays.
B. Block PPLS, reset PPLS and CIAS lockout relays.
C. Place CIAS override switches for HCV-204 and TCV-202 in override.
D. Place Defeat switch for HCV-204 in the defeat position.
page 56
 
2009 FORT CALHOUN RO EXAM (57)
How could inoperability of the Containment Purge Exhaust Fans affect a refueling outage?
A. Containment entry could be delayed due to higher airborne activity.
B. Containment entry could be delayed due to higher temperatures in containment.
C. Fuel movement could be delayed because Tech Specs require operability of the purge fans.
D. Plant restart could be delayed because Tech Specs require operability of the purge fans.
page 57
 
2009 FORT CALHOUN RO EXAM (58)
Given the following plant conditions:
T he plant is in a refueling outage S
hutdown Cooling is in service T
he Refueling Cavity is flooded T
he core has been offloaded to the Spent Fuel Pool S
pent Fuel Pool Cooling pump, AC-5A, has just tripped and cannot be restarted S
pent Fuel Pool Cooling pump, AC-5B, will not start How will alternate spent fuel pool cooling be established per AOP-36, LOSS OF SPENT FUEL POOL COOLING?
A. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water through the Spent Fuel Pool.
B. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.
C. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water through the Spent Fuel Pool.
D. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.
page 58
 
2009 FORT CALHOUN RO EXAM (59)
How will the Steam Dump and Bypass valves respond to an uncomplicated reactor trip from full power if the output from pressure controller PIC-910 fails low?
(Assume all systems are in automatic.)
A. The Steam Dump Valves, TCV-909s, will open fully and then reclose. The Bypass Valve, PCV-910, will open fully and remain open.
B. The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530°F and 535°F. The Bypass Valve, PCV-910, will remain fully closed.
C. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 530°F and 535°F.
D. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 535°F and 540°F.
page 59
 
2009 FORT CALHOUN RO EXAM (60)
Given the following:
C ondenser Evacuation pumps, FW-8A and FW-8C, are operating F
W-8B is the standby pump T
he "43/FW" switch is in the "OFF" position.
What will happen if FW-8A trips due to high seal water temperature?
A. FW-8B will start immediately. Condenser vacuum will be maintained steady.
B. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.
FW-8B will continue to run after automatically starting.
C. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.
FW-8B will then cycle on and off to maintain condenser vacuum between 24.5 and 25.5 inches of vacuum.
D. FW-8B will not start automatically unless the "43/FW" switch is placed in the "AUTO" position.
page 60
 
2009 FORT CALHOUN RO EXAM (61)
Given the following plant conditions:
T he plant is operating at 40% power C
ondensate pump, FW-2A is out of service C
ondensate pump, FW-2B, is operating F
W-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2 What action, if any, should be taken in accordance with OI-FW-1 and for what reason?
A. The selected pump should be changed to FW-2C to ensure that FW-2C will start automatically if FW-2B trips following a SIAS or CSAS actuation.
B. The selected pump should be changed to FW-2C to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.
C. FW-2B should remain as the selected pump to ensure that FW-2B will trip following a SIAS or CSAS actuation.
D. FW-2B should remain as the selected pump to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.
page 61
 
2009 FORT CALHOUN RO EXAM (62)
Given the following:
The plant is operating at full power REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annunciator is in alarm REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annunciator is in alarm The T-ref (black) pens on both of the TAVG/TREF Recorders (TR-111/TR-121) indicate 532°F Which one of the following would produce these indications?
A. One of the Power Range Control Channels output failed low.
B. Both of the Power Range Control Channels output failed low.
C. The Main Generator output transmitter failed low.
D. The Turbine first stage pressure transmitter failed low.
page 62
 
2009 FORT CALHOUN RO EXAM (63)
Given the following plant conditions:
W aste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank, WD-29B T
he Control Switch for WD-28A is in the "HAND" Position.
T he Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control valve, PCV-514B, is in the "HAND" position.
If vent header pressure is sufficient, which one of the following will act first to prevent overpressurizing WD-29B?
A. WD-28A will trip on high discharge pressure.
B. PCV-514B will close on high tank pressure.
C. WD-29B's rupture disk will break relieving to the room.
D. WD-29B's relief valve will open relieving to the Auxiliary Building Exhaust Duct.
page 63
 
2009 FORT CALHOUN RO EXAM (64)
The Distributed Control System (DCS) core mimic monitor provides color graphic displays for each CEDM. Green squares are used to indicate that the CEDM is fully inserted. The DCS input that results in the green square display comes from the:
A. Synchro-transmitters.
B. ERF computer.
C. Magnet actuated reed switches.
D. Cam actuated limit switches.
page 64
 
2009 FORT CALHOUN RO EXAM (65)
Which of the following describes the response of the Switchgear Room HVAC to Fire Protection System detector alarms in the East Switchgear Room?
A. After a detector has actuated in either zone 7 or 8, the ventilation dampers for only the East Switchgear Room shut.
B. After a detector has actuated in both zones 7 and 8, the ventilation dampers for only the East Switchgear Room shut.
C. After a detector has actuated in either zone 7 or 8, the ventilation dampers for both Switchgear Rooms shut.
D. After detectors have actuated in both zones 7 and 8, the ventilation dampers in both Switchgear Rooms shut.
page 65
 
2009 FORT CALHOUN RO EXAM (66)
For what procedures are you allowed to use the Indexes on the Document Control Web page to verify that the most current revision of a procedure is being used per SO-G-7, OPERATING MANUAL?
A. For all plant procedures.
B. Only for procedures designated as "Information Use."
C. Only for procedures designated as "Information Use" or "Reference Use."
D. Cannot be used to verify current revision for any procedures.
page 66
 
2009 FORT CALHOUN RO EXAM (67)
Spent fuel is being moved in the Spent Fuel Pool using Spent Fuel Handling Machine, FH-12. Which one of the following plant HVAC configurations is required in accordance with OP-12, FUELING OPERATIONS?
A. One Auxiliary Building Supply and two Auxiliary Exhaust Fans must be running.
B. All Auxiliary Building Exhaust Fans must be running.
C. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Filtered Air Makeup Mode.
D. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Recirculation Mode.
page 67
 
2009 FORT CALHOUN RO EXAM (68)
Given the following:
A surveillance test is being performed that measures the closure time of a containment isolation valve.
A surveillance test is being performed that measures the closure time of a containment isolation valve.
A suggestion is made that the test be conducted first for "just in time training" prior to the actual surve illance test being conducted.
A suggestion is made that the test be conducted first for "just in time training" prior to the actual surveillance test being conducted.
Is this allowe d in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM and why?Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior to measuring stroke time.
Is this allowed in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM and why?
Yes, this is a good practice although it is not required by SO-G-23.No, this is not a good practice because it involves excessive valve cycling.
A. Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior to measuring stroke time.
No, this is not allowed because SO-G-23 r equires the test be conducted from the"as found" condition.
B. Yes, this is a good practice although it is not required by SO-G-23.
A.B.C.D.page 68 2009 FORT CALHOUN RO EXAM (69)During the conduct of a survei lance test, the cont rol switch for a pum p that is required to be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.No other changes have been made to the system.
C. No, this is not a good practice because it involves excessive valve cycling.
How does this affect the Operab ility and Availability of the pump?
D. No, this is not allowed because SO-G-23 requires the test be conducted from the "as found" condition.
The pump is "Operable" and "Available." The pump is NOT "Operable" but is "Available." The pump is "Operable" but is NOT "Available." The pump is NOT "Operable" and NOT "Available." A.B.C.D.page 69 2009 FORT CALHOUN RO EXAM (70)The plant is operating at fu ll power. An instru ment bus has been pl aced in an abnormal alignment to allow for maintenance activites.
page 68
Which one of the following alignments requi res logging into a Limiting Condition for Operation?Instrument Bus "A" is being s upplied by swing inverter, EE-8T.Instrument Bus "A" is being s upplied by its bypass transformer.Instrument Bus "1" is being supp lied by its bypass transformer.Instrument Bus "1" is being suppli ed by its testing transformer.
 
A.B.C.D.page 70 2009 FORT CALHOUN RO EXAM (71)When are Control Room Log entries require d for containment entry and exit per Standing Order O-22, "CONTAIN MENT ACCESS AND EGRESS?
2009 FORT CALHOUN RO EXAM (69)
When one PAL door is inoperable.
During the conduct of a surveilance test, the control switch for a pump that is required to be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.
When containment integrity is required.
No other changes have been made to the system.
When entering without Radi ation Protection coverage.
How does this affect the Operability and Availability of the pump?
When the containment security ca rd readers are not operational.
A. The pump is "Operable" and "Available."
A.B.C.D.page 71 2009 FORT CALHOUN RO EXAM (72)How will placing the keyswitch on a Control Room process radiation monitor ratemeterin the "KEYPAD" position affect operation of the radiation monitor?
B. The pump is NOT "Operable" but is "Available."
Annunciation and equipment ac tuations will be blocked.
C. The pump is "Operable" but is NOT "Available."
Annunciation will still work but equi pment actuations will be blocked.
D. The pump is NOT "Operable" and NOT "Available."
Annunciation and equipment actuations will still work but output to the radiation monitor recorder will be blocked.
page 69
Annunciation and equipment actuations will still work but output to the ERF computer will be blocked.
 
A.B.C.D.page 72 2009 FORT CALHOUN RO EXAM (73)EOP-04, STEAM GENERATOR TUBE RUPTURE , directs aligning blowdown sample flow to the Spent Regenerant Tank to:
2009 FORT CALHOUN RO EXAM (70)
Limit the release of radioactive liquid to the river.
The plant is operating at full power. An instrument bus has been placed in an abnormal alignment to allow for maintenance activites.
Limit contamination of the wa ter in the Condenser Hotwell.
Which one of the following alignments requires logging into a Limiting Condition for Operation?
Minimize radiation levels in Room 81.
A. Instrument Bus "A" is being supplied by swing inverter, EE-8T.
Minimize radiation levels in the secondary sampling room.
B. Instrument Bus "A" is being supplied by its bypass transformer.
A.B.C.D.page 73 2009 FORT CALHOUN RO EXAM (74)In the Control Room, plant instruments that have been qualified to survive in an accident environment (EEQ) can be identified by:
C. Instrument Bus "1" is being supplied by its bypass transformer.
Orange tape.
D. Instrument Bus "1" is being supplied by its testing transformer.
Orange dots.
page 70
Yellow labels.
Red and white stri ped label borders.
A.B.C.D.page 74 2009 FORT CALHOUN RO EXAM (75)Given the following plant conditions:
A reactor startup is in progress Wide Nange NI power indicates 5 x 10
-5% power A sustained positive startup rate of 1.5 DPM is indicated on all channels.
All Zero Power Mode Bypa ss Switches are in the "BYPASS" position All Reactor Coolant Pumps are operating If Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and why would an automatic reactor trip occur and EOP-00 be entered?
Assume no operator actions.
The reactor would trip immedi ately due to low RCS flow.
The reactor would trip on low RCS flow when power exceeds 1 x 10
-4% power.The reactor would trip immediat ely due to high startup rate.
The reactor would trip on high star tup rate when power exceeds 1 x 10
-4% power.A.B.C.D.page 75   


RO EXAM HANDOUTS TECHNICAL SPECIFICATIONS
2009 FORT CALHOUN RO EXAM (71)
When are Control Room Log entries required for containment entry and exit per Standing Order O-22, "CONTAINMENT ACCESS AND EGRESS?
A. When one PAL door is inoperable.
B. When containment integrity is required.
C. When entering without Radiation Protection coverage.
D. When the containment security card readers are not operational.
page 71


===2.0 LIMITING===
2009 FORT CALHOUN RO EXAM (72)
CONDITIONS FOR OPERATION
How will placing the keyswitch on a Control Room process radiation monitor ratemeter in the "KEYPAD" position affect operation of the radiation monitor?
A. Annunciation and equipment actuations will be blocked.
B. Annunciation will still work but equipment actuations will be blocked.
C. Annunciation and equipment actuations will still work but output to the radiation monitor recorder will be blocked.
D. Annunciation and equipment actuations will still work but output to the ERF computer will be blocked.
page 72


===2.1 Reactor===
2009 FORT CALHOUN RO EXAM (73)
Coolant System
EOP-04, STEAM GENERATOR TUBE RUPTURE, directs aligning blowdown sample flow to the Spent Regenerant Tank to:
A. Limit the release of radioactive liquid to the river.
B. Limit contamination of the water in the Condenser Hotwell.
C. Minimize radiation levels in Room 81.
D. Minimize radiation levels in the secondary sampling room.
page 73


====2.1.1 Operable====
2009 FORT CALHOUN RO EXAM (74)
Components Applicability Applies to the operable status of t he reactor coolant system components.
In the Control Room, plant instruments that have been qualified to survive in an accident environment (EEQ) can be identified by:
Objective  To specify certain conditions of the reactor coolant system components.
A. Orange tape.
Specifications Limiting conditions for operation are as follows: 
B. Orange dots.
(1) Reactor Critical All four (4) reactor coolant pumps shall be in operation.
C. Yellow labels.
Exceptions The limitations of this specificati on may be suspended during the performance of physics tests provided the power level is <
D. Red and white striped label borders.
10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.  
page 74
(2) Hot Shutdown or 350F < T cold < 515F  (a) The reactor coolant loops listed below shall be operable:
(i) Reactor coolant loop 1 and at least one associated reactor coolant pump. (ii) Reactor coolant loop 2 and at least one associated reactor coolant pump.  (b) At least one of the above reactor coolant loops shall be in operation.
Exceptions All reactor coolant pumps may be de-energized for up to one hour provided


(1) no operations are permitted that w ould cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10F below saturation temperature.
2009 FORT CALHOUN RO EXAM (75)
Given the following plant conditions:
A reactor startup is in progress W
ide Nange NI power indicates 5 x 10-5% power A
sustained positive startup rate of 1.5 DPM is indicated on all channels.
A ll Zero Power Mode Bypass Switches are in the "BYPASS" position A
ll Reactor Coolant Pumps are operating If Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and why would an automatic reactor trip occur and EOP-00 be entered?
Assume no operator actions.
A. The reactor would trip immediately due to low RCS flow.
B. The reactor would trip on low RCS flow when power exceeds 1 x 10-4% power.
C. The reactor would trip immediately due to high startup rate.
D. The reactor would trip on high startup rate when power exceeds 1 x 10-4% power.
page 75


2.1 - Page 1 Amendment No. 46
RO EXAM HANDOUTS
,47 ,56 , 256 TECHNICAL SPECIFICATIONS


===2.0 LIMITING===
TECHNICAL SPECIFICATIONS 2.0   LIMITING CONDITIONS FOR OPERATION 2.1  Reactor Coolant System 2.1.1 Operable Components Applicability Applies to the operable status of the reactor coolant system components.
CONDITIONS FOR OPERATION
Objective To specify certain conditions of the reactor coolant system components.
Specifications Limiting conditions for operation are as follows:
(1)    Reactor Critical All four (4) reactor coolant pumps shall be in operation.
Exceptions The limitations of this specification may be suspended during the performance of physics tests provided the power level is < 10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.
(2)    Hot Shutdown or 350EF < Tcold < 515EF (a)    The reactor coolant loops listed below shall be operable:
(i)    Reactor coolant loop 1 and at least one associated reactor coolant pump.
(ii)  Reactor coolant loop 2 and at least one associated reactor coolant pump.
(b)    At least one of the above reactor coolant loops shall be in operation.
Exceptions All reactor coolant pumps may be de-energized for up to one hour provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10EF below saturation temperature.
2.1 - Page 1          Amendment No. 46,47,56, 256


===2.1 Reactor===
TECHNICAL SPECIFICATIONS 2.0  LIMITING CONDITIONS FOR OPERATION 2.1   Reactor Coolant System (Continued) 2.1.1 Operable Components (Continued)
Coolant System (Continued) 2.1.1 Operable Components (Continued)  
(c)   If fewer than the above required reactor coolant loops are OPERABLE, the required loops shall be restored to OPERABLE status within 72 hours or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours.
(c) If fewer than the above required reac tor coolant loops are OPERABLE, the required loops shall be restored to O PERABLE status within 72 hours or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours.  
(3)   210&deg;F Tcold  350&deg;F or Tcold < 210&deg;F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.
(3) 210&deg;F   T cold    350&deg;F or T cold < 210&deg;F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.  
(a)   At least two (2) of the decay heat removal loops listed below shall be OPERABLE:
(a) At least two (2) of the decay heat removal loops listed below shall be OPERABLE:  
(i)     Reactor coolant loop 1 and its associated steam generator and at least one associated reactor coolant pump.
(i) Reactor coolant loop 1 and its a ssociated steam generator and at least one associated reactor coolant pump.  
(ii)   Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.
(ii) Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.  
(iii)   One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.
(iii) One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.  
(iv)   One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addition to that in (iii) above, and associated shutdown cooling piping.
(iv) One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addi tion to that in (iii) above, and associated shutdown cooling piping.  
(b)   At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.
(b) At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.  
(c)   With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours.
(c) With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the R eactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours.  
(d)   For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:
(d) For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:  
(i)     Reactor Coolant System temperature is less than 120EF.
(i) Reactor Coolant System temperature is less than 120F. (ii) The Reactor Coolant System is vented with a vent area greater than or equal to 47 in
(ii)   The Reactor Coolant System is vented with a vent area greater than or equal to 47 in2.
: 2.  (4) DELETED  
(4)   DELETED 2.1 - Page 2      Amendment No. 39,56,136,188, 256


2.1 - Page 2 Amendment No. 39,56,136
FORT CALHOUN STATION                                                                                                                           TDB-VI TECHNICAL DATA BOOK                                                                                                                     PAGE 12 OF 19 126 LONG TERM STEADY STATE (104.5) 100.8                             INSERTION LIMIT (94.5)
,188 , 256 FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 12 OF 19 R36  COLR 020406080100POWER DEPENDENT INSERTION LIMIT FIGURE 2 126 100.8 75.6 50.4 25.2 0 GROUP 4 126 100.8 75.6 50.4 25.2 0 GROUP 3 126 100.8 75.6 50.4 25.2 0 GROUP 2 126 100.8 75.6 50.4 25.2 0 GROUP 1 CEA GROUP POSITIONS  (INCHES WITHDRAWN)
GROUP 4 (82.5) 75.6 SHORT TERM INSERTION LIMIT                PPDIL 126              50.4 100.8            25.2 CEA GROUP POSITIONS (INCHES WITHDRAWN)
REACTOR POWER (% OF ALLOWED POWER) LONG TERM STEADY STATEINSERTION LIMIT SHORT TERMINSERTION LIMIT (35.2)(25.2)(13.2)(104.5)(94.5)(82.5)PPDIL PDIL or TRANSIENT INSERTION LIMIT EMERGENCY BORATION LIMIT 12" BELOW PDIL - REFER TO AOP-3 ES-401, Page 31 of 33 ES-401 Site-Specific SRO Written Examination Form ES-401-8 Cover Sheet U.S. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:Date:Facility/Unit:
PDIL or TRANSIENT GROUP 3 INSERTION LIMIT 75.6             0 50.4 EMERGENCY BORATION LIMIT (35.2)                        12 BELOW PDIL - REFER TO AOP-3 25.2             126    (25.2)
Region:I        II        III      IV  Reactor Type:  W      CE        BW    GE  Start Time:Finish Time:
(13.2) 0               100.8 GROUP 2 75.6 50.4 126              25.2 100.8           0 GROUP 1 75.6 50.4 25.2 0
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade
0        20          40        60      80          10 0 REACTOR POWER (% OF ALLOWED POWER)
COLR                        POWER DEPENDENT INSERTION LIMIT                                   FIGURE 2
R36


of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items
ES-401                        Site-Specific SRO Written Examination                Form ES-401-8 Cover Sheet U.S. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:
Date:      03/27/2009                            Facility/Unit:  Fort Calhoun Region:          I    II      III  IV X          Reactor Type: W        CE X BW        GE Start Time:                                      Finish Time:
Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80.00 percent to pass. You have 8 hours to complete the combined examination, and 3 hours if you are only taking the SRO portion.
Applicant Certification All work done on this examination is my own. I have neither given nor received aid.
Applicants Signature Results RO/SRO-Only/Total Examination Values                                  /      /        Points Applicants Scores                                                    /      /        Points Applicants Grade                                                    /        /        Percent ES-401, Page 31 of 33


if given in conjunction with the RO exam; SRO-only exams given alone require a final grade
2009 FORT CALHOUN SRO EXAM (1)
A reactor trip has just occurred and the Standard Post Trip Actions are being performed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.
Which of the following parameters requires you to take contingency actions?
A. All trippable control element assemblies are fully inserted except for B-15. All non-trippable control element assemblies are fully withdrawn.
B. Instrument air pressure is 85 psig and stable.
C. Both steam generator wide range levels are 85% and stable.
D. Pressurizer pressure is 2060 psia and increasing.
page 1


of 80.00 percent to pass. You have 8 hours to complete the combined examination, and 3 hours if you are only taking the SRO portion.
2009 FORT CALHOUN SRO EXAM (2)
Applicant CertificationAll work done on this examination is my own. I have neither given nor received aid.
Given the following plant conditions:
______________________________________
A loss of load event resulted in a high pressure reactor trip Both of the Power-Operated Relief Valves (PORVs) opened One of the PORVs failed to close when pressurizer pressure lowered below it's setpoint Power was not available to the open PORV's block valve during performance of Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was entered Power has now been restored to the open PORV's block valve The PORV block valve associated with the open PORV should NOT be closed if:
Applicant's Signature Results RO/SRO-Only/Total Examination Values
A. Pressurizer level is at 100%.
B. Pressurizer pressure is 2010 psia.
C. Reactor vessel level is 83%.
D. RCS subcooling is 0&deg;F.
page 2


  /         
2009 FORT CALHOUN SRO EXAM (3)
  /
Given the following plant conditions:
Points  Applicant's Scores           
The plant is in hot shutdown Charging and letdown were isolated in response to RCS leakage Isolation of charging and letdown terminated the RCS leakage Pressurizer heaters have just lost power due to the low level cutout All Reactor Coolant Pumps are operating as designed How much time do the operators have to reestablish charging flow to the RCS before the pressurizer empties assuming RCS cold leg temperature stays steady at 532&deg;F?
  /         
A. 3.5 - 4.5 hours B. 5.0 - 6.0 hours C. 6.5 - 7.5 hours D. 8.0 - 9.0 hours page 3
  /
Points  Applicant's Grade             
  /         
  /
Percent


2009 FORT CALHOUN SRO EXAM (1)A reactor trip has just occurred and the Standard Post Trip Actions are beingperformed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.Which of the following parameters requires you to take contingency actions?All trippable control element assemblies are fully inserted except for B-15. Allnon-trippable control element assemblies are fully withdrawn.Instrument air pressure is 85 psig and stable.Both steam generator wide range levels are 85% and stable.
2009 FORT CALHOUN SRO EXAM (4)
Pressurizer pressure is 2060 psia and increasing.
The following plant conditions exist during a RCS heatup:
A.B.C.D.page 1 2009 FORT CALHOUN SRO EXAM (2)Given the following plant conditions:A loss of load event resulted in a high pressure reactor tripBoth of the Power-Operated Relief Valves (PORVs) openedOne of the PORVs failed to close when pressurizer pressure lowered below it's setpoint Power was not available to the open PORV's block valve during performance of              Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was enteredPower has now been restored to the open PORV's block valve  The PORV block valve associated with the open PORV should NOT be closed if:Pressurizer level is at 100%.Pressurizer pressure is 2010 psia.Reactor vessel level is  83%.RCS subcooling is 0&deg;F.
A.B.C.D.page 2 2009 FORT CALHOUN SRO EXAM (3)Given the following plant conditions:The plant is in hot shutdownCharging and letdown were isolated in response to RCS leakageIsolation of charging and letdown terminated the RCS leakagePressurizer heaters have just lost power due to the low level cutoutAll Reactor Coolant Pumps are operating as designedHow much time do the operators have to reestablish charging flow to the RCS beforethe pressurizer empties assuming RCS cold leg temperature stays steady at 532&deg;F?3.5 - 4.5 hours5.0 - 6.0 hours6.5 - 7.5 hours8.0 - 9.0 hours A.B.C.D.page 3 2009 FORT CALHOUN SRO EXAM (4)The following plant conditions exist during a RCS heatup:
T-cold is 410&deg;F.
T-cold is 410&deg;F.
T-hot is 411&deg;F.
T-hot is 411&deg;F.
Core Exit Thermocouples are reading between 410&deg;F and 415&deg;F.
Core Exit Thermocouples are reading between 410&deg;F and 415&deg;F.
Pressurizer pressure indicates 955 psia.
Pressurizer pressure indicates 955 psia.
No operations are in effect that could cause a RCS dilution.Which one of the following Reactor Coolant Pump operating conditions is NOT allowedby the requirements of T.S. 2.1.1?RC-3A and RC-3C are operable, but not operating. RC-3B and RC-3D are notoperable. RC-3A has been shutdown for 35 minutes.RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.RC-3B and RC-3D are operable, but not operating. RC-3A and RC-3C are notoperable. RC-3D has been shutdown for 35 minutes.RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B arenot operable. RC-3D has been shutdown for 75 minutes.
No operations are in effect that could cause a RCS dilution.
A.B.C.D.page 4 2009 FORT CALHOUN SRO EXAM (5)Given the following plant conditions:
Which one of the following Reactor Coolant Pump operating conditions is NOT allowed by the requirements of T.S. 2.1.1?
RCS temperature is 105&deg;F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1, SHUTDOWN COOLING                     INITIATION
A. RC-3A and RC-3C are operable, but not operating. RC-3B and RC-3D are not operable. RC-3A has been shutdown for 35 minutes.
B. RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.
C. RC-3B and RC-3D are operable, but not operating. RC-3A and RC-3C are not operable. RC-3D has been shutdown for 35 minutes.
D. RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B are not operable. RC-3D has been shutdown for 75 minutes.
page 4
 
2009 FORT CALHOUN SRO EXAM (5)
Given the following plant conditions:
RCS temperature is 105&deg;F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1, SHUTDOWN COOLING INITIATION LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designed What action (if any) should you perform after the Emergency Diesel Generators start and their output breakers close?
A. Manually restart the LPSI pumps.
B. Un-isolate the LPSI system from the RCS and restart the LPSI pumps.
C. No action is necessary; the Emergency Diesel Generators will pick up the LPSI pumps as dead bus loads.
D. No action is necessary; the sequencers will restart LPSI pumps within one minute of the breaker closing.
page 5


LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designedWhat action (if any) should you perform after the Emergency Diesel Generators startand their output breakers close?    Manually restart the LPSI pumps.Un-isolate the LPSI system from the RCS and restart the LPSI pumps.No action is necessary; the Emergency Diesel Generators will pick  up the LPSI pumps as dead bus loads.No action is necessary; the sequencers will restart LPSI pumps within one minuteof the breaker closing.
2009 FORT CALHOUN SRO EXAM (6)
A.B.C.D.page 5 2009 FORT CALHOUN SRO EXAM (6)The following plant conditions exist:
The following plant conditions exist:
The plant was operating at 65% power with all systems are aligned for normal               operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from     the operating CCW pump, AC-3A You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank level is 8 inches and lowering The reactor was manually tripped two minutes after the AUXILIARY COOLANT             FROM CRDM FLOW LO alarm was receivedWhat action should be performed in addition to Standard Post Trip Actions inaccordance with AOP-11?Trip one RCP in each loop within 3 minutes. Trip the remaining RCPs if highbearing temperature alarms are received.Trip one RCP in each loop within 5 minutes. Trip the remaining RCPs if highbearing temperature alarms are received.Shutdown all RCP's within 3 minutes.Shutdown all RCP's within 5 minutes.
The plant was operating at 65% power with all systems are aligned for normal operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from the operating CCW pump, AC-3A You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank level is 8 inches and lowering The reactor was manually tripped two minutes after the AUXILIARY COOLANT FROM CRDM FLOW LO alarm was received What action should be performed in addition to Standard Post Trip Actions in accordance with AOP-11?
A.B.C.D.page 6 2009 FORT CALHOUN SRO EXAM (7)Given the following sequence of events:
A. Trip one RCP in each loop within 3 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.
B. Trip one RCP in each loop within 5 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.
C. Shutdown all RCP's within 3 minutes.
D. Shutdown all RCP's within 5 minutes.
page 6
 
2009 FORT CALHOUN SRO EXAM (7)
Given the following sequence of events:
The plant was operating at full power Pressurizer level channel "Y" was selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%
The plant was operating at full power Pressurizer level channel "Y" was selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%
Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.
Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.
The Operator then took manual control of charging and letdown and restored level         to 60%  
The Operator then took manual control of charging and letdown and restored level to 60%
The operator then selected channel "X" as the controlling channel Pressurizer pressure control remained in automatic Current plant conditions are:
Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia Pressurizer steam temperature indicates 632&deg;F Pressurizer liquid temperature indicates 620&deg;F How will pressurizer pressure respond?
A. Pressurizer pressure will steadily increase to 2100 psia.
B. Pressurizer pressure will remain at approximately1950 psia until the Level Control Bistables, LC-101-1 and LC-101-2, located behind CB-1/2/3 are reset.
C. Pressurizer pressure will remain at approximately1950 psia until Channel "X" is selected on PZR Heater Cutout Channel Select Switch, HC-101-1.
D. Pressurizer pressure will remain at approximately1950 psia until the water in the pressurizer reaches saturation temperature.
page 7


The operator then selected channel "X" as the controlling channel Pressurizer pressure control remained in automaticCurrent plant conditions are:
2009 FORT CALHOUN SRO EXAM (8)
The plant experiences an ATWS event where both the reactor and turbine failed to trip.
What action does EOP-00 direct you to perform to limit reactor power?
A. Trip all Reactor Coolant Pumps.
B. Transfer charging pump suction to the SIRWT.
C. Insert the non-trippable CEAs.
D. Close the MSIVs.
page 8


Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia
2009 FORT CALHOUN SRO EXAM (9)
Given the following plant conditions:
The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressure is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steady Which one of the following actions will occur automatically with these plant conditions?
A. Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow will continue from RC-2A.
B. Blowdown flow from both Steam Generators will be isolated.
C. RCV-978, 6th Stage Extraction Isolation Valve, will close.
D. A Ventilation Isolation Actuation Signal (VIAS) will be generated page 9


Pressurizer steam temperature indicates 632&deg;F Pressurizer liquid temperature indicates 620&deg;F  How will pressurizer pressure respond?Pressurizer pressure will steadily increase to 2100 psia. Pressurizer pressure will remain at approximately1950 psia until the Level Control Bistables, LC-101-1 and LC-101-2, located behind CB-1/2/3 are reset.Pressurizer pressure will remain at approximately1950 psia until Channel "X"  isselected on PZR Heater Cutout Channel Select Switch, HC-101-1.Pressurizer pressure will remain at approximately1950 psia until the water in thepressurizer reaches saturation temperature.
2009 FORT CALHOUN SRO EXAM (10)
A.B.C.D.page 7 2009 FORT CALHOUN SRO EXAM (8)The plant experiences an ATWS event where both the reactor and turbine failed to trip.What action does EOP-00 direct you to perform to limit reactor power?Trip all Reactor Coolant Pumps.Transfer charging pump suction to the SIRWT.Insert the non-trippable CEAs.Close the MSIVs.
Given the following plant conditions:
A.B.C.D.page 8 2009 FORT CALHOUN SRO EXAM (9)Given the following plant conditions:
A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Generator, RC-2B, has ruptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVERY PROCEDURE, has been entered In mitigating this event, which steam generator(s), if any, should be isolated?
The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressure is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steadyWhich one of the following actions will occur automatically with these plant conditions?Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow willcontinue from RC-2A. Blowdown flow from both Steam Generators will be isolated. RCV-978, 6th Stage Extraction Isolation Valve, will close.A Ventilation Isolation Actuation Signal (VIAS) will be generated A.B.C.D.page 9 2009 FORT CALHOUN SRO EXAM (10)Given the following plant conditions:
A. Neither Steam Generator should be isolated.
A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Generator, RC-2B, has ruptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVERY PROCEDURE, has been enteredIn mitigating this event, which steam generator(s), if any, should be isolated?Neither Steam Generator should be isolated.Only RC-2A should be isolated.Only RC-2B should be isolated.Both steam generators should be isolated.
B. Only RC-2A should be isolated.
A.B.C.D.page 10 2009 FORT CALHOUN SRO EXAM (11)A break on the feedwater line to Steam Generator, RC-2B, inside containment has occurred. The following plant conditions exist:
C. Only RC-2B should be isolated.
D. Both steam generators should be isolated.
page 10
 
2009 FORT CALHOUN SRO EXAM (11)
A break on the feedwater line to Steam Generator, RC-2B, inside containment has occurred.
The following plant conditions exist:
SGIS has actuated Heat removal has been established using Steam Generator, RC-2A.
SGIS has actuated Heat removal has been established using Steam Generator, RC-2A.
AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available             AFW pump.
AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available AFW pump.
Steam Generator, RC-2B, has dried out.
No Reactor Coolant Pumps are running.
In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of the following actions should be taken and for what reason?
A. AFW flow should be established to RC-2B to help promote natural circulation flow in both RCS loops.
B. AFW flow should be established to RC-2B to increase decay heat removal.
C. AFW flow should NOT be established to RC-2B because it would result in a positive reactivity addition.
D. AFW flow should NOT be established to RC-2B because FW-6 does not have the capacity to feed both S/Gs simultaneously.
page 11


Steam Generator, RC-2B, has dried out.
2009 FORT CALHOUN SRO EXAM (12)
No Reactor Coolant Pumps are running.In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of thefollowing actions should be taken and for what reason?AFW flow should be established to RC-2B to help promote natural circulation flowin both RCS loops.AFW flow should be established to RC-2B to increase decay heat removal.AFW flow should NOT be established to RC-2B because it would result in a positivereactivity addition.AFW flow should NOT be established to RC-2B because FW-6 does not have thecapacity to feed both S/Gs simultaneously.
The following plant conditions exist:
A.B.C.D.page 11 2009 FORT CALHOUN SRO EXAM (12)The following plant conditions exist:
A loss of 161 KV to the plant resulted in fast transfer of vital buses 1A3 and 1A4 to 345 KV This was followed by a loss of load that resulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station blackout Breakers 1A11, 1A13, 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energized Which one of the following actions must be taken to allow disconnect, DS-T1, to be opened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?
A loss of 161 KV to the plant resulted in fast transfer of vital buses 1A3 and 1A4 to 345 KV This was followed by a loss of load that resulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station blackout
A. Breakers 1A13 and 1A24 must be closed.
B. The generator field breaker must be opened.
C. The Kirk key Interlock must be disengaged.
D. An isolated phase bus duct cooling unit must be started.
page 12
 
2009 FORT CALHOUN SRO EXAM (13)
The plant tripped from 100% power following a loss of all offsite power. The following conditions exist:
RCS pressure is 2000 psia.
Pressurizer level is 40%.
Steam Generator Pressures are 900 psia.
Steam Generator Wide Range levels are 40%.
Hot leg temperatures are 575F.
Cold leg temperatures are 532F.
Which of the following actions would be most effective in enhancing natural circulation?
A. Raise RCS pressure.
B. Raise Pressurizer level.
C. Raise Steam Generator pressures.
D. Raise Steam Generator levels.
page 13
 
2009 FORT CALHOUN SRO EXAM (14)
Given the following plant conditions:
The plant was operating at full power Power was lost to Instrument bus AI-40A AOP-16, LOSS OF INSTRUMENT BUS POWER, was entered AOP-16, Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closing BOTH of the PORV (Power-Operated Relief Valves) Block Valves" What is the purpose of this step?
A. An additional vital instrument bus failure will result in opening ONE of the PORVs.
B. An additional vital instrument bus failure will result in opening BOTH of the PORVs.
C. An additional vital instrument bus failure will result in the inability to close ONE of the PORV Block Valves.
D. An additional vital instrument bus failure will result in the inability to close BOTH of the PORV Block Valves.
page 14


Breakers 1A11, 1A13, 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energizedWhich one of the following actions must be taken to allow disconnect, DS-T1, to beopened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?Breakers 1A13 and 1A24 must be closed.The generator field breaker must be opened.The Kirk key Interlock must be disengaged.An isolated phase bus duct cooling unit must be started.
2009 FORT CALHOUN SRO EXAM (15)
A.B.C.D.page 12 2009 FORT CALHOUN SRO EXAM (13)The plant tripped from 100% power following a loss of all offsite power. The followingconditions exist:RCS pressure is 2000 psia.Pressurizer level is 40%.Steam Generator Pressures are 900 psia.Steam Generator Wide Range levels are 40%.Hot leg temperatures are 575 F.Cold leg temperatures are 532 F.Which of the following actions would be most effective in enhancing natural circulation?Raise RCS pressure.Raise Pressurizer level.Raise Steam Generator pressures.Raise Steam Generator levels.
The following plant indications were noted following a reactor trip.
A.B.C.D.page 13 2009 FORT CALHOUN SRO EXAM (14)Given the following plant conditions:The plant was operating at full powerPower was lost to Instrument bus AI-40AAOP-16, LOSS OF INSTRUMENT BUS POWER, was enteredAOP-16, Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closingBOTH of the PORV (Power-Operated Relief Valves) Block Valves"What is the purpose of this step?An additional vital instrument bus failure will result in opening ONE of the PORVs.An additional vital instrument bus failure will result in opening BOTH of the PORVs.An additional vital instrument bus failure will result in the inability to close ONE ofthe PORV Block Valves.An additional vital instrument bus failure will result in the inability to close BOTH ofthe PORV Block Valves.
A.B.C.D.page 14 2009 FORT CALHOUN SRO EXAM (15)The following plant indications were noted following a reactor trip.
Bus Power Failure DC Distribution Panel 1 Light is off.
Bus Power Failure DC Distribution Panel 1 Light is off.
Bus Power Failure DC Distribution Panel 2 Light is on.
Bus Power Failure DC Distribution Panel 2 Light is on.
The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.
The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.
All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.
All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.
FW-6 can NOT be started from CB-10,11.In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of thefollowing actions is required to be able to start FW-6?Place the 43/FW Switch in the AUTO position.Start FW-6 from AI-66A after placing the NORMAL/OVERRIDE switches on AI-66Ato OVERRIDE.Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to theemergency DC source.Start FW-6 from the Alternate Shutdown Panel, AI-179.
FW-6 can NOT be started from CB-10,11.
A.B.C.D.page 15 2009 FORT CALHOUN SRO EXAM (16)One of the two 20 inch underground Raw Water headers from the intake structure tothe auxiliary building completely ruptured. How does isolating the ruptured header affect the ability to provide cooling to theRW/CCW heat exchangers?Raw Water can be supplied to all of the RW/CCW heat exchangers but only two ofthe Raw Water Pumps can be used.Raw Water can only be supplied to two of the RW/CCW heat exchangers and onlytwo of the Raw Water Pumps can be used.Raw Water can be supplied to all of the RW/CCW heat exchangers but only threeof the Raw Water Pumps can be used.Raw Water can only be supplied to three of the RW/CCW heat exchangers andonly three of the Raw Water Pumps can be used.
In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of the following actions is required to be able to start FW-6?
A.B.C.D.page 16 2009 FORT CALHOUN SRO EXAM (17)The reactor has been manually tripped following a sudden loss of instrument airpressure. According to AOP-17, Loss of Instrument Air, which of the following actions should betaken to prevent RCS cooldown?Close FCV-1101 and FCV-1102 using DCS.Maximize S/G blowdown flow.Initiate a Steam Generator Isolation Signal (SGIS).Manually trip all Main Feedwater Pumps.
A. Place the 43/FW Switch in the AUTO position.
A.B.C.D.page 17 2009 FORT CALHOUN SRO EXAM (18)Given the following plant conditions:
B. Start FW-6 from AI-66A after placing the NORMAL/OVERRIDE switches on AI-66A to OVERRIDE.
The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator water cooling have been unsuccessful Stator cooling water outlet temperature has risen to 83&deg;CWhat action is required by AOP-27, GENERATOR MALFUNCTIONS?Manually trip the reactor.Manually trip the turbine.Manually trip the main generator output breakers.Manually open the main generator field breaker.
C. Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to the emergency DC source.
A.B.C.D.page 18 2009 FORT CALHOUN SRO EXAM (19)Given the following plant conditions:
D. Start FW-6 from the Alternate Shutdown Panel, AI-179.
A reactor startup is being performed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode. When will a SCEAPIS (DCS) rod block signal be generated?When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.When any CEA in group 1 reaches the upper rod stop.When any CEA in group 3 begins to withdraw.
page 15
A.B.C.D.page 19 2009 FORT CALHOUN SRO EXAM (20)Given the following plant conditions:
 
A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL                  POWER OPERATION The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn. Using the attached PDIL curve, determine what action must be taken as a result ofthese conditions?Immediately commence emergency boration.Withdraw group 4 CEAs to above the short term insertion limit.Withdraw group 4 CEAs until proper group overlap is achieved.Place the plant in hot shutdown within 6 hours.
2009 FORT CALHOUN SRO EXAM (16)
A.B.C.D.page 20 2009 FORT CALHOUN SRO EXAM (21)Given the following:
One of the two 20 inch underground Raw Water headers from the intake structure to the auxiliary building completely ruptured.
The AI-149 FIRE DETECTION ALARM OR TROUBLE alarm was received The Control Room Fire Detection Computer, PC-66, in dicates that multiple                      detectors in the Cable Spread Room are in alarm
How does isolating the ruptured header affect the ability to provide cooling to the RW/CCW heat exchangers?
A. Raw Water can be supplied to all of the RW/CCW heat exchangers but only two of the Raw Water Pumps can be used.
B. Raw Water can only be supplied to two of the RW/CCW heat exchangers and only two of the Raw Water Pumps can be used.
C. Raw Water can be supplied to all of the RW/CCW heat exchangers but only three of the Raw Water Pumps can be used.
D. Raw Water can only be supplied to three of the RW/CCW heat exchangers and only three of the Raw Water Pumps can be used.
page 16


The EONT was dispatched and reports that Halon is being discharged into the                 Cable Spread RoomIn accordance with AOP-06, FIRE EMERGENCY, what action should be taken by theControl Room Operators?Trip the reactor, open clutch power supply breakers, close the PORV block valvesand evacuate the Control Room.Trip the reactor, close the PORV block valves, start both Fire pumps, FP-1A andFP-1B, and evacuate the Control Room.Trip the reactor, open clutch power supply breakers, close the PORV block valvesand place the Control Room HVAC in Recirculation Mode.
2009 FORT CALHOUN SRO EXAM (17)
Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and placethe Control Room HVAC in Recirculation Mode.
The reactor has been manually tripped following a sudden loss of instrument air pressure.
A.B.C.D.page 21 2009 FORT CALHOUN SRO EXAM (22)The following power indications are observed 10 minutes after a reactor trip:
According to AOP-17, Loss of Instrument Air, which of the following actions should be taken to prevent RCS cooldown?
All four WR NI Channels are indicating 3 x 10
A. Close FCV-1101 and FCV-1102 using DCS.
-3% Power and lowering.All four WR NI Channels are indicating a startup rate of -0.1 DPM and steady.
B. Maximize S/G blowdown flow.
C. Initiate a Steam Generator Isolation Signal (SGIS).
D. Manually trip all Main Feedwater Pumps.
page 17
 
2009 FORT CALHOUN SRO EXAM (18)
Given the following plant conditions:
The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator water cooling have been unsuccessful Stator cooling water outlet temperature has risen to 83&deg;C What action is required by AOP-27, GENERATOR MALFUNCTIONS?
A. Manually trip the reactor.
B. Manually trip the turbine.
C. Manually trip the main generator output breakers.
D. Manually open the main generator field breaker.
page 18
 
2009 FORT CALHOUN SRO EXAM (19)
Given the following plant conditions:
A reactor startup is being performed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode.
When will a SCEAPIS (DCS) rod block signal be generated?
A. When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.
B. When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.
C. When any CEA in group 1 reaches the upper rod stop.
D. When any CEA in group 3 begins to withdraw.
page 19
 
2009 FORT CALHOUN SRO EXAM (20)
Given the following plant conditions:
A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL POWER OPERATION The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn.
Using the attached PDIL curve, determine what action must be taken as a result of these conditions?
A. Immediately commence emergency boration.
B. Withdraw group 4 CEAs to above the short term insertion limit.
C. Withdraw group 4 CEAs until proper group overlap is achieved.
D. Place the plant in hot shutdown within 6 hours.
page 20
 
2009 FORT CALHOUN SRO EXAM (21)
Given the following:
The AI-149 FIRE DETECTION ALARM OR TROUBLE alarm was received The Control Room Fire Detection Computer, PC-66, indicates that multiple detectors in the Cable Spread Room are in alarm The EONT was dispatched and reports that Halon is being discharged into the Cable Spread Room In accordance with AOP-06, FIRE EMERGENCY, what action should be taken by the Control Room Operators?
A. Trip the reactor, open clutch power supply breakers, close the PORV block valves and evacuate the Control Room.
B. Trip the reactor, close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and evacuate the Control Room.
C. Trip the reactor, open clutch power supply breakers, close the PORV block valves and place the Control Room HVAC in Recirculation Mode.
D. Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and place the Control Room HVAC in Recirculation Mode.
page 21
 
2009 FORT CALHOUN SRO EXAM (22)
The following power indications are observed 10 minutes after a reactor trip:
All four WR NI Channels are indicating 3 x 10-3% Power and lowering.
All four WR NI Channels are indicating a startup rate of -0.1 DPM and steady.
All four Power Range NI Channels are indicating 0% power and steady.
All four Power Range NI Channels are indicating 0% power and steady.
All four Delta-T Power Channels are indicating 2% power and lowering. A miscalibration of which of the following could cause these indications?Wide Range NI power indication channels.Wide Range NI startup rate channels.Power Range NI channels.Delta-T Power Channels.
All four Delta-T Power Channels are indicating 2% power and lowering.
A.B.C.D.page 22 2009 FORT CALHOUN SRO EXAM (23)Radioactive liquid that leaks inside containment will collect in the containment sump.The containment sump pumps will normally pump this radioactive water to the:Reactor Coolant Drain Tank.Waste Holdup Tanks.Waste Monitor Tanks.Spent Regenerant Tanks.
A miscalibration of which of the following could cause these indications?
A.B.C.D.page 23 2009 FORT CALHOUN SRO EXAM (24)The radioactive gases released following a waste gas decay tank rupture will consistmostly of isotopes of:Xenon and Krypton.Iodine and Cesium.Tritium and Carbon.Argon and Neon.
A. Wide Range NI power indication channels.
A.B.C.D.page 24 2009 FORT CALHOUN SRO EXAM (25)Given the following sequence of events:Condenser vacuum was lostThe turbine and reactor trippedImmediately following the trip, a small LOCA occurred inside containmentPPLS and CPHS have actuated   All HPSI pumps failed to startRCS pressure is steady at 1000 psiaReactor Vessel Level is at 43%Which of the following valves can be used by the Balance of Plant Operator toimmediately begin a RCS cooldown in accordance with EOP-03?           Steam Dump Valves, TCV-909-1,2,3,4.Steam Bypass Valve, PCV-910.Atmospheric Dump Valve, HCV-1040.Air Assisted Main Steam Safety Valves, MS-291, MS-292.
B. Wide Range NI startup rate channels.
A.B.C.D.page 25 2009 FORT CALHOUN SRO EXAM (26)FC-214, REACTOR COOLANT DAILY  
C. Power Range NI channels.
D. Delta-T Power Channels.
page 22
 
2009 FORT CALHOUN SRO EXAM (23)
Radioactive liquid that leaks inside containment will collect in the containment sump.
The containment sump pumps will normally pump this radioactive water to the:
A. Reactor Coolant Drain Tank.
B. Waste Holdup Tanks.
C. Waste Monitor Tanks.
D. Spent Regenerant Tanks.
page 23
 
2009 FORT CALHOUN SRO EXAM (24)
The radioactive gases released following a waste gas decay tank rupture will consist mostly of isotopes of:
A. Xenon and Krypton.
B. Iodine and Cesium.
C. Tritium and Carbon.
D. Argon and Neon.
page 24
 
2009 FORT CALHOUN SRO EXAM (25)
Given the following sequence of events:
Condenser vacuum was lost The turbine and reactor tripped Immediately following the trip, a small LOCA occurred inside containment PPLS and CPHS have actuated All HPSI pumps failed to start RCS pressure is steady at 1000 psia Reactor Vessel Level is at 43%
Which of the following valves can be used by the Balance of Plant Operator to immediately begin a RCS cooldown in accordance with EOP-03?
A. Steam Dump Valves, TCV-909-1,2,3,4.
B. Steam Bypass Valve, PCV-910.
C. Atmospheric Dump Valve, HCV-1040.
D. Air Assisted Main Steam Safety Valves, MS-291, MS-292.
page 25
 
2009 FORT CALHOUN SRO EXAM (26)
FC-214, REACTOR COOLANT DAILY  


==SUMMARY==
==SUMMARY==
REPORT, contains the followinginformation:Fuel Reliability Indicator (FRI): 1.1 x 10-4   uCi/gmDose Equivalent Iodine: 0.8 uCi/gmXe-133 Activity: 2.8 uCi/gmRCS Total Activity: 5.5 uCi/gmE-bar: 0.68 MevWhich one of the following actions is required?AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel ReliabilityIndicator. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 ActivityAOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due toDose Equivalent Iodine.
REPORT, contains the following information:
AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due tothe RCS Total Activity.
Fuel Reliability Indicator (FRI): 1.1 x 10-4 uCi/gm Dose Equivalent Iodine: 0.8 uCi/gm Xe-133 Activity: 2.8 uCi/gm RCS Total Activity: 5.5 uCi/gm E-bar: 0.68 Mev Which one of the following actions is required?
A.B.C.D.page 26 2009 FORT CALHOUN SRO EXAM (27)The "REACTOR VESSEL FLANGE LEAK" alarm was received due to leakage past theReactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.What one of the following parameters would cause an alarm if leakage occurs past theouter O-Ring?Increasing pressure.Increasing temperature.Decreasing pressure.Decreasing temperature.
A. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel Reliability Indicator.
A.B.C.D.page 27 2009 FORT CALHOUN SRO EXAM (28)Given the following:You have been directed to shutdown Reactor Coolant Pump, RC-3A in accordance       with OI-RC-9You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START"       position and that the Oil Lift Pump is not operatingWhich one of the following actions, if any, is required to ensure proper lubrication of theRCP bearings?Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.If the Oil Lift Pump does not start automatically after tripping RC-3A, thenmomentarily place the Oil Lift Pump Control Switch in the "STOP" position thenback to the "START" position to reset it. If the Oil Lift Pump does not start automatically after tripping RC-3A, then hold theOil Lift Pump Control switch in the "START" position until the "ZERO SPEED" light comes on.No action is required. The Oil Lift Pump is only needed when starting a ReactorCoolant Pump.
B. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 Activity C. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to Dose Equivalent Iodine.
A.B.C.D.page 28 2009 FORT CALHOUN SRO EXAM (29)Given the following plant conditions:Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been               discoveredThe leaking PORV has been isolated by closing its block valve, HCV-151   HCV-151 also leaks throughVCT makeup is in its normal alignmentAssuming no operator action is taken, how will the VCT level control system firstrespond?FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to theVCT at the neutral blend boron concentration.FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to thecharging pump suction at the neutral blend boron concentration.LCV-218-3 will open and LCV-218-2 will close automatically to supply water to theVCT at the SIRWT boron concentration.LCV-218-3 will open and LCV-218-2 will close automatically to supply water to thecharging pump suction at the SIRWT boron concentration.
D. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to the RCS Total Activity.
A.B.C.D.page 29 2009 FORT CALHOUN SRO EXAM (30)A plant shutdown and cooldown are being performed. One hour after placing shutdowncooling in service, the following plant indications are observed:
page 26
 
2009 FORT CALHOUN SRO EXAM (27)
The "REACTOR VESSEL FLANGE LEAK" alarm was received due to leakage past the Reactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.
What one of the following parameters would cause an alarm if leakage occurs past the outer O-Ring?
A. Increasing pressure.
B. Increasing temperature.
C. Decreasing pressure.
D. Decreasing temperature.
page 27
 
2009 FORT CALHOUN SRO EXAM (28)
Given the following:
You have been directed to shutdown Reactor Coolant Pump, RC-3A in accordance with OI-RC-9 You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START" position and that the Oil Lift Pump is not operating Which one of the following actions, if any, is required to ensure proper lubrication of the RCP bearings?
A. Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.
B. If the Oil Lift Pump does not start automatically after tripping RC-3A, then momentarily place the Oil Lift Pump Control Switch in the "STOP" position then back to the "START" position to reset it.
C. If the Oil Lift Pump does not start automatically after tripping RC-3A, then hold the Oil Lift Pump Control switch in the "START" position until the "ZERO SPEED" light comes on.
D. No action is required. The Oil Lift Pump is only needed when starting a Reactor Coolant Pump.
page 28
 
2009 FORT CALHOUN SRO EXAM (29)
Given the following plant conditions:
Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been discovered The leaking PORV has been isolated by closing its block valve, HCV-151 HCV-151 also leaks through VCT makeup is in its normal alignment Assuming no operator action is taken, how will the VCT level control system first respond?
A. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the VCT at the neutral blend boron concentration.
B. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the charging pump suction at the neutral blend boron concentration.
C. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the VCT at the SIRWT boron concentration.
D. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the charging pump suction at the SIRWT boron concentration.
page 29
 
2009 FORT CALHOUN SRO EXAM (30)
A plant shutdown and cooldown are being performed. One hour after placing shutdown cooling in service, the following plant indications are observed:
Pressurizer pressure and level are lowering.
Pressurizer pressure and level are lowering.
Containment sump level is steady.
Containment sump level is steady.
Line 635: Line 1,135:
Steam Generator pressures are lowering slowly.
Steam Generator pressures are lowering slowly.
RM-053 is in alarm.
RM-053 is in alarm.
All other process radiation monitors are reading normal.Which one of the following could cause these indications?A raw water/CCW heat exchanger tube leakA regenerative heat exchanger tube leak.A shutdown cooling heat exchanger tube leak.A steam generator tube leak.
All other process radiation monitors are reading normal.
A.B.C.D.page 30 2009 FORT CALHOUN SRO EXAM (31)Given the following:EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant AccidentA RCS cooldown is being conducted using shutdown cooling   The RCS cold leg temperatures are currently 170&deg;F.What is the maximum allowable cooldown rate under these conditions?25&deg;F/hr.50&deg;F/hr.100&deg;F/hr.200&deg;F/hr.A.B.C.D.page 31 2009 FORT CALHOUN SRO EXAM (32)The plant is operating at full power. HPSI pump, SI-2A, has been tagged out of servicedue to a breaker problem. How does this affect the operability of the HPSI train associated with SI-2A perTechnical Specifications?The HPSI train is considered operable if SI-2B is operable. The HPSI train is considered operable if SI-2C is operable.One train of HPSI is inoperable, SI-2A must be made operable within 24 hours.One train of HPSI is inoperable, SI-2A must be made operable within 7 days.
Which one of the following could cause these indications?
A.B.C.D.page 32 2009 FORT CALHOUN SRO EXAM (33)How is a steam bubble formed in the pressurizer following a refueling outage perOP-2A, PLANT STARTUP?With the pressurizer level at approximately 50%, pressurizer heaters are used toheat the water to saturation. Non-condensable gases are allowed to dissolve in thewater.With the pressurizer level at approximately 90%, pressurizer heaters are used toheat the water to saturation. Non-condensable gases are allowed to dissolve in thewater.
A. A raw water/CCW heat exchanger tube leak B. A regenerative heat exchanger tube leak.
With the pressurizer level at approximately 50%, pressurizer heaters are used toheat the water to saturation. Non-condensable gases are vented to the PQT or VCTusing OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMALOPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.With the pressurizer level at approximately 90%, pressurizer heaters are used toheat the water to saturation. Non-condensable gases are vented to the PQT or VCTusing OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.
C. A shutdown cooling heat exchanger tube leak.
A.B.C.D.page 33 2009 FORT CALHOUN SRO EXAM (34)Given the following plant conditions:
D. A steam generator tube leak.
page 30
 
2009 FORT CALHOUN SRO EXAM (31)
Given the following:
EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant Accident A RCS cooldown is being conducted using shutdown cooling The RCS cold leg temperatures are currently 170&deg;F.
What is the maximum allowable cooldown rate under these conditions?
A. 25&deg;F/hr.
B. 50&deg;F/hr.
C. 100&deg;F/hr.
D. 200&deg;F/hr.
page 31
 
2009 FORT CALHOUN SRO EXAM (32)
The plant is operating at full power. HPSI pump, SI-2A, has been tagged out of service due to a breaker problem.
How does this affect the operability of the HPSI train associated with SI-2A per Technical Specifications?
A. The HPSI train is considered operable if SI-2B is operable.
B. The HPSI train is considered operable if SI-2C is operable.
C. One train of HPSI is inoperable, SI-2A must be made operable within 24 hours.
D. One train of HPSI is inoperable, SI-2A must be made operable within 7 days.
page 32
 
2009 FORT CALHOUN SRO EXAM (33)
How is a steam bubble formed in the pressurizer following a refueling outage per OP-2A, PLANT STARTUP?
A. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.
B. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.
C. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.
D. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.
page 33
 
2009 FORT CALHOUN SRO EXAM (34)
Given the following plant conditions:
The plant is operating at 100% power.
The plant is operating at 100% power.
Pressurizer Safety Valve, RC-142, has seat leakage.
Pressurizer Safety Valve, RC-142, has seat leakage.
Quench Tank temperature and level are rising.
Quench Tank temperature and level are rising.
Quench Tank pressure is 8 psig and increasing slowly.Which one of the following automatic actions will occur assuming no operator actionsare taken?Quench Tank relief valve, RC-125, will open resulting in increasing containment pressure.Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.Quench Tank vent valve, HCV-155, will open and vent to the containment ventheader and the RCDT outlet containment isolation valve will close.Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk willrupture resulting in increasing containment pressure.
Quench Tank pressure is 8 psig and increasing slowly.
A.B.C.D.page 34 2009 FORT CALHOUN SRO EXAM (35)Given the following:
Which one of the following automatic actions will occur assuming no operator actions are taken?
The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off. What action will you direct the EONA to take before starting the first CCW pump,AC-3A?Ensure CCW Surge tank pressure is greater than 60 psig.Vent AC-3A using its casing vent valve.Fully open the discharge valve for AC-3A.Fully close the discharge valves for AC-3B and AC-3C.
A. Quench Tank relief valve, RC-125, will open resulting in increasing containment pressure.
A.B.C.D.page 35 2009 FORT CALHOUN SRO EXAM (36)Given the following:
B. Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.
plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in                40 seconds ago
C. Quench Tank vent valve, HCV-155, will open and vent to the containment vent header and the RCDT outlet containment isolation valve will close.
D. Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk will rupture resulting in increasing containment pressure.
page 34
 
2009 FORT CALHOUN SRO EXAM (35)
Given the following:
The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off.
What action will you direct the EONA to take before starting the first CCW pump, AC-3A?
A. Ensure CCW Surge tank pressure is greater than 60 psig.
B. Vent AC-3A using its casing vent valve.
C. Fully open the discharge valve for AC-3A.
D. Fully close the discharge valves for AC-3B and AC-3C.
page 35


CCW Header Pressure, PI-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are runningWhich one of the following conditions could cause these indications?PI-499, CCW header pressure, has failed low.CCW Pressure Switches, PCS-412 and PCS-413, have failed low.PIC-2802, CCW Surge Tank Pressure indication, has failed low.HCV-438A/B/C/D have inadvertently closed resulting in low CCW pressure to theRCPs.A.B.C.D.page 36 2009 FORT CALHOUN SRO EXAM (37)Given the following plant conditions:
2009 FORT CALHOUN SRO EXAM (36)
A Reactor Coolant System cooldown is in progress for a refueling outage Shutdown cooling is in operation per OI-SC-1 RCS temperature is 120&deg;F RCS pressure is 235 psia Reactor Coolant Pumps, RC-3A and RC-3B, are operating.
Given the following:
Pressure is being controlled manually using Main pressurizer spray and heaters.What actions should be taken before shutting down Reactor Coolant Pumps, RC-3Aand RC-3B, in accordance with OI-RC-9?RCS pressure should be lowered to less than 215 psia.RCS temperature should be lowered to less than 110&deg;F.The RCS should be borated to the refueling boron concentration.RCS pressure control using Auxiliary spray should be established.
plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in 40 seconds ago CCW Header Pressure, PI-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are running Which one of the following conditions could cause these indications?
A.B.C.D.page 37 2009 FORT CALHOUN SRO EXAM (38)Given the following plant conditions:
A. PI-499, CCW header pressure, has failed low.
Bus Power Failure DC Distribution Panel 1 Light is off DC BUS#1 LOW VOLT annunciator is in alarm DC Bus #1 voltage indicates 0 volts Power has been lost to the "A" DSS 86-RelayHow will operation of the Diverse Scram System (DSS) be affected?The DSS will initiate a reactor trip.The DSS will go to a "1 of 3" trip logic.The "A" DSS 86-Relay will not be capable of generating a reactor trip.The DSS will not be capable of generating a reactor trip.
B. CCW Pressure Switches, PCS-412 and PCS-413, have failed low.
A.B.C.D.page 38 2009 FORT CALHOUN SRO EXAM (39)Given the following:
C. PIC-2802, CCW Surge Tank Pressure indication, has failed low.
The power supply to RPS Clutch Power Supply Breaker, CB-AB,  will be                          transferred from Instrument Bus "B" to Instrument Bus "A".
D. HCV-438A/B/C/D have inadvertently closed resulting in low CCW pressure to the RCPs.
nverter "A" is supplying power to Instrument Bus "A" and Swing Inverter, EE-8U, is      supplying power to Instrument Bus "B".Which one of the following actions will be taken before placing the Clutch PowerSupply Transfer Switch, RPS/TS-AB, in the Instrument Bus A (#1) position inaccordance with OI-EE-4?Cross-tie Instrument Bus "A" to Instrument Bus "C".Bypass Inverter "A".Transfer Instrument Bus "B" supply to Inverter "B".Bypass Swing Inverter 8-U.
page 36
A.B.C.D.page 39 2009 FORT CALHOUN SRO EXAM (40)Given the following:    The plant was operating at 50% power when a LOCA occured    The reactor tripped automatically      PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated    The sequencers begin starting safeguards motors      During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased below the OPLS setpointHow will the OPLS relays respond and what action, if any, should be taken bythe Operators to ensure safeguards equipment actuates?OPLS will not actuate. Operators should trip both 86A/OPLS and 86B/OPLS.86A/OPLS will actuate. Operators should trip 86B/OPLS.86B/OPLS will actuate. Operators should trip 86A/OPLS.86A/OPLS and 86B/OPLS will both actuate. No operator action is required.
A.B.C.D.page 40 2009 FORT CALHOUN SRO EXAM (41)From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?Directly from the containment coolers. From the seismic skirt area.Directly from the containment atmosphere.From the nuclear detector well cooling system.
A.B.C.D.page 41 2009 FORT CALHOUN SRO EXAM (42)Given the following:
ECCS actuation has occurred due to a PPLS EOP-03, LOSS OF COOLANT ACCIDENT, has been entered Step 33 has been reached Step 33 says, "Verify that the Containment Sump level rises as the SIRWT level              lowers."
SIRWT level is 95 inches and lowering Containment sump level is low and not risingWhat action should be taken per EOP-03?Minimize ECCS flow to the minimum required to remove decay heat.Initiate containment spray to ensure adequate containment sump level.Begin blended makeup to the SIRWT to increase SIRWT inventory.Trip the LPSI pumps to reduce SIRWT depletion rate.
A.B.C.D.page 42 2009 FORT CALHOUN SRO EXAM (43)In order to maintain steam generator pressure below 1100 psia following a loss of loadfrom 100% power, Technical Specifications require that _________ be operable in modes 1 and 2.All 10 Main Steam Safety Valves.9 of 10 Main Steam Safety Valves.4 of 5 Main Steam Safety Valves on each Steam Generator.3 of 5 Main Steam Safety Valves on each Steam Generator.
A.B.C.D.page 43 2009 FORT CALHOUN SRO EXAM (44)Given the following plant conditions:
The plant is operating at full power All Feedwater Reg valves and Bypass valves are in AUTO on DCS The Bypass valves are closed Both DCS level controllers are in AUTO on DCS Narrow range level in both Steam Generators is at 63%How should the Feedwater Reg valves and Bypass valves respond to a reactor trip?The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves willinitially open to 40-45% and control narrow range water level at 63%  The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves willinitially open to 40-45% and control narrow range water level at 35%The Feedwater Reg valves will initially ramp down to 8% and control narrow rangewater level at 63%. The Feedwater Bypass valves will remain closed.The Feedwater Reg valves will initially ramp down to 8% and control narrow rangewater level at 35%. The Feedwater Bypass valves will remain closed.
A.B.C.D.page 44 2009 FORT CALHOUN SRO EXAM (45)To prevent a loss of RCS heat removal following a total loss of feedwater, either AFWflow must be initiated or once-through-cooling must be established when:Wide Range level in either S/G falls below 32%.Wide Range levels in both S/G's fall below 32%.
An uncontrolled rise in RCS T-cold of 6&deg;F.
An uncontrolled rise in RCS pressure of 50 psi.
A.B.C.D.page 45 2009 FORT CALHOUN SRO EXAM (46)Given the following plant conditions:
The plant was operating at full power An electrical grid disturbance results in degraded grid voltage AOP-31, 161 KV GRID MALFUNCTIONS, was entered The voltage on all 4160 V buses is less than the minimum required per AOP-31 The voltage on all 480 volt buses is less than the minimum required per AOP-31 The reactor was tripped and EOP-00, STANDARED POST TRIP ACTIONS, was            enteredWhat actions are directed by AOP-31 after tripping the reactor and entering EOP-00?Trip all pumps fed by 4160 V buses and manually initiate a 480 volt load shed.Trip all pumps fed by 4160 V buses, parallel Diesel Generators to buses 1A4 and1A3 and open their respective feeder breakers.Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers andallowing the Diesel Generators to power the buses, manually initiate thesequencers to start required loads.Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers andallowing the Diesel Generators to power the buses, manually start required loads.
A.B.C.D.page 46 2009 FORT CALHOUN SRO EXAM (47)Given the following:    The plant was operating at full power    The DC BUS #1 GROUND annunciator came into alarm    The EONT has been dispatched to 125 VDC Bus 1 EE-8F    You have been directed to check the DC Bus at AI-41A for indications of a ground          in accordance with ARP-CB-20/A15.Which one of the following is an indicator of a severe ground on 125V DC Bus #1 atAI-41A?Both white lights  will be brightly lit and one Ground Fault Voltmeter will indicate lowvoltage.One white light will be brightly lit and one Ground Fault Voltmeter will indicate lowvoltage.Both white lights will be brightly lit and both Ground Fault Voltmeters will indicatelow voltage.One white light will be brightly lit and both Ground Fault Voltmeters will indicate lowvoltage.A.B.C.D.page 47 2009 FORT CALHOUN SRO EXAM (48)The timer on battery charger #1, EE-8C, is being used to place an equalizing charge onbattery #1. What voltage would be expected to be indicated on DC bus #1 during this operationand when the timer times out?133-137 volts dropping to 123-127 volts.138-142 volts dropping to 123-127 volts.133-137 volts dropping to 128-132 volts.138-142 volts dropping to 128-132 volts.
A.B.C.D.page 48 2009 FORT CALHOUN SRO EXAM (49)Given the following plant conditions:
A large break LOCA occurred in containment Offsite power was lost at the same time Both Diesel Generators started DG-1's speed only increased to 700 rpm due to a problem with its governorHow would the ECCS pumps normally powered by DG-1 be affected?The output breaker from DG-1 would not close and there would be no power to thepumps.The output breaker from DG-1 would close, but the sequencers would not close theindividual pump breakers.The output breaker from DG-1 would close and the sequencers would close theindividual pump breakers, but the DG-1 output breaker would soon open due to anovercurrent condition.The output breaker from DG-1 would close and the sequencers would close theindividual pump breakers, but the pumps would run at reduced speed and flow.
A.B.C.D.page 49 2009 FORT CALHOUN SRO EXAM (50)Given the following plant conditions:
The plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service Letdown temperature transmitter, TE-2897, has just been recalibrated Atmospheric dump valve, HCV-1040, was just unisolated New fluid has just been added to the EHC system Power range NI power is rising slowly on all channels Delta T power is rising slowly on all channels All hot and cold leg temperatures are rising slowlyWhat action should be taken based on these indications?Bypass the ion exchangers using OI-CH-2.Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.Isolate the atmospheric dump valve using OI-MS-1A.
Check the EHC fluid for air bubbles using OI-ST-12.
A.B.C.D.page 50 2009 FORT CALHOUN SRO EXAM (51)Given the following plant conditions:
There is high activity in the RCS A steam generator tube leak exists in RC-2B RM-064 has been placed in service with the selector switch placed in the "auto" position The indicated radiation level on RM-064 will:Read background radiation only.Peg high and stay that way.Alternate between high and low readings.Slowly continue to rise.
A.B.C.D.page 51 2009 FORT CALHOUN SRO EXAM (52)Given the following conditions:
A steam line has ruptured inside containment The CCW surge tank has ruptured.
All other Engineered Safeguards Features are operating as designed River level is 990 feet Containment pressure is 40 psia Containment temperature is 190&deg;FShould Raw Water backup cooling be supplied to the Containment Coolers inaccordance with AOP-11, LOSS OF COMPONENT COOLING WATER and why?Yes, because both Containment temperature and pressure are high. No, because they are not needed with Containment Spray operating.No, because Containment temperature is too high.No, because river level is too low.
A.B.C.D.page 52 2009 FORT CALHOUN SRO EXAM (53)Given the following plant conditions:
The plant was operating at 100% power Raw Water pumps, AC-10A and AC-10B were running A Loss of Coolant Accident occurred coincident with a loss of offsite power Diesel Generator, DG-2, failed to startWhich Raw Water pumps will be running after sequencer operation?AC-10A and AC-10B.AC-10A and AC-10C.AC-10B and AC-10D.AC-10C and AC-10D.
A.B.C.D.page 53 2009 FORT CALHOUN SRO EXAM (54)Given the following plant conditions:
The plant is operating at full power The PLANT AIR PRESS LO annunciator alarmed Soon after, the INSTRUMENT AIR PRESS LO annunciator alarmed On CB-10,11, PI-1750, Instrument Air Pressure, is cycling between 80 and 85 psig  Which one of the following failures could cause these indications?A leak in an instrument air line inside containment.A stuck open relief valve on an air receiver.A clogged or flooded air dryer.A leak in the turbine building service air header.
A.B.C.D.page 54 2009 FORT CALHOUN SRO EXAM (55)A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that:The Inner PAL door cannot be opened with a high differential pressure across it.The Inner PAL door cannot be opened unless the outer PAL door is closed.The Outer PAL door cannot be opened from the outside with a ContainmentIsolation Actuation Signal (CIAS) present.The Outer PAL door cannot be opened from the outside with a ContainmentRadiation High Signal (CRHS) present.
A.B.C.D.page 55 2009 FORT CALHOUN SRO EXAM (56)Given the following plant conditions:
A steam line break has occurred in Room 81 PPLS and SGIS have actuated The affected steam generator has blown dry Pressurizer level is 60% and rising Pressurizer pressure is at 1650 psia and risingIn accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdown isolation valves, HCV-204 and TCV-202 to be opened?Reset Engineered Safeguards relays.Block PPLS, reset PPLS and CIAS lockout relays.Place CIAS override switches for HCV-204 and TCV-202 in override.Place Defeat switch for HCV-204 in the defeat position.
A.B.C.D.page 56 2009 FORT CALHOUN SRO EXAM (57)How could inoperability of the Containment Purge Exhaust Fans affect a refuelingoutage?Containment entry could be delayed due to higher airborne activity.Containment entry could be delayed due to higher temperatures in containment.Fuel movement could be delayed because Tech Specs require operability of thepurge fans.Plant restart could be delayed because Tech Specs require operability of the purgefans.A.B.C.D.page 57 2009 FORT CALHOUN SRO EXAM (58)Given the following plant conditions:
The plant is in a refueling outage Shutdown Cooling is in service The Refueling Cavity is flooded The core has been offloaded to the Spent Fuel Pool Spent Fuel Pool Cooling pump, AC-5A, has just tripped and cannot be restarted Spent Fuel Pool Cooling pump, AC-5B, will not start  How will alternate spent fuel pool cooling be established per AOP-36, LOSS OFSPENT FUEL POOL COOLING?The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned tocirculate water through the Spent Fuel Pool.The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned tocirculate water between the Refueling Cavity and Spent Fuel Pool, back through theFuel Transfer Tube.The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned tocirculate water through the Spent Fuel Pool.
The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned tocirculate water between the Refueling Cavity and Spent Fuel Pool, back through theFuel Transfer Tube.
A.B.C.D.page 58 2009 FORT CALHOUN SRO EXAM (59)How will the Steam Dump and Bypass valves respond to an uncomplicated reactor tripfrom full power if the output from pressure controller PIC-910 fails low?(Assume all systems are in automatic.)The Steam Dump Valves, TCV-909s, will open fully and then reclose. The BypassValve, PCV-910, will open fully and remain open.The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530&deg;F and 535&deg;F. The Bypass Valve, PCV-910,will remain fully closed.The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will openfully and then modulate to control RCS average temperature between 530&deg;F and 535&deg;F.
The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will openfully and then modulate to control RCS average temperature between 535&deg;F and 540&deg;F.A.B.C.D.page 59 2009 FORT CALHOUN SRO EXAM (60)Given the following:
Condenser Evacuation pumps, FW-8A and FW-8C, are operating FW-8B is the standby pump The "43/FW" switch is in the "OFF" position.What will happen if FW-8A trips due to high seal water temperature?FW-8B will start immediately. Condenser vacuum will be maintained steady.FW-8B will start automatically if condenser vacuum drops to 24.5 inches ofmercury. FW-8B will continue to run after automatically starting.FW-8B will start automatically if condenser vacuum drops to 24.5 inches ofmercury. FW-8B will then cycle on and off to maintain condenser vacuum between24.5 and 25.5 inches of vacuum.FW-8B will not start automatically unless the "43/FW" switch is placed in the"AUTO" position.
A.B.C.D.page 60 2009 FORT CALHOUN SRO EXAM (61)Given the following plant conditions:
The plant is operating at 40% power Condensate pump, FW-2A is out of service Condensate pump, FW-2B, is operating FW-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2What action, if any, should be taken in accordance with OI-FW-1 and for what reason?The selected pump should be changed to FW-2C to ensure that FW-2C will startautomatically if FW-2B trips following a SIAS or CSAS actuation.The selected pump should be changed to FW-2C to ensure that FW-2B willcontinue to run following a SIAS or CSAS actuation.FW-2B should remain as the selected pump to ensure that FW-2B will trip followinga SIAS or CSAS actuation.
FW-2B should remain as the selected pump to ensure that FW-2B will continue torun following a SIAS or CSAS actuation.
A.B.C.D.page 61 2009 FORT CALHOUN SRO EXAM (62)Given the following:
The plant is operating at full power


REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annunciator is in alarm
2009 FORT CALHOUN SRO EXAM (37)
Given the following plant conditions:
A Reactor Coolant System cooldown is in progress for a refueling outage S
hutdown cooling is in operation per OI-SC-1 R
CS temperature is 120&deg;F R
CS pressure is 235 psia R
eactor Coolant Pumps, RC-3A and RC-3B, are operating.
P ressure is being controlled manually using Main pressurizer spray and heaters.
What actions should be taken before shutting down Reactor Coolant Pumps, RC-3A and RC-3B, in accordance with OI-RC-9?
A. RCS pressure should be lowered to less than 215 psia.
B. RCS temperature should be lowered to less than 110&deg;F.
C. The RCS should be borated to the refueling boron concentration.
D. RCS pressure control using Auxiliary spray should be established.
page 37


REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annunciator is in alarm
2009 FORT CALHOUN SRO EXAM (38)
Given the following plant conditions:
B us Power Failure DC Distribution Panel 1 Light is off D
C BUS#1 LOW VOLT annunciator is in alarm D
C Bus #1 voltage indicates 0 volts P
ower has been lost to the "A" DSS 86-Relay How will operation of the Diverse Scram System (DSS) be affected?
A. The DSS will initiate a reactor trip.
B. The DSS will go to a "1 of 3" trip logic.
C. The "A" DSS 86-Relay will not be capable of generating a reactor trip.
D. The DSS will not be capable of generating a reactor trip.
page 38


The T-ref (black) pens on both of the TAVG/TREF Recorders (TR-111/TR-121) indicate 532&deg;FWhich one of the following would produce these indications?One of the Power Range Control Channels output failed low.Both of the Power Range Control Channels output failed low.The Main Generator output transmitter failed low.The Turbine first stage pressure transmitter failed low.
2009 FORT CALHOUN SRO EXAM (39)
A.B.C.D.page 62 2009 FORT CALHOUN SRO EXAM (63)Given the following plant conditions:
Given the following:
Waste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank,      WD-29B The Control Switch for WD-28A is in the "HAND" Position.
T he power supply to RPS Clutch Power Supply Breaker, CB-AB, will be transferred from Instrument Bus "B" to Instrument Bus "A".
The Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control          valve, PCV-514B, is in the "HAND" position.If vent header pressure is sufficient, which one of the following will act first to preventoverpressurizing WD-29B?WD-28A will trip on high discharge pressure.PCV-514B will close on high tank pressure.WD-29B's rupture disk will break relieving to the room.WD-29B's relief valve will open relieving to the Auxiliary Building Exhaust Duct.
nverter "A" is supplying power to Instrument Bus "A" and Swing Inverter, EE-8U, is supplying power to Instrument Bus "B".
A.B.C.D.page 63 2009 FORT CALHOUN SRO EXAM (64)The Distributed Control System (DCS) core mimic monitor provides color graphicdisplays for each CEDM. Green squares are used to indicate that the CEDM is fullyinserted. The DCS input that results in the green square display comes from the:Synchro-transmitters.ERF computer.Magnet actuated reed switches.Cam actuated limit switches.
Which one of the following actions will be taken before placing the Clutch Power Supply Transfer Switch, RPS/TS-AB, in the Instrument Bus A (#1) position in accordance with OI-EE-4?
A.B.C.D.page 64 2009 FORT CALHOUN SRO EXAM (65)Which of the following describes the response of the Switchgear Room HVAC toFire Protection System detector alarms in the East Switchgear Room?After a detector has actuated in either zone 7 or 8, the ventilation dampers for onlythe East Switchgear Room shut. After a detector has actuated in both zones 7 and 8, the ventilation dampers foronly the East Switchgear Room shut. After a detector has actuated in either zone 7 or 8, the ventilation dampers for bothSwitchgear Rooms shut.
A. Cross-tie Instrument Bus "A" to Instrument Bus "C".
After detectors have actuated in both zones 7 and 8, the ventilation dampers inboth Switchgear Rooms shut.
B. Bypass Inverter "A".
A.B.C.D.page 65 2009 FORT CALHOUN SRO EXAM (66)For what procedures are you allowed to use the Indexes on the Document ControlWeb page to verify that the most current revision of a procedure is being used perSO-G-7, OPERATING MANUAL?For all plant procedures.Only for procedures designated as "Information Use."Only for procedures designated as "Information Use" or "Reference Use."Cannot be used to verify current revision for any procedures.
C. Transfer Instrument Bus "B" supply to Inverter "B".
A.B.C.D.page 66 2009 FORT CALHOUN SRO EXAM (67)Spent fuel is being moved in the Spent Fuel Pool using Spent Fuel Handling Machine,FH-12. Which one of the following plant HVAC configurations is required in accordancewith OP-12, FUELING OPERATIONS?One Auxiliary Building Supply and two Auxiliary Exhaust Fans must be running.All Auxiliary Building Exhaust Fans must be running.Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position andControl Room Ventilation must be operating in the Filtered Air Makeup Mode.Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position andControl Room Ventilation must be operating in the Recirculation Mode.
D. Bypass Swing Inverter 8-U.
A.B.C.D.page 67 2009 FORT CALHOUN SRO EXAM (68)Given the following:
page 39
A surveillance test is being performed that measures the closure time of a                        containment isolation valve.
 
A suggestion is made that the test be conducted first for "just in time training" prior          to the actual surveillance test being conducted. Is this allowed in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM andwhy?Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior tomeasuring stroke time.Yes, this is a good practice although it is not required by SO-G-23.No, this is not a good practice because it involves excessive valve cycling.No, this is not allowed because SO-G-23 requires the test be conducted from the"as found" condition.
2009 FORT CALHOUN SRO EXAM (40)
A.B.C.D.page 68 2009 FORT CALHOUN SRO EXAM (69)During the conduct of a surveilance test, the control switch for a pump that is requiredto be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.No other changes have been made to the system. How does this affect the Operability and Availability of the pump?The pump is "Operable" and "Available."The pump is NOT "Operable" but is "Available."The pump is "Operable" but is NOT "Available."The pump is NOT "Operable" and NOT "Available." A.B.C.D.page 69 2009 FORT CALHOUN SRO EXAM (70)The plant is operating at full power. An instrument bus has been placed in an abnormalalignment to allow for maintenance activites. Which one of the following alignments requires logging into a Limiting Condition forOperation?Instrument Bus "A" is being supplied by swing inverter, EE-8T.Instrument Bus "A" is being supplied by its bypass transformer.Instrument Bus "1" is being supplied by its bypass transformer.Instrument Bus "1" is being supplied by its testing transformer.
Given the following:
A.B.C.D.page 70 2009 FORT CALHOUN SRO EXAM (71)When are Control Room Log entries required for containment entry and exit perStanding Order O-22, "CONTAINMENT ACCESS AND EGRESS?When one PAL door is inoperable.When containment integrity is required.When entering without Radiation Protection coverage.When the containment security card readers are not operational.
The plant was operating at 50% power when a LOCA occured The reactor tripped automatically PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated The sequencers begin starting safeguards motors During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased below the OPLS setpoint How will the OPLS relays respond and what action, if any, should be taken by the Operators to ensure safeguards equipment actuates?
A.B.C.D.page 71 2009 FORT CALHOUN SRO EXAM (72)How will placing the keyswitch on a Control Room process radiation monitor ratemeterin the "KEYPAD" position affect operation of the radiation monitor?Annunciation and equipment actuations will be blocked.Annunciation will still work but equipment actuations will be blocked.Annunciation and equipment actuations will still work but output to the radiationmonitor recorder will be blocked.Annunciation and equipment actuations will still work but output to the ERFcomputer will be blocked.
A. OPLS will not actuate. Operators should trip both 86A/OPLS and 86B/OPLS.
A.B.C.D.page 72 2009 FORT CALHOUN SRO EXAM (73)EOP-04, STEAM GENERATOR TUBE RUPTURE, directs aligning blowdown sampleflow to the Spent Regenerant Tank to:Limit the release of radioactive liquid to the river.Limit contamination of the water in the Condenser Hotwell.Minimize radiation levels in Room 81.Minimize radiation levels in the secondary sampling room.
B. 86A/OPLS will actuate. Operators should trip 86B/OPLS.
A.B.C.D.page 73 2009 FORT CALHOUN SRO EXAM (74)In the Control Room, plant instruments that have been qualified to survive in anaccident environment (EEQ) can be identified by:Orange tape.Orange dots.Yellow labels.Red and white striped label borders.
C. 86B/OPLS will actuate. Operators should trip 86A/OPLS.
A.B.C.D.page 74 2009 FORT CALHOUN SRO EXAM (75)Given the following plant conditions:
D. 86A/OPLS and 86B/OPLS will both actuate. No operator action is required.
A reactor startup is in progress Wide Nange NI power indicates 5 x 10
page 40
-5% power A sustained positive startup rate of 1.5 DPM is indicated on all channels.
 
All Zero Power Mode Bypass Switches are in the "BYPASS" position All Reactor Coolant Pumps are operatingIf Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and whywould an automatic reactor trip occur and EOP-00 be entered?Assume no operator actions.The reactor would trip immediately due to low RCS flow.The reactor would trip on low RCS flow when power exceeds 1 x 10
2009 FORT CALHOUN SRO EXAM (41)
-4% power.The reactor would trip immediately due to high startup rate.The reactor would trip on high startup rate when power exceeds 1 x 10
From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?
-4% power.A.B.C.D.page 75 2009 FORT CALHOUN SRO EXAM (76)The Power Dependent (transient) Insertion Limits (PDILs) specified in the CoreOperating Limits Report (COLR) are based on ensuring that:Adequate shutdown margin is available following a reactor trip.The rate of reactivity addition during a CEA withdrawal event does not exceed thevalue used in the Chapter 14 analysis.A diverging xenon oscillation will not be initiated.
A. Directly from the containment coolers.
Excessive swelling of the B 4C in the CEAs is prevented.
B. From the seismic skirt area.
A.B.C.D.page 76 2009 FORT CALHOUN SRO EXAM (77)Given the following plant conditions::The Crew has entered EOP-03, LOSS OF COOLANT ACCIDENTA small break LOCA has been isolated in accordance with EOP-03he RCS Pressure and Temperature limits of EOP-AO P Attachment 2, "RCS                  Pressure-Temperature Limits for 40 EFPY" have been violatedWhat action is required to be taken after pressure and temperature have been stabilized?Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40EFPY, and soak the RCS at the current pressure and temperature for 3 hours.Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40EFPY, and contact the PRC for an Appendix E limit evaluation.Implement EOP-AOP Attachment 27, P-T Limit Restoration, and soak the RCS atthe current pressure and temperature for 3 hours.
C. Directly from the containment atmosphere.
Implement EOP-AOP Attachment 27, P-T Limit Restoration, and contact the PRCfor an Appendix E limit evaluation.
D. From the nuclear detector well cooling system.
A.B.C.D.page 77 2009 FORT CALHOUN SRO EXAM (78)Given the following plant conditions:The plant is operating at full powerAnnunciator CB-1/2/3 A6 A-4, "REACTOR COOLANT PUMP RC-3A VIBRATION          HI" is in alarm.
page 41
A plant operator was dispatched to AI-270 and reports that the alarm is valid and       that the vibration on the upper guide bearing is above the action level but below              the shutdown limit.What action should you direct be taken as a result of this alarm?Enter AOP-35, REACTOR COOLANT PUMP MALFUNCTION, and continue tomonitor the vibration level.Enter AOP-05, EMERGENCY PLANT SHUTDOWN. Trip RC-3A after the reactorhas been shut down.Reference OI-RC-13, OPERATION OF RCP VIBRATION MONITORING SYSTEM,and contact the system engineer.Trip the reactor and enter EOP-00, STANDARD POST-TRIP ACTIONS. Trip RC-3Aafter the reactor has been shut down.
 
A.B.C.D.page 78 2009 FORT CALHOUN SRO EXAM (79)Given the following plant conditions:The plant is operating at 100% powerThe FEEDWATER CONTROL STEAM GENERATOR RC-2A(B) LEVEL LO-LO            annunciators are in alarm for both Steam GeneratorsThe levels on both Steam Generato rs are continuing to lower slowlyTwo main feedwater pumps operatingFW level control valves LCV-1101 and LCV-1102 are 100% open in automatic            control.What actions should you direct the Operators to take?Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. Establishauxiliary feedwater flow to the steam generators using the contingency actions ofEOP-00.Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. AfterReactivity Control is verified, transition to EOP-06, LOSS OF ALL FEEDWATER,and establish auxiliary feedwater flow to both steam generators.Refer to the ARP and attempt to restore main feedwater flow by taking manualcontrol of feedwater using DCS.Refer to the ARP and attempt to restore main feedwater flow by starting a thirdmain feedwater pump.
2009 FORT CALHOUN SRO EXAM (42)
A.B.C.D.page 79 2009 FORT CALHOUN SRO EXAM (80)Given the following plant conditions:The reactor was in hot shutdown with RCS cold leg temperatures being maintained at 532&deg;F  a steam generator tube ruptured resulting in PPLS actuation  Instrument air pressure is below 40 psig due to a ruptured header in the auxiliary            building. What actions should you direct to be taken?Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primaryto Secondary Leak Rate Actions. After completing these actions, enter AOP-17,LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header.Enter AOP-22, REACTOR COOLANT LEAK, and perform the initial actions. Thenenter AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate theruptured header. After performing these actions, return to AOP-22 and performAttachment B,  Primary to Secondary Leak Rate Actions.Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the requiredactions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to isolate the ruptured header.Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the requiredactions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to implement AOP-17, LOSS OFINSTRUMENT AIR, which will direct you to isolate the ruptured header.
Given the following:
A.B.C.D.page 80 2009 FORT CALHOUN SRO EXAM (81)Given the following plant conditions:The plant was operating at full power  The copy of the capability curve normally located on CB-20 has been removed for        some control board mimic changesa "GENERATOR FIELD OVERVOLTAGE" alarm was received on CB-20/A14. What procedures would be used to adjust Main Generator Field Voltage and verify thatthe generator is operating within its capability curve?AOP-27, MAIN GENERATOR MALFUNCTIONS, and OI-ST-1, TURBINEGENERATOR NORMAL OPERATION.AOP-27, MAIN GENERATOR MALFUNCTIONS, and the TECHNICAL DATA BOOK.ARP, CB-20/A14, and OI-ST-1, TURBINE GENERATOR NORMAL OPERATION.
E CCS actuation has occurred due to a PPLS E
ARP, CB-20/A14, and the TECHNICAL DATA BOOK.
OP-03, LOSS OF COOLANT ACCIDENT, has been entered S
A.B.C.D.page 81 2009 FORT CALHOUN SRO EXAM (82)The plant was operating with the following initial conditions:The reactor is operating at 55% power during a power ascensionThe DCS SCEAPIS function is inoperableThe plant conditions suddenly changed such that:The ROD DROP NUCLEAR INSTRUMENTATION CHANNEL annunciator is in              alarm Nuclear Instrumentation channel "C" indication initially lowered to 46% power and           is now reading 50%
tep 33 has been reached S
and steadyThe other three Nuclear Instrumentation channels indication initially lowered to               49% power and are now reading 52% and steadyRCS cold leg temperatures have all lowered by 5&deg;F and are steady.Which one of the following procedures should be entered as a result of theseconditions?    AOP-40, OVERCOOLING / EXCESSIVE STEAM DEMAND.AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMINGAOP-03, EMERGENCY BORATION.
tep 33 says, "Verify that the Containment Sump level rises as the SIRWT level lowers."
AOP-02, CEA AND CONTROL SYSTEM MALFUNCTIONS.
S IRWT level is 95 inches and lowering C
A.B.C.D.page 82 2009 FORT CALHOUN SRO EXAM (83)Given the following plant conditions:24 hours prior to startup, Wide range channel "A" was removed from service due to a failed fission chamberA plant startup is in progressCriticality has just been achieved and power has been stabilized at 1x10
ontainment sump level is low and not rising What action should be taken per EOP-03?
-3 %                    Power Wide range channels "B" and "D" have just failed low following a voltage transientWhat action is required by Technical Specifications and AOP-15, "Loss of FluxIndication or Flow Streaming" and why?The reactor must be shutdown by manually inserting CEAs because wide rangechannel "D" failed and reactor power indication will not be available on AI-212.The reactor must be shutdown by manually inserting CEAs because SCEAPIS(DCS) requires at least 2 wide range channels greater than 10
A. Minimize ECCS flow to the minimum required to remove decay heat.
-4 % power to enablethe rod block function.The reactor must be tripped because there are an inadequate number of operablechannels for the RPS high startup rate trip.The reactor must be tripped because there are an inadequate number of operablechannels for the RPS axial power distribution trip.
B. Initiate containment spray to ensure adequate containment sump level.
A.B.C.D.page 83 2009 FORT CALHOUN SRO EXAM (84)Given the following plant  initial conditions:A refueling outage is in progress. 106 fuel assembles have been loaded into the core  The 107th fuel assembly (a new fuel assembly) is being moved over the coreThe Equipment Hatch, Room 66 roll-up doors, Room 66 construction access opening and both PAL doors are all open  Plant conditions then change:The moving fuel assembly drops from FH-1. No radiation monitor alarms are received.Which one of the following actions meets the requirements of AOP-08, FUELHANDLING INCIDENT, if performed within one hour?"Initiate CIAS using the EMERGENCY OPERATE switches. Close the equipmenthatch and one of the PAL doors. Initiate CIAS using the EMERGENCY OPERATE switches. Close the room 66rollup doors and both of the PAL doors.Initiate VIAS using the CRHS test switches. Close the equipment hatch and one ofthe PAL doors.
C. Begin blended makeup to the SIRWT to increase SIRWT inventory.
Initiate VIAS using the CRHS test switches. Close the room 66 rollup doors andboth of the PAL doors.
D. Trip the LPSI pumps to reduce SIRWT depletion rate.
A.B.C.D.page 84 2009 FORT CALHOUN SRO EXAM (85)Given the following plant conditions:The plant is operating at full power  The RM-057 CONDENSER OFF GAS HIGH RADIATION annunciator is in alarm  The radiation level on RM-057 is just above the Alert setpoint and rising slowlyPressurizer level is steady at 60%Charging flow at 40 gpmLetdown flow is 36 gpm  The Shift Chemist reports that the primary to secondary leak rate is 8 gallons per            day. What action should you direct be taken based on these conditions?Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary toSecondary Leak Rate Actions. Use SO-G-105, STEAM GENERATOR TUBELEAKAGE, to determine action level and other required actions.
page 42
Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary toSecondary Leak Rate Actions. SO-G-105, STEAM GENERATOR TUBELEAKAGE, is not used unless primary to secondary leakage exceeds 10% of the Technical Specification Limit.Enter AOP-22, REACTOR COOLANT LEAK, perform Attachment B, Primary toSecondary Leak Rate Actions, when the primary to secondary leakage increases togreater than 10 gpd. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, todetermine action level and other required actions.Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action leveland required actions. AOP-22, REACTOR COOLANT LEAK, will not be enteredwith normal indications of pressurizer level, charging and letdown.
 
A.B.C.D.page 85 2009 FORT CALHOUN SRO EXAM (86)Given the following initial plant conditions:The plant is shutdown with the RCS at mid-loop for replacement of a reactor                    coolant pump sealBoric Acid Pump Header to Charging Pumps Isolation Valve, HCV-268, is closed            and tagged out of service  All other CVCS components are operableAll CEAs are fully inserted  Plant conditions change such that:The count rates indicated by two of the four operable Wide Range Nuclear                      Instrumentation Channels are rising steadily and have doubled in the past 15 minutesAll four Power Range channels are indicating 0% and are steady What action should you direct be taken?Enter AOP-03, EMERGENCY BORATION. Perform emergency boration from theBoric Acid Storage Tanks per the procedure.Enter EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path RC-2,and perform alternate emergency boration from the SIRWT.Enter SO-O-21, SHUTDOWN OPERATIONS PROTECTION PLAN, Attachment7.6, Reduced Inventory, and ensure reactivity management resources are available.Enter AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMING. Direct I&Cto recalibrate the Wide Range NI Channels.
2009 FORT CALHOUN SRO EXAM (43)
A.B.C.D.page 86 2009 FORT CALHOUN SRO EXAM (87)Given the following initial plant conditions:Shutdown Cooling is in operation using Low Pressure Safety Injection Pump,                  SI-1ARCS temperature is 250&deg;FPressurizer pressure is 250 psiaPressurizer level at 50%Plant conditions change such that:SI-1A tripsThe LPSI PUMP SI-1A O/L OR TRIP annunciator is in alarmThe SHUTDOWN COOLING FLOW HI-LO annunciator is in alarmVoltage on bus 1A3 is 3950 VoltsVoltage on bus 1A4 is 4160 Volts.What action should be taken as a result of these conditions?Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place LPSI pump SI-1B inservice.Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place Containment SprayPump, SI-3A, in service.Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place LPSI pump SI-1B inservice.
In order to maintain steam generator pressure below 1100 psia following a loss of load from 100% power, Technical Specifications require that _________ be operable in modes 1 and 2.
Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place Containment SprayPump, SI-3A, in service.
A. All 10 Main Steam Safety Valves.
A.B.C.D.page 87 2009 FORT CALHOUN SRO EXAM (88)Given the following plant conditions:A large LOCA has occurred inside containment. PPLS, CPHS and CSAS have all actuatedEOP-03, LOSS OF COOLANT ACCIDENT, has been enteredContainment Cooling and Filtering Units, VA-3A tripped and VA-3B failed to start Containment pressure is 62 psigWhat action should be taken as a result of these plant conditions?Ensure maximum CCW flow to Containment Cooling Units, VA-7A and VA-7B. DoNOT start any containment spray pumps.Manually initiate SGLS to enable containment spray operation.Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CIand establish containment spray flow using one containment spray pump.Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CI and establish containment spray flow using all available containment spray pumps.
B. 9 of 10 Main Steam Safety Valves.
A.B.C.D.page 88 2009 FORT CALHOUN SRO EXAM (89)Given the following plant conditions:The plant is operating at 60% powerThe FEEDWATER CONTROL STEAM GENERATOR RC-2B LEVEL HI-HI                      annunciator is in alarm Steam Generator, RC-2B, narrow range level is 84%DCS controller, FC1102, has transferred to manualFeed Reg Valve, FCV-1102, went closed but is now reopeningWhat actions should be taken after entering ARP CB-4/A8?Direct the BOPO to monitor FC1102 and verify that control transfers back to automatic.Direct the BOPO to return level to 63% using manual control of FCV-1102.Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPOto transfer FC1102 to single element control.
C. 4 of 5 Main Steam Safety Valves on each Steam Generator.
Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPOto open FCV-1102 to 50% in manual and then place DCS Controller FC1102 inautomatic control.
D. 3 of 5 Main Steam Safety Valves on each Steam Generator.
A.B.C.D.page 89 2009 FORT CALHOUN SRO EXAM (90)Given the following plant conditions:A severe thunderstorm occurred 6 hours agoDebris has been observed floating in the riverThe river level is 985'The plant is operating at full powerRaw Water Pumps, AC-10A and AC-10B are operating with their pressure                      indicating lights lit The RAW WATER SUPPLY HEADER FLOW LO annunciator is in alarmThe AC-12A STRAINER DP HIGH annunciator is in alarm.The AC-12B STRAINER DP HIGH annunciator is in alarm.Which one of the following actions should be taken as a result?Enter AOP-01, ACTS OF NATURE, and place the Raw Water Strainers in MANUALBACKWASH.Enter AOP-01, ACTS OF NATURE, and ensure that Raw Water pump AC-10A isnot running.Enter AOP-18, LOSS OF RAW WATER, and ensure that the traveling screens areoperating in MANUAL-SLOW.
page 43
Enter AOP-18, LOSS OF RAW WATER, and shutdown the Circulating WaterPumps that share cells with the running Raw Water pumps.
 
A.B.C.D.page 90 2009 FORT CALHOUN SRO EXAM (91)Given the following plant conditions:The plant is operating at full power.During surveillance testing, it was determined that one of the group 4 Control Element Assemblies was immovable due to excessive frictionThe immovable CEA is aligned with the other CEAs in its groupAdequate shutdown margin was verified assuming the inoperable CEA and the                highest worth CEA do not insert following a reactor trip.What action is required by Technical Specifications?Enter Tech Spec 2.0.1 and place the plant in hot shutdown within 6 hours.Enter Tech Spec 2.10.2(4) and place the plant in hot shutdown within 7 hours.Enter Tech Spec 2.10.2(4) and lower reactor power to less than 70% within onehour. Operation below 70% power may continue up to 8 hours.Enter Tech Spec 2.10.2(1) and verify adequate shutdown margin every 24 hoursusing TDB-V.9, SHUTDOWN MARGIN WORKSHEET.
2009 FORT CALHOUN SRO EXAM (44)
A.B.C.D.page 91 2009 FORT CALHOUN SRO EXAM (92)Given the following plant conditions:A Loss of Coolant Accident with delayed ECCS operation has occurredThe core was uncovered for more than one hour but is now coveredCore Exit Thermocouple temperatures exceeded 2000&deg;F but now indicate 240&deg;FRadiation level inside containment is 94,000 R/hrContainment pressure reached 55 psig but is now 10 psigContainment relative humidity is 100%The ERF computer shows that containment temperature is 240&deg;F  A Control Room Operator has placed the hydrogen analyzers in serviceIndicated containment hydrogen concentration is 3.2%  What action is required to correct the indicated hydrogen concentration for highcontainment temperature?Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZEROPERATION, which will result in a higher than indicated hydrogen concentration.Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZER OPERATION, which will result in a lower than indicated hydrogen concentration.Use the correction curve in EOP-AOP Attachment 16, CONTAINMENTHYDROGEN ANALYZER STARTUP, which will result in a higher than indicated hydrogen concentration.Use the correction curve in EOP-AOP Attachment 16, CONTAINMENTHYDROGEN ANALYZER STARTUP, which will result in a lower than indicatedhydrogen concentration.
Given the following plant conditions:
A.B.C.D.page 92 2009 FORT CALHOUN SRO EXAM (93)Given the following plant conditions:The plant was operating at 100% powerAn event occurred that resulted in a loss of the intake structure and all of the                  equipment inside The turbine and reactor tripped automatically due to a loss condenser vacuum  EOP-00, STANDARD POST TRIP ACTIONS, have been completedWhich one of the following actions should be taken to cool components that arenormally cooled by Component Cooling Water?  Use AOP-10, LOSS OF CIRCULATING WATER, to provide cooling to requiredcomponents using Potable Water.Use AOP-11, LOSS OF COMPONENT COOLING WATER, to provide cooling torequired components using the RW/CCW interface valves.Use AOP-18, LOSS OF RAW WATER, to line up alternate cooling to a RW/CCWHeat Exchanger using hoses from the plant Fire Protection System.
T he plant is operating at full power A
Use OCAG-1, OPERATIONAL CONTINGENCY ACTION GUIDELINE, to line upalternate cooling to a RW/CCW Heat Exchanger using hoses from the FCS FireEngine.A.B.C.D.page 93 2009 FORT CALHOUN SRO EXAM (94)The plant is operating at full power. You have just received a FC-214 report fromchemistry that reports the following plant chemistry parameters:Oxygen concentration is 0.12 ppm.
ll Feedwater Reg valves and Bypass valves are in AUTO on DCS T
Chloride concentration is 0.12 ppm.
he Bypass valves are closed B
oth DCS level controllers are in AUTO on DCS N
arrow range level in both Steam Generators is at 63%
How should the Feedwater Reg valves and Bypass valves respond to a reactor trip?
A. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 63%
B. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 35%
C. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 63%. The Feedwater Bypass valves will remain closed.
D. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 35%. The Feedwater Bypass valves will remain closed.
page 44
 
2009 FORT CALHOUN SRO EXAM (45)
To prevent a loss of RCS heat removal following a total loss of feedwater, either AFW flow must be initiated or once-through-cooling must be established when:
A. Wide Range level in either S/G falls below 32%.
B. Wide Range levels in both S/G's fall below 32%.
C. An uncontrolled rise in RCS T-cold of 6&deg;F.
D. An uncontrolled rise in RCS pressure of 50 psi.
page 45
 
2009 FORT CALHOUN SRO EXAM (46)
Given the following plant conditions:
T he plant was operating at full power A
n electrical grid disturbance results in degraded grid voltage A
OP-31, 161 KV GRID MALFUNCTIONS, was entered T
he voltage on all 4160 V buses is less than the minimum required per AOP-31 T
he voltage on all 480 volt buses is less than the minimum required per AOP-31 T
he reactor was tripped and EOP-00, STANDARED POST TRIP ACTIONS, was entered What actions are directed by AOP-31 after tripping the reactor and entering EOP-00?
A. Trip all pumps fed by 4160 V buses and manually initiate a 480 volt load shed.
B. Trip all pumps fed by 4160 V buses, parallel Diesel Generators to buses 1A4 and 1A3 and open their respective feeder breakers.
C. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually initiate the sequencers to start required loads.
D. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually start required loads.
page 46
 
2009 FORT CALHOUN SRO EXAM (47)
Given the following:
The plant was operating at full power The DC BUS #1 GROUND annunciator came into alarm The EONT has been dispatched to 125 VDC Bus 1 EE-8F You have been directed to check the DC Bus at AI-41A for indications of a ground in accordance with ARP-CB-20/A15.
Which one of the following is an indicator of a severe ground on 125V DC Bus #1 at AI-41A?
A. Both white lights will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.
B. One white light will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.
C. Both white lights will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.
D. One white light will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.
page 47
 
2009 FORT CALHOUN SRO EXAM (48)
The timer on battery charger #1, EE-8C, is being used to place an equalizing charge on battery #1.
What voltage would be expected to be indicated on DC bus #1 during this operation and when the timer times out?
A. 133-137 volts dropping to 123-127 volts.
B. 138-142 volts dropping to 123-127 volts.
C. 133-137 volts dropping to 128-132 volts.
D. 138-142 volts dropping to 128-132 volts.
page 48
 
2009 FORT CALHOUN SRO EXAM (49)
Given the following plant conditions:
A large break LOCA occurred in containment O
ffsite power was lost at the same time B
oth Diesel Generators started D
G-1's speed only increased to 700 rpm due to a problem with its governor How would the ECCS pumps normally powered by DG-1 be affected?
A. The output breaker from DG-1 would not close and there would be no power to the pumps.
B. The output breaker from DG-1 would close, but the sequencers would not close the individual pump breakers.
C. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the DG-1 output breaker would soon open due to an overcurrent condition.
D. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the pumps would run at reduced speed and flow.
page 49
 
2009 FORT CALHOUN SRO EXAM (50)
Given the following plant conditions:
T he plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service L etdown temperature transmitter, TE-2897, has just been recalibrated A tmospheric dump valve, HCV-1040, was just unisolated N ew fluid has just been added to the EHC system P ower range NI power is rising slowly on all channels D elta T power is rising slowly on all channels A ll hot and cold leg temperatures are rising slowly What action should be taken based on these indications?
A. Bypass the ion exchangers using OI-CH-2.
B. Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.
C. Isolate the atmospheric dump valve using OI-MS-1A.
D. Check the EHC fluid for air bubbles using OI-ST-12.
page 50
 
2009 FORT CALHOUN SRO EXAM (51)
Given the following plant conditions:
T here is high activity in the RCS A
steam generator tube leak exists in RC-2B R
M-064 has been placed in service with the selector switch placed in the "auto" position The indicated radiation level on RM-064 will:
A. Read background radiation only.
B. Peg high and stay that way.
C. Alternate between high and low readings.
D. Slowly continue to rise.
page 51
 
2009 FORT CALHOUN SRO EXAM (52)
Given the following conditions:
A steam line has ruptured inside containment T
he CCW surge tank has ruptured.
A ll other Engineered Safeguards Features are operating as designed R
iver level is 990 feet C
ontainment pressure is 40 psia C
ontainment temperature is 190&deg;F Should Raw Water backup cooling be supplied to the Containment Coolers in accordance with AOP-11, LOSS OF COMPONENT COOLING WATER and why?
A. Yes, because both Containment temperature and pressure are high.
B. No, because they are not needed with Containment Spray operating.
C. No, because Containment temperature is too high.
D. No, because river level is too low.
page 52
 
2009 FORT CALHOUN SRO EXAM (53)
Given the following plant conditions:
T he plant was operating at 100% power R
aw Water pumps, AC-10A and AC-10B were running A
Loss of Coolant Accident occurred coincident with a loss of offsite power D
iesel Generator, DG-2, failed to start Which Raw Water pumps will be running after sequencer operation?
A. AC-10A and AC-10B.
B. AC-10A and AC-10C.
C. AC-10B and AC-10D.
D. AC-10C and AC-10D.
page 53
 
2009 FORT CALHOUN SRO EXAM (54)
Given the following plant conditions:
T he plant is operating at full power T
he PLANT AIR PRESS LO annunciator alarmed S
oon after, the INSTRUMENT AIR PRESS LO annunciator alarmed O
n CB-10,11, PI-1750, Instrument Air Pressure, is cycling between 80 and 85 psig Which one of the following failures could cause these indications?
A. A leak in an instrument air line inside containment.
B. A stuck open relief valve on an air receiver.
C. A clogged or flooded air dryer.
D. A leak in the turbine building service air header.
page 54
 
2009 FORT CALHOUN SRO EXAM (55)
A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that:
A. The Inner PAL door cannot be opened with a high differential pressure across it.
B. The Inner PAL door cannot be opened unless the outer PAL door is closed.
C. The Outer PAL door cannot be opened from the outside with a Containment Isolation Actuation Signal (CIAS) present.
D. The Outer PAL door cannot be opened from the outside with a Containment Radiation High Signal (CRHS) present.
page 55
 
2009 FORT CALHOUN SRO EXAM (56)
Given the following plant conditions:
A steam line break has occurred in Room 81 P
PLS and SGIS have actuated T
he affected steam generator has blown dry P
ressurizer level is 60% and rising P
ressurizer pressure is at 1650 psia and rising In accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdown isolation valves, HCV-204 and TCV-202 to be opened?
A. Reset Engineered Safeguards relays.
B. Block PPLS, reset PPLS and CIAS lockout relays.
C. Place CIAS override switches for HCV-204 and TCV-202 in override.
D. Place Defeat switch for HCV-204 in the defeat position.
page 56
 
2009 FORT CALHOUN SRO EXAM (57)
How could inoperability of the Containment Purge Exhaust Fans affect a refueling outage?
A. Containment entry could be delayed due to higher airborne activity.
B. Containment entry could be delayed due to higher temperatures in containment.
C. Fuel movement could be delayed because Tech Specs require operability of the purge fans.
D. Plant restart could be delayed because Tech Specs require operability of the purge fans.
page 57
 
2009 FORT CALHOUN SRO EXAM (58)
Given the following plant conditions:
T he plant is in a refueling outage S
hutdown Cooling is in service T
he Refueling Cavity is flooded T
he core has been offloaded to the Spent Fuel Pool S
pent Fuel Pool Cooling pump, AC-5A, has just tripped and cannot be restarted S
pent Fuel Pool Cooling pump, AC-5B, will not start How will alternate spent fuel pool cooling be established per AOP-36, LOSS OF SPENT FUEL POOL COOLING?
A. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water through the Spent Fuel Pool.
B. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.
C. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water through the Spent Fuel Pool.
D. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.
page 58
 
2009 FORT CALHOUN SRO EXAM (59)
How will the Steam Dump and Bypass valves respond to an uncomplicated reactor trip from full power if the output from pressure controller PIC-910 fails low?
(Assume all systems are in automatic.)
A. The Steam Dump Valves, TCV-909s, will open fully and then reclose. The Bypass Valve, PCV-910, will open fully and remain open.
B. The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530&deg;F and 535&deg;F. The Bypass Valve, PCV-910, will remain fully closed.
C. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 530&deg;F and 535&deg;F.
D. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 535&deg;F and 540&deg;F.
page 59
 
2009 FORT CALHOUN SRO EXAM (60)
Given the following:
C ondenser Evacuation pumps, FW-8A and FW-8C, are operating F
W-8B is the standby pump T
he "43/FW" switch is in the "OFF" position.
What will happen if FW-8A trips due to high seal water temperature?
A. FW-8B will start immediately. Condenser vacuum will be maintained steady.
B. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury. FW-8B will continue to run after automatically starting.
C. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury. FW-8B will then cycle on and off to maintain condenser vacuum between 24.5 and 25.5 inches of vacuum.
D. FW-8B will not start automatically unless the "43/FW" switch is placed in the "AUTO" position.
page 60
 
2009 FORT CALHOUN SRO EXAM (61)
Given the following plant conditions:
T he plant is operating at 40% power C
ondensate pump, FW-2A is out of service C
ondensate pump, FW-2B, is operating F
W-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2 What action, if any, should be taken in accordance with OI-FW-1 and for what reason?
A. The selected pump should be changed to FW-2C to ensure that FW-2C will start automatically if FW-2B trips following a SIAS or CSAS actuation.
B. The selected pump should be changed to FW-2C to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.
C. FW-2B should remain as the selected pump to ensure that FW-2B will trip following a SIAS or CSAS actuation.
D. FW-2B should remain as the selected pump to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.
page 61
 
2009 FORT CALHOUN SRO EXAM (62)
Given the following:
The plant is operating at full power REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annunciator is in alarm REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annunciator is in alarm The T-ref (black) pens on both of the TAVG/TREF Recorders (TR-111/TR-121) indicate 532&deg;F Which one of the following would produce these indications?
A. One of the Power Range Control Channels output failed low.
B. Both of the Power Range Control Channels output failed low.
C. The Main Generator output transmitter failed low.
D. The Turbine first stage pressure transmitter failed low.
page 62
 
2009 FORT CALHOUN SRO EXAM (63)
Given the following plant conditions:
W aste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank, WD-29B T
he Control Switch for WD-28A is in the "HAND" Position.
T he Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control valve, PCV-514B, is in the "HAND" position.
If vent header pressure is sufficient, which one of the following will act first to prevent overpressurizing WD-29B?
A. WD-28A will trip on high discharge pressure.
B. PCV-514B will close on high tank pressure.
C. WD-29B's rupture disk will break relieving to the room.
D. WD-29B's relief valve will open relieving to the Auxiliary Building Exhaust Duct.
page 63
 
2009 FORT CALHOUN SRO EXAM (64)
The Distributed Control System (DCS) core mimic monitor provides color graphic displays for each CEDM. Green squares are used to indicate that the CEDM is fully inserted. The DCS input that results in the green square display comes from the:
A. Synchro-transmitters.
B. ERF computer.
C. Magnet actuated reed switches.
D. Cam actuated limit switches.
page 64
 
2009 FORT CALHOUN SRO EXAM (65)
Which of the following describes the response of the Switchgear Room HVAC to Fire Protection System detector alarms in the East Switchgear Room?
A. After a detector has actuated in either zone 7 or 8, the ventilation dampers for only the East Switchgear Room shut.
B. After a detector has actuated in both zones 7 and 8, the ventilation dampers for only the East Switchgear Room shut.
C. After a detector has actuated in either zone 7 or 8, the ventilation dampers for both Switchgear Rooms shut.
D. After detectors have actuated in both zones 7 and 8, the ventilation dampers in both Switchgear Rooms shut.
page 65
 
2009 FORT CALHOUN SRO EXAM (66)
For what procedures are you allowed to use the Indexes on the Document Control Web page to verify that the most current revision of a procedure is being used per SO-G-7, OPERATING MANUAL?
A. For all plant procedures.
B. Only for procedures designated as "Information Use."
C. Only for procedures designated as "Information Use" or "Reference Use."
D. Cannot be used to verify current revision for any procedures.
page 66
 
2009 FORT CALHOUN SRO EXAM (67)
Spent fuel is being moved in the Spent Fuel Pool using Spent Fuel Handling Machine, FH-12. Which one of the following plant HVAC configurations is required in accordance with OP-12, FUELING OPERATIONS?
A. One Auxiliary Building Supply and two Auxiliary Exhaust Fans must be running.
B. All Auxiliary Building Exhaust Fans must be running.
C. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Filtered Air Makeup Mode.
D. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Recirculation Mode.
page 67
 
2009 FORT CALHOUN SRO EXAM (68)
Given the following:
A surveillance test is being performed that measures the closure time of a containment isolation valve.
A suggestion is made that the test be conducted first for "just in time training" prior to the actual surveillance test being conducted.
Is this allowed in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM and why?
A. Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior to measuring stroke time.
B. Yes, this is a good practice although it is not required by SO-G-23.
C. No, this is not a good practice because it involves excessive valve cycling.
D. No, this is not allowed because SO-G-23 requires the test be conducted from the "as found" condition.
page 68
 
2009 FORT CALHOUN SRO EXAM (69)
During the conduct of a surveilance test, the control switch for a pump that is required to be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.
No other changes have been made to the system.
How does this affect the Operability and Availability of the pump?
A. The pump is "Operable" and "Available."
B. The pump is NOT "Operable" but is "Available."
C. The pump is "Operable" but is NOT "Available."
D. The pump is NOT "Operable" and NOT "Available."
page 69
 
2009 FORT CALHOUN SRO EXAM (70)
The plant is operating at full power. An instrument bus has been placed in an abnormal alignment to allow for maintenance activites.
Which one of the following alignments requires logging into a Limiting Condition for Operation?
A. Instrument Bus "A" is being supplied by swing inverter, EE-8T.
B. Instrument Bus "A" is being supplied by its bypass transformer.
C. Instrument Bus "1" is being supplied by its bypass transformer.
D. Instrument Bus "1" is being supplied by its testing transformer.
page 70
 
2009 FORT CALHOUN SRO EXAM (71)
When are Control Room Log entries required for containment entry and exit per Standing Order O-22, "CONTAINMENT ACCESS AND EGRESS?
A. When one PAL door is inoperable.
B. When containment integrity is required.
C. When entering without Radiation Protection coverage.
D. When the containment security card readers are not operational.
page 71
 
2009 FORT CALHOUN SRO EXAM (72)
How will placing the keyswitch on a Control Room process radiation monitor ratemeter in the "KEYPAD" position affect operation of the radiation monitor?
A. Annunciation and equipment actuations will be blocked.
B. Annunciation will still work but equipment actuations will be blocked.
C. Annunciation and equipment actuations will still work but output to the radiation monitor recorder will be blocked.
D. Annunciation and equipment actuations will still work but output to the ERF computer will be blocked.
page 72
 
2009 FORT CALHOUN SRO EXAM (73)
EOP-04, STEAM GENERATOR TUBE RUPTURE, directs aligning blowdown sample flow to the Spent Regenerant Tank to:
A. Limit the release of radioactive liquid to the river.
B. Limit contamination of the water in the Condenser Hotwell.
C. Minimize radiation levels in Room 81.
D. Minimize radiation levels in the secondary sampling room.
page 73
 
2009 FORT CALHOUN SRO EXAM (74)
In the Control Room, plant instruments that have been qualified to survive in an accident environment (EEQ) can be identified by:
A. Orange tape.
B. Orange dots.
C. Yellow labels.
D. Red and white striped label borders.
page 74
 
2009 FORT CALHOUN SRO EXAM (75)
Given the following plant conditions:
A reactor startup is in progress W
ide Nange NI power indicates 5 x 10-5% power A
sustained positive startup rate of 1.5 DPM is indicated on all channels.
A ll Zero Power Mode Bypass Switches are in the "BYPASS" position A
ll Reactor Coolant Pumps are operating If Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and why would an automatic reactor trip occur and EOP-00 be entered?
Assume no operator actions.
A. The reactor would trip immediately due to low RCS flow.
B. The reactor would trip on low RCS flow when power exceeds 1 x 10-4% power.
C. The reactor would trip immediately due to high startup rate.
D. The reactor would trip on high startup rate when power exceeds 1 x 10-4% power.
page 75
 
2009 FORT CALHOUN SRO EXAM (76)
The Power Dependent (transient) Insertion Limits (PDILs) specified in the Core Operating Limits Report (COLR) are based on ensuring that:
A. Adequate shutdown margin is available following a reactor trip.
B. The rate of reactivity addition during a CEA withdrawal event does not exceed the value used in the Chapter 14 analysis.
C. A diverging xenon oscillation will not be initiated.
D. Excessive swelling of the B4C in the CEAs is prevented.
page 76
 
2009 FORT CALHOUN SRO EXAM (77)
Given the following plant conditions::
The Crew has entered EOP-03, LOSS OF COOLANT ACCIDENT A small break LOCA has been isolated in accordance with EOP-03 he RCS Pressure and Temperature limits of EOP-AOP Attachment 2, "RCS Pressure-Temperature Limits for 40 EFPY" have been violated What action is required to be taken after pressure and temperature have been stabilized?
A. Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40 EFPY, and soak the RCS at the current pressure and temperature for 3 hours.
B. Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40 EFPY, and contact the PRC for an Appendix E limit evaluation.
C. Implement EOP-AOP Attachment 27, P-T Limit Restoration, and soak the RCS at the current pressure and temperature for 3 hours.
D. Implement EOP-AOP Attachment 27, P-T Limit Restoration, and contact the PRC for an Appendix E limit evaluation.
page 77
 
2009 FORT CALHOUN SRO EXAM (78)
Given the following plant conditions:
The plant is operating at full power Annunciator CB-1/2/3 A6 A-4, "REACTOR COOLANT PUMP RC-3A VIBRATION HI" is in alarm.
A plant operator was dispatched to AI-270 and reports that the alarm is valid and that the vibration on the upper guide bearing is above the action level but below the shutdown limit.
What action should you direct be taken as a result of this alarm?
A. Enter AOP-35, REACTOR COOLANT PUMP MALFUNCTION, and continue to monitor the vibration level.
B. Enter AOP-05, EMERGENCY PLANT SHUTDOWN. Trip RC-3A after the reactor has been shut down.
C. Reference OI-RC-13, OPERATION OF RCP VIBRATION MONITORING SYSTEM, and contact the system engineer.
D. Trip the reactor and enter EOP-00, STANDARD POST-TRIP ACTIONS. Trip RC-3A after the reactor has been shut down.
page 78
 
2009 FORT CALHOUN SRO EXAM (79)
Given the following plant conditions:
The plant is operating at 100% power The FEEDWATER CONTROL STEAM GENERATOR RC-2A(B) LEVEL LO-LO annunciators are in alarm for both Steam Generators The levels on both Steam Generators are continuing to lower slowly Two main feedwater pumps operating FW level control valves LCV-1101 and LCV-1102 are 100% open in automatic control.
What actions should you direct the Operators to take?
A. Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. Establish auxiliary feedwater flow to the steam generators using the contingency actions of EOP-00.
B. Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. After Reactivity Control is verified, transition to EOP-06, LOSS OF ALL FEEDWATER, and establish auxiliary feedwater flow to both steam generators.
C. Refer to the ARP and attempt to restore main feedwater flow by taking manual control of feedwater using DCS.
D. Refer to the ARP and attempt to restore main feedwater flow by starting a third main feedwater pump.
page 79
 
2009 FORT CALHOUN SRO EXAM (80)
Given the following plant conditions:
The reactor was in hot shutdown with RCS cold leg temperatures being maintained at 532&deg;F a steam generator tube ruptured resulting in PPLS actuation Instrument air pressure is below 40 psig due to a ruptured header in the auxiliary building.
What actions should you direct to be taken?
A. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. After completing these actions, enter AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header.
B. Enter AOP-22, REACTOR COOLANT LEAK, and perform the initial actions. Then enter AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header. After performing these actions, return to AOP-22 and perform Attachment B, Primary to Secondary Leak Rate Actions.
C. Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the required actions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to isolate the ruptured header.
D. Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the required actions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to implement AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header.
page 80
 
2009 FORT CALHOUN SRO EXAM (81)
Given the following plant conditions:
The plant was operating at full power The copy of the capability curve normally located on CB-20 has been removed for some control board mimic changes a "GENERATOR FIELD OVERVOLTAGE" alarm was received on CB-20/A14.
What procedures would be used to adjust Main Generator Field Voltage and verify that the generator is operating within its capability curve?
A. AOP-27, MAIN GENERATOR MALFUNCTIONS, and OI-ST-1, TURBINE GENERATOR NORMAL OPERATION.
B. AOP-27, MAIN GENERATOR MALFUNCTIONS, and the TECHNICAL DATA BOOK.
C. ARP, CB-20/A14, and OI-ST-1, TURBINE GENERATOR NORMAL OPERATION.
D. ARP, CB-20/A14, and the TECHNICAL DATA BOOK.
page 81
 
2009 FORT CALHOUN SRO EXAM (82)
The plant was operating with the following initial conditions:
The reactor is operating at 55% power during a power ascension The DCS SCEAPIS function is inoperable The plant conditions suddenly changed such that:
The ROD DROP NUCLEAR INSTRUMENTATION CHANNEL annunciator is in alarm Nuclear Instrumentation channel "C" indication initially lowered to 46% power and is now reading 50% and steady The other three Nuclear Instrumentation channels indication initially lowered to 49% power and are now reading 52% and steady RCS cold leg temperatures have all lowered by 5&deg;F and are steady.
Which one of the following procedures should be entered as a result of these conditions?
A. AOP-40, OVERCOOLING / EXCESSIVE STEAM DEMAND.
B. AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMING C. AOP-03, EMERGENCY BORATION.
D. AOP-02, CEA AND CONTROL SYSTEM MALFUNCTIONS.
page 82
 
2009 FORT CALHOUN SRO EXAM (83)
Given the following plant conditions:
24 hours prior to startup, Wide range channel "A" was removed from service due to a failed fission chamber A plant startup is in progress Criticality has just been achieved and power has been stabilized at 1x10-3 %
Power W ide range channels "B" and "D" have just failed low following a voltage transient What action is required by Technical Specifications and AOP-15, "Loss of Flux Indication or Flow Streaming" and why?
A. The reactor must be shutdown by manually inserting CEAs because wide range channel "D" failed and reactor power indication will not be available on AI-212.
B. The reactor must be shutdown by manually inserting CEAs because SCEAPIS (DCS) requires at least 2 wide range channels greater than 10-4 % power to enable the rod block function.
C. The reactor must be tripped because there are an inadequate number of operable channels for the RPS high startup rate trip.
D. The reactor must be tripped because there are an inadequate number of operable channels for the RPS axial power distribution trip.
page 83
 
2009 FORT CALHOUN SRO EXAM (84)
Given the following plant initial conditions:
A refueling outage is in progress.
106 fuel assembles have been loaded into the core The 107th fuel assembly (a new fuel assembly) is being moved over the core The Equipment Hatch, Room 66 roll-up doors, Room 66 construction access opening and both PAL doors are all open Plant conditions then change:
The moving fuel assembly drops from FH-1.
No radiation monitor alarms are received.
Which one of the following actions meets the requirements of AOP-08, FUEL HANDLING INCIDENT, if performed within one hour?"
A. Initiate CIAS using the EMERGENCY OPERATE switches. Close the equipment hatch and one of the PAL doors.
B. Initiate CIAS using the EMERGENCY OPERATE switches. Close the room 66 rollup doors and both of the PAL doors.
C. Initiate VIAS using the CRHS test switches. Close the equipment hatch and one of the PAL doors.
D. Initiate VIAS using the CRHS test switches. Close the room 66 rollup doors and both of the PAL doors.
page 84
 
2009 FORT CALHOUN SRO EXAM (85)
Given the following plant conditions:
The plant is operating at full power The RM-057 CONDENSER OFF GAS HIGH RADIATION annunciator is in alarm The radiation level on RM-057 is just above the Alert setpoint and rising slowly Pressurizer level is steady at 60%
Charging flow at 40 gpm Letdown flow is 36 gpm The Shift Chemist reports that the primary to secondary leak rate is 8 gallons per day.
What action should you direct be taken based on these conditions?
A. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and other required actions.
B. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. SO-G-105, STEAM GENERATOR TUBE LEAKAGE, is not used unless primary to secondary leakage exceeds 10% of the Technical Specification Limit.
C. Enter AOP-22, REACTOR COOLANT LEAK, perform Attachment B, Primary to Secondary Leak Rate Actions, when the primary to secondary leakage increases to greater than 10 gpd. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and other required actions.
D. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and required actions. AOP-22, REACTOR COOLANT LEAK, will not be entered with normal indications of pressurizer level, charging and letdown.
page 85
 
2009 FORT CALHOUN SRO EXAM (86)
Given the following initial plant conditions:
The plant is shutdown with the RCS at mid-loop for replacement of a reactor coolant pump seal Boric Acid Pump Header to Charging Pumps Isolation Valve, HCV-268, is closed and tagged out of service All other CVCS components are operable All CEAs are fully inserted Plant conditions change such that:
The count rates indicated by two of the four operable Wide Range Nuclear Instrumentation Channels are rising steadily and have doubled in the past 15 minutes All four Power Range channels are indicating 0% and are steady What action should you direct be taken?
A. Enter AOP-03, EMERGENCY BORATION. Perform emergency boration from the Boric Acid Storage Tanks per the procedure.
B. Enter EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path RC-2, and perform alternate emergency boration from the SIRWT.
C. Enter SO-O-21, SHUTDOWN OPERATIONS PROTECTION PLAN, Attachment 7.6, Reduced Inventory, and ensure reactivity management resources are available.
D. Enter AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMING. Direct I&C to recalibrate the Wide Range NI Channels.
page 86
 
2009 FORT CALHOUN SRO EXAM (87)
Given the following initial plant conditions:
Shutdown Cooling is in operation using Low Pressure Safety Injection Pump, SI-1A RCS temperature is 250&deg;F Pressurizer pressure is 250 psia Pressurizer level at 50%
Plant conditions change such that:
SI-1A trips The LPSI PUMP SI-1A O/L OR TRIP annunciator is in alarm The SHUTDOWN COOLING FLOW HI-LO annunciator is in alarm Voltage on bus 1A3 is 3950 Volts Voltage on bus 1A4 is 4160 Volts.
What action should be taken as a result of these conditions?
A. Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place LPSI pump SI-1B in service.
B. Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place Containment Spray Pump, SI-3A, in service.
C. Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place LPSI pump SI-1B in service.
D. Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place Containment Spray Pump, SI-3A, in service.
page 87
 
2009 FORT CALHOUN SRO EXAM (88)
Given the following plant conditions:
A large LOCA has occurred inside containment.
PPLS, CPHS and CSAS have all actuated EOP-03, LOSS OF COOLANT ACCIDENT, has been entered Containment Cooling and Filtering Units, VA-3A tripped and VA-3B failed to start Containment pressure is 62 psig What action should be taken as a result of these plant conditions?
A. Ensure maximum CCW flow to Containment Cooling Units, VA-7A and VA-7B. Do NOT start any containment spray pumps.
B. Manually initiate SGLS to enable containment spray operation.
C. Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CI and establish containment spray flow using one containment spray pump.
D. Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CI and establish containment spray flow using all available containment spray pumps.
page 88
 
2009 FORT CALHOUN SRO EXAM (89)
Given the following plant conditions:
The plant is operating at 60% power The FEEDWATER CONTROL STEAM GENERATOR RC-2B LEVEL HI-HI annunciator is in alarm Steam Generator, RC-2B, narrow range level is 84%
DCS controller, FC1102, has transferred to manual Feed Reg Valve, FCV-1102, went closed but is now reopening What actions should be taken after entering ARP CB-4/A8?
A. Direct the BOPO to monitor FC1102 and verify that control transfers back to automatic.
B. Direct the BOPO to return level to 63% using manual control of FCV-1102.
C. Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPO to transfer FC1102 to single element control.
D. Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPO to open FCV-1102 to 50% in manual and then place DCS Controller FC1102 in automatic control.
page 89


Fluoride concentration is 0.12 ppm.What action, if any, is required by Technical Specifications?Begin action to restore oxygen concentration within 8 hours.Begin action to restore chloride concentration immediately.Begin action to restore oxygen and fluoride concentrations within 8 hours. Begin action to restore oxygen and fluoride concentrations immediately.
2009 FORT CALHOUN SRO EXAM (90)
A.B.C.D.page 94 2009 FORT CALHOUN SRO EXAM (95)Given the following plant conditions:Fuel movement is in progress using Fuel Handling Machine, FH-1, and Spent Fuel          Handling Machine, FH-12. A vendor is being used to operate the fuel handling equipment. What are the requirements for OPPD supervision of the vendor activities?A Fuel Handling Coordinator with an SRO license to supervise Fuel Movement at FH-1.A Fuel Handling Coordinator with an RO or SRO license to supervise FuelMovement at FH-1.Fuel Handling Coordinators with SRO licenses to supervise Fuel Movement at bothFH-1 and FH-12.
Given the following plant conditions:
Fuel Handling Coordinators with RO or SRO licenses to supervise Fuel Movementat both FH-1 and FH-12.
A severe thunderstorm occurred 6 hours ago Debris has been observed floating in the river The river level is 985' The plant is operating at full power Raw Water Pumps, AC-10A and AC-10B are operating with their pressure indicating lights lit The RAW WATER SUPPLY HEADER FLOW LO annunciator is in alarm The AC-12A STRAINER DP HIGH annunciator is in alarm.
A.B.C.D.page 95 2009 FORT CALHOUN SRO EXAM (96)Given the following:The boron concentration in the Safety Injection and Refueling Water Storage Tank          (SIRWT) and Safety Injection Tanks equals the refueling boron concentration.The water level in the SIRWT is 188 inches.SIRWT water temperature is 74&deg;FThe pressure and level of each Safety Injection Tank is listed below: 
The AC-12B STRAINER DP HIGH annunciator is in alarm.
Which one of the following actions should be taken as a result?
A. Enter AOP-01, ACTS OF NATURE, and place the Raw Water Strainers in MANUAL BACKWASH.
B. Enter AOP-01, ACTS OF NATURE, and ensure that Raw Water pump AC-10A is not running.
C. Enter AOP-18, LOSS OF RAW WATER, and ensure that the traveling screens are operating in MANUAL-SLOW.
D. Enter AOP-18, LOSS OF RAW WATER, and shutdown the Circulating Water Pumps that share cells with the running Raw Water pumps.
page 90


LEVEL PRESSURE        SI-6A            67.
2009 FORT CALHOUN SRO EXAM (91)
2%                  245 psig        SI-6B            69.
Given the following plant conditions:
5%                  241 psig        SI-6C            72.
The plant is operating at full power.
2%                  265 psig        SI-6D            74.
During surveillance testing, it was determined that one of the group 4 Control Element Assemblies was immovable due to excessive friction The immovable CEA is aligned with the other CEAs in its group Adequate shutdown margin was verified assuming the inoperable CEA and the highest worth CEA do not insert following a reactor trip.
6%                  258 psigWhat action is required prior to taking the plant from mode 3 to mode 2 in accordancewith Technical Specifications?No action is required.Raise the level in the SIRWT using OI-CH-4, CHEMICAL AND VOLUMECONTROL SYSTEM MAKEUP OPERATIONS, Attachment 7.Raise the pressure in SI-6B using OI-SI-1, SAFETY INJECTION - NORMALOPERATION, Attachment 7.Lower the level in SI-6D using OI-SI-1, SAFETY INJECTION - NORMALOPERATION, Attachment 27.
What action is required by Technical Specifications?
A.B.C.D.page 96 2009 FORT CALHOUN SRO EXAM (97)Given the following plant conditions:Steam Generator "A" Blowdown Radiation Monitor, RM-054A, has just been                    declared inoperable by the Shift ManagerAnalysis of secondary chemistry samples indicates background activity onlyWhat action is required to be taken within 2 hours by CH-ODCM-0001, OFF-SITEDOSE CALCULATION MANUAL?Isolate blowdown flow from Steam Generator, RC-2A.Reduce blowdown flow from Steam Generator, RC-2A, to less than 20,000 lbm/hr.Align blowdown sample flow to the Spent Regenerant Tank.
A. Enter Tech Spec 2.0.1 and place the plant in hot shutdown within 6 hours.
Align blowdown sample flow such that blowdown from both Steam Generators issampled by RM-054B.
B. Enter Tech Spec 2.10.2(4) and place the plant in hot shutdown within 7 hours.
A.B.C.D.page 97 2009 FORT CALHOUN SRO EXAM (98)Given the following conditions:Spent Fuel is being moved from the Spent Fuel Pool to the Independent Spent                Fuel Storage Installation (ISFSI)A Transfer Cask/Dry Shielded Canister (TC/DSC) is being removed from the                    Spent Fuel Pool and transferred to the work platform.How will the Spent Fuel Pool Area be posted and access controlled during thisoperation?The area will be posted as a Radiation Area; gates and doors to the area will be locked.The area will be posted as a Radiation Area; gates and doors to the area will not be locked.The area will be posted as a Restricted High Radiation Area; gates and doors to thearea will be locked.
C. Enter Tech Spec 2.10.2(4) and lower reactor power to less than 70% within one hour. Operation below 70% power may continue up to 8 hours.
The area will be posted as a Restricted High Radiation Area; gates and doors to thearea will not be locked.
D. Enter Tech Spec 2.10.2(1) and verify adequate shutdown margin every 24 hours using TDB-V.9, SHUTDOWN MARGIN WORKSHEET.
A.B.C.D.page 98 2009 FORT CALHOUN SRO EXAM (99)How are the FCS Severe Accident Management Guideline's (SAMGs) used?EOF personnel use the SAMGs to support the Control Room Operators inmitigating core damage events.TSC personnel use the SAMGs to support the Control Room Operators inmitigating core damage events.The Control Room Operators use the SAMGs along with the EOPs to mitigate coredamage events.
page 91
The Control Room Operators transition from the EOPs to the SAMGs to mitigatecore damage events.
A.B.C.D.page 99 2009 FORT CALHOUN SRO EXAM (100)The following plant conditions exist:  A Steam Generator Tube Rupture occured from full power  After Standard Post Trip Actions wer performed, EOP-04, STEAM GENERATOR            TUBE RUPTURE, was entered RC-2A was identified as the affected Steam Generator and isolated per EOP-04  A plant cooldown is being performed using RC-2B  RCS cooldown rate = 30&deg;F/hour RCS pressure = 700 psia and lowering Core exit thermocouples indicate 400&deg;F Pressurizer level = 48% and steady RVLMS level = 100%
RC-2A pressure = 740 psia and steady.
RC-2B pressure = 240 psia and lowering. What action should be taken as a result of these plant conditions?Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWINGSGTR"  to ensure RCS activity remains below limits that would require a change inEmergency Action Levels.Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWINGSGTR"  to ensure RCS boron concentration is high enough to ensure adequateshutdown margin.
Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent voidformation in Steam Generator RC-2A's tubes.Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent voidformation in Steam Generator RC-2B's tubes.
A.B.C.D.page 100   


S RO EXAM HANDOUTS TECHNICAL SPECIFICATIONS
2009 FORT CALHOUN SRO EXAM (92)
Given the following plant conditions:
A Loss of Coolant Accident with delayed ECCS operation has occurred The core was uncovered for more than one hour but is now covered Core Exit Thermocouple temperatures exceeded 2000&deg;F but now indicate 240&deg;F Radiation level inside containment is 94,000 R/hr Containment pressure reached 55 psig but is now 10 psig Containment relative humidity is 100%
The ERF computer shows that containment temperature is 240&deg;F A Control Room Operator has placed the hydrogen analyzers in service Indicated containment hydrogen concentration is 3.2%
What action is required to correct the indicated hydrogen concentration for high containment temperature?
A. Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZER OPERATION, which will result in a higher than indicated hydrogen concentration.
B. Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZER OPERATION, which will result in a lower than indicated hydrogen concentration.
C. Use the correction curve in EOP-AOP Attachment 16, CONTAINMENT HYDROGEN ANALYZER STARTUP, which will result in a higher than indicated hydrogen concentration.
D. Use the correction curve in EOP-AOP Attachment 16, CONTAINMENT HYDROGEN ANALYZER STARTUP, which will result in a lower than indicated hydrogen concentration.
page 92


===2.0 LIMITING===
2009 FORT CALHOUN SRO EXAM (93)
CONDITIONS FOR OPERATION
Given the following plant conditions:
The plant was operating at 100% power An event occurred that resulted in a loss of the intake structure and all of the equipment inside The turbine and reactor tripped automatically due to a loss condenser vacuum EOP-00, STANDARD POST TRIP ACTIONS, have been completed Which one of the following actions should be taken to cool components that are normally cooled by Component Cooling Water?
A. Use AOP-10, LOSS OF CIRCULATING WATER, to provide cooling to required components using Potable Water.
B. Use AOP-11, LOSS OF COMPONENT COOLING WATER, to provide cooling to required components using the RW/CCW interface valves.
C. Use AOP-18, LOSS OF RAW WATER, to line up alternate cooling to a RW/CCW Heat Exchanger using hoses from the plant Fire Protection System.
D. Use OCAG-1, OPERATIONAL CONTINGENCY ACTION GUIDELINE, to line up alternate cooling to a RW/CCW Heat Exchanger using hoses from the FCS Fire Engine.
page 93


===2.1 Reactor===
2009 FORT CALHOUN SRO EXAM (94)
Coolant System
The plant is operating at full power. You have just received a FC-214 report from chemistry that reports the following plant chemistry parameters:
Oxygen concentration is 0.12 ppm.
Chloride concentration is 0.12 ppm.
Fluoride concentration is 0.12 ppm.
What action, if any, is required by Technical Specifications?
A. Begin action to restore oxygen concentration within 8 hours.
B. Begin action to restore chloride concentration immediately.
C. Begin action to restore oxygen and fluoride concentrations within 8 hours.
D. Begin action to restore oxygen and fluoride concentrations immediately.
page 94


====2.1.1 Operable====
2009 FORT CALHOUN SRO EXAM (95)
Components Applicability Applies to the operable status of t he reactor coolant system components.
Given the following plant conditions:
Objective  To specify certain conditions of the reactor coolant system components.
Fuel movement is in progress using Fuel Handling Machine, FH-1, and Spent Fuel Handling Machine, FH-12.
Specifications Limiting conditions for operation are as follows:
A vendor is being used to operate the fuel handling equipment.
(1) Reactor Critical All four (4) reactor coolant pumps shall be in operation.
What are the requirements for OPPD supervision of the vendor activities?
Exceptions The limitations of this specificati on may be suspended during the performance of physics tests provided the power level is <
A. A Fuel Handling Coordinator with an SRO license to supervise Fuel Movement at FH-1.
10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.  
B. A Fuel Handling Coordinator with an RO or SRO license to supervise Fuel Movement at FH-1.
(2) Hot Shutdown or 350F < T cold < 515F  (a) The reactor coolant loops listed below shall be operable:
C. Fuel Handling Coordinators with SRO licenses to supervise Fuel Movement at both FH-1 and FH-12.
(i) Reactor coolant loop 1 and at least one associated reactor coolant pump.  (ii) Reactor coolant loop 2 and at least one associated reactor coolant pump.  (b) At least one of the above reactor coolant loops shall be in operation.
D. Fuel Handling Coordinators with RO or SRO licenses to supervise Fuel Movement at both FH-1 and FH-12.
Exceptions All reactor coolant pumps may be de-energized for up to one hour provided
page 95


(1) no operations are permitted that w ould cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10F below saturation temperature.
2009 FORT CALHOUN SRO EXAM (96)
Given the following:
The boron concentration in the Safety Injection and Refueling Water Storage Tank (SIRWT) and Safety Injection Tanks equals the refueling boron concentration.
The water level in the SIRWT is 188 inches.
SIRWT water temperature is 74&deg;F The pressure and level of each Safety Injection Tank is listed below:
LEVEL            PRESSURE SI-6A        67.2%            245 psig SI-6B        69.5%            241 psig SI-6C        72.2%            265 psig SI-6D        74.6%            258 psig What action is required prior to taking the plant from mode 3 to mode 2 in accordance with Technical Specifications?
A. No action is required.
B. Raise the level in the SIRWT using OI-CH-4, CHEMICAL AND VOLUME CONTROL SYSTEM MAKEUP OPERATIONS, Attachment 7.
C. Raise the pressure in SI-6B using OI-SI-1, SAFETY INJECTION - NORMAL OPERATION, Attachment 7.
D. Lower the level in SI-6D using OI-SI-1, SAFETY INJECTION - NORMAL OPERATION, Attachment 27.
page 96


2.1 - Page 1 Amendment No. 46
2009 FORT CALHOUN SRO EXAM (97)
,47 ,56 , 256 TECHNICAL SPECIFICATIONS
Given the following plant conditions:
Steam Generator "A" Blowdown Radiation Monitor, RM-054A, has just been declared inoperable by the Shift Manager Analysis of secondary chemistry samples indicates background activity only What action is required to be taken within 2 hours by CH-ODCM-0001, OFF-SITE DOSE CALCULATION MANUAL?
A. Isolate blowdown flow from Steam Generator, RC-2A.
B. Reduce blowdown flow from Steam Generator, RC-2A, to less than 20,000 lbm/hr.
C. Align blowdown sample flow to the Spent Regenerant Tank.
D. Align blowdown sample flow such that blowdown from both Steam Generators is sampled by RM-054B.
page 97


===2.0 LIMITING===
2009 FORT CALHOUN SRO EXAM (98)
CONDITIONS FOR OPERATION
Given the following conditions:
Spent Fuel is being moved from the Spent Fuel Pool to the Independent Spent Fuel Storage Installation (ISFSI)
A Transfer Cask/Dry Shielded Canister (TC/DSC) is being removed from the Spent Fuel Pool and transferred to the work platform.
How will the Spent Fuel Pool Area be posted and access controlled during this operation?
A. The area will be posted as a Radiation Area; gates and doors to the area will be locked.
B. The area will be posted as a Radiation Area; gates and doors to the area will not be locked.
C. The area will be posted as a Restricted High Radiation Area; gates and doors to the area will be locked.
D. The area will be posted as a Restricted High Radiation Area; gates and doors to the area will not be locked.
page 98


===2.1 Reactor===
2009 FORT CALHOUN SRO EXAM (99) How are the FCS Severe Accident Management Guideline's (SAMGs) used?
Coolant System (Continued) 2.1.1 Operable Components (Continued)  
A. EOF personnel use the SAMGs to support the Control Room Operators in mitigating core damage events.
(c) If fewer than the above required reac tor coolant loops are OPERABLE, the required loops shall be restored to O PERABLE status within 72 hours or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours.  
B. TSC personnel use the SAMGs to support the Control Room Operators in mitigating core damage events.
(3) 210&deg;F  T cold    350&deg;F or T cold < 210&deg;F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.  
C. The Control Room Operators use the SAMGs along with the EOPs to mitigate core damage events.
(a) At least two (2) of the decay heat removal loops listed below shall be OPERABLE:
D. The Control Room Operators transition from the EOPs to the SAMGs to mitigate core damage events.
(i) Reactor coolant loop 1 and its a ssociated steam generator and at least one associated reactor coolant pump.
page 99
(ii) Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.
(iii) One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.
(iv) One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addi tion to that in (iii) above, and associated shutdown cooling piping.  
(b) At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.  
(c) With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the R eactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours.  
(d) For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:
(i) Reactor Coolant System temperature is less than 120F. (ii) The Reactor Coolant System is vented with a vent area greater than or equal to 47 in
: 2.  (4) DELETED


2.1 - Page 2 Amendment No. 39,56,136
2009 FORT CALHOUN SRO EXAM (100)
,188 , 256 FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 12 OF 19 R36  COLR 020406080100POWER DEPENDENT INSERTION LIMIT FIGURE 2 126 100.8 75.6 50.4 25.2 0 GROUP 4 126 100.8 75.6 50.4 25.2 0 GROUP 3 126 100.8 75.6 50.4 25.2 0 GROUP 2 126 100.8 75.6 50.4 25.2 0 GROUP 1 CEA GROUP POSITIONS  (INCHES WITHDRAWN)
The following plant conditions exist:
REACTOR POWER (% OF ALLOWED POWER)  LONG TERM STEADY STATEINSERTION LIMIT SHORT TERMINSERTION LIMIT (35.2)(25.2)(13.2)(104.5)(94.5)(82.5)PPDIL PDIL or TRANSIENT INSERTION LIMIT EMERGENCY BORATION LIMIT 12" BELOW PDIL - REFER TO AOP-3 TECHNICAL SPECIFICATIONS
A Steam Generator Tube Rupture occured from full power After Standard Post Trip Actions wer performed, EOP-04, STEAM GENERATOR TUBE RUPTURE, was entered RC-2A was identified as the affected Steam Generator and isolated per EOP-04 A plant cooldown is being performed using RC-2B RCS cooldown rate = 30&deg;F/hour RCS pressure = 700 psia and lowering C
ore exit thermocouples indicate 400&deg;F P
ressurizer level = 48% and steady RVLMS level = 100%
R C-2A pressure = 740 psia and steady.
R C-2B pressure = 240 psia and lowering.
What action should be taken as a result of these plant conditions?
A. Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWING SGTR" to ensure RCS activity remains below limits that would require a change in Emergency Action Levels.
B. Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWING SGTR" to ensure RCS boron concentration is high enough to ensure adequate shutdown margin.
C. Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent void formation in Steam Generator RC-2A's tubes.
D. Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent void formation in Steam Generator RC-2B's tubes.
page 100


===2.0 LIMITING===
SRO EXAM HANDOUTS
CONDITIONS FOR OPERATION


===2.1 Reactor===
TECHNICAL SPECIFICATIONS 2.0  LIMITING CONDITIONS FOR OPERATION 2.1   Reactor Coolant System 2.1.1 Operable Components Applicability Applies to the operable status of the reactor coolant system components.
Coolant System (Continued) 2.1.5 Maximum Reactor Coolant Oxygen and Halogens Concentrations Applicability Applied to the reactor coolant oxygen and halogens concentrations.
Objective To specify certain conditions of the reactor coolant system components.
Objective To specify the maximum oxygen and halogens concentrations of the reactor coolant system for safe reactor operation.
Specifications Limiting conditions for operation are as follows:
Specifications Maximum limits of oxygen and halogens concentrations are as follows:  
(1)    Reactor Critical All four (4) reactor coolant pumps shall be in operation.
(1) If the concentration of oxygen in the reactor coolant exceeds 0.1 ppm during power operation, corrective action shall be initiated within 8 hours to return oxygen
Exceptions The limitations of this specification may be suspended during the performance of physics tests provided the power level is < 10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.
(2)    Hot Shutdown or 350EF < Tcold < 515EF (a)    The reactor coolant loops listed below shall be operable:
(i)    Reactor coolant loop 1 and at least one associated reactor coolant pump.
(ii)   Reactor coolant loop 2 and at least one associated reactor coolant pump.
(b)    At least one of the above reactor coolant loops shall be in operation.
Exceptions All reactor coolant pumps may be de-energized for up to one hour provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10EF below saturation temperature.
2.1 - Page 1          Amendment No. 46,47,56, 256


levels to <
TECHNICAL SPECIFICATIONS 2.0   LIMITING CONDITIONS FOR OPERATION 2.1  Reactor Coolant System (Continued) 2.1.1 Operable Components (Continued)
: 0. 1 ppm.
(c)   If fewer than the above required reactor coolant loops are OPERABLE, the required loops shall be restored to OPERABLE status within 72 hours or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours.
(2) If the concentration of chloride in the reactor coolant exceeds 0.15 ppm during power operation, corrective action shall be in itiated within 8 hours to return chloride levels to <
(3)   210&deg;F  Tcold  350&deg;F or Tcold < 210&deg;F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.
0.15 ppm.
(a)    At least two (2) of the decay heat removal loops listed below shall be OPERABLE:
(3) If the concentration of fluorides in t he reactor coolant exceeds 0.10 ppm following modifications or repair to the reactor c oolant system involving welding, corrective action shall be initiated within 8 hours to return fluoride levels to <
(i)    Reactor coolant loop 1 and its associated steam generator and at least one associated reactor coolant pump.
0.10 ppm. 
(ii)   Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.
(4) If the oxygen concentration and the chloride or fluoride concentration of the reactor coolant simultaneously exceed the limits given in (1), (2) and (3), respectively, corrective action is to be taken immediatel y to return the system to within normal operation specifications.  
(iii)  One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.
(5) If the concentration limits of oxygen and chlo ride or fluoride given in (1), (2) and (3) above are not restored within 24 hours, t he reactor shall be placed in a hot shutdown condition within 12 hours thereafter.
(iv)    One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addition to that in (iii) above, and associated shutdown cooling piping.
If the normal operational limits are not restored within an additional 24-hour peri od, the reactor shall be placed in a
(b)    At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.
(c)   With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours.
(d)   For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:
(i)     Reactor Coolant System temperature is less than 120EF.
(ii)   The Reactor Coolant System is vented with a vent area greater than or equal to 47 in2.
(4)  DELETED 2.1 - Page 2      Amendment No. 39,56,136,188, 256


cold shutdown condition within 24 hours thereafter.
FORT CALHOUN STATION                                                                                                                          TDB-VI TECHNICAL DATA BOOK                                                                                                                    PAGE 12 OF 19 126 LONG TERM STEADY STATE (104.5) 100.8                              INSERTION LIMIT (94.5)
Basis  By maintaining the oxygen, chloride and fluor ide concentrations in the reactor coolant within the limits specified, the integrity of the reactor coolant system materials in contact with the coolant (1) are protected against potential stress corrosion attack.  
GROUP 4 (82.5) 75.6 SHORT TERM INSERTION LIMIT                PPDIL 126              50.4 100.8            25.2 CEA GROUP POSITIONS (INCHES WITHDRAWN)
(2)
PDIL or TRANSIENT GROUP 3 INSERTION LIMIT 75.6            0 50.4 EMERGENCY BORATION LIMIT (35.2)                       12 BELOW PDIL - REFER TO AOP-3 25.2            126    (25.2)
(13.2) 0                100.8 GROUP 2 75.6 50.4 126              25.2 100.8            0 GROUP 1 75.6 50.4 25.2 0
0        20          40        60      80          10 0 REACTOR POWER (% OF ALLOWED POWER)
COLR                        POWER DEPENDENT INSERTION LIMIT                                    FIGURE 2
R36


2.1 - Page 18}}
TECHNICAL SPECIFICATIONS 2.0  LIMITING CONDITIONS FOR OPERATION 2.1  Reactor Coolant System (Continued) 2.1.5 Maximum Reactor Coolant Oxygen and Halogens Concentrations Applicability Applied to the reactor coolant oxygen and halogens concentrations.
Objective To specify the maximum oxygen and halogens concentrations of the reactor coolant system for safe reactor operation.
Specifications Maximum limits of oxygen and halogens concentrations are as follows:
(1)    If the concentration of oxygen in the reactor coolant exceeds 0.1 ppm during power operation, corrective action shall be initiated within 8 hours to return oxygen levels to <0. 1 ppm.
(2)    If the concentration of chloride in the reactor coolant exceeds 0.15 ppm during power operation, corrective action shall be initiated within 8 hours to return chloride levels to <0.15 ppm.
(3)    If the concentration of fluorides in the reactor coolant exceeds 0.10 ppm following modifications or repair to the reactor coolant system involving welding, corrective action shall be initiated within 8 hours to return fluoride levels to <0.10 ppm.
(4)    If the oxygen concentration and the chloride or fluoride concentration of the reactor coolant simultaneously exceed the limits given in (1), (2) and (3), respectively, corrective action is to be taken immediately to return the system to within normal operation specifications.
(5)    If the concentration limits of oxygen and chloride or fluoride given in (1), (2) and (3) above are not restored within 24 hours, the reactor shall be placed in a hot shutdown condition within 12 hours thereafter. If the normal operational limits are not restored within an additional 24-hour period, the reactor shall be placed in a cold shutdown condition within 24 hours thereafter.
Basis By maintaining the oxygen, chloride and fluoride concentrations in the reactor coolant within the limits specified, the integrity of the reactor coolant system materials in contact with the coolant (1) are protected against potential stress corrosion attack. (2) 2.1 - Page 18}}

Latest revision as of 14:55, 12 March 2020

2009-03-Final Written Exam - Site-Specific RO and SRO Written Examinations
ML091030679
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/27/2009
From:
NRC Region 4
To:
References
Download: ML091030679 (188)


Text

l ES-401 Site-Specific RO Written Examination Form ES-401-7 Cover Sheet U.S. Nuclear Regulatory Commission l Site-Specific RO Written Examination Applicant Information Name:

Date: 03/27/2009 Facility/Unit: Fort Calhoun l Region: I II III IV X Reactor Type: W CE X BW GE l

Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet l on top of the answer sheets. To pass the examination, you must achieve a final grade of at least 80.00 percent. Examination papers will be collected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the examination begins.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicants Signature Results Examination Value __________ Points Applicants Score __________ Points Applicants Grade __________ Percent ES-401, Page 30 of 33

2009 FORT CALHOUN RO EXAM (1)

A reactor trip has just occurred and the Standard Post Trip Actions are being performed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.

Which of the following parameters requires you to take contingency actions?

A. All trippable control element assemblies are fully inserted except for B-15. All non-trippable control element assemblies are fully withdrawn.

B. Instrument air pressure is 85 psig and stable.

C. Both steam generator wide range levels are 85% and stable.

D. Pressurizer pressure is 2060 psia and increasing.

page 1

2009 FORT CALHOUN RO EXAM (2)

Given the following plant conditions:

A loss of load event resulted in a high pressure reactor trip Both of the Power-Operated Relief Valves (PORVs) opened One of the PORVs failed to close when pressurizer pressure lowered below it's setpoint Power was not available to the open PORV's block valve during performance of Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was entered Power has now been restored to the open PORV's block valve The PORV block valve associated with the open PORV should NOT be closed if:

A. Pressurizer level is at 100%.

B. Pressurizer pressure is 2010 psia.

C. Reactor vessel level is 83%.

D. RCS subcooling is 0°F.

page 2

2009 FORT CALHOUN RO EXAM (3)

Given the following plant conditions:

The plant is in hot shutdown Charging and letdown were isolated in response to RCS leakage Isolation of charging and letdown terminated the RCS leakage Pressurizer heaters have just lost power due to the low level cutout All Reactor Coolant Pumps are operating as designed How much time do the operators have to reestablish charging flow to the RCS before the pressurizer empties assuming RCS cold leg temperature stays steady at 532°F?

A. 3.5 - 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> B. 5.0 - 6.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> C. 6.5 - 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> D. 8.0 - 9.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> page 3

2009 FORT CALHOUN RO EXAM (4)

The following plant conditions exist during a RCS heatup:

T-cold is 410°F.

T-hot is 411°F.

Core Exit Thermocouples are reading between 410°F and 415°F.

Pressurizer pressure indicates 955 psia.

No operations are in effect that could cause a RCS dilution.

Which one of the following Reactor Coolant Pump operating conditions is NOT allowed by the requirements of T.S. 2.1.1?

A. RC-3A and RC-3C are operable, but not operating. RC-3B and RC-3D are not operable. RC-3A has been shutdown for 35 minutes.

B. RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.

C. RC-3B and RC-3D are operable, but not operating. RC-3A and RC-3C are not operable. RC-3D has been shutdown for 35 minutes.

D. RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B are not operable. RC-3D has been shutdown for 75 minutes.

page 4

2009 FORT CALHOUN RO EXAM (5)

Given the following plant conditions:

RCS temperature is 105°F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1, SHUTDOWN COOLING INITIATION LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designed What action (if any) should you perform after the Emergency Diesel Generators start and their output breakers close?

A. Manually restart the LPSI pumps.

B. Un-isolate the LPSI system from the RCS and restart the LPSI pumps.

C. No action is necessary; the Emergency Diesel Generators will pick up the LPSI pumps as dead bus loads.

D. No action is necessary; the sequencers will restart LPSI pumps within one minute of the breaker closing.

page 5

2009 FORT CALHOUN RO EXAM (6)

The following plant conditions exist:

The plant was operating at 65% power with all systems are aligned for normal operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from the operating CCW pump, AC-3A You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank level is 8 inches and lowering The reactor was manually tripped two minutes after the AUXILIARY COOLANT FROM CRDM FLOW LO alarm was received What action should be performed in addition to Standard Post Trip Actions in accordance with AOP-11?

A. Trip one RCP in each loop within 3 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.

B. Trip one RCP in each loop within 5 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.

C. Shutdown all RCP's within 3 minutes.

D. Shutdown all RCP's within 5 minutes.

page 6

2009 FORT CALHOUN RO EXAM (7)

Given the following sequence of events:

The plant was operating at full power Pressurizer level channel "Y" was selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%

Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.

The Operator then took manual control of charging and letdown and restored level to 60%

The operator then selected channel "X" as the controlling channel Pressurizer pressure control remained in automatic Current plant conditions are:

Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia Pressurizer steam temperature indicates 632°F Pressurizer liquid temperature indicates 620°F How will pressurizer pressure respond?

A. Pressurizer pressure will steadily increase to 2100 psia.

B. Pressurizer pressure will remain at approximately1950 psia until the Level Control Bistables, LC-101-1 and LC-101-2, located behind CB-1/2/3 are reset.

C. Pressurizer pressure will remain at approximately1950 psia until Channel "X" is selected on PZR Heater Cutout Channel Select Switch, HC-101-1.

D. Pressurizer pressure will remain at approximately1950 psia until the water in the pressurizer reaches saturation temperature.

page 7

2009 FORT CALHOUN RO EXAM (8)

The plant experiences an ATWS event where both the reactor and turbine failed to trip.

What action does EOP-00 direct you to perform to limit reactor power?

A. Trip all Reactor Coolant Pumps.

B. Transfer charging pump suction to the SIRWT.

C. Insert the non-trippable CEAs.

D. Close the MSIVs.

page 8

2009 FORT CALHOUN RO EXAM (9)

Given the following plant conditions:

The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressure is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steady Which one of the following actions will occur automatically with these plant conditions?

A. Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow will continue from RC-2A.

B. Blowdown flow from both Steam Generators will be isolated.

C. RCV-978, 6th Stage Extraction Isolation Valve, will close.

D. A Ventilation Isolation Actuation Signal (VIAS) will be generated page 9

2009 FORT CALHOUN RO EXAM (10)

Given the following plant conditions:

A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Generator, RC-2B, has ruptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVERY PROCEDURE, has been entered In mitigating this event, which steam generator(s), if any, should be isolated?

A. Neither Steam Generator should be isolated.

B. Only RC-2A should be isolated.

C. Only RC-2B should be isolated.

D. Both steam generators should be isolated.

page 10

2009 FORT CALHOUN RO EXAM (11)

A break on the feedwater line to Steam Generator, RC-2B, inside containment has occurred.

The following plant conditions exist:

SGIS has actuated Heat removal has been established using Steam Generator, RC-2A.

AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available AFW pump.

Steam Generator, RC-2B, has dried out.

No Reactor Coolant Pumps are running.

In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of the following actions should be taken and for what reason?

A. AFW flow should be established to RC-2B to help promote natural circulation flow in both RCS loops.

B. AFW flow should be established to RC-2B to increase decay heat removal.

C. AFW flow should NOT be established to RC-2B because it would result in a positive reactivity addition.

D. AFW flow should NOT be established to RC-2B because FW-6 does not have the capacity to feed both S/Gs simultaneously.

page 11

2009 FORT CALHOUN RO EXAM (12)

The following plant conditions exist:

A loss of 161 KV to the plant resulted in fast transfer of vital buses 1A3 and 1A4 to 345 KV This was followed by a loss of load that resulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station blackout Breakers 1A11, 1A13, 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energized Which one of the following actions must be taken to allow disconnect, DS-T1, to be opened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?

A. Breakers 1A13 and 1A24 must be closed.

B. The generator field breaker must be opened.

C. The Kirk key Interlock must be disengaged.

D. An isolated phase bus duct cooling unit must be started.

page 12

2009 FORT CALHOUN RO EXAM (13)

The plant tripped from 100% power following a loss of all offsite power. The following conditions exist:

RCS pressure is 2000 psia.

Pressurizer level is 40%.

Steam Generator Pressures are 900 psia.

Steam Generator Wide Range levels are 40%.

Hot leg temperatures are 575F.

Cold leg temperatures are 532F.

Which of the following actions would be most effective in enhancing natural circulation?

A. Raise RCS pressure.

B. Raise Pressurizer level.

C. Raise Steam Generator pressures.

D. Raise Steam Generator levels.

page 13

2009 FORT CALHOUN RO EXAM (14)

Given the following plant conditions:

The plant was operating at full power Power was lost to Instrument bus AI-40A AOP-16, LOSS OF INSTRUMENT BUS POWER, was entered AOP-16,Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closing BOTH of the PORV (Power-Operated Relief Valves) Block Valves" What is the purpose of this step?

A. An additional vital instrument bus failure will result in opening ONE of the PORVs.

B. An additional vital instrument bus failure will result in opening BOTH of the PORVs.

C. An additional vital instrument bus failure will result in the inability to close ONE of the PORV Block Valves.

D. An additional vital instrument bus failure will result in the inability to close BOTH of the PORV Block Valves.

page 14

2009 FORT CALHOUN RO EXAM (15)

The following plant indications were noted following a reactor trip.

Bus Power Failure DC Distribution Panel 1 Light is off.

Bus Power Failure DC Distribution Panel 2 Light is on.

The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.

All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.

FW-6 can NOT be started from CB-10,11.

In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of the following actions is required to be able to start FW-6?

A. Place the 43/FW Switch in the AUTO position.

B. Start FW-6 from AI-66A after placing the NORMAL/OVERRIDE switches on AI-66A to OVERRIDE.

C. Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to the emergency DC source.

D. Start FW-6 from the Alternate Shutdown Panel, AI-179.

page 15

2009 FORT CALHOUN RO EXAM (16)

One of the two 20 inch underground Raw Water headers from the intake structure to the auxiliary building completely ruptured.

How does isolating the ruptured header affect the ability to provide cooling to the RW/CCW heat exchangers?

A. Raw Water can be supplied to all of the RW/CCW heat exchangers but only two of the Raw Water Pumps can be used.

B. Raw Water can only be supplied to two of the RW/CCW heat exchangers and only two of the Raw Water Pumps can be used.

C. Raw Water can be supplied to all of the RW/CCW heat exchangers but only three of the Raw Water Pumps can be used.

D. Raw Water can only be supplied to three of the RW/CCW heat exchangers and only three of the Raw Water Pumps can be used.

page 16

2009 FORT CALHOUN RO EXAM (17)

The reactor has been manually tripped following a sudden loss of instrument air pressure.

According to AOP-17, Loss of Instrument Air, which of the following actions should be taken to prevent RCS cooldown?

A. Close FCV-1101 and FCV-1102 using DCS.

B. Maximize S/G blowdown flow.

C. Initiate a Steam Generator Isolation Signal (SGIS).

D. Manually trip all Main Feedwater Pumps.

page 17

2009 FORT CALHOUN RO EXAM (18)

Given the following plant conditions:

The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator water cooling have been unsuccessful Stator cooling water outlet temperature has risen to 83°C What action is required by AOP-27, GENERATOR MALFUNCTIONS?

A. Manually trip the reactor.

B. Manually trip the turbine.

C. Manually trip the main generator output breakers.

D. Manually open the main generator field breaker.

page 18

2009 FORT CALHOUN RO EXAM (19)

Given the following plant conditions:

A reactor startup is being performed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode.

When will a SCEAPIS (DCS) rod block signal be generated?

A. When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.

B. When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.

C. When any CEA in group 1 reaches the upper rod stop.

D. When any CEA in group 3 begins to withdraw.

page 19

2009 FORT CALHOUN RO EXAM (20)

Given the following plant conditions:

A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL POWER OPERATION The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn.

Using the attached PDIL curve, determine what action must be taken as a result of these conditions?

A. Immediately commence emergency boration.

B. Withdraw group 4 CEAs to above the short term insertion limit.

C. Withdraw group 4 CEAs until proper group overlap is achieved.

D. Place the plant in hot shutdown within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

page 20

2009 FORT CALHOUN RO EXAM (21)

Given the following:

The AI-149 FIRE DETECTION ALARM OR TROUBLE alarm was received The Control Room Fire Detection Computer, PC-66, indicates that multiple detectors in the Cable Spread Room are in alarm The EONT was dispatched and reports that Halon is being discharged into the Cable Spread Room In accordance with AOP-06, FIRE EMERGENCY, what action should be taken by the Control Room Operators?

A. Trip the reactor, open clutch power supply breakers, close the PORV block valves and evacuate the Control Room.

B. Trip the reactor, close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and evacuate the Control Room.

C. Trip the reactor, open clutch power supply breakers, close the PORV block valves and place the Control Room HVAC in Recirculation Mode.

D. Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and place the Control Room HVAC in Recirculation Mode.

page 21

2009 FORT CALHOUN RO EXAM (22)

The following power indications are observed 10 minutes after a reactor trip:

All four WR NI Channels are indicating 3 x 10-3% Power and lowering.

All four WR NI Channels are indicating a startup rate of -0.1 DPM and steady.

All four Power Range NI Channels are indicating 0% power and steady.

All four Delta-T Power Channels are indicating 2% power and lowering.

A miscalibration of which of the following could cause these indications?

Assume trip from full power.

A. Wide Range NI power indication channels.

B. Wide Range NI startup rate channels.

C. Power Range NI channels.

D. Delta-T Power Channels.

page 22

2009 FORT CALHOUN RO EXAM (23)

Radioactive liquid that leaks inside containment will collect in the containment sump.

The containment sump pumps will normally pump this radioactive water to the:

A. Reactor Coolant Drain Tank.

B. Waste Holdup Tanks.

C. Waste Monitor Tanks.

D. Spent Regenerant Tanks.

page 23

2009 FORT CALHOUN RO EXAM (24)

The radioactive gases released following a waste gas decay tank rupture will consist mostly of isotopes of:

A. Xenon and Krypton.

B. Iodine and Cesium.

C. Tritium and Carbon.

D. Argon and Neon.

page 24

2009 FORT CALHOUN RO EXAM (25)

Given the following sequence of events:

Condenser vacuum was lost The turbine and reactor tripped Immediately following the trip, a small LOCA occurred inside containment PPLS and CPHS have actuated All HPSI pumps failed to start RCS pressure is steady at 1000 psia Reactor Vessel Level is at 43%

Which of the following valves can be used by the Balance of Plant Operator to immediately begin a RCS cooldown in accordance with EOP-03?

A. Steam Dump Valves, TCV-909-1,2,3,4.

B. Steam Bypass Valve, PCV-910.

C. Atmospheric Dump Valve, HCV-1040.

D. Air Assisted Main Steam Safety Valves, MS-291, MS-292.

page 25

2009 FORT CALHOUN RO EXAM (26)

FC-214, REACTOR COOLANT DAILY

SUMMARY

REPORT, contains the following information:

Fuel Reliability Indicator (FRI): 1.1 x 10-4 uCi/gm Dose Equivalent Iodine: 0.8 uCi/gm Xe-133 Activity: 2.8 uCi/gm RCS Total Activity: 5.5 uCi/gm E-bar: 0.68 Mev Which one of the following actions is required?

A. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel Reliability Indicator.

B. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 Activity C. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to Dose Equivalent Iodine.

D. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to the RCS Total Activity.

page 26

2009 FORT CALHOUN RO EXAM (27)

The "REACTOR VESSEL FLANGE LEAK" alarm was received due to leakage past the Reactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.

What one of the following parameters would cause an alarm if leakage occurs past the outer O-Ring?

A. Increasing pressure.

B. Increasing temperature.

C. Decreasing pressure.

D. Decreasing temperature.

page 27

2009 FORT CALHOUN RO EXAM (28)

Given the following:

You have been directed to shutdown Reactor Coolant Pump, RC-3A in accordance with OI-RC-9 You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START" position and that the Oil Lift Pump is not operating Which one of the following actions, if any, is required to ensure proper lubrication of the RCP bearings?

A. Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.

B. If the Oil Lift Pump does not start automatically after tripping RC-3A, then momentarily place the Oil Lift Pump Control Switch in the "STOP" position then back to the "START" position to reset it.

C. If the Oil Lift Pump does not start automatically after tripping RC-3A, then hold the Oil Lift Pump Control switch in the "START" position until the "ZERO SPEED" light comes on.

D. No action is required. The Oil Lift Pump is only needed when starting a Reactor Coolant Pump.

page 28

2009 FORT CALHOUN RO EXAM (29)

Given the following plant conditions:

Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been discovered The leaking PORV has been isolated by closing its block valve, HCV-151 HCV-151 also leaks through VCT makeup is in its normal alignment Assuming no operator action is taken, how will the VCT level control system first respond?

A. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the VCT at the neutral blend boron concentration.

B. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the charging pump suction at the neutral blend boron concentration.

C. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the VCT at the SIRWT boron concentration.

D. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the charging pump suction at the SIRWT boron concentration.

page 29

2009 FORT CALHOUN RO EXAM (30)

A plant shutdown and cooldown are being performed. One hour after placing shutdown cooling in service, the following plant indications are observed:

Pressurizer pressure and level are lowering.

Containment sump level is steady.

CCW surge tank level and pressure are increasing.

Steam Generator levels are steady.

Steam Generator pressures are lowering slowly.

RM-053 is in alarm.

All other process radiation monitors are reading normal.

Which one of the following could cause these indications?

A. A raw water/CCW heat exchanger tube leak B. A regenerative heat exchanger tube leak.

C. A shutdown cooling heat exchanger tube leak.

D. A steam generator tube leak.

page 30

2009 FORT CALHOUN RO EXAM (31)

Given the following:

EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant Accident A RCS cooldown is being conducted using shutdown cooling The RCS cold leg temperatures are currently 170°F.

What is the maximum allowable cooldown rate under these conditions?

A. 25°F/hr.

B. 50°F/hr.

C. 100°F/hr.

D. 200°F/hr.

page 31

2009 FORT CALHOUN RO EXAM (32)

The plant is operating at full power. HPSI pump, SI-2A, has been tagged out of service due to a breaker problem. Normal actions have been taken.

How does this affect the operability of the HPSI train associated with SI-2A per Technical Specifications?

A. The HPSI train is considered operable if SI-2B is operable.

B. The HPSI train is considered operable if SI-2C is operable.

C. One train of HPSI is inoperable, SI-2A must be made operable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D. One train of HPSI is inoperable, SI-2A must be made operable within 7 days.

page 32

2009 FORT CALHOUN RO EXAM (33)

How is a steam bubble formed in the pressurizer following a refueling outage per OP-2A, PLANT STARTUP?

A. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.

B. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.

C. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.

D. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.

page 33

2009 FORT CALHOUN RO EXAM (34)

Given the following plant conditions:

The plant is operating at 100% power.

Pressurizer Safety Valve, RC-142, has seat leakage.

Quench Tank temperature and level are rising.

Quench Tank pressure is 8 psig and increasing slowly.

Which one of the following automatic actions will occur assuming no operator actions are taken?

A. Quench Tank relief valve, RC-125, will open resulting in increasing containment pressure.

B. Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.

C. Quench Tank vent valve, HCV-155, will open and vent to the containment vent header and the RCDT outlet containment isolation valve will close.

D. Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk will rupture resulting in increasing containment pressure.

page 34

2009 FORT CALHOUN RO EXAM (35)

Given the following:

The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off.

What action will you direct the EONA to take before starting the first CCW pump, AC-3A?

A. Ensure CCW Surge tank pressure is greater than 60 psig.

B. Vent AC-3A using its casing vent valve.

C. Fully open the discharge valve for AC-3A.

D. Fully close the discharge valves for AC-3B and AC-3C.

page 35

2009 FORT CALHOUN RO EXAM (36)

Given the following:

plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in 40 seconds ago CCW Header Pressure, PI-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are running Which one of the following conditions could cause these indications?

A. PI-499, CCW header pressure, has failed low.

B. CCW Pressure Switches, PCS-412 and PCS-413, have failed low.

C. PIC-2802, CCW Surge Tank Pressure indication, has failed low.

D. HCV-438A/B/C/D have inadvertently closed resulting in low CCW pressure to the RCPs.

page 36

2009 FORT CALHOUN RO EXAM (37)

Given the following plant conditions:

A Reactor Coolant System cooldown is in progress for a refueling outage S

hutdown cooling is in operation per OI-SC-1 R

CS temperature is 120°F R

CS pressure is 235 psia R

eactor Coolant Pumps, RC-3A and RC-3B, are operating.

P ressure is being controlled manually using Main pressurizer spray and heaters.

What actions should be taken before shutting down Reactor Coolant Pumps, RC-3A and RC-3B, in accordance with OI-RC-9?

A. RCS pressure should be lowered to less than 215 psia.

B. RCS temperature should be lowered to less than 110°F.

C. The RCS should be borated to the refueling boron concentration.

D. RCS pressure control using Auxiliary spray should be established.

page 37

2009 FORT CALHOUN RO EXAM (38)

Given the following plant conditions:

B us Power Failure DC Distribution Panel 1 Light is off D

C BUS#1 LOW VOLT annunciator is in alarm D

C Bus #1 voltage indicates 0 volts P

ower has been lost to the "A" DSS 86-Relay How will operation of the Diverse Scram System (DSS) be affected?

A. The DSS will initiate a reactor trip.

B. The DSS will go to a "1 of 3" trip logic.

C. The "A" DSS 86-Relay will not be capable of generating a reactor trip.

D. The DSS will not be capable of generating a reactor trip.

page 38

2009 FORT CALHOUN RO EXAM (39)

Given the following:

T he power supply to RPS Clutch Power Supply Breaker, CB-AB, will be transferred from Instrument Bus "B" to Instrument Bus "A".

nverter "A" is supplying power to Instrument Bus "A" and Swing Inverter, EE-8U, is supplying power to Instrument Bus "B".

Which one of the following actions will be taken before placing the Clutch Power Supply Transfer Switch, RPS/TS-AB, in the Instrument Bus A (#1) position in accordance with OI-EE-4?

A. Cross-tie Instrument Bus "A" to Instrument Bus "C".

B. Bypass Inverter "A".

C. Transfer Instrument Bus "B" supply to Inverter "B".

D. Bypass Swing Inverter 8-U.

page 39

2009 FORT CALHOUN RO EXAM (40)

Given the following:

The plant was operating at 50% power when a LOCA occured The reactor tripped automatically PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated The sequencers begin starting safeguards motors During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased below the OPLS setpoint How will the OPLS relays respond and what action, if any, should be taken by the Operators to ensure safeguards equipment actuates?

A. OPLS will not actuate. Operators should trip both 86A/OPLS and 86B/OPLS.

B. 86A/OPLS will actuate. Operators should trip 86B/OPLS.

C. 86B/OPLS will actuate. Operators should trip 86A/OPLS.

D. 86A/OPLS and 86B/OPLS will both actuate. No operator action is required.

page 40

2009 FORT CALHOUN RO EXAM (41)

From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?

A. Directly from the containment coolers.

B. From the seismic skirt area.

C. Directly from the containment atmosphere.

D. From the nuclear detector well cooling system.

page 41

2009 FORT CALHOUN RO EXAM (42)

Given the following:

E CCS actuation has occurred due to a PPLS E

OP-03, LOSS OF COOLANT ACCIDENT, has been entered S

tep 33 has been reached S

tep 33 says, "Verify that the Containment Sump level rises as the SIRWT level lowers."

S IRWT level is 95 inches and lowering C

ontainment sump level is low and not rising What action should be taken per EOP-03?

A. Minimize ECCS flow to the minimum required to remove decay heat.

B. Initiate containment spray to ensure adequate containment sump level.

C. Begin blended makeup to the SIRWT to increase SIRWT inventory.

D. Trip the LPSI pumps to reduce SIRWT depletion rate.

page 42

2009 FORT CALHOUN RO EXAM (43)

In order to maintain steam generator pressure below 1100 psia following a loss of load from 100% power, Technical Specifications require that _________ be operable in modes 1 and 2.

A. All 10 Main Steam Safety Valves.

B. 9 of 10 Main Steam Safety Valves.

C. 4 of 5 Main Steam Safety Valves on each Steam Generator.

D. 3 of 5 Main Steam Safety Valves on each Steam Generator.

page 43

2009 FORT CALHOUN RO EXAM (44)

Given the following plant conditions:

T he plant is operating at full power A

ll Feedwater Reg valves and Bypass valves are in AUTO on DCS T

he Bypass valves are closed B

oth DCS level controllers are in AUTO on DCS N

arrow range level in both Steam Generators is at 63%

How should the Feedwater Reg valves and Bypass valves respond to a reactor trip?

A. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 63%

B. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 35%

C. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 63%. The Feedwater Bypass valves will remain closed.

D. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 35%. The Feedwater Bypass valves will remain closed.

page 44

2009 FORT CALHOUN RO EXAM (45)

To prevent a loss of RCS heat removal following a total loss of feedwater, either AFW flow must be initiated or once-through-cooling must be established when:

A. Wide Range level in either S/G falls below 32%.

B. Wide Range levels in both S/G's fall below 32%.

C. An uncontrolled rise in RCS T-cold of 6°F.

D. An uncontrolled rise in RCS pressure of 50 psi.

page 45

2009 FORT CALHOUN RO EXAM (46)

Given the following plant conditions:

T he plant was operating at full power A

n electrical grid disturbance results in degraded grid voltage A

OP-31, 161 KV GRID MALFUNCTIONS, was entered T

he voltage on all 4160 V buses is less than the minimum required per AOP-31 T

he voltage on all 480 volt buses is less than the minimum required per AOP-31 T

he reactor was tripped and EOP-00, STANDARED POST TRIP ACTIONS, was entered What actions are directed by AOP-31 after tripping the reactor and entering EOP-00?

A. Trip all pumps fed by 4160 V buses and manually initiate a 480 volt load shed.

B. Trip all pumps fed by 4160 V buses, parallel Diesel Generators to buses 1A4 and 1A3 and open their respective feeder breakers.

C. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually initiate the sequencers to start required loads.

D. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually start required loads.

page 46

2009 FORT CALHOUN RO EXAM (47)

Given the following:

The plant was operating at full power The DC BUS #1 GROUND annunciator came into alarm The EONT has been dispatched to 125 VDC Bus 1 EE-8F You have been directed to check the DC Bus at AI-41A for indications of a ground in accordance with ARP-CB-20/A15.

Which one of the following is an indicator of a severe ground on 125V DC Bus #1 at AI-41A?

A. Both white lights will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.

B. One white light will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.

C. Both white lights will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.

D. One white light will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.

page 47

2009 FORT CALHOUN RO EXAM (48)

The timer on battery charger #1, EE-8C, is being used to place an equalizing charge on battery #1.

What voltage would be expected to be indicated on DC bus #1 during this operation and when the timer times out?

A. 133-137 volts dropping to 123-127 volts.

B. 138-142 volts dropping to 123-127 volts.

C. 133-137 volts dropping to 128-132 volts.

D. 138-142 volts dropping to 128-132 volts.

page 48

2009 FORT CALHOUN RO EXAM (49)

Given the following plant conditions:

A large break LOCA occurred in containment O

ffsite power was lost at the same time B

oth Diesel Generators started D

G-1's speed only increased to 700 rpm due to a problem with its governor How would the ECCS pumps normally powered by DG-1 be affected?

A. The output breaker from DG-1 would not close and there would be no power to the pumps.

B. The output breaker from DG-1 would close, but the sequencers would not close the individual pump breakers.

C. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the DG-1 output breaker would soon open due to an overcurrent condition.

D. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the pumps would run at reduced speed and flow.

page 49

2009 FORT CALHOUN RO EXAM (50)

Given the following plant conditions:

T he plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service L etdown temperature transmitter, TE-2897, has just been recalibrated A tmospheric dump valve, HCV-1040, was just unisolated N ew fluid has just been added to the EHC system P ower range NI power is rising slowly on all channels D elta T power is rising slowly on all channels A ll hot and cold leg temperatures are rising slowly What action should be taken based on these indications?

A. Bypass the ion exchangers using OI-CH-2.

B. Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.

C. Isolate the atmospheric dump valve using OI-MS-1A.

D. Check the EHC fluid for air bubbles using OI-ST-12.

page 50

2009 FORT CALHOUN RO EXAM (51)

Given the following plant conditions:

T here is high activity in the RCS A

steam generator tube leak exists in RC-2B R

M-064 has been placed in service with the selector switch placed in the "auto" position The indicated radiation level on RM-064 will:

A. Read background radiation only.

B. Peg high and stay that way.

C. Alternate between high and low readings.

D. Slowly continue to rise.

page 51

2009 FORT CALHOUN RO EXAM (52)

Given the following conditions:

A steam line has ruptured inside containment T

he CCW surge tank has ruptured.

A ll other Engineered Safeguards Features are operating as designed R

iver level is 990 feet C

ontainment pressure is 40 psia C

ontainment temperature is 190°F Should Raw Water backup cooling be supplied to the Containment Coolers in accordance with AOP-11, LOSS OF COMPONENT COOLING WATER and why?

A. Yes, because both Containment temperature and pressure are high.

B. No, because they are not needed with Containment Spray operating.

C. No, because Containment temperature is too high.

D. No, because river level is too low.

page 52

2009 FORT CALHOUN RO EXAM (53)

Given the following plant conditions:

T he plant was operating at 100% power R

aw Water pumps, AC-10A and AC-10B were running A

Loss of Coolant Accident occurred coincident with a loss of offsite power D

iesel Generator, DG-2, failed to start Which Raw Water pumps will be running after sequencer operation?

A. AC-10A and AC-10B.

B. AC-10A and AC-10C.

C. AC-10B and AC-10D.

D. AC-10C and AC-10D.

page 53

2009 FORT CALHOUN RO EXAM (54)

Given the following plant conditions:

T he plant is operating at full power T

he PLANT AIR PRESS LO annunciator alarmed S

oon after, the INSTRUMENT AIR PRESS LO annunciator alarmed O

n CB-10,11, PI-1750, Instrument Air Pressure, is cycling between 80 and 85 psig Which one of the following failures could cause these indications?

A. A leak in an instrument air line inside containment.

B. A stuck open relief valve on an air receiver.

C. A clogged or flooded air dryer.

D. A leak in the turbine building service air header.

page 54

2009 FORT CALHOUN RO EXAM (55)

A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that:

A. The Inner PAL door cannot be opened with a high differential pressure across it.

B. The Inner PAL door cannot be opened unless the outer PAL door is closed.

C. The Outer PAL door cannot be opened from the outside with a Containment Isolation Actuation Signal (CIAS) present.

D. The Outer PAL door cannot be opened from the outside with a Containment Radiation High Signal (CRHS) present.

page 55

2009 FORT CALHOUN RO EXAM (56)

Given the following plant conditions:

A steam line break has occurred in Room 81 P

PLS and SGIS have actuated T

he affected steam generator has blown dry P

ressurizer level is 60% and rising P

ressurizer pressure is at 1650 psia and rising In accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdown isolation valves, HCV-204 and TCV-202 to be opened?

A. Reset Engineered Safeguards relays.

B. Block PPLS, reset PPLS and CIAS lockout relays.

C. Place CIAS override switches for HCV-204 and TCV-202 in override.

D. Place Defeat switch for HCV-204 in the defeat position.

page 56

2009 FORT CALHOUN RO EXAM (57)

How could inoperability of the Containment Purge Exhaust Fans affect a refueling outage?

A. Containment entry could be delayed due to higher airborne activity.

B. Containment entry could be delayed due to higher temperatures in containment.

C. Fuel movement could be delayed because Tech Specs require operability of the purge fans.

D. Plant restart could be delayed because Tech Specs require operability of the purge fans.

page 57

2009 FORT CALHOUN RO EXAM (58)

Given the following plant conditions:

T he plant is in a refueling outage S

hutdown Cooling is in service T

he Refueling Cavity is flooded T

he core has been offloaded to the Spent Fuel Pool S

pent Fuel Pool Cooling pump, AC-5A, has just tripped and cannot be restarted S

pent Fuel Pool Cooling pump, AC-5B, will not start How will alternate spent fuel pool cooling be established per AOP-36, LOSS OF SPENT FUEL POOL COOLING?

A. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water through the Spent Fuel Pool.

B. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.

C. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water through the Spent Fuel Pool.

D. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.

page 58

2009 FORT CALHOUN RO EXAM (59)

How will the Steam Dump and Bypass valves respond to an uncomplicated reactor trip from full power if the output from pressure controller PIC-910 fails low?

(Assume all systems are in automatic.)

A. The Steam Dump Valves, TCV-909s, will open fully and then reclose. The Bypass Valve, PCV-910, will open fully and remain open.

B. The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530°F and 535°F. The Bypass Valve, PCV-910, will remain fully closed.

C. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 530°F and 535°F.

D. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 535°F and 540°F.

page 59

2009 FORT CALHOUN RO EXAM (60)

Given the following:

C ondenser Evacuation pumps, FW-8A and FW-8C, are operating F

W-8B is the standby pump T

he "43/FW" switch is in the "OFF" position.

What will happen if FW-8A trips due to high seal water temperature?

A. FW-8B will start immediately. Condenser vacuum will be maintained steady.

B. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.

FW-8B will continue to run after automatically starting.

C. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury.

FW-8B will then cycle on and off to maintain condenser vacuum between 24.5 and 25.5 inches of vacuum.

D. FW-8B will not start automatically unless the "43/FW" switch is placed in the "AUTO" position.

page 60

2009 FORT CALHOUN RO EXAM (61)

Given the following plant conditions:

T he plant is operating at 40% power C

ondensate pump, FW-2A is out of service C

ondensate pump, FW-2B, is operating F

W-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2 What action, if any, should be taken in accordance with OI-FW-1 and for what reason?

A. The selected pump should be changed to FW-2C to ensure that FW-2C will start automatically if FW-2B trips following a SIAS or CSAS actuation.

B. The selected pump should be changed to FW-2C to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.

C. FW-2B should remain as the selected pump to ensure that FW-2B will trip following a SIAS or CSAS actuation.

D. FW-2B should remain as the selected pump to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.

page 61

2009 FORT CALHOUN RO EXAM (62)

Given the following:

The plant is operating at full power REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annunciator is in alarm REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annunciator is in alarm The T-ref (black) pens on both of the TAVG/TREF Recorders (TR-111/TR-121) indicate 532°F Which one of the following would produce these indications?

A. One of the Power Range Control Channels output failed low.

B. Both of the Power Range Control Channels output failed low.

C. The Main Generator output transmitter failed low.

D. The Turbine first stage pressure transmitter failed low.

page 62

2009 FORT CALHOUN RO EXAM (63)

Given the following plant conditions:

W aste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank, WD-29B T

he Control Switch for WD-28A is in the "HAND" Position.

T he Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control valve, PCV-514B, is in the "HAND" position.

If vent header pressure is sufficient, which one of the following will act first to prevent overpressurizing WD-29B?

A. WD-28A will trip on high discharge pressure.

B. PCV-514B will close on high tank pressure.

C. WD-29B's rupture disk will break relieving to the room.

D. WD-29B's relief valve will open relieving to the Auxiliary Building Exhaust Duct.

page 63

2009 FORT CALHOUN RO EXAM (64)

The Distributed Control System (DCS) core mimic monitor provides color graphic displays for each CEDM. Green squares are used to indicate that the CEDM is fully inserted. The DCS input that results in the green square display comes from the:

A. Synchro-transmitters.

B. ERF computer.

C. Magnet actuated reed switches.

D. Cam actuated limit switches.

page 64

2009 FORT CALHOUN RO EXAM (65)

Which of the following describes the response of the Switchgear Room HVAC to Fire Protection System detector alarms in the East Switchgear Room?

A. After a detector has actuated in either zone 7 or 8, the ventilation dampers for only the East Switchgear Room shut.

B. After a detector has actuated in both zones 7 and 8, the ventilation dampers for only the East Switchgear Room shut.

C. After a detector has actuated in either zone 7 or 8, the ventilation dampers for both Switchgear Rooms shut.

D. After detectors have actuated in both zones 7 and 8, the ventilation dampers in both Switchgear Rooms shut.

page 65

2009 FORT CALHOUN RO EXAM (66)

For what procedures are you allowed to use the Indexes on the Document Control Web page to verify that the most current revision of a procedure is being used per SO-G-7, OPERATING MANUAL?

A. For all plant procedures.

B. Only for procedures designated as "Information Use."

C. Only for procedures designated as "Information Use" or "Reference Use."

D. Cannot be used to verify current revision for any procedures.

page 66

2009 FORT CALHOUN RO EXAM (67)

Spent fuel is being moved in the Spent Fuel Pool using Spent Fuel Handling Machine, FH-12. Which one of the following plant HVAC configurations is required in accordance with OP-12, FUELING OPERATIONS?

A. One Auxiliary Building Supply and two Auxiliary Exhaust Fans must be running.

B. All Auxiliary Building Exhaust Fans must be running.

C. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Filtered Air Makeup Mode.

D. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Recirculation Mode.

page 67

2009 FORT CALHOUN RO EXAM (68)

Given the following:

A surveillance test is being performed that measures the closure time of a containment isolation valve.

A suggestion is made that the test be conducted first for "just in time training" prior to the actual surveillance test being conducted.

Is this allowed in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM and why?

A. Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior to measuring stroke time.

B. Yes, this is a good practice although it is not required by SO-G-23.

C. No, this is not a good practice because it involves excessive valve cycling.

D. No, this is not allowed because SO-G-23 requires the test be conducted from the "as found" condition.

page 68

2009 FORT CALHOUN RO EXAM (69)

During the conduct of a surveilance test, the control switch for a pump that is required to be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.

No other changes have been made to the system.

How does this affect the Operability and Availability of the pump?

A. The pump is "Operable" and "Available."

B. The pump is NOT "Operable" but is "Available."

C. The pump is "Operable" but is NOT "Available."

D. The pump is NOT "Operable" and NOT "Available."

page 69

2009 FORT CALHOUN RO EXAM (70)

The plant is operating at full power. An instrument bus has been placed in an abnormal alignment to allow for maintenance activites.

Which one of the following alignments requires logging into a Limiting Condition for Operation?

A. Instrument Bus "A" is being supplied by swing inverter, EE-8T.

B. Instrument Bus "A" is being supplied by its bypass transformer.

C. Instrument Bus "1" is being supplied by its bypass transformer.

D. Instrument Bus "1" is being supplied by its testing transformer.

page 70

2009 FORT CALHOUN RO EXAM (71)

When are Control Room Log entries required for containment entry and exit per Standing Order O-22, "CONTAINMENT ACCESS AND EGRESS?

A. When one PAL door is inoperable.

B. When containment integrity is required.

C. When entering without Radiation Protection coverage.

D. When the containment security card readers are not operational.

page 71

2009 FORT CALHOUN RO EXAM (72)

How will placing the keyswitch on a Control Room process radiation monitor ratemeter in the "KEYPAD" position affect operation of the radiation monitor?

A. Annunciation and equipment actuations will be blocked.

B. Annunciation will still work but equipment actuations will be blocked.

C. Annunciation and equipment actuations will still work but output to the radiation monitor recorder will be blocked.

D. Annunciation and equipment actuations will still work but output to the ERF computer will be blocked.

page 72

2009 FORT CALHOUN RO EXAM (73)

EOP-04, STEAM GENERATOR TUBE RUPTURE, directs aligning blowdown sample flow to the Spent Regenerant Tank to:

A. Limit the release of radioactive liquid to the river.

B. Limit contamination of the water in the Condenser Hotwell.

C. Minimize radiation levels in Room 81.

D. Minimize radiation levels in the secondary sampling room.

page 73

2009 FORT CALHOUN RO EXAM (74)

In the Control Room, plant instruments that have been qualified to survive in an accident environment (EEQ) can be identified by:

A. Orange tape.

B. Orange dots.

C. Yellow labels.

D. Red and white striped label borders.

page 74

2009 FORT CALHOUN RO EXAM (75)

Given the following plant conditions:

A reactor startup is in progress W

ide Nange NI power indicates 5 x 10-5% power A

sustained positive startup rate of 1.5 DPM is indicated on all channels.

A ll Zero Power Mode Bypass Switches are in the "BYPASS" position A

ll Reactor Coolant Pumps are operating If Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and why would an automatic reactor trip occur and EOP-00 be entered?

Assume no operator actions.

A. The reactor would trip immediately due to low RCS flow.

B. The reactor would trip on low RCS flow when power exceeds 1 x 10-4% power.

C. The reactor would trip immediately due to high startup rate.

D. The reactor would trip on high startup rate when power exceeds 1 x 10-4% power.

page 75

RO EXAM HANDOUTS

TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.1 Reactor Coolant System 2.1.1 Operable Components Applicability Applies to the operable status of the reactor coolant system components.

Objective To specify certain conditions of the reactor coolant system components.

Specifications Limiting conditions for operation are as follows:

(1) Reactor Critical All four (4) reactor coolant pumps shall be in operation.

Exceptions The limitations of this specification may be suspended during the performance of physics tests provided the power level is < 10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.

(2) Hot Shutdown or 350EF < Tcold < 515EF (a) The reactor coolant loops listed below shall be operable:

(i) Reactor coolant loop 1 and at least one associated reactor coolant pump.

(ii) Reactor coolant loop 2 and at least one associated reactor coolant pump.

(b) At least one of the above reactor coolant loops shall be in operation.

Exceptions All reactor coolant pumps may be de-energized for up to one hour provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10EF below saturation temperature.

2.1 - Page 1 Amendment No. 46,47,56, 256

TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.1 Reactor Coolant System (Continued) 2.1.1 Operable Components (Continued)

(c) If fewer than the above required reactor coolant loops are OPERABLE, the required loops shall be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(3) 210°F Tcold 350°F or Tcold < 210°F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.

(a) At least two (2) of the decay heat removal loops listed below shall be OPERABLE:

(i) Reactor coolant loop 1 and its associated steam generator and at least one associated reactor coolant pump.

(ii) Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.

(iii) One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.

(iv) One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addition to that in (iii) above, and associated shutdown cooling piping.

(b) At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.

(c) With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

(d) For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:

(i) Reactor Coolant System temperature is less than 120EF.

(ii) The Reactor Coolant System is vented with a vent area greater than or equal to 47 in2.

(4) DELETED 2.1 - Page 2 Amendment No. 39,56,136,188, 256

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 12 OF 19 126 LONG TERM STEADY STATE (104.5) 100.8 INSERTION LIMIT (94.5)

GROUP 4 (82.5) 75.6 SHORT TERM INSERTION LIMIT PPDIL 126 50.4 100.8 25.2 CEA GROUP POSITIONS (INCHES WITHDRAWN)

PDIL or TRANSIENT GROUP 3 INSERTION LIMIT 75.6 0 50.4 EMERGENCY BORATION LIMIT (35.2) 12 BELOW PDIL - REFER TO AOP-3 25.2 126 (25.2)

(13.2) 0 100.8 GROUP 2 75.6 50.4 126 25.2 100.8 0 GROUP 1 75.6 50.4 25.2 0

0 20 40 60 80 10 0 REACTOR POWER (% OF ALLOWED POWER)

COLR POWER DEPENDENT INSERTION LIMIT FIGURE 2

R36

ES-401 Site-Specific SRO Written Examination Form ES-401-8 Cover Sheet U.S. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:

Date: 03/27/2009 Facility/Unit: Fort Calhoun Region: I II III IV X Reactor Type: W CE X BW GE Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80.00 percent to pass. You have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to complete the combined examination, and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> if you are only taking the SRO portion.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicants Signature Results RO/SRO-Only/Total Examination Values / / Points Applicants Scores / / Points Applicants Grade / / Percent ES-401, Page 31 of 33

2009 FORT CALHOUN SRO EXAM (1)

A reactor trip has just occurred and the Standard Post Trip Actions are being performed in accordance with EOP-00, STANDARD POST TRIP ACTIONS.

Which of the following parameters requires you to take contingency actions?

A. All trippable control element assemblies are fully inserted except for B-15. All non-trippable control element assemblies are fully withdrawn.

B. Instrument air pressure is 85 psig and stable.

C. Both steam generator wide range levels are 85% and stable.

D. Pressurizer pressure is 2060 psia and increasing.

page 1

2009 FORT CALHOUN SRO EXAM (2)

Given the following plant conditions:

A loss of load event resulted in a high pressure reactor trip Both of the Power-Operated Relief Valves (PORVs) opened One of the PORVs failed to close when pressurizer pressure lowered below it's setpoint Power was not available to the open PORV's block valve during performance of Standard Post Trip Actions EOP-03, LOSS OF COOLANT ACCIDENT, was entered Power has now been restored to the open PORV's block valve The PORV block valve associated with the open PORV should NOT be closed if:

A. Pressurizer level is at 100%.

B. Pressurizer pressure is 2010 psia.

C. Reactor vessel level is 83%.

D. RCS subcooling is 0°F.

page 2

2009 FORT CALHOUN SRO EXAM (3)

Given the following plant conditions:

The plant is in hot shutdown Charging and letdown were isolated in response to RCS leakage Isolation of charging and letdown terminated the RCS leakage Pressurizer heaters have just lost power due to the low level cutout All Reactor Coolant Pumps are operating as designed How much time do the operators have to reestablish charging flow to the RCS before the pressurizer empties assuming RCS cold leg temperature stays steady at 532°F?

A. 3.5 - 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> B. 5.0 - 6.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> C. 6.5 - 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> D. 8.0 - 9.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> page 3

2009 FORT CALHOUN SRO EXAM (4)

The following plant conditions exist during a RCS heatup:

T-cold is 410°F.

T-hot is 411°F.

Core Exit Thermocouples are reading between 410°F and 415°F.

Pressurizer pressure indicates 955 psia.

No operations are in effect that could cause a RCS dilution.

Which one of the following Reactor Coolant Pump operating conditions is NOT allowed by the requirements of T.S. 2.1.1?

A. RC-3A and RC-3C are operable, but not operating. RC-3B and RC-3D are not operable. RC-3A has been shutdown for 35 minutes.

B. RC-3A is operating. RC-3C is operable, but not operating. RC-3B and RC-3D are not operable. RC-3C has been shutdown for 75 minutes.

C. RC-3B and RC-3D are operable, but not operating. RC-3A and RC-3C are not operable. RC-3D has been shutdown for 35 minutes.

D. RC-3C is operating. RC-3D is operable, but not operating. RC-3A and RC-3B are not operable. RC-3D has been shutdown for 75 minutes.

page 4

2009 FORT CALHOUN SRO EXAM (5)

Given the following plant conditions:

RCS temperature is 105°F Pressurizer pressure is 15 psia Shutdown Cooling was in operation per OI-SC-1, SHUTDOWN COOLING INITIATION LPSI pump, SI-1A, was running The pressurizer manway is removed Offsite power has just been lost The Emergency Diesel Generators operate as designed What action (if any) should you perform after the Emergency Diesel Generators start and their output breakers close?

A. Manually restart the LPSI pumps.

B. Un-isolate the LPSI system from the RCS and restart the LPSI pumps.

C. No action is necessary; the Emergency Diesel Generators will pick up the LPSI pumps as dead bus loads.

D. No action is necessary; the sequencers will restart LPSI pumps within one minute of the breaker closing.

page 5

2009 FORT CALHOUN SRO EXAM (6)

The following plant conditions exist:

The plant was operating at 65% power with all systems are aligned for normal operation The "CC WATER SURGE TANK AC-2 HI OR LO LEVEL" alarm was received The Auxiliary Building Operator reported that he heard a loud rumbling noise from the operating CCW pump, AC-3A You observe fluctuating current and discharge pressure for AC-3A The CCW surge tank level is 8 inches and lowering The reactor was manually tripped two minutes after the AUXILIARY COOLANT FROM CRDM FLOW LO alarm was received What action should be performed in addition to Standard Post Trip Actions in accordance with AOP-11?

A. Trip one RCP in each loop within 3 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.

B. Trip one RCP in each loop within 5 minutes. Trip the remaining RCPs if high bearing temperature alarms are received.

C. Shutdown all RCP's within 3 minutes.

D. Shutdown all RCP's within 5 minutes.

page 6

2009 FORT CALHOUN SRO EXAM (7)

Given the following sequence of events:

The plant was operating at full power Pressurizer level channel "Y" was selected as the controlling channel LT-101Y failed Letdown flow increased Pressurizer level lowered to 31%

Pressurizer pressure lowered to 1920 psia All pressurizer heaters turned off.

The Operator then took manual control of charging and letdown and restored level to 60%

The operator then selected channel "X" as the controlling channel Pressurizer pressure control remained in automatic Current plant conditions are:

Pressurizer pressure and level are both stable with level at 60% and pressure at 1950 psia Pressurizer steam temperature indicates 632°F Pressurizer liquid temperature indicates 620°F How will pressurizer pressure respond?

A. Pressurizer pressure will steadily increase to 2100 psia.

B. Pressurizer pressure will remain at approximately1950 psia until the Level Control Bistables, LC-101-1 and LC-101-2, located behind CB-1/2/3 are reset.

C. Pressurizer pressure will remain at approximately1950 psia until Channel "X" is selected on PZR Heater Cutout Channel Select Switch, HC-101-1.

D. Pressurizer pressure will remain at approximately1950 psia until the water in the pressurizer reaches saturation temperature.

page 7

2009 FORT CALHOUN SRO EXAM (8)

The plant experiences an ATWS event where both the reactor and turbine failed to trip.

What action does EOP-00 direct you to perform to limit reactor power?

A. Trip all Reactor Coolant Pumps.

B. Transfer charging pump suction to the SIRWT.

C. Insert the non-trippable CEAs.

D. Close the MSIVs.

page 8

2009 FORT CALHOUN SRO EXAM (9)

Given the following plant conditions:

The plant is operating at 20% power A high radiation alarm has been received on RM-054B Counts are rising RM-057 but below the alarm setpoint Charging flow is 40 gpm Letdown flow is 30 gpm Pressurizer pressure is 2080 psia and steady Pressurizer level is 48% and steady The are no containment radiation alarms Containment pressure is steady Containment sump level is steady Which one of the following actions will occur automatically with these plant conditions?

A. Blowdown flow from Steam Generator, RC-2B will be isolated. Blowdown flow will continue from RC-2A.

B. Blowdown flow from both Steam Generators will be isolated.

C. RCV-978, 6th Stage Extraction Isolation Valve, will close.

D. A Ventilation Isolation Actuation Signal (VIAS) will be generated page 9

2009 FORT CALHOUN SRO EXAM (10)

Given the following plant conditions:

A tube has ruptured in Steam Generator, RC-2A The steam line from Steam Generator, RC-2B, has ruptured in room 81 EOP-00, STANDARD POST TRIP ACTIONS, has been completed EOP-20, FUNCTIONAL RECOVERY PROCEDURE, has been entered In mitigating this event, which steam generator(s), if any, should be isolated?

A. Neither Steam Generator should be isolated.

B. Only RC-2A should be isolated.

C. Only RC-2B should be isolated.

D. Both steam generators should be isolated.

page 10

2009 FORT CALHOUN SRO EXAM (11)

A break on the feedwater line to Steam Generator, RC-2B, inside containment has occurred.

The following plant conditions exist:

SGIS has actuated Heat removal has been established using Steam Generator, RC-2A.

AFW Pump, FW-6, is feeding Steam Generator RC-2A and is the only available AFW pump.

Steam Generator, RC-2B, has dried out.

No Reactor Coolant Pumps are running.

In accordance with EOP-05, UNCONTROLLED HEAT EXTRACTION, which one of the following actions should be taken and for what reason?

A. AFW flow should be established to RC-2B to help promote natural circulation flow in both RCS loops.

B. AFW flow should be established to RC-2B to increase decay heat removal.

C. AFW flow should NOT be established to RC-2B because it would result in a positive reactivity addition.

D. AFW flow should NOT be established to RC-2B because FW-6 does not have the capacity to feed both S/Gs simultaneously.

page 11

2009 FORT CALHOUN SRO EXAM (12)

The following plant conditions exist:

A loss of 161 KV to the plant resulted in fast transfer of vital buses 1A3 and 1A4 to 345 KV This was followed by a loss of load that resulted in a reactor trip Both D/Gs failed to start due to a common mode failure resulting in a station blackout Breakers 1A11, 1A13, 1A22 and 1A24 are open The generator field breaker is closed The Kirk key for disconnect, DS-T1, has been inserted and turned he isolated phase bus duct cooling units are off All Main Steam Stop Valves are closed Both DC buses are energized Which one of the following actions must be taken to allow disconnect, DS-T1, to be opened from CB-20 prior to restoring 345 KV power to buses 1A3 and 1A4?

A. Breakers 1A13 and 1A24 must be closed.

B. The generator field breaker must be opened.

C. The Kirk key Interlock must be disengaged.

D. An isolated phase bus duct cooling unit must be started.

page 12

2009 FORT CALHOUN SRO EXAM (13)

The plant tripped from 100% power following a loss of all offsite power. The following conditions exist:

RCS pressure is 2000 psia.

Pressurizer level is 40%.

Steam Generator Pressures are 900 psia.

Steam Generator Wide Range levels are 40%.

Hot leg temperatures are 575F.

Cold leg temperatures are 532F.

Which of the following actions would be most effective in enhancing natural circulation?

A. Raise RCS pressure.

B. Raise Pressurizer level.

C. Raise Steam Generator pressures.

D. Raise Steam Generator levels.

page 13

2009 FORT CALHOUN SRO EXAM (14)

Given the following plant conditions:

The plant was operating at full power Power was lost to Instrument bus AI-40A AOP-16, LOSS OF INSTRUMENT BUS POWER, was entered AOP-16,Section II, "Loss of Instrument Bus AI-40A", Step 14 states "Consider closing BOTH of the PORV (Power-Operated Relief Valves) Block Valves" What is the purpose of this step?

A. An additional vital instrument bus failure will result in opening ONE of the PORVs.

B. An additional vital instrument bus failure will result in opening BOTH of the PORVs.

C. An additional vital instrument bus failure will result in the inability to close ONE of the PORV Block Valves.

D. An additional vital instrument bus failure will result in the inability to close BOTH of the PORV Block Valves.

page 14

2009 FORT CALHOUN SRO EXAM (15)

The following plant indications were noted following a reactor trip.

Bus Power Failure DC Distribution Panel 1 Light is off.

Bus Power Failure DC Distribution Panel 2 Light is on.

The DC BUS#1 LOW VOLT annunciator is in alarm The 43/FW Switch is in the OFF position.

All NORMAL/OVERRIDE switches on AI-66A are in NORMAL.

FW-6 can NOT be started from CB-10,11.

In accordance with AOP-16, LOSS OF INSTRUMENT BUS POWER, which one of the following actions is required to be able to start FW-6?

A. Place the 43/FW Switch in the AUTO position.

B. Start FW-6 from AI-66A after placing the NORMAL/OVERRIDE switches on AI-66A to OVERRIDE.

C. Use the 1A1-1A3 Emergency MTS button, PB2-1A1-1A3 PBS, to switch to the emergency DC source.

D. Start FW-6 from the Alternate Shutdown Panel, AI-179.

page 15

2009 FORT CALHOUN SRO EXAM (16)

One of the two 20 inch underground Raw Water headers from the intake structure to the auxiliary building completely ruptured.

How does isolating the ruptured header affect the ability to provide cooling to the RW/CCW heat exchangers?

A. Raw Water can be supplied to all of the RW/CCW heat exchangers but only two of the Raw Water Pumps can be used.

B. Raw Water can only be supplied to two of the RW/CCW heat exchangers and only two of the Raw Water Pumps can be used.

C. Raw Water can be supplied to all of the RW/CCW heat exchangers but only three of the Raw Water Pumps can be used.

D. Raw Water can only be supplied to three of the RW/CCW heat exchangers and only three of the Raw Water Pumps can be used.

page 16

2009 FORT CALHOUN SRO EXAM (17)

The reactor has been manually tripped following a sudden loss of instrument air pressure.

According to AOP-17, Loss of Instrument Air, which of the following actions should be taken to prevent RCS cooldown?

A. Close FCV-1101 and FCV-1102 using DCS.

B. Maximize S/G blowdown flow.

C. Initiate a Steam Generator Isolation Signal (SGIS).

D. Manually trip all Main Feedwater Pumps.

page 17

2009 FORT CALHOUN SRO EXAM (18)

Given the following plant conditions:

The plant is operating at 10% reactor power A loss of stator water cooling occurred Attempts to restore stator water cooling have been unsuccessful Stator cooling water outlet temperature has risen to 83°C What action is required by AOP-27, GENERATOR MALFUNCTIONS?

A. Manually trip the reactor.

B. Manually trip the turbine.

C. Manually trip the main generator output breakers.

D. Manually open the main generator field breaker.

page 18

2009 FORT CALHOUN SRO EXAM (19)

Given the following plant conditions:

A reactor startup is being performed using OP-2A, PLANT STARTUP The brake on one of regulating group 2 CEAs fails to release The CEAs are being withdrawn in the manual sequential mode.

When will a SCEAPIS (DCS) rod block signal be generated?

A. When any CEA in group 2 is withdrawn 8 inches above the stuck CEA.

B. When any CEA in group 2 is withdrawn 4 inches above the stuck CEA.

C. When any CEA in group 1 reaches the upper rod stop.

D. When any CEA in group 3 begins to withdraw.

page 19

2009 FORT CALHOUN SRO EXAM (20)

Given the following plant conditions:

A power increase is in progress per OP-4, LOAD CHANGE AND NORMMAL POWER OPERATION The reactor is at 80% power Group 4 CEAs are at 52 inches All other CEAs are fully withdrawn.

Using the attached PDIL curve, determine what action must be taken as a result of these conditions?

A. Immediately commence emergency boration.

B. Withdraw group 4 CEAs to above the short term insertion limit.

C. Withdraw group 4 CEAs until proper group overlap is achieved.

D. Place the plant in hot shutdown within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

page 20

2009 FORT CALHOUN SRO EXAM (21)

Given the following:

The AI-149 FIRE DETECTION ALARM OR TROUBLE alarm was received The Control Room Fire Detection Computer, PC-66, indicates that multiple detectors in the Cable Spread Room are in alarm The EONT was dispatched and reports that Halon is being discharged into the Cable Spread Room In accordance with AOP-06, FIRE EMERGENCY, what action should be taken by the Control Room Operators?

A. Trip the reactor, open clutch power supply breakers, close the PORV block valves and evacuate the Control Room.

B. Trip the reactor, close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and evacuate the Control Room.

C. Trip the reactor, open clutch power supply breakers, close the PORV block valves and place the Control Room HVAC in Recirculation Mode.

D. Close the PORV block valves, start both Fire pumps, FP-1A and FP-1B, and place the Control Room HVAC in Recirculation Mode.

page 21

2009 FORT CALHOUN SRO EXAM (22)

The following power indications are observed 10 minutes after a reactor trip:

All four WR NI Channels are indicating 3 x 10-3% Power and lowering.

All four WR NI Channels are indicating a startup rate of -0.1 DPM and steady.

All four Power Range NI Channels are indicating 0% power and steady.

All four Delta-T Power Channels are indicating 2% power and lowering.

A miscalibration of which of the following could cause these indications?

A. Wide Range NI power indication channels.

B. Wide Range NI startup rate channels.

C. Power Range NI channels.

D. Delta-T Power Channels.

page 22

2009 FORT CALHOUN SRO EXAM (23)

Radioactive liquid that leaks inside containment will collect in the containment sump.

The containment sump pumps will normally pump this radioactive water to the:

A. Reactor Coolant Drain Tank.

B. Waste Holdup Tanks.

C. Waste Monitor Tanks.

D. Spent Regenerant Tanks.

page 23

2009 FORT CALHOUN SRO EXAM (24)

The radioactive gases released following a waste gas decay tank rupture will consist mostly of isotopes of:

A. Xenon and Krypton.

B. Iodine and Cesium.

C. Tritium and Carbon.

D. Argon and Neon.

page 24

2009 FORT CALHOUN SRO EXAM (25)

Given the following sequence of events:

Condenser vacuum was lost The turbine and reactor tripped Immediately following the trip, a small LOCA occurred inside containment PPLS and CPHS have actuated All HPSI pumps failed to start RCS pressure is steady at 1000 psia Reactor Vessel Level is at 43%

Which of the following valves can be used by the Balance of Plant Operator to immediately begin a RCS cooldown in accordance with EOP-03?

A. Steam Dump Valves, TCV-909-1,2,3,4.

B. Steam Bypass Valve, PCV-910.

C. Atmospheric Dump Valve, HCV-1040.

D. Air Assisted Main Steam Safety Valves, MS-291, MS-292.

page 25

2009 FORT CALHOUN SRO EXAM (26)

FC-214, REACTOR COOLANT DAILY

SUMMARY

REPORT, contains the following information:

Fuel Reliability Indicator (FRI): 1.1 x 10-4 uCi/gm Dose Equivalent Iodine: 0.8 uCi/gm Xe-133 Activity: 2.8 uCi/gm RCS Total Activity: 5.5 uCi/gm E-bar: 0.68 Mev Which one of the following actions is required?

A. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Fuel Reliability Indicator.

B. AOP-09, HIGH RADIOACTIVITY, must be entered due to the Xe-133 Activity C. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to Dose Equivalent Iodine.

D. AOP-21, REACTOR COOLANT SYSTEM HIGH ACTIVITY, must be entered due to the RCS Total Activity.

page 26

2009 FORT CALHOUN SRO EXAM (27)

The "REACTOR VESSEL FLANGE LEAK" alarm was received due to leakage past the Reactor Vessel Flange inner O-Ring. Actions were taken to reset the alarm condition.

What one of the following parameters would cause an alarm if leakage occurs past the outer O-Ring?

A. Increasing pressure.

B. Increasing temperature.

C. Decreasing pressure.

D. Decreasing temperature.

page 27

2009 FORT CALHOUN SRO EXAM (28)

Given the following:

You have been directed to shutdown Reactor Coolant Pump, RC-3A in accordance with OI-RC-9 You notice the Control Switch for Oil Lift Pump, RC-3A-1, is in the "AFTER START" position and that the Oil Lift Pump is not operating Which one of the following actions, if any, is required to ensure proper lubrication of the RCP bearings?

A. Do not trip RCP, RC-3A unless its' Oil Lift Pump is running.

B. If the Oil Lift Pump does not start automatically after tripping RC-3A, then momentarily place the Oil Lift Pump Control Switch in the "STOP" position then back to the "START" position to reset it.

C. If the Oil Lift Pump does not start automatically after tripping RC-3A, then hold the Oil Lift Pump Control switch in the "START" position until the "ZERO SPEED" light comes on.

D. No action is required. The Oil Lift Pump is only needed when starting a Reactor Coolant Pump.

page 28

2009 FORT CALHOUN SRO EXAM (29)

Given the following plant conditions:

Leakage through Power Operated Relief Valve (PORV), PCV-102-1, has been discovered The leaking PORV has been isolated by closing its block valve, HCV-151 HCV-151 also leaks through VCT makeup is in its normal alignment Assuming no operator action is taken, how will the VCT level control system first respond?

A. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the VCT at the neutral blend boron concentration.

B. FCV-269, FCV-269X and FCV-269Y will open automatically to supply water to the charging pump suction at the neutral blend boron concentration.

C. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the VCT at the SIRWT boron concentration.

D. LCV-218-3 will open and LCV-218-2 will close automatically to supply water to the charging pump suction at the SIRWT boron concentration.

page 29

2009 FORT CALHOUN SRO EXAM (30)

A plant shutdown and cooldown are being performed. One hour after placing shutdown cooling in service, the following plant indications are observed:

Pressurizer pressure and level are lowering.

Containment sump level is steady.

CCW surge tank level and pressure are increasing.

Steam Generator levels are steady.

Steam Generator pressures are lowering slowly.

RM-053 is in alarm.

All other process radiation monitors are reading normal.

Which one of the following could cause these indications?

A. A raw water/CCW heat exchanger tube leak B. A regenerative heat exchanger tube leak.

C. A shutdown cooling heat exchanger tube leak.

D. A steam generator tube leak.

page 30

2009 FORT CALHOUN SRO EXAM (31)

Given the following:

EOP/AOP Attachment 7, "SDC WITH RAS" has been entered following a Loss of Coolant Accident A RCS cooldown is being conducted using shutdown cooling The RCS cold leg temperatures are currently 170°F.

What is the maximum allowable cooldown rate under these conditions?

A. 25°F/hr.

B. 50°F/hr.

C. 100°F/hr.

D. 200°F/hr.

page 31

2009 FORT CALHOUN SRO EXAM (32)

The plant is operating at full power. HPSI pump, SI-2A, has been tagged out of service due to a breaker problem.

How does this affect the operability of the HPSI train associated with SI-2A per Technical Specifications?

A. The HPSI train is considered operable if SI-2B is operable.

B. The HPSI train is considered operable if SI-2C is operable.

C. One train of HPSI is inoperable, SI-2A must be made operable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D. One train of HPSI is inoperable, SI-2A must be made operable within 7 days.

page 32

2009 FORT CALHOUN SRO EXAM (33)

How is a steam bubble formed in the pressurizer following a refueling outage per OP-2A, PLANT STARTUP?

A. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.

B. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are allowed to dissolve in the water.

C. With the pressurizer level at approximately 50%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.

D. With the pressurizer level at approximately 90%, pressurizer heaters are used to heat the water to saturation. Non-condensable gases are vented to the PQT or VCT using OI-CH-3, CHEMICAL AND VOLUME CONTROL SYSTEM NORMAL OPERATION OF VOLUME CONTROL TANK, Attachment 5 or 6.

page 33

2009 FORT CALHOUN SRO EXAM (34)

Given the following plant conditions:

The plant is operating at 100% power.

Pressurizer Safety Valve, RC-142, has seat leakage.

Quench Tank temperature and level are rising.

Quench Tank pressure is 8 psig and increasing slowly.

Which one of the following automatic actions will occur assuming no operator actions are taken?

A. Quench Tank relief valve, RC-125, will open resulting in increasing containment pressure.

B. Quench Tank relief valve, RC-125, will open and relieve to the waste gas system.

C. Quench Tank vent valve, HCV-155, will open and vent to the containment vent header and the RCDT outlet containment isolation valve will close.

D. Quench Tank vent valve, HCV-155, will open and the Quench Tank rupture disk will rupture resulting in increasing containment pressure.

page 34

2009 FORT CALHOUN SRO EXAM (35)

Given the following:

The CCW system is being started up in accordance with OI-CC-1 All pre-requisites have been met All CCW pumps are off.

What action will you direct the EONA to take before starting the first CCW pump, AC-3A?

A. Ensure CCW Surge tank pressure is greater than 60 psig.

B. Vent AC-3A using its casing vent valve.

C. Fully open the discharge valve for AC-3A.

D. Fully close the discharge valves for AC-3B and AC-3C.

page 35

2009 FORT CALHOUN SRO EXAM (36)

Given the following:

plant transient resulted in valid SIAS and CIAS actuations COMPONENT COOLING WATER SYSTEM LOW PRESSURE alarm came in 40 seconds ago CCW Header Pressure, PI-499, indicates 118 psig HCV-438A/B/C/D are closed in automatic CCW Surge Tank Pressure indicates 41 psig All CCW Pumps are running Which one of the following conditions could cause these indications?

A. PI-499, CCW header pressure, has failed low.

B. CCW Pressure Switches, PCS-412 and PCS-413, have failed low.

C. PIC-2802, CCW Surge Tank Pressure indication, has failed low.

D. HCV-438A/B/C/D have inadvertently closed resulting in low CCW pressure to the RCPs.

page 36

2009 FORT CALHOUN SRO EXAM (37)

Given the following plant conditions:

A Reactor Coolant System cooldown is in progress for a refueling outage S

hutdown cooling is in operation per OI-SC-1 R

CS temperature is 120°F R

CS pressure is 235 psia R

eactor Coolant Pumps, RC-3A and RC-3B, are operating.

P ressure is being controlled manually using Main pressurizer spray and heaters.

What actions should be taken before shutting down Reactor Coolant Pumps, RC-3A and RC-3B, in accordance with OI-RC-9?

A. RCS pressure should be lowered to less than 215 psia.

B. RCS temperature should be lowered to less than 110°F.

C. The RCS should be borated to the refueling boron concentration.

D. RCS pressure control using Auxiliary spray should be established.

page 37

2009 FORT CALHOUN SRO EXAM (38)

Given the following plant conditions:

B us Power Failure DC Distribution Panel 1 Light is off D

C BUS#1 LOW VOLT annunciator is in alarm D

C Bus #1 voltage indicates 0 volts P

ower has been lost to the "A" DSS 86-Relay How will operation of the Diverse Scram System (DSS) be affected?

A. The DSS will initiate a reactor trip.

B. The DSS will go to a "1 of 3" trip logic.

C. The "A" DSS 86-Relay will not be capable of generating a reactor trip.

D. The DSS will not be capable of generating a reactor trip.

page 38

2009 FORT CALHOUN SRO EXAM (39)

Given the following:

T he power supply to RPS Clutch Power Supply Breaker, CB-AB, will be transferred from Instrument Bus "B" to Instrument Bus "A".

nverter "A" is supplying power to Instrument Bus "A" and Swing Inverter, EE-8U, is supplying power to Instrument Bus "B".

Which one of the following actions will be taken before placing the Clutch Power Supply Transfer Switch, RPS/TS-AB, in the Instrument Bus A (#1) position in accordance with OI-EE-4?

A. Cross-tie Instrument Bus "A" to Instrument Bus "C".

B. Bypass Inverter "A".

C. Transfer Instrument Bus "B" supply to Inverter "B".

D. Bypass Swing Inverter 8-U.

page 39

2009 FORT CALHOUN SRO EXAM (40)

Given the following:

The plant was operating at 50% power when a LOCA occured The reactor tripped automatically PPLS, CPHS, SIAS, CIAS, VIAS and SGIS all actuated The sequencers begin starting safeguards motors During the starting sequence bus 1A3 voltage and transformer T1A3 voltage decreased below the OPLS setpoint How will the OPLS relays respond and what action, if any, should be taken by the Operators to ensure safeguards equipment actuates?

A. OPLS will not actuate. Operators should trip both 86A/OPLS and 86B/OPLS.

B. 86A/OPLS will actuate. Operators should trip 86B/OPLS.

C. 86B/OPLS will actuate. Operators should trip 86A/OPLS.

D. 86A/OPLS and 86B/OPLS will both actuate. No operator action is required.

page 40

2009 FORT CALHOUN SRO EXAM (41)

From where do the CEDM Cooling Fans, VA-2A and VA-2B, take suction?

A. Directly from the containment coolers.

B. From the seismic skirt area.

C. Directly from the containment atmosphere.

D. From the nuclear detector well cooling system.

page 41

2009 FORT CALHOUN SRO EXAM (42)

Given the following:

E CCS actuation has occurred due to a PPLS E

OP-03, LOSS OF COOLANT ACCIDENT, has been entered S

tep 33 has been reached S

tep 33 says, "Verify that the Containment Sump level rises as the SIRWT level lowers."

S IRWT level is 95 inches and lowering C

ontainment sump level is low and not rising What action should be taken per EOP-03?

A. Minimize ECCS flow to the minimum required to remove decay heat.

B. Initiate containment spray to ensure adequate containment sump level.

C. Begin blended makeup to the SIRWT to increase SIRWT inventory.

D. Trip the LPSI pumps to reduce SIRWT depletion rate.

page 42

2009 FORT CALHOUN SRO EXAM (43)

In order to maintain steam generator pressure below 1100 psia following a loss of load from 100% power, Technical Specifications require that _________ be operable in modes 1 and 2.

A. All 10 Main Steam Safety Valves.

B. 9 of 10 Main Steam Safety Valves.

C. 4 of 5 Main Steam Safety Valves on each Steam Generator.

D. 3 of 5 Main Steam Safety Valves on each Steam Generator.

page 43

2009 FORT CALHOUN SRO EXAM (44)

Given the following plant conditions:

T he plant is operating at full power A

ll Feedwater Reg valves and Bypass valves are in AUTO on DCS T

he Bypass valves are closed B

oth DCS level controllers are in AUTO on DCS N

arrow range level in both Steam Generators is at 63%

How should the Feedwater Reg valves and Bypass valves respond to a reactor trip?

A. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 63%

B. The Feedwater Reg valves will ramp closed. The Feedwater Bypass valves will initially open to 40-45% and control narrow range water level at 35%

C. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 63%. The Feedwater Bypass valves will remain closed.

D. The Feedwater Reg valves will initially ramp down to 8% and control narrow range water level at 35%. The Feedwater Bypass valves will remain closed.

page 44

2009 FORT CALHOUN SRO EXAM (45)

To prevent a loss of RCS heat removal following a total loss of feedwater, either AFW flow must be initiated or once-through-cooling must be established when:

A. Wide Range level in either S/G falls below 32%.

B. Wide Range levels in both S/G's fall below 32%.

C. An uncontrolled rise in RCS T-cold of 6°F.

D. An uncontrolled rise in RCS pressure of 50 psi.

page 45

2009 FORT CALHOUN SRO EXAM (46)

Given the following plant conditions:

T he plant was operating at full power A

n electrical grid disturbance results in degraded grid voltage A

OP-31, 161 KV GRID MALFUNCTIONS, was entered T

he voltage on all 4160 V buses is less than the minimum required per AOP-31 T

he voltage on all 480 volt buses is less than the minimum required per AOP-31 T

he reactor was tripped and EOP-00, STANDARED POST TRIP ACTIONS, was entered What actions are directed by AOP-31 after tripping the reactor and entering EOP-00?

A. Trip all pumps fed by 4160 V buses and manually initiate a 480 volt load shed.

B. Trip all pumps fed by 4160 V buses, parallel Diesel Generators to buses 1A4 and 1A3 and open their respective feeder breakers.

C. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually initiate the sequencers to start required loads.

D. Deenergize buses 1A4 and 1A3 by opening their respective feeder breakers and allowing the Diesel Generators to power the buses, manually start required loads.

page 46

2009 FORT CALHOUN SRO EXAM (47)

Given the following:

The plant was operating at full power The DC BUS #1 GROUND annunciator came into alarm The EONT has been dispatched to 125 VDC Bus 1 EE-8F You have been directed to check the DC Bus at AI-41A for indications of a ground in accordance with ARP-CB-20/A15.

Which one of the following is an indicator of a severe ground on 125V DC Bus #1 at AI-41A?

A. Both white lights will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.

B. One white light will be brightly lit and one Ground Fault Voltmeter will indicate low voltage.

C. Both white lights will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.

D. One white light will be brightly lit and both Ground Fault Voltmeters will indicate low voltage.

page 47

2009 FORT CALHOUN SRO EXAM (48)

The timer on battery charger #1, EE-8C, is being used to place an equalizing charge on battery #1.

What voltage would be expected to be indicated on DC bus #1 during this operation and when the timer times out?

A. 133-137 volts dropping to 123-127 volts.

B. 138-142 volts dropping to 123-127 volts.

C. 133-137 volts dropping to 128-132 volts.

D. 138-142 volts dropping to 128-132 volts.

page 48

2009 FORT CALHOUN SRO EXAM (49)

Given the following plant conditions:

A large break LOCA occurred in containment O

ffsite power was lost at the same time B

oth Diesel Generators started D

G-1's speed only increased to 700 rpm due to a problem with its governor How would the ECCS pumps normally powered by DG-1 be affected?

A. The output breaker from DG-1 would not close and there would be no power to the pumps.

B. The output breaker from DG-1 would close, but the sequencers would not close the individual pump breakers.

C. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the DG-1 output breaker would soon open due to an overcurrent condition.

D. The output breaker from DG-1 would close and the sequencers would close the individual pump breakers, but the pumps would run at reduced speed and flow.

page 49

2009 FORT CALHOUN SRO EXAM (50)

Given the following plant conditions:

T he plant is operating at 90% power 10 months into the operating cycle Ion Exchanger, CH-8B, has just been placed into service L etdown temperature transmitter, TE-2897, has just been recalibrated A tmospheric dump valve, HCV-1040, was just unisolated N ew fluid has just been added to the EHC system P ower range NI power is rising slowly on all channels D elta T power is rising slowly on all channels A ll hot and cold leg temperatures are rising slowly What action should be taken based on these indications?

A. Bypass the ion exchangers using OI-CH-2.

B. Manually increase CCW flow through the letdown heat exchanger using OI-CH-2.

C. Isolate the atmospheric dump valve using OI-MS-1A.

D. Check the EHC fluid for air bubbles using OI-ST-12.

page 50

2009 FORT CALHOUN SRO EXAM (51)

Given the following plant conditions:

T here is high activity in the RCS A

steam generator tube leak exists in RC-2B R

M-064 has been placed in service with the selector switch placed in the "auto" position The indicated radiation level on RM-064 will:

A. Read background radiation only.

B. Peg high and stay that way.

C. Alternate between high and low readings.

D. Slowly continue to rise.

page 51

2009 FORT CALHOUN SRO EXAM (52)

Given the following conditions:

A steam line has ruptured inside containment T

he CCW surge tank has ruptured.

A ll other Engineered Safeguards Features are operating as designed R

iver level is 990 feet C

ontainment pressure is 40 psia C

ontainment temperature is 190°F Should Raw Water backup cooling be supplied to the Containment Coolers in accordance with AOP-11, LOSS OF COMPONENT COOLING WATER and why?

A. Yes, because both Containment temperature and pressure are high.

B. No, because they are not needed with Containment Spray operating.

C. No, because Containment temperature is too high.

D. No, because river level is too low.

page 52

2009 FORT CALHOUN SRO EXAM (53)

Given the following plant conditions:

T he plant was operating at 100% power R

aw Water pumps, AC-10A and AC-10B were running A

Loss of Coolant Accident occurred coincident with a loss of offsite power D

iesel Generator, DG-2, failed to start Which Raw Water pumps will be running after sequencer operation?

A. AC-10A and AC-10B.

B. AC-10A and AC-10C.

C. AC-10B and AC-10D.

D. AC-10C and AC-10D.

page 53

2009 FORT CALHOUN SRO EXAM (54)

Given the following plant conditions:

T he plant is operating at full power T

he PLANT AIR PRESS LO annunciator alarmed S

oon after, the INSTRUMENT AIR PRESS LO annunciator alarmed O

n CB-10,11, PI-1750, Instrument Air Pressure, is cycling between 80 and 85 psig Which one of the following failures could cause these indications?

A. A leak in an instrument air line inside containment.

B. A stuck open relief valve on an air receiver.

C. A clogged or flooded air dryer.

D. A leak in the turbine building service air header.

page 54

2009 FORT CALHOUN SRO EXAM (55)

A mechanical interlock is provided on the Personnel Air Lock (PAL) doors to ensure that:

A. The Inner PAL door cannot be opened with a high differential pressure across it.

B. The Inner PAL door cannot be opened unless the outer PAL door is closed.

C. The Outer PAL door cannot be opened from the outside with a Containment Isolation Actuation Signal (CIAS) present.

D. The Outer PAL door cannot be opened from the outside with a Containment Radiation High Signal (CRHS) present.

page 55

2009 FORT CALHOUN SRO EXAM (56)

Given the following plant conditions:

A steam line break has occurred in Room 81 P

PLS and SGIS have actuated T

he affected steam generator has blown dry P

ressurizer level is 60% and rising P

ressurizer pressure is at 1650 psia and rising In accordance with EOP-AOP Attachment 23, RESTORATION OF LETDOWN, what action should be taken to allow the letdown isolation valves, HCV-204 and TCV-202 to be opened?

A. Reset Engineered Safeguards relays.

B. Block PPLS, reset PPLS and CIAS lockout relays.

C. Place CIAS override switches for HCV-204 and TCV-202 in override.

D. Place Defeat switch for HCV-204 in the defeat position.

page 56

2009 FORT CALHOUN SRO EXAM (57)

How could inoperability of the Containment Purge Exhaust Fans affect a refueling outage?

A. Containment entry could be delayed due to higher airborne activity.

B. Containment entry could be delayed due to higher temperatures in containment.

C. Fuel movement could be delayed because Tech Specs require operability of the purge fans.

D. Plant restart could be delayed because Tech Specs require operability of the purge fans.

page 57

2009 FORT CALHOUN SRO EXAM (58)

Given the following plant conditions:

T he plant is in a refueling outage S

hutdown Cooling is in service T

he Refueling Cavity is flooded T

he core has been offloaded to the Spent Fuel Pool S

pent Fuel Pool Cooling pump, AC-5A, has just tripped and cannot be restarted S

pent Fuel Pool Cooling pump, AC-5B, will not start How will alternate spent fuel pool cooling be established per AOP-36, LOSS OF SPENT FUEL POOL COOLING?

A. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water through the Spent Fuel Pool.

B. The Fuel Transfer Canal Drain pumps, AC-13A and AC-13B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.

C. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water through the Spent Fuel Pool.

D. The Low Pressure Safety Injection Pumps, SI-1A and SI-1B, will be aligned to circulate water between the Refueling Cavity and Spent Fuel Pool, back through the Fuel Transfer Tube.

page 58

2009 FORT CALHOUN SRO EXAM (59)

How will the Steam Dump and Bypass valves respond to an uncomplicated reactor trip from full power if the output from pressure controller PIC-910 fails low?

(Assume all systems are in automatic.)

A. The Steam Dump Valves, TCV-909s, will open fully and then reclose. The Bypass Valve, PCV-910, will open fully and remain open.

B. The Steam Dump Valves, TCV-909s, will open fully and then modulate to control RCS average temperature between 530°F and 535°F. The Bypass Valve, PCV-910, will remain fully closed.

C. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 530°F and 535°F.

D. The Steam Dump Valves, TCV-909s, and the Bypass Valve, PCV-910, will open fully and then modulate to control RCS average temperature between 535°F and 540°F.

page 59

2009 FORT CALHOUN SRO EXAM (60)

Given the following:

C ondenser Evacuation pumps, FW-8A and FW-8C, are operating F

W-8B is the standby pump T

he "43/FW" switch is in the "OFF" position.

What will happen if FW-8A trips due to high seal water temperature?

A. FW-8B will start immediately. Condenser vacuum will be maintained steady.

B. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury. FW-8B will continue to run after automatically starting.

C. FW-8B will start automatically if condenser vacuum drops to 24.5 inches of mercury. FW-8B will then cycle on and off to maintain condenser vacuum between 24.5 and 25.5 inches of vacuum.

D. FW-8B will not start automatically unless the "43/FW" switch is placed in the "AUTO" position.

page 60

2009 FORT CALHOUN SRO EXAM (61)

Given the following plant conditions:

T he plant is operating at 40% power C

ondensate pump, FW-2A is out of service C

ondensate pump, FW-2B, is operating F

W-2B is selected on SIAS/CSAS selector switch, 43-SIAS/FW2 What action, if any, should be taken in accordance with OI-FW-1 and for what reason?

A. The selected pump should be changed to FW-2C to ensure that FW-2C will start automatically if FW-2B trips following a SIAS or CSAS actuation.

B. The selected pump should be changed to FW-2C to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.

C. FW-2B should remain as the selected pump to ensure that FW-2B will trip following a SIAS or CSAS actuation.

D. FW-2B should remain as the selected pump to ensure that FW-2B will continue to run following a SIAS or CSAS actuation.

page 61

2009 FORT CALHOUN SRO EXAM (62)

Given the following:

The plant is operating at full power REACTOR REGULATING SYSTEM LOOP 1 TREF/TAVG GROSS DEV annunciator is in alarm REACTOR REGULATING SYSTEM LOOP 2 TREF/TAVG GROSS DEV annunciator is in alarm The T-ref (black) pens on both of the TAVG/TREF Recorders (TR-111/TR-121) indicate 532°F Which one of the following would produce these indications?

A. One of the Power Range Control Channels output failed low.

B. Both of the Power Range Control Channels output failed low.

C. The Main Generator output transmitter failed low.

D. The Turbine first stage pressure transmitter failed low.

page 62

2009 FORT CALHOUN SRO EXAM (63)

Given the following plant conditions:

W aste Gas Compressor, WD-28A, is lined up and discharging to Gas Decay Tank, WD-29B T

he Control Switch for WD-28A is in the "HAND" Position.

T he Control Switch for Waste Gas Decay Tank, WD-29B's, Inlet Pressure Control valve, PCV-514B, is in the "HAND" position.

If vent header pressure is sufficient, which one of the following will act first to prevent overpressurizing WD-29B?

A. WD-28A will trip on high discharge pressure.

B. PCV-514B will close on high tank pressure.

C. WD-29B's rupture disk will break relieving to the room.

D. WD-29B's relief valve will open relieving to the Auxiliary Building Exhaust Duct.

page 63

2009 FORT CALHOUN SRO EXAM (64)

The Distributed Control System (DCS) core mimic monitor provides color graphic displays for each CEDM. Green squares are used to indicate that the CEDM is fully inserted. The DCS input that results in the green square display comes from the:

A. Synchro-transmitters.

B. ERF computer.

C. Magnet actuated reed switches.

D. Cam actuated limit switches.

page 64

2009 FORT CALHOUN SRO EXAM (65)

Which of the following describes the response of the Switchgear Room HVAC to Fire Protection System detector alarms in the East Switchgear Room?

A. After a detector has actuated in either zone 7 or 8, the ventilation dampers for only the East Switchgear Room shut.

B. After a detector has actuated in both zones 7 and 8, the ventilation dampers for only the East Switchgear Room shut.

C. After a detector has actuated in either zone 7 or 8, the ventilation dampers for both Switchgear Rooms shut.

D. After detectors have actuated in both zones 7 and 8, the ventilation dampers in both Switchgear Rooms shut.

page 65

2009 FORT CALHOUN SRO EXAM (66)

For what procedures are you allowed to use the Indexes on the Document Control Web page to verify that the most current revision of a procedure is being used per SO-G-7, OPERATING MANUAL?

A. For all plant procedures.

B. Only for procedures designated as "Information Use."

C. Only for procedures designated as "Information Use" or "Reference Use."

D. Cannot be used to verify current revision for any procedures.

page 66

2009 FORT CALHOUN SRO EXAM (67)

Spent fuel is being moved in the Spent Fuel Pool using Spent Fuel Handling Machine, FH-12. Which one of the following plant HVAC configurations is required in accordance with OP-12, FUELING OPERATIONS?

A. One Auxiliary Building Supply and two Auxiliary Exhaust Fans must be running.

B. All Auxiliary Building Exhaust Fans must be running.

C. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Filtered Air Makeup Mode.

D. Spent Fuel Pool Area Filter, VA-66, must be in the Filtered Mode position and Control Room Ventilation must be operating in the Recirculation Mode.

page 67

2009 FORT CALHOUN SRO EXAM (68)

Given the following:

A surveillance test is being performed that measures the closure time of a containment isolation valve.

A suggestion is made that the test be conducted first for "just in time training" prior to the actual surveillance test being conducted.

Is this allowed in accordance with SO-G-23, SURVEILLANCE TEST PROGRAM and why?

A. Yes, SO-G-23 requires pre-cycling of the valves to ensure operability prior to measuring stroke time.

B. Yes, this is a good practice although it is not required by SO-G-23.

C. No, this is not a good practice because it involves excessive valve cycling.

D. No, this is not allowed because SO-G-23 requires the test be conducted from the "as found" condition.

page 68

2009 FORT CALHOUN SRO EXAM (69)

During the conduct of a surveilance test, the control switch for a pump that is required to be operable by Technical Specifications is placed in the "PULL-TO-LOCK" position.

No other changes have been made to the system.

How does this affect the Operability and Availability of the pump?

A. The pump is "Operable" and "Available."

B. The pump is NOT "Operable" but is "Available."

C. The pump is "Operable" but is NOT "Available."

D. The pump is NOT "Operable" and NOT "Available."

page 69

2009 FORT CALHOUN SRO EXAM (70)

The plant is operating at full power. An instrument bus has been placed in an abnormal alignment to allow for maintenance activites.

Which one of the following alignments requires logging into a Limiting Condition for Operation?

A. Instrument Bus "A" is being supplied by swing inverter, EE-8T.

B. Instrument Bus "A" is being supplied by its bypass transformer.

C. Instrument Bus "1" is being supplied by its bypass transformer.

D. Instrument Bus "1" is being supplied by its testing transformer.

page 70

2009 FORT CALHOUN SRO EXAM (71)

When are Control Room Log entries required for containment entry and exit per Standing Order O-22, "CONTAINMENT ACCESS AND EGRESS?

A. When one PAL door is inoperable.

B. When containment integrity is required.

C. When entering without Radiation Protection coverage.

D. When the containment security card readers are not operational.

page 71

2009 FORT CALHOUN SRO EXAM (72)

How will placing the keyswitch on a Control Room process radiation monitor ratemeter in the "KEYPAD" position affect operation of the radiation monitor?

A. Annunciation and equipment actuations will be blocked.

B. Annunciation will still work but equipment actuations will be blocked.

C. Annunciation and equipment actuations will still work but output to the radiation monitor recorder will be blocked.

D. Annunciation and equipment actuations will still work but output to the ERF computer will be blocked.

page 72

2009 FORT CALHOUN SRO EXAM (73)

EOP-04, STEAM GENERATOR TUBE RUPTURE, directs aligning blowdown sample flow to the Spent Regenerant Tank to:

A. Limit the release of radioactive liquid to the river.

B. Limit contamination of the water in the Condenser Hotwell.

C. Minimize radiation levels in Room 81.

D. Minimize radiation levels in the secondary sampling room.

page 73

2009 FORT CALHOUN SRO EXAM (74)

In the Control Room, plant instruments that have been qualified to survive in an accident environment (EEQ) can be identified by:

A. Orange tape.

B. Orange dots.

C. Yellow labels.

D. Red and white striped label borders.

page 74

2009 FORT CALHOUN SRO EXAM (75)

Given the following plant conditions:

A reactor startup is in progress W

ide Nange NI power indicates 5 x 10-5% power A

sustained positive startup rate of 1.5 DPM is indicated on all channels.

A ll Zero Power Mode Bypass Switches are in the "BYPASS" position A

ll Reactor Coolant Pumps are operating If Reactor Coolant Pump, RC-3D, were to trip from these conditions, when and why would an automatic reactor trip occur and EOP-00 be entered?

Assume no operator actions.

A. The reactor would trip immediately due to low RCS flow.

B. The reactor would trip on low RCS flow when power exceeds 1 x 10-4% power.

C. The reactor would trip immediately due to high startup rate.

D. The reactor would trip on high startup rate when power exceeds 1 x 10-4% power.

page 75

2009 FORT CALHOUN SRO EXAM (76)

The Power Dependent (transient) Insertion Limits (PDILs) specified in the Core Operating Limits Report (COLR) are based on ensuring that:

A. Adequate shutdown margin is available following a reactor trip.

B. The rate of reactivity addition during a CEA withdrawal event does not exceed the value used in the Chapter 14 analysis.

C. A diverging xenon oscillation will not be initiated.

D. Excessive swelling of the B4C in the CEAs is prevented.

page 76

2009 FORT CALHOUN SRO EXAM (77)

Given the following plant conditions::

The Crew has entered EOP-03, LOSS OF COOLANT ACCIDENT A small break LOCA has been isolated in accordance with EOP-03 he RCS Pressure and Temperature limits of EOP-AOP Attachment 2, "RCS Pressure-Temperature Limits for 40 EFPY" have been violated What action is required to be taken after pressure and temperature have been stabilized?

A. Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40 EFPY, and soak the RCS at the current pressure and temperature for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

B. Implement EOP-AOP Attachment 2, RCS Pressure-Temperature Limits for 40 EFPY, and contact the PRC for an Appendix E limit evaluation.

C. Implement EOP-AOP Attachment 27, P-T Limit Restoration, and soak the RCS at the current pressure and temperature for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

D. Implement EOP-AOP Attachment 27, P-T Limit Restoration, and contact the PRC for an Appendix E limit evaluation.

page 77

2009 FORT CALHOUN SRO EXAM (78)

Given the following plant conditions:

The plant is operating at full power Annunciator CB-1/2/3 A6 A-4, "REACTOR COOLANT PUMP RC-3A VIBRATION HI" is in alarm.

A plant operator was dispatched to AI-270 and reports that the alarm is valid and that the vibration on the upper guide bearing is above the action level but below the shutdown limit.

What action should you direct be taken as a result of this alarm?

A. Enter AOP-35, REACTOR COOLANT PUMP MALFUNCTION, and continue to monitor the vibration level.

B. Enter AOP-05, EMERGENCY PLANT SHUTDOWN. Trip RC-3A after the reactor has been shut down.

C. Reference OI-RC-13, OPERATION OF RCP VIBRATION MONITORING SYSTEM, and contact the system engineer.

D. Trip the reactor and enter EOP-00, STANDARD POST-TRIP ACTIONS. Trip RC-3A after the reactor has been shut down.

page 78

2009 FORT CALHOUN SRO EXAM (79)

Given the following plant conditions:

The plant is operating at 100% power The FEEDWATER CONTROL STEAM GENERATOR RC-2A(B) LEVEL LO-LO annunciators are in alarm for both Steam Generators The levels on both Steam Generators are continuing to lower slowly Two main feedwater pumps operating FW level control valves LCV-1101 and LCV-1102 are 100% open in automatic control.

What actions should you direct the Operators to take?

A. Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. Establish auxiliary feedwater flow to the steam generators using the contingency actions of EOP-00.

B. Trip the reactor and enter EOP-00, STANDARD POST TRIP ACTIONS. After Reactivity Control is verified, transition to EOP-06, LOSS OF ALL FEEDWATER, and establish auxiliary feedwater flow to both steam generators.

C. Refer to the ARP and attempt to restore main feedwater flow by taking manual control of feedwater using DCS.

D. Refer to the ARP and attempt to restore main feedwater flow by starting a third main feedwater pump.

page 79

2009 FORT CALHOUN SRO EXAM (80)

Given the following plant conditions:

The reactor was in hot shutdown with RCS cold leg temperatures being maintained at 532°F a steam generator tube ruptured resulting in PPLS actuation Instrument air pressure is below 40 psig due to a ruptured header in the auxiliary building.

What actions should you direct to be taken?

A. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. After completing these actions, enter AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header.

B. Enter AOP-22, REACTOR COOLANT LEAK, and perform the initial actions. Then enter AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header. After performing these actions, return to AOP-22 and perform Attachment B, Primary to Secondary Leak Rate Actions.

C. Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the required actions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to isolate the ruptured header.

D. Enter EOP-00, STANDARD POST TRIP ACTIONS. After performing the required actions, go to EOP-20, FUNCTIONAL RECOVERY PROCEDURE. EOP-20 Success Path MVA-IA will direct you to implement AOP-17, LOSS OF INSTRUMENT AIR, which will direct you to isolate the ruptured header.

page 80

2009 FORT CALHOUN SRO EXAM (81)

Given the following plant conditions:

The plant was operating at full power The copy of the capability curve normally located on CB-20 has been removed for some control board mimic changes a "GENERATOR FIELD OVERVOLTAGE" alarm was received on CB-20/A14.

What procedures would be used to adjust Main Generator Field Voltage and verify that the generator is operating within its capability curve?

A. AOP-27, MAIN GENERATOR MALFUNCTIONS, and OI-ST-1, TURBINE GENERATOR NORMAL OPERATION.

B. AOP-27, MAIN GENERATOR MALFUNCTIONS, and the TECHNICAL DATA BOOK.

C. ARP, CB-20/A14, and OI-ST-1, TURBINE GENERATOR NORMAL OPERATION.

D. ARP, CB-20/A14, and the TECHNICAL DATA BOOK.

page 81

2009 FORT CALHOUN SRO EXAM (82)

The plant was operating with the following initial conditions:

The reactor is operating at 55% power during a power ascension The DCS SCEAPIS function is inoperable The plant conditions suddenly changed such that:

The ROD DROP NUCLEAR INSTRUMENTATION CHANNEL annunciator is in alarm Nuclear Instrumentation channel "C" indication initially lowered to 46% power and is now reading 50% and steady The other three Nuclear Instrumentation channels indication initially lowered to 49% power and are now reading 52% and steady RCS cold leg temperatures have all lowered by 5°F and are steady.

Which one of the following procedures should be entered as a result of these conditions?

A. AOP-40, OVERCOOLING / EXCESSIVE STEAM DEMAND.

B. AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMING C. AOP-03, EMERGENCY BORATION.

D. AOP-02, CEA AND CONTROL SYSTEM MALFUNCTIONS.

page 82

2009 FORT CALHOUN SRO EXAM (83)

Given the following plant conditions:

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, Wide range channel "A" was removed from service due to a failed fission chamber A plant startup is in progress Criticality has just been achieved and power has been stabilized at 1x10-3 %

Power W ide range channels "B" and "D" have just failed low following a voltage transient What action is required by Technical Specifications and AOP-15, "Loss of Flux Indication or Flow Streaming" and why?

A. The reactor must be shutdown by manually inserting CEAs because wide range channel "D" failed and reactor power indication will not be available on AI-212.

B. The reactor must be shutdown by manually inserting CEAs because SCEAPIS (DCS) requires at least 2 wide range channels greater than 10-4 % power to enable the rod block function.

C. The reactor must be tripped because there are an inadequate number of operable channels for the RPS high startup rate trip.

D. The reactor must be tripped because there are an inadequate number of operable channels for the RPS axial power distribution trip.

page 83

2009 FORT CALHOUN SRO EXAM (84)

Given the following plant initial conditions:

A refueling outage is in progress.

106 fuel assembles have been loaded into the core The 107th fuel assembly (a new fuel assembly) is being moved over the core The Equipment Hatch, Room 66 roll-up doors, Room 66 construction access opening and both PAL doors are all open Plant conditions then change:

The moving fuel assembly drops from FH-1.

No radiation monitor alarms are received.

Which one of the following actions meets the requirements of AOP-08, FUEL HANDLING INCIDENT, if performed within one hour?"

A. Initiate CIAS using the EMERGENCY OPERATE switches. Close the equipment hatch and one of the PAL doors.

B. Initiate CIAS using the EMERGENCY OPERATE switches. Close the room 66 rollup doors and both of the PAL doors.

C. Initiate VIAS using the CRHS test switches. Close the equipment hatch and one of the PAL doors.

D. Initiate VIAS using the CRHS test switches. Close the room 66 rollup doors and both of the PAL doors.

page 84

2009 FORT CALHOUN SRO EXAM (85)

Given the following plant conditions:

The plant is operating at full power The RM-057 CONDENSER OFF GAS HIGH RADIATION annunciator is in alarm The radiation level on RM-057 is just above the Alert setpoint and rising slowly Pressurizer level is steady at 60%

Charging flow at 40 gpm Letdown flow is 36 gpm The Shift Chemist reports that the primary to secondary leak rate is 8 gallons per day.

What action should you direct be taken based on these conditions?

A. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and other required actions.

B. Enter AOP-22, REACTOR COOLANT LEAK, and perform Attachment B, Primary to Secondary Leak Rate Actions. SO-G-105, STEAM GENERATOR TUBE LEAKAGE, is not used unless primary to secondary leakage exceeds 10% of the Technical Specification Limit.

C. Enter AOP-22, REACTOR COOLANT LEAK, perform Attachment B, Primary to Secondary Leak Rate Actions, when the primary to secondary leakage increases to greater than 10 gpd. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and other required actions.

D. Use SO-G-105, STEAM GENERATOR TUBE LEAKAGE, to determine action level and required actions. AOP-22, REACTOR COOLANT LEAK, will not be entered with normal indications of pressurizer level, charging and letdown.

page 85

2009 FORT CALHOUN SRO EXAM (86)

Given the following initial plant conditions:

The plant is shutdown with the RCS at mid-loop for replacement of a reactor coolant pump seal Boric Acid Pump Header to Charging Pumps Isolation Valve, HCV-268, is closed and tagged out of service All other CVCS components are operable All CEAs are fully inserted Plant conditions change such that:

The count rates indicated by two of the four operable Wide Range Nuclear Instrumentation Channels are rising steadily and have doubled in the past 15 minutes All four Power Range channels are indicating 0% and are steady What action should you direct be taken?

A. Enter AOP-03, EMERGENCY BORATION. Perform emergency boration from the Boric Acid Storage Tanks per the procedure.

B. Enter EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path RC-2, and perform alternate emergency boration from the SIRWT.

C. Enter SO-O-21, SHUTDOWN OPERATIONS PROTECTION PLAN, Attachment 7.6, Reduced Inventory, and ensure reactivity management resources are available.

D. Enter AOP-15, LOSS OF FLUX INDICATION OR FLOW STREAMING. Direct I&C to recalibrate the Wide Range NI Channels.

page 86

2009 FORT CALHOUN SRO EXAM (87)

Given the following initial plant conditions:

Shutdown Cooling is in operation using Low Pressure Safety Injection Pump, SI-1A RCS temperature is 250°F Pressurizer pressure is 250 psia Pressurizer level at 50%

Plant conditions change such that:

SI-1A trips The LPSI PUMP SI-1A O/L OR TRIP annunciator is in alarm The SHUTDOWN COOLING FLOW HI-LO annunciator is in alarm Voltage on bus 1A3 is 3950 Volts Voltage on bus 1A4 is 4160 Volts.

What action should be taken as a result of these conditions?

A. Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place LPSI pump SI-1B in service.

B. Enter AOP-19, LOSS OF SHUTDOWN COOLING, and place Containment Spray Pump, SI-3A, in service.

C. Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place LPSI pump SI-1B in service.

D. Enter AOP-31, 161 KV GRID MALFUNCTIONS, and place Containment Spray Pump, SI-3A, in service.

page 87

2009 FORT CALHOUN SRO EXAM (88)

Given the following plant conditions:

A large LOCA has occurred inside containment.

PPLS, CPHS and CSAS have all actuated EOP-03, LOSS OF COOLANT ACCIDENT, has been entered Containment Cooling and Filtering Units, VA-3A tripped and VA-3B failed to start Containment pressure is 62 psig What action should be taken as a result of these plant conditions?

A. Ensure maximum CCW flow to Containment Cooling Units, VA-7A and VA-7B. Do NOT start any containment spray pumps.

B. Manually initiate SGLS to enable containment spray operation.

C. Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CI and establish containment spray flow using one containment spray pump.

D. Transition to EOP-20, FUNCTIONAL RECOVERY PROCEDURE, Success Path CI and establish containment spray flow using all available containment spray pumps.

page 88

2009 FORT CALHOUN SRO EXAM (89)

Given the following plant conditions:

The plant is operating at 60% power The FEEDWATER CONTROL STEAM GENERATOR RC-2B LEVEL HI-HI annunciator is in alarm Steam Generator, RC-2B, narrow range level is 84%

DCS controller, FC1102, has transferred to manual Feed Reg Valve, FCV-1102, went closed but is now reopening What actions should be taken after entering ARP CB-4/A8?

A. Direct the BOPO to monitor FC1102 and verify that control transfers back to automatic.

B. Direct the BOPO to return level to 63% using manual control of FCV-1102.

C. Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPO to transfer FC1102 to single element control.

D. Transition to OI-FW-3, STEAM GENERATOR LEVEL CONTROL. Direct the BOPO to open FCV-1102 to 50% in manual and then place DCS Controller FC1102 in automatic control.

page 89

2009 FORT CALHOUN SRO EXAM (90)

Given the following plant conditions:

A severe thunderstorm occurred 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> ago Debris has been observed floating in the river The river level is 985' The plant is operating at full power Raw Water Pumps, AC-10A and AC-10B are operating with their pressure indicating lights lit The RAW WATER SUPPLY HEADER FLOW LO annunciator is in alarm The AC-12A STRAINER DP HIGH annunciator is in alarm.

The AC-12B STRAINER DP HIGH annunciator is in alarm.

Which one of the following actions should be taken as a result?

A. Enter AOP-01, ACTS OF NATURE, and place the Raw Water Strainers in MANUAL BACKWASH.

B. Enter AOP-01, ACTS OF NATURE, and ensure that Raw Water pump AC-10A is not running.

C. Enter AOP-18, LOSS OF RAW WATER, and ensure that the traveling screens are operating in MANUAL-SLOW.

D. Enter AOP-18, LOSS OF RAW WATER, and shutdown the Circulating Water Pumps that share cells with the running Raw Water pumps.

page 90

2009 FORT CALHOUN SRO EXAM (91)

Given the following plant conditions:

The plant is operating at full power.

During surveillance testing, it was determined that one of the group 4 Control Element Assemblies was immovable due to excessive friction The immovable CEA is aligned with the other CEAs in its group Adequate shutdown margin was verified assuming the inoperable CEA and the highest worth CEA do not insert following a reactor trip.

What action is required by Technical Specifications?

A. Enter Tech Spec 2.0.1 and place the plant in hot shutdown within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

B. Enter Tech Spec 2.10.2(4) and place the plant in hot shutdown within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

C. Enter Tech Spec 2.10.2(4) and lower reactor power to less than 70% within one hour. Operation below 70% power may continue up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

D. Enter Tech Spec 2.10.2(1) and verify adequate shutdown margin every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> using TDB-V.9, SHUTDOWN MARGIN WORKSHEET.

page 91

2009 FORT CALHOUN SRO EXAM (92)

Given the following plant conditions:

A Loss of Coolant Accident with delayed ECCS operation has occurred The core was uncovered for more than one hour but is now covered Core Exit Thermocouple temperatures exceeded 2000°F but now indicate 240°F Radiation level inside containment is 94,000 R/hr Containment pressure reached 55 psig but is now 10 psig Containment relative humidity is 100%

The ERF computer shows that containment temperature is 240°F A Control Room Operator has placed the hydrogen analyzers in service Indicated containment hydrogen concentration is 3.2%

What action is required to correct the indicated hydrogen concentration for high containment temperature?

A. Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZER OPERATION, which will result in a higher than indicated hydrogen concentration.

B. Use the correction curve in OI-VA-6, CONTAINMENT HYDROGEN ANALYZER OPERATION, which will result in a lower than indicated hydrogen concentration.

C. Use the correction curve in EOP-AOP Attachment 16, CONTAINMENT HYDROGEN ANALYZER STARTUP, which will result in a higher than indicated hydrogen concentration.

D. Use the correction curve in EOP-AOP Attachment 16, CONTAINMENT HYDROGEN ANALYZER STARTUP, which will result in a lower than indicated hydrogen concentration.

page 92

2009 FORT CALHOUN SRO EXAM (93)

Given the following plant conditions:

The plant was operating at 100% power An event occurred that resulted in a loss of the intake structure and all of the equipment inside The turbine and reactor tripped automatically due to a loss condenser vacuum EOP-00, STANDARD POST TRIP ACTIONS, have been completed Which one of the following actions should be taken to cool components that are normally cooled by Component Cooling Water?

A. Use AOP-10, LOSS OF CIRCULATING WATER, to provide cooling to required components using Potable Water.

B. Use AOP-11, LOSS OF COMPONENT COOLING WATER, to provide cooling to required components using the RW/CCW interface valves.

C. Use AOP-18, LOSS OF RAW WATER, to line up alternate cooling to a RW/CCW Heat Exchanger using hoses from the plant Fire Protection System.

D. Use OCAG-1, OPERATIONAL CONTINGENCY ACTION GUIDELINE, to line up alternate cooling to a RW/CCW Heat Exchanger using hoses from the FCS Fire Engine.

page 93

2009 FORT CALHOUN SRO EXAM (94)

The plant is operating at full power. You have just received a FC-214 report from chemistry that reports the following plant chemistry parameters:

Oxygen concentration is 0.12 ppm.

Chloride concentration is 0.12 ppm.

Fluoride concentration is 0.12 ppm.

What action, if any, is required by Technical Specifications?

A. Begin action to restore oxygen concentration within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

B. Begin action to restore chloride concentration immediately.

C. Begin action to restore oxygen and fluoride concentrations within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

D. Begin action to restore oxygen and fluoride concentrations immediately.

page 94

2009 FORT CALHOUN SRO EXAM (95)

Given the following plant conditions:

Fuel movement is in progress using Fuel Handling Machine, FH-1, and Spent Fuel Handling Machine, FH-12.

A vendor is being used to operate the fuel handling equipment.

What are the requirements for OPPD supervision of the vendor activities?

A. A Fuel Handling Coordinator with an SRO license to supervise Fuel Movement at FH-1.

B. A Fuel Handling Coordinator with an RO or SRO license to supervise Fuel Movement at FH-1.

C. Fuel Handling Coordinators with SRO licenses to supervise Fuel Movement at both FH-1 and FH-12.

D. Fuel Handling Coordinators with RO or SRO licenses to supervise Fuel Movement at both FH-1 and FH-12.

page 95

2009 FORT CALHOUN SRO EXAM (96)

Given the following:

The boron concentration in the Safety Injection and Refueling Water Storage Tank (SIRWT) and Safety Injection Tanks equals the refueling boron concentration.

The water level in the SIRWT is 188 inches.

SIRWT water temperature is 74°F The pressure and level of each Safety Injection Tank is listed below:

LEVEL PRESSURE SI-6A 67.2% 245 psig SI-6B 69.5% 241 psig SI-6C 72.2% 265 psig SI-6D 74.6% 258 psig What action is required prior to taking the plant from mode 3 to mode 2 in accordance with Technical Specifications?

A. No action is required.

B. Raise the level in the SIRWT using OI-CH-4, CHEMICAL AND VOLUME CONTROL SYSTEM MAKEUP OPERATIONS, Attachment 7.

C. Raise the pressure in SI-6B using OI-SI-1, SAFETY INJECTION - NORMAL OPERATION, Attachment 7.

D. Lower the level in SI-6D using OI-SI-1, SAFETY INJECTION - NORMAL OPERATION, Attachment 27.

page 96

2009 FORT CALHOUN SRO EXAM (97)

Given the following plant conditions:

Steam Generator "A" Blowdown Radiation Monitor, RM-054A, has just been declared inoperable by the Shift Manager Analysis of secondary chemistry samples indicates background activity only What action is required to be taken within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> by CH-ODCM-0001, OFF-SITE DOSE CALCULATION MANUAL?

A. Isolate blowdown flow from Steam Generator, RC-2A.

B. Reduce blowdown flow from Steam Generator, RC-2A, to less than 20,000 lbm/hr.

C. Align blowdown sample flow to the Spent Regenerant Tank.

D. Align blowdown sample flow such that blowdown from both Steam Generators is sampled by RM-054B.

page 97

2009 FORT CALHOUN SRO EXAM (98)

Given the following conditions:

Spent Fuel is being moved from the Spent Fuel Pool to the Independent Spent Fuel Storage Installation (ISFSI)

A Transfer Cask/Dry Shielded Canister (TC/DSC) is being removed from the Spent Fuel Pool and transferred to the work platform.

How will the Spent Fuel Pool Area be posted and access controlled during this operation?

A. The area will be posted as a Radiation Area; gates and doors to the area will be locked.

B. The area will be posted as a Radiation Area; gates and doors to the area will not be locked.

C. The area will be posted as a Restricted High Radiation Area; gates and doors to the area will be locked.

D. The area will be posted as a Restricted High Radiation Area; gates and doors to the area will not be locked.

page 98

2009 FORT CALHOUN SRO EXAM (99) How are the FCS Severe Accident Management Guideline's (SAMGs) used?

A. EOF personnel use the SAMGs to support the Control Room Operators in mitigating core damage events.

B. TSC personnel use the SAMGs to support the Control Room Operators in mitigating core damage events.

C. The Control Room Operators use the SAMGs along with the EOPs to mitigate core damage events.

D. The Control Room Operators transition from the EOPs to the SAMGs to mitigate core damage events.

page 99

2009 FORT CALHOUN SRO EXAM (100)

The following plant conditions exist:

A Steam Generator Tube Rupture occured from full power After Standard Post Trip Actions wer performed, EOP-04, STEAM GENERATOR TUBE RUPTURE, was entered RC-2A was identified as the affected Steam Generator and isolated per EOP-04 A plant cooldown is being performed using RC-2B RCS cooldown rate = 30°F/hour RCS pressure = 700 psia and lowering C

ore exit thermocouples indicate 400°F P

ressurizer level = 48% and steady RVLMS level = 100%

R C-2A pressure = 740 psia and steady.

R C-2B pressure = 240 psia and lowering.

What action should be taken as a result of these plant conditions?

A. Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWING SGTR" to ensure RCS activity remains below limits that would require a change in Emergency Action Levels.

B. Implement EOP/AOP floating step CC, "SAMPLING THE RCS FOLLOWING SGTR" to ensure RCS boron concentration is high enough to ensure adequate shutdown margin.

C. Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent void formation in Steam Generator RC-2A's tubes.

D. Implement EOP/AOP Attachment 14, "RCS VOID ELIMINATION" to prevent void formation in Steam Generator RC-2B's tubes.

page 100

SRO EXAM HANDOUTS

TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.1 Reactor Coolant System 2.1.1 Operable Components Applicability Applies to the operable status of the reactor coolant system components.

Objective To specify certain conditions of the reactor coolant system components.

Specifications Limiting conditions for operation are as follows:

(1) Reactor Critical All four (4) reactor coolant pumps shall be in operation.

Exceptions The limitations of this specification may be suspended during the performance of physics tests provided the power level is < 10-1% of rated power and the flow requirements of Table 1.1 No. 2 are met.

(2) Hot Shutdown or 350EF < Tcold < 515EF (a) The reactor coolant loops listed below shall be operable:

(i) Reactor coolant loop 1 and at least one associated reactor coolant pump.

(ii) Reactor coolant loop 2 and at least one associated reactor coolant pump.

(b) At least one of the above reactor coolant loops shall be in operation.

Exceptions All reactor coolant pumps may be de-energized for up to one hour provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10EF below saturation temperature.

2.1 - Page 1 Amendment No. 46,47,56, 256

TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.1 Reactor Coolant System (Continued) 2.1.1 Operable Components (Continued)

(c) If fewer than the above required reactor coolant loops are OPERABLE, the required loops shall be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or the reactor shall be placed in COLD SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(3) 210°F Tcold 350°F or Tcold < 210°F with fuel in the reactor and all reactor vessel head closure bolts fully tensioned.

(a) At least two (2) of the decay heat removal loops listed below shall be OPERABLE:

(i) Reactor coolant loop 1 and its associated steam generator and at least one associated reactor coolant pump.

(ii) Reactor coolant loop 2 and its associated steam generator and at least one associated reactor coolant pump.

(iii) One shutdown cooling pump, one shutdown cooling heat exchanger, and associated shutdown cooling piping.

(iv) One shutdown cooling pump, in addition to that in (iii) above, one shutdown cooling heat exchanger, in addition to that in (iii) above, and associated shutdown cooling piping.

(b) At least one (1) of the decay heat removal loops listed above shall be IN OPERATION.

(c) With no coolant loop IN OPERATION, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and initiate corrective action to return the required coolant loop to operation in 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

(d) For the purposes of items a(iii) and a(iv) above, the containment spray pumps can be considered as available shutdown cooling pumps only if both of the following conditions are met:

(i) Reactor Coolant System temperature is less than 120EF.

(ii) The Reactor Coolant System is vented with a vent area greater than or equal to 47 in2.

(4) DELETED 2.1 - Page 2 Amendment No. 39,56,136,188, 256

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 12 OF 19 126 LONG TERM STEADY STATE (104.5) 100.8 INSERTION LIMIT (94.5)

GROUP 4 (82.5) 75.6 SHORT TERM INSERTION LIMIT PPDIL 126 50.4 100.8 25.2 CEA GROUP POSITIONS (INCHES WITHDRAWN)

PDIL or TRANSIENT GROUP 3 INSERTION LIMIT 75.6 0 50.4 EMERGENCY BORATION LIMIT (35.2) 12 BELOW PDIL - REFER TO AOP-3 25.2 126 (25.2)

(13.2) 0 100.8 GROUP 2 75.6 50.4 126 25.2 100.8 0 GROUP 1 75.6 50.4 25.2 0

0 20 40 60 80 10 0 REACTOR POWER (% OF ALLOWED POWER)

COLR POWER DEPENDENT INSERTION LIMIT FIGURE 2

R36

TECHNICAL SPECIFICATIONS 2.0 LIMITING CONDITIONS FOR OPERATION 2.1 Reactor Coolant System (Continued) 2.1.5 Maximum Reactor Coolant Oxygen and Halogens Concentrations Applicability Applied to the reactor coolant oxygen and halogens concentrations.

Objective To specify the maximum oxygen and halogens concentrations of the reactor coolant system for safe reactor operation.

Specifications Maximum limits of oxygen and halogens concentrations are as follows:

(1) If the concentration of oxygen in the reactor coolant exceeds 0.1 ppm during power operation, corrective action shall be initiated within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to return oxygen levels to <0. 1 ppm.

(2) If the concentration of chloride in the reactor coolant exceeds 0.15 ppm during power operation, corrective action shall be initiated within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to return chloride levels to <0.15 ppm.

(3) If the concentration of fluorides in the reactor coolant exceeds 0.10 ppm following modifications or repair to the reactor coolant system involving welding, corrective action shall be initiated within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to return fluoride levels to <0.10 ppm.

(4) If the oxygen concentration and the chloride or fluoride concentration of the reactor coolant simultaneously exceed the limits given in (1), (2) and (3), respectively, corrective action is to be taken immediately to return the system to within normal operation specifications.

(5) If the concentration limits of oxygen and chloride or fluoride given in (1), (2) and (3) above are not restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be placed in a hot shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter. If the normal operational limits are not restored within an additional 24-hour period, the reactor shall be placed in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.

Basis By maintaining the oxygen, chloride and fluoride concentrations in the reactor coolant within the limits specified, the integrity of the reactor coolant system materials in contact with the coolant (1) are protected against potential stress corrosion attack. (2) 2.1 - Page 18