ML092170107: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092170107
| number = ML092170107
| issue date = 08/05/2009
| issue date = 08/05/2009
| title = Vogtle Request for Documents for Radiation Protection Inspection
| title = Request for Documents for Radiation Protection Inspection
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB1
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Tynan T E
| addressee name = Tynan T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000424, 05000425
| docket = 05000424, 05000425
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 5, 2009  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 5, 2009 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.
 
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  


==SUBJECT:==
==SUBJECT:==
RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC   GENERATING PLANT  
RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC GENERATING PLANT


==Dear Mr. Tynan:==
==Dear Mr. Tynan:==


During the week of September 28 - October 2, 2009, the NRC will perform a baseline radiation safety inspection at Vogtle Electric Generating Plant (VEGP) consisting of NRC Inspection Procedures 71121.01, Access Control to Radiologically Significant Areas, and 71151, Performance Indicator Verification for the Occupational Radiation Safety Cornerstone. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. We request that the documents be copied to electronic media, to the extent practical, and mailed to the NRC Region II office on or before September 18, 2009.  
During the week of September 28 - October 2, 2009, the NRC will perform a baseline radiation safety inspection at Vogtle Electric Generating Plant (VEGP) consisting of NRC Inspection Procedures 71121.01, Access Control to Radiologically Significant Areas, and 71151, Performance Indicator Verification for the Occupational Radiation Safety Cornerstone.
 
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. We request that the documents be copied to electronic media, to the extent practical, and mailed to the NRC Region II office on or before September 18, 2009.
During the week of October 5 - 9, 2009, the NRC will perform Temporary Instruction (TI) 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative. A document request for this TI is included in the enclosure; however the documents can be made available for onsite review and do not need to be included on the electronic media.
During the week of October 5 - 9, 2009, the NRC will perform Temporary Instruction (TI) 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative. A document request for this TI is included in the enclosure; however the documents can be made available for onsite review and do not need to be included on the electronic media.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mukut Sharma of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen, at (404) 562-4660, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mukut Sharma of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen, at (404) 562-4660, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.
SNC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely, /RA/         Brian Bonser, Chief       Plant Support Branch 1       Division of Reactor Safety Docket Nos.: 50-424/425 License Nos.: NPF-68/81 cc w/encl: (See Page 3)  
SNC                                           2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                              /RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-424/425 License Nos.: NPF-68/81 cc w/encl: (See Page 3)


==Enclosure:==
==Enclosure:==
Document Request List  
Document Request List
 
_________________________
G  SUNSI REVIEW COMPLETE OFFICE RII:DRS      SIGNATURE AND /RA/      NAME ANielsen      DATE 08/04/2009      E-MAIL COPY?    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO SNC 3  cc w/encl:
Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution N. J. Stringfellow Manager Licensing Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution


L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
_________________________                G SUNSI REVIEW COMPLETE OFFICE            RII:DRS SIGNATURE          AND /RA/
Electronic Mail Distribution Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL   35201-1295 Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution  
NAME              ANielsen DATE                  08/04/2009 E-MAIL COPY?        YES          NO  YES      NO  YES      NO  YES        NO  YES      NO YES      NO  YES NO SNC                                      3 cc w/encl:                                Lee Foley Angela Thornhill                          Manager of Contracts Generation Managing Attorney and Compliance Officer  Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Mr. N. Holcomb N. J. Stringfellow                        Commissioner Manager                                    Department of Natural Resources Licensing                                  Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Dr. Carol Couch Director Jeffrey T. Gasser                          Environmental Protection Executive Vice President                  Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Cynthia Sanders L. Mike Stinson                           Program Manager Vice President                             Radioactive Materials Program Fleet Operations Support                   Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Jim Sommerville Michael A. MacFarlane                     (Acting) Chief Southern Nuclear Operating Company, Inc. Environmental Protection Division 40 Inverness Center Parkway               Department of Natural Resources P.O. Box 1295                             Electronic Mail Distribution Birmingham, AL 35201-1295 Mr. Steven M. Jackson Paula Marino                               Senior Engineer - Power Supply Vice President                             Municipal Electric Authority of Georgia Engineering                               Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution               Mr. Reece McAlister Executive Secretary Bob Masse                                 Georgia Public Service Commission Resident Manager                           Electronic Mail Distribution Vogtle Electric Generating Plant Oglethorpe Power Corporation               Office of the Attorney General Electronic Mail Distribution              Electronic Mail Distribution Moanica Caston                             Office of the County Commissioner Vice President and General Counsel         Burke County Commission Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/Encl continued page 4)


Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution  
SNC                                    4 cc w/Encl continued Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Director Consumers' Utility Counsel Division Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution


Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution
SNC                                       5 Letter to Tom E. Tynan from Brian Bonser dated August 5, 2009
 
Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution
 
Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power  Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution (cc w/Encl continued page 4)
 
SNC      4 cc w/Encl continued
 
Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution Director  Consumers' Utility Counsel Division Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA  30334-4600 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
 
SNC 5   Letter to Tom E. Tynan from Brian Bonser dated August 5, 2009  


==SUBJECT:==
==SUBJECT:==
RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC   GENERATING PLANT  
RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC GENERATING PLANT Distribution w/encl:
 
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
Distribution w/encl
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
 
Enclosure Document Request List Inspection Dates:  September 28 - October 2 and October 5 - 9, 2009


Inspectors:   Adam Nielsen, Health Physicist Inspection Procedures: IP 71121.01 Access Control to Radiologically Significant Areas IP 71151 Performance Indicator Verification TI 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention: Adam Nielsen, 61 Forsyth St SW, Suite 23T85, Atlanta, GA 30303-3415). The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (The preferred file format is Word, WordPerfect, or searchable ".pdf" files on CDROM or "thumb" drive). Please organize the information as it is arranged below (e.g. a folder labeled "Miscellaneous" containing items 1-3, a folder labeled "Access Controls" containing items 4-10, etc). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
Document Request List Inspection Dates:                      September 28 - October 2 and October 5 - 9, 2009 Inspectors:                             Adam Nielsen, Health Physicist Inspection Procedures:                 IP 71121.01   Access Control to Radiologically Significant Areas IP 71151     Performance Indicator Verification TI 2515/173   Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:
Adam Nielsen, 61 Forsyth St SW, Suite 23T85, Atlanta, GA 30303-3415). The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (The preferred file format is Word, WordPerfect, or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g. a folder labeled Miscellaneous containing items 1-3, a folder labeled Access Controls containing items 4-10, etc). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
Miscellaneous
Miscellaneous
: 1. Current organization chart for HP with contact numbers 2. Corrective action program procedure  
: 1. Current organization chart for HP with contact numbers
: 2. Corrective action program procedure
: 3. Outage schedule of major activities (Gantt chart if available)
: 3. Outage schedule of major activities (Gantt chart if available)
Access Controls
Access Controls
: 4. Plant maps (survey maps are acceptable) of all Locked HRAs and VHRAs 5. Procedures related to HP/access controls, e.g. (Posting, labeling, surveys, RWPs, contamination control, dosimetry, multi-dosimetry, key control, control of divers, controls during fuel offload, etc.) 6. List of all non-fuel items stored in spent fuel pool 7. Internal dose assessments for intakes where dose was assigned since October 2008 8. Documentation associated with any skin contaminations where SDE was assigned, since October 2008 9. Most recent self-assessment or audit of access control program  
: 4. Plant maps (survey maps are acceptable) of all Locked HRAs and VHRAs
: 5. Procedures related to HP/access controls, e.g. (Posting, labeling, surveys, RWPs, contamination control, dosimetry, multi-dosimetry, key control, control of divers, controls during fuel offload, etc.)
: 6. List of all non-fuel items stored in spent fuel pool
: 7. Internal dose assessments for intakes where dose was assigned since October 2008
: 8. Documentation associated with any skin contaminations where SDE was assigned, since October 2008
: 9. Most recent self-assessment or audit of access control program
: 10. LIST of CRs related to access controls (including poor radworker or HP tech performance) issued since October 2008. This should be a list of corrective action documents containing a CR number and brief description, not full CRs PI Verification (occupational cornerstone)
: 10. LIST of CRs related to access controls (including poor radworker or HP tech performance) issued since October 2008. This should be a list of corrective action documents containing a CR number and brief description, not full CRs PI Verification (occupational cornerstone)
: 11. Procedure for gathering and reporting PI data 12. List of all electronic dosimeter dose rate alarms >1R/hr since October 2008 13. List of all electronic dosimeter dose alarms since October 2008 Enclosure Groundwater TI The following items do not need to be included on the disk. However, they should be made available for onsite review beginning 10/5/09. 14. Procedure/Guidance for groundwater monitoring program including:  a. Sample collection and frequency  b. NEI GPI compliance including communication protocols  c. Processes for remediation (as applicable)  d. Record keeping  e. QA/QC  15. All 30-day reports, special reports, or voluntary/informal communication reports since    August 2008  16. ODCM  17. Current maps showing locations of all groundwater monitoring wells  18. Latest site hydrology/geology report  19. Any revisions to FSAR or ODCM made as a result of the groundwater monitoring program  20. List of Structures, Systems, and Components (SSCs) ranked according to risk for release of  contaminated liquid 21. Current 50.75(g) decomissioning file 
: 11. Procedure for gathering and reporting PI data
: 12. List of all electronic dosimeter dose rate alarms >1R/hr since October 2008
: 13. List of all electronic dosimeter dose alarms since October 2008 Enclosure


Inspector Contact Information:
2 Groundwater TI The following items do not need to be included on the disk. However, they should be made available for onsite review beginning 10/5/09.
Adam Nielsen, CHP (404) 562-4660 Adam.Nielsen@nrc.gov}}
: 14. Procedure/Guidance for groundwater monitoring program including:
: a. Sample collection and frequency
: b. NEI GPI compliance including communication protocols
: c. Processes for remediation (as applicable)
: d. Record keeping
: e. QA/QC
: 15. All 30-day reports, special reports, or voluntary/informal communication reports since August 2008
: 16. ODCM
: 17. Current maps showing locations of all groundwater monitoring wells
: 18. Latest site hydrology/geology report
: 19. Any revisions to FSAR or ODCM made as a result of the groundwater monitoring program
: 20. List of Structures, Systems, and Components (SSCs) ranked according to risk for release of contaminated liquid
: 21. Current 50.75(g) decomissioning file Inspector Contact Information:
Adam Nielsen, CHP (404) 562-4660 Adam.Nielsen@nrc.gov Enclosure}}

Latest revision as of 11:15, 12 March 2020

Request for Documents for Radiation Protection Inspection
ML092170107
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/05/2009
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Tynan T
Southern Nuclear Operating Co
References
Download: ML092170107 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 5, 2009 Mr. Tom E. Tynan Vice President Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC GENERATING PLANT

Dear Mr. Tynan:

During the week of September 28 - October 2, 2009, the NRC will perform a baseline radiation safety inspection at Vogtle Electric Generating Plant (VEGP) consisting of NRC Inspection Procedures 71121.01, Access Control to Radiologically Significant Areas, and 71151, Performance Indicator Verification for the Occupational Radiation Safety Cornerstone.

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. We request that the documents be copied to electronic media, to the extent practical, and mailed to the NRC Region II office on or before September 18, 2009.

During the week of October 5 - 9, 2009, the NRC will perform Temporary Instruction (TI) 2515/173, Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative. A document request for this TI is included in the enclosure; however the documents can be made available for onsite review and do not need to be included on the electronic media.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mukut Sharma of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen, at (404) 562-4660, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.

SNC 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-424/425 License Nos.: NPF-68/81 cc w/encl: (See Page 3)

Enclosure:

Document Request List

_________________________ G SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE AND /RA/

NAME ANielsen DATE 08/04/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 3 cc w/encl: Lee Foley Angela Thornhill Manager of Contracts Generation Managing Attorney and Compliance Officer Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Mr. N. Holcomb N. J. Stringfellow Commissioner Manager Department of Natural Resources Licensing Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dr. Carol Couch Director Jeffrey T. Gasser Environmental Protection Executive Vice President Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Cynthia Sanders L. Mike Stinson Program Manager Vice President Radioactive Materials Program Fleet Operations Support Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Jim Sommerville Michael A. MacFarlane (Acting) Chief Southern Nuclear Operating Company, Inc. Environmental Protection Division 40 Inverness Center Parkway Department of Natural Resources P.O. Box 1295 Electronic Mail Distribution Birmingham, AL 35201-1295 Mr. Steven M. Jackson Paula Marino Senior Engineer - Power Supply Vice President Municipal Electric Authority of Georgia Engineering Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Bob Masse Georgia Public Service Commission Resident Manager Electronic Mail Distribution Vogtle Electric Generating Plant Oglethorpe Power Corporation Office of the Attorney General Electronic Mail Distribution Electronic Mail Distribution Moanica Caston Office of the County Commissioner Vice President and General Counsel Burke County Commission Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/Encl continued page 4)

SNC 4 cc w/Encl continued Arthur H. Domby, Esq.

Troutman Sanders Electronic Mail Distribution Director Consumers' Utility Counsel Division Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution

SNC 5 Letter to Tom E. Tynan from Brian Bonser dated August 5, 2009

SUBJECT:

RADIATION PROTECTION INSPECTION - VOGTLE ELECTRIC GENERATING PLANT Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource

Document Request List Inspection Dates: September 28 - October 2 and October 5 - 9, 2009 Inspectors: Adam Nielsen, Health Physicist Inspection Procedures: IP 71121.01 Access Control to Radiologically Significant Areas IP 71151 Performance Indicator Verification TI 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:

Adam Nielsen, 61 Forsyth St SW, Suite 23T85, Atlanta, GA 30303-3415). The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (The preferred file format is Word, WordPerfect, or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g. a folder labeled Miscellaneous containing items 1-3, a folder labeled Access Controls containing items 4-10, etc). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

Miscellaneous

1. Current organization chart for HP with contact numbers
2. Corrective action program procedure
3. Outage schedule of major activities (Gantt chart if available)

Access Controls

4. Plant maps (survey maps are acceptable) of all Locked HRAs and VHRAs
5. Procedures related to HP/access controls, e.g. (Posting, labeling, surveys, RWPs, contamination control, dosimetry, multi-dosimetry, key control, control of divers, controls during fuel offload, etc.)
6. List of all non-fuel items stored in spent fuel pool
7. Internal dose assessments for intakes where dose was assigned since October 2008
8. Documentation associated with any skin contaminations where SDE was assigned, since October 2008
9. Most recent self-assessment or audit of access control program
10. LIST of CRs related to access controls (including poor radworker or HP tech performance) issued since October 2008. This should be a list of corrective action documents containing a CR number and brief description, not full CRs PI Verification (occupational cornerstone)
11. Procedure for gathering and reporting PI data
12. List of all electronic dosimeter dose rate alarms >1R/hr since October 2008
13. List of all electronic dosimeter dose alarms since October 2008 Enclosure

2 Groundwater TI The following items do not need to be included on the disk. However, they should be made available for onsite review beginning 10/5/09.

14. Procedure/Guidance for groundwater monitoring program including:
a. Sample collection and frequency
b. NEI GPI compliance including communication protocols
c. Processes for remediation (as applicable)
d. Record keeping
e. QA/QC
15. All 30-day reports, special reports, or voluntary/informal communication reports since August 2008
16. ODCM
17. Current maps showing locations of all groundwater monitoring wells
18. Latest site hydrology/geology report
19. Any revisions to FSAR or ODCM made as a result of the groundwater monitoring program
20. List of Structures, Systems, and Components (SSCs) ranked according to risk for release of contaminated liquid
21. Current 50.75(g) decomissioning file Inspector Contact Information:

Adam Nielsen, CHP (404) 562-4660 Adam.Nielsen@nrc.gov Enclosure