ML103010523: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML103010523
| number = ML103010523
| issue date = 11/16/2010
| issue date = 11/16/2010
| title = 10/28/10 Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA
| title = Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA
| author name = Regner L
| author name = Regner L
| author affiliation = NRC/NRR/DLR/RPB2
| author affiliation = NRC/NRR/DLR/RPB2
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16,2010 LICENSEE:     Arizona Public Service Company FACILITY:     Palo Verde Nuclear Generating Station, Units 1, 2, and 3
FACILITY:  


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16,2010 Arizona Public Service Company Palo Verde Nuclear Generating Station, Units 1 , 2 , and 3


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010 , BETW EEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY , CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION , UNITS 1, 2, AND 3, LICENS E RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the staff's draft follow-up request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3 , license renewal application.
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION ,
The telephone conference call was useful in clarifying the int e nt of the staff's draft RAI. Enclosure 1 provides a listing of the participants and E nclosure 2 contains a list i ng of the d r aft RAI discussed with the applicant, including a brief descript i on on the status of the items. The applicant had an opportunity to comment on this summary. Docket Nos 50-528, 50-529, and 50-530  
UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the staff's draft follow-up request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI. provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the items .
The applicant had an opportunity to comment on this summary.
isa M. Rea , Sr. r,:;,ject Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos 50-528, 50-529, and 50-530


==Enclosures:==
==Enclosures:==


As stated cc w/encls: Distribution via Listserv isa M. Re a , S r. r,:;, ject Manage r Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION PARTICIPANTS Lisa Regner William Holston Angela Krainik Glenn M i chael Shabb ir Pittalwala Roger Fongemie Eric Blocher LIST OF PARTICIPANTS OCTOBER 28, 2010 AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC) NRC Arizona Public Service Company (APS) APS APS APS Strategic Teaming and Resource Sharing Alliance ENCLOSURE 1
As stated cc w/encls: Distribution via Listserv
DRAFT REQUEST FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION OCTOBER 28, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (APS or the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the following draft request for additiona l infor mation (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3, li cense renewal applicat ion (LRA). 1. Justify why the insp ections of in-scope diesel fuel oil piping , discussed in a l et t e r from APS dated October 13, 2010, is not included in the Updated Final Safety Analysis Report Supplement, Appendix A of the LRA. 2. How many feet of in-scope buried fuel oil piping are located at each unit? How many feet of in-scope buried diesel fuel oil piping are not under concrete or asphalt? 3. Justify how aging of underground buried fuel oil piping will be managed in the 30-40 year, 40-50 year, and 50-60 year license renewal periods. Discussion:
The applicant stated that it understood the questions and would provide a follow-up r esponse to RAI 82.1.18-1. ENCLOSURE 2
November 16, 2010 LICENSEE:
Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1,2, and 3


==SUBJECT:==
TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS OCTOBER 28, 2010 PARTICIPANTS                AFFILIATIONS Lisa Regner                  U.S. Nuclear Regulatory Commission (NRC)
 
William Holston              NRC Angela Krainik              Arizona Public Service Company (APS)
==SUMMARY==
Glenn Michael              APS Shabbir Pittalwala          APS Roger Fongemie              APS Eric Blocher                Strategic Teaming and Resource Sharing Alliance ENCLOSURE 1
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 , 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the staff's draft follow-up request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 , license renewal application.
The telephone conference call was useful in clarifying the intent of the staff's draft RAI. Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant , including a brief description on the status of the items. The applicant had an opportunity to comment on this summary. Docket Nos. 50-528 , 50-529, and 50-530


==Enclosures:==
DRAFT REQUEST FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION OCTOBER 28, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (APS or the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3, license renewal application (LRA) .
: 1. Justify why the inspections of in-scope diesel fuel oil piping , discussed in a letter from APS dated October 13, 2010, is not included in the Updated Final Safety Analysis Report Supplement, Appendix A of the LRA.
: 2. How many feet of in-scope buried fuel oil piping are located at each unit? How many feet of in-scope buried diesel fuel oil piping are not under concrete or asphalt?
: 3. Justify how aging of underground buried fuel oil piping will be managed in the 30-40 year, 40-50 year, and 50-60 year license renewal periods.
Discussion: The applicant stated that it understood the questions and would provide a follow-up response to RAI 82.1.18-1.
ENCLOSURE 2


As stated cc w/encls: Distribution v i a Listserv DISTRIBUTION
..' ML103010523                                           *concurred via e-mail OFFICE   LARPOB:DLR
: See next page ADAMS Accession No' ML103010523  
* PM:RPB2:DLR           BC:RPB2:DLR           PM:RPB2:DLR NAME     IKing                     LRegner               DWrona               LRegner (Signature) 11/5/10                   11/15/10             11116/10             11/16/10 DATE Memorandum to Arizona Public Service Company from Lisa M. Regner dated November 16, 2010
.. IRAJ Lisa M. Regner, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
*concurred via e-mail OFFICE LARPOB: DLR
* PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IKing LRegner DWrona LRegner (Signature)
DATE 11/5/10 11/15/10 11116/10 11/16/10 OFFICIAL RECORD COPY Memorandum to Arizona Public Service Company from Lisa M. Regner dated November 16, 2010  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION , UNITS 1 , 2, AND 3 , LICENSE RENEWAL APPLICATION DISTRIBUTION:
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION ,
HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource R i dsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrD lr Rapb Resource RidsNrrD l rRpob Resource R i dsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource L. Regner D. Drucker R. Hall B. Mizuno, OGC J. H. Bashore , RIV G. P i ck , RIV}}
UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource L. Regner D. Drucker R. Hall B. Mizuno, OGC J. H. Bashore, RIV G. Pick, RIV}}

Latest revision as of 13:22, 11 March 2020

Summary of Teleconference Held on Between the U.S. NRC and Arizona Public Service Company, Concerning Draft Follow-Up Request for Additional Information Pertaining to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3, LRA
ML103010523
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/16/2010
From: Lisa Regner
License Renewal Projects Branch 2
To:
Office of Nuclear Reactor Regulation
Regner L M, NRR/DLR, 415-1906
References
Download: ML103010523 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 16,2010 LICENSEE: Arizona Public Service Company FACILITY: Palo Verde Nuclear Generating Station, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION ,

UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the staff's draft follow-up request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's draft RAI. provides a listing of the participants and Enclosure 2 contains a listing of the draft RAI discussed with the applicant, including a brief description on the status of the items .

The applicant had an opportunity to comment on this summary.

isa M. Rea , Sr. r,:;,ject Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos 50-528, 50-529, and 50-530

Enclosures:

As stated cc w/encls: Distribution via Listserv

TELEPHONE CONFERENCE CALL PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS OCTOBER 28, 2010 PARTICIPANTS AFFILIATIONS Lisa Regner U.S. Nuclear Regulatory Commission (NRC)

William Holston NRC Angela Krainik Arizona Public Service Company (APS)

Glenn Michael APS Shabbir Pittalwala APS Roger Fongemie APS Eric Blocher Strategic Teaming and Resource Sharing Alliance ENCLOSURE 1

DRAFT REQUEST FOR ADDITIONAL INFORMATION PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 LICENSE RENEWAL APPLICATION OCTOBER 28, 2010 The U.S. Nuclear Regulatory Commission (the staff) and representatives of Arizona Public Service Company (APS or the applicant) held a telephone conference call on October 28, 2010, to discuss and clarify the following draft request for additional information (RAI) concerning the Palo Verde Nuclear Generating Station , Units 1, 2, and 3, license renewal application (LRA) .

1. Justify why the inspections of in-scope diesel fuel oil piping , discussed in a letter from APS dated October 13, 2010, is not included in the Updated Final Safety Analysis Report Supplement, Appendix A of the LRA.
2. How many feet of in-scope buried fuel oil piping are located at each unit? How many feet of in-scope buried diesel fuel oil piping are not under concrete or asphalt?
3. Justify how aging of underground buried fuel oil piping will be managed in the 30-40 year, 40-50 year, and 50-60 year license renewal periods.

Discussion: The applicant stated that it understood the questions and would provide a follow-up response to RAI 82.1.18-1.

ENCLOSURE 2

..' ML103010523 *concurred via e-mail OFFICE LARPOB:DLR

  • PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IKing LRegner DWrona LRegner (Signature) 11/5/10 11/15/10 11116/10 11/16/10 DATE Memorandum to Arizona Public Service Company from Lisa M. Regner dated November 16, 2010

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28,2010, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ARIZONA PUBLIC SERVICE COMPANY, CONCERNING DRAFT FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE PALO VERDE NUCLEAR GENERATING STATION ,

UNITS 1, 2, AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsOpaMail Resource L. Regner D. Drucker R. Hall B. Mizuno, OGC J. H. Bashore, RIV G. Pick, RIV