ML19046A238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML19046A238
| number = ML19046A238
| issue date = 02/15/2019
| issue date = 02/15/2019
| title = Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010)
| title = NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010)
| author name = Kim J
| author name = Kim J
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Kim, James Sent:                            Friday, February 15, 2019 12:32 PM To:                              Duke, Paul R.
Cc:                              Thomas, Brian J.
 
==Subject:==
Acceptance Review Result: Hope Creek-Relief Request to USE ASME Code Case OMN-17 (L-2019-LLR-0010)
Mr. Duke, By letter dated January 31, 2019 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML19031B845), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a relief request for Hope Creek Generating Station in accordance with 10 CFR 50.55a, Codes and standards, paragraph (z)(i) requesting approval for alternate rules for testing ASME Class 1 Pressure Relief/Safety Valves for the fourth 10-year inservice inspection interval.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::120 hours]] to complete. The NRC staff expect to complete this review in approximately 8 months, which is October 2019 in support of the fall 2019 refueling outage. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.
James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1
 
Hearing Identifier:    NRR_DMPS Email Number:          802 Mail Envelope Properties    (James.Kim@nrc.gov20190215123100)
 
==Subject:==
Acceptance Review Result: Hope Creek-Relief Request to USE ASME Code Case OMN-17 (L-2019-LLR-0010)
Sent Date:              2/15/2019 12:31:51 PM Received Date:          2/15/2019 12:31:00 PM From:                  Kim, James Created By:            James.Kim@nrc.gov Recipients:
"Thomas, Brian J." <Brian.Thomas@pseg.com>
Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>
Tracking Status: None Post Office:
Files                          Size                  Date & Time MESSAGE                        2548                  2/15/2019 12:31:00 PM Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:}}

Latest revision as of 16:39, 5 March 2020

NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010)
ML19046A238
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/15/2019
From: James Kim
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
References
L-2019-LLR-0010
Download: ML19046A238 (2)


Text

NRR-DMPSPEm Resource From: Kim, James Sent: Friday, February 15, 2019 12:32 PM To: Duke, Paul R.

Cc: Thomas, Brian J.

Subject:

Acceptance Review Result: Hope Creek-Relief Request to USE ASME Code Case OMN-17 (L-2019-LLR-0010)

Mr. Duke, By letter dated January 31, 2019 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML19031B845), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a relief request for Hope Creek Generating Station in accordance with 10 CFR 50.55a, Codes and standards, paragraph (z)(i) requesting approval for alternate rules for testing ASME Class 1 Pressure Relief/Safety Valves for the fourth 10-year inservice inspection interval.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expect to complete this review in approximately 8 months, which is October 2019 in support of the fall 2019 refueling outage. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.

James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1

Hearing Identifier: NRR_DMPS Email Number: 802 Mail Envelope Properties (James.Kim@nrc.gov20190215123100)

Subject:

Acceptance Review Result: Hope Creek-Relief Request to USE ASME Code Case OMN-17 (L-2019-LLR-0010)

Sent Date: 2/15/2019 12:31:51 PM Received Date: 2/15/2019 12:31:00 PM From: Kim, James Created By: James.Kim@nrc.gov Recipients:

"Thomas, Brian J." <Brian.Thomas@pseg.com>

Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2548 2/15/2019 12:31:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: