ML19326A142: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
{{#Wiki_filter:m
{{#Wiki_filter:m
: u. S. NUCLEAR REGULA10RY COV.WuMM em.
: u. S. NUCLEAR REGULA10RY COV.WuMM em.
(7 771
(7 771 G                                                                  ,.                                                                        .
          ..
G                                                                  ,.                                                                        .
                                                                               .              LICENSEE EVENT REl' ORT CCNTRCL SLOCK. l                            l      l      l        l l]                              (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o i        lo      l    H        l    o    in  i  s      I  t  l@lc              to  l-    la  is    N      le    ir  l    1013 l @ le. hUCEME
                                                                               .              LICENSEE EVENT REl' ORT CCNTRCL SLOCK. l                            l      l      l        l l]                              (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o i        lo      l    H        l    o    in  i  s      I  t  l@lc              to  l-    la  is    N      le    ir  l    1013 l @ le. hUCEME
                                                                                                                                                   .3    26 11 1TYPE 11 JJtl@l's l LAI T ddl@
                                                                                                                                                   .3    26 11 1TYPE 11 JJtl@l's l LAI T ddl@
Line 28: Line 26:
1012l l At 1000 hours on 1/16/73, when performing Surveillance Test ST 5051.01. "Emercancv I
1012l l At 1000 hours on 1/16/73, when performing Surveillance Test ST 5051.01. "Emercancv I
lo la11 Core Cooling System Subsystems Monthly Test". Decay Heat Pump 1-1 failed to start.                                                                                                                                    f l
lo la11 Core Cooling System Subsystems Monthly Test". Decay Heat Pump 1-1 failed to start.                                                                                                                                    f l
t o 14 l l This placed the unit in the Action Statement of Tech Spec 3.5.2 which requires twe iol5l l operable Decay Heat / Low Pressure Injection Pumps in Modes 1, 2 and 3.                                                                                                        There was no            I l o is I l danger to the health and safety of the public or to unit eersonnel.                                                                                                      Decav Heat Pomo l
t o 14 l l This placed the unit in the Action Statement of Tech Spec 3.5.2 which requires twe iol5l l operable Decay Heat / Low Pressure Injection Pumps in Modes 1, 2 and 3.                                                                                                        There was no            I l o is I l danger to the health and safety of the public or to unit eersonnel.                                                                                                      Decav Heat Pomo l l0{7l l l-2 was operabl6. Reactor pcwer was Icss than 1% of full cover.                                                                                                      ( NP -3 3 13 )              I l
:
l o ir II                                                                                                                                                                                                    60 7        8 9                                                                                                                                                  COf.:P.        VALVE SYSTE P.1              CAUSE              CAUSE CCOE                    CCCE            SU$ COLD                      COVPONENT CODE                        SubCOCE          SU8COOC loi'l                                      l SI Fj@ Lej@ l Al@ I c l K ! T l a l a i n l@ I A l@ tr                                              13            19              20 l@
_.
l0{7l l l-2 was operabl6. Reactor pcwer was Icss than 1% of full cover.                                                                                                      ( NP -3 3 13 )              I
                                                                                                                                                                                                                            '
l l o ir II                                                                                                                                                                                                    60 7        8 9                                                                                                                                                  COf.:P.        VALVE SYSTE P.1              CAUSE              CAUSE CCOE                    CCCE            SU$ COLD                      COVPONENT CODE                        SubCOCE          SU8COOC loi'l                                      l SI Fj@ Lej@ l Al@ I c l K ! T l a l a i n l@ I A l@ tr                                              13            19              20 l@
4                                3          10              11                  12                13 7
4                                3          10              11                  12                13 7
OCCURPFNCE              REPORT                      REVISION
OCCURPFNCE              REPORT                      REVISION
Line 48: Line 42:
                                                                                   .                              r*OU R S              CUS .it TTED      FOi'M hua.          Su PLita          MarJU F ACTLeu R IE!@lE!@              4 L3_J@
                                                                                   .                              r*OU R S              CUS .it TTED      FOi'M hua.          Su PLita          MarJU F ACTLeu R IE!@lE!@              4 L3_J@
3 I41@
3 I41@
                                                                                     .6
                                                                                     .6 1010131 31                        40 I    l48Y l@          l42Y l@            lNl@ lWl1l2l0!@
                                                                                    ,
1010131 31                        40 I    l48Y l@          l42Y l@            lNl@ lWl1l2l0!@
43            44                47 JJ cAust oc::RiPTION Ar.0 GCARECTl'/ti ACTIONS h 11 !OIl The fuses in the breaker for the Decov Heat Punn 1 -1                                                                                    ntor which 'ummiv m n rol w I
43            44                47 JJ cAust oc::RiPTION Ar.0 GCARECTl'/ti ACTIONS h 11 !OIl The fuses in the breaker for the Decov Heat Punn 1 -1                                                                                    ntor which 'ummiv m n rol w I
                                                                                                                                                                                                                          -
[1 ii; Leo the cicse (start) circuit were not making proper contact. At 1008 hours on 1/16/78; fuse black
[1 ii; Leo the cicse (start) circuit were not making proper contact. At 1008 hours on 1/16/78; fuse black
       ,, ; ,, j the control power fuses were pulled and then re-inserted into the                                                                                                                                    9 g ,,; l which rattirned Decay Hnat Pump l-l to service. ::ainLenance Work Order 78-193 has                                                                                                                      l
       ,, ; ,, j the control power fuses were pulled and then re-inserted into the                                                                                                                                    9 g ,,; l which rattirned Decay Hnat Pump l-l to service. ::ainLenance Work Order 78-193 has                                                                                                                      l g,,,,j      l been issued to inspect fuses and fuse blocks to aesure proper contact.                                                                                                                      dQ 1      & )                                                                                                      "ETHOcc7 r act u Tv                                                                                                                                        DISCOVERY CESCniPitON          .
                                                                                                                                                                                                                      !
g,,,,j      l been issued to inspect fuses and fuse blocks to aesure proper contact.                                                                                                                      dQ 1      & )                                                                                                      "ETHOcc7
                                                                                                          ,
r act u Tv                                                                                                                                        DISCOVERY CESCniPitON          .
ST%TV1                      ", P'W.E d                          CTHERSTATL3
ST%TV1                      ", P'W.E d                          CTHERSTATL3
* DISCOV ER Y l1 } C l l Cl                        ldl)l0                      l N.\                                            lRl            Surveillance Tesr 9T 5051.01 do l
* DISCOV ER Y l1 } C l l Cl                        ldl)l0                      l N.\                                            lRl            Surveillance Tesr 9T 5051.01 do l
Line 68: Line 55:
I 1i i-l 1 01 0l 0!@l                  n Zi@lo :ta                                                                                                                                                  w
I 1i i-l 1 01 0l 0!@l                  n Zi@lo :ta                                                                                                                                                  w
       ,      ..                                  >2 PEllCC'.NE L t*4JL.41.5
       ,      ..                                  >2 PEllCC'.NE L t*4JL.41.5
* W M .e
* W M .e n CC* , d TION l
                          .
n CC* , d TION l
l 0l dl Of                            N.\
l 0l dl Of                            N.\
e, 4 .                          n        .
e, 4 .                          n        .
3 w.w ; To ec.;r.ITV
3 w.w ; To ec.;r.ITV
("gg;.r' t ;r..; - e ;
("gg;.r' t ;r..; - e ;
            .
8oo2o3oog                                                                          i 60 r      <.*                    b                                                                                                                                                    NRC USF. ONLY Pt m t o TY
8oo2o3oog                                                                          i 60 r      <.*                    b                                                                                                                                                    NRC USF. ONLY Pt m t o TY
* C.U r                .
* C.U r                .
Line 83: Line 67:
DVR 78-011'                    N,wt or eng/,nm Dw1 %eler                                                                      pggyg. MM ) WGM. N. N [,
DVR 78-011'                    N,wt or eng/,nm Dw1 %eler                                                                      pggyg. MM ) WGM. N. N [,


_ _ _
d
d
                  -
                                          ,-                                    ..
          .
        -                                .
()
()
     '(/            .
     '(/            .
                          .-
TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATI05 FOR LER NP-33-78-13                  -
* TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATI05 FOR LER NP-33-78-13                  -
                                                                                                                    .
                                                                                                          -
DATE OF EVENT: January 16, 1978 FACILITY: Davis-Besse Unit 1 IDENTIFICATI0N'0F OCCURRENCE: Decay Heat Pump 1-1-failed to start.
DATE OF EVENT: January 16, 1978 FACILITY: Davis-Besse Unit 1 IDENTIFICATI0N'0F OCCURRENCE: Decay Heat Pump 1-1-failed to start.
>
Conditions Prior to Occurrence: The unit was in Mode 2, with Power (MWT) = 0, and Load DME) = 0.
Conditions Prior to Occurrence: The unit was in Mode 2, with Power (MWT) = 0, and Load DME) = 0.
                                                                                                      *
:
                                                                                                                  -
'              Description of Occurrence: At 1000 hours on January 16, 1978 when performing Sur-veillance. Test ST 3051.01, " Emergency Core Cooling System (ECCS) Subsystems Monthly          -
'              Description of Occurrence: At 1000 hours on January 16, 1978 when performing Sur-veillance. Test ST 3051.01, " Emergency Core Cooling System (ECCS) Subsystems Monthly          -
,!
Test", Decay Heat Pump 1-1 failed to start. This placed the unit in the Action Statement of Technical Specification 3.5.2 which requires two operable Decay Heat /
Test", Decay Heat Pump 1-1 failed to start. This placed the unit in the Action Statement of Technical Specification 3.5.2 which requires two operable Decay Heat /
Low Pressure Injection Pumps in Modes 1, 2 and 3.
Low Pressure Injection Pumps in Modes 1, 2 and 3.
                                      .
Designation of Apparent Cause of Occurrence: The fuses in the breaker for the Decay i      '''h Heat Pump 1-l motor which supply control power to the close (start) circuit were
Designation of Apparent Cause of Occurrence: The fuses in the breaker for the Decay i      '''h Heat Pump 1-l motor which supply control power to the close (start) circuit were
              .
           / not making proper contact. The exact reason for the fuses not making proper contact ts not known at present.
           / not making proper contact. The exact reason for the fuses not making proper contact
'
    .
'
ts not known at present.
I 1
I 1
Analysis of Occurrence: Therc was no danger to the health and safety of the public or to unit personnel. Decay Heat Pump 1-2 was operable. Reactor power was less **            ~
Analysis of Occurrence: Therc was no danger to the health and safety of the public or to unit personnel. Decay Heat Pump 1-2 was operable. Reactor power was less **            ~
than 1% of full power.
than 1% of full power.
Corrective Action: At 1008 hours on January 16, 1978, the control power fuses were pulled.and then re-inserted into the fuse block. The Surveillance Test was success-fully completed which returned Decay Heat Pu=p 1-1 to service. This removed the unit from the Action Statement of Technical Specification 3.5.2. Maintenance Work 1
Corrective Action: At 1008 hours on January 16, 1978, the control power fuses were pulled.and then re-inserted into the fuse block. The Surveillance Test was success-fully completed which returned Decay Heat Pu=p 1-1 to service. This removed the unit from the Action Statement of Technical Specification 3.5.2. Maintenance Work 1
Order 78-193 has been issued to inspect fuses and fuse blocks to assuru proper
Order 78-193 has been issued to inspect fuses and fuse blocks to assuru proper contact.
>
contact.
Failure Data: No previous _similar events have occurred.
Failure Data: No previous _similar events have occurred.
LER #78-011
LER #78-011
:
     /      s i
     /      s
v.s) l
* i v.s)
                                                                                                                      !
'
                        '
                                                                                              .
                                                                                                                      ;
l
                                       .                ..          --.            . . . -.  .-.    . .- -}}
                                       .                ..          --.            . . . -.  .-.    . .- -}}

Latest revision as of 17:44, 18 February 2020

LER 78-011/03L-0:on 780116,during Surveillance Test,Decay Heat Pump 1-1 Failed to Start.Caused by Fuses in Breaker for Decay Heat Motor Failing to Make Proper Contact.Control Power Fuese Pulled & Reinserted.Pump Returned to Svc
ML19326A142
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/09/1978
From: Beeler T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19326A139 List:
References
LER-78-011-03L, LER-78-11-3L, NUDOCS 8002030019
Download: ML19326A142 (2)


Text

m

u. S. NUCLEAR REGULA10RY COV.WuMM em.

(7 771 G ,. .

. LICENSEE EVENT REl' ORT CCNTRCL SLOCK. l l l l l l] (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o i lo l H l o in i s I t l@lc to l- la is N le ir l 1013 l @ le. hUCEME

.3 26 11 1TYPE 11 JJtl@l's l LAI T ddl@

7 4 9 LICENSEE CygE 14 15 UCcNS '.v2.11s h M CON'T l011l Q0" n l6JL '@l 0 l 5 l0 l- l0 l 3 14 16l@l01111 tic, 6J EVENT DATE l61 71 4Sl@l 0 l 2 ! 0 l 917 l 8 l@

J4 54EPonT D ATE If0 I C 61 00CK ET !4U".'S ER EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h i

1012l l At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on 1/16/73, when performing Surveillance Test ST 5051.01. "Emercancv I

lo la11 Core Cooling System Subsystems Monthly Test". Decay Heat Pump 1-1 failed to start. f l

t o 14 l l This placed the unit in the Action Statement of Tech Spec 3.5.2 which requires twe iol5l l operable Decay Heat / Low Pressure Injection Pumps in Modes 1, 2 and 3. There was no I l o is I l danger to the health and safety of the public or to unit eersonnel. Decav Heat Pomo l l0{7l l l-2 was operabl6. Reactor pcwer was Icss than 1% of full cover. ( NP -3 3 13 ) I l

l o ir II 60 7 8 9 COf.:P. VALVE SYSTE P.1 CAUSE CAUSE CCOE CCCE SU$ COLD COVPONENT CODE SubCOCE SU8COOC loi'l l SI Fj@ Lej@ l Al@ I c l K ! T l a l a i n l@ I A l@ tr 13 19 20 l@

4 3 10 11 12 13 7

OCCURPFNCE REPORT REVISION

'E QU E N TI AL REPORT NO. CODE TY*C No.

LCR RO Te1NTvt#A

,m. OM Mw

" L *. i; E R l718l l-l l011l1l l/] l013 l l L]

' l-l l0 l

/

24 .6 27 23 29 20 34 32

_.25 42 23 l ) A17ACHME'sT .P'.0 4 PRIM 8 COr.:P. CO*.tPONPa r i: F 8 f '" SWTO C' .4

( x '

/ ACT O*; f JTURE T A M. 'J AC16074 0l? TANT * ?ETNO

. r*OU R S CUS .it TTED FOi'M hua. Su PLita MarJU F ACTLeu R IE!@lE!@ 4 L3_J@

3 I41@

.6 1010131 31 40 I l48Y l@ l42Y l@ lNl@ lWl1l2l0!@

43 44 47 JJ cAust oc::RiPTION Ar.0 GCARECTl'/ti ACTIONS h 11 !OIl The fuses in the breaker for the Decov Heat Punn 1 -1 ntor which 'ummiv m n rol w I

[1 ii; Leo the cicse (start) circuit were not making proper contact. At 1008 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.83544e-4 months <br /> on 1/16/78; fuse black

,, ; ,, j the control power fuses were pulled and then re-inserted into the 9 g ,,; l which rattirned Decay Hnat Pump l-l to service. ::ainLenance Work Order 78-193 has l g,,,,j l been issued to inspect fuses and fuse blocks to aesure proper contact. dQ 1 & ) "ETHOcc7 r act u Tv DISCOVERY CESCniPitON .

ST%TV1 ", P'W.E d CTHERSTATL3

  • DISCOV ER Y l1 } C l l Cl ldl)l0 l N.\ lRl Surveillance Tesr 9T 5051.01 do l

7 d . a il 14 40 43 4.CTIVI TY CON T ENT AVOUNT Cf " 'TIVITY LCCATION OF RELEASE -

DE LE * !!'? 08 1i ie I l zl @ 'ida*8Ly@l 3A l l NA  !

44 d$ 20 I d d I; 11

  1. E ANON *aEL f xPO4LMi3 '

a 7.2 f A Tv8f DESC4 PT!ch *-

I 1i i-l 1 01 0l 0!@l n Zi@lo :ta w

, .. >2 PEllCC'.NE L t*4JL.41.5

  • W M .e n CC* , d TION l

l 0l dl Of N.\

e, 4 . n .

3 w.w ; To ec.;r.ITV

("gg;.r' t ;r..; - e ;

8oo2o3oog i 60 r <.* b NRC USF. ONLY Pt m t o TY

  • C.U r .

Q B , d %w

, 3 2 U\ " ELO? PflON D' 7.c l us e l!!IIII!'I II I*

oi. :

DVR 78-011' N,wt or eng/,nm Dw1 %eler pggyg. MM ) WGM. N. N [,

d

()

'(/ .

TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATI05 FOR LER NP-33-78-13 -

DATE OF EVENT: January 16, 1978 FACILITY: Davis-Besse Unit 1 IDENTIFICATI0N'0F OCCURRENCE: Decay Heat Pump 1-1-failed to start.

Conditions Prior to Occurrence: The unit was in Mode 2, with Power (MWT) = 0, and Load DME) = 0.

' Description of Occurrence: At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on January 16, 1978 when performing Sur-veillance. Test ST 3051.01, " Emergency Core Cooling System (ECCS) Subsystems Monthly -

Test", Decay Heat Pump 1-1 failed to start. This placed the unit in the Action Statement of Technical Specification 3.5.2 which requires two operable Decay Heat /

Low Pressure Injection Pumps in Modes 1, 2 and 3.

Designation of Apparent Cause of Occurrence: The fuses in the breaker for the Decay i h Heat Pump 1-l motor which supply control power to the close (start) circuit were

/ not making proper contact. The exact reason for the fuses not making proper contact ts not known at present.

I 1

Analysis of Occurrence: Therc was no danger to the health and safety of the public or to unit personnel. Decay Heat Pump 1-2 was operable. Reactor power was less ** ~

than 1% of full power.

Corrective Action: At 1008 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.83544e-4 months <br /> on January 16, 1978, the control power fuses were pulled.and then re-inserted into the fuse block. The Surveillance Test was success-fully completed which returned Decay Heat Pu=p 1-1 to service. This removed the unit from the Action Statement of Technical Specification 3.5.2. Maintenance Work 1

Order 78-193 has been issued to inspect fuses and fuse blocks to assuru proper contact.

Failure Data: No previous _similar events have occurred.

LER #78-011

/ s i

v.s) l

. .. --. . . . -. .-. . .- -