ML120480100: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:10 CFR 55.40 fr1 Progress Energy 4
Serial: RNP-RA/1 1-0048 OCT13 2I1 Mr. Mark Bates Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
 
==Dear Mr. Bates:==
 
In accordance with the guidelines in Revision 9, Supplement 1, of NUREG- 1021, Operator Licensing Examination Standards for Power Reactors, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, Reference Material Guidelines For Initial Licensing Examinations, for examinations scheduled to begin the week of November 28, 2011.
As required by Attachment 1 of Revision 9, Supplement 1, ofNUREG-102l, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. James Conder at (843) 857-1656.
Sincerely, Chris Kamilaris Manager Support Services Nuclear CAC Enclosure Progress Energy Carolinas, inc.
Robinson Nuclear Plant 3581 Went Entrance Road Hartsville, SC 29550
 
United States Nuclear Regulatory Commission Serial: RNP-RA/1 1-0048 Page 2 of 2 c:  Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. V. McCree, NRC, Region II (w/o Enclosure)
Ms. B. Mozafari, NRC, NRR (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)}}

Latest revision as of 18:01, 6 February 2020

Initial Exam 2011-302 General Correspondence
ML120480100
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/10/2012
From: Kamilaris C
Progress Energy Co
To: Bates M
NRC/RGN-II
Mark Bates
Shared Package
ML120470109 List:
References
Download: ML120480100 (2)


Text

10 CFR 55.40 fr1 Progress Energy 4

Serial: RNP-RA/1 1-0048 OCT13 2I1 Mr. Mark Bates Operations Engineer, Division of Reactor Safety U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

Dear Mr. Bates:

In accordance with the guidelines in Revision 9, Supplement 1, of NUREG- 1021, Operator Licensing Examination Standards for Power Reactors, Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201, Reference Material Guidelines For Initial Licensing Examinations, for examinations scheduled to begin the week of November 28, 2011.

As required by Attachment 1 of Revision 9, Supplement 1, ofNUREG-102l, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.

If you have any questions concerning this matter, please contact Mr. James Conder at (843) 857-1656.

Sincerely, Chris Kamilaris Manager Support Services Nuclear CAC Enclosure Progress Energy Carolinas, inc.

Robinson Nuclear Plant 3581 Went Entrance Road Hartsville, SC 29550

United States Nuclear Regulatory Commission Serial: RNP-RA/1 1-0048 Page 2 of 2 c: Document Control Desk (w/o Enclosure)

NRC Resident Inspector, HBRSEP (w/o Enclosure)

Mr. V. McCree, NRC, Region II (w/o Enclosure)

Ms. B. Mozafari, NRC, NRR (w/o Enclosure)

Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)