|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13228A039 | | | number = ML13228A039 |
| | issue date = 08/28/2013 | | | issue date = 08/28/2013 |
| | title = Davis-Besse Nuclear Power Station, Unit No. 1 - Correction Letter for Safety Evaluation for Relief Request RP-6 and RV-1 | | | title = Correction Letter for Safety Evaluation for Relief Request RP-6 and RV-1 |
| | author name = Brown E A | | | author name = Brown E |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Lieb R | | | addressee name = Lieb R |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF0754, TAC:NF0755 | | | project = TAC:MF0754, TAC:NF0755 |
| | | stage = Approval |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:August 28, 2013 Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760 |
| | |
| August 28, 2013 ! | |
| Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067) | | DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067) |
|
| |
|
| ==Dear Mr. Lieb:== | | ==Dear Mr. Lieb:== |
Line 30: |
Line 28: |
| Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read: | | Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read: |
| Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013. | | Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013. |
| Additionally on page 8 the second section under Section 4.0 should be revised to read: In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety. These corrections do not alter any findings or conclusions | | Additionally on page 8 the second section under Section 4.0 should be revised to read: |
| | | In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety. |
| Sincerely, | | These corrections do not alter any findings or conclusions Sincerely, |
| / RA /
| | / RA / |
| | | Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 |
| Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |
| | |
| Docket No. 50-346 | |
| | |
| August 28, 2013 Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760
| |
| | |
| ==SUBJECT:==
| |
| DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067)
| |
|
| |
|
| ==Dear Mr. Lieb:==
| | ML13228A039 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC(A) |
| | | NAME EBrown SRorher (SFiguroa) JBowen (JWiebe for) |
| By letter dated August 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No ML13210A467), the Nuclear Regulatory Commission (NRC) approved requests for relief RP-6 and RV-1 at Davis-Besse Nuclear Power Station (DBNPS)
| | DATE 8/26/13 8/26/13 8/28/13}} |
| Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read:
| |
| Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013.
| |
| Additionally on page 8 the second section under Section 4.0 should be revised to read: In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety. These corrections do not alter any findings or conclusions in the issued safety evaluation.
| |
| | |
| Sincerely, / RA /
| |
| Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
| |
| | |
| Distribution: PUBLIC LPL3-2 R/F RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR MFarnan RidsNrrDorlLpl3-2 Resource RidsNrrDeEpnb Resource RidsNrrDavisBesse Resource VCampbell, EDO, RIII RidsNrrLASRorher ADAMS ACCESSION NUMBER:ML13228A039 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC(A) NAME EBrown SRorher (SFiguroa) JBowen (JWiebe for) DATE 8/26/13 8/26/13 8/28/13 OFFICIAL RECORD COPY
| |
| }} | |
Letter Sequence Approval |
---|
|
|
MONTHYEARML13079A3452013-03-13013 March 2013 NRR E-mail Capture - Acceptance Review Results for Davis-Besse 10 CFR 50.55a Requests RP-6 (TAC No. MF0755) and RV-1 (TAC No. MF0754) Regarding Inservice Pump and Valve Testing Project stage: Acceptance Review ML13210A4672013-08-0101 August 2013 Safety Evaluation for Relief Requests RP-6 and RV-1 Project stage: Approval ML13228A0392013-08-28028 August 2013 Correction Letter for Safety Evaluation for Relief Request RP-6 and RV-1 Project stage: Approval 2013-08-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
August 28, 2013 Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067)
Dear Mr. Lieb:
By letter dated August 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No ML13210A467), the Nuclear Regulatory Commission (NRC) approved requests for relief RP-6 and RV-1 at Davis-Besse Nuclear Power Station (DBNPS)
Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read:
Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013.
Additionally on page 8 the second section under Section 4.0 should be revised to read:
In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety.
These corrections do not alter any findings or conclusions Sincerely,
/ RA /
Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
ML13228A039 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC(A)
NAME EBrown SRorher (SFiguroa) JBowen (JWiebe for)
DATE 8/26/13 8/26/13 8/28/13