ML13228A039: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13228A039 | | number = ML13228A039 | ||
| issue date = 08/28/2013 | | issue date = 08/28/2013 | ||
| title = | | title = Correction Letter for Safety Evaluation for Relief Request RP-6 and RV-1 | ||
| author name = Brown E | | author name = Brown E | ||
| author affiliation = NRC/NRR/DORL/LPLIII-2 | | author affiliation = NRC/NRR/DORL/LPLIII-2 | ||
| addressee name = Lieb R | | addressee name = Lieb R | ||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:MF0754, TAC:NF0755 | |||
| stage = Approval | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:August 28, 2013 Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760 | |||
==SUBJECT:== | |||
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067) | |||
==Dear Mr. Lieb:== | |||
By letter dated August 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No ML13210A467), the Nuclear Regulatory Commission (NRC) approved requests for relief RP-6 and RV-1 at Davis-Besse Nuclear Power Station (DBNPS) | |||
Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read: | |||
Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013. | |||
Additionally on page 8 the second section under Section 4.0 should be revised to read: | |||
In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety. | |||
These corrections do not alter any findings or conclusions Sincerely, | |||
/ RA / | |||
Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 | |||
ML13228A039 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC(A) | |||
NAME EBrown SRorher (SFiguroa) JBowen (JWiebe for) | |||
DATE 8/26/13 8/26/13 8/28/13}} |
Latest revision as of 03:26, 6 February 2020
ML13228A039 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 08/28/2013 |
From: | Ellen Brown Plant Licensing Branch III |
To: | Lieb R FirstEnergy Nuclear Operating Co |
Eva Brown, NRR/DORL 415-2315 | |
References | |
L-13-067, TAC MF0754, TAC NF0755 | |
Download: ML13228A039 (3) | |
Text
August 28, 2013 Mr. Ray Lieb Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 North State, Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- CORRECTION LETTER FOR SAFETY EVALUATION FOR RELIEF REQUESTS RP-6 AND RV-1 (TAC NOS. MF0754 AND MF0755)(L-13-067)
Dear Mr. Lieb:
By letter dated August 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No ML13210A467), the Nuclear Regulatory Commission (NRC) approved requests for relief RP-6 and RV-1 at Davis-Besse Nuclear Power Station (DBNPS)
Unit 1. On August 6, 2013, Mr. Phil Lashley notified the NRC staff of a minor error in the safety evaluation. On page 7 at the top of the page, the sentence should be revised to read:
Alternative testing in accordance with ASME Code Case OMN-1 (2006 Addenda) is requested for MOV assemblies included in the DBNPS MOV program listed on pages 4-9 of Attachment F to the letter dated February 27, 2013.
Additionally on page 8 the second section under Section 4.0 should be revised to read:
In addition, the NRC staff has concluded that the proposed alternative RV-1 to implement ASME OM Code 2006 Addenda Code Case OMN-1, with the conditions specified in RG 1.192 for MOV assemblies listed on pages 4-9 of Attachment F to the letter dated February 27, 2013, provides an acceptable level of quality and safety.
These corrections do not alter any findings or conclusions Sincerely,
/ RA /
Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
ML13228A039 NRR-028 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC(A)
NAME EBrown SRorher (SFiguroa) JBowen (JWiebe for)
DATE 8/26/13 8/26/13 8/28/13