ML14364A363: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/24/2014 | | issue date = 11/24/2014 | ||
| title = 2014 Braidwood Station Initial License Examination Form ES-301-2 | | title = 2014 Braidwood Station Initial License Examination Form ES-301-2 | ||
| author name = | | author name = Mcneil D | ||
| author affiliation = NRC/RGN-III/DRS/OLB | | author affiliation = NRC/RGN-III/DRS/OLB | ||
| addressee name = | | addressee name = | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
-Plant Systems Outline Form ES-301-2 | Type Safety System / JPM Title Code* Function D, S, P 1 | ||
Braidwood Station Date of Examination: 11/10/14 | : a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance A, N, S 2 | ||
-I); (2 or 3 for SRO | : b. SIM-205 Raise SI Accumulator level using 1B SI pump A, D, L, S 3 | ||
-U, including 1 ESF) | : c. SIM-302 Transfer to Cold Leg Recirculation N, S 4S | ||
System / JPM Title | : d. SIM-416S CD/CB Pump Trip M, S 5 | ||
: e. SIM-510 Start 1A CS pump for Surveillance | |||
-I); (3 or 2 for SRO | : f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip A, D, S, L 6 failures | ||
-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO | : g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service" A, D, P, S 8 | ||
-I control room (and in | : h. SIM-801 Respond to a RCP Thermal Barrier Leak In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
-plant) systems must be different and serve different safety functions; all 5 SRO | : i. IP-104 Local Reactor Trip A, D, E 1 | ||
-U systems must serve different safety functions; in | : j. IP-206 Local reset of Phase A D, E 2 | ||
-plant systems and functions may overlap those tested in the control room. | : k. IP-409S Locally start the 2B AF pump D, R 4S | ||
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in | *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected) | ||
-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | (R)CA >1 / >1 / >1 (S)imulator | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | |||
-Plant Systems Outline Form ES-301-2 | Function | ||
Braidwood Station Date of Examination: 11/10/14 | : a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1 | ||
-I); (2 or 3 for SRO | : b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 | ||
-U, including 1 ESF) | : c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 | ||
System / JPM Title Type Code* | : d. SIM-416S CD/CB Pump Trip N, S 4S | ||
: e. n/a n/a n/a | |||
: f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed A, D, S, L 6 trip failures | |||
-I); (3 or 2 for SRO | : g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service" | ||
-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO | : h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | ||
-I control room (and in | : i. IP-104 Local Reactor Trip A, D, E 1 | ||
-plant) systems must be different and serve different safety functions; all 5 SRO | : j. IP-206 Local reset of Phase A D, E 2 | ||
-U systems must serve different safety functions; in | : k. IP-409S Locally start the 2B AF pump D, R 4S | ||
-plant systems and functions may overlap those tested in the control room. | @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | ||
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected) | |||
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in | (R)CA >1 / >1 / >1 (S)imulator}} | ||
-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
< 3 / | |||
Latest revision as of 15:31, 5 February 2020
ML14364A363 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 11/24/2014 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Exelon Generation Co |
Shared Package | |
ML14344A990 | List: |
References | |
ES-301-2 50-456/OL-14, 50-457/OL-14 | |
Download: ML14364A363 (2) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Type Safety System / JPM Title Code* Function D, S, P 1
- a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance A, N, S 2
- b. SIM-205 Raise SI Accumulator level using 1B SI pump A, D, L, S 3
- c. SIM-302 Transfer to Cold Leg Recirculation N, S 4S
- d. SIM-416S CD/CB Pump Trip M, S 5
- e. SIM-510 Start 1A CS pump for Surveillance
- f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip A, D, S, L 6 failures
- g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service" A, D, P, S 8
- h. SIM-801 Respond to a RCP Thermal Barrier Leak In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. IP-104 Local Reactor Trip A, D, E 1
- j. IP-206 Local reset of Phase A D, E 2
- k. IP-409S Locally start the 2B AF pump D, R 4S
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1
- b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2
- c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3
- d. SIM-416S CD/CB Pump Trip N, S 4S
- e. n/a n/a n/a
- g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service"
- h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. IP-104 Local Reactor Trip A, D, E 1
- j. IP-206 Local reset of Phase A D, E 2
- k. IP-409S Locally start the 2B AF pump D, R 4S
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator