ML14364A363: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = 2014 Braidwood Station Initial License Examination Form ES-301-2
| title = 2014 Braidwood Station Initial License Examination Form ES-301-2
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 16: Line 16:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:ES-301                          Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility: Braidwood Station                                            Date of Examination: 11/10/14 Exam Level: RO            SRO-I      SRO-U                            Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Type        Safety System / JPM Title Code*      Function D, S, P          1
: a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance A, N, S          2
: b. SIM-205 Raise SI Accumulator level using 1B SI pump A, D, L, S        3
: c. SIM-302 Transfer to Cold Leg Recirculation N, S          4S
: d. SIM-416S CD/CB Pump Trip M, S          5
: e. SIM-510 Start 1A CS pump for Surveillance
: f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip                    A, D, S, L        6 failures
: g. SIM-711 Place Channel Service Status from "Out of Service" to "In                          N, S          7 Service" A, D, P, S        8
: h. SIM-801 Respond to a RCP Thermal Barrier Leak In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. IP-104 Local Reactor Trip                                                                A, D, E          1
: j. IP-206 Local reset of Phase A                                                            D, E            2
: k. IP-409S Locally start the 2B AF pump                                                      D, R          4S
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                  *Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                          4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                        <9 / <8      / <4 (E)mergency or abnormal in-plant                                          >1 / >1      / >1 (L)ow-Power / Shutdown                                                    >1 / >1      / >1 (N)ew or (M)odified from bank including 1(A)                              >2 / >2      / >1 (P)revious 2 exams                                                        <3/ <3 /      < 2 (randomly selected)
(R)CA                                                                      >1 / >1      / >1 (S)imulator
ES-301                            Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility: Braidwood Station                                              Date of Examination: 11/10/14 Exam Level: RO              SRO-I      SRO-U                              Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                      Type Code*
Function
: a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance                          D, S, P          1
: b. SIM-205 Raise SI Accumulator level using 1B SI pump                                      A, N, S          2
: c. SIM-302 Transfer to Cold Leg Recirculation                                              A, D, L, S        3
: d. SIM-416S CD/CB Pump Trip                                                                  N, S          4S
: e. n/a                                                                                        n/a          n/a
: f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed A, D, S, L        6 trip failures
: g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S            7 Service"
: h. SIM-801 Respond to a RCP Thermal Barrier Leak                                          A, D, P, S        8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. IP-104 Local Reactor Trip                                                                A, D, E          1
: j. IP-206 Local reset of Phase A                                                              D, E            2
: k. IP-409S Locally start the 2B AF pump                                                      D, R          4S
  @          All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                    *Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                            4-6 /  4-6 / 2-3 (C)ontrol room (D)irect from bank                                                          <9 / <8      / <4 (E)mergency or abnormal in-plant                                            >1 / >1      / >1 (L)ow-Power / Shutdown                                                      >1 / >1      / >1 (N)ew or (M)odified from bank including 1(A)                                >2 / >2      / >1 (P)revious 2 exams                                                          <3/ <3 /      < 2 (randomly selected)
(R)CA                                                                        >1 / >1      / >1 (S)imulator}}

Latest revision as of 15:31, 5 February 2020

2014 Braidwood Station Initial License Examination Form ES-301-2
ML14364A363
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A990 List:
References
ES-301-2 50-456/OL-14, 50-457/OL-14
Download: ML14364A363 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Type Safety System / JPM Title Code* Function D, S, P 1

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance A, N, S 2
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, D, L, S 3
c. SIM-302 Transfer to Cold Leg Recirculation N, S 4S
d. SIM-416S CD/CB Pump Trip M, S 5
e. SIM-510 Start 1A CS pump for Surveillance
f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip A, D, S, L 6 failures
g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service" A, D, P, S 8
h. SIM-801 Respond to a RCP Thermal Barrier Leak In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. IP-104 Local Reactor Trip A, D, E 1
j. IP-206 Local reset of Phase A D, E 2
k. IP-409S Locally start the 2B AF pump D, R 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2
c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3
d. SIM-416S CD/CB Pump Trip N, S 4S
e. n/a n/a n/a
f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed A, D, S, L 6 trip failures
g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service"
h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. IP-104 Local Reactor Trip A, D, E 1
j. IP-206 Local reset of Phase A D, E 2
k. IP-409S Locally start the 2B AF pump D, R 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator