{{#Wiki_filter:Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial -ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested.
{{#Wiki_filter:ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                         Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I   Item# I UnSat/Editorial I                         Chief Examiner Comment                                             Facility Action/Response Qperatina Test JPM417    Editorial        Chanoe estimated comoletion time from 15 minutes to 35 minutes.                 Chanoed as requested .
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested. clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are within ranae (500-0 KVAR\ and aenerator load is beina raised.
JPM418            Editorial
* General note -add steps for evaluator to annotate performance of the A and Changed as requested. B FCVs.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.
* Step 8.4.2.2. -add cue "If examinee requests to use "double detent'', authorize use.
clockwise rotation and adjust DG speed if necessary, and then turn the synch
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
                              . scope back off.
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "is" in Changed as requested. front of MIA.
Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
JPM429    Editorial
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested. the simulator)
* General note - add steps for evaluator to annotate performance of the A and   Changed as requested.
* Add remaining TCVs (2, 3, 4) to JPM .
B FCVs.
* Add cues that the plant is stable .
* Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
* Delete instructor stationed @ P678 -NRC will orovide P678 cue .
authorize use.
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.
JPM247    Editorial
* Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in   Changed as requested.
front of MIA.
* Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
JPM501    Editorial
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
the simulator)
* Add remaining TCVs (2, 3, 4) to JPM.
* Add cues that the plant is stable.
* Delete instructor stationed @ P678 - NRC will orovide P678 cue .
JPM531    Editorial
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.         Changed as requested.
* Add 8.3.2.3 to the initial conditions .
* Add 8.3.2.3 to the initial conditions .
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the examlnee binders
JPM534    Editorial
* Chanae Estimated Comoletion Time from 1 O to 20 minutes .
                              .* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested. plant is in Mode 1 ")
* Chanae Estimated Comoletion Time from 1Oto 20 minutes.
Changed as requested .
Incorporated all 6 changes as requested .
JPM537    Editorial
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Fix typo -8.1.1.3 should be 8.1.2.3 .
* Fix typo - 8.1 .1.3 should be 8.1.2.3 .
* Add the following_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test pushbutton was released, acknowledge -*-the report and state, "Take appropriate action for the valve closure".
* Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that     -*- ----- -..-****-
-                                  1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* Step 8.2.5.2 -Standard -Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue" Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial ::;cenano 1 *---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
* Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"
* Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002". . Add 'Today's date is 11/27/14" to the initial conditions block. . JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
 
* Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station                                                                                                               Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#     UnSat/Editorial                             Chief Examiner Comment                                                   Facilit Action/Res onse JPM423      Editorial        . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters         Changed as requested .
                                  "Open and/or On" in the Original Condition field of CPS 3512.01F002".
* Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".
JPM532      Editorial              Add 'Today's date is 11/27/14" to the initial conditions block.                   Changed as requested .
JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
JPM535      Unsat
* Change the first sentence of the initial conditions block to read, "The plant was   Changed as requested .
operating at rated thermal power with no out of service equipment."
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
* JPM step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 to the list.
* JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
* Terminating Cues -Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bulleted line. Step 1 Standard -soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2
* Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
* Step 8.5.8.3 Standard -change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2. . Step 8.2.2 Cue -Add a cue that flow noise can be heard if requested by the examinee.
JPM536      Editorial        Steo 4 Standard - add Channel 3 to the end of the first bulleted line.                 Chanaed as requested.
* Add alarms that are expected to be In to the initial conditions block.
JPM538      Editorial        Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2             Chanaed as requested.
* Step 8.4.6.1 -Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed. Event 4 TDRFP 'A' High Bearing Temperature -the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3. -cFC'ommen! -sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism. Event Triggers and Role Play -Event #4 -add EO cue (ii directed to raise cooling water flow\ -"Flow Is hiah in the band". Date Received: 2/13115 Facilit Action/Res onse Changed as requested . Changed as requested . Changed as requested . Chanaed as requested. Chanaed as requested. Changed as requested. Changed as requested. <Cil-* . ... .. ... Added CPS 3103.01 section 8.1.6 to the ATC actions block. NO reas16ie way lo ao llils=lefl as 1s. Added computer points to the simulator lesson plan to cause them to ramp up -30&deg;F over 1 O minutes. Added EO cue #6 to event 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubbler flow is normal." Event Triggers and Role Play -Event #8 -add cue from field concerning local gas boundary inspections. Event Triggers and Role Play -Event #4 -add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide. Event 7/8 -the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide. The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be below Fig. N. Event 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add rising trend to the CAD temperature reported from the area operator. Event 6 -Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide. Event 8 -Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide. The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions. -.. -. Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide. Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Revised critical task listing PC-7.1 to state, 'Within 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\ Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6. Added trend information to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions block. Added ITS 3.4.5 to the SRO Actions block for event 8. Changed all instances of 1540 psig to 1510 psig. Added to ATC & SRO actions for event #8. Added to the Simulator Operator Initial Setup instructions. *-
JPM244      Editorial
Clinton Power Station ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I JPM417 Editorial JPM418 Editorial JPM429 Editorial JPM247 Editorial JPM501 Editorial JPM531 Editorial JPM534 Editorial JPM537 Editorial -ILT 14-1 NRC Exam Submittal Comments Date Received: 2/13115 Chief Examiner Comment Facility Action/Response Qperatina Test Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested.
* Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e        Changed as requested.
* Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested. clockwise rotation and adjust DG speed if necessary, and then turn the synch scope back off. . Step 8.2.12.6 -add comment that JPM can be terminated when VARS are within ranae (500-0 KVAR\ and aenerator load is beina raised.
                              . Main Control Switch in MANUAL 1 and/or Manual 2.
* General note -add steps for evaluator to annotate performance of the A and Changed as requested. B FCVs.
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
* Step 8.4.2.2. -add cue "If examinee requests to use "double detent'', authorize use.
JPM451      Editorial
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the threshold of a minor reactivitv manaoement event.
* Add alarms that are expected to be In to the initial conditions block.               Changed as requested.
* Typo on page 7 -step 4.1 -standard third bullet -remove the word "is" in Changed as requested. front of MIA.
* Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
* Step 5.8 -add to the cue -If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
                                                                                                              *.~        <Cil-*
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested. the simulator)
                                                                                                                                      .... ... *.~..r::
* Add remaining TCVs (2, 3, 4) to JPM .
                                                                                                                                                        "~**''"*              ..
* Add cues that the plant is stable .
                                                                                                                                                                *.~.*:~~,M:~~ ~
* Delete instructor stationed @ P678 -NRC will orovide P678 cue .
Scenario 1        Editorial  Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section        Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but          block.
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
the scenario quide onlv references section 6.1.3.
::;cenano 1  *---eai!Orlal  -cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~              NO reas16ie way lo ao llils=lefl as 1s.
Scenario 1        Editorial  Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7      Added computer points to the simulator lesson plan to to add realism.                                                                        cause them to ramp up - 30&deg;F over 1Ominutes.
Scenario 1        Editorial  Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling    Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                                  Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item#     I UnSat/Editorial I                           Chief Examiner Comment                                                Facility Action/Response Scenario 1       Editorial       Event Triggers and Role Play - Event #4 - add EO cue (if directed to check          Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Scenario 1      Editorial       Event Triggers and Role Play - Event #8 - add cue from field concerning local gas  Added EO cue #3 to event 8.
boundary inspections.
Scenario 1      Editorial      Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.
requested to check TDAFP 'A' room conditions on the camera.
Scenario 2      Editorial      Event 7/8- the actions required to perform "Terminate and prevent LPCS and         Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide.                             and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Scenario 2      Editorial      Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide.                                                                 actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Scenario 2      Editorial      The critical tasks listing on page 4 of the scenario guide needs to be revised to  Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure        minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N.                       pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\
Scenario 2      Editorial        Event 6 - the actions to terminate HPCS injection are reversed from those          Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card.                                                        oumo in the BOP actions block of event #6.
Scenario 2      Editorial        Event 4 - need to add rising trend to the CAD temperature reported from the area  Added trend information to event 4 EO cue 1a.
operator.
Scenario 3       Editorial        Event 6 - Validation crew swapped the running SPE blowers; those actions are not  Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide.         block.
Scenario 3      Editorial        Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not   Added ITS 3.4.5 to the SRO Actions block for event 8.
listed in the scenario auide.
Scenario 3      Editorial      The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.
scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Scenario 3      Editorial        Event B - Add SRO action to direct RR Loop emergency isolation                    Added to ATC & SRO actions for event #8.
Scenario 1,      Editorial        Add MCA Baseline data to PPG 10 in the simulator setup instructions.               Added to the Simulator Operator Initial Setup 2, and 3                                                                                                            instructions.
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                         Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I   Item# I UnSat/Editorial I                         Chief Examiner Comment                                            Facility Action/Response Qperatina Test JPM417     Editorial         Chanoe estimated comoletion time from 15 minutes to 35 minutes.                  Chanoed as requested .
JPM418            Editorial
* Add action to simulator setup instructions to turn the synch scope on, verify  Changed as requested.
clockwise rotation and adjust DG speed if necessary, and then turn the synch
                              . scope back off.
Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.
JPM429    Editorial
* General note - add steps for evaluator to annotate performance of the A and   Changed as requested.
B FCVs.
* Step 8.4.2.2. - add cue "If examinee requests to use "double detent'',
authorize use.
* Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.
JPM247    Editorial
* Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in   Changed as requested.
front of MIA.
* Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.
JPM501    Editorial
* Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.
the simulator)
* Add remaining TCVs (2, 3, 4) to JPM.
* Add cues that the plant is stable.
* Delete instructor stationed @ P678 - NRC will orovide P678 cue .
JPM531    Editorial
* Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions.         Changed as requested.
* Add 8.3.2.3 to the initial conditions .
* Add 8.3.2.3 to the initial conditions .
* Put a copy of 9000.01 in examinee binders Changed as requested. . Put a copy of the blank data sheet in the examlnee binders
JPM534    Editorial
* Chanae Estimated Comoletion Time from 1 O to 20 minutes .
                              .* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The Incorporated all 6 changes as requested. plant is in Mode 1 ")
* Chanae Estimated Comoletion Time from 1Oto 20 minutes.
Changed as requested .
Incorporated all 6 changes as requested .
JPM537    Editorial
* Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
* Fix typo -8.1.1.3 should be 8.1.2.3 .
* Fix typo - 8.1 .1.3 should be 8.1.2.3 .
* Add the following_ to the cue for step 8.1.1.3 -When examinee reoorts that ------.. -****-1B2f.F022B closed fully after the test pushbutton was released, acknowledge -*-the report and state, "Take appropriate action for the valve closure".
* Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that     -*- ----- -..-****-
-                                  1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
* Step 8.2.5.2 -Standard -Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue" Clinton.Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial JPM423 Editorial JPM532 Editorial JPM535 Un sat JPM536 Editorial JPM538 Editorial JPM244 Editorial JPM451 Editorial Scenario 1 Editorial ::;cenano 1 *---eai!Orlal Scenario 1 Editorial Scenario 1 Editorial ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment . Step 8.3. 1 .1 #1 on page 8 -change the standard to read "Examinee enters "Open and/or On" in the Original Condition field of CPS 3512.01 F002".
* Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"
* Step 8.3.1.1 #2 on page 8-change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01 F002". . Add 'Today's date is 11/27/14" to the initial conditions block. . JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
 
* Change the first sentence of the initial conditions block to read, "The plant was operating at rated thermal power with no out of service equipment."
ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station                                                                                                               Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item#     UnSat/Editorial                             Chief Examiner Comment                                                   Facilit Action/Res onse JPM423      Editorial        . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters         Changed as requested .
                                  "Open and/or On" in the Original Condition field of CPS 3512.01F002".
* Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".
JPM532      Editorial              Add 'Today's date is 11/27/14" to the initial conditions block.                   Changed as requested .
JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)
JPM535      Unsat
* Change the first sentence of the initial conditions block to read, "The plant was   Changed as requested .
operating at rated thermal power with no out of service equipment."
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
* Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
* Change the first bulleted item in the Initiating cue block to read, ''Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
* JPM step 1 standard -Add ITS 3.6.1.3 A.1 and A.2 to the list.
* JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
* Terminating Cues -Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem". Steo 4 Standard -add Channel 3 to the end of the first bulleted line. Step 1 Standard -soecilv reauirements for ITS 3.6.1.3 Action A.1 and A.2
* Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".
* Step 8.5.8.3 Standard -change the standard to read, "Simulates placing the Main Control Switch in MANUAL 1 and/or Manual 2. . Step 8.2.2 Cue -Add a cue that flow noise can be heard if requested by the examinee.
JPM536      Editorial        Steo 4 Standard - add Channel 3 to the end of the first bulleted line.                 Chanaed as requested.
* Add alarms that are expected to be In to the initial conditions block.
JPM538      Editorial        Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2             Chanaed as requested.
* Step 8.4.6.1 -Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed. Event 4 TDRFP 'A' High Bearing Temperature -the MDRFP. is started per section 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but the scenario quide onlv references section 6.1.3. -cFC'ommen! -sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 to add realism. Event Triggers and Role Play -Event #4 -add EO cue (ii directed to raise cooling water flow\ -"Flow Is hiah in the band". Date Received: 2/13115 Facilit Action/Res onse Changed as requested . Changed as requested . Changed as requested . Chanaed as requested. Chanaed as requested. Changed as requested. Changed as requested. <Cil-* . ... .. ... Added CPS 3103.01 section 8.1.6 to the ATC actions block. NO reas16ie way lo ao llils=lefl as 1s. Added computer points to the simulator lesson plan to cause them to ramp up -30&deg;F over 1 O minutes. Added EO cue #6 to event 4 Clinton Power Station ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# I UnSat/Editorial I Scenario 1 Editorial Scenario 1 Editorial Scenario 1 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 2 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 3 Editorial Scenario 1, Editorial 2, and 3 *-... ILT 14-1 NRC Exam Submittal Comments Chief Examiner Comment Event Triggers and Role Play -Event #4 -add EO cue (if directed to check TDRFP bearina bubbler flow) -"Bubbler flow is normal." Event Triggers and Role Play -Event #8 -add cue from field concerning local gas boundary inspections. Event Triggers and Role Play -Event #4 -add EO cue to report no abnormalities if requested to check TDAFP 'A' room conditions on the camera. Event 7/8-the actions required to perform "Terminate and prevent LPCS and LPCI injection" are not detailed in the scenario guide. Event 7/8 -the crew may "Anticipate Blowdown" but those actions are not listed in the scenario guide. The critical tasks listing on page 4 of the scenario guide needs to be revised to reflect that EOP-6 does not require a blowdown on high Containment Pressure unless contain.ment pressure cannot be below Fig. N. Event 6 -the actions to terminate HPCS injection are reversed from those contained on the hard card. Event 4 -need to add rising trend to the CAD temperature reported from the area operator. Event 6 -Validation crew swapped the running SPE blowers; those actions are not listed in the Annlicant's Actions or Behavior block of the scenario auide. Event 8 -Validation crew entered ITS 3.4.5 RA B.1 but the ITS reference is not listed in the scenario auide. The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig. Chanae the reported pressure to 1510 psig. Event B -Add SRO action to direct RR Loop emergency isolation Add MCA Baseline data to PPG 10 in the simulator setup instructions. -.. -. Date Received: 2/13/15 Facility Action/Response Added EO cue #7 to event 4 Added EO cue #3 to event 8. Added EO cue #8 to event 4. Added actions required to Terminate and Prevent LPCS and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide. Added "Anticipate Slowdown" to the ATC and SAO actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown. Revised critical task listing PC-7.1 to state, 'Within 10 minutes of exceeding Figure N and containment pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\ Swapped actions to shut 1 E22-F004 and Stop the HPCS oumo in the BOP actions block of event #6. Added trend information to event 4 EO cue 1a. Added open bullet action to the Event 6 BOP actions block. Added ITS 3.4.5 to the SRO Actions block for event 8. Changed all instances of 1540 psig to 1510 psig. Added to ATC & SRO actions for event #8. Added to the Simulator Operator Initial Setup instructions. *-}}
JPM244      Editorial
* Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e        Changed as requested.
                              . Main Control Switch in MANUAL 1 and/or Manual 2.
Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.
JPM451      Editorial
* Add alarms that are expected to be In to the initial conditions block.              Changed as requested.
* Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
                                                                                                              *.~        <Cil-*
                                                                                                                                      .... ... *.~..r::
                                                                                                                                                        "~**''"*              ..
                                                                                                                                                                *.~.*:~~,M:~~ ~
Scenario 1        Editorial  Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section        Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but           block.
the scenario quide onlv references section 6.1.3.
::;cenano 1  *---eai!Orlal  -cFC'ommen! - sFiOUTd we cna:riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~              NO reas16ie way lo ao llils=lefl as 1s.
Scenario 1        Editorial  Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7       Added computer points to the simulator lesson plan to to add realism.                                                                       cause them to ramp up - 30&deg;F over 1Ominutes.
Scenario 1        Editorial  Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling     Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".
 
ILT 14-1 NRC Exam Submittal Comments Clinton Power Station                                                                                                                  Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item#     I UnSat/Editorial I                           Chief Examiner Comment                                                Facility Action/Response Scenario 1       Editorial       Event Triggers and Role Play - Event #4 - add EO cue (if directed to check         Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."
Scenario 1      Editorial      Event Triggers and Role Play - Event #8 - add cue from field concerning local gas   Added EO cue #3 to event 8.
boundary inspections.
Scenario 1      Editorial      Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.
requested to check TDAFP 'A' room conditions on the camera.
Scenario 2      Editorial      Event 7/8- the actions required to perform "Terminate and prevent LPCS and         Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide.                             and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.
Scenario 2      Editorial      Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide.                                                                 actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.
Scenario 2      Editorial      The critical tasks listing on page 4 of the scenario guide needs to be revised to   Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure         minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N.                        pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\
Scenario 2      Editorial        Event 6 - the actions to terminate HPCS injection are reversed from those         Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card.                                                         oumo in the BOP actions block of event #6.
Scenario 2      Editorial        Event 4 - need to add rising trend to the CAD temperature reported from the area   Added trend information to event 4 EO cue 1a.
operator.
Scenario 3      Editorial        Event 6 - Validation crew swapped the running SPE blowers; those actions are not   Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide.         block.
Scenario 3      Editorial        Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not   Added ITS 3.4.5 to the SRO Actions block for event 8.
listed in the scenario auide.
Scenario 3      Editorial      The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.
scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.
Chanae the reported pressure to 1510 psig.
Scenario 3      Editorial        Event B - Add SRO action to direct RR Loop emergency isolation                     Added to ATC & SRO actions for event #8.
Scenario 1,      Editorial        Add MCA Baseline data to PPG 10 in the simulator setup instructions.               Added to the Simulator Operator Initial Setup 2, and 3                                                                                                            instructions.
            *-             .. .                               -           ..                   -.                                                                 *-}}

Latest revision as of 07:48, 5 February 2020

2015 Clinton Power Station Initial License Examination Submittal Comments
ML15314A105
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/10/2015
From:
Division of Reactor Safety III
To:
Zoia, C D
Shared Package
ML15124A054 List:
References
Download: ML15314A105 (3)


Text

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Qperatina Test JPM417 Editorial Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested .

JPM418 Editorial

  • Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch

. scope back off.

Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.

JPM429 Editorial

  • General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

  • Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

  • Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.

JPM247 Editorial

  • Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

  • Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

JPM501 Editorial

  • Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

  • Add remaining TCVs (2, 3, 4) to JPM.
  • Add cues that the plant is stable.
  • Delete instructor stationed @ P678 - NRC will orovide P678 cue .

JPM531 Editorial

  • Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
  • Add 8.3.2.3 to the initial conditions .

JPM534 Editorial

.* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders

  • Chanae Estimated Comoletion Time from 1Oto 20 minutes.

Changed as requested .

Incorporated all 6 changes as requested .

JPM537 Editorial

  • Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
  • Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
  • Fix typo - 8.1 .1.3 should be 8.1.2.3 .
  • Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that -*- ----- -..-****-

- 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

  • On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
  • Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial Chief Examiner Comment Facilit Action/Res onse JPM423 Editorial . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters Changed as requested .

"Open and/or On" in the Original Condition field of CPS 3512.01F002".

  • Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".

JPM532 Editorial Add 'Today's date is 11/27/14" to the initial conditions block. Changed as requested .

JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

JPM535 Unsat

  • Change the first sentence of the initial conditions block to read, "The plant was Changed as requested .

operating at rated thermal power with no out of service equipment."

  • Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
  • Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
  • JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
  • Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

JPM536 Editorial Steo 4 Standard - add Channel 3 to the end of the first bulleted line. Chanaed as requested.

JPM538 Editorial Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2 Chanaed as requested.

JPM244 Editorial

  • Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e Changed as requested.

. Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

JPM451 Editorial

  • Add alarms that are expected to be In to the initial conditions block. Changed as requested.
  • Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
  • .~ <Cil-*

.... ... *.~..r::

"~**"* ..

  • .~.*:~~,M:~~ ~

Scenario 1 Editorial Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but block.

the scenario quide onlv references section 6.1.3.

cenano 1 *---eai!Orlal -cFC'ommen! - sFiOUTd we cna
riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~ NO reas16ie way lo ao llils=lefl as 1s.

Scenario 1 Editorial Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 Added computer points to the simulator lesson plan to to add realism. cause them to ramp up - 30°F over 1Ominutes.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (if directed to check Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Scenario 1 Editorial Event Triggers and Role Play - Event #8 - add cue from field concerning local gas Added EO cue #3 to event 8.

boundary inspections.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.

requested to check TDAFP 'A' room conditions on the camera.

Scenario 2 Editorial Event 7/8- the actions required to perform "Terminate and prevent LPCS and Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide. and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Scenario 2 Editorial Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide. actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Scenario 2 Editorial The critical tasks listing on page 4 of the scenario guide needs to be revised to Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N. pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\

Scenario 2 Editorial Event 6 - the actions to terminate HPCS injection are reversed from those Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card. oumo in the BOP actions block of event #6.

Scenario 2 Editorial Event 4 - need to add rising trend to the CAD temperature reported from the area Added trend information to event 4 EO cue 1a.

operator.

Scenario 3 Editorial Event 6 - Validation crew swapped the running SPE blowers; those actions are not Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide. block.

Scenario 3 Editorial Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not Added ITS 3.4.5 to the SRO Actions block for event 8.

listed in the scenario auide.

Scenario 3 Editorial The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.

scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Scenario 3 Editorial Event B - Add SRO action to direct RR Loop emergency isolation Added to ATC & SRO actions for event #8.

Scenario 1, Editorial Add MCA Baseline data to PPG 10 in the simulator setup instructions. Added to the Simulator Operator Initial Setup 2, and 3 instructions.

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3116/15 Operating Test 2015-301 I Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Qperatina Test JPM417 Editorial Chanoe estimated comoletion time from 15 minutes to 35 minutes. Chanoed as requested .

JPM418 Editorial

  • Add action to simulator setup instructions to turn the synch scope on, verify Changed as requested.

clockwise rotation and adjust DG speed if necessary, and then turn the synch

. scope back off.

Step 8.2.12.6 - add comment that JPM can be terminated when VARS are within ranae (500- 0 KVAR\ and aenerator load is beina raised.

JPM429 Editorial

  • General note - add steps for evaluator to annotate performance of the A and Changed as requested.

B FCVs.

  • Step 8.4.2.2. - add cue "If examinee requests to use "double detent,

authorize use.

  • Add a comment to step 8.4.2.2. to discuss the amount of FCV movement that is reauired to meet the th reshold of a minor reactivitv manaoement event.

JPM247 Editorial

  • Typo on page 7 - step 4.1 - standard third bullet - remove the word "is" in Changed as requested.

front of MIA.

  • Step 5.8 - add to the cue - If the operator sends an EO to the RCIC Room, cue him/her that there are no abnormalities in the room and that the RCIC Turbine is rotatina slowlv.

JPM501 Editorial

  • Move Simulator Setup action #2 to after action to just before action 7 (Freeze Changed as requested.

the simulator)

  • Add remaining TCVs (2, 3, 4) to JPM.
  • Add cues that the plant is stable.
  • Delete instructor stationed @ P678 - NRC will orovide P678 cue .

JPM531 Editorial

  • Add the first 3 steps (FC031A, 19A & 21A) to the initial conditions. Changed as requested.
  • Add 8.3.2.3 to the initial conditions .

JPM534 Editorial

.* Put a copy of 9000.01 in examinee binders Put a copy of the blank data sheet in the examlnee binders

  • Chanae Estimated Comoletion Time from 1Oto 20 minutes.

Changed as requested .

Incorporated all 6 changes as requested .

JPM537 Editorial

  • Remove second sentence from INITIAL CONDITIONS (leaving ONLY, "The plant is in Mode 1")
  • Remove the following words from the INITIATING CUE, "for MSIVs 1621-F022A and 1B21-F022B".
  • Fix typo - 8.1 .1.3 should be 8.1.2.3 .
  • Add the following_ to the cue for step 8.1 .1.3 - When examinee reoorts that -*- ----- -..-****-

- 1B2f.F022B closed fully after the test pushbutton was released, acknowledge the report and state, "Take appropriate action for the valve closure".

  • On the marked up copy of CPS 9031.10, delete the N/A'ed steps .
  • Step 8.2.5.2 - Standard - Change to read, "No action required. Permission received in the steo 8.2.5.1 Time Comoression cue"

ILT 14-1 NRC Exam Submittal Comments Clinton.Power Station Date Received: 2/13115 ILT Class 14-1 Exam Date 3/16/15 Operating Test 2015-301 Item# UnSat/Editorial Chief Examiner Comment Facilit Action/Res onse JPM423 Editorial . Step 8.3. 1.1 #1 on page 8 - change the standard to read "Examinee enters Changed as requested .

"Open and/or On" in the Original Condition field of CPS 3512.01F002".

  • Step 8.3.1 .1 #2 on page 8- change the standard to read "Examinee enters "Not Ooen and/or Off" in the Original Condition field of CPS 3512.01F002".

JPM532 Editorial Add 'Today's date is 11/27/14" to the initial conditions block. Changed as requested .

JPM Stec 3 Cue -Add "if requested, provide RWP (Attachment 1)

JPM535 Unsat

  • Change the first sentence of the initial conditions block to read, "The plant was Changed as requested .

operating at rated thermal power with no out of service equipment."

  • Delete the 200 sentence in the Initial Conditions block (NO LCOs are in effect.)
  • Change the first bulleted item in the Initiating cue block to read, Technical Specification actions are required to be entered, and if the event is reportable, the reportability requirements. Delete the second bulleted line.
  • JPM step 1 standard - Add ITS 3.6.1.3 A.1 and A.2 to the list.
  • Terminating Cues - Change the terminating cue to read, "Examinee has evaluated ITS and determined reponlng requirements for inoperablllty of the High Pressure Core Sorav (HPCSl Svstem".

JPM536 Editorial Steo 4 Standard - add Channel 3 to the end of the first bulleted line. Chanaed as requested.

JPM538 Editorial Step 1 Standard - soecilv reauirements for ITS 3.6.1 .3 Action A.1 and A.2 Chanaed as requested.

JPM244 Editorial

  • Step 8.5.8.3 Standard - change the standard to read, "Simulates placing th e Changed as requested.

. Main Control Switch in MANUAL 1 and/or Manual 2.

Step 8.2.2 Cue - Add a cue that flow noise can be heard if requested by the examinee.

JPM451 Editorial

  • Add alarms that are expected to be In to the initial conditions block. Changed as requested.
  • Step 8.4.6. 1 - Add a cue that describes what alarms are in and if they are expected to reset when steo 8.4.6.1 is performed.
  • .~ <Cil-*

.... ... *.~..r::

"~**"* ..

  • .~.*:~~,M:~~ ~

Scenario 1 Editorial Event 4 TDRFP 'A' High Bearing Temperature - the MDRFP. is started per section Added CPS 3103.01 section 8.1.6 to the ATC actions 8.1.3 MDRFP Startup and section 8.1.6 Transition from a TORFP to a MDRFP but block.

the scenario quide onlv references section 6.1.3.

cenano 1 *---eai!Orlal -cFC'ommen! - sFiOUTd we cna
riae lo soeea i.JDCfiTeT6 lransler lo l'VJ[J~ NO reas16ie way lo ao llils=lefl as 1s.

Scenario 1 Editorial Alter computer points CW-BA027, 28, and 29 to simulator lesson plan for event #7 Added computer points to the simulator lesson plan to to add realism. cause them to ramp up - 30°F over 1Ominutes.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (ii directed to raise cooling Added EO cue #6 to event 4 water flow\ - "Flow Is hiah in the band".

ILT 14-1 NRC Exam Submittal Comments Clinton Power Station Date Received: 2/13/15 ILT Class 14-1 Exam Date 3/16/1 5 Operating Test 2015-301 Item# I UnSat/Editorial I Chief Examiner Comment Facility Action/Response Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue (if directed to check Added EO cue #7 to event 4 TDRFP bearina bubbler flow) - "Bubbler flow is normal."

Scenario 1 Editorial Event Triggers and Role Play - Event #8 - add cue from field concerning local gas Added EO cue #3 to event 8.

boundary inspections.

Scenario 1 Editorial Event Triggers and Role Play - Event #4 - add EO cue to report no abnormalities if Added EO cue #8 to event 4.

requested to check TDAFP 'A' room conditions on the camera.

Scenario 2 Editorial Event 7/8- the actions required to perform "Terminate and prevent LPCS and Added actions required to Terminate and Prevent LPCS LPCI injection" are not detailed in the scenario guide. and LPCI injection to the BOP Actions for Event 7/8 in the Scenario 2 sim auide.

Scenario 2 Editorial Event 7/8 - the crew may "Anticipate Blowdown" but those actions are not listed in Added "Anticipate Slowdown" to the ATC and SAO the scenario guide. actions block for events 7/8. Modified the PC-7.1 critical task listing in the scenario outline to indicate that a blowdown is not required if containment pressure can be lowered below EOP*6 Figure N after anticipating blowdown.

Scenario 2 Editorial The critical tasks listing on page 4 of the scenario guide needs to be revised to Revised critical task listing PC-7.1 to state, 'W ithin 10 reflect that EOP-6 does not require a blowdown on high Containment Pressure minutes of exceeding Figure N and containment unless contain.ment pressure cannot be low~red below Fig. N. pressure continuing to rise, the SAO will enter EOP*3 Emergency RPV Depressurization. If the crew Anticipates Slowdown using bypass valves, and in doing so Containment Pressure can be reduced I maintained below Fig. N, then this critical task is considered to be met. IPAA\

Scenario 2 Editorial Event 6 - the actions to terminate HPCS injection are reversed from those Swapped actions to shut 1E22-F004 and Stop the HPCS contained on the hard card. oumo in the BOP actions block of event #6.

Scenario 2 Editorial Event 4 - need to add rising trend to the CAD temperature reported from the area Added trend information to event 4 EO cue 1a.

operator.

Scenario 3 Editorial Event 6 - Validation crew swapped the running SPE blowers; those actions are not Added open bullet action to the Event 6 BOP actions listed in the Annlicant's Actions or Behavior block of the scenario auide. block.

Scenario 3 Editorial Event 8 - Validation c rew entered ITS 3.4.5 RA B.1 but the ITS reference is not Added ITS 3.4.5 to the SRO Actions block for event 8.

listed in the scenario auide.

Scenario 3 Editorial The ITS 3.1.5 pressure limit value for accumulator pressure is <: 1520 psig. In the Changed all instances of 1540 psig to 1510 psig.

scenario guide for Event #7, the accumulator pressure is reported to be 1540 psig.

Chanae the reported pressure to 1510 psig.

Scenario 3 Editorial Event B - Add SRO action to direct RR Loop emergency isolation Added to ATC & SRO actions for event #8.