ML15313A061

From kanterella
Jump to navigation Jump to search
2015 Clinton Power Station Initial License Examination Form ES-201-1
ML15313A061
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/06/2015
From:
Division of Reactor Safety III
To:
Zoia, C D
Shared Package
ML15124A054 List:
References
Download: ML15313A061 (1)


Text

~~020f9-s1ml -final-forms-ms doc Form ES-201-1 Facility: CL1A1/0A/

Date of Examination: ffa.v1-h Written - Facility ~

NRC D Operating - Facility 'R:J' NRC D ao1<

Developed by:

II Target Chief Date*

Task Description (Reference)

Examiner's Initials

-180

1.

Examination administration date confirmed (C.1.a; C.2.a and b) 6~

-120

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

.{!>(/

-120

3.

Facility contact briefed on security and other requirements (C.2.c)

(jf>

-120

4.

Corporate notification letter sent (C.2.d)

(J,f/

[-90]

(5.

Reference material due (C.1.e; C.3.c; Attachment 3))

11/}

{-75}

6.

Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, {!;f ES-301-1, ES-301-2. ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70}

{7.

Examination outline(s) reviewed by NRC and feedback provided to facility

~

licensee (C.2.h; C.3.e)}

{-45}

8.

Proposed examinations (including written, walk-through JPMs, and Jr scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201 -3 updates}, and reference materials due (C.1.e, f, g and h; C.3.d)

-30

9.

Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g; t>/'

ES-202)

-14

10.

Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i; !!/

ES-202)

-14

11.

Examination approved by NRC supervisor for facility licensee review

~

(C.2.h; C.3.f)

-14

12.

Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) 6~

-7

13.

Written examinations and operating tests approved by NRC supervisor (3(

(C.2.i; C.3.h)

-7

14.

Final applications reviewed; 1 or 2 (if >10) applications audited to confirm 6f qualifications I eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7

15.

Proctoring/written exam administration guidelines reviewed (Y

with facility licensee (C.3.k)

-7

16.

Approved scenarios, job performance measures, and questions 6f/

distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only) {Does not apply} to examinations prepared by the NRC.

~~020f9-s1ml -final-forms-ms doc Form ES-201-1 Facility: CL1A1/0A/

Date of Examination: ffa.v1-h Written - Facility ~

NRC D Operating - Facility 'R:J' NRC D ao1<

Developed by:

II Target Chief Date*

Task Description (Reference)

Examiner's Initials

-180

1.

Examination administration date confirmed (C.1.a; C.2.a and b) 6~

-120

2.

NRC examiners and facility contact assigned (C.1.d; C.2.e)

.{!>(/

-120

3.

Facility contact briefed on security and other requirements (C.2.c)

(jf>

-120

4.

Corporate notification letter sent (C.2.d)

(J,f/

[-90]

(5.

Reference material due (C.1.e; C.3.c; Attachment 3))

11/}

{-75}

6.

Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, {!;f ES-301-1, ES-301-2. ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70}

{7.

Examination outline(s) reviewed by NRC and feedback provided to facility

~

licensee (C.2.h; C.3.e)}

{-45}

8.

Proposed examinations (including written, walk-through JPMs, and Jr scenarios, as applicable), supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form ES-201 -3 updates}, and reference materials due (C.1.e, f, g and h; C.3.d)

-30

9.

Preliminary license applications (NRC Form 398's) due (C.1.1; C.2.g; t>/'

ES-202)

-14

10.

Final license applications due and Form ES-201-4 prepared (C.1.1; C.2.i; !!/

ES-202)

-14

11.

Examination approved by NRC supervisor for facility licensee review

~

(C.2.h; C.3.f)

-14

12.

Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) 6~

-7

13.

Written examinations and operating tests approved by NRC supervisor (3(

(C.2.i; C.3.h)

-7

14.

Final applications reviewed; 1 or 2 (if >10) applications audited to confirm 6f qualifications I eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7

15.

Proctoring/written exam administration guidelines reviewed (Y

with facility licensee (C.3.k)

-7

16.

Approved scenarios, job performance measures, and questions 6f/

distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only) {Does not apply} to examinations prepared by the NRC.