| number = ML17037C324
| number = ML17037C324
| issue date = 09/06/1973
| issue date = 09/06/1973
| title = Nine Mile Point Unit 1 - Letter Responding to the July 5, 1973 Letter Requesting Comment on the AEC Draft Environmental Statement Relating to the Conversion of the Current Provisional Operating License to a Full-Term License
| title = Letter Responding to the July 5, 1973 Letter Requesting Comment on the AEC Draft Environmental Statement Relating to the Conversion of the Current Provisional Operating License to a Full-Term License
| author name = Phillips T A
| author name = Phillips T
| author affiliation = US Federal Power Commission
| author affiliation = US Federal Power Commission
| addressee name = Muller D R
| addressee name = Muller D
| addressee affiliation = US Atomic Energy Commission (AEC)
| addressee affiliation = US Atomic Energy Commission (AEC)
| docket = 05000220
| docket = 05000220
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:~rt AEC DIS XBUTION FOR PART 50 DOCKET MA"XAL (TEt 1PORARY FORM)CONTROL NO: 6874 FILE: ENVIRO FROM: Federal Power Commission ,Washington, D.C.20426 T.A.Phillips DATE OF DOC 9-6-73 DATE REC'D 9-11-73 MMO OTHER TO: CLASS UNCLASS XXX D.R.Muller PROP INFO ORIG 1 signed'NPUT CC OTHER NO C S REC'D SENT AEC PDR SENT LOCAL PDR X DOCKET NO: 50-220 DESCRXPTION:
{{#Wiki_filter:AEC DIS XBUTION FOR PART 50 DOCKET MA           "XAL
Ltr furnishing comments on DES...r ENCLOSURES:
      ~        rt                                (TEt 1PORARY FORM)                           CONTROL NO:   6874 FILE:   ENVIRO FROM:                                     DATE OF DOC        DATE REC'D              MMO              OTHER Federal Power Commission
r ACKNOWLEDGED ONOT PE>>~E Nine Mile Point Unit 8'FOR ACTION/INFORMATION 9-11-73 fod BUTLER(L)W/Copies CLARK(L)W/Copies GOLLER(L)W/Copies KNIEL(L)W/Copies SCI1WENCER(L)
    ,Washington, D. C.         20426               9-6-73           9-11-73 T. A. Phillips TO:                                           ORIG            CC    OTHER            SENT AEC PDR D. R. Muller                   1  signed                                  SENT LOCAL PDR      X CLASS        UNCLASS        PROP INFO         'NPUT           NO C S REC'D             DOCKET NO:
W/Copies STOLZ(L)W/Copies VASSALLO(L)
XXX                                                                50-220 DESCRXPTION:                                                  ENCLOSURES:
W/Copies SCHEMEL(L)
Ltr furnishing       comments on DES...
W/Copies NIEMANN (L)W/1 Copies DICKER(E)W/Copies KNIGHTON(E)
r r
" W/Copies YOUNGBLOOD(E)
ACKNOWLEDGED ONOT       PE>>~E Nine Mile Point Unit 8' FOR ACTION/INFORMATION             9-11-73     fod BUTLER(L)             SCI1WENCER(L)        NIEMANN(L)            ~GAN(E)
W/Copies~GAN(E)W/4 Copies W/Copies W/Copies W/Copies INTERNAL DISTRIBUTION
W/ Copies               W/   Copies             W/1 Copies             W/4 Copies CLARK(L)               STOLZ(L)               DICKER(E)
~G FXLE C P OGC, ROOM P-506A~TZING/STAFF CASE GIAMBUSSO BOYD MOORE (L)(BWR)DEYOUNG(L)(PWR)~KOVHOLT (L)P.COLLINS REG.OPR~ILE&REGION(3)MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS~BENAROYA VOLTE R DEN TON GRIMES GAK1ILL KASTNER~LLARD SPANGLER ENVLRO MULLER~DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR DITTMAN ESS LIC ASST HIGGS (L)GEARIN (L)GOULBOURNE (L)LEE (L)MAIGRET (L)SERVICE (L)SHEPPARD (E)SMITH (L)TEETS (L)WADE (E)WILLIAMS (E)WILSON (L)~AT LND BRAI'OMAN SALTZMAN PLANS MODONALD DUBE INFO C.MILES-LOCAL PDR Oswe o N.Y.-DTIE(ABERNATHY) 1"-NSIC(BUCHANAN) 1-ASLB(YORE/SAYRE/
W/ Copies               W/ Copies               W/ Copies               W/   Copies GOLLER(L)              VASSALLO(L)            KNIGHTON(E)     "
WOODARD/"H" ST.16-CYS ACRS HOLDING r t A EXTERNAL DISTRIBUTION
W/ Copies               W/ Copies              W/ Copies              W/   Copies KNIEL(L)                SCHEMEL(L)              YOUNGBLOOD(E)
~(1)M@83)-NATIONAL LAB'~N~1-R.Schoonmaker,OC,GT,D-323
W/ Copies               W/ Copies               W/   Copies           W/   Copies INTERNAL DISTRIBUTION
'1-R.CATLXN, E-256-GT 1-CONSULTANT'S NEWMARK/BLUME/AGBABIAN 1-GERALD ULRXKSON.~~OIQK~l-Pennington 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE BROOKHAVEN NAT.LAB 1-AGMED(WALTER KOESTER HM-C-427-GT 1-RD MULLER..F-309 GT pc'l>>" (>tt(>>gpFI l y4,',l~',.~C,<,p II<~(li>, f q,',tgi4 g.S'g~)g g if I''fh I''I'lt II Ol ERAL POWER COMMISSION WASHINGTON, D.C.20426 IN REPLY REFER TOI 50-220 Mr.Daniel R.Muller Assistant Director for Environmental Projects Direct'orate of Licensing U.S.Atomic Energy Commission Hashington, D.C.20545~EF'XZ)973~
  ~G         FXLE               TECH REVIEW        DENTON LIC ASST
)(np 6)gg
                                                                                                  ~AT LND C P                     HENDRIE            GRIMES                                        BRAI'OMAN OGC, ROOM       P-506A     SCHROEDER          GAK1ILL          HIGGS (L)                  SALTZMAN
~TZING/STAFF                   MACCARY              KASTNER            GEARIN (L)
CASE                        KNIGHT            ~LLARD              GOULBOURNE    (L)         PLANS GIAMBUSSO                  PAWLICKI            SPANGLER          LEE (L)                   MODONALD BOYD                        SHAO                                  MAIGRET  (L)             DUBE MOORE      (L) (BWR)       STELLO             ENVLRO             SERVICE  (L)
DEYOUNG(L) (PWR)           HOUSTON            MULLER          SHEPPARD (E)               INFO
  ~KOVHOLT (L)                 NOVAK            ~  DICKER            SMITH   (L)               C. MILES P. COLLINS                ROSS                KNIGHTON          TEETS   (L)
IPPOLITO            YOUNGBLOOD        WADE (E)
REG. OPR                  TEDESCO              REGAN              WILLIAMS (E)
~ILE & REGION(3)                LONG            PROJECT DITTMAN LDR    WILSON   (L)
MORRIS                      LAINAS STEELE                  ~BENAROYA                    ESS VOLTE R EXTERNAL DISTRIBUTION
        -   LOCAL PDR Oswe o       N. Y.
1 "-
        -   DTIE(ABERNATHY)
NSIC(BUCHANAN)
                                            ~ (1) M@83)-NATIONAL       LAB'~N~
1-R.Schoonmaker,OC,GT,D-323 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE 1   -   ASLB(YORE/SAYRE/                             '1-R. CATLXN, E-256-GT              BROOKHAVEN NAT. LAB WOODARD/ "H" ST.                              1-CONSULTANT'S                        1-AGMED(WALTER KOESTER 16    -    CYS ACRS HOLDING                                NEWMARK/BLUME/AGBABIAN                HM-C-427-GT t
r A
1-GERALD ULRXKSON. ~ ~ OIQK          1-RD   MULLER..F-309 GT
                                                      ~l-Pennington


==Dear Mr.Muller:==
                                            " (>              tt(>>gp FI  l y4, pc 'l>>
This is in response to your letter dated July 5, 1973, requesting comment on the AEC Draft Environmental Statement relating to the conversion of the current provisional operating license to a full~term license to the Niagara Mohawk Power Corporation for the Nine Mile Point Nuclear Station Unit 1 (Docket No.50-220).The following comments are made in compliance with the National Environmental Policy Act of 1969, and the April 23, 1971, Guidelines of the Council on Environmental Quality, and review the need for the capacity of the 610-megawatt Nine Mile Point Nuclear Unit 1 with regard to the adequacy and reliability of the affected electric power systems and related matters.In preparation of these comments, the Federal Power Commission's Bureau of Power staff has considered the AEC Draft Environmental State-ment;the Applicant's Environmental Report and Supplements thereto;related reports made in response to the CommissionIs Statement of Policy on Reliability and Adequacy of Electric Service (Docket No.R-362);and the staff's analysis of these documents togetherwith related information from other FPC reports.The staff generally bases its evaluation of the need for a specific bulk power facility upon long-term considerations as well as upon the load-supply situation for the peak load period immediately following the availability of the facility.It should be noted that the useful life of the Nine Mile Point unzt is expected to be 30 years or more.During that period the unit will make a significant contribution to the adequacy of power supply in the Applicant's service area.The Nine Mile Point Nuclear Unit 1 has been in commercial operation since December 1969.During the period from December 1969 to December 31, 1971, the unit produced 4,858 billion kilowatt-hours of electric energy, and during 1972 the unit produced an additional 3,242 billion kilowatt-hours.
                                                                                  ',l~',
uQ GQV 033 2~AC 1 i"-:;3"-'i se ni~awl.-&R I' Mr.Daniel R.Muller The Applicant is a member of the New York Power Pool (NYPP), which coordinates the operation of members'ulk power systems whose combined service areas serve the entire State of New York.The Applicant is also a member of the Northeast Power Coordinating Council (NPCC), which coordinates the planning of the members'enerating and transmission facilities in the area which includes the State of New York, New England and th'e provinces of New Brunswick and Ontario.NPCC has established a reliabilzty criterion equivalent to a loss of load probability of one day'n ten years.Members'of the NYPP have agreed that to maintain this standard, each memb'er system w'ill maintain installed capacity at least equal to that required to meet an 18 percent reserve during its most recent annual peak load.The Bureau of Power'taff has analyzed, the effect o'f the capacity of Nine Mile Point No.1 onthe winter-peaking Applicant's system for the 1973-1974 Winter Peak Period and the summer-peaking NYPP for the 1974 Summer Peak Period.The following tabulations show the effect of the Nine Mile Unit 1 on these systems.NIAGARA MOHAWK SYSTEM 1/1973-74 WINTER PEAK LOAD PERIOD With Unit 1 Without Unit 1 Total Owned Capability, Dec.31, 1972, MW Share of Roseton No.1, MW Share of Roseton No.2, MW Share of Fitzpatrick No.1, MW Share of Blenheim-Gilboa, MW Other Purchases Total Capability, MW Estimated Peak Load, MW Reserve MW Reserve,%of Peak Load 3 251 240 240 295 550 1 646 6,222 5 200 1,022 19.7 2,641 240 240 295 550 1 646 5,612 5 200 412 7.9 1/Niagara Mohawk Form 12 Report For 1972.
                                                                        . ~
H f I'll)ggy~II J<+$Jlt>ll i<(4*Ah$Jll.'):ir h9'<3!i ai.<~A t~V Mr.Daniel R.Muller NEW YORK POWER POOL 1974 SUMMER PEAK PERlOD 1/With Unit 1 Without Unit 1 f Total Capability
C,<,p II<~(
-.Megawatts Net Peak Load.-Megawatts Reserve Margin-Megawatts.',<<Reserve Margin-Percent of Pe'ak Load 27,671 225006 2/5,665 25.8 27,061 22,006 2/5,055 23.0 1/Data Source: NPCC Report 383-2 dated April 1, 1973.2/Coincident Peak Load of 21,930 megawatts increased by 76 MW as a result of transactions with systems outside NYPP.The Niagara Mohawk reserve of 19.7%with Nine Mile Point is within the range usually found satisfactory, but the bare numerical value is deceptive.
li >,
Of the 1,646 MW listed under"Other Purchases," 270 MW is supplied by.Rochester Gas&Electric Company, who in turn is relying on a purchase of 207 MW from Power Authority of the State of New York.However, Rochester Gas&Electric Company,'according to its 1972 Form 12 Report to the Federal Power Commission, will only have a 5.2%reserve at the time of its 1973-74 winter peak.Consequently, of the 1,022 megawatt reserve that Niagara Mohawk appears to have with Nine Mile Point No.1, 270 megawatts can, be considered of doubtful reliability.
f q,   ',tgi4    g. S' g~)g g if I''fh I I'l      t II
Without Nine Mile Point, Niagara Mohawk would have only a 7.9%reserve, more than half of which would be dependent on a purchase of doubtful reliability.
Xt is therefore essential for Niagara Mohawk's adequacy of service to have Nine Mile Point No.1 in operation at its full rated 610 megawatts.
The Applicant's system is integrated with all New York State systems through the NYPP and the summer-peaking pool indicates reserves of 25.8 percent of peak, load responsibility with the capacity of Unit 1 and 23.0 percent without the unit.During the week of the summer peaks in 1971 and 1972 the NYPP experienced unavailable capacity totalling 3,326 megawatts and 3,581 megawatts, respectively, due to scheduled maintenance, forced outages, delays in availability of new units and variation of hydro conditions from median values.Xf the average of the capacity losses experienced during the 1971 and 1972 summer peaks existed at the time of the 1974 summer peak, the reserves on the NYPP system would be reduced to 10.0 percent with Unit 1 and 7.3 percent without the unit.


Mr.Daniel R.Muller During the 1974 summer period, the availability of emergency power supplies from the neighboring NEPOOL 1/and PJM 2/pools may be limited by the needs of those systems to maintain planned reserve levels.The limited capacity of the intexconnections and the predominantly thermal systems of NEPOOL and PJM, which are subject to forced outages, fuel shortages and operating restrictions due to air quality limitations, indicate that little capacity reserve would be available from these areas.The winter-peaking Ontario Hydro system has indicated reserves after maintenance of 31.3 percent of peak load, totalling 3,490 mega-watts, and i,s considered the only available source of emergency power supply.The Nine Mile Point Unit 1 is completed and has been producing electric powex'ince 1969.In view of the substantial purchases of power necessary by the Applicant to meet its system demands, the Bureau of Power staff recommends that the full-tenn operating license be issued to the Applicant for this unit.Power purchases are an expedient for meeting electric system demands during construction of new units;however, purchases are not a satisfactory substitute for adequate base-load owned generation.
Ol                        ERAL POWER COMMISSION WASHINGTON, D.C. 20426 IN REPLY REFER TOI 50-220 Mr. Daniel R. Muller Assistant Director for                  ~EF'XZ)973~    )(  np      6  )gg Environmental Projects Direct'orate of Licensing U. S. Atomic Energy Commission Hashington, D. C. 20545
Regional reliability is greatly improved when each electric system has adequate installed generating capacity to meet its syst: em demands and provide reserve capacity.r The use of geothermal power as an alternative to the nuclear unit was not considered, according to the Draft Environmental Statement (page 9-1).In light of the fact that geo)ljermal sources are known to exist in New York and neighboring states,-a discussion of this alternate would be appropriate.
 
Hydroelectric power as a substitute for the Nine Mile Point Nuclear unit would be impractical and inadequate.
==Dear Mr. Muller:==
Although the total generating capacity that could be made available in New York by the addition of'enerators at existing hydro sites and the development of new sites is some 1,292 megawatts, 4/'his capacity would be scattered over a laxge number of sites.The total average annual energy available fxom all the sites;4/would be approximately equal to the annual energy obtainable.
 
1/New England Power Pool.2/Pennsylvania<<New Jersey-Maryland Interconnection.
This  is in  response  to your letter dated July 5, 1973, requesting comment on  the AEC  Draft Environmental Statement relating to the conversion of the current provisional operating license to a full~term license to the Niagara Mohawk Power Corporation for the Nine Mile Point Nuclear Station Unit 1 (Docket No. 50-220).
3/Thermal Springs of the United States and Other Countries of the world-A Summary.Geological Survey Professional Paper 492.U.S.Government Printing Office, 1965.4/Hydroelectric Power Resources of the United States, January 1, 1972.Federal Power Commission, FPC P-42.
The following comments are made in compliance with the National Environmental Policy Act of 1969, and the April 23, 1971, Guidelines of the Council on Environmental Quality, and review the need for the capacity of the 610-megawatt Nine Mile Point Nuclear Unit 1 with regard to the adequacy and reliability of the affected electric power systems and related matters.
I~ Mr.Daniel R.Muller from Nine Mile Point No.1.However, it is not considered
In preparation of these comments, the Federal Power Commission's Bureau of Power staff has considered the AEC Draft Environmental State-ment; the Applicant's Environmental Report and Supplements thereto; related reports made in response to the CommissionIs Statement of Policy on Reliability and Adequacy of Electric Service (Docket No. R-362); and the staff's analysis of these documents togetherwith related information from other FPC reports. The staff generally bases its evaluation of the need for a specific bulk power facility upon long-term considerations as well as upon the load-supply situation for the peak load period immediately following the availability of the facility.        It  should be noted that the useful life of the Nine Mile Point unzt is expected to be 30 years or more. During that period the unit will make a significant contribution to the adequacy of power supply in the Applicant's service area.
'feasible to develop a large number of small hydroelectric"sites due to environmental, considerations and public reaction.'he Bureau of Power staff considers that the Nine Mile Point Unit 1 is needed on the Applicant's system to meet the projected loads.,In view of the substantial power purchases required by Niagara Mohawk Power Corporation to'eet loads and the serious consequences of inadequate installed generating capacity, the staff considers it prudent that a full-term license be issued to the Applicant for the continued operation of the Nine Mile Nuclear Station Unit 1.Very truly yours, T A.hillip Chief, Bureau of Power  
The Nine Mile Point Nuclear Unit 1 has been in commercial operation since December 1969. During the period from December 1969 to December 31, 1971, the unit produced 4,858 billion kilowatt-hours of electric energy, and during 1972 the unit produced an additional 3,242 billion kilowatt-hours.
.Regulatory}}
 
uQ  GQV  033    2 ~AC 1
i "-:;3 "-'i se  ni~    awl.-
        &  R I'
 
Mr. Daniel R. Muller The  Applicant is    a member  of the  New York Power Pool (NYPP), which coordinates the operation of members'ulk power systems whose combined service areas serve the entire State of New York. The Applicant is also a member of the Northeast Power Coordinating Council (NPCC), which coordinates the planning of the members'enerating and transmission facilities in the area which includes the State of New York, New England and th'e provinces of New Brunswick and Ontario. NPCC has established a reliabilzty criterion equivalent to a loss of load probability of one day'n ten years. Members 'of the NYPP have agreed that to maintain this standard, each memb'er system w'ill maintain installed capacity at least equal to that required to meet an 18 percent reserve during its most recent annual peak load.
The Bureau  of Power'taff    has analyzed, the effect o'f the capacity of Nine Mile Point No. 1  on the winter-peaking Applicant's system for the 1973-1974 Winter Peak Period and the summer-peaking NYPP for the 1974 Summer Peak Period.      The following tabulations show the effect of the Nine Mile Unit 1 on these systems.
NIAGARA MOHAWK SYSTEM 1/
1973-74 WINTER PEAK LOAD PERIOD With Unit    1 Without Unit 1 Total  Owned  Capability,  Dec. 31, 1972,  MW            3 251          2,641 Share  of  Roseton No. 1,    MW                                240            240 Share  of  Roseton No. 2,    MW                                240            240 Share  of  Fitzpatrick  No. 1,  MW                          295            295 Share  of  Blenheim-Gilboa,    MW                              550            550 Other Purchases                                            1 646          1 646 Total Capability,    MW                                  6,222          5,612 Estimated Peak Load,    MW                                5 200          5 200 Reserve  MW                                              1,022            412 Reserve,  %  of Peak Load                                    19. 7            7.9 1/ Niagara  Mohawk Form 12 Report For 1972.
 
H f I'll) ggy  ~ IIJ<+$ Jlt>ll i<( 4*Ah$ Jll
    .'):ir    h9  '<  3!i ai.<~A t
~ V
 
Mr. Daniel R. Muller NEW YORK POWER POOL 1974 SUMMER PEAK PERlOD 1/
With Unit  1 Without Unit  1 f
Total Capability -. Megawatts                        27,671          27,061 Net Peak Load.- Megawatts                            225006  2/      22,006 2/
Reserve Margin - Megawatts .',<<                        5,665          5,055 Reserve Margin - Percent of Pe'ak Load                    25.8            23.0 1/ Data Source:    NPCC Report 383-2 dated April 1, 1973.
2/ Coincident  Peak Load of 21,930 megawatts increased by 76  MW as a result of transactions with systems outside  NYPP.
The Niagara Mohawk reserve of 19.7% with Nine Mile Point is within the range usually found satisfactory, but the bare numerical value is deceptive. Of the 1,646 MW listed under "Other Purchases," 270 MW is supplied by. Rochester Gas & Electric Company, who in turn is relying on a purchase of 207 MW from Power Authority of the State of New York.
However, Rochester Gas & Electric Company, 'according to its 1972 Form 12 Report to the Federal Power Commission, will only have a 5.2% reserve at the time of its 1973-74 winter peak. Consequently, of the 1,022 megawatt reserve that Niagara Mohawk appears to have with Nine Mile Point No. 1, 270 megawatts can, be considered of doubtful reliability. Without Nine Mile Point, Niagara Mohawk would have only a 7.9% reserve, more than half of which would be dependent on a purchase of doubtful reliability. Xt is therefore essential for Niagara Mohawk's adequacy of service to have Nine Mile Point No. 1 in operation at its full rated 610 megawatts.
The Applicant's system is integrated with all New York State systems through the NYPP and the summer-peaking pool indicates reserves of 25.8 percent of peak, load responsibility with the capacity of Unit 1 and 23.0 percent without the unit. During the week of the summer peaks in 1971 and 1972 the NYPP experienced unavailable capacity totalling 3,326 megawatts and 3,581 megawatts, respectively, due to scheduled maintenance, forced outages, delays in availability of new units and variation of hydro conditions from median values. Xf the average of the capacity losses experienced during the 1971 and 1972 summer peaks existed at the time of the 1974 summer peak, the reserves on the NYPP system would be reduced to 10.0 percent with Unit 1 and 7.3 percent without the unit.
 
Mr. Daniel     R. Muller During the 1974 summer period, the availability of emergency power supplies from the neighboring NEPOOL 1/ and PJM 2/pools may be limited by the needs of those systems to maintain planned reserve levels. The limited capacity of the intexconnections and the predominantly thermal systems of NEPOOL and PJM, which are subject to forced outages, fuel shortages and operating restrictions due to air quality limitations, indicate that little capacity reserve would be available from these areas. The winter-peaking Ontario Hydro system has indicated reserves after maintenance of 31.3 percent of peak load, totalling 3,490 mega-watts, and i,s considered the only available source of emergency power supply.
The Nine     Mile Point Unit   1 is completed and has been producing electric powex'ince         1969. In view of the substantial purchases of power necessary by the Applicant to meet its system demands, the Bureau of Power staff recommends that the full-tenn operating license be issued to the Applicant for this unit. Power purchases are an expedient for meeting electric system demands during construction of new units; however, purchases are not a satisfactory substitute for adequate base-load owned generation.       Regional reliability is greatly improved when each   electric     system has adequate installed generating capacity to meet its   syst: em r
demands and provide reserve capacity.
The use of geothermal power as an alternative to the nuclear unit was not considered, according to the Draft Environmental Statement (page 9-1). In light of the fact that geo)ljermal sources are known to exist in New York and neighboring states, a discussion of this alternate would be appropriate.
Hydroelectric power as a substitute for the Nine Mile Point Nuclear unit would be impractical and inadequate. Although the total generating capacity that could be made available in New York by the addition of
'enerators at existing hydro sites and the development of new sites is some 1,292 megawatts,     4/'his   capacity would be scattered over a laxge number of sites.         The total average annual energy available fxom all the sites;   4/ would be approximately equal to the annual energy obtainable.
1/ New England Power Pool.
2/ Pennsylvania<<New Jersey-Maryland Interconnection.
3/ Thermal Springs of the United States and Other Countries of the world - A Summary. Geological Survey Professional Paper 492. U. S.
Government     Printing Office,   1965.
4/ Hydroelectric       Power Resources of the United   States, January 1, 1972.
Federal Power Commission, FPC P-42.
 
I ~
Mr. Daniel R. Muller from Nine Mile Point No. 1. However,   it is not considered 'feasible to develop a large number of small hydroelectric"sites due to environmental, considerations and public reaction.
    'he Bureau of Power staff considers that the Nine Mile Point Unit 1 is needed on the Applicant's system to meet the projected loads. ,In view of the substantial power purchases required by Niagara Mohawk Power Corporation to'eet loads and the serious consequences of inadequate installed generating capacity, the staff considers it prudent that a full-term license be issued to the Applicant for the continued operation of the Nine Mile Nuclear Station Unit 1.
Very truly yours, T A. hillip Chief, Bureau of Power
 
. Regulatory}}

Latest revision as of 20:57, 4 February 2020

Letter Responding to the July 5, 1973 Letter Requesting Comment on the AEC Draft Environmental Statement Relating to the Conversion of the Current Provisional Operating License to a Full-Term License
ML17037C324
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/06/1973
From: Phillips T
US Federal Power Commission
To: Muller D
US Atomic Energy Commission (AEC)
References
Download: ML17037C324 (12)


Text

AEC DIS XBUTION FOR PART 50 DOCKET MA "XAL

~ rt (TEt 1PORARY FORM) CONTROL NO: 6874 FILE: ENVIRO FROM: DATE OF DOC DATE REC'D MMO OTHER Federal Power Commission

,Washington, D. C. 20426 9-6-73 9-11-73 T. A. Phillips TO: ORIG CC OTHER SENT AEC PDR D. R. Muller 1 signed SENT LOCAL PDR X CLASS UNCLASS PROP INFO 'NPUT NO C S REC'D DOCKET NO:

XXX 50-220 DESCRXPTION: ENCLOSURES:

Ltr furnishing comments on DES...

r r

ACKNOWLEDGED ONOT PE>>~E Nine Mile Point Unit 8' FOR ACTION/INFORMATION 9-11-73 fod BUTLER(L) SCI1WENCER(L) NIEMANN(L) ~GAN(E)

W/ Copies W/ Copies W/1 Copies W/4 Copies CLARK(L) STOLZ(L) DICKER(E)

W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L) VASSALLO(L) KNIGHTON(E) "

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L) SCHEMEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION

~G FXLE TECH REVIEW DENTON LIC ASST

~AT LND C P HENDRIE GRIMES BRAI'OMAN OGC, ROOM P-506A SCHROEDER GAK1ILL HIGGS (L) SALTZMAN

~TZING/STAFF MACCARY KASTNER GEARIN (L)

CASE KNIGHT ~LLARD GOULBOURNE (L) PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L) MODONALD BOYD SHAO MAIGRET (L) DUBE MOORE (L) (BWR) STELLO ENVLRO SERVICE (L)

DEYOUNG(L) (PWR) HOUSTON MULLER SHEPPARD (E) INFO

~KOVHOLT (L) NOVAK ~ DICKER SMITH (L) C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

IPPOLITO YOUNGBLOOD WADE (E)

REG. OPR TEDESCO REGAN WILLIAMS (E)

~ILE & REGION(3) LONG PROJECT DITTMAN LDR WILSON (L)

MORRIS LAINAS STEELE ~BENAROYA ESS VOLTE R EXTERNAL DISTRIBUTION

- LOCAL PDR Oswe o N. Y.

1 "-

- DTIE(ABERNATHY)

NSIC(BUCHANAN)

~ (1) M@83)-NATIONAL LAB'~N~

1-R.Schoonmaker,OC,GT,D-323 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE 1 - ASLB(YORE/SAYRE/ '1-R. CATLXN, E-256-GT BROOKHAVEN NAT. LAB WOODARD/ "H" ST. 1-CONSULTANT'S 1-AGMED(WALTER KOESTER 16 - CYS ACRS HOLDING NEWMARK/BLUME/AGBABIAN HM-C-427-GT t

r A

1-GERALD ULRXKSON. ~ ~ OIQK 1-RD MULLER..F-309 GT

~l-Pennington

" (> tt(>>gp FI l y4, pc 'l>>

',l~',

. ~

C,<,p II<~(

li >,

f q, ',tgi4 g. S' g~)g g if Ifh I I'l t II

Ol ERAL POWER COMMISSION WASHINGTON, D.C. 20426 IN REPLY REFER TOI 50-220 Mr. Daniel R. Muller Assistant Director for ~EF'XZ)973~ )( np 6 )gg Environmental Projects Direct'orate of Licensing U. S. Atomic Energy Commission Hashington, D. C. 20545

Dear Mr. Muller:

This is in response to your letter dated July 5, 1973, requesting comment on the AEC Draft Environmental Statement relating to the conversion of the current provisional operating license to a full~term license to the Niagara Mohawk Power Corporation for the Nine Mile Point Nuclear Station Unit 1 (Docket No. 50-220).

The following comments are made in compliance with the National Environmental Policy Act of 1969, and the April 23, 1971, Guidelines of the Council on Environmental Quality, and review the need for the capacity of the 610-megawatt Nine Mile Point Nuclear Unit 1 with regard to the adequacy and reliability of the affected electric power systems and related matters.

In preparation of these comments, the Federal Power Commission's Bureau of Power staff has considered the AEC Draft Environmental State-ment; the Applicant's Environmental Report and Supplements thereto; related reports made in response to the CommissionIs Statement of Policy on Reliability and Adequacy of Electric Service (Docket No. R-362); and the staff's analysis of these documents togetherwith related information from other FPC reports. The staff generally bases its evaluation of the need for a specific bulk power facility upon long-term considerations as well as upon the load-supply situation for the peak load period immediately following the availability of the facility. It should be noted that the useful life of the Nine Mile Point unzt is expected to be 30 years or more. During that period the unit will make a significant contribution to the adequacy of power supply in the Applicant's service area.

The Nine Mile Point Nuclear Unit 1 has been in commercial operation since December 1969. During the period from December 1969 to December 31, 1971, the unit produced 4,858 billion kilowatt-hours of electric energy, and during 1972 the unit produced an additional 3,242 billion kilowatt-hours.

uQ GQV 033 2 ~AC 1

i "-:;3 "-'i se ni~ awl.-

& R I'

Mr. Daniel R. Muller The Applicant is a member of the New York Power Pool (NYPP), which coordinates the operation of members'ulk power systems whose combined service areas serve the entire State of New York. The Applicant is also a member of the Northeast Power Coordinating Council (NPCC), which coordinates the planning of the members'enerating and transmission facilities in the area which includes the State of New York, New England and th'e provinces of New Brunswick and Ontario. NPCC has established a reliabilzty criterion equivalent to a loss of load probability of one day'n ten years. Members 'of the NYPP have agreed that to maintain this standard, each memb'er system w'ill maintain installed capacity at least equal to that required to meet an 18 percent reserve during its most recent annual peak load.

The Bureau of Power'taff has analyzed, the effect o'f the capacity of Nine Mile Point No. 1 on the winter-peaking Applicant's system for the 1973-1974 Winter Peak Period and the summer-peaking NYPP for the 1974 Summer Peak Period. The following tabulations show the effect of the Nine Mile Unit 1 on these systems.

NIAGARA MOHAWK SYSTEM 1/

1973-74 WINTER PEAK LOAD PERIOD With Unit 1 Without Unit 1 Total Owned Capability, Dec. 31, 1972, MW 3 251 2,641 Share of Roseton No. 1, MW 240 240 Share of Roseton No. 2, MW 240 240 Share of Fitzpatrick No. 1, MW 295 295 Share of Blenheim-Gilboa, MW 550 550 Other Purchases 1 646 1 646 Total Capability, MW 6,222 5,612 Estimated Peak Load, MW 5 200 5 200 Reserve MW 1,022 412 Reserve,  % of Peak Load 19. 7 7.9 1/ Niagara Mohawk Form 12 Report For 1972.

H f I'll) ggy ~ IIJ<+$ Jlt>ll i<( 4*Ah$ Jll

.'):ir h9 '< 3!i ai.<~A t

~ V

Mr. Daniel R. Muller NEW YORK POWER POOL 1974 SUMMER PEAK PERlOD 1/

With Unit 1 Without Unit 1 f

Total Capability -. Megawatts 27,671 27,061 Net Peak Load.- Megawatts 225006 2/ 22,006 2/

Reserve Margin - Megawatts .',<< 5,665 5,055 Reserve Margin - Percent of Pe'ak Load 25.8 23.0 1/ Data Source: NPCC Report 383-2 dated April 1, 1973.

2/ Coincident Peak Load of 21,930 megawatts increased by 76 MW as a result of transactions with systems outside NYPP.

The Niagara Mohawk reserve of 19.7% with Nine Mile Point is within the range usually found satisfactory, but the bare numerical value is deceptive. Of the 1,646 MW listed under "Other Purchases," 270 MW is supplied by. Rochester Gas & Electric Company, who in turn is relying on a purchase of 207 MW from Power Authority of the State of New York.

However, Rochester Gas & Electric Company, 'according to its 1972 Form 12 Report to the Federal Power Commission, will only have a 5.2% reserve at the time of its 1973-74 winter peak. Consequently, of the 1,022 megawatt reserve that Niagara Mohawk appears to have with Nine Mile Point No. 1, 270 megawatts can, be considered of doubtful reliability. Without Nine Mile Point, Niagara Mohawk would have only a 7.9% reserve, more than half of which would be dependent on a purchase of doubtful reliability. Xt is therefore essential for Niagara Mohawk's adequacy of service to have Nine Mile Point No. 1 in operation at its full rated 610 megawatts.

The Applicant's system is integrated with all New York State systems through the NYPP and the summer-peaking pool indicates reserves of 25.8 percent of peak, load responsibility with the capacity of Unit 1 and 23.0 percent without the unit. During the week of the summer peaks in 1971 and 1972 the NYPP experienced unavailable capacity totalling 3,326 megawatts and 3,581 megawatts, respectively, due to scheduled maintenance, forced outages, delays in availability of new units and variation of hydro conditions from median values. Xf the average of the capacity losses experienced during the 1971 and 1972 summer peaks existed at the time of the 1974 summer peak, the reserves on the NYPP system would be reduced to 10.0 percent with Unit 1 and 7.3 percent without the unit.

Mr. Daniel R. Muller During the 1974 summer period, the availability of emergency power supplies from the neighboring NEPOOL 1/ and PJM 2/pools may be limited by the needs of those systems to maintain planned reserve levels. The limited capacity of the intexconnections and the predominantly thermal systems of NEPOOL and PJM, which are subject to forced outages, fuel shortages and operating restrictions due to air quality limitations, indicate that little capacity reserve would be available from these areas. The winter-peaking Ontario Hydro system has indicated reserves after maintenance of 31.3 percent of peak load, totalling 3,490 mega-watts, and i,s considered the only available source of emergency power supply.

The Nine Mile Point Unit 1 is completed and has been producing electric powex'ince 1969. In view of the substantial purchases of power necessary by the Applicant to meet its system demands, the Bureau of Power staff recommends that the full-tenn operating license be issued to the Applicant for this unit. Power purchases are an expedient for meeting electric system demands during construction of new units; however, purchases are not a satisfactory substitute for adequate base-load owned generation. Regional reliability is greatly improved when each electric system has adequate installed generating capacity to meet its syst: em r

demands and provide reserve capacity.

The use of geothermal power as an alternative to the nuclear unit was not considered, according to the Draft Environmental Statement (page 9-1). In light of the fact that geo)ljermal sources are known to exist in New York and neighboring states, a discussion of this alternate would be appropriate.

Hydroelectric power as a substitute for the Nine Mile Point Nuclear unit would be impractical and inadequate. Although the total generating capacity that could be made available in New York by the addition of

'enerators at existing hydro sites and the development of new sites is some 1,292 megawatts, 4/'his capacity would be scattered over a laxge number of sites. The total average annual energy available fxom all the sites; 4/ would be approximately equal to the annual energy obtainable.

1/ New England Power Pool.

2/ Pennsylvania<<New Jersey-Maryland Interconnection.

3/ Thermal Springs of the United States and Other Countries of the world - A Summary. Geological Survey Professional Paper 492. U. S.

Government Printing Office, 1965.

4/ Hydroelectric Power Resources of the United States, January 1, 1972.

Federal Power Commission, FPC P-42.

I ~

Mr. Daniel R. Muller from Nine Mile Point No. 1. However, it is not considered 'feasible to develop a large number of small hydroelectric"sites due to environmental, considerations and public reaction.

'he Bureau of Power staff considers that the Nine Mile Point Unit 1 is needed on the Applicant's system to meet the projected loads. ,In view of the substantial power purchases required by Niagara Mohawk Power Corporation to'eet loads and the serious consequences of inadequate installed generating capacity, the staff considers it prudent that a full-term license be issued to the Applicant for the continued operation of the Nine Mile Nuclear Station Unit 1.

Very truly yours, T A. hillip Chief, Bureau of Power