ML17312B562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:9707180220 9707i0 PDR'ADDCK 05000528 I PDR TABLE OF CONTENTS SCPPA by Definition Executive Director's Letter Prcsidcnt's Letter The Retail Revolution Operations and Financiais Palo Verde Nuclear Generating Station...
{{#Wiki_filter:9707180220 9707i0 PDR 'ADDCK 05000528 I             PDR
9 San Juan Gcncrating Station Mead-Phoenix/Mead-Adclanto Transmission Projects Hoover Uprating Project Southern Transmission System Legislative Advocacy Report of Independent Accountants Combined Balance Sheet l2 l2 l3 l3 l7 IS Combined Statement of Operations Combined Statement of Cash Flows l9 l9 Notes to Financial Statements Supplemental Financial Information 2I 3I Palo Verde Nuclear Generating Station...
 
32 Southern Transmission System Hoover Uprating Project Mead-Phoenix Transmission Project Mead-Adclanto Transmission Project Multiple Project San Juan Generating Station 36 40 43 47 5I 53 SCPPA BY DEFINITION The Southern California Public Power Authority (SCPPA)is a joint powers authority formed in 1980 to acquire reliable, cost-efficient electrical generation facilities and transmission systems for its members.The membership includes ten municipal utilities and one irrigation district that deliver electricity to nearly two million customers from northern Los Angeles County to the Mexican border.Backed by its members'fifnancial strength, SCPPA has issued$8.2 billion in bonds, notes and refunding bonds since its inception, of which$3.6 billion in principal remains outstanding.
TABLE OF CONTENTS SCPPA by Definition Executive Director's Letter Prcsidcnt's Letter The Retail Revolution Operations and Financiais Palo Verde Nuclear Generating Station... 9 San Juan Gcncrating Station Mead-Phoenix/Mead-Adclanto Transmission Projects                   l2 Hoover Uprating Project                   l2 Southern Transmission System               l3 Legislative Advocacy                         l3 Report of Independent Accountants           l7 Combined Balance Sheet                       IS Combined Statement of Operations             l9 Combined Statement of Cash Flows             l9 Notes to Financial Statements               2I Supplemental Financial Information         3I Palo Verde Nuclear Generating Station... 32 Southern Transmission System             36 Hoover Uprating Project                   40 Mead-Phoenix Transmission Project         43 Mead-Adclanto Transmission Project       47 Multiple Project                         5I San Juan Generating Station               53
With these proceeds the SCPPA members have jointly purchased or refinanced interests in generating and transmission facilities throughout the southwestern United States.SCPPA's primary role has been to secure financing for these projects, but in light of pending electric industry restructuring, SCPPA has increasingly helped its members become more competitive and provided legislative and regulatory advocacy at the state and federal.levels.This advocacy ensures that legislators and regulators will consider the needs of public power providers in this region as they propose sweeping changes in laws and regulations affecting the electric industry.Today's radically shifting economic and political climates pose major challenges for public power providers.
 
SCPPA's sound financial basis and cooperative approach to industry problem-solving will help its members weather the storm and deliver new benefits to their customers.
SCPPA BY DEFINITION The Southern California Public Power Authority (SCPPA) is a joint powers authority formed in 1980 to acquire reliable, cost-efficient electrical generation facilities and transmission systems for its members. The membership includes ten municipal utilities and one irrigation district that deliver electricity to nearly two million customers from northern Los Angeles County to the Mexican border.
SCPPA MEMBERS City of Anaheim City of Azusa City of Banning City of Burbank City of Colton City of Glendale Imperial Irrigation District Los Angeles Department of Water And Power City of Pasadena City of Riverside City of Vernon NEVAOA-Q.>Ml INTTAM Aot cxAN Yt Sl STATI UTAH VSSII SOVI III AN sv Dc TTAhlklssloU
Backed by its members'fifnancial strength, SCPPA has issued $ 8.2 billion in bonds, notes and refunding bonds since its inception, of which $ 3.6 billion in principal remains outstanding. With these proceeds the SCPPA members               have jointly purchased                           or refinanced interests in generating and transmission facilities throughout the southwestern United States.
+c ID 7 ll TATSS~SANNAN IIN TT l>Ftnsintttk AIIIZONA NEW MEXICO TAIO YTADS ADttANTO, CONYTATIA MCADADIIANTO STATION rtoilctl I TANTO+MSSY AC I A S TATI(AN+co tn sa nt m IAMSIIAP t tes ttts 0~Ivrttsot+tl SS~~ANAAtlu IITSTIIINO rtottct IO svssTATIDN ININAI kANAIIOS~rtoktt~Southern Transmission System~Mead-Phoenix Transmission Project~Mead-Adelanto Transmission Project Q Palo Verde Nuclear Generating Station Q Hoover Uprating Project Q San juan Generating Station~Member Agencies EXECUTIVE DIRECTOR'S LETTER In last year's message I predicted that this fiscal year would be a watershed period for the nation's public utilities-and the events that unfolded proved my penchant for understatement.
SCPPA's primary role has been to secure financing for these projects, but in                                                       light of pending electric industry restructuring, SCPPA has increasingly helped its members become more competitive and provided legislative and regulatory advocacy at the state and federal. levels. This advocacy ensures that legislators and regulators will consider the needs of public power providers in this region as they propose sweeping changes in laws and regulations affecting the electric industry.
Debate about electric utility restructuring and competition was highly visible on the U.S.congressional agenda, and legislation that would direct states to begin retail customer access choice by the end of the year 2000 was proposed.The Federal Energy Regulatory Commission continued their move to ensure that the nation's transmission system is open to all in a fair, nondiscriminatory fashion.In Californi, discussion intensified and the realities of market transformation began to unfold.In a landmark decision in December, the California Public Utilities Commission issued a policy decision setting January 1, 1998 as the beginning of direct access for retail customers of the state'investor-owned utilities.
Today's radically shifting economic and political climates pose major challenges for public power providers. SCPPA's sound financial basis and cooperative approach to industry problem-solving will help its members weather the storm and deliver new benefits to their customers.
The Deregulation Countdown on page 7 further illustrates the timing of the new market scenario.During this year SCPPA's staff and its member agencies infused their own considerable energy into representing and protecting public power agencies and their customers in the deregulation continuum.
SCPPA MEMBERS City of Anaheim NEVAOA                  -Q.>Ml
I caned these themes to the U.S.Senate when I testified before its Energy and Natural Resources Committee at a restructuring hearing in March.As SCPPA representatives and I visited with Members of Congress and staff, we provided them a consumer-owned utility perspective on the CPUC decision and its impacts, and on proposed federal legislation.
                                                                                                                                              ~    Southern Transmission System
These views took on reality for congressional staff members as they toured several SCPPA facilities in April.
                                                                                                                                                  ~ Mead-Phoenix City of Azusa                                                                                                                                       Transmission Project ll City of Banning
Back at home the SCPPA staff worked to reduce project and overhead costs, and to restructure project debt including a move to increased variable rate debt, thereby lowering project costs.SCPPA members spent this year in high gear, delivering reliable power and quality energy services to their customers, while retooling to meet the demands of the coming open market envi-ronment.The following pages further describe their strategies to reduce costs, increase efficiency, develop new revenue sources, and communicate with their customers, city administrators, and elected officials.
                                                      +c ID TATSS INTTAM cxAN Yt Sl Aot                    ~ Mead-Adelanto City of Burbank                                                                                             STATI                                  Transmission Project UTAH 7                                                                                        Q Palo Verde Nuclear City of Colton                                                                               SOVI IIIAN VSSII TTAhlklssloU                                            Generating Station City of Glendale                                                               sv Dc Q Hoover Uprating
SCPPA has served as a catalyst and resource for these efforts.p 0 0 Eldon A.Cotton SECRETARY Daniel W.Waters EXECVTIYE DIRECTOR Bill D.Carnahan PRESIDENT Thomas H.MOGuinness ASSISTANT SECRETARY Bernard Y.Palk VICE PRESIDENT Despite the current maelstrom of changing times and markets, SCPPA's mission is becoming progressively clearer.We will continue to support our member utilities'conomic strength and marketing presence as we enter the new millennium.
                                                                                                                          ~SANNANIINTT l ADttANTO, Imperial Irrigation District             CONYTATIA MCADADIIANTO                                                                                      Project Los Angeles Department         S I TANTO TATI(AN+co
Daniel W.Waters Ezcunva DiREcroR PRESIDENT'S LETTER In this era of profound change, SCPPA's benefit is its ability to influence the develop-ment of a new industry structure, ensuring that its member utilities can compete effectively.
                                                  +
Two years ago we set a goal of making SCPPA the voice of the Southern California municipal utilities in national forums, and we have made great progress in this regard.In the past year, SCPPA continued to become more prominent in its spheres of influence at the federal and state levels.SCPPA projects are critical to its member utilities'ability to compete.Over the past year we member utilities have worked to critically analyze our own operations, with efficiencies and cost reduction as our prime objectives.
STATION       rtoilctl MSSY AC I tn sa nt m A
Our participation in SCPPA-funded projects provides us some of these efficiencies, such as expanding our access to low-cost power sources.In addition to its advocacy and financial benefits, SCPPA helps member agencies develop common strategies, including how to establish Competition Transition Charges.SCPPA serves as a forum for identifying interacfive issues and ferreting out solutions.
t                         AIIIZONA
Aided by our SCPPA membership, our customers will continue to reap the benefits of local control of public utilities.
                                                                                                                      > Ftnsintttk Q San  juan Generating of Water And Power            IAMSIIAP                                                                                                          Station City of Pasadena              tes    ttts 0          ~ Ivrttsot                + tl                                                              ~ Member Agencies SS ~
We know our customers, operate our own generation and transmission system, and can provide more opportunities for value-added energy services.These attributes will make the crucial difference as we head into the coming market environment.
                                          ~ ANAAtlu                                                                 NEW MEXICO City of Riverside                                                  rtottct              IITSTIIINO IO   svssTATIDN City of Vernon                              ININAIkANAIIOS
Bill D.Camahan PREsroHNr THE RETAIL REVOLUTION In March 1896, an enterprising businessman bought a franchise from the City of Los Angeles for$100, permitting the operation of a power system within the city.He and his partners had built a small generating plant outside the city limits the previous December that would supply the proposed system.Since this franchise was to expire within two weeks, he and his three partners, along with their four employees, put on their overalls and feverishly strung wire through the streets and over rooftops of the city.At 4:55 p.m.on April 14, 1896, the first electric lights lit up the City Hall tower.This tiny company owned the exclusive right to sell power to its customers, along with the exclusive responsibility to maintain near-perfect service and develop new power supplies to support the explosive growth to come.This scenario was repeated in burgeoning cities throughout Southern California in the 1890s.Small companies built and operated generation resources and transmission infrastructure, and kept up with the insatiable thirst for power of a population fresh off the new trains from the east.Some of these cities later bought the electrical systems within their boundaries, acquiring the same exclusive rights and responsibilities to their customers.
                                                                              ~
To purchase the new generation and transmission systems they needed, they would subsequently pool their financial resources in the Southern California Public Power Authority.
TAIO YTADS rtoktt
-THE COMPETITION TRANSITION CHARGE (CTC)Reeonnfing the Past toith the Future Under tho proposed CTC, consumers who choose to change electricity suppliers would pay a monthly surcharge on their electricity bill.The purpose of this surcharge ls to ensure that the cost of retiring the debt on exisdng power, infrastructure does not shift to the customers who remain with their uuhty.In many cases, the remaining customers are likely to be residential and small business customers, while the ones who change suppliers will be the large commercial/
 
EXECUTIVE DIRECTOR'S LETTER In last year's message I predicted that this fiscal year would be a watershed period for the nation's public utilities and the events     that unfolded proved my penchant for understatement. Debate about electric utility restructuring and competition was highly visible on the U.S. congressional agenda, and legislation that would direct states to begin retail customer access choice by the end of the year 2000 was proposed. The Federal Energy Regulatory Commission continued their move to ensure that the nation's transmission system is open to all in a fair, nondiscriminatory fashion.
In Californi, discussion intensified and the realities of market transformation began to unfold.
In a landmark decision in December, the California Public Utilities Commission issued         a policy decision setting January 1, 1998 as the beginning of direct access for retail customers of the state' investor-owned utilities. The Deregulation Countdown on page 7 further illustrates the timing of the new market scenario.
During this year SCPPA's staff and its member agencies infused their own considerable energy into representing and protecting public power agencies and their customers in the deregulation continuum. I caned these themes to the U.S. Senate when I testified before its Energy and Natural Resources Committee at a restructuring hearing in March. As SCPPA representatives and       I visited with Members of Congress and staff, we provided them a consumer-owned utilityperspective on the CPUC decision and its impacts, and on proposed federal legislation. These views took on reality for congressional staff members as they toured several SCPPA facilities in April.
 
Back at home the SCPPA staff worked to reduce project and overhead costs, and to restructure project debt including a move to increased variable rate debt, thereby lowering project costs.
SCPPA members spent this year in high gear, delivering reliable power and quality energy services to their customers, while retooling to meet the demands       of the coming open market envi-ronment. The following pages further describe their strategies to reduce costs, increase efficiency, develop new revenue sources, and communicate with their customers, city administrators, and elected officials. SCPPA has served as a catalyst and resource for these efforts.
p 0
0 Eldon A. Cotton                     Bill D. Carnahan                        Bernard Y. Palk SECRETARY                             PRESIDENT                          VICE PRESIDENT Daniel W.Waters                     Thomas H. MOGuinness EXECVTIYE DIRECTOR                    ASSISTANT SECRETARY Despite the current maelstrom of changing times and markets, SCPPA's mission is becoming progressively clearer. We will continue to support our member utilities'conomic strength and marketing presence as we enter the new millennium.
Daniel W. Waters Ezcunva DiREcroR
 
PRESIDENT'S LETTER In this era of profound change, SCPPA's benefit is its ability to influence the develop-ment of a new industry structure, ensuring that its member utilities can compete effectively. Two years ago we set a goal of making SCPPA the voice of the Southern California municipal utilities in national forums, and we have made great progress in this regard.
In the past year, SCPPA continued to become more prominent in its spheres of influence at the federal and state levels.
SCPPA projects are critical to its member utilities'ability to compete. Over the past year we member utilities have worked to critically analyze our own operations, with efficiencies and cost reduction as our prime objectives. Our participation in SCPPA-funded projects provides us some of these efficiencies, such as expanding our access to low-cost power sources.
In addition to its advocacy and financial benefits, SCPPA helps member agencies develop common strategies, including how to establish Competition Transition Charges. SCPPA serves as a forum for identifying interacfive issues and ferreting out solutions.
Aided by our SCPPA membership, our customers will continue to reap the benefits of local control of public utilities. We know our customers, operate our own generation and transmission system, and can provide more opportunities for value-added energy services. These attributes will make the crucial difference as we head into the coming market environment.
Bill D. Camahan PREsroHNr
 
THE RETAIL REVOLUTION In March 1896, an enterprising businessman bought a franchise from the City of Los Angeles for
$ 100, permitting the operation of a power system within the city. He and his partners had built a small generating plant outside the city limits the previous December that would supply the proposed system. Since this franchise was to expire within two weeks, he and his three partners, along with their four employees, put on their overalls and feverishly strung wire through the streets and over rooftops of the city. At 4:55 p.m. on April 14, 1896, the first electric lights lit up the City Hall tower.
This tiny company owned the exclusive right to sell power to its customers, along THE COMPETITION with the exclusive responsibility to maintain near-perfect service and develop new                     TRANSITION CHARGE (CTC) power supplies to support the explosive growth to come.                                                 Reeonnfing the Past toith the Future This scenario was repeated in burgeoning cities throughout Southern California in                 Under tho proposed CTC, consumers who choose to change electricity suppliers the 1890s. Small companies built and operated generation resources and transmission                     would pay a monthly surcharge on their electricity bill.The purpose of this surcharge ls to infrastructure, and kept up with the insatiable thirst for power of a population fresh off             ensure that the cost of retiring the debt on exisdng power, infrastructure does not shift to the new trains from the east.                                                                           the customers who remain with their uuhty. In many cases, Some of these cities later bought the electrical systems within their boundaries,                 the remaining customers are likely to be residential and small business customers, while acquiring the same exclusive rights and responsibilities to their customers. To purchase               the ones who change suppliers will be the large commercial/
industrial customers.
industrial customers.
In March 1996, descendants of private companies like that first private partnership filed to divest themselves of their generating plants voluntarily.
the new generation and transmission systems they needed, they would subsequently pool their financial resources in the Southern California Public Power Authority.
This followed on the decision the previous December by the California Public Utilities Commission to open market access to the power infra-structure initiated 100 years ago.A few weeks later, in April 1996, these private power companies filed to create a Power Exchange, into which they would sell their generation, and an Independent System Operator to operate and manage the state's transmission system.
In March 1996, descendants of private companies like that first private partnership filed to divest themselves of their generating plants voluntarily. This followed on the decision the previous December by the California Public Utilities Commission to open market access to the power infra-structure initiated 100 years ago. A few weeks   later, in April1996, these private power companies filed to create a Power Exchange, into which they would sell their generation, and an Independent System Operator to operate and manage the state's transmission system.
Custome Served:..........
 
Power Generated and Purchased (In Hegawatt.Hours)
clTY OF ANAHEIM As the City's sole power provider for more that l00 years, tho Anaheim Public Utilities Department has              The municipal power companies, although not directly regulated by the now positioned Itself for dereguladon and competition. In I4arch 1996, cominerclal        CPUC, willparticipate and compete in this market-based environment... a whole and industrial customers saw a rato decrease of up to five percent. Reslden.
Self-generated Purchased.............
tlal rates remained stable, already set        new world.
Total...............
approximately 25 percent lower than thoso In neighboring communities. Taking advantage of a unique opportunity, the Department entered into a landmark              wHv nEREaumTE7            Historically, the regulatory compact provided exclusive publicfprivate partnership to utilize Its fiber optic cable This partnership will pro-vide the community with access to a            service territories and rates sufficient to cover utilities'costs. In the 1970s, utilities VnlversalTelecommunications System In I 997.
Transmhslon (In mlles)Total Revenues (000's).......Operating Costs (000's)I 04,805 880,7 I 5 l,973, I I 0 2,853,825 I>417$246,479$I 97,895 clTY OF ANAHEIM As the City's sole power provider for more that l00 years, tho Anaheim Public Utilities Department has now positioned Itself for dereguladon and competition.
were facing demand growth of seven percent per year, and were forbidden by Custome    Served:..........        I 04,805 Power Generated and Purchased (In Hegawatt.Hours)                            federal law from burning natural gas in utility boilers. This led to investments in Self-generated                  880,7 I 5 Purchased.............        l,973, I I 0 Total  ...............
In I4arch 1996, cominerclal and industrial customers saw a rato decrease of up to five percent.Reslden.tlal rates remained stable, already set approximately 25 percent lower than thoso In neighboring communities.
Transmhslon (In mlles) 2,853,825 I>417 nuclear and coal fueled generating plants.
Taking advantage of a unique opportunity, the Department entered into a landmark publicfprivate partnership to utilize Its fiber optic cable This partnership will pro-vide the community with access to a VnlversalTelecommunications System In I 997.The municipal power companies, although not directly regulated by the CPUC, will participate and compete in this market-based environment...
Total Revenues (000's)
a whole new world.wHv nEREaumTE7 Historically, the regulatory compact provided exclusive service territories and rates sufficient to cover utilities'costs.
Operating Costs (000's)
In the 1970s, utilities were facing demand growth of seven percent per year, and were forbidden by federal law from burning natural gas in utility boilers.This led to investments in nuclear and coal fueled generating plants.In recent years the California government mandated investment in renewable energy sources and promotion of energy efficiency.
                        .......  $ 246,479
In this era the utilities provided a complete electric system.They also had the obligation to plan and develop facilities to cover future electric needs and were accountable for near-perfect service to all customers.
                                  $ I 97,895 In recent years the California government mandated investment in renewable energy sources and promotion of energy efficiency. In this era the utilities provided a complete electric system. They also had the obligation to plan and develop facilities to cover future electric needs and were accountable for near-perfect service to all customers. As a result of the move to protect the environment and promote renewable resources, investor-owned utility gOU) rates in California were 50 percent higher than the national average. The rates of consumer-owned utilities like the SCPPA member agencies were generally 15 to 30 percent lower than those of the IOUs.
As a result of the move to protect the environment and promote renewable resources, investor-owned utility gOU)rates in California were 50 percent higher than the national average.The rates of consumer-owned utilities like the SCPPA member agencies were generally 15 to 30 percent lower than those of the IOUs.These high rates are driving the move to deregulation in Californi.
These high rates are driving the move to deregulation in Californi.
New technology enables new projects to generate electricity at lower cost using relatively inex-pensive natural gas.At the same time, global economic forces are pressuring California's industries to become more competitive.
New technology enables new projects to generate electricity at lower cost using relatively inex-pensive natural gas. At the same time, global economic forces are pressuring California's industries to become more competitive. These customers want the immediate benefit of the new generation technology and lower electricity bills.
These customers want the immediate benefit of the new generation technology and lower electricity bills.In the new world of deregulated power supply, industrial customers will have access to an open market in which they can buy electricity from the lowest bidder.9dEh5aaR AaEPgciES IN ACTloN The eleven SCPPA member agencies have been planning for the new market transformation for the last few years.This past fiscal year has seen the most active PASSWORDS TO A NEW ERA OVARY Ii Five.year phase-In iirect retail access for IOUs ins: Largo customers may ose alternate generation pliers.IOUs must bid all eratlon into Power Exchange satisfy customers'nergy ds by buying from the Power hange.Customers choosing mate suppliers pay CTC.DEREGULATION COUNTDOWN Direct retail access for all customers begins.IOUs no longer must bid generation into the Powci Exchange.CTC ends.2003 National Energy Policy Act gives FERC authority to order open transmission access.AGGREGATORS
In the new world of deregulated power supply, industrial customers will have            access to an open market in which they can buy electricity from the lowest bidder.
-Brokers who seek to bring together , customers to create a"load" so that they can buy power in bulk, making a profit on the sale.COMPETITION TRANSITION CHARGE (CTC)-A non-bypassable fec paid by retail customers to their former power supplier when taking service from an alternative supplier.This fee reflects the difference between a stranded asset's market price and its cost.The purpose Is to avoid cost shifting, and to enable utilities to retire debt and compete fairly.COST BASED RATEMAKING Regulated rates based on costs expended.COST SHIFTING-Moving cost Increases or decreases to classes of customers, a.g.to residential from industrial or to commercial from residential.
9dEh5aaR AaEPgciES        IN ACTloN The eleven SCPPA member agencies have been planning for the new market transformation for the last few years. This past fiscal year has seen the most active
DIRECT ACCESS-Ability of a power producer to sell directly to thc retail customer.ructurlnglfunctlonal ndling.IOUs to file icatlons to transfer e.CPUC to ensure al consumer protection ores are in place.li+y p 0 MARCH: IOUs apply for voluntary divestiture of 50 percent of fossil generation.
 
APRIL Draft of ISO/Power Exchange filing availablo to stakcholders.
PASSWORDS TO A NEW ERA AGGREGATORS - Brokers who seek to bring together
IOUs file proposals to establish ISO and Power Exchange.JULY: IOUs apply for performance-based ratemaklng.
                                                                                                                            , customers to create a "load" so that they can buy power in bulk, DEREGULATION COUNTDOWN                                                            making a profit on the sale.
CPUC Issues draft rulemaklng envisioning futuro where customers choose among competing generation pioviders, and performance-based ratcmaking replaces traditional castoff-service ratcmaklng.
COMPETITION TRANSITION CHARGE (CTC) A non--
X995 MARCH: FERC issues Notice of Proposed Rulemaklng (NOPR)proposing significant changes in transmission scrvicc regulation.
bypassable fec paid by retail customers to their former power supplier when taking service from an alternative Direct retail access for supplier. This fee reflects the all customers begins.
Goal: to deny transmission facility owners unfair advantage over competitors.
difference between a stranded IOUs no longer must                                                                asset's market price and its cost.
MAY: CPUC issues proposal that electric gcncrators should sell power to independent system operator (ISO), which would distributo power to Californians at lower price than currently paying.A new Power Exchange would create a wholesale power pool where all suppliers could sell electricity according to established competitive bidding procedures.
bid generation into                                                                The purpose Is to avoid cost the Powci Exchange.                                                               shifting, and to enable utilities to CTC ends.                                                                          retire debt and compete fairly.
DECEMBERi CPUC adopts final policy which Includes the following:
OVARY Ii Five. year phase-In iirect retail access for IOUs ins: Largo customers may ose alternate generation 2003                                                                          COST BASED RATEMAKING Regulated rates based on costs expended.
Creates a Power Exchange starting Jan.I, I 998.Initiates direct access for retail customers with five-year phase-In and proposes competition transition charge (CTC).Creates ISO for the trans-mission grid.Develops performance-bascd ratemaking for IOUs.Requires real-time rate and time-of.usc rate options.INDEPENDENT SYSTEM OPERATOR (ISO)-Independent manager of trans-mission lines which assures safe and fair transfer of electricity from generators to distribution companies INTEGRATED UTILITY A company that provides a complete electric system, generation transmission and distribution services, for Its customers.
pliers. IOUs must bid all National Energy                  COST SHIFTING Moving-eratlon into Power Exchange                                                                                                   cost Increases or decreases to Policy Act gives FERC satisfy customers'nergy                                                                                                     classes of customers, a.g. to authority to order ds by buying from the Power                                                                                                   residential from industrial or to open transmission hange. Customers choosing                                                                                                     commercial from residential.
PERFORMANCE BASED RATEMAKING (PBR)Regula(ed rates based on performance objectives, not on actual costs.POWER EXCHANGE (PX)-A spot prico market for electricity into which power generators could sell their electricity and from which retail and wholesale customers could buy.RESTRUCTURING Reconliguring tha market structure by eliminating tha monopoly on the essential func-tions of an electric company.RETAIL WHEELING Tile ability of generation companies or brokers to sell directly to retail customers, utilizing regu-lated transmission lines and the distribution services of existing utility companies.
access.
STRANDED INVESTMENT OR STRANDED ASSETS Gcncration facilities, owned by existing utility companies, that produce electricity at above-markct marginal prices.UNBUNDLED RATES Separate itcmlzcd charges for generation, transmission, distrib-ution, and other services.UNBUNDLED SERVICES Customer can select which services they want and which company provides them WHOLESALE WHEELING Selling electricity to wholesale buyers for resale to retail customers fulfillment of their transformation plans to date.The agencies have put significant time and effort into many of these activities:
mate suppliers pay CTC.
~Communicating with city councils, utility boards, and major customers about the deregulation process, its implications, and the member agencies'preparation for it.~Downsizing and reorganizing staff.~Transforming from engineering-based to customer-focused corporate culture.~Becoming more familiar with customer needs and planning new products and services.~Aggressively cutting costs while maintaining service reliability.
DIRECT ACCESS      - Abilityof a power producer to sell directly to thc retail customer.
~Preparing new unbundled and time-of-use rate structures.
INDEPENDENT SYSTEM OPERATOR      (ISO)-
~Working on reducing transfers to their cities'general funds.~Renegotiating power contracts to cut costs.~Meeting off-balance sheet debt obligations.
CPUC Issues        Independent manager of trans-y li +                                                                          draft rulemaklng  mission lines which assures safe p                                    envisioning futuro where customers choose among competing generation pioviders, and performance-and fair transfer of electricity from generators to distribution companies INTEGRATED UTILITY 0                        based ratcmaking replaces traditional castoff-service A company that provides a ructurlnglfunctlonal                                                                                                          complete electric system, ndling. IOUs to file ratcmaklng.                     generation transmission and icatlons to transfer                                                                                                          distribution services, for Its
~Pursuing revenue enhancement opportunities, such as leasing poles and conduit for fiber optics and other telecommunications activities.
: e. CPUC to ensure                                                                                                              customers.
~Adopting a Competition Transition Charge.~Reducing project operating and maintenance costs.~Renegotiating fuel contracts.
al consumer protection PERFORMANCE BASED ores are in place.                                                                                                         RATEMAKING(PBR)
~Reducing debt service by refinancing at lower interest rates.~Moving to more variable rate debt.~Pursuing aggressive legislative advocacy.JOSEPH FI HSV Customers Served:.........
X995 MARCH: FERC issues Notice of Proposed Regula(ed rates based on performance objectives, not on actual costs.
Power Generated and Purchased (in H egawatt.Hours)Self.genensted:
Rulemaklng (NOPR) proposing significant                                                -A POWER EXCHANGE (PX) changes in transmission scrvicc regulation.
..........
MARCH: IOUs apply for                                                                          spot prico market for electricity Goal: to deny transmission facility owners voluntary divestiture of                                                                       into which power generators unfair advantage over competitors.                      could sell their electricity and 50 percent of fossil generation.
Purchased:.............
from which retail and wholesale MAY: CPUC issues proposal that electric                customers could buy.
Sales Recall: Wholesale:
gcncrators should sell power to independent APRIL Draft of ISO/Power              system operator (ISO), which would distributo          RESTRUCTURING Exchange filing availablo              power to Californians at lower price than              Reconliguring tha market to stakcholders. IOUs file            currently paying. A new Power Exchange                 structure by eliminating tha proposals to establish ISO            would create a wholesale power pool where               monopoly on the essential func-and Power Exchange.                    all suppliers could sell electricity according to       tions of an electric company.
Total Revenues (000s):.......
established competitive bidding procedures.             RETAIL WHEELING Tile JULY: IOUs apply    for performance-based                                                                              ability of generation companies DECEMBERi CPUC adopts final policy                      or brokers to sell directly to ratemaklng.                            which Includes the following: Creates a Power           retail customers, utilizing regu-Exchange starting Jan. I, I 998. Initiates direct       lated transmission lines and the access for retail customers with five-year             distribution services of existing phase-In and proposes competition transition           utility companies.
Operating Costs (000s):......r V rued lted i4 422 220 202$23$20 clTY oF AzvsA Tho city's electric I was established ln I 898, and for most history Azusa purchased electricity w sale from Southern California Ed Since tho mid.l980s, through succr litigation against Edison on transmi access, Azusa began to obtain short long.term contracts with other utiliti well as from SCPPA, by particlpath Palo Verde Nuclear Generadng Se Hoover Hydroelectric Plant, and San Generating Station Unit¹3.By havln, ability to diversify its power supply ol tlons, Azusa has maintained its retail i at tho l983 level.These compedtivo i w/II help tho city make a less stressful sltlon toward tho deregulated m'nvironment.
charge (CTC). Creates ISO for the trans-mission grid. Develops performance-bascd               STRANDED INVESTMENT OR STRANDED ASSETS ratemaking for IOUs. Requires real-time rate           Gcncration facilities, owned by and time-of.usc rate options.                           existing utility companies, that produce electricity at above-markct marginal prices.
set PA JN AcTJON The last three items above are the particular expertise and benefit that SCPPA brought its member agencies during this fiscal year.Moreover, SCPPA staff members have adopted the new streamlined business atmosphere of the member agencies by"doing more with less" in all aspects of operations.
UNBUNDLED RATES Separate itcmlzcd charges for generation, transmission, distrib-ution, and other services.
It has been a year of unprecedented energy and accomplishment.
UNBUNDLED SERVICES Customer can select which services they want and which company provides them WHOLESALE WHEELING Selling electricity to wholesale buyers for resale to retail customers
PAUL TOOR OPERATIONS AND FINANCIALS CITY OF OAHHIHG As of Oetober 31, 1996 SCPPA BONDS Hoover Uprating Project Southern Transmission System Project Seruor Uen Bonds Subordinate Uen Bonds'alo Verde Project Senior Uen Bonds 1992 Subordinate Uen Bonds'ubordinate Uen Bonds'ead-Adelanto Transmission Project Insured Refunding Bonds'onrefunded Bonds'ead-Phoenix TransmLsion Project Insured Refunding Bonds'onrefunded Bonds'ultiple Project'an Juan Unit 3 Project'stimated Iveighted Average Cost of Capitatt~)6.11 432 SAO SA8 6.21 5.12 Bond Ratings Standard&Ibor's Aa Aaa/VMG1 AA-AAA/A-1+A1 Aaa Aaa/VMIG1 AA-AAA AAA/A-1+Aaa A A Aaa AAA A A AAA hfood~slnvestor Customers Served:.........
 
Power Generated and Purchased (In Megawatt-Hours)
fulfillment of their transformation plans to date. The agencies have put significant time and effort into many of these activities:
Self~en eratedt Purchased:.............
~ Communicating        with city councils, utility boards, and major customers about the deregulation process, its implications, and the member agencies'preparation for it.
Total...............
JOSEPH FI HSV
Transmission (in miles)Total Revenues (000s):.......
~ Downsizing and reorganizing staff.
Operating Costs (000s)I......9,0$0 0 I I 7,879 I I 7,87 I l22$I3,230$I2,7$0 Established ln I 9 I 3,the Banning electrical system now serves an area of approxi-mately 2I square miles.The city owns a pordon of San Juan Unit 3 and a portion of Mead Adelanto and Mead-Phoenix transmission lines.In addition, the city owns a distribution system and four sub-statlons to serve the customers.
~ Transforming from engineering-based        to customer-focused corporate culture.
Being a full service city, Banning's load mix is strengthened by Industrial customers, with more Industrial projects on the way.Major distribution system improvements are also ln progress.'nsured;1991 Suhndinate Van'able Rate Bonds QMBAC)t 1996 Subordinate Snies A Bonds (MBIA)/1996 Subordinate van'able Rate genes B Bonds (ESA).I Insund: 1992 Senior Ifm Bonds QMBAC);1993 Subordinate Bonds (IGIC);1996 Suhndinate Snies A Bonds QAIBAC),'996 Subordfnate Vanabie Rate Senes B and C Bonds QI(IBAC).I Insund: 1994 Sen'es A Bonds (AMBAC), Unmmmittof bond promds eecund by a guarantmi rate Investment contract.I Insund: 1993 genes A Bonds (MBIA).I Ail genemtion bonds: 466%;ali transmissum bonds: 512%;eomhned gennntion and transmission:
~ Becoming more familiar with customer needs and planning new products and               clTY oF AzvsA Tho city's electric I was established ln I 898, and for most services.                                                                            history Azusa purchased electricity w sale from Southern California Ed Since tho mid.l980s, through succr
500%During the fiscal year, SCPPA continued to monitor the financial markets and address opportu-nities to reduce its fixed interest costs.SCPPA refunded$222.2 million in PaloVerde Project bonds which were originally issued in 1986 and 1987.The 1996 refunding bonds consisted of sales of$152.9 million in Series A fixed rate bonds in February, and$58.9 million in Series B variable rate obligations in April.These insured revenue bonds will produce estimated present value savings of$29.5 million, or 14 percent of the refunding bonds.As the fiscal year ended, SCPPA was working on a similar two-part refunding for the Southern Transmission System, and an additional variable rate issue for Palo Verde.Following is a status report on SCPPA's generating and transmission projects.PALO VERDE OPERATIONS PALO VERDE NUCLEAR GENERATING sTATIDN (PvNGS)Ten SCPPA members (all but the City of Anaheim)share a 5.91 percent interest in the three units of PVNGS, Unit 1 Unit 2 Unit 3 Generation (Millions of MIVHs)9.8 9.2 Ca(tacity Utiiuation
~ Aggressively cutting costs    while maintaining service reliability.                  litigation against Edison on transmi access, Azusa began to obtain short
(%)199$90 OPERATIONS entitling them to 225 megawatts of power.SCPPA continues to Agg"ga<<Industry average 69.9 work with the operating agent, Arizona Public Service (APS), to increase output and lower costs in order to make Palo Verde a competitive and dependable resource.Palo Verde began a reengineering of work processes and organization in September 1993.Thus far, the reengineering effort has yielded lower costs, higher output, higher ratings by the Nuclear Regulatory Commission (NRC)and the Institute of Nuclear Power Operations (INPO), shorter refueling outages, and better teamwork and morale.Ckieadhr Year 1993 1994 1995 per klVh 2.02 1.93 1.61 PRODUCTION COST I>>>dhkiswmcr N>>ch>>cr>>ce v.<l.-~>PaloVerdo's Spring l 996 refueling outage for Unit 2 was completed in a record 49 days.I-I~>c INPO conducted a two-week evaluation of PVNGS in October 1995 and issued its first"1" rating, indicating that PVNGS achieved the highest level of exceHence in nuclear plant operation.
~ Preparing new unbundled and time-of-use rate structures.                              long. term contracts with other utiliti well as from SCPPA, by particlpath Palo Verde Nuclear Generadng Se
The AOIIAIO Y SYASSI t>>I')r, i);.,Ikj>Customers Served:.........
~  Working on reducing transfers to their cities'general funds.                         Hoover Hydroelectric Plant, and San Generating Station Unit &#xb9;3. By havln,
~ Renegotiating power contracts to cut costs.                                            ability to diversify its power supply ol tlons, Azusa has maintained its retail             i
~ Meeting off-balance sheet debt obligations.                                           at tho l983 level.These compedtivo                  i w/II help tho city make a less stressful sltlon toward tho deregulated
~ Pursuing revenue        enhancement    opportunities, such as leasing poles and                                             m'nvironment.
conduit for fiber optics and other telecommunications activities.                    Customers  Served:.........               i4 Power Generated and Purchased (in H egawatt. Hours)
~ Adopting a Competition Transition Charge.                                                Self.genensted:  ..........
Purchased:.............           422 Sales
~ Reducing project operating and maintenance costs.                                         Recall:                          220 Wholesale:                         202
~ Renegotiating fuel contracts.                                                         Total Revenues  (000s):.......     $ 23 Operating Costs (000s):   ......   $ 20 rVrued lted
~ Reducing debt service by refinancing at lower interest rates.
~ Moving to more variable rate debt.
~ Pursuing aggressive legislative advocacy.
set PA  JN AcTJON    The last three items above are the particular expertise and benefit that SCPPA brought its member agencies during this fiscal year. Moreover, SCPPA staff members have adopted the new streamlined business atmosphere of the member agencies by"doing more with less" in all aspects of operations. It has been a year of unprecedented energy and accomplishment.
 
PAUL TOOR OPERATIONS AND FINANCIALS CITY OF OAHHIHG Established ln I 9 I 3,the Banning electrical system now serves an area of approxi-As of Oetober 31, 1996                                                                                    Iveighted Average                  Bond Ratings                  mately 2I square miles. The city owns a SCPPA BONDS Hoover Uprating Project Cost
                                                                                                          ~)of Capitatt 6.11 hfood~slnvestor            Standard Ibor's
                                                                                                                                                                    &      pordon of San Juan Unit 3 and a portion of Mead Adelanto and Mead-Phoenix transmission lines. In addition, the city Southern Transmission System Project                                                                        432                                                              owns a distribution system and four sub-Seruor Uen Bonds                                                                                                                Aa                      AA-            statlons to serve the customers. Being a Subordinate Uen                                                                                                            Aaa/VMG1                  AAA/A-1+          full service city, Banning's load mix is Verde Project Bonds'alo strengthened by Industrial customers, Senior Uen Bonds                                                                                                                A1                      AA-            with more Industrial projects on the way.
Project'stimated 1992 Subordinate Uen Uen                                          Bonds'ubordinate Aaa Aaa/VMIG1 AAA AAA/A-1+
Major distribution system improvements are also ln progress.
Transmission Project Bonds'ead-Adelanto SAO                                                              Customers    Served:.........            9,0$ 0 Insured Refunding                                                                                                                                                      Power Generated and Purchased Bonds'onrefunded (In Megawatt-Hours)
Self~en eratedt                            0 SA8                                                                Purchased:.............
Bonds'ead-Phoenix TransmLsion Project                                                                                                                                                                         I I 7,879 Insured Refunding Bonds'onrefunded Aaa A
AAA A
Total  ...............
Transmission (in miles)
I I 7,87 I l22 A           Total Revenues  (000s):.......   $ I3,230 A
Bonds'ultiple 6.21 Operating Costs (000s)I            $ I2,7$ 0 Project'an Juan Unit 3                                                                                          5.12                      Aaa                    AAA
'nsured; 1991 Suhndinate Van'able Rate Bonds QMBAC)t 1996 Subordinate Snies A Bonds (MBIA)/1996Subordinate van'able Rate genes B Bonds (ESA).
I Insund: 1992 Senior Ifm Bonds QMBAC); 1993 Subordinate                                          Bonds (IGIC); 1996 Suhndinate Snies A Bonds QAIBAC),'996 Subordfnate Vanabie Rate Senes B and C Bonds QI(IBAC).
I Insund: 1994 Sen'es A Bonds (AMBAC),
Unmmmittof bond promds eecund by a guarantmi rate Investment contract.
I Insund: 1993 genes A Bonds (MBIA).
IAilgenemtion bonds: 466%; ali transmissum bonds: 512%; eomhned gennntion and transmission: 500%
During the fiscal year, SCPPA continued to monitor the financial markets and address opportu-nities to reduce its fixed interest costs.
SCPPA refunded $ 222.2 million in PaloVerde Project bonds which were originally issued in 1986 and 1987. The 1996 refunding bonds consisted of sales of $ 152.9 million in Series                                                                                      A fixed rate      bonds in February, and $58.9 million in Series B variable rate obligations in April. These insured revenue bonds will produce estimated present value savings of $ 29.5 million, or 14 percent of the refunding bonds.
As the fiscal year ended, SCPPA was working on a similar two-part refunding for the Southern Transmission System, and an additional variable rate issue for Palo Verde.
Following is a status report on SCPPA's generating and transmission projects.
PALO VERDE OPERATIONS                                                                      PALO VERDE NUCLEAR GENERATING                                        199$ 90 OPERATIONS Generation      Ca(tacity (Millionsof    Utiiuation MIVHs)           (%)
sTATIDN (PvNGS)                                                                       Ten SCPPA members (all but the City of Unit 1                9.8 Unit 2                9.2 Anaheim) share a 5.91 percent interest in the three units of PVNGS,                                                                                   Unit 3 entitling them to 225 megawatts of power. SCPPA continues to                                                                                          Agg"ga<<
Industry average                    69.9
 
work with the operating agent, Arizona Public Service (APS), to increase output and lower costs in order to make Palo Verde a competitive and dependable resource.
Palo Verde began a reengineering          of work processes and organization in September 1993. Thus far, the reengineering effort has yielded lower costs, higher output, higher                PRODUCTION COST I      >>>dhkiswmcr  N>>ch>>cr>>ce Ckieadhr ratings by the Nuclear Regulatory Commission (NRC) and the Institute of                      Year          per klVh 1993              2.02 1994              1.93 Nuclear Power Operations (INPO), shorter refueling outages, and better 1995              1.61 teamwork and morale.
                                                                                                    ~ >
: v. l.-  ~ >
I I
c PaloVerdo's Spring l 996 refueling outage for Unit 2 was completed in a record 49 days.
INPO conducted a two-week evaluation of PVNGS in October 1995 and issued its first "1" rating, indicating that PVNGS achieved the highest level of exceHence in nuclear plant operation. The AOIIAIOY    SYASSI                                  high rating is expected to reduce PVNGS'insurance costs by nearly $ 1 million per year.
t>>I        ')   r,    i);.,Ikj  >
The NRC's latest Systematic Assessment of Licensee Performance (SALP) report clTY oF nunaatex            Burbank's Public          gave PVNGS ratings      of"1"in Operations, Maintenance, and Engineering, and"2>vin Service f3epartment began serving cus-tomers In I 9 I 3,and installed onwlte gen-eration ln response to a surge in industri-          Plant Support. "1" is the highest rating, and represents superior safety performance al and residential growth In tho 1940's and I 950's.Today the city receives power from which exceeds NRC standards. In the previous assessment period, PVNGS received three SCPPA projects, the Bonneville Power Admlnhtratlon, as well as firm and Interruptible supplies from other utilities          "2" ratings in all four categories. The NRC noted that APS has established new and government agencies.
Customers    Served:.........                         programs and processes necessary to achieve and sustain superior performance.
Power Generated and pe>chased (ln Hegawatt-I4ours)
Power Generated and pe>chased (ln Hegawatt-I4ours)
Self.generated Purchased.............
Self.generated                         I 0 I,078 Purchased Total
Total Transmission (In Miles).......
                .............             928,0 I I I,029,098 Transmission (In Miles).......                   398 Total Revenues (000'I)
Total Revenues (000'I).......Operating Costs (000's)I 0 I,078 928,0 I I I,029,098 398 8 94,430 8 93>744 clTY oF nunaatex Burbank's Public Service f3epartment began serving cus-tomers In I 9 I 3,and installed onwlte gen-eration ln response to a surge in industri-al and residential growth In tho 1940's and I 950's.Today the city receives power from three SCPPA projects, the Bonneville Power Admlnhtratlon, as well as firm and Interruptible supplies from other utilities and government agencies.high rating is expected to reduce PVNGS'insurance costs by nearly$1 million per year.The NRC's latest Systematic Assessment of Licensee Performance (SALP)report gave PVNGS ratings of"1" in Operations, Maintenance, and Engineering, and"2>vin Plant Support."1" is the highest rating, and represents superior safety performance which exceeds NRC standards.
Operating Costs (000's)
In the previous assessment period, PVNGS received"2" ratings in all four categories.
                        .......       8 94,430 8 93>744
The NRC noted that APS has established new programs and processes necessary to achieve and sustain superior performance.
 
THOMAS K CtARKE Corrective measures implemented following a tube rupture in one of Unit 2's steam generators in 1993 have allowed operation at full capacity, but the operating agent has recommended replacement of unit 2's two steam generators, perhaps within the next ten years, due to safety and economy reasons.If the co-owners of PVNGS decide to replace the steam generators, SCPPA's share of the cost is estimated at approximately
THOMAS K CtARKE Corrective measures            implemented following a tube rupture in one of crrv os cotTDH The Colton munidpal electric utility was established in I 895, Unit 2's steam generators in 1993 have allowed operation at full capacity,                      eight years after city incorporation. Since I 986,the electric utilityhas changed from being solely dependent on Southern but the operating agent has recommended replacement of unit 2's two steam                      California Edison for its purchased power to being actively engaged in purchasing generators,         perhaps within the next ten years, due to safety and economy                power from several different sources, achieving significant cost savings in the process.
$9 million and would be expended over approximately six years.One owner of PVNGS, El Paso Electric Company, has been under bankruptcy protection since 1992, and filed its Fourth Amended Stand Alone Plan Customers Served:.........
reasons.     If the co-owners of PVNGS          decide to replace the steam generators,      Customers    Served:.........        15,932 Power Generated and Purchased (in ldegawatt.Hours)
15,932 Power Generated and Purchased (in ldegawatt.Hours)
SCPPA's share          of the cost is estimated at approximately $9 million and would be            Sclf~ncratcd                            0 Purchased  .............
Sclf~ncratcd Purchased.............
Total ..............        ~ ~
Total..............
241,582 24 I,582 expended over approximately six years.                                                        Transmission  (ln miles)                  23 Total  Revenues (000's)
~~Transmission (ln miles)Total Revenues (000's).......Operating Costs (000's)e unaudited 0 241,582 24 I,582 23$26,072e$24,60 I e crrv os cotTDH The Colton munidpal electric utility was established in I 895, eight years after city incorporation.
Operating    Costs (000's)
Since I 986,the electric utility has changed from being solely dependent on Southern California Edison for its purchased power to being actively engaged in purchasing power from several different sources, achieving significant cost savings in the process.in September 1995.The Bankruptcy Court approved the plan, and El Paso emerged from Chapter 11 bankruptcy on February 12, 1996.All of El Paso's obligations regarding PVNGS during the bank-ruptcy period have been met.sAN JUAN oPERATIQNs San Juan Unit 3 continued to be a dependable resource for the five SCPPA members (Azusa, Banning, Colton, Glendale, and Imperial Irrigation District)who own a 41.8 per-cent share of the unit through SCPPA.IARD Ya PAtK omen Served:.........
                                                                                                                                                .......  $ 26,072e
ir Gencratcd and Purchased legawatt.Hours)
                                                                                                                                                          $ 24,60 I e One owner of PVNGS, El Paso Electric Company, has been under                              e unaudited bankruptcy protection since 1992, and filed its Fourth Amended Stand Alone Plan in September 1995. The Bankruptcy Court approved the plan, and El Paso emerged from Chapter 11 bankruptcy on February 12, 1996. All of El Paso's obligations regarding PVNGS during the bank-ruptcy period have been met.
If.g enerated rchased.............
sAN JUAN oPERATIQNs San Juan Unit 3 continued to be a dependable resource for the five SCPPA members (Azusa, Banning, Colton, Glendale, and Imperial Irrigation District) who own a 41.8 per-cent share of the unit through SCPPA.
smhslon (in miles)IR cvenues (000's).......rating Costs (000's)82,57 I I d3,499 939,096 I, I 02,595 d9$98,020$85,026 os otsHDAta Incorporated In l 906, idalo purchased Its electric utility In', obtaining power from outside sup-s.It received Its first power frotn ver Dam ln I 937 and inaugurated thc unit of its own steam generating t In l94I.Now called the Grayson cr Plant, this facility today has eight iratlng units.Glendale continues to hase 85 percent of Its power from ilde sources.A second Interim Invoicing Agreement further encouraged high capacity factors and lower per unit fuel costs.Despite the major scheduled maintenance outage in the spring, SCPPA members received nearly 1.5 million MWH from San Juan in FY 1995-96.Installation of a new limestone scrubber system for the removal of sulfur~dioxide was approved late in the fiscal year.Besides improving emissions control, the three-year project will save SCPPA$3 million per year in operating and main-tenance costs.Both the operating agent (Public Service Company of New Mexico)and the coal supplier are actively exploring other ways to reduce costs and make San Juan Generating Station a competitive resource for its owners MEAD-PHQENIx/MEAD-ADELANTo TRANsMIssloN PRDJEcTs After more than a decade of plan-ning and two and a half years of construction the Mead-Phoenix and Mead-Adelanto Transmission Lines went into commercial operation in April 1996.These two 500-kV AC transmission lines will cany power between the Phoenix area, the Las Vegas area, and Southern California.
A  second Interim Invoicing Agreement further encouraged        high capacity IARD Ya PAtK factors and lower per unit fuel costs. Despite the major scheduled maintenance outage in the spring, SCPPA members received nearly 1.5 million MWH from os otsHDAta Incorporated In l 906, idalo purchased Its electric utility In San Juan in FY 1995-96.
Nine San Juan Gonaratlng Station SCPPA members own roughly one-fifth of Mead-Phoenix and one-third of Mead-Adelanto through SCPPA.HoovER UPRATING PRoJEcT The Hoover Uprating Project, which increased the rated capacity at Hoover Power Plant by 35 percent, was declared complete this year.Nine SCPPA members (Anaheim, Azusa, Banning, Burbank, Colton, Glendale, Pasadena, Riverside, and Vernon)participated in the uprating and have obtained entitlements totaling 127 MW of capacity and approximately 143,000 MWH per year in allocated energy.The cities of Anaheim, Riverside, Burbank, Azusa, Banning, and Colton financed their participation through SCPPA.Two issues which may affect operations at Hoover are the proposed sale of the Federal Power Marketing Administrations (PMAs)and possible required mitigation of effects on endangered species in the lower Colorado River area.These issues are discussed under Legislative Advocacy.souTHERN TRANshIissloN SYSTEM As usual, the Southern Transmission System (STS)continued to operate at or above design parameters, transmitting 11.3 mil-lion MWH of power over its 488 miles, compared with 12 million MWH in fiscal year 1994-95.The line operated at 70.5 percent of capability, with 99.53 percent availability.
', obtaining power from outside sup-
STS, a a 500-kV DC transmission line and associated converter stations, moves power between the Intermountain Converter Station in Utah to the Adelanto Converter Station in Southern California.
: s. It received Its first power frotn ver Dam ln I 937 and inaugurated thc                Installation of a new limestone scrubber system for the removal of sulfur unit of its own steam generating t In l94I. Now called the Grayson cr Plant, this facility today has eight      ~
KENNETH S MOILER IMPERIAL IRRIGATION DISTRICT IID entered the power Industry In l936 and today serves a peak load of 640 NW with 790 NW of generating resources.
dioxide was approved late in the fiscal year. Besides improving emissions control, iratlng units. Glendale continues to hase 85 percent of Its power from ilde sources.                                  the three-year project will save SCPPA $ 3 million per year in operating and main-omen    Served:.........           82,57 I ir Gencratcd  and Purchased                    tenance costs.
Among IID~ned resources are 24 NW of low head hydro units along the All American Canal, 307 NW of gas-fired steam and combined cyde units, and l62 NW of peaking gas turbines.In addition to IID's share of SCPPA resources com-prislng l04 NW at San Juan and l4 NW at Palo Verde, IID has 179 NW of other resources under long-tenn purchase con-tracts.86,870 Customers Serve>h........
legawatt.Hours)
Power Generated and Purchased (In N egawatt-Hours)
If.generated                      I d3,499 rchased    .............         939,096 I, I 02,595 Both the operating agent (Public Service Company of New Mexico) and the smhslon (in miles)                      d9 IR  cvenues (000's) ....... $ 98,020 rating Costs (000's)          $ 85,026
Self-Generated
 
.........774,587 Purchased...........
coal supplier are actively exploring other ways to reduce costs and make San Juan Generating Station a competitive resource  for its owners MEAD-PHQENIx/MEAD-ADELANToTRANsMIssloN PRDJEcTs                    After more than a decade of plan-ning and two and a half years of construction the Mead-Phoenix and Mead-Adelanto Transmission Lines went into commercial operation in April 1996. These two 500-kV AC transmission lines will cany power between the Phoenix        area, the Las Vegas area, and Southern California. Nine San Juan Gonaratlng Station SCPPA members own roughly one-fifth of Mead-Phoenix and one-third of Mead-Adelanto through SCPPA.
I,893,599 Total...............
HoovER UPRATING PRoJEcT            The Hoover Uprating Project, which increased the rated capacity at Hoover Power Plant by 35 percent, was declared complete this year. Nine SCPPA members (Anaheim, Azusa, Banning, Burbank, Colton, Glendale, Pasadena,              Riverside, and Vernon) participated in the uprating and have obtained entitlements totaling 127 MW of capacity and approximately 143,000 MWH per year in allocated energy. The cities of Anaheim, Riverside, Burbank, Azusa, Banning, and Colton financed their participation through SCPPA.
2,668,I86 Transmission Facilities (in Miles)l,637 Total Revenues (000's).....$I 97,9 I 7 Operating Costs (000's)....$I 77,624 LEGISLATIVE ADVOCACY In the past year, SCPPA played its most crucial role to date in representing public power issues in Washington, D.C.By year end it had also made plans to maintain a continuous presence in the California legislature.
Two issues which may affect operations at Hoover are the proposed sale of the Federal Power
The following examples underscore the value of SCPPA's advocacy in Congress.ELEcTRlc UTILITY INDUsTRY REsTRUcTURING Discussions about electric utility restructuring 4 A>COTTON li'NCEIXS DEPARTMENT OF WATER AND In 19I6, the City of Los Angeles I distributing electric power pur-id from the Pasadena Municipal;r Plant, and the following year;Orated its first generating capacity at Francisqulto Power Plant No.I.22 the city purchased thc remaining butlon system of Southern California
 
>n Company within the city limits.It Ir thc largest Inunlcipally owned elec-itility In the nation.During l 995-96 It rwcnt a major business restructuring Iss to prepare for upcoming dcrcgu-I>mers Servcdi........
KENNETH S MOILER Marketing Administrations (PMAs) and possible required mitigation of effects on endangered species in the lower Colorado River area. These issues are discussed IMPERIAL IRRIGATION DISTRICT under Legislative Advocacy.                                                                     IID entered the power Industry In l936 and today serves a peak load of 640 NW with 790 NW of generating resources.
I,350,807 rG eneratcd and Purchased egawatt.Hours)
Among IID~ned resources are 24 NW souTHERN TRANshIissloN SYSTEM As usual, the Southern Transmission System                        of low head hydro units along the All American Canal, 307 NW of gas-fired steam and combined cyde units, and l62 (STS) continued to operate at        or above design parameters, transmitting 11.3 mil-        NW of peaking gas turbines. In addition to IID's share of SCPPA resources com-lion MWH of power over its 488 miles, compared with 12 million MWH in fiscal                    prislng l04 NW at San Juan and l4 NW at Palo Verde, IID has 179 NW of other resources under long-tenn purchase con-year 1994-95. The line operated at 70.5 percent of capability, with 99.53 percent              tracts.
I'-generated
Customers Serve>h........              86,870 Power Generated and Purchased availability. STS, a a 500-kV DC transmission line and associated                converter (In N egawatt-Hours)
.........2I,848,8I6 chased............
Self-Generated Purchased
7,079,3 I 3 al...............
                                                                                                                                    ...........            774,587 I,893,599 stations, moves power between the Intermountain Converter Station in Utah to                      Total  ...............
28>928,I29 ,mhslon (ln miles).....3,743 Revenues (000's)......$l,946,850 sting Costs(000's)
Transmission Facilities (in Miles) 2,668,I86 l,637 Total Revenues (000's)    .....     I 97,9 I 7 the Adelanto Converter Station in Southern California.                                          Operating Costs (000's)     .... $$  I 77,624 LEGISLATIVEADVOCACY In the past year, SCPPA played its most crucial role to date in representing public power issues in Washington, D.C. By year end it had also made plans to maintain a continuous presence in the California legislature. The following examples underscore the value of SCPPA's advocacy in Congress.
.....$I,625,753 and ways to increase competition in the industry were prominent on the congres-sional agenda in 1996.SCPPA was actively involved in this federal restructuring debate.During visits with Members of Congress and staff in Washington, D.C., and an April congressional staff tour of several SCPPA facilities, SCPPA representatives discussed the effects of the California restructuring on municipal utilities, and SCPPA's view that federal legislation would be premature at this'time.
ELEcTRlc UTILITY INDUsTRY REsTRUcTURING                      Discussions about electric utility restructuring 4  A> COTTON and ways to increase competition in the industry were prominent on the congres-li'NCEIXS sional agenda in 1996. SCPPA was actively involved in this federal restructuring DEPARTMENT OF WATER AND In 19I6, the City of Los Angeles          debate. During visits with Members of Congress and staff in Washington, D.C., and I distributing electric power pur-id from the Pasadena Municipal
In addition, Executive Director Dan Waters testified for SCPPA and the American Public Power Association on March 29 at a restructuring hearing held by the Senate Energy and Natural Resources Committee.
;r Plant, and the following year              an April congressional staff tour of several SCPPA facilities, SCPPA representatives
Rusus HICHTOWER Customers Scrvcd:.........
;Orated its first generating capacity at Francisqulto Power Plant No. I.
Power Generated and Purchased (ln Megawatt.Hours)Sell-generated Purchased Total Transmission Facilidcs (in Miles).Total Revenues (000's).......Operating Costs (000's)58,732 I 85,289 984,0$7 I~I 69,346$7$I I 0,975$9$,654 clTY DF FAsADEHA Established In 1906, tho city built its first electric generating steam plant In I 907 and took over opera-tion of its municipal street lighting from Edison Electric.In 1909, Pasadena began the extension of its operations to com-mercial and residential customers that resulted In the replacement of all Edison electric service In tho city by l920.In I 995.96, Pasadena purchased approxi-mately 85 percent of its power needs.Utility restructuring and consumer choice issues are likely to be at the top of the energy agenda in the 105th Congress.SCPPA will continue to play a role in the development of legislation as the restructuring debate moves forward next year.THE NUcLEAR wAsTE PQLIGY AcT With a 5.91 percent interest in the PaloVerde Nuclear Generating Facility, SCPPA has a keen interest in pending legislation to reauthorize the Nuclear Waste Policy Act of 1982, with amendments.
discussed the effects of the California restructuring on municipal utilities, and 22 the city purchased thc remaining butlon system of Southern California
Passage of these proposed amendments would provide solutions for waste generated at the station at an interim nuclear waste disposal facility by 1998 and later at a permanent disposal site atYucca Mountain, Nevada.The Senate bill was eventually approved, but a veto threat from President Clinton and strong opposition from the Nevada delegation stopped efforts to pass the legislation this year.PowER 9dARKETINa AotdiNISTRATIoNS In its early years the Clinton administration attempted to auction federally owned power marketing administrations (PMAs)for a one-time reduction in the federal deficit.One PMA earmarked for sale was the Western Area Power Administration (WAPA), which provides power to most SCPPA members.This proposed sale would privatize the Hoover hydroelectric project, the Parker and Davis power plants, and their related transmission facilities.
>n Company within the city limits. It          SCPPA's view that federal legislation would be premature at this'time. In addition, Ir thc largest Inunlcipally owned elec-itilityIn the nation. During l 995-96 It rwcnt a major business restructuring          Executive Director Dan Waters testified for SCPPA and the American Public Power Iss to prepare for upcoming dcrcgu-I Association on March 29 at a restructuring hearing held by the Senate Energy and
Sale of the PMAs would negatively affect public power operations unless the sales are made to existing contractors.
>mers  Servcdi........         I,350,807 rG eneratcd  and Purchased egawatt.Hours)                                Natural Resources Committee.
Although no serious PMA auction effort surfaced in 1996, the federal power program was carefully scrutinized, and many legislators remain staunch advocates of privatization.
I'-generated  .........
ENI3ANaEREI3 SPEciES ACT REAUTHoRIXATIoN Republican leaders named reauthorization of the Endangered Species Act as a top legislative priority, but their legislation immediately met opposition from environmental groups, Democrats, and many Republicans.
chased............
Fearing anti-environmental sentiment for the GOP, its Customers Served: Power Generated and Purchased (In Megawatt.Hours)Self~ncratcd Purchased.............
2I,848,8I6 7,079,3 I 3 al  ...............
Total Transmhsion (In miles)Total Revenues (000's).......Operating Costs (000's)29$I 7 5 I6 BILL Do CARHAHAH l.~clTY oF RlvfnsIDE Rlversldo Pl Utilities is posltlonlng Itself to offer t petltive rates ln the new dercgul environment.
,mhslon (ln miles) .....
Power and transmh costs constitute the bulk of cha passed on to our customers thrI rates.Cost reduction and rcstructII efforts at SCPPA have had slgnlfi impact on Riverside Public Utlli efforts in meeting our lower ope.cost targets.Additional efforts, espc at Palo Verde Iqucicar Gener.Station, will be required for Riversid compete ln future years.
28>928,I29 3,743 Revenues (000's)  ......   $ l,946,850 sting Costs(000's) .....     $ I,625,753
leadership kept the legislation from being brought to the House floor for a vote this year.SCPPA continues to support ongoing voluntary efforts by California, Arizona, Nevada, and the Department of the Interior to protect endangered species in the Lower Colorado River region.These agencies are proceeding on the assumption that there will be no significant changes to the Endangered Species Act in the future.TAx-ExEIuiPT FUNDING Concentrated efforts by SCPPA members and the public power community~'I;er Dam to educate Members of Congress and staff of the value of tax-exempt financing provided a needed advantage in 1996.Investor-owned utilities gOUs)have opposed tax-exemption for public power entities, claiming that this status would give public power an unfair advantage under deregulation.
 
Despite IOU attempts to restrict tax-exempt financing in 1996 budget reconciliation legislation, no such proposals were approved.RENEwABLE ENERGY PRDDUcTIDN INcENTIYE The Department of Energy's Renewable Energy Production Incentive (REPg provides incentive payments to KENNETH Je DE DARIO Customers Served:.........
Rusus HICHTOWER clTY DF FAsADEHA Established In 1906,                 Utilityrestructuring and consumer choice issues are likely to be at the top of tho city built its first electric generating steam plant In I 907 and took over opera-tion of its municipal street lighting from        the energy agenda in the 105th Congress. SCPPA willcontinue to play a role in the Edison Electric. In 1909, Pasadena began the extension of its operations to com-mercial and residential customers that development of legislation as the restructuring debate moves forward next year.
Power Generated and Purchased (in Megawatt-Hours)
resulted In the replacement of all Edison electric service In tho city by l920. In I 995.96, Pasadena    purchased approxi-mately 85 percent of its power needs.             THE NUcLEAR wAsTE PQLIGY AcT        With a 5.91 percent interest in the PaloVerde Customers    Scrvcd:.........             58,732 Power Generated and Purchased                    Nuclear Generating Facility, SCPPA has a keen interest in pending legislation to (ln Megawatt. Hours)
Selpgenerated Purchased........,..., Total Transmission (in miles)Total Revenues (000's)Operadng Costs (000's)~Unaudited 2,040 676 l,077,823 l,078,499 2.4$50, I 99e$37, I 62t'lTY oF YERNQN Vernon's Light and Power Department began serving indus-trial'customers in!933, with completion of its diesel generating plant.In addition to its own power from diesel units plus recently Installed gas turbines, Vernon now receives power from Palo Verde, Hoover, and various utilities, including APS, CDWR, SRP, BPA and Edison.
Sell-generated                        I 85,289 Purchased                          984,0$ 7  reauthorize the Nuclear Waste Policy Act of 1982, with amendments. Passage Total                            I ~ I 69,346 Transmission Facilidcs (in Miles) .            $7 Total Revenues (000's)
energy providers who generate energy from such sources as wind, geothermal sources, and landfill gas.SCPPA and other REPI supporters obtained last-minute funding for the program during the fiscal year 1996 appropriations process.SCPPA member City of Glendale received the largest single payment of$946,921 for more than 60 million kilowatt-hours of power generated during 1995 at its Grayson landfill gas-fired facility.Intense efforts by SCPPA and other REPI supporters established fiscal year 1997 incentives as a major bipartisan platform during the appropriations debate.A)e;g>C" N'js!A(lj 4 Br'delanto Converter Station is the western terminus of tho Southern Tranmission System.PERCENTAGE OF SCPPA MEMBER PARTICIPATION IN SCPPA'S INTEREST PALO VERDE PROJECT HOOVER VPRATIHO PROJECT HEAD ADELAHIO PROJECT HNA~PRO/ECI SOUTHERH TRAHIHUNIOH NVNTEH PROJECT NAH JVAH PROJECT (OX (0%u(NP(LNN LllQ LNQ(5 ND(ONL NINON(OX(NN(((LNR (1X BDO NN(5D(N(DDN QNJNQ QBO(lf JL(ONL (LIX MNJ NYBM((11(X 0 NINNNN I Nmx NNNUN 1L(L((NL LN(((5 LNINBN LML QBDIL(LINENS QLNN ts(X BO0 REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its opemtions and its cash flows for the years then ended in conformity with generally accepted accounting principles.
Operating Costs (000's)
These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits.We conducted our audits of these statements in accordance with generally accep'ted auditing standards which require that we plan and perform the audit to obtain reasonable assumnce about whether the financial statements are free of material misstatement.
                        .......     $ I I 0,975  of these proposed amendments would provide solutions for waste generated at
An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.
                                    $ 9$ ,654 the station at an interim nuclear waste disposal facility by 1998 and later at a permanent disposal site atYucca Mountain, Nevada. The Senate bill was eventually approved, but a veto threat from President Clinton and strong opposition from the Nevada delegation stopped efforts to pass the legislation this year.
We believe that our audits provide a reason-able basis for the opinion expressed above.In our opinion, the accompanying separate balance sheets and the related sepamte statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Mo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of opemtions of the Authority's PaloVerde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generaHy accepted accounting principles.
PowER 9dARKETINa AotdiNISTRATIoNS In its early years the Clinton administration attempted to auction federally owned power marketing administrations (PMAs) for a one-time reduction in the federal deficit. One PMA earmarked for sale was the Western Area Power Administration (WAPA),
These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial state-ments based on our audits.We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement.
which provides power to most SCPPA members. This proposed sale would privatize the Hoover hydroelectric project, the Parker and Davis power plants, and their related transmission facilities. Sale of the PMAs would negatively affect public power operations unless the sales are BILL Do CARHAHAH l
An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.
made to existing contractors. Although no serious PMA auction effort surfaced in                            . ~
We believe that our audits provide a reasonable basis for the opinion expressed above.Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole.The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements.
1996, the federal power program was carefully scrutinized, and many legislators clTY oF RlvfnsIDE Rlversldo Pl Utilities is posltlonlng Itself to offer t remain staunch advocates of privatization.                                                   petltive rates ln the new dercgul environment. Power and transmh costs constitute the bulk of cha passed on to our customers thrI ENI3ANaEREI3 SPEciES ACT REAUTHoRIXATIoN                    Republican leaders named        rates. Cost reduction and rcstructII efforts at SCPPA have had slgnlfi impact on Riverside Public Utlli reauthorization of the Endangered Species Act as a top legislative priority, but their        efforts in meeting our lower ope .
This information is the responsibility of the Authority's management.
cost targets. Additional efforts, espc at Palo Verde Iqucicar Gener.
Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.Price Waterhouse LLP Los Angeles, California SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED BALANCE SHEET tin thousands)
legislation immediately met opposition from environmental groups, Democrats,                  Station, will be required for Riversid compete ln future years.
ASSETS June 30, 1996 Mo Itansn2issu7n Hoooer Mead-Mead-Mutt2)7tc San June 30, Verde System I!puting Phoenix BMttanto Project juan 1995 project ptoj62t pn7jeet project project F~Projnt Thtal Xta!Utility plant: Production
and many Republicans. Fearing anti-environmental sentiment for the GOP, its                  Customers Served:
.Transmission General S 613,608 14,146$674,606~569 18 893 S 171,068$48,307 164 1 971$183@09 8 613 S 967985$795080 737,223 689,447~3046 29155 Less-Accumulated depreciation
Power Generated and Purchased (In Megawatt. Hours)
.630+23 693,499 250 021 194 127 S0,278 171,232 846 1 255 191,922 1,737,254 1513,682 36622~48 871 418688 Construction work in progress Nudear fuel, at amortized cost Net utility plant Spedal funds: Available for sale at fair value (Note 2): Decommissioning fund........
Self~ncratcd                        29 Purchased.............
Investmcnts Escrow account-Came series Advance to Intennountain Power Agency.Advances for capacity and energy, net Interest receivable Cash and cash cquivalcnts 33,474 11S,746 102,842$343,898 19~1,512 67879 2,169 90324 380+02 499,372 9+03 13 225 49,432 169,977 3,116~5'48 169977 155,300 1,254$83 1,094,994 3,501 16,120 206/73 13225~1716 158 801 1,283 728~114.283 9,628 10,119 6 841 2,285 1997~18~4N 9,220 67 7546 33,474 597,427 343,898 19/50 10,119 16,100 173 798 24~682,442 343,921 19~0 11,903 16~1 120 610 21/91 6~62$250,888 34,170 Accounts receivable Materials and supplies Costs recoverable from future billings to participants..................
Total Transmhsion (In miles)
Unrealized loss on investments in funds available for sale Prepaid construction costs Prepaid cxpcnses................
Total Revenues (000's)
Unamortized debt expenses, less accumulated amortization of$132,265 and$127,197 in1996and1995
Operating Costs (000's)
.218 611 558 718 21 750 23 980~69 1 260108 41 783 1'194 366 1 219470 738 9,240 2,687 19'1,750 4,741 (6,402)945 4,478 S,272 3569 12,809 13,297 204,945 203,787 7~Ir394 4+83 31,780 453,827 411,031 3 9 28 4 3,365 2+35 5~26 66 92 3090 413348~429 08 201 693 164 247~37 9 888 28 225 S 1,011,713$1,431,741 S 32.617$89,59S$276,669 S 253,706$239,972$3,366,013$3,400,732 Long-tenn debt LIABILITIES
                                                                                                                                              .......     $ I7 5 I6
$981,155$1,034,757 S 30,981 S 86,417$268,05 S 242,786$222,444 S 2,866~5$2,894,471 Subordinate Refunding Crossover Series Arbitmgc rebate payable Defcrrcd aedits Current liabilities:
 
Long-tenn debt due within one year..Acaucd interest Accounts payable and accrued expenses Total cunent liabilities Commitments and contingencies.....
leadership kept the legislation from being brought to the House floor for a vote this year. SCPPA continues to support ongoing voluntary efforts by California, Arizona, Nevada, and the Department of the Interior to protect endangered species in the Lower Colorado River region. These agencies are proceeding on the assumption that there willbe no significant changes to the Endangered Species Act in the future.
347/88 347,782 77 2,664 1,141 25,690 10,845 1,085 6,035 43,655 38,790 24~38,436 489~7,884 8,256 S,994 88,182 95,288 10 333 315 62 S90 780 5499 17579 73185~60 8~49 96 1636 3178 8664 8256~17 28 149416 157261$1,041,713$1,431,741$32,617$89595$276,669$253,706$239,972$3,366,013$3,400,732 7he turornpanying notes an an integ7u!Part of thesefinaneiat statrrnenh.
TAx-ExEIuiPT FUNDING Concentrated efforts by SCPPA members and the public power community
                                                                              ~ '
I; er Dam KENNETH Je DE DARIO to educate Members of Congress and staff of the value of tax-exempt financing provided a needed advantage in 1996. Investor-owned utilities gOUs) have oF YERNQN      Vernon's Light and opposed tax-exemption for public power entities, claiming that this status would      Power Department began serving indus-trial'customers in !933, with completion of its diesel generating plant. In addition give public power an unfair advantage under deregulation. Despite IOU attempts        to its own power from diesel units plus recently Installed gas turbines, Vernon to restrict tax-exempt financing in 1996 budget reconciliation legislation, no such  now receives power from Palo Verde, Hoover, and various utilities, including APS, CDWR, SRP, BPA and Edison.
proposals were approved.                                                              Customers    Served:.........         2,04062t'lTY Power Generated and Purchased (in Megawatt-Hours)
Selpgenerated                        676 RENEwABLE ENERGY PRDDUcTIDN INcENTIYE The Department                    of Energy's   Purchased  ........,...,     l,077,823 Total                          l,078,499 Transmission (in miles)                  2.4 Renewable Energy Production Incentive (REPg provides incentive payments to           Total Revenues (000's)            $ 50, I 99e Operadng Costs (000's)            $ 37, I
                                                                                              ~ Unaudited
 
energy providers who generate energy from such sources as wind, geothermal sources, and landfill gas. SCPPA and other REPI supporters              obtained last-minute funding for the program during the fiscal year 1996 appropriations process. SCPPA member City of Glendale received the largest single payment of $ 946,921 for more than 60 million kilowatt-hours of power generated during 1995 at its Grayson landfill gas-fired facility. Intense efforts by SCPPA and other REPI supporters established fiscal year 1997 incentives as a major bipartisan platform during the appropriations debate.
N A)e;                                                                                                                            'js g>C"
                                                                                                                        !            A(lj 4 Br'delanto Converter Station is the western terminus of tho Southern Tranmission System.
PERCENTAGE OF SCPPA MEMBER PARTICIPATION IN SCPPA'S INTEREST PALO VERDE                        HOOVER VPRATIHO          HEAD ADELAHIO              HNA~                  SOUTHERH                        NAH JVAH PROJECT                          PROJECT                  PROJECT                    PRO/ECI                TRAHIHUNIOH                      PROJECT NVNTEH PROJECT (OX                                  (0%
u(    NP(LNN    LllQ LNQ(5 ND(ONL NINON(
OX(NN(    ((LNR I
LN(((5 Nmx    NNNUN 1L(L((NL LNINBN  LML QBDIL(
(1X BDO                                      NYBM(                              LINENS NN(5D(  N(DDN    QNJNQ                                    (11(X                              QLNN QBO(lf                                      0 NINNNN ts(X JL(ONL                                                                      BO0 (LIX MNJ
 
REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board  of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its opemtions and its cash flows for the years then ended in conformity with generally accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with generally accep'ted auditing standards which require that we plan and perform the audit to obtain reasonable assumnce about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reason-able basis for the opinion expressed above.
In our opinion, the accompanying separate balance sheets and the related sepamte statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Mo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of opemtions of the Authority's PaloVerde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generaHy accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial state-ments based on our audits. We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for the opinion expressed above.
Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole.
The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements. This information is the responsibility of the Authority's management. Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.
Price Waterhouse LLP Los Angeles, California
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED BALANCE SHEET tin thousands)
June 30, 1996 Mo            Itansn2issu7n  Hoooer          Mead-             Mead-           Mutt2)7tc      San                            June 30, Verde         System         I!puting        Phoenix            BMttanto        Project         juan                            1995 project        ptoj62t        pn7jeet          project            project        F~              Projnt        Thtal          Xta!
ASSETS Utilityplant:
Production .                                                    S    613,608                                                      S    171,068                    $    183@09    S    967985    $    795080 Transmission                                                            14,146  $    674,606                    $      48,307                164                                      737,223        689,447 General                                                          ~569                  18 893                            1  971                                            8 613 ~3046                  29155 630+23        693,499                            S0,278          171,232                          191,922    1,737,254        1513,682 Less  - Accumulated depreciation          .                           250 021        194 127                                846            1 255                        36622  ~48        871      418688 380+02        499,372                            49,432          169,977                          155,300    1,254$ 83        1,094,994 Construction work in progress                                            9+03                                            3,116                                            3,501          16,120        206/73 Nudear fuel, at amortized cost                                          13 225                                                                                                            13225    ~1716 Net utilityplant                                                                                              ~5'48                  169977                          158 801    1,283 728    ~114.283 Spedal funds:
Available for sale at fair value (Note 2):
Decommissioning        fund........                                 33,474                                                                                                            33,474          24~
Investmcnts                                                        11S,746        102,842  $        9,628          21/91              6~62 $        250,888          34,170        597,427        682,442 Escrow account -    Came        series                                          343,898                                                                                            343,898        343,921 Advance to Intennountain Power Agency                .                                   19~                                                                                              19/50          19~0 Advances for capacity and energy, net                                                                    10,119                                                                            10,119          11,903 Interest receivable                                                                                                                                                                                        16~1 Cash and cash cquivalcnts 1,512 67879 2,169 90324            1997 6
                                                                                                                  ~18 ~4N      841          2,285            9,220 7546 67        16,100 173 798          120 610 218 611        558 718          21 750          23 980      ~69          1      260108            41 783    1 '194  366    1 219470 Accounts receivable                                                          738          2,687              19          '1,750            4,741          (6,402)            945          4,478          S,272 Materials and supplies                                                      9,240                                                                                            3569          12,809          13,297 Costs recoverable from future billings to participants..................                                        204,945        203,787            7~              Ir394            4+83                          31,780      453,827          411,031 Unrealized loss on investments in funds available for sale                                                                                            3                9              28                              4          3,365          2+35 Prepaid construction costs                                                                                                                                                                                    5~
Prepaid  cxpcnses................                                                                                              26              66                                              92 Unamortized debt expenses, less accumulated amortization of $ 132,265 and $ 127,197 in1996and1995        .                                            201 693        164 247  ~37                        9 888          28 225                            3090        413348    ~429        08 S 1,011,713    $ 1,431,741    S      32.617    $    89,59S      $    276,669  S    253,706    $    239,972  $ 3,366,013    $ 3,400,732 LIABILITIES Long-tenn debt                                                    $    981,155  $ 1,034,757 S          30,981    S    86,417 $        268,05    S    242,786    $    222,444  S  2,866~5 $ 2,894,471 Subordinate Refunding Crossover Series                                                                                                                                                    347/88          347,782 Arbitmgc rebate payable                                                                                                                                                                                          77 Defcrrcd aedits                                                                                                                                                                              2,664          1,141 Current liabilities:
Long-tenn debt due within one year Acaucd interest Accounts payable and accrued expenses 25,690 24~
10 333 10,845 38,436 315 1,085 489 62
                                                                                                                            ~  S90 7,884 780 8,256 6,035 S,994 5499 43,655 88,182 17579 38,790 95,288 73185 Total cunent liabilities                                        ~60          8 ~49        96          1636            3178              8664            8256    ~17        28      149416          157261 Commitments and        contingencies.....
                                                                  $ 1,041,713   $ 1,431,741   $      32,617 $       89595 $         276,669   $    253,706   $   239,972   $ 3,366,013 $ 3,400,732 7he turornpanying notes an an integ7u! Part of thesefinaneiat statrrnenh.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPERATIONS (in thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPERATIONS (in thousands)
Southe7n T)nrn7nission Hoootr Sltste7n trprating p7ofeet profert Year Pe7ded j(ale SO, 1996 San 7172r Bukd juan june 30, ptojeet 7t)tat 199S Operating revenues: Sales of electric enetm7.Sales of transmission services.$135,464$3+49$50,117$188,930$183,603$85 297$226$172 85 695 91,250 Total operating revenues 155 464 85 297~39 226 172 50'117 274 625 274.853 Opera tmg expenses: Amortization of nudear fuel Other operations
Year Pe7ded j(ale SO, 1996 Southe7n T)nrn7nission      Hoootr                                        San                          7172r Bukd Sltste7n            trprating                                      juan                        june 30, p7ofeet            profert                                        ptojeet        7t)tat        199S Operating revenues:
..Maintenance
Sales of electric enetm7 .                                                $ 135,464                        $    3+49                                      $ 50,117      $ 188,930      $ 183,603 Sales of transmission services .                                                      $ 85 297                            $        226      $    172                      85 695        91,250 Total operating revenues                                              155 464          85 297        ~39                      226          172        50'117      274 625        274.853 Opera tmg expenses:
.Depreciation
Amortization of nudear fuel                                                    7,949                                                                                            7,949        8,150 Other operations      ..                                                    25,
.Decommissioning
COMBINED SCHEDULE OF LONG-TERM DEBT AT JUNE 303 1996 fin th7outanA)
COMBINED SCHEDULE OF LONG-TERM DEBT AT JUNE 303 1996 fin th7outanA)
Principal:
I/ate    Effntloe      Maturity on oJ Sate  Interest Rate July  I          Total Principal:
Palo Verde Project Revenue and Refunding Bonds Southern I?ansmission System Project Revenue and Refunding Bonds 1985A 1985B 1986A 1986B 1987A 1989A 1992A 1992C 1993Sub 1993A 1996A 1996B 1986A 1986B 1988A 1991A 1992 Comp 1,2,4 1992 Comp 3 1993A I/ate oJ Sate 05/22/85 07/02/85 03/13/86 12/16/86 02/11/87 02/1S/89 01/01/92 01/01/92 03/01/93 03/01/93 02/13/96 02/29/96 03/18/86 04/29/86 11/22/88 IN/17/91 07/20/92 07/20/92 07/01/93 Effntloe Interest Rate 9.7%9.1%8.2%7.2%6.9%7.2%6.0%6.0%55%55%4.4%44%8.0%75%7.2%6.4%6.1%6.1%S.4%Maturity on July I 1996 to 1999 1996 to 2000 1996 to 2006 1996 to 2017 1996 to 2017 1996 to 2015 1996 to 2010'1996 to 2010 1996 to 2017 1996 to 2017 1996 to 2017 1996 to 2017 1996 to 2021 1996 to 2023 1996 to 2015 2019 1996 to 2021 1996 to 2021 1996 to 2023 Total$1,070 5,610 71,220 96,450 43,720 287,705 7,265 15,620 98,200 270,035 152,905 58 870 1,108,670 107@00 401570 154,085 291,700 40,639 431,766 125 865 Hoover Uprating Project Revenue and Refunding Bonds.1986A 1991'8/13/86 8.1%08/01/91 6.2%1996 to 2017 1996 to 2017 4,160 31695'ultiple Project Revenue Bonds Mead-Phoenix Project Mead-Adeianto Project Multiple Project.1989 1989 1989 01/01/90 7.1%01/IN/90 7.1%01/04/90 7.1%1999 to 2020 1999 to 2020 1999 to 2020 38,800 106,700 259 100 Mead-Phoenix Project Revenue Bonds Mead-Adelanto Projed Revenue Bonds San Juan Project Revenue Bonds Total principal amount Unamortized bond discount: Mo Verde Project Southcmltansmission System Project Hoover Uprating Project Mead-Phoenix Project Mead-Adelanto Project........Multiple Projed Fund San Juan Project Total unamortized bond discount Long-tenn debt due within one year'lbtal long-term debt, net (including Subordinate Refunding Crom'eries) 1993 03/01/94 53%03/01/94 53%06/01/93 5.6%2006 to 2015 2006 to 2015 1997 to 2020 51 835 173 955~257 75~365 015 (101,823)(1S9,935)(3~9)(4,218)(12,650)(16313)~8899 30742 43 655$3.213.933 Note S-Disclosures about Fair Value of Financial Instrumcntsr The following methods and assumptions were used to estimate the fair value of each class of financial instruments for which it is pmc-ticable to estimate that value: Long-tenn debt/Special Obligation Crossover Series Bonds/Subordinate Refiutding Crossover Series-The fair value of the Authority's debt is estimated based on the quoted market prices for the same or sim-ilar issues or on the current avemge rates offered to the Authority for debt of approximately the same remaining maturities, net'of the effect of a related interest rate swap agreement.
Palo Verde Project Revenue and Refunding Bonds               1985A                     05/22/85  9.7%          1996    to 1999  $        1,070 1985B                     07/02/85 9.1%          1996    to 2000          5,610 1986A                    03/13/86 8.2%          1996  to 2006          71,220 1986B                    12/16/86 7.2%          1996  to 2017          96,450 1987A                    02/11/87 6.9%          1996  to 2017          43,720 1989A                    02/1S/89 7.2%          1996  to 2015        287,705 1992A                    01/01/92 6.0%          1996  to 2010            7,265 1992C                    01/01/92 6.0%          '1996  to 2010          15,620 1993Sub                  03/01/93 55%          1996    to 2017          98,200 1993A                      03/01/93 55%          1996    to 2017        270,035 1996A                      02/13/96 4.4%        1996    to 2017        152,905 1996B                      02/29/96 44%          1996    to 2017          58 870 1,108,670 Southern I?ansmission System Project Revenue and Refunding Bonds                                1986A                    03/18/86 8.0%          1996    to 2021        107@00 1986B                    04/29/86 75%          1996    to 2023        401570 1988A                    11/22/88 7.2%          1996    to 2015        154,085 1991A                    IN/17/91 6.4%          2019                  291,700 1992 Comp 1,2,4          07/20/92 6.1%          1996    to 2021          40,639 1992 Comp 3              07/20/92  6.1%         1996    to 2021      431,766 1993A                    07/01/93  S.4%         1996    to 2023        125 865 Hoover Uprating Project Revenue and Refunding Bonds .                                         1986A                    '8/13/86  8.1%         1996 to 2017              4,160 1991                      08/01/91  6.2%         1996 to 2017            31695
The fair values of the Authority's financial instruments are as follows (in thousands):
                                                                                                                                                'ultiple Project Revenue Bonds Mead-Phoenix Project                                      1989                      01/01/90  7.1%         1999 to 2020            38,800 Mead-Adeianto Project                                      1989                      01/IN/90  7.1%         1999 to 2020          106,700 Multiple Project .                                         1989                      01/04/90  7.1%         1999 to 2020          259 100 Mead-Phoenix Project Revenue Bonds                                                    03/01/94  53%          2006 to 2015            51 835 Mead-Adelanto Projed Revenue Bonds                                                    03/01/94  53%          2006 to 2015         173 955 San Juan Project Revenue Bonds                              1993                      06/01/93  5.6%          1997 to 2020    ~257 75 Total principal amount                                                                                                        ~365 015 Unamortized bond discount:
Abets: Cash and cash equivalents Escrow account Subordinate Refunding Crom'eries Decommissioning fund Investments Liabilities:
MoVerde    Project                                                                                                              (101,823)
Debt Suboniinate Refunding~Series Fait Fatr Vitue Cost Wue$173,798$173,798$120,610$'120,610 346,468 33,865 597,831 343,898 33,474 597,427 345,782 343,921 24503 24~682,916 682,442 2,910,200 3,210,790 2,933,261 3,198~347@88 385,516 347,782 377,700 OJIBalarree Shert Ffrtanrfal Iastrurrrents:
Southcmltansmission System Project                                                                                                (1S9,935)
Spedal Obligation Crammer Series Bonds~escrow accounts 63,415 63,849 67,739 63,849 70,680 75+00 70,959 70,959 Noto 5-Power Sales and Transmission Scrvlco Contracts:
Hoover Uprating Project                                                                                                              (3~9)
The Authority has power sales contmcts with ten participants of the Palo Verde Project (see Note 1).Under the terms of the con-tracts, the participants are entitled to power output from the PVNGS and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Power Project Revenue Bonds and other debt.The contracts expire in 2030 and, as long as any Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Mead-Phoenix Project Mead-Adelanto Project Multiple Projed Fund
The Authority has tmnsmission service contmcts with six partic-ipants of the Southern Transmission System Project (see Note 1).Under the terms of the contracts, the participants are entitled to tmnsmission service utilizing the Southern Tmnsmission System Project and are obligated to make payments on a"take or pay"basis Cnsh and cash equivalents-The carrying value approximates fair value because of the short maturity of those instruments.
                            ........                                                                                                    (4,218)
Investnlents/Decouunissioning fiui/Escroto account-Subordinate Refiutding Crossover Series/Crossover escrow accounts-The fair values of investments are estimated based on quoted market prices for the same or similar investments.
(12,650)
for their proportionate share of operating and maintenance expenses and debt service on Tmnsmission Project Revenue Bonds and other debt.The contmcts expire in 2027 and, as long as any Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
(16313)
In March 1986, the Authority entered into power sales contmcts with six participants of the Hoover Upmting Project (see Note 1).Under the terms of the contmcts, the participants are entitled to capacity and associated firm energy of the Hoover Uprating Project and are obligated to make payments on a"take or pay" basis for their proportionate share of opemting and maintenance expenses and debt service whether or not the Hoover Upmting Project or any part thereof has been completed, is operating or is operable, or its service is suspended, interfered with, reduced or curtailed or ter-minated in whole or in part.The contracts expire in 2018, and as long as any Hydroelectric Power Project Revenue Bonds are out-standing, cannot be terminated or amended in any manner which win impair or adversely affect the rights of the bondholders.
San Juan Project                                                                                                             ~8899 Total unamortized bond discount                                                                                                  30742 Long-tenn debt due within one year                                                                                                43 655
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1).Under the terms of the contracts, the participants are enti-tled to transmission service utilizing the Mead-Phoenix Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Phoenix Revenue Bonds and other debt, whether or not the Mead-Phoenix Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The contracts expire in 2030 and, as long as any Multiple Project and Mead-Phoenix Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
    'lbtal long-term debt, net (including Subordinate Refunding Crom'eries)                                                                                                    $ 3.213.933
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Adelanto Project (see Note 1).Under the terms of the contmcts, the participants are entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a"take or pay"basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Adelanto Revenue Bonds and other debt, whether or not the Mead-Adelanto Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The con-tracts expire in 2030 and, as long as any Multiple Project and Mead-Adelanto Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
 
In January 1993, the Authority entered into power sales contracts with five participants of Unit 3 of the San Juan Project (see Note 1).Under the terms of the contmcts, the participants are entitled to their proportionate share of the power output of the San Juan Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and mainte-nance expenses and debt service on the San Juan Revenue Bonds, whether or not Unit 3 of the San Juan Project or any part thereof is operating or operable, or its senrice is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The con-tracts expire in 2030 and, as long as any San Juan Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Note S Disclosures about Fair Value of Financial Instrumcntsr                for their proportionate share of operating and maintenance The following methods and assumptions were used to estimate the                expenses and debt service on Tmnsmission Project Revenue Bonds fair value of each class of financial instruments for which it is pmc-         and other debt. The contmcts expire in 2027 and, as long as any ticable to estimate that value:                                                Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or Cnsh and cash equivalents -The carrying value approximates fair                adversely affect the rights of the bondholders.
GAAP items not induded in billings to partidpants:
value because of the short maturity of those instruments.                         In March 1986, the Authority entered into power sales contmcts with six participants of the Hoover Upmting Project (see Note 1).
Depreciation of plant Amortization of bond discount, debt issue costs, and mst of refunding Nudear fuel amortization Decommissioning expense Interest cxpcnse l4Luue Bseat Mance tune30, 1996 tune 30, 1995 Aetnt 1996$348328$49323$397,651 206,470 18,650 75.233 23,165 37,745 898 7,610 22,798 244,215 19W8 82,843 45,963 Bond requirements induded in billings to participants:
Investnlents/Decouunissioning fiui/Escroto account  Subordinate Under the terms of the contmcts, the participants are entitled to Refiutding Crossover Series/Crossover escrow accounts- The fair values capacity and associated firm energy of the Hoover Uprating Project of investments are estimated based on quoted market prices for the and are obligated to make payments on a "take or pay" basis for same or similar investments.
Operations and maintenance, net of investment inmrnc Costs of acquisition of capacity-SIS Reduction in debt service billings duc to transfer of excess funds prind pal repayments Other (67,253)(18/50)78,658 (222,130)~31 740$411,031 (21,062)(11,099)(39N9)~3858$42,796 (88315)(18~)67W9 (261,689)~35598$453W7 Note 7-Costs Rccoverablc from Future Billings to Participants:
their proportionate share of opemting and maintenance expenses Long-tenn debt/Special Obligation Crossover Series Bonds/Subordinate          and debt service whether or not the Hoover Upmting Project or Refiutding Crossover Series-The fair value of the Authority's debt is          any part thereof has been completed, is operating or is operable, or estimated based on the quoted market prices for the same or sim-              its service is suspended, interfered with, reduced or curtailed or ter-ilar issues or on the current avemge rates offered to the Authority            minated in whole or in part. The contracts expire in 2018, and as for debt of approximately the same remaining maturities, net'of the           long as any Hydroelectric Power Project Revenue Bonds are out-effect of a related interest rate swap agreement.                             standing, cannot be terminated or amended in any manner which The fair values of the Authority's financial instruments are as           win impair or adversely affect the rights of the bondholders.
Billings to participants are designed to recover"costs" as defined by the power sales and transmission service agreements.
follows (in thousands):                                                           In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1). Under the terms of the contracts, the participants are enti-Fait                  Fatr tled to transmission service utilizing the Mead-Phoenix Project and Vitue        Cost      Wue are obligated to make payments on a "take or pay" basis for their Abets:
'Ihe billings are structured to systematically provide for debt senrice requirements, opemting funds and reserves in accordance with these agreements.
                                                        $ 120,610  $ '120,610 proportionate share of operating and maintenance expenses and Cash and cash equivalents      $ 173,798 $ 173,798 Escrow account                                                              debt service on the Multiple Project and Mead-Phoenix Revenue Subordinate Refunding                                                    Bonds and other debt, whether or not the Mead-Phoenix Project Crom'eries                    346,468  343,898    345,782   343,921 or any part thereof has been completed, is operating and operable, Decommissioning fund              33,865    33,474      24503      24~
Those expenses, according to generally accepted accounting principles (GAAP), which are not included as"costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt.Costs recoverable from future billings to participants are comprised of the following:
Investments                      597,831  597,427    682,916    682,442  or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as
system established by the legislation.
      ~
The Bill also mandates the collection of a public benefit charge from all electric utility customers in the state.Although these funds (currently estimated at 2.5'/o of gross revenues)must be spent on renewable resources, conservation, research and development, or low income rate subsidies, the governing authority of each consumer-owned utility will control actual expenditures.
Liabilities:
As a participant in the PVNGS, the Authority could be subject to assessment of retroactive insumnce premium adjustments in the event of a nuclear incident at the PVNGS or at any other licensed reactor in the United States.The Authority is involved in various legal actions.In the opinion of management, the outcome of such litigation or claims will not have a material effect on the financial position of the Authority or the respective separate projects.Note 9-subsequent Events: On July 1, 1996, the crossover date for the Palo Verde Special Obligation Bonds Series B, trust assets held in escrow of$63,415,000 were used to advance refund$62,000,000 of previously issued bonds.In August 1996, the Authority issued$89,570,000 of Mo Verde 1996 Subordinate Refunding Series C bonds to refund$95,015,000 of 1986 Refunding Series B bonds.The refunding is expected to reduce total debt service payments over the next 20 years by approximately
Debt                          2,910,200 3,210,790  2,933,261  3,198~      long as any Multiple Project and Mead-Phoenix Revenue Bonds Suboniinate Refunding                                                      are outstanding, cannot be terminated or amended in any manner Series            347@88    385,516    347,782    377,700 which willimpair or adversely affect the rights of the bondholders.
$24,713,000 (the difference between the debt service payments on the old and new debt)and is expected to result in a net present value savings of approximately
OJIBalarree Shert Ffrtanrfal                                                      In August 1992, the Authority entered into transmission service
$16,955,000.
      ~                                                                        contracts with nine participants of the Mead-Adelanto Project Iastrurrrents:
In September 1996, the Authority issued$42,245,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series A and$121,065,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series B to refund$68,720,000 and$127,100,000 of the STS 1986 Refunding Series A and B, respec-tively.The refunding is expected to reduce total debt service payments over the next 10 years by approximately
Spedal Obligation Crammer Series Bonds        63,415    67,739      70,680      75+00  (see Note 1). Under the terms of the contmcts, the participants are escrow accounts    63,849    63,849      70,959      70,959  entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a"take or pay"basis for their proportionate share of operating and maintenance Noto 5 Power Sales and Transmission Scrvlco Contracts:                        expenses and debt service on the Multiple Project and Mead-The Authority has power sales contmcts with ten participants of                Adelanto Revenue Bonds and other debt, whether or not the the Palo Verde Project (see Note 1). Under the terms of the con-              Mead-Adelanto Project or any part thereof has been completed, is tracts, the participants are entitled to power output from the                operating and operable, or its service is suspended, interfered with, PVNGS and are obligated to make payments on a "take or pay"                   reduced or curtailed or terminated in whole or in part. The con-basis for their proportionate share of operating and maintenance              tracts expire in 2030 and, as long as any Multiple Project expenses and debt service on Power Project Revenue Bonds and                  and Mead-Adelanto Revenue Bonds are outstanding, cannot be other debt. The contracts expire in 2030 and, as long as any Power            terminated or amended in any manner which will impair or Project Revenue Bonds are outstanding, cannot be terminated or                 adversely affect the rights of the bondholders.
$6,029,000 (the difference between the debt senrice payments on the old and new debt)and is expected to result in a net present value savings of approximately
amended in any manner which will impair or adversely affect the                     In January 1993, the Authority entered into power sales rights of the bondholders.                                                    contracts with five participants of Unit 3 of the San Juan Project The Authority has tmnsmission service contmcts with six partic-          (see Note 1). Under the terms of the contmcts, the participants are ipants of the Southern Transmission System Project (see Note 1).              entitled to their proportionate share of the power output of the Under the terms of the contracts, the participants are entitled to            San Juan Project and are obligated to make payments on a"take or tmnsmission service utilizing the Southern Tmnsmission System                  pay" basis for their proportionate share of operating and mainte-Project and are obligated to make payments on a"take or pay"basis              nance expenses and debt service on the San Juan Revenue Bonds,
$3,372,000.
 
Note 8-Commltmcnts and Contlngenclest On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill)which provides for broad deregulation of the power generation industry in California.
whether or not Unit 3 of the San Juan Project or any part thereof is      system established by the legislation. The Bill also mandates the operating or operable, or its senrice is suspended, interfered with,       collection of a public benefit charge from all electric utility reduced or curtailed or terminated in whole or in part. The con-          customers in the state. Although these funds (currently estimated tracts expire in 2030 and, as long as any San Juan Revenue Bonds           at 2.5'/o of gross revenues) must be spent on renewable resources, are outstanding, cannot be terminated or amended in any manner             conservation, research and development, or low income rate which willimpair or adversely affect the rights of the bondholders.       subsidies, the governing authority of each consumer-owned utility willcontrol actual expenditures.
The Bill, which is pending approval by the Governo, requires the participation of the state'three investor-owned utilities.
As a participant in the PVNGS, the Authority could be subject Note 7 Costs Rccoverablc from Future Billings to
Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process.The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMENTAL FINANCIAL INFORMATION INDEX Palo Verde Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Southern Transmission S tern Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Hoover Upratlng Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead.Phoenix Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and'1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead-Adelanto Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lo Pro ect Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 San Juan Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL BALANCE SHEET fin uh7uuranh)
 
Utility plant: Production
==Participants:==
.Tlallsnusslon General Less-Acaunulatal depreciation Construction work in progress Nudcar fueL at amortized cost Net utility plant.Special funds: Available for sale at fair value: Decommissioning fund.lnvcstmcnts Interest receivable Cash and cash equivalents Accounts receivable
to assessment of retroactive insumnce premium adjustments in the Billings to participants are designed to recover "costs" as defined      event of a nuclear incident at the PVNGS or at any other licensed by the power sales and transmission service agreements. 'Ihe              reactor in the United States.
.Materials and supplies Costs recoverable from future billings to participants Unrealized loss on investments in funds available for sale ASSETS$613,608 14,146 4569 380@02 9~13 223 403 030 33,474 115,746 1,512 67 879 218 611 9,240 204,945 junc 50, 1995$611,771 14,146 M74 628,491 219 881 408,610 9,683 12716 431,009 24~143,600 1 223~49 354 218 680 912 9,618 197/15 Unamortized debt expenses, less accumulated amortization of$65,795 and$71+25'Ibtal assets.204,693$1,041,713 209 740$'1.067,700 Long-tenn debt Current liabilities:
billings are structured to systematically provide for debt senrice            The Authority is involved in various legal actions. In the requirements, opemting funds and reserves in accordance with             opinion of management, the outcome of such litigation or claims these agreements. Those expenses, according to generally accepted        will not have a material effect on the financial position of the accounting principles (GAAP), which are not included as                   Authority or the respective separate projects.
Long-term debt due within one year Acaued interest Accounts payablc and acaued expenses Total aurcnt liabilities Commitments and contingencies Total liabilities LIABILITIES
"costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt.                                                             Note 9 subsequent Events:
$981,155 25,690 24~10~$1,041,713 23,855 30,685'16 770 71310$1.067,700 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS t176 tl74744547ndS) 1996 Y674r Enhd june 30, 1995 Operating revenue: SaIes of electric energy.Opetatmg expenses: Nudear fuel.Other operations Maintenance Depreciation
Costs recoverable from future billings to participants are          On July 1, 1996, the crossover date for the Palo Verde Special comprised of the following:                                              Obligation Bonds Series B, trust assets held in escrow of
.Deconunissioning Total operating expenses Operating income.Investment income Income before debt expense Debt expense Costs recoverable from future billings to participants
                                                                          $ 63,415,000 were used to advance refund $ 62,000,000 of previously l4Luue      Bseat    Mance tune30,    1996      tune 30,  issued bonds.
$135464 7,949 25,815 6317 18,425~1497 64,461 10,886 ($7,430)5 129,180 8,150 25+07 7,825 19,145 13 401 9963 65@20 77 976 (3 176567 5te tx7tts t474i7x3&#xc3;471 tt44tr777677ts.
Aetnt 1995                  1996 In August 1996, the Authority issued $ 89,570,000 of Mo Verde GAAP items not induded in 1996 Subordinate Refunding Series C bonds to refund $ 95,015,000 billings to partidpants:
Depreciation of plant                  $ 348328    $ 49323  $ 397,651  of 1986 Refunding Series B bonds. The refunding is expected to Amortization of bond discount,                                          reduce total debt service payments over the next 20 years debt issue costs, and mst of refunding                            206,470    37,745 by approximately $ 24,713,000 (the difference between the debt 244,215 Nudear fuel amortization                  18,650        898    19W8  service payments on the old and new debt) and is expected to Decommissioning expense                    75.233    7,610      82,843 result in a net present value savings of approximately $ 16,955,000.
Interest cxpcnse                          23,165    22,798      45,963    In September 1996, the Authority issued $ 42,245,000 of Bond requirements induded in billings                                      Transmission Project Revenue Bonds, 1996 Subordinate Refunding to participants:
Series A and $ 121,065,000 of Transmission Project Revenue Bonds, Operations and maintenance, net of investment inmrnc              (67,253)  (21,062)    (88315) 1996 Subordinate Refunding Series B to refund $ 68,720,000 and Costs of acquisition of capacity - SIS    (18/50)              (18~)  $ 127,100,000 of the STS 1986 Refunding Series A and B, respec-Reduction in debt service billings duc to transfer of excess funds tively. The refunding is expected to reduce total debt service 78,658  (11,099)    67W9 prind pal repayments                    (222,130)  (39N9)    (261,689) payments over the next 10 years by approximately $ 6,029,000 Other                                  ~31 740    ~3858    ~35598    (the difference between the debt senrice payments on the old and
                                          $ 411,031  $ 42,796  $ 453W7    new debt) and is expected to result in a net present value savings of approximately $ 3,372,000.
Note 8 Commltmcnts and Contlngenclest On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill) which provides for broad deregulation of the power generation industry in California. The Bill, which is pending approval by the Governo, requires the participation of the state' three investor-owned utilities. Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process. The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMENTAL FINANCIALINFORMATION INDEX Palo Verde Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Southern Transmission S tern Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Hoover Upratlng Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead. Phoenix Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and '1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead-Adelanto Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lo Pro ect Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 San Juan Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL BALANCE SHEET fin uh7uuranh) junc 50, 1995 ASSETS Utilityplant:
Production .                                                                              $   613,608          $    611,771 Tlallsnusslon                                                                                    14,146                14,146 General                                                                                          4569                  M74 628,491 Less - Acaunulatal depreciation                                                                                    219 881 380@02                408,610 Construction work in progress                                                                    9~                    9,683 Nudcar fueL at amortized cost                                                                    13 223                12716 Net utilityplant  .                                                                      403 030                431,009 Special funds:
Available for sale at fair value:
Decommissioning fund        .                                                                  33,474                24~
lnvcstmcnts                                                                                  115,746                143,600 Interest receivable                                                                              1,512                  1 223 Cash and cash equivalents                                                                        67 879          ~49      354 218 611                218 680 Accounts receivable  .                                                                                                      912 Materials and supplies                                                                              9,240                  9,618 Costs recoverable from future billings to participants                                          204,945                197/15 Unrealized loss on investments in funds available for sale Unamortized debt expenses, less accumulated amortization of $ 65,795 and $ 71+25                204,693                209 740
'Ibtal assets  .                                                                           $ 1,041,713          $ '1.067,700 LIABILITIES Long-tenn debt                                                                              $  981,155 Current liabilities:
Long-term debt due within one year                                                                25,690                23,855 Acaued interest                                                                                  24~                  30,685 Accounts payablc and acaued expenses                                                              10~                  '16 770 Total aurcnt liabilities                                                                                            71310 Commitments and contingencies Total liabilities                                                                        $ 1,041,713          $ 1.067,700
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS t176 tl74744547ndS)
Y674r Enhd june 30, 1996                             1995 Operating revenue:
SaIes of electric energy            .                                                      $  135464                        5  129,180 Opetatmg expenses:
Nudear fuel .                                                                                      7,949                            8,150 Other operations                                                                                  25,815                          25+07 Maintenance                                                                                        6317                            7,825 Depreciation .                                                                                    18,425                          19,145 Deconunissioning                                                                            ~1497                                13 401 Total operating expenses Operating income .                                                                                64,461 Investment income                                                                                  10,886                            9963 Income before debt expense                                                                                                   65@20 Debt expense                                                                                                                         77 976 Costs recoverable from future billings to participants                                     ($     7,430)                     (3   176567 5te tx7tts t474i7x3&#xc3;471 tt44tr777677ts.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS fin thttsanat&s)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS fin thttsanat&s)
Cash flows from operating activities:
Year Enkd tuna 30, 1996 Cash flows from operating activities:
Costs recoverable from future billings to partidpants
Costs recoverable from future billings to partidpants .                                      ($      7rI30)                    ($  12,656)
.Adjustments to amve at net cash provided by (used for)operating activitics-Depreciation
Adjustments to amve at net cash provided by (used for) operating activitics-Depreciation     ..                                                                             18,425                          19,145 Decommissioning .                                                                                 17497                          13,401 Amortization of nudear fuel .                                                                       7,949                          8,150 Amortization of debt costs                                                                       24,428                          16,607 Changes in assets and liabilities:
..Decommissioning
Decommissioning fund                                                                           (8,971)                        (1,297)
.Amortization of nudear fuel.Amortization of debt costs Changes in assets and liabilities:
Interest receivable                                                                               (289)                            127 Accounts receivable                                                                               174                            131 Materials and supplies .                                                                           378                            729 Other assets     .                                                                                 55                              (2)
Decommissioning fund Interest receivable Accounts receivable Materials and supplies.Other assets.Accrued interest.Accounts payable and accrued expenses..Net cash provided by operating activities Cash flows from investing activities:
Accrued interest .                                                                             (6,150)                          (719)
Payments for construction of faciTity.Purchases of investments Proceeds frotn sale/maturity of investments Nct cash provided by (used for)investing activities Cash flows from capital and related financing activities:
Accounts payable and accrued expenses       ..                                           ~643                                  3 241 Net cash provided by operating activities                                                 34 629                          46 837 Cash flows from investing activities:
Payment of pnndpal on long-term debt lbyment of bond issue costs..Payment for defeasance of rcvcnue bonds Proceeds from issuance of refunding bonds Net cash used for capital and related financing activities Net increase (decease)in cash and cash equivalents Cash and cash equivalents at beginning of period Cash and cash equivalents at end of year Supplemental disdosure of cash flow information:
Payments for construction of faciTity .                                                           (10,892)                          (9/69)
Cash paid during the year for interest (net of amount capitalized) 1996 ($7rI30)18,425 17497 7,949 24,428 (8,971)(289)174 378 55 (6,150)~643 34 629 (10,892)(154,685)1~16 732 (23,855)(4,832)(233,632)229 483 (32,836)18/25~49$67,879$64,499 Year Enkd tuna 30, ($12,656)19,145 13,401 8,150 16,607 (1,297)127 131 729 (2)(719)3 241 46 837 (9/69)(97,108)68,891 37 786 (22425)(13/54)~6708 8 49384$62.089 Se notes tofinant7a!
Purchases of investments Proceeds frotn sale/maturity of investments                                                       1~
staten3tne.
(154,685)                        (97,108) 68,891 Nct cash provided by (used for) investing activities                                     16 732                          37 786 Cash flows from capital and related financing activities:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$1996 fin hurusandsi Mance at June 30, 1995 9 22rrantis-Detrt RSserre&surtNtg gemue Rettenue Operating Gintingeruy issue Funds Fund Fimd Fund Fund Fimd I&11 7tttal 3 137,133 5-$30 948 3 16$74 S 12,4S2$24.490$216 627 Additions:
Payment of pnndpal on long-term debt                                                               (23,855) lbyment of bond issue costs     ..                                                                   (4,832)
Investment earnings Distribution of investment camings.Discount on investment purchases Revenue from power sales Distribution of rcvenucs Transfers to csaow for refundings
Payment for defeasance of rcvcnue bonds                                                         (233,632)
..Transfer from escrow for prinopal and interest payments 4,409 (5,734)1,971 49 81,922 (10,413)379 634 31 8,604 3 129,180 (138,843)78 951 834 (1,213)513 37 39,603 (93)~11 06 1,100 (1,000)336 6 3,989 (2,886)~10 81 616 (657)41 5325 4,046 749 8,004 7,739 3,287 129,272 (9,268)380 099 Total 451 838 4 28 614~1126~972 9176 S11129 Deductions:
Proceeds from issuance of refunding bonds                                                         229 483 Net cash used for capital and related financing activities                               (32,836)                        (22425)
Construction expenditures Operating cxpcnditures
Net increase (decease) in cash and cash equivalents                                                   18/25                          (13/54)
..Fuel costs.....
Cash and cash equivalents at beginning of period                                               ~49                              ~6708 Cash and cash equivalents at end     of year                                                   $    67,879                      8  49384 Supplemental disdosure of cash flow information:
Bond issue costs Ibyment of principal Intcrcst paid Premium and interest paid on investments Payment of principal and interest on esaow bonds 23,855 55,130 202 3SO 099 31,041 8,457 115 3,060 58 3.173 131 3,060 5 31,046 8,457 3.173 23,855 60,793 506 380 099 Mance at Junc 30, 1996 459 236 39 613 3118 8 836 186 510 989$124,685$4$19,949$25582$13,017$33,530$216,767 1his schedule sununarizes the rccdpts and disbursements in funds requited under thc Bond Indenture and has been prepared from the trust statements.'Ihe balances in thc funds consist of cash and investments at original cost.These balances do not indudc aeaued interest receivable of$1,245 and$1,223 and Decommissioning Fund acaued intaest receivable of$267 and$138 at june 30, 1996 and 1995, respectively, nor do they include total amortized net investmcnt discounts of$788 and$918 at june 30, 1996 and 1995, respectively.'Ihese balances also do not indude utuealizcd loss on investments in funds available for sale of$456 and$226 at Junc 30, 1996 and 1995,~ly.
Cash paid during the year for interest (net of amount capitalized)                           $     64,499                      $  62.089 Se notes tofinant7a! staten3tne.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL BALANCE SHEET f172~)Utihty plant: Transnusslon General Less-Accumulated depreciation Construction work in progress Nct utiTity plant ASSETS$674,606 18 893 693,499 194 127 499 372 199S$675+01 18,893 694,194~174 92 519,802 1 212 321034 Special funds: Available for sale at fair value: Investments Escrow account-Subordinate Refunding Crosamr Series Advance to Intennountain power Agency.Interest receivable Cash and cash equivalents Accounts receivable Costs recoverable hum future billings to participants Unrealized loss on investments in funds available for sale Unamortized debt expenses, less accumulated amortization of$59,752 and$51,415 Total assets 102,842 343,898 19/50 2,169~90 24 558 7S3 203,787 164 247$1.431,741 144,476 343,921 19~1,807 54 678 564 432 2,469 183,154 1,897$1.445.746 Long-tenn debt Subordinate Refunding Crossover Series Current liabilities:
 
Long-tenn debt due within one year Accrued interest Accounts payable and acaued expenses Total cunent liabilities
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ 1996 fin hurusandsi 9 22rrantis-Detrt                                                  RSserre  &                  surtNtg gemue              Rettenue          Operating        Gintingeruy    issue        Funds Fund              Fimd              Fund              Fund          Fimd          I &11            7tttal Mance at June 30, 1995                                                        3 137,133          5            -    $    30 948      3    16$ 74  S    12,4S2  $    24.490      $ 216 627 Additions:
.Commitments and contingcndes Total liabilities LIABILITIES
Investment earnings                                                                  4,409                  31              834            1,100          616            749            7,739 Distribution of investment camings .                                                (5,734)             8,604            (1,213)           (1,000)         (657)
$1 034 757 10,845 38,436 315 49 596$1,431,741$1,042,002 347 782 14325 39/79 2,258$1,445.746 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS iin huus(tnds)
Discount on investment purchases                                                    1,971                  3              513              336            41                            3,287 Revenue from power sales                                                                49          129,180                  37               6                                      129,272 Distribution of rcvenucs                                                            81,922          (138,843)           39,603              3,989        5325          8,004 Transfers to csaow for refundings    ..                                           (10,413)                78                (93)          (2,886)        4,046                          (9,268)
Opemting revenue: Sales of tmnsmission services Operating expenses: Other opemtions Maintenance Depreciation
Transfer from escrow for prinopal and interest payments                          379 634                  951    ~11      06      ~10        81                                      380 099 Total                                                                    451 838                    4          28 614      ~1126          ~972                9176            S11129 Deductions:
.Total opcmting expenses Opcmting income Investment income Income before debt expense Debt expense Costs rccovemblc from fuhue billings to participants
Construction expenditures                                                                                                                  3,060                                          3,060 Operating cxpcnditures    ..                                                                                          31,041                                                5          31,046 Fuel costs.....                                                                                                           8,457                                                            8,457 Bond issue costs                                                                                                                                          3.173                            3.173 Ibyment of principal                                                              23,855                                                                                                23,855 Intcrcst paid                                                                      55,130                                                                                                60,793 Premium and interest paid on investments                                              202                                  115                58                          131              506 Payment of principal and interest on esaow bonds                                3SO 099                                                                                                380 099 459 236                                39 613              3118          8 836            186          510 989 Mance at Junc 30, 1996                                                        $ 124,685          $            4    $    19,949      $    25582    $    13,017  $    33,530      $ 216,767 1his schedule sununarizes the rccdpts and disbursements in funds requited under thc Bond Indenture and has been prepared from the trust statements.'Ihe balances in thc funds consist of cash and investments at original cost. These balances do not indudc aeaued interest receivable of $ 1,245 and $ 1,223 and Decommissioning Fund acaued intaest receivable of respectively.'Ihese
$$5297 10,192 5,236 20 329 49~0 ($20.633)Yav Erukd June 30, 1995 11,839 4,498 19 735 36072 85,263 ($160(0)&e notts t()fi)u(ntt((l tt()tt)ntnls.
$ 267 and $ 138 at june 30, 1996 and 1995, respectively, nor do they include total amortized net investmcnt discounts of $ 788 and $ 918 at june 30, 1996 and 1995, balances also  do not indude utuealizcd  loss on  investments in funds available for  sale of $ 456  and  $ 226 at Junc 30,  1996  and 1995,  ~ly.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAl STATEMENT OF CASH FLOWS (bi thou54uur51 Cash flows from operating activities:
 
Costs remvcrable from future billings to participants
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT
.Adjustments to anivc at net cash provided by (used for)operating activities-Depreciation Amortization of debt msts Write-off of construction work in progress msts Changes in assets and liabilities:
                                                                            ~)
Interest receivable
SUPPLEMENTAL BALANCE SHEET f172 199S ASSETS Utihty plant:
.Accounts receivable Other assets.Accrued interest..Accounts payable and accrued expenses Net cash provided by operating activities Cash flows from investing activities:
Transnusslon                                                                              $    674,606  $  675+01 General                                                                                          18 893      18,893 693,499      694,194 Less  - Accumulated depreciation                                                                194 127  ~174      92 519,802 Construction work in progress                                                                                  1 212 Nct utiTity plant                                                                      499 372      321034 Special funds:
Payments for construction of facility.Purchases of investments
Available for sale at fair value:
~from sale/maturity of investments Net cash provided by (used for)investing activities Cash flows from capital and related financing activities:
Investments                                                                                  102,842      144,476 Escrow account - Subordinate Refunding Crosamr Series                                        343,898      343,921 Advance to Intennountain power Agency .                                                          19/50        19~
Payment for defeasance of revenue bonds Repayment of principal on long-term debt Net cash used for capital and related flnancing activities Nct increase in cash and cash equivalents Cash and cash cqirivalents at beginning of year Cash and cash equivalents at end of>ear Supplemental disdosure of cash flow information:
Interest receivable                                                                                2,169        1,807 Cash and cash equivalents                                                                ~90        24      54 678 558 7S3      564 432 Accounts receivable                                                                                              2,469 Costs recoverable hum future billings to participants                                            203,787      183,154 Unrealized loss on investments in funds available for sale                                                        1,897 Unamortized debt expenses, less accumulated amortization of $ 59,752 and $ 51,415                                                          164 247 Total assets                                                                                $  1.431,741  $ 1.445.746 LIABILITIES Long-tenn debt                                                                              $  1 034 757  $ 1,042,002 Subordinate Refunding Crossover Series                                                                        347 782 Current liabilities:
Cash paid during thc year for interest (nct of amount capi~($20,633)20329 11,739 1313 (362)(218)(943)~7943 9282 (154,904)~395 93 40 689 14,3~243 35,646$90324$88370 Year Enkd June 30, 1995 ($1~)19,735 11'15 1,940 17 10,773~))29 497 (315)(94,425)90 462~4,278 (5,479)~13 615 19 094 6,125 5 54.678 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$I 996 ffn t 67usands)GSnstnution Fund.Initial Dtt7t F8uititus Se727ite Ament Fund Cc7urul Ot7entting Fund teese727e Issue Fund Fund Balance at June 30, 1995$222 3 115959 8 6822 8 94N$77128$343S69$~54 6N Additions:
Long-tenn debt due within one year                                                              10,845        14325 Accrued interest                                                                                  38,436        39/79 Accounts payable and acaued expenses                                                                  315        2,258 Total cunent liabilities .                                                                 49 596 Commitments and contingcndes Total liabilities                                                                  $ 1,431,741  $ 1,445.746
Investment earnings Distribution of investment earnings Revenue from transmission sales Distribution of revenue..Transfer from escrow for principal and interest payments 12 6,485 (5,710)42,530 463 635 9,408 (596)83,953 (78,891)(5@03)3,102 6,182 50,942 18~7 (9,284)(9,278)29,264 83,953~1911 Total 12 56,216 14 933~264 N 226 5 126128 Deductions:
 
Operating expenses.Payment of principal Intcrcst paid Payment of principal and interest on esaow bonds Premium and interest paid on investment purchases Other 41/76 1/921 1,267 39 14,904 14+25 14/25 19,286 60,862 26575 39,496 1/06 949 949 Total 55 764 14 9N 39 61 135 131 842 Balance at Junc 30, 1996$234$106,411$6.051$4,157$76,219$343,874$536,946 This schedule sununarizes the receipts and disbursements in funds ettuited under the Bond Indenture and has been prepared from thc tmst statements.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS iin huus(tnds)
The bahnces in the funds consist of cash and investments at original cost.These balances do not indude acaucd interest receivable of$2,169 and$1,807 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discounts of$2,983 and f4312 at June 30, 1996 and 1995, respectably.112ese bahnccs do not indude ueaeat'zcd loss on investmcnts in funds avaihble for sale of$2 865 and$1 897 at June 30, 1996 and 1995, respectively.
Yav Erukd June 30, 1995 Opemting revenue:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET tin thousanh)Special funds: Investments available for saic at fair value.Advances for capacity and energy, nct Interest receivable Cash and cash equivalents ASSETS$9,628 10,119 6 1 997 31 750 1995$7,653 11,903 26 2,745~327 Accounts receivable Costs rcawcrable fiom future billings to partlcipants Unrealized loss on investments in funds availablc for sale..Unamortize debt expenses, less accumulated amortization of$937 and$795 Total assets.19 7,538 3~37$32,617 7,299 18 3 12 5 33.156 Long-tenn debt Current liabilities:
Sales of tmnsmission services                                                            $ $ 5297 Operating expenses:
Long-term debt due within one year Accrued interest Accounts payablc and accrued expenses Total current liabilities Commitments and contingencies
Other opemtions                                                                            10,192                          11,839 Maintenance                                                                                  5,236                          4,498 Depreciation .                                                                            20 329                          19 735 Total opcmting expenses                                                                                                36072 Opcmting income                                                                            49~0 Investment income Income before debt expense                                                                                            85,263 Debt expense Costs rccovemblc from fuhue billings to participants                                      ($ 20.633)                    ($  160(0)
.Total liabilities LIABILITIES 3 30 931 1,085 489 62 1,636$32,617$31,977.610 500 69 1.179$33,156 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS tin uhousan61$
&e notts t()fi)u(ntt((ltt()tt)ntnls.
)Operating revenue: Sales of electri energy.Operating expenses: Capacity charges..Energy charges Other operations Reimbursement of advances for capacity and energy Total operating~............
 
Operating income.Investment income Income before debt cxpcnse Debt expense Costs rmwerablc from future billings to participants 1996$3349 1,011 844 342 3 1,149 874 ($239)Yrar&cbtfuno30, 1995$3W9 1,207 832 360 12 2,411'1,158 514 1,672 MIO ($693)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAl STATEMENT OF CASH FLOWS (bi thou54uur51 Year Enkd June 30, 1995 Cash flows from operating activities:
Costs remvcrable from future billings to participants .                                      ($   20,633)                    ($   1~)
Adjustments to anivc at net cash provided by (used for) operating activities-Depreciation                                                                                    20329                            19,735 Amortization of debt msts                                                                        11,739 Write-offof construction work in progress msts                                                    1313                            11'15 Changes in assets and liabilities:
Interest receivable  .                                                                          (362)
Accounts receivable                                                                              (218)                          1,940 Other assets .                                                                                                                      17 Accrued interest    ..                                                                           (943)                        10,773 Accounts payable and accrued expenses                                                     ~7943                                ~))
Net cash provided by operating activities                                                  9282                            29 497 Cash flows from investing activities:
  ~
Payments for construction of facility .
Purchases of investments from sale/maturity of investments Net cash provided by (used for) investing activities (154,904)
                                                                                                ~395      93 40 689 (315)
(94,425) 90 462
                                                                                                                                ~4,278 Cash flows from capital and related financing activities:
Payment for defeasance of revenue bonds                                                                                              (5,479)
Repayment of principal on long-term debt                                                          14,3                        ~13 615 Net cash used for capital and related flnancing activities                            ~243                                  19 094 Nct increase in cash and cash equivalents                                                            35,646                            6,125 Cash and cash cqirivalents at beginning  of year Cash and cash equivalents at end of >ear                                                        $    90324                      5    54.678 Supplemental disdosure of cash flow information:
Cash paid during thc year for interest (nct of amount  capi~                                 $   88370
 
SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ I 996 ffn t 67usands)
GSnstnution Fund. Initial      Dtt7t          Cc7urul F8uititus          Se727ite        Ot7entting    teese727e        Issue Ament              Fund            Fund          Fund            Fund Balance at June 30, 1995                                                  $        222      3 115959        8      6822  8        94N    $    77128    $ 343S69      ~54
                                                                                                                                                                          $      6N Additions:
Investment earnings                                                                12              6,485            463            635        3,102        18~7          29,264 Distribution of investment earnings                                                                (5,710)        9,408            (596)        6,182        (9,284)
Revenue from transmission sales                                                                                  83,953                                                      83,953 Distribution of revenue      ..                                                                   42,530        (78,891)          (5@03)       50,942        (9,278)
Transfer from escrow for principal and interest payments                                                                                                                  ~1911 Total                                                                      12            56,216          14 933  ~264                  N 226              5        126128 Deductions:
Operating expenses .                                                                                                                                                         14,904 Payment of principal                                                                                                                            14+25                        14/25 Intcrcst paid                                                                                      41/76                                        19,286                      60,862 Payment of principal and interest on esaow bonds                                                  1/921                                        26575                        39,496 Premium and interest paid on investment purchases                                                    1,267                            39                                      1/06 Other                                                                                                                                              949                          949 Total                                                                                    55 764        14  9N              39        61 135                      131 842 Balance at Junc 30, 1996                                                    $        234      $ 106,411      $      6.051  $        4,157  $    76,219  $ 343,874      $ 536,946 This schedule sununarizes the receipts and disbursements in funds ettuited under the Bond Indenture and has been prepared from thc tmst statements. The bahnces in the funds consist of cash and investments at original cost.These balances do not indude acaucd interest receivable of $2,169 and $ 1,807 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discounts of $ 2,983 and f4312 at June 30, 1996 and 1995, respectably.112ese bahnccs do not indude ueaeat'zcd loss on investmcnts in funds avaihble for sale of $ 2 865 and $ 1 897 at June 30, 1996 and 1995, respectively.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET tin thousanh) 1995 ASSETS Special funds:
Investments available for saic at fair value .                                                    $      9,628                    $      7,653 Advances for capacity and energy, nct                                                                  10,119                          11,903 Interest receivable                                                                                          6                               26 Cash and cash equivalents                                                                              1  997                          2,745 31 750                    ~327 Accounts receivable                                                                                          19 Costs rcawcrable fiom future billings to partlcipants                                                    7,538                            7,299 Unrealized loss on investments in funds availablc for sale  ..                                                3                              18 Unamortize debt expenses, Total assets  .
less accumulated amortization of $ 937 and $ 795                  ~37
                                                                                                    $   32,617                    5 3 12 33.156 LIABILITIES Long-tenn debt                                                                                      3  30 931                      $    31,977 Current liabilities:
Long-term debt due within one year                                                                      1,085                          . 610 Accrued interest                                                                                            489                            500 Accounts payablc and accrued expenses                                                                        62                              69 Total current liabilities                                                                        1,636                          1.179 Commitments and contingencies        .
Total liabilities                                                                            $    32,617                    $    33,156 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS tin uhousan61$ )
Yrar &cbtfuno30, 1996                            1995 Operating revenue:
Sales of electri energy  .                                                                      $      3349                    $      3W9 Operating expenses:
Capacity charges      ..                                                                                1,011                          1,207 Energy charges                                                                                              844                            832 Other operations                                                                                            342                            360 Reimbursement of advances for capacity and energy Total operating Operating income .
                        ~............                                                                          3 2,411 12
                                                                                                                                          '1,158 1,149 Investment income                                                                                            874                              514 Income before debt cxpcnse                                                                                                         1,672 Debt expense                                                                                                                               MIO Costs rmwerablc from future billings to participants                                               ($       239)                 ($         693)
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f178 rru7us457ds)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f178 rru7us457ds)
Cash flows from operating activities:
Yi44r Eekd fuze 30, 1996                              1999 Cash flows from operating activities:
Costs recoverable from future billings to partidpants
Costs recoverable from future billings to partidpants   ..                                   ($      239)                      ($        638)
..Adjustments to anivc at net cash used for operating activities:
Adjustments to anivc at net cash used for operating activities:
Amortization of debt costs Changes in assets and liabilities:
Amortization of debt costs                                                                         294 Changes in assets and liabilities:
interest receivable Accounts receivable Other assets Accrued interest Accounts payablc and accrued expenses.Net cash provided by (used)for operating activities Cash fiows from investing activities:
interest receivable                                                                                 20 Accounts receivable                                                                               (19)
Purchases of investments
Other assets                                                                                                                           21 Accrued interest Accounts payablc and accrued expenses       .                                                                               ~94      (18)
~from salelmaturity of investments Advances for capacity and energy, net Nct cash used for investing activities Cash Qows from capital and related financing activities:
Net cash provided by (used) for operating activities
Payment for defeasance of revenue bonds Repayment of principal on long-term debt..Net cash used for capital and related financing activities Net decrease in cash and cash equivalents Cash and cash equivalents at bcy'nning of year Cash and cash equivalents at cnd of year Supplemental disdosurc of cash Row information:
~
Cash paid during ycar for interest (net of amount capitalized) 1996 ($239)294 20 (19)(22,665)20,705 1,784 610 610 (748)2,745$1,997 5 1.978 Yi44r Eekd fuze 30, 1999 ($638)21 (18)~94 (11~6)9,491 1 415~640 (319)~860 1 179 5451 5 0,745$2059 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$I 996 (tn thousanA)Wortdng Fund Dtbt Debt Stroke G$7ural S$7$7irc Rtsrrre Rts$7225 Am7unt Ament Ament Tbtal Balance at June 30, 1995$~410$-$-3 u0$1435$3018~$876$~10 64 Additions:
Cash fiows from investing activities:
Investment earnings Distribution of investment earnings Discount on investment purchases.Revenue from paver sales.....Distribution of revenues Thnsfer from escrow for principal and interest payments Total 16 193 85 2 2 (2)256 43 3,330 165 (3,342)~2393 147~751~099 355 (29)3.177~433 5 842~382 37~383 33 1S2 3 (90)(11S)(213)289 211 628 3,330~318~613 Deductions:
Purchases of investments from salelmaturity of investments Advances for capacity and energy, net (22,665) 20,705 1,784 (11~6) 9,491 1  415 Nct cash used for investing activities                                                                                       ~640 Cash Qows from capital and related financing activities:
Advances for capacity and energy Payment of principal Administrative expenditures Interest paid Premium on investment p~........
Payment for defeasance of revenue bonds                                                                                                 (319)
Payment of principal and interest on escrow bonds 75 117 610 1,978 24418 37 75 610 348 1,978 37 70418 Total Balance at June 30, 1996 311 117$-$4 906 37 560$&71$3,083$5,259$11511 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.'Ihe bahnces in the funds consist of cash and innstmcnts at orighai cost These balances do not indude accrued interest rcccivablc of$6 and$26 at June 30,'l996 and 1995, respectively, nor do they indude total amortized net investment discount of$117 and$52 at June 30, 1996 and 1995, respectively.'Ihese bahnces aho do not indude~loss on investments in funds avaihble for sale of$3 and$18 at June 30, 1996 and 1995, respectively.
Repayment of principal on long-term debt     ..                                                     610                        ~860 Net cash used for capital and related financing activities                                       610                              1  179 Net decrease in cash and cash equivalents                                                             (748)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL BALANCE SHEET 119$~)Utility plant: Transmission Geneml Less: Accumulated depreciation ASSETS$48/07 1 921 50,278 846 1995 Construction work in progress Net utility plant..Special funds: Investments available for sale at fair value.Interest receivable Cash and cash equivalents Accounts rcccivable Costs recoverable from future billings to participants Unrealized loss on investments in funds available for saIc Prepaid expense Unamortized debt expenses, less accumulated amortization of$1,257 and$736.49,432 3 116 5~8 21591 841 1~8 1,750 1+94 9 26$89595$39119 39,179 32,759 1,246 1 280 35 285 1,963 51 2,003 10 608$88.889 Long-term debt Current liabiTitics:
Cash and cash equivalents at bcy'nning   of year                                                   2,745                            5451 Cash and cash equivalents at cnd   of year                                                     $    1,997                        5    0,745 Supplemental disdosurc of cash Row information:
Acaucd interest Accounts payable Total current liabilities
Cash paid during ycar for interest (net of amount capitalized)                               5     1.978                       $   2059
.Commitments and contingencies Total liabiTities LIABIUTIES
 
$86,417 2,588 590 3,178$89395$86,267$88.889 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30$1996*fin housan4ts)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ I 996 (tn thousanA)
Operating revenue: Sales of tmnsmission services Operating expenses: Other operations
Dtbt Wortdng         Debt             Stroke         G$ 7ural S$ 7$ 7irc       Rtsrrre       Rts$ 7225 Fund            Am7unt           Ament         Ament           Tbtal Balance at June 30, 1995                                       ~410
.Maintenance
                                                              $                $         -     $         - 3       u0       $         1435   $     3018   ~$         876 ~10
.Depredation Total operating expenses Investment income Income before debt expense Debt expense Costs recoverable from future billings to participants 213 13 342 (342)410 1462 ($1264)See notes lo financid stalen$ents'Operations commenced April 1996.
                                                                                                                                                                                $          64 Additions:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f/2$6$6uSa226b)Cash flows from operating activities:
Investment earnings                                                 16                2              2                                33          1S2                3 Distribution of investment earnings                                 193                (2)            256          (29)                (90)        (11S)            (213)
Cost recoverable from future billings to participants Adjustments to amve at net cash provided by (used for)operating activities:
Discount on investment purchases                                     85              43                                                289                            211            628 Revenue from paver sales       .....   .
Depreciation
3,330                                                                            3,330 Distribution of revenues                                                             165          (3,342)                            3.177 Thnsfer from escrow for principal and interest payments                                   ~2393                     147     ~751                         ~433                            ~382 ~318 Total                                                    ~099                     355                                             5 842             37 ~383 ~613 Deductions:
.Amortizafion of debt costs..Changes in assets and liabilities:
Advances for capacity and energy                                     75                                                                                                                75 Payment of principal                                                                                                                   610                                            610 Administrative expenditures                                                         117                                                                                              348 Interest paid Premium on investment     p~........
Intcrcst receivable
Payment of principal and interest on escrow bonds 1,978 24418 37 1,978 37 70418 Total                                                             311              117                                              4 906            37 Balance at June 30, 1996                                                                       $         - $       560     $         &71     $     3,083   $       5,259   $     11511 net investment discount of $ 117 and $ 52 at June 30, 1996 and 1995, respectively.'Ihese bahnces aho do not indude at June 30, 1996 and 1995, respectively.
..Accounts receivable Other assets Accounts payable Net cash provided by operating activities
                                                                                                                  ~
.Cash flows from investing activities:
This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.'Ihe bahnces in the funds consist of cash and innstmcnts at orighai cost These balances do not indude accrued interest rcccivablc of $ 6 and $26 at June 30, 'l996 and 1995, respectively, nor do they indude total amortized loss on investments in funds avaihble for sale of $ 3 and $ 18
Interest received on investmcnts Payments for construction of facility Purchases of investments Proceeds from sale/maturity of investments Reimbursement from WAPA..Nct cash (used for)provided by investing activities Cash flmvs from capital and related financing activities:
 
Payment of interest on long-term debt..Payment for bond issue costs Net cash used for capital and related finandng activities Net Increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year Supplemental disdosure of cash flow information:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT
                                                                                  ~)
SUPPLEMENTAL BALANCE SHEET 119$
1995 ASSETS Utilityplant:
Transmission                                                                               $ 48/07 Geneml                                                                                        1 921 50,278 Less: Accumulated depreciation                                                                  846 49,432 Construction work in progress                                                                 3 116 $  39119 Net utilityplant  ..                                                                           5~8        39,179 Special funds:
Investments available for sale at fair value .                                               21591      32,759 Interest receivable                                                                             841      1,246 Cash and cash equivalents                                                                     1~8        1 280 35 285 Accounts rcccivable                                                                             1,750      1,963 Costs recoverable from future billings to participants                                         1+94 Unrealized loss on investments in funds available for saIc                                         9        51 Prepaid expense                                                                                   26      2,003 Unamortized debt expenses, less accumulated amortization of $ 1,257 and $ 736 .                           10 608
                                                                                            $ 89595 $   88.889 LIABIUTIES Long-term debt                                                                             $  86,417 $  86,267 Current liabiTitics:
Acaucd interest                                                                               2,588 Accounts payable                                                                               590 Total current liabilities .                                                               3,178 Commitments and contingencies Total liabiTities                                                                     $ 89395 $   88.889
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30$ 1996*
fin housan4ts)
Operating revenue:
Sales of tmnsmission services Operating expenses:
Other operations       .                                                                       213 Maintenance .                                                                                   13 Depredation                                                                                     342 Total operating expenses (342)
Investment income                                                                                 410 Income before debt expense Debt expense                                                                                     1462 Costs recoverable from future billings to participants                                       ($ 1264)
See notes lofinancid stalen$ ents
'Operations commenced April 1996.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f/2$ 6$ 6uSa226b) 1995 Cash flows from operating activities:
Cost recoverable from future billings to participants                                         $  1  94 Adjustments to amve at net cash provided by (used for) operating activities:
Depreciation .                                                                                   342 Amortizafion of debt costs   ..                                                                   167 Changes in assets and liabilities:
Intcrcst receivable ..                                                                         405 Accounts receivable                                                                             213 Other assets                                                                                 1,977 Accounts payable                                                                               556 Net cash provided by operating activities   .
Cash flows from investing activities:
Interest received on investmcnts                                                                                 4,251 Payments for construction of facility                                                           (13,208)    (21410)
Purchases of investments                                                                         (3,264)      (2,725)
Proceeds from sale/maturity of investments                                                       16L474      26,078 Reimbursement from WAPA         ..                                                                                 83 Nct cash (used for) provided by investing activities                                                       6 312 Cash flmvs from capital and related financing activities:
Payment of interest on long-term debt Payment for bond issue costs Net cash used for capital and related finandng activities
                                                                                                          ~8    (5,093) 5 102 Net Increase in cash and cash equivalents                                                                         1,275 Cash and cash equivalents at beginning     of year                                                 1 280 Cash and cash equivalents at end   of year                                                     $  2668  $      1.2M Supplemental disdosure of cash flow information:
Cash paid during the period for interest (net of amount capitalized)
Cash paid during the period for interest (net of amount capitalized)
$1 94 342 167 405 213 1,977 556 (13,208)(3,264)16L474 1 280$2668 1995 4,251 (21410)(2,725)26,078 83 6 312 (5,093)~8 5 102 1,275$1.2M SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FORTHE YEAR ENDED JUNE 30$1996 tin thus427uh)
 
Dd7t$$727ue Sc777k>>R2s$727s It7n7rnus issue Otscnt ting Aaount 6tc727unt Fund Fund Fund Tbt6d Balance at June 30, 1995$18972$4288$8916$$4994$$34,170 Additions:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FORTHE YEAR ENDED JUNE 30$ 1996 tin thus427uh)
Investment earnings'itansfer of investments Reimbursement from WAPA'iiansmission revenue...
Dd7t
Transfer of monthly transmission costs Total Deductions:
                                                                                                          $ $ 727ue Sc777k>>       R2s$ 727s       It7n7rnus     issue           Otscnt ting Aaount       6tc727unt       Fund         Fund             Fund           Tbt6d Balance at June 30, 1995                                                 $     18972       $       4288 $         8916   $           $     4994       $             $     34,170 Additions:
Construction
Investment earnings                                                                                               435                                                        2,441
<<xpendihues Interest paid Premium and interest paid on investment purchases Operating expenses..1 644 435 (435)~2!t7t 89 2,441 80 360 297 297~881 8~5,176 89 60 8,536 2,642~629 60'13,861 Nance at June 30, 1996$12,080$2367$5,916$65$Z525$237$23,190 1Ius schedule sununarizcs the receipts and isbursemcnts in funds~under the Bond Indenture and has been prepared from the trust statements.1hc balances in the funds consist of cash and investments at orighal cost.'Ihese balances do not indude accrued intent receivable of$841 and$1,246 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment premiums of$42 and$80 at June 30, 1996 and 1995, respecuvely.
  'itansfer of investments                                                                                         (435)
1hese balances do not indude unrealized loss on investments in funds available for sale of$9 and$51 at June 30, 1996 and 1995, espectimly.
Reimbursement from WAPA                                                                                                                                                         80
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD ADELANTO PROJECT SUPPLEMENTAL BALANCE SHEET fin thousands)
  'iiansmission revenue...                                                                                                                                                       360 Transfer of monthly transmission costs                                                                                 ~2!t7t                                  297 Total                                                                   1 644                                                                              297  ~881 Deductions:
UtiTity plant: Transmission General Less: Accumulated depreciation Construction work in progress Net utility plant..Special funds: Investments available for sale at fair value Interest receivable Cash and cash equivalents Accounts receivable Costs recoverable from future billings to participants Unrealized loss on investments in funds available for saic ASSETS 1996$171,068 164 171 232 1 255'169 977 62,562 2,285 69 1 4,741 jun@30 1995$154 011 154 011 76,235 2,976 4,279 4,669 Prepaid expense Unamortized debt expenses, less accumulated amortization of$3582 and$2,098 Total assets 28125$276,669 29 607$275.481 Long-term debt Current liabilities:
Construction <<xpendihues                                                                                                                                                     8~
Accrued interest Accounts payable Total current liabilities
Interest paid                                                                                                                                                                 5,176 Premium and interest paid on investment purchases                                                                                             89                                89 Operating expenses     ..                                                                                                                                                       60 8,536             2,642                               ~629                         60       '13,861 Nance at June 30, 1996                                                   $   12,080       $     2367   $         5,916 $         65 $     Z525       $         237 $     23,190 1Ius schedule sununarizcs the receipts and isbursemcnts in funds ~       under the Bond Indenture and has been prepared from the trust statements.1hc balances in the funds consist of cash and investments at orighal cost.'Ihese balances do not indude accrued intent receivable of $841 and $ 1,246 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment premiums of $ 42 and $ 80 at June 30, 1996 and 1995, respecuvely. 1hese balances do not indude unrealized loss on investments in funds available for sale of
.Commitments and contingencies Total liabilities LIABILITIES 7,884 780 8,664$276,669~$267 61 7,885 35$278,481 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30s 1996*tIn t7asananh)
$ 9 and $ 51 at June 30, 1996 and 1995, espectimly.
Operating revenue Sales of transmission services Opcratlng expenses: Other operations
 
.Maintenance Depredation Total operating expenses Operating loss Investment income.Income before debt expense Debt expense.Costs recoverable from future billings to participants
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD ADELANTO PROJECT SUPPLEMENTAL BALANCE SHEET fin thousands) jun@ 30 1996                1995 ASSETS UtiTityplant:
$172 145 27 1 132 1 132 1 174 42 4,425 (3 3233)See notes to financia statements.
Transmission                                                                               $  171,068 General                                                                                           164 171 232 Less: Accumulated depreciation                                                                   1 255 Construction work in progress                                                                                   $  154 011 Net utilityplant  ..                                                                           '169 977            154 011 Special funds:
Investments available for sale at fair value                                                   62,562              76,235 Interest receivable                                                                             2,285              2,976 Cash and cash equivalents                                                                                           4,279 69  1 Accounts receivable                                                                               4,741              4,669 Costs recoverable from future billings to participants Unrealized loss on investments in funds available for saic Prepaid expense Unamortized debt expenses, less accumulated amortization of $ 3582 and $2,098                     28125              29 607 Total assets                                                                           $ 276,669         $   275.481 LIABILITIES Long-term debt                                                                                                   ~$  267 61 Current liabilities:
Accrued interest                                                                                 7,884              7,885 Accounts payable                                                                                   780                  35 Total current liabilities .                                                                 8,664 Commitments and contingencies Total liabilities                                                                     $ 276,669         $   278,481
 
SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30s 1996*
tIn t7asananh)
Operating revenue Sales of transmission services                                                             $  172 Opcratlng expenses:
Other operations       .                                                                     145 Maintenance                                                                                     27 Depredation                                                                                 1 132 Total operating expenses Operating loss                                                                         1 132 Investment income         .                                                                   1 174 Income before debt expense                                                                 42 Debt expense       .                                                                           4,425 Costs recoverable from future billings to participants                                       (3 3233)
See notes to financia statements.
'Operations commenced April 1996.
'Operations commenced April 1996.
SOUTHERN CALIFORNIA PUIILIC POWER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS tin thousands)
 
Cash flows from opemting activities:
SOUTHERN CALIFORNIA PUIILIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS tin thousands) 1996          1995 Cash flows from opemting activities:
Cost recoverable
Cost recoverable &om future billings to participants                                         ($    4+83)
&om future billings to participants Adjustments to anive at net cash provided by (used for)operating activities:
Adjustments to anive at net cash provided by (used for) operating activities:
Depreciation Amortization of debt costs.......
Depreciation                                                                                     1.132 Amortization of debt   costs.......                                                                 482 Changes in assets and liabilities:
Changes in assets and liabilities:
Interest receivable ..                                                                           691 Accounts receivable                                                                               (72)
Interest receivable
Prepaid expense                                                                               3,467 Acaued interest                                                                                     (I)
..Accounts receivable Prepaid expense Acaued interest Accounts payable Net cash provided by operating adivities.Cash flows from investing activities:
Accounts payable                                                                                 745 Net cash provided by operating adivities .
Interest received on investments
Cash flows from investing activities:
..Payments for construction of facility Purchases of investments Proceeds horn sale/maturity of investments Rcimburscment from WAPA........
Interest received on investments     ..                                                                         11+16 Payments for construction of facility                                                             (15,652)      (71,033)
Nct cash (used for)provided by investing adivities Cash flows from capital and related financing activities:
Purchases of investments                                                                           (9,184)      (4,627)
Payments of interest on long-term debt Payment for bond issue costs Net cash used for capital and related Gnancing activities Net increase in cash and cash cquivalcnts Cash and cash equivalents at beginning of year Cash and cash equivalents at cnd of year Supplemental disdosure of cash flow information:
Proceeds horn sale/maturity of investments                                                         23,000        84,113 Rcimburscment from     WAPA........
Cash paid during the period for interest (net of amount capitalized) 1996 ($4+83)1.132 482 691 (72)3,467 (I)745 (15,652)(9,184)23,000 4 279$4~1995 11+16 (71,033)(4,627)84,113 19797 (15,487)~$7 15 18 4,279$4.279 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 I 996 fin thousands)
Nct cash (used for) provided by investing adivities                                                         19797 Cash flows from capital and related financing activities:
Acquisition Aemunl Debt Shia Aimunt Debt$7727ioe Reseirle Operating Issue Reoenue Aemunt Fund Fund Fund Tbta!Balance at June 30, 1995 3 36,134 S 11793 S 16267 3 S 16,760 S Additions:
Payments of interest on long-term debt Payment for bond issue costs                                                                               ~$  (15,487) 15 18 7
Investment camings Transfer of investment earnings Reimbursement from WAPA.Transfers to opemting fund Tmnsmission revenue 3,217 13 772 1,196 1,196 (1,196)451 517 1 S,704 13 (451)521 521 Total 3 230'1,968 452 517 Deductions:
Net cash used for capital and related Gnancing activities Net increase in cash and cash cquivalcnts                                                                         4,279 Cash and cash equivalents at beginning   of year                                                   4 279 Cash and cash equivalents at cnd   of year                                                     $    4~      $    4.279 Supplemental disdosure of cash flow information:
Construction expenditures Interest paid Premium and interest paid on investment purchases Operatmg expenses.Total 3,697 7,264 2 3 699 7 264 189 8,505 298 3,697 15,769 298 191 189 0840-19 93S Mance at June 30, 1996 3 6497 3 16.267 S 263$8,474$71 3 67.237 1Ms schedule summarizes the receipts and d'sbursements in funds requital under the Bond Indenture and has been prepared from the trust statements.
Cash paid during the period for interest (net of amount capitalized)
The bahnces in thc funds consist of cash and investments at origlnal cost.These balances do not indude acctucd interest receivable of$2285 and$2,976 at June 30, 1996 and 1995, rcspomvcly, nor do they indude total amortized nct investment premiums of$143 and$269 at June 30, 1996 and 1995,~vcly.These balances do not indude unrealized loss on investments in funds available for sale of$28 and$171 at June 30, 1996 and 1995, respectively.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 I 996 fin thousands)
Debt Debt           $ 7727ioe Acquisition        Shia            Reseirle       Operating     Issue         Reoenue Aemunl            Aimunt          Aemunt         Fund           Fund           Fund             Tbta!
Balance at June 30, 1995                                                   3   36,134       S   11793     S     16267   3             S     16,760   S Additions:
Investment camings                                                             3,217                 772             1,196                         517              1            S,704 Transfer of investment earnings                                                                    1,196           (1,196)
Reimbursement from WAPA .                                                          13                                                                                                13 Transfers to opemting fund                                                                                                          451                         (451)
Tmnsmission revenue                                                                                                                                                521             521 Total                                                                     3 230               '1,968                           452           517 Deductions:
Construction expenditures                                                     3,697                                                                                              3,697 Interest paid                                                                                     7,264                                          8,505                          15,769 Premium and interest paid on investment purchases                                                                                                   298                            298 Operatmg expenses .                                                                 2                                              189                                            191 Total                                                                     3 699               7 264                             189         0840               -           19 93S Mance at June 30, 1996                                                                         3     6497     3     16.267   S       263   $     8,474   $         71   3     67.237 1Ms schedule summarizes the receipts and d'sbursements in funds requital under the Bond Indenture and has been prepared from the trust statements. The bahnces in thc funds consist of cash and investments at origlnal cost. These balances do not indude acctucd interest receivable of $ 2285 and $ 2,976 at June 30, 1996 and 1995, rcspomvcly, nor do they indude total amortized nct investment premiums of $ 143 and $269 at June 30, 1996 and 1995,   ~vcly.         These balances do not indude unrealized loss on investments in funds available for sale of
$ 28 and $ 171 at June 30, 1996 and 1995, respectively.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET tin thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET tin thousands)
Special funds: Investments available for saic at fair va!ue Interest receivable Total assets ASSETS 1996$250,888 9220$260,108 June 30, 1995$249,020 9 194$258.214 LIABILITIES Long-term debt Arbitrage rebate payablc Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project Deferred credits Current liabilities:
June 30, 1996                            1995 ASSETS Special funds:
Accrued interest Commitments and contingcncics
Investments available for saic at fair va! ue                                                 $ 250,888                       $ 249,020 Interest receivable                                                                                9220                            9 194 Total assets                                                                            $ 260,108                      $  258.214 LIABILITIES Long-term debt                                                                                 ~24
'otal liabilities
                                                                                                $      786                      $  242,107 Arbitrage rebate payablc Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project                                   6 402                            6,632 Deferred credits                                                                                                                       1,141 Current liabilities:
$~24 786 6 402 8,256 5 u0,108$242,107 6,632 1,141 8 257$258.214 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS fln thousands)
Accrued interest                                                                                   8,256                            8 257 Commitments and contingcncics
Cash flows from operating activities Cash flows from investing activities:
    'otal liabilities                                                                         5 u0,108                       $ 258.214 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS fln thousands)
Interest received on investments Arbitrage payment Purchases of investmcnts
Year Ended June 30, 1995 Cash flows from operating activities Cash flows from investing activities:
~from sale/maturity of investmcnts Net cash provided by investing activities Cash flows from capital and related financing activities:
Interest received on investments                                                                 18+80                          18,470
Payments of interest on long-term debt Nct cash used for capital and financing activities Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash cquivalcnts at cnd of year 18+80 (1,868)~I6 12 16 12 16512 Year Ended June 30, 1995 18,470 (3,757)(1,958)3 757 16/12 16 12 16 12 Sre notre tofina7dal ttaten7enls.
  ~
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 3031996 ff72~)Mance at June 30, 1995$247 727 842772ingS 44274472t$1 293$249020 Additions:
Arbitrage payment Purchases of investmcnts from sale/maturity of investmcnts Net cash provided by investing activities                                               ~I6 (1,868) 12 (3,757)
investment earnings......
(1,958) 3 757 16/12 Cash flows from capital and related financing activities:
Transfer to earnings account Transfer to debt service account 18,208 (16512)16 12 172 16412~16 512 18,380 Total Deductions:
16 12                           16 12 Payments of interest on long-term debt 16512                            16 12 Nct cash used for capital and financing activities Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash cquivalcnts at cnd of year Sre notre tofina7dal ttaten7enls.
interest paid Total Balance at June 30, 1996$249,423~16 12~16 12 16 512 172~13 16 512~16 12 S 1,465 This schedule summarizes the receipts and disbursements in funds required under the Bond indenture and has been prepared from the trust statements.1he Mances in the funds consist of investments at original cost.'Ihese balances do not indude accrued interest receivable of$9,220 and$9,19I at June 30, 1996 and 1995, espectbely.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN jUAN PROIECT SUPPLEMENTAL BALANCE SHEET t17$4$627nids)Utility phut: Production General Less-Accumulated depreciation Construction work in process Net utility plant.Special funds: Investments available for sale at fair value Interest receivable Cash and cash equivalents Accounts receivable
..Materials and supplies Costs recoverable from future billings to participants ASSETS$183,309 8613 191,922 36 622 155+00~31 158 Ml 34,170 67 7 546 41,783 3~9 31,780 1995$183~7 688 190,997 24,415 166/82 2,488 169 070 28,699 69 8 274 37,042 1,891 3,679 Unrealized loss (gain)on investments in funds availablc for sale Unamortized debt expenses, less accumulated amortization of$942 and$628 Total assets$239,972 (28)3,461$238,178 Long-term debt Current liabilities:
Long-tenn debt due within one year Accrued interest Accounts payable Total current liabiTitics
.Commitments and contingencies Total liabilities LIABILITIES
$222,444 6,035 5,994 5,499 17528$239.972 S 228,167 5,994 4,017 10,011$238.178 SOLITHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS fin Ohuusan)ts)
Operating revenue: Sales of electric energy.Operating expenses: Other operations Maintenance Depreciation
.Decommissioning Total operating expenses Operating income (loss)Investment income Income before debt expense Debt cxpcnsc Costs recoverable from future billings to participants 1996$50 117 314 35,760 9,095 3 113 48 282 1,835 3,897 1 614 (S 8,717)year Ended june A, 1995 316 38511 9,095 3 112 51 534 (180)1/70I~1595 ($13894)Sa notes tofinane2a!
statemaine.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT'SUPPLEMENTAL STATEMENT OF CASH FLOWS fin~)Cash flows from operating activities:
Costs recoverable from future billings to participants Adjustments to arrive at net cash provided by (used for)operating activitics-Depreciation
.Decommissioning costs Amortization of debt costs..Changes in assets and liabilities:
Interest receivable Accounts receivable Materials and supplies Other assets Accounts payable Net cash provided by operating activities Cash flows from inv4csting activities:
Payments for construction of facility Purchases of investments Proceeds from sale/maturity of investments Net cash used for investing activities
.Nct decrease in cash and cash equivalents...
Cash and cash equivalents at beginning of year Cash and cash equivalents at cnd of year Supplemental disclosure of cash flow information:
Cash paid during the year for interest (net of amount capitaliizcd)
($8,717)9,095 3113 626 2 946 110 56 1482 6 713 (1,938)(14370)8 S67 441 (728)8 274$7~6$11,988 Yem Ended June 30, 1995 ($10,894)9,095 3112 610 (59)(669)1/40 81 711~327 (1,861)(12749)19 918 3 692 (365)8639 8 8.274 3 11.988 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 1996 f178~)Mance at June 30, 1995 Debt Drt7t$57$48te Stroke Rsme 44$27477r 44828477r$-$1&93$-$112$5,994$18,025$11 179$36943 Additions:
Investment earnings Distribution of investment earnings Discount on investment purchases...
Revenue from power sales Distribution of revenues Refund from Cenhuy Ibwcr Corporation 32 54 1,945 (64)4 10 S2933 (54,914)38,249 12 54 1,061 (168)(1,061)114 14+15 537 (652)112 2,145 1,750 242 S2,933 400 Total 38 249 414~14 15~142~55 25 Deductions:
Payment for construction
..Administmtive
<<xpcnditures Interest paid.Total Mance at June 30, 1996 1,938 36,691 38 629$1,253 11 988 11 988 1,938 36,691 11 983 50617$5$526$8621$18025$13021$41651 1hts schedule surnmarizcs the receipts and~cuts in funds rc4luired under the Bond Indenture and has been prepared from the trust statements.lhe balances in the funds consist of cash and investments at original cost.1hese balances do not indudc accrued intent receivable of$67 and$69 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discount of$69 and$2 at June 30, 1996 and 1995, respectively.
These balances do not indude unrealized loss (gain)on Investments in funds available for sale of$4 and ($28)at June 30, 1996 and 1995, respectively.
~~I~~~0'0~~~~~~g


SOUTHERN CALIF<ORNIA PUBLIC POWER AUTHORITY REPORT AND FINANCIAL STATEMENTS AND SUPPLE<MENTAL FINANCIAL INFORMATION JUNE 80, 1996 AND 1998 I
SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS
400 South Hope Street Telephone 213 236 3000 Los Angetes, CA 90071.2889 Price Paterhouse Lsz REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its operations and its cash flows for the years then ended in conformity with generally accepted accounting principles.
                                                                                            ~)
These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits.We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement.
REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 3031996 ff72 842772ingS 44274472t Mance at June    30, 1995                                                                              $      247 727                              $          1 293 $ 249020 Additions:
An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.
investment earnings......                                                                                      18,208                                            172    18,380 Transfer to earnings account                                                                                  (16512)                                        16412 Transfer to debt service account                                                                                                      16 12        ~16          512 Total                                                                                                                  ~16          12                    172 ~13 Deductions:
We believe that our audits provide a reasonable basis for the opinion expressed above.In our opinion, the accompanying separate balance sheets and the related separate statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generally accepted accounting principles.
interest paid                                                                                                                ~16          12                            16 512 Total                                                                                                                            16 512                        ~16    12 Balance at June 30, 1996                                                                              $      249,423                              S          1,465 This schedule summarizes the receipts and disbursements in funds required under the Bond indenture and has been prepared from the trust statements.1he Mances in the funds consist of investments at original cost.'Ihese balances do not indude accrued interest receivable of $ 9,220 and $ 9,19I at June 30, 1996 and 1995, espectbely.
These'inancial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits.We, conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, An audit includes examining, on a test basis, evidence l I I~~I~I~
 
The Board of Directors September 10, 1996 Page 2 supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN jUAN PROIECT SUPPLEMENTAL BALANCE SHEET t17$ 4$ 627nids) 1995 ASSETS Utilityphut:
We believe that our audits provide a reasonable basis for the opinion expressed above.Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole.The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements.
Production                                                                                $ 183,309 $  183~
This information is the responsibility of the Authority's management.
General                                                                                        8613      7 688 191,922    190,997 Less  - Accumulated depreciation                                                              36 622    24,415 Construction work in process                                                              ~31 155+00    166/82 2,488 Net utilityplant    .                                                                   158 Ml    169 070 Special funds:
Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.
Investments available for sale at fair value                                                  34,170    28,699 Interest receivable                                                                              67          69 Cash and cash equivalents                                                                      7 546      8 274 41,783    37,042 Accounts receivable    ..                                                                                  1,891 Materials and supplies                                                                          3~9        3,679 Costs recoverable from future billings to participants                                          31,780 Unrealized loss (gain) on investments in funds availablc for sale                                              (28)
I l I''
Unamortized debt expenses, less accumulated amortization of $ 942 and $ 628                                3,461 Total assets                                                                          $ 239,972 $  238,178 LIABILITIES Long-term debt                                                                              $ 222,444 S  228,167 Current liabilities:
SOIyfHERN CALIFORNIA PUBLIC POWER AUTHORITY CotfBI D B A (in thousands)
Long-tenn debt due within one year                                                            6,035 Accrued interest                                                                              5,994      5,994 Accounts payable                                                                              5,499      4,017 Total current liabiTitics .                                                              17528      10,011 Commitments and contingencies Total liabilities                                                                      $ 239.972 $  238.178
Palo Verde Em'outhern Transmission System~&oaf Hoover Uprating Emmy une 30 hfead-Phoenix hfead-hfultiple Adelanto Project JMaL~id San June 30, Juan 1995~t~a Utility plant: Production Transmission Ceileral$613,608 14,146 S 674,606~~5~88$48/07~7$171,068 164 S 183,309 8~$967,985$795,080'?37,223 689,447~228't~2 1K Less-Accumulated depreciation 630,323 693,499~9dhU,~JRI 50,278 171,232~u 191,922 1,737,254 1,513,682~KfbIR~2JUl Construction work in progress'Nuclear fuel, at amortized cost 380@02 9/03~225 499,372 49,432 3,116 169,977 155,300 1,254,383 1,09f,994 3,501 16,120 206,573~iu'Net utility plant Special funds: Available for sale at fair value (Note 2): Decommissioning fund'Investments Escrow account-Crossover series Advance to Intemountaln Power Agency<<Advances for capacity and energy, net Interest receivable Cash and cash equivalents 33,474 115,746 1,512~7879 102,842 S 9,628 343,898 19+50 10,119 2,169 6 90 374 I 2u 403 030~92~37~880~uz773~34 83 24403 682,442 343,921 19,550 11,903 16~1~9hlQ 33,474 21491 62462 S 250,888 34,170 597,427 343,898 19+50 10,119 811 2485 9/20 67 16,100~725~73 XK~53u 438783 21730 73980~2a4<<MOtu25~LJ>u~7~3!~26u Accounts receivable hlaterials and supplies Costs receive from future billings.to participants
 
'Unrealized loss on investments in funds available for sale ,Prepaid construction costs Prepaid expenses Unamortized debt expenses, less accumulated amortization of$132,265 and$127,197 in 1996 and 1995 738 9,240 20I,9IS 456 2,687 19 1,750 203,787 7+38 1@9h 4,741 2,865 (6,402)9IS 3/69 313780 4,478 12,809 5,272 13,297 453,827 411,031 28 3,365 2@35 59536 26~07~888~28 2 3 090~4348~42 508 t J 01~73~1431 741~32 617~89 595 aata~660~253 706~23 7g~3366 0 3 t 3~00 73 Long-turn debt$981,155 5 1,034,757$30,981$86,417$268,005 S 242,786 3 222,444 5 2,866,545$2,894,471 Subordinate Refunding Crossover Series Ariiitrage rebate payable Defencd credits 347@88 2,664 347,388 2,664 347,782 77 1,141 Cuncnt liabilities:
SOLITHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS fin Ohuusan)ts) year Ended june A, 1996                            1995 Operating revenue:
Long.tenn debt due within one year'Accrued interest Accounts payable and accrued expenses Total cuncnt liabilities 25,690 10,845 1,085 6,035 43,655 38,790 24435 38,436 489 2,588 7,884 8,256 5,994 88,182 95,288~333~3~~90 7110~22~'~7 23 183~suit~49 06 I&16~78~l~~852~728~4~~z22!2 Comiuitmcnts and contingencies
Sales of electric energy    .                                                                  $  50 117 Operating expenses:
~II'~13~43~74~32 6 7~IIO 505~276 669~25 706~23~07~~3~03~!I 400 73 The accompanying notes arc an inteyal part of these{inancial statements.
Other operations                                                                                        314                              316 Maintenance                                                                                        35,760                          38511 Depreciation .                                                                                        9,095                          9,095 Decommissioning                                                                                      3 113                          3 112 Total operating expenses                                                                        48 282                          51 534 Operating income (loss)                                                                              1,835                            (180)
I I'l I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPFRATIONS (In thousands)
Investment income Income before debt expense                                                                      3,897                          1/70I Debt cxpcnsc                                                                                          1 614                        ~1595 Costs recoverable statemaine.
Year Ended une 30 1996 Southern Palo Transmission Hoover Verde System Uprating~Pro'ect~Pro'ect~Pro eat Mead-Phoenix~Pro'act Mead-Adelanto San Juan~Pro'ect~Pro ect Total Year Ended June 30, 1995 Operating revenues: Sales of electric energy Sales of transmission services S 135,464 85 297 S 3,349 S 50,117 S 188,930 S 183,603 226 g 172 85 695 91 250 Total operating revenues 135 464 85 297 3 349 226 172 50 117 274 625 274 853 Operating cxpcnses: Amortization of nuclear fuel Other operations Maintenance Depreciation Decommissioning 7,949 25,815 6,317 18,425 12 497 10,192 2,200 5,236 20,329 213 13 342 145 27 1,132 314 35,760 9,095 3 113 7,949 38,879 47,353 49,323 15 610 8,150 39,873 50,834 47,975 16 513 Total operating expenses 71 003 35 757 2 200 568 1 304 48 282 159 114 163 345 Operating income (loss)Investment income Income before debt expense 64,461 49,540 75,347 78,533 10 886 28 993 1,149 874 2,023 (342)410 68 (1,132)1,835 115,511 3,897 159,910 1 174 2 062 44 399 111,508 23 884 135,392 Debt expense 82 777 99 166 2 262 1 462 4 425 12 614 202 706 174 140 Costs recoverable from future billings to participants
from future billings to participants                                        (S    8,717)                    ($  13894)
~7430~20 633~239~1394~4383~8717~42 796~38 748 The accompanying notes are an integral part of these financial statements.
Sa notes tofinane2a!
4 l l I I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY 8 M W (In thousands)
 
Cash flows from operating activities:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT
Costs recoverable from I'uture billings to participants Adjustments to arrive at net cash provided by (used for)operating activities-Depreciation Decommissioning Amortization of nuclear fuel Amortization of debt costs Write-off of construction work in progress costs Changes in assets and liabilities:
                                                                                    ~)
Decommissioning I'und Interest receivable Accounts receivable hlaterials and supplies'Other assets Accrued interest Accounts payablc and accrued expenses Net cash provided by operating activities (S 7,430)(S 20,633)(S 239)(S 1,394)(S 4,383)18,425 12,497 7,949 24,428 20/29 342 1,132 11,739 294 167 482 1,313 (8,971)(289)174 378 55 (6,150)~6823 (362)(218)20 (19)405 213 1,977 (943)(11)~2653~~jd 691 (72)3,467 (I)~2IZ 9S~266~06 Palo Southern Hoover hfead-hfead-hfultiplc Verde Transmission Uprating Phoenix Adelanto Project 205991 2252052272991
                                                        'SUPPLEMENTAL STATEMENT OF CASH FLOWS fin Yem Ended June 30, 1995 Cash flows from operating activities:
&0555>U22j2a U4225a Year Ended San June 30, Juan 1995 Total 9,095 3,113 626 49,323 15,610 7,949 379736 47,975 16,513 8,150 29,050 1,313 2 946 110 56 (8,971)467 1,024 488 5,555 (7,105)~56OQ (1,297)437 1,402 2,069 117 10,036~QK (S 8,717)(S 42,796)(S 38,748)Cash flows from investing activiticst Interest received on investments Arbitrage payment Pa>ments for construction of facilities Purchases of investments Proceeds from sale/maturity of investments Advances for capacity and energy, net Reimbursement from WAPA (10,892)(154,685)(154,904)182,309 195,593 (22,665)20,705 19784 (13,208)(3,264)14,474 (15,652)(9,184)23,000 S 18,380 (1,938)(1,868)(14@70)8,867 18@80 (41,690)(360,940)444,948 1,784 34,037 (3,757)(104,088)(230,693)299,265 1,415~1 Net cash provided by (used for)investing activities
Costs recoverable from future billings to participants                                      ($  8,717)                    ($    10,894)
~473 40 659 Qyyjj~zjjy~22j~hjz~yddjj~62 0~37 0 Cash flows from capital and related financing activities:
Adjustments to arrive at net cash provided by (used for) operating activitics-Depreciation .                                                                                  9,095                            9,095 Decommissioning costs                                                                          3113                            3112 Amortization of debt costs  ..                                                                   626                              610 Changes in assets and liabilities:
Payments of interest on long-term debt Proceeds from sale of bonds Papncnt for defeasance of revenue bonds Repapnent of principal on long.term debt'Pa>ment for bond issue costs 229,483 (233,632)(23,855)~403 (14325)(610)(16512)(16,512)(37,092)229,483 (233,632)(5,798)(38,790)(36,900)~484~40j Net cash used for capital and related financing activities M2R)-UkhRS~7dQS Net increase (decrease) in cash and cash equivalents 18,525 35,646 (748)268 225 (728)53,188 (4,746)~K@II~~~K~12-~I~~ME~~3k Cash and cash equivalents at beginning of year C h d h~141 I 0 d fy~67II7 Supplemental disclosure oi'ash flow inforrnationt Cash paid during the year for interest (net of amount capitalized) hZ0~%S j~t7~540~4507 t.~7546 5 173 798~120 610 jy 64 49z~00 37II~ja70 t, s,~6us~II 903~87 347~00 700 The accompanying notes arc an Integral part of these flnancial statements.
Interest receivable                                                                              2                              (59)
l I l I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY NOTES TO I INANCIAL STATEMENTS NOTE 1-ORGANIZATION AND PURPOSE: Southern California Public Power Authority (Authority), a public entity organized under the laws of the State of California, was formed by a Joint Powers Agreement dated as of November 1, 1980 pursuant to the Joint Exercise of Powers Act of the State of California.
Accounts receivable                                                                            946                            (669)
The Authority's participant membership consists of ten Southern California cities and one public district of the State of California.
Materials and supplies                                                                          110                            1/40 Other assets                                                                                    56                                81 Accounts payable                                                                              1482                              711 Net cash provided by operating activities                                                6 713                      ~327 Cash flows from inv4csting activities:
The Authority was formed for the purpose of planning, financing, developing, acquiring, constructing, operating and maintaining projects for the generation and transmission of electric energy for sale to its participants.
Payments for construction of facility                                                            (1,938)                          (1,861)
The Joint Powers Agreement has a term of fifty years.The members have the following participation percentages in the Authority's interest in the projects at June 30, 1996 and 1995:~Partici ants Southern Palo Transmission Hoover Mead-Mead-San V s s II i h i Ad]City of Los Angeles City of Anaheim City of Riverside Imperial Irrigation District City of Vernon City of Azusa City of Banning City of Colton City of Burbank City of Glendale City of Pasadena 6.5 4.9 1.0 1.0 1.0 4.4 4,,4, 4,.4.4.5 2.3 5.9 67.0%59.5%17.6 5.4 10.2 42.6%31.9 4.2 2.1 3.2 16.0 51.0%1.0 1.0 1.0 15.4 14.8 13.8 14.7 9.8 14.7 2.2 1.3 2.6 11.5 11.1 9.8 8.6 24.8%35.7%24.2 13.5 4.0 13.5~l.%~1,%~1 The members do not currently participate in the Multiple Project Fund.Mead-Phoenix participation reflects three ownership components (see below).Palo Verde Pro'ect The Authority, pursuant to an assignment agreement dated as of August 14, 1981 with the Salt River Project (Salt River), purchased a 5.91%interest in the Palo Verde Nuclear Generating Station (PVNGS), a 3,810 megawatt nuclear-fueled generating station near Phoenix, Arizona, and a 6.55%share of the right to use certain portions of the Arizona Nuclear Power Project Valley Transmission System (collectively, the Palo Verde Project).
Purchases of investments                                                                        (14370)                          (12749)
I I NOTE 1: (Continued)
Proceeds from sale/maturity of investments                                                        8 S67                          19 918 Net cash used for investing activities  .                                                  441                            3 692 Nct decrease in cash and cash equivalents...                                                        (728)                            (365)
As of July 1, 1981, ten participants had entered into power sales contracts with the Authority to purchase the Authority's share of PVNGS capacity and energy.Units 1, 2 and 3 of the Palo Verde Project began commercial operations in January 1986, September 1986, and January 1988, respectively.
Cash and cash equivalents at beginning    of year                                                  8 274                            8639 Cash and cash equivalents at cnd    of year                                                    $  7~6                        8    8.274 Supplemental disclosure of cash flow information:
Southern Transmission S stem Pro'ect The Authority, pursuant to an agreement dated as of May 1, 1983 with the Intermountain Power Agency (IPA), has made payments-in-aid of construction to IPA to defray all the costs of acquisition and construction of the Southern Transmission System Project (STS), which provides for the transmission of energy from the Intermountain Generating Station in Utah to Southern California.
Cash paid during the year for interest (net of amount capitaliizcd)                          $  11,988                      3    11.988
The Authority entered into an agreement also dated as of May 1, 1983 with six of its participants pursuant to which each member assigned its entitlement to capacity of STS to the Authority in return for the Authority's agreement to make payments-in-aid of construction to IPA.STS commenced commercial operations in July 1986.The Department of Water and Power of the City of Los Angeles (LADWP), a member of the Authority, serves as project manager and operating agent of the Intermountain Power Project (IPP).Hoover U ratin Pro'ect The Authority and six participants entered into an agreement dated as of March 1, 1986, pursuant to which each participant assigned its entitlement to capacity and associated firm energy to the Authority in return for the Authority's agreement to make advance payments to the United States Bureau of Reclamation (USBR)on behalf of such participants.
 
The USBR has declared that the Project was substantially complete as of September 30, 1995 with minor work scheduled to be completed in the spring of 1997.The Authority has an 18.68%interest in the contingent capacity of the Hoover Uprating Project (HU).All seventeen"uprated" generators of the HU have commenced commercial operations.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS
Mead-Phoenix Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire an interest in the Mead-Phoenix Project (MP), a transmission line extending between the Westwing substation in Arizona and the Marketplace substation in Nevada.The agreement provides the Authority with an 18.31%interest in the Westwing-Mead project component, a 17.76%interest in the Mead Substation project component and a 22.41%interest in the Mead-Marketplace project component.
                                                                                              ~)
The Authority has entered into transmission service contracts for the entire capability of its interest with nine members of the Authority on a"take or pay" basis.In addition, the Authority has administrative responsibility for accounting for the separate ownership interest in the project by Western Area Power Administration (WAPA), who is providing separate funding (872,874,000 and 858,676,000 at June 30, 1996 and 1995, respectively) for its interest.Commercial operations of MP commenced in April 1996.Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4).
REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 1996 f178 Debt            Drt7t $ 57$ 48te Stroke            Rsme 44$ 27477r        44828477r Mance at June 30, 1995                                        $          -    $    1 &93    $        -    $      112    $        5,994  $     18,025    $  11 179    $   36943 Additions:
I~I I I NOTE 1: (Continued)
Investment earnings                                                32                54                            12                54          1,061          537            1,750 Distribution of investment earnings                              1,945              (64)                                            (168)        (1,061)        (652)
Mead-Adelanto Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire a 67.92%interest in the Mead-Adelanto Project (MA), a transmission linc extending between the Adelanto substation in Southern California and the Marketplace substation in Nevada.The Authority has entered into transmission service contracts for thc entire capability of its interest with nine members of the Authority on a"take or pay" basis.In addition, thc Authority has administrative responsibility for accounting for the separate ownership interest in the project by WAPA, who is providing separate funding (817,088,000 and 816,282,000 at June 30, 1996 and 1995, respectively) for its interest.Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4).Commercial operations commenced in April 1996.LADWP serves as both construction manager and operations manager.Multi le Pro'ect Fund During fiscal year 1990, the Authority issued Multiple Project Revenue Bonds for net proceeds of approximately 8600 million to provide funds to finance costs of construction and acquisition of ownership interests or capacity rights in one or more then unspecified projects for the generation or transmission of electric energy.In August 1992, the Authority's Board of Directors approved a resolution authorizing the use of certain proceeds of Multiple Project Revenue Bonds to finance t)ie Authority's ownership interests in the Mead-Phoenix and Mead-Adelanto projects.Transfers made from the Multiple Project Fund are sufficient to provide for the Authority's sharc of the estimated costs of acquisition and construction of these two projects, including reimbursement of planning, development and other related costs.Effective July 1, 1993, the Authority purchased a 41.80%interest in Unit 3, a 488 megawatt unit and related common facilities, of the San Juan Generating Station (SJGS)from Century Power Corporation.
Discount on investment purchases...                                  4              10                                              114                          112              242 Revenue from power sales                                        S2933                                                                                                          S2,933 Distribution of revenues                                      (54,914)        38,249                                          14+15                          2,145 Refund from Cenhuy Ibwcr Corporation                                                                                                                                                400 Total                                                                      38 249                            414    ~14          15                    ~142 ~55                25 Deductions:
Unit 3 is one unit of a four-unit coal-fired power generating station in New Mexico.The Authority allocated the$193 million purchase price to the estimated fair value of the utility plant (8190 million)and to materials and supplies (83 million).The purchase has been financed through the issuance of approximately
Payment for construction    ..                                                  1,938                                                                                          1,938 Administmtive <<xpcnditures                                                      36,691                                                                                          36,691 Interest paid .                                                                                                                  11 988                                        11 983 Total                                                                      38 629                                          11 988                                        50617 Mance at June 30, 1996                                                        $    1,253    $        5    $      526    $        8621    $      18025      $  13021      $    41651 1hts schedule surnmarizcs the receipts and  ~cuts        in funds rc4luired under the Bond Indenture and has been prepared from the trust statements.lhe balances in the funds consist of cash and investments at original cost. 1hese balances do not indudc accrued intent receivable of $ 67 and $ 69 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discount of $ 69 and $ 2 at June 30, 1996 and 1995, respectively. These balances do not indude unrealized loss (gain) on Investments in funds available for sale of
$237 million (par value)of San Juan Project Revenue Bonds.The Authority has entered into power sales contracts for thc entire capability of its interest with five members of the Authority on a"take or pay" basis.
$ 4 and ($28) at June 30, 1996 and 1995, respectively.
Oc I l NOTE 2-
 
~
        ~
I ~ ~
    ~  0  '        0 ~ ~ ~
  ~ ~     ~
g
 
SOUTHERN CALIF<ORNIA PUBLIC POWER AUTHORITY REPORT AND FINANCIALSTATEMENTS AND SUPPLE<MENTAL FINANCIALINFORMATION JUNE 80, 1996 AND 1998
 
I 400 South Hope Street      Telephone 213 236 3000 Los Angetes, CA 90071.2889 Price Paterhouse Lsz REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its operations and its cash flows for the years then ended in conformity with generally accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for the opinion expressed above.
In our opinion, the accompanying separate balance sheets and the related separate statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generally accepted accounting principles. These'inancial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We, conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, An audit includes examining, on a test basis, evidence
 
l I
I
~
~
I
~
I
~
 
The Board of Directors September 10, 1996 Page 2 supporting  the amounts and disclosures in the financial statements, assessing the accounting  principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable  basis for the opinion expressed above.
Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole. The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements. This information is the responsibility of the Authority's management. Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.
 
I l
I''
 
SOIyfHERN CALIFORNIA PUBLIC POWER AUTHORITY CotfBI  DB    A (in thousands) une 30 Em'outhern Palo      Transmission      Hoover        hfead-        hfead-      hfultiple      San                    June 30, Verde          System        Uprating      Phoenix      Adelanto      Project      Juan                      1995
                                                              ~&oaf            Emmy                        JMaL        ~id                      ~t~a Utility plant:
Production                                  $  613,608                                                $ 171,068                  S 183,309  $  967,985  $    795,080 Transmission Ceileral                                  ~~5 14,146  S
                                                              ~88 674,606
                                                                                          ~7
                                                                                          $  48/07              164 8~ ~228't
                                                                                                                                                    '?37,223
                                                                                                                                                              ~2 1K689,447 Less  - Accumulated depreciation 630,323
                                                ~9dhU, 380@02
                                                              ~  693,499 JRI 499,372 50,278 49,432
                                                                                                          ~u171,232 169,977 191,922
                                                                                                                                    ~KfbIR 155,300 1,737,254
                                                                                                                                                ~2JUl 1,254,383 1,513,682 1,09f,994 Construction work in progress
  'Nuclear fuel, at amortized cost            ~225 9/03                                      3,116                                    3,501
                                                                                                                                                ~iu  16,120      206,573
            'Net utility plant                    403 030    ~92~37                                                                ~880        ~uz773      ~34        83 Special funds:
Available for sale at fair value (Note 2):
Decommissioning fund                      33,474                                                                                            33,474      24403
        'Investments                              115,746        102,842    S  9,628        21491        62462      S 250,888        34,170      597,427      682,442 Escrow account - Crossover series                        343,898                                                                            343,898      343,921 Advance to Intemountaln Power Agency                            19+50                                                                              19+50        19,550
  <<Advances for capacity and energy, net                                        10,119                                                                10,119      11,903 Interest receivable                               1,512          2,169            6            811        2485          9/20           67      16,100      16~1 Cash and cash equivalents                  ~7879              90 374        I 2u                                                ~725 ~73 XK ~9hlQ
                                              ~53u              438783        21730          73980    ~2a4<<          MOtu25      ~LJ>u ~7~3! ~26u Accounts receivable                                    738          2,687          19        1,750          4,741        (6,402)       9IS        4,478        5,272 hlaterials and supplies                              9,240                                                                              3/69        12,809      13,297 Costs receive from future billings. to participants                      20I,9IS        203,787        7+38          1@9h                                    313780      453,827      411,031
'Unrealized loss on investments in funds available for sale                                  456          2,865                                        28                                  3,365        2@35
,Prepaid construction costs                                                                                                                                          59536 Prepaid expenses                                                                                  26 Unamortized debt expenses, less accumulated amortization of $ 132,265 and $ 127,197 in 1996 and 1995                                          ~07 ~888                    ~28      2                      3 090  ~4348 ~42            508 t J 01~73      ~1431    741  ~32 617 ~89            595  aata~660      ~253 706    ~23      7g ~3366    0 3 t 3 ~00 73 Long-turn debt                                $  981,155    5 1,034,757    $  30,981    $    86,417    $ 268,005    S  242,786  3 222,444  5 2,866,545  $ 2,894,471 Subordinate Refunding Crossover Series                                              347@88                                                                            347,388      347,782 Ariiitrage rebate payable                                                                                                                                              77 Defencd credits                                                                                                              2,664                    2,664        1,141 Cuncnt liabilities:
Long. tenn debt due within one year
  'Accrued interest Accounts payable and accrued expenses Total cuncnt liabilities
                                              ~333
                                              ~suit 25,690 24435
                                                              ~3
                                                              ~49 10,845 38,436 06
                                                                            ~    1,085 489 I &16
                                                                                          ~90  2,588
                                                                                          ~78 ~l~
7,884 7110 8,256
                                                                                                                        ~852 ~728 6,035 5,994
                                                                                                                                    ~22 ~'~7
                                                                                                                                                ~4~
43,655 88,182
                                                                                                                                                              ~z22!2 38,790 95,288 23 183 Comiuitmcnts and contingencies
                                              ~II'~13       ~43~74        ~32 6    7  ~IIO 505        ~276 669      ~25    706  ~23    ~07  ~~3~03 ~!I 400 73 The accompanying notes arc an inteyal part of these {inancial statements.
I I
'l I
I I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPFRATIONS (In thousands)
Year Ended    une 30 1996 Southern Palo    Transmission    Hoover          Mead-          Mead-                              Year Ended Verde        System      Uprating        Phoenix        Adelanto          San Juan            June 30,
                                  ~Pro'ect    ~Pro'ect    ~Pro eat      ~Pro'act        ~Pro'ect        ~Pro ect      Total    1995 Operating revenues:
Sales of electric energy      S 135,464                    S 3,349                                      S  50,117 S 188,930  S 183,603 Sales of transmission services                  85 297                          226      g      172                    85 695    91 250 Total operating revenues    135 464        85 297        3 349              226            172          50 117  274 625    274 853 Operating cxpcnses:
Amortization of nuclear fuel      7,949                                                                                  7,949      8,150 Other operations                  25,815        10,192        2,200              213            145            314    38,879    39,873 Maintenance                        6,317          5,236                            13              27          35,760    47,353    50,834 Depreciation                      18,425        20,329                          342          1,132          9,095    49,323    47,975 Decommissioning                  12 497                                                                        3 113    15 610     16 513 Total operating expenses      71 003        35 757        2 200              568          1 304          48 282  159 114    163 345 Operating income (loss)          64,461        49,540        1,149            (342)         (1,132)         1,835  115,511    111,508 Investment income                  10 886        28 993          874              410          1 174          2 062    44 399    23 884 Income before debt expense    75,347        78,533        2,023              68                          3,897  159,910    135,392 Debt expense                        82 777        99 166        2 262          1  462          4 425          12 614  202 706    174 140 Costs recoverable from future billings to participants        ~7430          ~20 633      ~239          ~1394            ~4383          ~8717      ~42  796  ~38  748 The accompanying notes are an integral part of these financial statements.
4
 
l l
I I
I I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY 8              M                      W (In thousands)
Year Ended Palo      Southern        Hoover        hfead-      hfead-      hfultiplc        San                    June 30, Verde    Transmission    Uprating      Phoenix      Adelanto      Project        Juan                      1995 205991    2252052272991    &0555>        U22j2a      U4225a                                                    Total Cash flows from operating activities:
Costs recoverable from I'uture billings to participants                                    (S    7,430) (S 20,633)  (S    239)  (S    1,394)  (S  4,383)                (S  8,717)  (S 42,796)    (S  38,748)
Adjustments to arrive at net cash provided by (used for) operating activities-Depreciation                                        18,425      20/29                          342        1,132                      9,095        49,323        47,975 Decommissioning                                    12,497                                                                            3,113          15,610        16,513 Amortization of nuclear fuel                        7,949                                                                                            7,949          8,150 Amortization of debt costs                        24,428        11,739          294          167          482                          626        379736        29,050 Write-off of construction work in progress costs                                                          1,313                                                                              1,313 Changes in assets and liabilities:
Decommissioning I'und                              (8,971)                                                                                          (8,971)        (1,297)
Interest receivable                                  (289)        (362)          20          405          691                            2          467            437 Accounts receivable                                    174        (218)        (19)          213          (72)                        946          1,024          1,402
                                                                                  ~ ~jd hlaterials and supplies                                378                                                                              110            488          2,069
        'Other assets                                            55                                1,977        3,467                          56          5,555            117 Accrued interest                                    (6,150)        (943)        (11)                        (I)                                    (7,105)      10,036 Accounts payablc and accrued expenses        ~6823 ~2653                                                                                    ~56OQ          ~QK Net cash provided by operating activities                                            ~2IZ                9S  ~266 ~06 Cash flows from investing activiticst Interest received on investments                                                                                      S  18,380                        18@80          34,037 Arbitrage payment                                                                                                                                                      (3,757)
Pa>ments for construction of facilities              (10,892)                                (13,208)    (15,652)                      (1,938)      (41,690)      (104,088)
Purchases of investments                          (154,685)     (154,904)    (22,665)      (3,264)       (9,184)      (1,868)      (14@70)      (360,940)      (230,693)
Proceeds from sale/maturity of investments          182,309      195,593      20,705        14,474      23,000                        8,867      444,948        299,265 Advances for capacity and energy, net Reimbursement from WAPA 19784                                                                  1,784
                                                                                                                                                                      ~1      1,415 Net cash provided by (used for) investing activities                            ~473              40 659        Qyyjj  ~zjjy ~22j ~hjz ~yddjj                                ~62        0  ~37        0 Cash flows from capital and related financing activities:
Payments of interest on long-term debt                                                                                  (16512)                       (16,512)      (37,092)
Proceeds from sale of bonds                        229,483                                                                                          229,483 Papncnt for defeasance of revenue bonds            (233,632)                                                                                        (233,632)          (5,798)
Repapnent of principal on long. term debt                        (14325)
    'Pa>ment for bond issue costs                    ~403 (23,855)                      (610)
                                                                                                                                                      ~484 (38,790)
                                                                                                                                                                      ~40j (36,900)
Net cash used for capital and related financing activities                                                                                      M2R)                -      UkhRS ~7dQS Net increase (decrease)      in cash and cash equivalents                                      18,525      35,646        (748)          268          225                        (728)        53,188        (4,746)
Cash and cash equivalents at beginning of year                        ~K@II        ~~ ~K ~12                                    -        ~I~          ~ME ~~3k C h        d      h~141      I  0    d  fy            ~67II7          hZ0~%S      j~t7        ~540          ~4507        t  .       ~7546        5 173 798      ~120      610 Supplemental disclosure oi'ash flow inforrnationt Cash paid during the year for interest (net of amount capitalized)                        jy    64 49z    ~00 37II    ~ja70        t, s,                       ~6us ~II 903 ~87 347 ~00 700 The accompanying notes arc an Integral part of these flnancial statements.
l I
l I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY NOTES TO I INANCIALSTATEMENTS NOTE    1 - ORGANIZATION AND PURPOSE:
Southern California Public Power Authority (Authority), a public entity organized under the laws of the State of California, was formed by a Joint Powers Agreement dated as of November 1, 1980 pursuant to the Joint Exercise of Powers Act of the State of California. The Authority's participant membership consists of ten Southern California cities and one public district of the State of California. The Authority was formed for the purpose of planning, financing, developing, acquiring, constructing, operating and maintaining projects for the generation and transmission of electric energy for sale to its participants. The Joint Powers Agreement has a term of fifty years.
The members have the following participation percentages in the Authority's interest in the projects at June 30, 1996 and 1995:
Southern Palo    Transmission  Hoover      Mead-    Mead-       San
~Partici ants                      V s          s        II    i      h    i  Ad]
City of Los Angeles                67.0%       59.5%                  24.8%    35.7%
City of Anaheim                                17.6      42.6%        24.2      13.5 City of Riverside                    5.4        10.2      31.9          4.0      13.5 Imperial Irrigation District        6.5                                                    51.0%
City of Vernon                      4.9 City of Azusa                        1.0                    4.2        1.0      2.2      14.7 City of Banning                      1.0                    2.1        1.0      1.3        9.8 City of Colton                      1.0                    3.2        1.0      2.6      14.7 City of Burbank                      4.4          4.5      16.0        15.4      11.5 City of Glendale                    4,,4,        2.3                  14.8      11.1        9.8 City of Pasadena                    4,.4.        5.9                  13.8      8.6
                                              ~l.    %  ~1,    %  ~1 The members do not currently participate in the Multiple Project Fund.
Mead-Phoenix participation reflects three ownership components (see below).
Palo Verde Pro'ect The Authority, pursuant to an assignment agreement dated as of August 14, 1981 with the Salt River Project (Salt River), purchased a 5.91% interest in the Palo Verde Nuclear Generating Station (PVNGS), a 3,810 megawatt nuclear-fueled generating station near Phoenix, Arizona, and a 6.55% share of the right to use certain portions of the Arizona Nuclear Power Project Valley Transmission System (collectively, the Palo Verde Project).
I I
 
NOTE 1: (Continued)
As of July 1, 1981, ten participants had entered into power sales contracts with the Authority to purchase the Authority's share of PVNGS capacity and energy. Units 1, 2 and 3 of the Palo Verde Project began commercial operations in January 1986, September 1986, and January 1988, respectively.
Southern Transmission S stem Pro'ect The Authority, pursuant to an agreement dated as of May 1, 1983 with the Intermountain Power Agency (IPA), has made payments-in-aid of construction to IPA to defray all the costs of acquisition and construction of the Southern Transmission System Project (STS), which provides for the transmission of energy from the Intermountain Generating Station in Utah to Southern California. The Authority entered into an agreement also dated as of May 1, 1983 with six of its participants pursuant to which each member assigned its entitlement to capacity of STS to the Authority in return for the Authority's agreement to make payments-in-aid of construction to IPA.
STS commenced commercial operations in July 1986. The Department of Water and Power of the City of Los Angeles (LADWP), a member of the Authority, serves as project manager and operating agent of the Intermountain Power Project (IPP).
Hoover U ratin    Pro'ect The Authority and six participants entered into an agreement dated as of March 1, 1986, pursuant to which each participant assigned its entitlement to capacity and associated firm energy to the Authority in return for the Authority's agreement to make advance payments to the United States Bureau of Reclamation (USBR) on behalf of such participants. The USBR has declared that the Project was substantially complete as of September 30, 1995 with minor work scheduled to be completed in the spring of 1997. The Authority has an 18.68% interest in the contingent capacity of the Hoover Uprating Project (HU). All seventeen "uprated" generators of the HU have commenced commercial operations.
Mead-Phoenix Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire an interest in the Mead-Phoenix Project (MP), a transmission line extending between the Westwing substation in Arizona and the Marketplace substation in Nevada. The agreement provides the Authority with an 18.31% interest in the Westwing-Mead project component, a 17.76% interest in the Mead Substation project component and a 22.41% interest in the Mead-Marketplace project component.
The Authority has entered into transmission service contracts for the entire capability of its interest with nine members of the Authority on a "take or pay" basis. In addition, the Authority has administrative responsibility for accounting for the separate ownership interest in the project by Western Area Power Administration (WAPA), who is providing separate funding (872,874,000 and 858,676,000 at June 30, 1996 and 1995, respectively) for its interest. Commercial operations of MP commenced in April 1996. Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4).
I
~
I I
I
 
NOTE 1: (Continued)
Mead-Adelanto Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire a 67.92%
interest in the Mead-Adelanto Project (MA), a transmission linc extending between the Adelanto substation in Southern California and the Marketplace substation in Nevada. The Authority has entered into transmission service contracts for thc entire capability of its interest with nine members of the Authority on a "take or pay" basis. In addition, thc Authority has administrative responsibility for accounting for the separate ownership interest in the project by WAPA, who is providing separate funding (817,088,000 and 816,282,000 at June 30, 1996 and 1995, respectively) for its interest. Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4). Commercial operations commenced in April 1996. LADWP serves as both construction manager and operations manager.
Multi le Pro'ect Fund During fiscal year 1990, the Authority issued Multiple Project Revenue Bonds for net proceeds of approximately 8600 million to provide funds to finance costs of construction and acquisition of ownership interests or capacity rights in one or more then unspecified projects for the generation or transmission of electric energy.
In August 1992, the Authority's Board of Directors approved a resolution authorizing the use of certain proceeds of Multiple Project Revenue Bonds to finance t)ie Authority's ownership interests in the Mead-Phoenix and Mead-Adelanto projects. Transfers made from the Multiple Project Fund are sufficient to provide for the Authority's sharc of the estimated costs of acquisition and construction of these two projects, including reimbursement of planning, development and other related costs.
Effective July 1, 1993, the Authority purchased a 41.80% interest in Unit 3, a 488 megawatt unit and related common facilities, of the San Juan Generating Station (SJGS) from Century Power Corporation. Unit 3 is one unit of a four-unit coal-fired power generating station in New Mexico.
The Authority allocated the $ 193 million purchase price to the estimated fair value of the utility plant (8190 million) and to materials and supplies (83 million). The purchase has been financed through the issuance of approximately $ 237 million (par value) of San Juan Project Revenue Bonds. The Authority has entered into power sales contracts for thc entire capability of its interest with five members of the Authority on a "take or pay" basis.
Oc I
l
 
NOTE 2 -  


==SUMMARY==
==SUMMARY==
Ol SIGNIFICANT ACCOUNTING POLICIES: The financial statements of the Authority are presented in conformity with generally accepted accounting principles, and substantially in conformity with accounting principles prescribed by the Federal Energy Regulatory Commission and the California Public Utilities Commission.
Ol SIGNIFICANT ACCOUNTING POLICIES:
The Authority is not subject to regulation by either of these regulatory bodies.The financial statements represent the Authority's share in each jointly-owned project.The Authority's share of direct expenses of jointly-owned projects are included in the corresponding operating expense of the statement of operations.
The financial statements of the Authority are presented in conformity with generally accepted accounting principles, and substantially in conformity with accounting principles prescribed by the Federal Energy Regulatory Commission and the California Public Utilities Commission. The Authority is not subject to regulation by either of these regulatory bodies.
E<ach owner of the jointly-owned projects is required to provide their own financing.
The financial statements represent the Authority's share in each jointly-owned project. The Authority's share of direct expenses of jointly-owned projects are included in the corresponding operating expense of the statement of operations. E<ach owner of the jointly-owned projects is required to provide their own financing.
~Utilit Plant The Authority's share of all expenditures, including general administrative and other overhead expenses, payments-in-aid of construction, interest net of related investment income, deferred cost amortization and the fair value of test power generated and delivered to the participants are capitalized as utility plant construction work in progress until a facility commences commercial operation.
~Utilit Plant The Authority's share of all expenditures, including general administrative and other overhead expenses, payments-in-aid of construction, interest net of related investment income, deferred cost amortization and the fair value of test power generated and delivered to the participants are capitalized as utility plant construction work in progress until a facility commences commercial operation.
The Authority's sharc of construction and betterment costs associated with PVNGS is included as utility plant.Depreciation expense is computed using the straight-line method based on the estimated service life of thirty-five years.Nuclear fuel is amortized and charged to expense on the basis of actual thermal energy produced relative to total thermal energy expected to be produced over the life of the fuel.Under the provisions of the Nuclear Waste Policy Act of 1982, the Authority is charged one mill per kilowatt-hour, by the federal government, on its share of electricity produced by PVNGS, and such funds will eventually be utilized by the federal government to provide for PVNGS'uclear waste disposal.The Authority records this charge as a current year expense, The Authority's share of construction and betterment costs associated with STS, MP, MA and SJGS are included as utility plant.Depreciation expense is computed using the straight-line method based on the estimated service lives, principally thirty-five years for STS, MA and MP and twenty-one years for SJGS.Interest costs incurred by the MP and MA projects through the date commercial operations commenced (April 1996)are capitalized in utility plant.Total interest costs capitalized were 811,827,000 and 315,769,000 in fiscal 1996 and 1995, respectively, for the MA project and 83,881,000 and 85,175,000 in fiscal 1996 and 1995, respectively, for the MP project.Advances for Ca acit and Ener Advance payments to USBR for the uprating of the 17 generators at the Hoover Power Plant are included in advances for capacity and energy.These advances are being reduced by credits on billings to participants for energy and capacity.
The Authority's sharc of construction and betterment costs associated with PVNGS is included as utility plant. Depreciation expense is computed using the straight-line method based on the estimated service life of thirty-five years. Nuclear fuel is amortized and charged to expense on the basis of actual thermal energy produced relative to total thermal energy expected to be produced over the life of the fuel. Under the provisions of the Nuclear Waste Policy Act of 1982, the Authority is charged one mill per kilowatt-hour, by the federal government, on its share of electricity produced by PVNGS, and such funds will eventually be utilized by the federal government to provide for PVNGS'uclear waste disposal. The Authority records this charge as a current year expense, The Authority's share   of construction and betterment costs associated with STS, MP, MA and SJGS are included as     utility plant. Depreciation expense is computed using the straight-line method based on the     estimated service lives, principally thirty-five years for STS, MA and MP and twenty-one years   for SJGS.
I I I NOTE 2: (Continued)
Interest costs incurred by the MP and MA projects through the date commercial operations commenced (April 1996) are capitalized in utility plant. Total interest costs capitalized were 811,827,000 and 315,769,000 in fiscal 1996 and 1995, respectively, for the MA project and 83,881,000 and 85,175,000 in fiscal 1996 and 1995, respectively, for the MP project.
Nuclear Decommissionin Decommissioning of PVNGS is projected to commence subsequent to the year 2022.Based upon an updated study performed by an independent engineering firm, the Authority's share of the estimated decommissioning costs is$85.5 million in 1995 dollars (8390 million in 2022 dollars assuming a 6%estimated annual inflation rate).The Authority is providing for its share of the estimated future decommissioning costs over the remaining life of the nuclear power plant (25 to 27 years)through annual charges to expense which amounted to 812.5 million and 813.4 million in fiscal 1996 and 1995, respectively.
Advances for Ca acit and Ener Advance payments to USBR for the uprating of the 17 generators at the Hoover Power Plant are included in advances for capacity and energy. These advances are being reduced by credits on billings to participants for energy and capacity.
The decommissioning liability is included as a component of accumulated depreciation and was 888.1 million and$75.6 million at June 30, 1996 and 1995, respectively.
I I
A Decommissioning Fund has been established and partially funded at$33.9 million at June 30, 1996.The Decommissioning Fund earned interest income of 5700,000 during fiscal 1996.Demolition and Site Reclamation Demolition and site reclamation of SJGS, which involves restoring the site to a"green" condition which existed prior to SJGS construction, is projected to commence subsequent to the year 2014.Based upon a study performed by an independent engineering firm, the Authority's share of the estimated demolition and site reclamation costs is$18.7 million in 1992 dollars (865.3 million in 2014 dollars using a 6%estimated annual inflation rate).The Authority is providing for its share of the estimated future demolition costs over the remaining life of the power plant (18 years)through annual charges to expense of$3.1 million.The demolition liability is included as a component of accumulated depreciation and was 89.3 million and 86.2 million at June 30, 1996 and 1995, respectively.
I
As of June 30, 1996, the Authority has not billed participants for the cost of demolition nor has it established a demolition fund.Unamortized Debt Ex enses Unamortized debt issue costs, including the loss on refundings, are being amortized over the terms of the respective issues and arc reported net of accumulated amortization.
 
Total deferred loss on refundings, net of accumulated amortization, was$378,070,000 and$393,440,000 at June 30, 1996 and 1995, respectively.
NOTE 2: (Continued)
Investments Investments include United States Government and governmental agency securities and repurchase agreements which are collateralized by such securities.
Nuclear Decommissionin Decommissioning of PVNGS is projected to commence subsequent to the year 2022. Based upon an updated study performed by an independent engineering firm, the Authority's share of the estimated decommissioning costs is $ 85.5 million in 1995 dollars (8390 million in 2022 dollars assuming a 6% estimated annual inflation rate). The Authority is providing for its share of the estimated future decommissioning costs over the remaining life of the nuclear power plant (25 to 27 years) through annual charges to expense which amounted to 812.5 million and 813.4 million in fiscal 1996 and 1995, respectively. The decommissioning liability is included as a component of accumulated depreciation and was 888.1 million and $ 75.6 million at June 30, 1996 and 1995, respectively.
Additionally, the Mead-Phoenix Project, the Mead-Adelanto Project and the Multiple Project Fund's investments are comprised of an investment agreement with a financial institution earning a guaranteed rate of l I 4 (c a~'I I I I l NOTE 2: (Continued) return.The Southern Transmission System Project has debt service reserve funds associated with the 1991 and 1992 Subordinate Refunding Series Bonds invested with a financial institution under a specific investment agreement allowed under the Bond Indenture earning a guaranteed rate of return.Investments available for sale are carried at aggregate fair value and changes in unrealized net gains or losses are recorded separately.
A Decommissioning Fund     has been established and partially funded at $ 33.9 million at June 30, 1996. The Decommissioning Fund earned interest income of 5700,000 during fiscal 1996.
Investments are reduced to estimated net realizable value when necessary for declines in value considered to be other than temporary.
Demolition and Site Reclamation Demolition and site reclamation of SJGS, which involves restoring the site to a "green" condition which existed prior to SJGS construction, is projected to commence subsequent to the year 2014.
Gains and losses realized on the sale of investments are generally determined using the specific identification method.As discussed in Note 3, all of the investments are restricted as to their use.Cash and Cash E uivalents Cash and cash equivalents include cash and all investments with original maturities less than 90 days.Revenues Revenues consist of billings to participants for the sales of electric energy and of transmission service in accordance with the participation agreements.
Based upon a study performed by an independent engineering firm, the Authority's share of the estimated demolition and site reclamation costs is $ 18.7 million in 1992 dollars (865.3 million in 2014 dollars using a 6% estimated annual inflation rate). The Authority is providing for its share of the estimated future demolition costs over the remaining life of the power plant (18 years) through annual charges to expense of $ 3.1 million. The demolition liability is included as a component of accumulated depreciation and was 89.3 million and 86.2 million at June 30, 1996 and 1995, respectively.
Generally, revenues are fixed at a level to recover all operating and debt service costs over the commercial life of the property (see Note 6).Debt Ex ense Debt expense includes interest on debt and the amortization of bond discounts, debt issuance expense and loss on refunding costs.Arbitra e Rebate A rebate payable to the Internal Revenue Service (IRS)results from the investment of the proceeds from the Multiple Project Revenue Bond offering in a taxable financial instrument that yields a higher rate of interest income than the cost of the associated funds.The excess of interest income over costs is payable to the IRS within five years of the date of the bond offering and each consecutive five years thereafter.
As of June 30, 1996, the Authority has not billed participants for the cost of demolition nor has it established a demolition fund.
The Authority made its first rebate payment of$3.8 million during fiscal year 1995.The next rebate payment to the IRS is due in fiscal year 2000.Reclassi fications Certain reclassifications have been made in the fiscal year 1995 financial statements to conform to the fiscal year 1996 presentation.
Unamortized Debt Ex enses Unamortized debt issue costs, including the loss on refundings, are being amortized over the terms of the respective issues and arc reported net of accumulated amortization. Total deferred loss on refundings, net of accumulated amortization, was $ 378,070,000 and $ 393,440,000 at June 30, 1996 and 1995, respectively.
I I I I I I NOTE 2: (Continued)
Investments Investments include United States Government and governmental agency securities and repurchase agreements which are collateralized by such securities. Additionally, the Mead-Phoenix Project, the Mead-Adelanto Project and the Multiple Project Fund's investments are comprised of an investment agreement with a financial institution earning a guaranteed rate of l
Use of Estimates The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period.Actual results could differ from those estimates.
I 4
NOTE 3-SPECIAL FUNDS: The Bond Indentures for the six projects and the Multiple Project Fund require the following special funds to be established to account for the Authority's receipts and disbursements.
( c I
The moneys and investments held in these funds are restricted in use to the purposes stipulated in the Bond Indentures.
a~'
A summary of these funds follows: I'und~Pur ose Construction To disburse funds for the acquisition and construction of the project.Debt Service Revenue Operating Reserve and Contingency To pay interest and principal related to the Revenue Bonds.To initially receive all revenues and disburse them to other funds.To pay operating expenses.To pay capital improvements and make up deficiencies in other funds.General Reserve Advance Payments Proceeds Account To make up any deficiencies in other funds.To disburse funds for the cost of acquisition of capacity.To initially receive the proceeds of the sale of the Multiple Project Revenue Bonds.Earnings Account To receive investment earnings on the Multiple Project Revenue Bonds.Revolving Fund Decommissioning Fund To pay the Authority's operating expenses.To accumulate funds related to the future decommissioning of PVNGS.
I I
I I l I I I I NOTE 3: (Continued)
I l
Issue Fund To initially receive pledged revenues associated with the applicable subordinated refunding series'ndenture of Trust and pay the related interest and principal.
 
Escrow account-Subordinate Refunding Crossover Series To initially receive pledged revenues associated with Component 3 of the 1993 Subordinate Refunding Crossover Series'ndenture of Trust and pay the related interest and principal.
NOTE 2: (Continued) return. The Southern Transmission System Project has debt service reserve funds associated with the 1991 and 1992 Subordinate Refunding Series Bonds invested with a financial institution under a specific investment agreement allowed under the Bond Indenture earning a guaranteed rate of return.
Acquisition Account To disburse funds for the acquisition and construction of the Mead-Phoenix, Mead-Adelanto and San Juan projects.All of the funds listed above, except for the Revolving Fund, are held by the respective trustees.Palo Verde Pro'ect The balances of the funds required by the Bond Indenture are as follows, in thousands:
Investments available for sale are carried at aggregate fair value and changes in unrealized net gains or losses are recorded separately. Investments are reduced to estimated net realizable value when necessary for declines in value considered to be other than temporary. Gains and losses realized on the sale of investments are generally determined using the specific identification method. As discussed in Note 3, all of the investments are restricted as to their use.
une 30 1996 Amortized Fair Cost Value 1995 Amortized Fair Cost Value Debt Service Fund-Debt Service Account Debt Service Reserve Account Revenue Fund Operating Fund Reserve and Contingency Fund Decommissioning Trust Fund Issue Fund Revolving Fund 8 51,386 74,420 5 20,130 25,924 34,131 13,026 45 8 51,394 74,160 5 20,134 26,107 33,740 13,026 45 8 52,457 81,497 1 31,141 16,776 24,503 12,486 45 S 52,467 81,077 1 31,026 17,075 24,503 12,486 45 Contractual maturities:
Cash and Cash E uivalents Cash and cash equivalents include cash and all investments with original maturities less than 90 days.
Within one year After one year through five years After five years through ten years After ten years~2~~7~2~~21~Q~211~3 69,781 8 69,391 136,279 136,148 3,187 3,252 9 820 9 820~2]067$218~11 NOTE 3: (Continued)
Revenues Revenues consist of billings to participants for the sales of electric energy and of transmission service in accordance with the participation agreements. Generally, revenues are fixed at a level to recover all operating and debt service costs over the commercial life of the property (see Note 6).
Debt Ex ense Debt expense includes interest on debt and the amortization of bond discounts, debt issuance expense and loss on refunding costs.
Arbitra e Rebate A rebate payable to the Internal Revenue Service (IRS) results from the investment of the proceeds from the Multiple Project Revenue Bond offering in a taxable financial instrument that yields a higher rate of interest income than the cost of the associated funds. The excess of interest income over costs is payable to the IRS within five years of the date of the bond offering and each consecutive five years thereafter. The Authority made its first rebate payment of $ 3.8 million during fiscal year 1995. The next rebate payment to the IRS is due in fiscal year 2000.
Reclassi fications Certain reclassifications have been made in the fiscal year 1995 financial statements to conform to the fiscal year 1996 presentation.
 
I I
I I
I I
 
NOTE 2: (Continued)
Use of Estimates The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.
NOTE 3 - SPECIAL FUNDS:
The Bond Indentures for the six projects and the Multiple Project Fund require the following special funds to be established to account for the Authority's receipts and disbursements. The moneys and investments held in these funds are restricted in use to the purposes stipulated in the Bond Indentures. A summary of these funds follows:
I'und                                           ~Pur ose Construction                       To disburse funds for the acquisition and construction of the project.
Debt Service                       To pay interest and principal related to the Revenue Bonds.
Revenue                            To initially receive all revenues and disburse them to other funds.
Operating                          To pay operating expenses.
Reserve and Contingency            To pay capital improvements and make up deficiencies in other funds.
General Reserve                     To make up any deficiencies in other funds.
Advance Payments                    To disburse funds for the cost of acquisition of capacity.
Proceeds Account                    To initially receive the proceeds of the sale of the Multiple Project Revenue Bonds.
Earnings Account                   To receive investment earnings on the Multiple Project Revenue Bonds.
Revolving Fund                     To pay the Authority's operating expenses.
Decommissioning Fund                To accumulate funds related to the future decommissioning of PVNGS.
I I
l I
I I
I
 
NOTE 3: (Continued)
Issue Fund                           To initially receive pledged revenues associated with the applicable subordinated refunding series'ndenture of Trust and pay the related interest and principal.
Escrow account - Subordinate         To initially receive pledged revenues associated with Refunding Crossover Series            Component 3 of the 1993 Subordinate Refunding Crossover Series'ndenture of Trust and pay the related interest and principal.
Acquisition Account                 To disburse funds for the acquisition and construction of the Mead-Phoenix, Mead-Adelanto and San Juan projects.
All of the funds listed above, except for the Revolving Fund, are held by the respective trustees.
Palo Verde Pro'ect The balances of the funds required by the Bond Indenture are as follows, in thousands:
une 30 1996                       1995 Amortized       Fair      Amortized      Fair Cost         Value         Cost       Value Debt Service Fund-Debt Service Account                           8 51,386    8 51,394      8 52,457    S  52,467 Debt Service Reserve Account                       74,420      74,160        81,497      81,077 Revenue Fund                                              5            5            1          1 Operating Fund                                      20,130        20,134       31,141      31,026 Reserve and Contingency Fund                        25,924        26,107        16,776       17,075 Decommissioning Trust Fund                          34,131        33,740        24,503      24,503 Issue Fund                                          13,026      13,026        12,486      12,486 Revolving Fund                                            45            45            45          45 Contractual maturities:
                                                    ~2~~7       ~2~           ~21 ~Q ~211~
Within one year                                  3 69,781     8 69,391 After one year through five years                  136,279       136,148 After five years through ten years                    3,187         3,252 After ten years                                      9 820         9 820
                                                    ~2] 067     $ 218~11 NOTE 3: (Continued)
Southern Transmission S stem Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
Southern Transmission S stem Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
une 30 1996 Amortized Cost Fair Value 1995 Amortized Cost Fair Value Construction fund-Initial Facilities Account Debt Service Fund-Debt Service Account Debt Service Reserve Account Operating Fund General Reserve Fund Issue Fund Escrow Account-Subordinate Refunding Crossover Series Revolving Fund 21,921 86,220 6,015 4,194 77,024 21,896 86,189 6,007 4,194 76,794 31,480 66,672 5,987 9,533 77,768 31,491 66,857 5,987 9,542 77,579 346,474 343,903 355,101 353,188 15 15 15 15 f~42 Z%~2~4~77 S 235 8 235 8 223 8 223 Contractual maturities:
une 30 1996                   1995 Amortized      Fair    Amortized     Fair Cost       Value       Cost       Value Construction fund - Initial Facilities Account   S    235 8      235    8    223  8      223 Debt Service Fund-Debt Service Account                             21,921    21,896      31,480      31,491 Debt Service Reserve Account                     86,220     86,189      66,672      66,857 Operating Fund                                      6,015      6,007       5,987        5,987 General Reserve Fund                                4,194     4,194        9,533      9,542 Issue Fund                                          77,024    76,794      77,768     77,579 Escrow Account - Subordinate Refunding Crossover Series                                346,474   343,903     355,101     353,188 Revolving Fund                                          15         15           15         15 f~42   Z   %~2         ~4~77 Contractual maturities:
Within one year After one year through five years After five years through ten years After ten years 8102,008 8101,975 80,852 80,803 36,972 34,189 322 266 322 266~42 098~63')~2.3 In addition, at June 30, 1996 and 1995, the Authority had non-interest bearing advances outstanding to IPA of 819,550,000.
Within one year                               8102,008 8101,975 After one year through five years                 80,852    80,803 After five years through ten years               36,972     34,189 After ten years                                  322 266 322 266
I I k I I I I NOTE 3: (Continued)
                                                  ~42   098 ~63')~2. 3 In addition, at June 30, 1996 and 1995, the Authority had non-interest bearing advances outstanding to IPA of 819,550,000.
I I
I k
I I
I
 
NOTE 3: (Continued)
Ifoover U ratin Pro ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
Ifoover U ratin Pro ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
1996 une 30 1995 Amortized I'air Cost Value Amortized Cost Fair Value Advance Payments Fund Operating-Working Capital Fund Debt Service Fund-Debt Service Account Debt Service Reserve Account General Reserve Fund Revolving Fund 3 804 2,390 2,390 3,122 3,121 5,318 5,316 1,440 3,078 2,911 13 1,429 3,068 2,914 13 8 2,437 8 2,437 804 563 563 5 1 1~4]~ll+1~1~442~1(~424 Contractual maturities:
une 30 1996                    1995 Amortized     I'air     Amortized      Fair Cost       Value         Cost       Value Advance Payments Fund                                   3            8  2,437    8    2,437 Operating-Working Capital Fund                     804      804          563            563 Debt Service Fund-Debt Service Account                         2,390     2,390         1,440        1,429 Debt Service Reserve Account                  3,122     3,121         3,078        3,068 General Reserve Fund                            5,318     5,316         2,911         2,914 Revolving Fund                                                              13            13 5 1 1~4 ]~ll     +1     ~1~442     ~1(~424 Contractual maturities:
Within one year After one year through five years 8 2,003 8 2,003 9 681 9 628)~ll 34~1~1+1 In addition, at June 30, 1996 and 1995, the Authority had advances to USBR of 810,119,000 and 811,903,000, respectively.
Within one year                         8   2,003 8 2,003 After one year through five years            9 681     9 628
                                                )~ll   34 ~1~1+1 In addition, at June 30, 1996 and 1995, the Authority had advances to USBR of 810,119,000 and 811,903,000, respectively.
Mead-Phoenix Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
Mead-Phoenix Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
une 30 1996 Amortized Cost Fair Value 1995 Amortized Cost Fair Value Acquisition Account Debt Service Fund-Debt Service Account Debt Service Reserve Account Issue Fund Revenue Fund Operating Fund Revolving Fund 4,976 4,967 6,133 6,133 4,444 6,132 4,924 4,444 6,132 4,873 64 239 6 64 239 6 8 12,571 8 12,571 8 19,830 8 19,830~23 982 M2'h~R  
une 30 1996                     1995 Amortized      Fair      Amortized       Fair Cost       Value         Cost       Value Acquisition Account                         8 12,571    8 12,571      8 19,830  8    19,830 Debt Service Fund-Debt Service Account                         4,976     4,967         4,444        4,444 Debt Service Reserve Account                  6,133     6,133         6,132        6,132 Issue Fund                                                              4,924         4,873 Revenue Fund                                        64         64 Operating Fund                                    239      239 Revolving Fund                                      6           6
                                                ~23   982 M2'h~R


NOTE 3: (Continued)
NOTE 3: (Continued)
Contractual maturities:
Contractual maturities:
Within one year After one year through five years After ten years 2,389 8 2,389 1,242 1,233 20 858 20 358 5 2'>MR~22K Mead-Adelanto Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
Within one year                               2,389 8 2,389 After one year through five years            1,242     1,233 After ten years                              20 858     20 358 5 2'>MR     ~22K Mead-Adelanto Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:
1996 une 30 1995 Amortized Fair Cost Value Amortized Cost Fair Value Acquisition Account Debt Service Fund-Debt Service Account Debt Service Reserve Account Issue Fund Revenue Fund Operating Fund Revolving Fund 15,194 15,166 16,865 16,865 12,353 17,040 16,517 12,353 17,040 16,346 71 264 6 71 264 6 8 36,979 8 36,979 8 37,745 8 37,745 Contractual maturities:
une 30 1996                    1995 Amortized     Fair    Amortized      Fair Cost       Value       Cost       Value Acquisition Account                         8 36,979    8 36,979    8 37,745    8  37,745 Debt Service Fund-Debt Service Account                         15,194     15,166       12,353        12,353 Debt Service Reserve Account                16,865     16,865       17,040      17,040 Issue Fund                                                              16,517       16,346 Revenue Fund                                        71       71 Operating Fund                                    264        264 Revolving Fund                                        6         6 Contractual maturities:
Within one year After one year through five years After ten years 8 6,794 8 6,789 4,161 4,138 58 424 58 424 I I I I NOTE 3: (Continued)
Within one year                           8   6,794 8 6,789 After one year through five years            4,161     4,138 After ten years                              58 424     58 424 I
I I
I
 
NOTE 3: (Continued)
Multi le Pro'ect Fund The balances in the special funds required by the Bond Indenture are as follows, in thousands:
Multi le Pro'ect Fund The balances in the special funds required by the Bond Indenture are as follows, in thousands:
1996 une 30 1995 Amortized Fair Cost Value Amortized Fair Cost Value Proceeds Account Earnings Account 8256,830 8256,830 8256,830 8 256,830 3 278 3 278 1 384 1 384 Contractual maturities:
une 30 1996                      1995 Amortized       Fair      Amortized      Fair Cost       Value       Cost       Value Proceeds Account                             8256,830 8256,830         8256,830   8 256,830 Earnings Account                                3 278       3 278       1 384         1 384
Within one year After ten years~20~10[~2(~1$~2~214~2~214 9,220 8 9,220 250 888 250 888~2()10/f$2{~01 The balances in the special funds required by the Bond Indenture are as follows, in thousands:
                                                ~20~10     [~2(~1$       ~2~214     ~2~214 Contractual maturities:
1996 une 30 1995 Amortized Fair Cost Value Amortized Cost Fair Value Operating Reserve Operating Revenue Fund Acquisition Account Debt Service Fund-Debt Service Account Debt Service Reserve Account Reserve and Contingency Revolving 8 1,238 8 1,238 8 1,618 8 1,618 7 7 2 2 527 527 112 112 8,607 8,597 6,017 6,017 18,031 18,031 18,026 18,026 13,377 13,383 11,224 11,252 15 15 JL44~77 g 41~73~7~4~~~7L422 Contractual maturities:
Within one year                              9,220 8   9,220 After ten years                            250 888   250 888
Within one year After one year through five years After ten years 5 7,613 8 7,613 16,149 16,145 18 025 18 025 fj 41~77 j~4~7$
                                                ~2() 10/f $ 2{~01 The balances in the special funds required by the Bond Indenture are as follows, in thousands:
I I I I I NOTE 3: (Continued Pro'ect Investment Sales There were no proceeds from sales of investments during fiscal 1996 or 1995.NOTE 4-LONG-TERM DEBT: Reference is made below to the Combined Schedule of Long-term Debt at June 30, 1996 for details related to all of the Authority's outstanding bonds.Palo Verde Pro'ect To finance the purchase and construction of the Authority's share of the Palo Verde Project, the Authority issued Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of July 1, 1981 (Senior Indenture), as amended and supplemented.
une 30 1996                      1995 Amortized     Fair      Amortized      Fair Cost       Value         Cost       Value Operating Reserve                           8   1,238 8     1,238     8 1,618   8     1,618 Operating Revenue Fund                              7           7           2             2 Acquisition Account                                527         527         112           112 Debt Service Fund-Debt Service Account                          8,607     8,597         6,017         6,017 Debt Service Reserve Account                18,031     18,031       18,026       18,026 Reserve and Contingency                        13,377     13,383       11,224       11,252 Revolving                                                                    15           15 JL44~77 g 41~73           ~7~4       ~~~7L422 Contractual maturities:
The Authority also has issued and has outstanding Power Project Subordinate Refunding Series Bonds issued under an Indenture of Trust dated as of January 1, 1993 (Subordinate Indenture).
Within one year                           5   7,613 8 7,613 After one year through five years            16,149     16,145 After ten years                              18 025     18 025 fj 41~77   j~4~7$
The Subordinate Refunding Bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.
I I
The bond indenturcs provide that the Revenue Bonds and Subordinate Refunding Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1)proceeds from the sale of bonds, (2)all revenues, incomes, rents and receipts attributable to the Palo Verde Project (see Note 6)and interest on all moneys or securities (other than in the Construction Fund)held pursuant to the Bond Indenture and (3)all funds established by the Bond Indenture.
I I
I
 
NOTE 3: (Continued Pro'ect Investment Sales There were no proceeds from sales of investments during fiscal 1996 or 1995.
NOTE 4 - LONG-TERM DEBT:
Reference is made below to the Combined Schedule of Long-term Debt at June 30, 1996 for details related to all of the Authority's outstanding bonds.
Palo Verde Pro'ect To finance the purchase and construction of the Authority's share of the Palo Verde Project, the Authority issued Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of July 1, 1981 (Senior Indenture), as amended and supplemented. The Authority also has issued and has outstanding Power Project Subordinate Refunding Series Bonds issued under an Indenture of Trust dated as of January 1, 1993 (Subordinate Indenture). The Subordinate Refunding Bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.
The bond indenturcs provide that the Revenue Bonds and Subordinate Refunding Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to the Palo Verde Project (see Note 6) and interest on all moneys or securities (other than in the Construction Fund) held pursuant to the Bond Indenture and (3) all funds established by the Bond Indenture.
At the option of the Authority, all outstanding Power Project Revenue Bonds and Subordinate Refunding Term Bonds are subject to redemption prior to maturity, except for the 1996 Subordinate Refunding Series A which is not redeemable.
At the option of the Authority, all outstanding Power Project Revenue Bonds and Subordinate Refunding Term Bonds are subject to redemption prior to maturity, except for the 1996 Subordinate Refunding Series A which is not redeemable.
The Bond Indenture requires mandatory'sinking fund installments to be made beginning in fiscal year 2003 (1986 Series A Bonds and 1987 Series A Bonds), 2005 (1989 Series A Bonds), 2010 (1993 Series A Bonds), and 2008 (1996 Subordinate Refunding Series B).Scheduled principal maturities for the Palo Verde Project during the five fiscal years following June 30, 1996 are$25,690,000 in 1997, 822,220,000 in 1998,$23,580,000 in 1999, 825,145,000 in 2000, and 512,860,000 in 2001.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8%and 6.0%, respectively.
The Bond Indenture requires mandatory 'sinking fund installments to be made beginning in fiscal year 2003 (1986 Series A Bonds and 1987 Series A Bonds), 2005 (1989 Series A Bonds), 2010 (1993 Series A Bonds), and 2008 (1996 Subordinate Refunding Series B). Scheduled principal maturities for the Palo Verde Project during the five fiscal years following June 30, 1996 are
$ 25,690,000 in 1997, 822,220,000 in 1998, $ 23,580,000 in 1999, 825,145,000 in 2000, and 512,860,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8% and 6.0%, respectively.
NOTE 4: (Continued)
Southern Transmission S stem Pro'ect To finance payments-in-aid of construction to IPA for construction of the STS, the Authority issued Transmission Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of May 1, 1983 (Senior Indenture), as amended and supplemented. The Authority also has issued and has outstanding Transmission Project Revenue Bonds 1991 and 1992 Subordinate Refunding Series issued under Indentures of Trust dated as of March 1, 1991 and June 1, 1992, respectively. The 1991 and 1992 subordinated bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.
The bond indentures provide that the Revenue Bonds and the Subordinate Refunding Series Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to STS (see Note 6) and interest on all moneys or securities (other than in the Construction Fund) held pursuant to the Bond Indenture and (3) all funds established by the Bond Indenture.
All outstanding Transmission Project Revenue and Refunding Bonds, at the option of the Authority, are subject to redemption prior to maturity.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2003 (for the 1986 Series A Bonds), 2002 (1986 Series B Bonds) and 2007 (1988 Series A Bonds). Scheduled principal maturities for STS during the five fiscal years following June 30, 1996 are $ 10,845,000 in 1997, 821,565,000 in 1998, 822,790,000 in 1999, 810,200,000 in 2000, and
$ 10,115,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 8.3%.
I.loover U ratin  Pro ect To finance advance payments to USBR for application to the costs of the Hoover Uprating Project, the Authority issued Hydroelectric Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of March 1, 1986 (Bond Indenture).
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) the proceeds from the sale of the bonds, (2) all revenues from sales of energy to participants (see Note 6), (3) interest or other receipts derived from any moneys or securities held pursuant to the Bond Indenture and (4) all funds established by the Bond Indenture (except for the Interim Advance Payments Account in the Advance Payments Fund).
At the option of the Authority, all outstanding Hydroelectric Power Project Revenue Bonds are subject to redemption prior to maturity.
I I
I I
I I
I
 
NOTE 4: (Continued)
NOTE 4: (Continued)
Southern Transmission S stem Pro'ect To finance payments-in-aid of construction to IPA for construction of the STS, the Authority issued Transmission Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of May 1, 1983 (Senior Indenture), as amended and supplemented.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2007 for the 1991 Series A Bonds maturing on October 1, 2010 and fiscal year 2011 for the 1991 Series A Bonds maturing on October 1, 2017. Scheduled principal maturities for the Hoover Uprating Project during the five fiscal years following June 30, 1996 are 81,085,000 in 1997, 81,130,000 in 1998, 81,230,000 in 1999, $ 1,285,000 in 2000, and 81,400,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8% and 6.1%,
The Authority also has issued and has outstanding Transmission Project Revenue Bonds 1991 and 1992 Subordinate Refunding Series issued under Indentures of Trust dated as of March 1, 1991 and June 1, 1992, respectively.
respectively.
The 1991 and 1992 subordinated bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.
During fiscal 1995, the Authority repurchased 8340,000 of outstanding Hydroelectric Power Project Revenue Bonds with excess funds in the Advance Payments I und.
The bond indentures provide that the Revenue Bonds and the Subordinate Refunding Series Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1)proceeds from the sale of bonds, (2)all revenues, incomes, rents and receipts attributable to STS (see Note 6)and interest on all moneys or securities (other than in the Construction Fund)held pursuant to the Bond Indenture and (3)all funds established by the Bond Indenture.
Multi le Pro'ect Fund To finance costs of construction and acquisition of ownership interests or capacity rights in one or more projects expected to be undertaken within five years after issuance, the Authority issued Multiple Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of August 1, 1989 (Bond Indenture), as amended and supplemented.
All outstanding Transmission Project Revenue and Refunding Bonds, at the option of the Authority, are subject to redemption prior to maturity.The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2003 (for the 1986 Series A Bonds), 2002 (1986 Series B Bonds)and 2007 (1988 Series A Bonds).Scheduled principal maturities for STS during the five fiscal years following June 30, 1996 are$10,845,000 in 1997, 821,565,000 in 1998, 822,790,000 in 1999, 810,200,000 in 2000, and$10,115,000 in 2001.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 8.3%.I.loover U ratin Pro ect To finance advance payments to USBR for application to the costs of the Hoover Uprating Project, the Authority issued Hydroelectric Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of March 1, 1986 (Bond Indenture).
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) with respect to each authorized project, the revenues of such authorized project, and (3) all funds established by the Bond Indenture.
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1)the proceeds from the sale of the bonds, (2)all revenues from sales of energy to participants (see Note 6), (3)interest or other receipts derived from any moneys or securities held pursuant to the Bond Indenture and (4)all funds established by the Bond Indenture (except for the Interim Advance Payments Account in the Advance Payments Fund).At the option of the Authority, all outstanding Hydroelectric Power Project Revenue Bonds are subject to redemption prior to maturity.
In October 1992, 8103,640,000 and 8285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project and the Mead-Adelanto Project, respectively, to finance the estimated costs of acquisition and construction of the projects.
I I I I I I I NOTE 4: (Continued)
A total of $ 153,500,000 of the outstanding Multiple Project Revenue Bonds are not subject to redemption prior to maturity. At the option of the Authority, the balance of the outstanding bonds are subject to redemption prior to maturity.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2007 for the 1991 Series A Bonds maturing on October 1, 2010 and fiscal year 2011 for the 1991 Series A Bonds maturing on October 1, 2017.Scheduled principal maturities for the Hoover Uprating Project during the five fiscal years following June 30, 1996 are 81,085,000 in 1997, 81,130,000 in 1998, 81,230,000 in 1999,$1,285,000 in 2000, and 81,400,000 in 2001.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8%and 6.1%, respectively.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2006 for the 1989 Series Bonds. The first scheduled principal maturity for the Multiple Project Revenue Bonds is 88,645,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.8%.
During fiscal 1995, the Authority repurchased 8340,000 of outstanding Hydroelectric Power Project Revenue Bonds with excess funds in the Advance Payments I und.Multi le Pro'ect Fund To finance costs of construction and acquisition of ownership interests or capacity rights in one or more projects expected to be undertaken within five years after issuance, the Authority issued Multiple Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of August 1, 1989 (Bond Indenture), as amended and supplemented.
Mead-Phoenix Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, 8103,640,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project in October 1992.
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1)proceeds from the sale of bonds, (2)with respect to each authorized project, the revenues of such authorized project, and (3)all funds established by the Bond Indenture.
In March 1994, the Authority issued and has outstanding 851,835,000 of Mead-Phoenix Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture). The proceeds from the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project I
In October 1992, 8103,640,000 and 8285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project and the Mead-Adelanto Project, respectively, to finance the estimated costs of acquisition and construction of the projects.A total of$153,500,000 of the outstanding Multiple Project Revenue Bonds are not subject to redemption prior to maturity.At the option of the Authority, the balance of the outstanding bonds are subject to redemption prior to maturity.The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2006 for the 1989 Series Bonds.The first scheduled principal maturity for the Multiple Project Revenue Bonds is 88,645,000 in fiscal year 2000.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.8%.Mead-Phoenix Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, 8103,640,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project in October 1992.In March 1994, the Authority issued and has outstanding 851,835,000 of Mead-Phoenix Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture).
I
The proceeds from the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project I I NOTE 4: (Continued)
Acquisition Fund, werc used to advance refund 864,840,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Phoenix Project.The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1)proceeds from the sale of bonds, (2)all revenues, incomes, rents and receipts attributable to Mead-Phoenix (see Note 6)and interest on all moneys or securities and (3)all funds established by the Bond Indenture.
At the option of the Authority, all outstanding Mead-Phoenix Revenue Bonds are subject to redemption prior to maturity.The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1994 Series Bonds.The first scheduled principal maturity for the Mead-Phoenix Revenue Bonds is$1,295,000 in fiscal year 2000.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.0%.Mead-Adelanto Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, S285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Adelanto Project in October 1992.In March 1994, the Authority issued and has outstanding 8173,955,000 of Mead-Adelanto Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture).
The proceeds of the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project Acquisition Fund, were used to advance refund 8178,310,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Adelanto Project.The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, 1)proceeds from the sale of bonds, (2)all revenues, incomes, rents and receipts attributable to Mead-Adelanto (see Note 6)and interest on all moneys or securities and (3)all funds established by the Bond Indenture.
At the option of the Authority, all outstanding Mead-Adelanto Revenue Bonds are subject to redemption prior to maturity.The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1995 Series Bonds, The first scheduled principal maturity for the Mead-Adelanto Revenue Bonds is 83,560,000 in fiscal year 2000.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.9%and 6.0%, respectively.
S~P To finance the costs of acquisition of an ownership interest in Unit 3 of the SJGS, the Authority issued San Juan Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of January 1, 1993 (Bond Indenture).


NOTE 4: (Continued)
NOTE 4: (Continued)
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1)proceeds from the sale of bonds, (2)all revenues, incomes, rents and receipts attributable to San Juan (see Note 6)and interest on all moneys or securities and (3)all funds established by the Bond Indenture.
Acquisition Fund, werc used to advance refund 864,840,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Phoenix Project.
At the option of the Authority, all outstanding San Juan Project Revenue Bonds are subject to redemption prior to maturity.The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2012 for the 1993 Series A Bonds.The scheduled principal maturities for the San Juan Project Revenue Bonds during the five fiscal years following June 30, 1996 are 86,035,000 in 1998, 86,275,000 in 1999, 86,540,000 in 2000 and 86,825,000 in 2001.The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.3%.Refundin Bonds In April 1996, the Authority issued 8152,905,000 of Palo Verde 1996 Subordinate Refunding Series A Bonds to refund 8163,355,000 of previously issued Palo Verde 1987 Refunding Series A Bonds and issued 858,870,000 of Palo Verde 1996 Subordinate Refunding Series B Bonds to refund 818,555,000 and 840,315,000 of previously issued Palo Verde 1986 Refunding Series B and 1987 Refunding Series A Bonds, respectively.
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to Mead-Phoenix (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.
The refunding is expected to reduce total debt service payments over the next 13 years by approximately 850,967,000 (the difference between the debt service payments on the old and new debt)and is expected to result in a net present value savings of approximately 829,537,000.
At the option of the Authority, all outstanding Mead-Phoenix Revenue Bonds are subject    to redemption prior to maturity.
In March 1994, the Authority issued 851,835,000 of Mead-Phoenix Project Revenue Bonds and 8173,955,000 of Mead-Adelanto Project Revenue Bonds to refund 8243,150,000 of previously issued Multiple Project Revenue Bonds which were transferred to the Mead-Phoenix and Mead-Adelanto projects during fiscal year 1993.The partial refunding of the original issue within five years of its issuance triggered a recalculation of the arbitrage yield.The recalculation resulted in a higher arbitrage yield which reduced the rebate liability of the Authority.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1994 Series Bonds. The first scheduled principal maturity for the Mead-Phoenix Revenue Bonds is $ 1,295,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.0%.
At June 30, 1996, cumulative savings due to the rebate calculation amounted to 86,401,924.
Mead-Adelanto Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, S285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Adelanto Project in October 1992.
This amount was allocated 81,707,180 and 84,694,744 to the Mead-Phoenix and Mead-Adelanto Projects, respectively.
In March 1994, the Authority issued and has outstanding 8173,955,000 of Mead-Adelanto Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture). The proceeds of the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project Acquisition Fund, were used to advance refund 8178,310,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Adelanto Project.
In July 1992, the Authority issued 8475,000,000 of Southern Transmission Project Revenue Bonds to refund 8385,385,000 of previously issued bonds.Principal and interest with respect to the 1992 bonds are allocated into four separate components.
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, 1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to Mead-Adelanto (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.
Each of components 1, 2 and 3 is secured by, and payable from, investments in its escrow fund until scheduled crossover dates.Component 4 proceeds of 814,100,000 were used to advance refund approximately 89,000,000 of bonds in fiscal year 1993.On the Component 1 Crossover date (January 1, 1994), Component 1 proceeds of 813,959,000 were used in fiscal 1994 to advance refund 813,455,000 of previously issued bonds.On the Component 2 Crossover date (January 1, 1995), Component 2 proceeds of 85,519,000 were used in fiscal 1995 to advance refund 85,335,000 of previously issued bonds.Proceeds from Component 3 of 8343,921,000 werc placed in an irrevocable trust and will be used to redeem 8313,050,000 of bonds currently included within long-term debt at scheduled call dates.The I
At the option of the Authority, all outstanding Mead-Adelanto Revenue Bonds are subject    to redemption prior to maturity.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1995 Series Bonds, The first scheduled principal maturity for the Mead-Adelanto Revenue Bonds is 83,560,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.9% and 6.0%, respectively.
S~P To finance the costs of acquisition of an ownership interest in Unit 3 of the SJGS, the Authority issued San Juan Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of January 1, 1993 (Bond Indenture).
 
NOTE 4: (Continued)
The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to San Juan (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.
At the option of the Authority, all outstanding San Juan Project Revenue Bonds are subject to redemption prior to maturity.
The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2012 for the 1993 Series A Bonds. The scheduled principal maturities for the San Juan Project Revenue Bonds during the five fiscal years following June 30, 1996 are 86,035,000 in 1998, 86,275,000 in 1999, 86,540,000 in 2000 and 86,825,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.3%.
Refundin   Bonds In April 1996, the Authority issued 8152,905,000 of Palo Verde 1996 Subordinate Refunding Series A Bonds to refund 8163,355,000 of previously issued Palo Verde 1987 Refunding Series A Bonds and issued 858,870,000 of Palo Verde 1996 Subordinate Refunding Series B Bonds to refund 818,555,000 and 840,315,000 of previously issued Palo Verde 1986 Refunding Series B and 1987 Refunding Series A Bonds, respectively. The refunding is expected to reduce total debt service payments over the next 13 years by approximately 850,967,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately 829,537,000.
In March 1994, the Authority issued 851,835,000 of Mead-Phoenix Project Revenue Bonds and 8173,955,000 of Mead-Adelanto Project Revenue Bonds to refund 8243,150,000 of previously issued Multiple Project Revenue Bonds which were transferred to the Mead-Phoenix and Mead-Adelanto projects during fiscal year 1993. The partial refunding of the original issue within five years of its issuance triggered a recalculation of the arbitrage yield. The recalculation resulted in a higher arbitrage yield which reduced the rebate liability of the Authority. At June 30, 1996, cumulative savings due to the rebate calculation amounted to 86,401,924. This amount was allocated 81,707,180 and 84,694,744 to the Mead-Phoenix and Mead-Adelanto Projects, respectively.
In July 1992, the Authority issued 8475,000,000 of Southern Transmission Project Revenue Bonds to refund 8385,385,000 of previously issued bonds. Principal and interest with respect to the 1992 bonds are allocated into four separate components. Each of components 1, 2 and 3 is secured by, and payable from, investments in its escrow fund until scheduled crossover dates. Component 4 proceeds of 814,100,000 were used to advance refund approximately 89,000,000 of bonds in fiscal year 1993. On the Component 1 Crossover date (January 1, 1994), Component 1 proceeds of 813,959,000 were used in fiscal 1994 to advance refund 813,455,000 of previously issued bonds.
On the Component 2 Crossover date (January 1, 1995), Component 2 proceeds of 85,519,000 were used in fiscal 1995 to advance refund 85,335,000 of previously issued bonds. Proceeds from Component 3 of 8343,921,000 werc placed in an irrevocable trust and will be used to redeem 8313,050,000 of bonds currently included within long-term debt at scheduled call dates. The I
NOTE 4: (Continued) combined refunding is expected to reduce total debt service payments over the next 25 years by approximately 852,585,000 and is expected to result in an overall net present value savings of approximately 825,060,000.
NOTE 4: (Continued) combined refunding is expected to reduce total debt service payments over the next 25 years by approximately 852,585,000 and is expected to result in an overall net present value savings of approximately 825,060,000.
Until the bonds to be refunded by Component 3 are called, interest on the bonds is payable from interest earned on investments with a financial institution under a specific investment agreement purchased out of the proceeds of the sales and held in bank escrow accounts.After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through fiscal 1997, interest on the bonds will be payable from revenues.The trust account assets (8343,898,000 in escrow accounts and 82,410,000 in unamortized debt expense at June 30, 1996)and liabilities (8347,388,000, net of bond discounts, at June 30, 1996)for Component 3 are included in the Authority's financial statements.
Until the bonds to be refunded by Component 3 are called, interest on the bonds is payable from interest earned on investments with a financial institution under a specific investment agreement purchased out of the proceeds of the sales and held in bank escrow accounts. After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through fiscal 1997, interest on the bonds will be payable from revenues. The trust account assets (8343,898,000 in escrow accounts and 82,410,000 in unamortized debt expense at June 30, 1996) and liabilities (8347,388,000, net of bond discounts, at June 30, 1996) for Component 3 are included in the Authority's financial statements. The revenue bonds to be refunded are also included in the financial statements until the scheduled call date, at which time the refunded bonds and related trust account assets will be removed from the balance sheet and the cost of refunding the debt will be included in unamortized debt expenses.
The revenue bonds to be refunded are also included in the financial statements until the scheduled call date, at which time the refunded bonds and related trust account assets will be removed from the balance sheet and the cost of refunding the debt will be included in unamortized debt expenses.In January 1992,$70,680,000 of Palo Verde Special Obligation Crossover Series Bonds were issued, the proceeds of which were placed in an irrevocable trust and will be used to redeem 869,125,000 of bonds currently included within long term debt at scheduled call dates.Until the bonds to be refunded by the Palo Verde Special Obligation Crossover Series Bonds are called, interest on the Palo Verde Special Obligation Crossover Series Bonds is payable from interest earned on securities of the United States Government purchased out of the proceeds of the sales and held in bank escrow accounts.After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through 1996, interest on the Palo Verde Special Obligation Crossover Series Bonds will be payable from revenues.The trust account assets and the liability for the Palo Verde Special Obligation Crossover Series Bonds are not included in the Authority's financial statements.
In January 1992, $ 70,680,000 of Palo Verde Special Obligation Crossover Series Bonds were issued, the proceeds of which were placed in an irrevocable trust and will be used to redeem 869,125,000 of bonds currently included within long term debt at scheduled call dates.
At June 30, 1996 and 1995,$63,849,000 and$70,959,000, respectively, of these trust assets have been offset against the Palo Verde Special Obligation Crossover Series Bonds.On July 1, 1995, the crossover date for the Palo Verde Special Obligation Bonds Series A, trust assets in escrow of 87,131,000 were used to advance refund 87,125,000 of previously issued bonds.At June 30, 1996 and 1995, the aggregate amount of debt in all projects considered to be defeased was$3,535,075,000 and 83,305,725,000, respectively.
Until the bonds to be refunded by the Palo Verde Special Obligation Crossover Series Bonds are called, interest on the Palo Verde Special Obligation Crossover Series Bonds is payable from interest earned on securities of the United States Government purchased out of the proceeds of the sales and held in bank escrow accounts. After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through 1996, interest on the Palo Verde Special Obligation Crossover Series Bonds will be payable from revenues. The trust account assets and the liability for the Palo Verde Special Obligation Crossover Series Bonds are not included in the Authority's financial statements. At June 30, 1996 and 1995, $ 63,849,000 and $ 70,959,000, respectively, of these trust assets have been offset against the Palo Verde Special Obligation Crossover Series Bonds.
Interest Rate Swa In fiscal year 1991, the Authority entered into an Interest Rate Swap agreement with a third party for the purpose of hedging against interest rate fluctuations arising from the issuance of the Transmission Project Revenue Bonds, 1991 Subordinate Refunding Series as variable rate obligations.
On July 1, 1995, the crossover date for the Palo Verde Special Obligation Bonds Series A, trust assets in escrow of 87,131,000 were used to advance refund 87,125,000 of previously issued bonds.
The notional amount of the Swap Agreement is equal to the par value of the bond ($291,700,000 and$292,000,000 at June 30, 1996 and 1995, respectively).
At June 30, 1996 and 1995, the aggregate amount of debt in all projects considered to be defeased was $ 3,535,075,000 and 83,305,725,000, respectively.
The Swap Agreement provides for the Authority to make payments to the third party on a fixed rate basis at 6.38%, and for the third party to make reciprocal payments based on a variable rate basis (3.1%and 3.9%at June 30, 1996 and 1995, respectively).
Interest Rate Swa In fiscal year 1991, the Authority entered into an Interest Rate Swap agreement with a third party for the purpose of hedging against interest rate fluctuations arising from the issuance of the Transmission Project Revenue Bonds, 1991 Subordinate Refunding Series as variable rate obligations. The notional amount of the Swap Agreement is equal to the par value of the bond ($ 291,700,000 and
The bonds mature in 2019.
$ 292,000,000 at June 30, 1996 and 1995, respectively). The Swap Agreement provides for the Authority to make payments to the third party on a fixed rate basis at 6.38%, and for the third party to make reciprocal payments based on a variable rate basis (3.1% and 3.9% at June 30, 1996 and 1995, respectively). The bonds mature in 2019.
I I I I I COMBiNED SCHEDULE OF LONG-TERhf DEBT (ln thousands)
I I
~o Principal:
I I
Palo Verde Project Revenue and Refunding Bonds 1985A 1985B 1986A 1986B 1987A 1989A 1992A 1992C 1993Sub 1993A 1996A 1996B Date 05/22/85 07/02/85 03/13/86 12/16/86 02/11/87 02/15/89 01/01/92 01/01/92 03/01/93 03/01/93 02/13/96 02/29/96 Effcctivc 9.7%9.1%8.2%7.2%6.9%Z.2%6.0%6.0%5.5%5.5%4.4%4.4%Maturity on tu33, 1996 to 1999 1996 to 2000 1996 to 2006 1996 to 2017 1996 to 2017 1996 to 2015 1996 to 2010 1996 to 2010 1996 to 2017 1996 to 2017 1996 to 2017 1996 to 201Z 8 1,070 5,610 71,220 96,450 43,720 287,705 7465 15,620 98,200 270,035 152,905 1,108,670 Southern Transmission System Project Revenue and Refunding Bonds 1986A 1986B 1988A 1991A 1992 Comp 1, 2,4 1992 Comp 3 1993A 03/18/86 04/29/86 11/22/88 4/17/91 7/20/92 7/20/92 7/01/93 8.0%7.5%7.2%6.4%6.1%6.1%5.4%1996 to 2021 1996 to 2023 1996 to 2015 2019 1996 to 2021 1996 to 2021 1996 to 2023 107,300 401,570 154,085 291,700 40,639 431,766 Hoover Uprating Project Revenue and Refunding Bonds 1986A 1991 08/13/86 08/01/91 8.1%6.2%1996 to 2017 1996 to 2017~5925 4,160 multiple Project Revenue Bonds Mead-Phoenix Project Mead-Adelanto Project hfultiple Project 1989 1989 1989 01/04/90 01/0$/90 01/0$/90 7.1%7.1%7.1%1999 to 2020 1999 to 2020 1999 to 2020~5655 38,800 106,ZOO~259 99 Mead-Phoenix Project Revenue Bonds hfead.Addanto Project Revenue Bonds San Juan Project Revenue Bonds Total principal amount Unamortized bond discount: Palo Verde Project Southern Transmission System Project Hoover Uprating Project Mead-Phoenix Project hfead-Adelanto Project hfultiple Project Fund San Juan Project 1994A 1994A 1993 03/01/94 03/01/94 06/01/93 5.3%5.3%5.6%2006 to 2015 2006 to 2015 1997 to 2020 5 835 7 955 237 37 (101,823)(159,935)(3+89)(4,218)(12,650)(16813)~L92$Total unamortized bond discount Long.tenn debt due within one year Total long-term debt, net (including Subordinate Refunding Crossover Series)Note-bonds which have been refunded arc excluded from this schedule~3974 7~4~5~32 3933 vg I I NOTE 5-DISCLOSURES ABOUT FAIR VALUE 01 FINANCIAL INSTRUMENTS:
I
The following methods and assumptions were used to estimate the fair value of each class of financial instruments for which it is practicable to estimate that value: Cash and cash e uivalents The carrying value approximates fair value because of the short maturity of those instruments.
 
Investments Decommissionin fund Escrow account-Subordinate Refundin Crossover Series Crossover escrow accounts The fair values of investments are estimated based on quoted market prices for the same or similar investments.
COMBiNED SCHEDULE OF LONG-TERhf DEBT (ln thousands)
Lon-term deb S ecial Obli ation Crossover Series Bonds Subordinate Refundin Crossover Series The fair value of the Authority's debt is estimated based on the quoted market prices for the same or similar issues or on the current average rates offered to the Authority for debt of approximately the same remaining maturities, net of the effect of a related interest rate swap agreement.
Date  Effcctivc  Maturity on
                  ~o                                                                             tu33, Principal:
Palo Verde Project Revenue and Refunding Bonds         1985A         05/22/85     9.7%    1996  to 1999 8      1,070 1985B          07/02/85     9.1%    1996  to 2000        5,610 1986A          03/13/86     8.2%    1996  to 2006      71,220 1986B          12/16/86     7.2%    1996  to 2017      96,450 1987A          02/11/87   6.9%    1996  to 2017      43,720 1989A          02/15/89   Z.2%    1996  to 2015    287,705 1992A          01/01/92   6.0%    1996  to 2010        7465 1992C          01/01/92   6.0%    1996  to 2010      15,620 1993Sub          03/01/93   5.5%    1996  to 2017      98,200 1993A          03/01/93   5.5%    1996  to 2017    270,035 1996A          02/13/96   4.4%    1996  to 2017    152,905 1996B          02/29/96   4.4%   1996   to 201Z 1,108,670 Southern Transmission System Project Revenue and Refunding Bonds                             1986A           03/18/86   8.0%    1996 to 2021      107,300 1986B          04/29/86   7.5%    1996 to 2023      401,570 1988A          11/22/88   7.2%    1996 to 2015      154,085 1991A          4/17/91     6.4%        2019          291,700 1992 Comp 1, 2,4      7/20/92     6.1%    1996 to 2021        40,639 1992 Comp 3        7/20/92     6.1%    1996 to 2021      431,766 1993A          7/01/93     5.4%   1996 to 2023
                                                                                                            ~5925 Hoover Uprating Project Revenue and Refunding Bonds                                         1986A         08/13/86     8.1%    1996 to 2017          4,160 1991          08/01/91     6.2%   1996 to 2017
                                                                                                            ~5655 multiple Project Revenue Bonds Mead-Phoenix Project                                     1989         01/04/90     7.1%    1999 to 2020        38,800 Mead-Adelanto Project                                    1989          01/0$ /90   7.1%    1999 to 2020      106,ZOO hfultiple Project                                        1989          01/0$ /90   7.1%   1999 to 2020   ~259       99 Mead-Phoenix Project Revenue Bonds                       1994A          03/01/94    5.3%    2006 to 2015        5 835 hfead.Addanto Project Revenue Bonds                       1994A          03/01/94    5.3%    2006 to 2015        7 955 San Juan Project Revenue Bonds                             1993         06/01/93     5.6%   1997 to 2020       237 37 Total principal amount Unamortized bond discount:
Palo Verde Project                                                                                            (101,823)
Southern Transmission System Project                                                                          (159,935)
Hoover Uprating Project                                                                                          (3+89)
Mead-Phoenix Project                                                                                            (4,218) hfead-Adelanto Project                                                                                        (12,650) hfultiple Project Fund                                                                                        (16813)
San Juan Project                                                                                          ~L92$
Total unamortized bond discount                                                                         ~3974      7 Long. tenn debt due within one year                                                                       ~4~5 Total long-term debt, net (including Subordinate Refunding Crossover Series)                           ~32    3933 Note - bonds which have been refunded arc excluded from this schedule
 
vg I
I
 
NOTE 5 - DISCLOSURES ABOUT FAIR VALUE 01 FINANCIALINSTRUMENTS:
The following methods and assumptions were used to estimate the fair value of each class of financial instruments for which it is practicable to estimate that value:
Cash and cash e uivalents The carrying value approximates fair value because of the short maturity of those instruments.
Investments Decommissionin     fund Escrow account - Subordinate Refundin         Crossover Series Crossover escrow accounts The fair values of investments are estimated based on quoted market prices for the same or similar investments.
Lon -term deb S ecial Obli ation Crossover Series Bonds Subordinate Refundin           Crossover Series The fair value of the Authority's debt is estimated based on the quoted market prices for the same or similar issues or on the current average rates offered to the Authority for debt of approximately the same remaining maturities, net of the effect of a related interest rate swap agreement.
The fair values of the Authority's financial instruments are as follows (in thousands):
The fair values of the Authority's financial instruments are as follows (in thousands):
1996 Amortized Cost Fair Value une 30 Amortized Cost 1995 Fair Value Assets: Cash and cash equivalents Escrow account-Subordinate Refunding Crossover Series Decommissioning fund Investments 346,468 33,865 597,831 343,898 33,474 597,427 345,782 24,503 682,916 343,921 24,503 682,442 173,798 8 173,798 8 120,610 8 120,610 Liabilities:
une 30 1996                       1995 Amortized          Fair      Amortized       Fair Cost         Value         Cost       Value Assets:
Debt Subordinate Refunding Crossover Series 2,910,200 3,210,790 2,933,261 3,198,500 347,388 385,516 347,782 377,700 Off Balance Sheet Financial Instruments:
Cash and cash equivalents                         173,798  8 173,798      8 120,610      8  120,610 Escrow account - Subordinate Refunding Crossover Series                               346,468       343,898      345,782          343,921 Decommissioning fund                                33,865        33,474       24,503          24,503 Investments                                      597,831        597,427      682,916         682,442 Liabilities:
Special Obligation Crossover Series Bonds 63,415-67,739 70,680 Crossover escrow accounts 63,849 63,849 70,959 75,800 70,959 I l;'I I NOTE 6-POWER SALES AND TRANSMISSION SERVICE CONTRACTS:
Debt                                           2,910,200     3,210,790     2,933,261       3,198,500 Subordinate Refunding Crossover Series            347,388       385,516     347,782         377,700 Off Balance Sheet Financial Instruments:
The Authority has power sales contracts with ten participants of the Palo Verde Project (see Note 1).Under the terms of the contracts, the participants are entitled to popover output from the PVNGS and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Power Project Revenue Bonds and other debt.The contracts expire in 2030 and, as long as any Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Special Obligation Crossover Series Bonds           63,415     - 67,739       70,680         75,800 Crossover escrow accounts                           63,849       63,849       70,959         70,959 I
The Authority has transmission service contracts with six participants of the Southern Transmission System Project (see Note 1).Under the terms of the contracts, the participants are entitled to transmission service utilizing the Southern Transmission System Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Transmission Project Revenue Bonds and other debt.The contracts expire in 2027 and, as long as any Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
l;
In March 1986, the Authority entered into power sales contracts with six participants of the Hoover Uprating Project (see Note 1).Under the terms of the contracts, the participants are entitled to capacity and associated firm energy of the Hoover Uprating Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service whether or not the Hoover Uprating Project or any part thereof has been completed, is operating or is operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The contracts expire in 2018, and as long as any Hydroelectric Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
'I I
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1).Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Phoenix Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Phoenix Revenue Bonds and other debt, whether or not the Mead-Phoenix Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The contracts expire in 2030 and, as long as any Multiple Project and Mead-Phoenix Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
 
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Adelanto Project (see Note 1).Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Adelanto Revenue Bonds and other debt, whether or not the Mead-Adelanto Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The contracts expire k%l~sg.Y I J1 I k I NOTE 6: (Continued) in 2030 and, as long as any Multiple Project and Mead-Adelanto Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bond holders.In January 1993, the Authority entered into power sales contracts with five participants of Unit 3 of the San Juan Project (see Note 1).Under the terms of the contracts, the participants are entitled to their proportionate share of the power output of the San Juan Project and are obligated to make payments on a"take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the San Juan Revenue Bonds, whether or not Unit 3 of the San Juan Project or any part thereof is operating or operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part.The contracts expire in 2030 and, as long as any San Juan Revenue Bonds are'outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
NOTE 6 - POWER SALES AND TRANSMISSION SERVICE CONTRACTS:
NOTE 7-COSTS RECOVERABLE I ROM I'UTURE BILLINGS TO PARTICIPANTS:
The Authority has power sales contracts with ten participants of the Palo Verde Project (see Note 1).
Billings to participants are designed to recover"costs" as defined by the power sales and transmission service agreements.
Under the terms of the contracts, the participants are entitled to popover output from the PVNGS and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Power Project Revenue Bonds and other debt. The contracts expire in 2030 and, as long as any Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
The billings are structured to systematically provide for debt service requirements, operating funds and reserves in accordance with these agreements.
The Authority has transmission service contracts with six participants of the Southern Transmission System Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Southern Transmission System Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Transmission Project Revenue Bonds and other debt. The contracts expire in 2027 and, as long as any Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Those expenses, according to generally accepted accounting principles (GAAP), which are not included as"costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt.Costs recoverable from future billings to participants are comprised of the following:
In March 1986, the Authority entered into power sales contracts with six participants of the Hoover Uprating Project (see Note 1). Under the terms of the contracts, the participants are entitled to capacity and associated firm energy of the Hoover Uprating Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service whether or not the Hoover Uprating Project or any part thereof has been completed, is operating or is operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2018, and as long as any Hydroelectric Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Balance June 30, 1995 Fiscal 1996~Activit Balance June 30, 1996 GAAP items not included in billings to participants:
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Phoenix Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Phoenix Revenue Bonds and other debt, whether or not the Mead-Phoenix Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as long as any Multiple Project and Mead-Phoenix Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
Depreciation of plant Amortization of bond discount, debt issue costs, and cost of refunding Nuclear fuel amortization Decommissioning expense Interest expense 206,470 18,650 75,233 23,165 37,745 244,215 898 19,548 7,610 82,843 22,798 45,963 8348,328 8 49,323 N97,651 Bond requirements included in billings to participants:
In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Adelanto Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Adelanto Revenue Bonds and other debt, whether or not the Mead-Adelanto Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire l
Operations and maintenance, net of investment income Costs of acquisition of capacity-STS Reduction in debt service billings due to transfer of excess funds Principal repayments Other (67,253)(18,350)78,658 (222,130)~31 740 (21,062)(88,315)(18,350)(11,099)67,559 (39,559)(261,689)~3858~85 598~41~1@f~42~7
k%
]~~27 I%'~I I I NOTE 8-COMMITMENTS AND CONTINGENCIES:
          ~
On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill)which provides for broad deregulation of the power generation industry in California.
sg .
The Bill, which is pending approval by the Governor, requires the participation of the state's three investor-owned utilities.
Y I
Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process.The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission system established by the legislation.
J 1
The Bill also mandates the collection of a public benefit charge from all electric utility customers in the state.Although these funds (currently estimated at 2.5%of gross revenues)must be spent on renewable resources, conservation, research and development, or low income rate subsidies, the governing authority of each consumer-owned utility will control actual expenditures.
I k
As a participant in the PVNGS, the Authority could be subject to assessment of retroactive insurance premium adjustments in the event of a nuclear incident at the PVNGS or at any other licensed reactor in the United States.The Authority is involved in various legal actions.In the opinion of management, the outcome of such litigation or claims will not have a material effect on the financial position of the Authority or the respective separate projects.NOTE 9: SUBSE UENT EVENTS: On July 1, 1996, the crossover date for t)ie Palo Verde Special Obligation Bonds Series B, trust assets held in escrow of 863,415,000 were used to advance refund 862,000,000 of previously issued bonds.In August 1996, the Authority issued$89,570,000 of Palo Verde 1996 Subordinate Refunding Series C bonds to refund$95,015,000 of 1986 Refunding Series B bonds.The refunding is expected to reduce total debt service payments over the next 20 years by approximately 824,713,000 (the difference between the debt service payments on the old and new debt)and is expected to result in a net present value savings of approximately
I
$16,955,000.
 
In September 1996, the Authority issued 842,245,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series A and 8121,065,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series B to refund 868,720,000 and 8127,100,000 of the STS 1986 Refunding Series A and B, respectively.
NOTE 6: (Continued) in 2030 and, as long as any Multiple Project and Mead-Adelanto Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bond holders.
The refunding is expected to reduce total debt service payments over the next 10 years by approximately
In January 1993, the Authority entered into power sales contracts with five participants of Unit 3 of the San Juan Project (see Note 1). Under the terms of the contracts, the participants are entitled to their proportionate share of the power output of the San Juan Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the San Juan Revenue Bonds, whether or not Unit 3 of the San Juan Project or any part thereof is operating or operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as long as any San Juan Revenue Bonds are
$6,029,000 (the difference between the debt service payments on the old and new debt)and is expected to result in a net present value savings of approximately N,372,000.
'outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.
I I I I Palo Verde Pro'ect SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMFNTAL FINANCIAL INFORitfATION INDF.X Supplemental Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for thc Years Ended June 30, 1996 and 1995 Supplcmcntal Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended Junc 30, 1996 Southern Transmission S stem Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statcmcnt of Operations for the Years Ended June 30, 1996 and 1995 Supplcmcntal Statcmcnt of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by thc Bond Indcnturc for thc Year Ended June 30, 1996 Hoover U ratin Pro'ect Supplcmcntal Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended Junc 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 hfead-Phoenix Pro'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Rcquircd by the Bond indenture for thc Year Ended Junc 30, 1996 Mead-Adelanto Pie'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statcmcnt of Operations for the Three Months Ended June 30, 1996 Supplcmcntal Statcmcnt of Cash Flows for the Years Ended Junc 30, 1996 and 1995 Supplcmcntal Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lc Pro'cct Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Rcquircd by the Bond Indenture for the Year Ended June 30, 1996 San uan Pro'ect Supplcmcntal Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 meed 1995 Supplemental Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schedule of Receipts and Disburscmcnts in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 5
NOTE 7 - COSTS RECOVERABLE I ROM I'UTURE BILLINGS TO PARTICIPANTS:
SOUTIIERN CALIFORNIA PVBLIC POWER AUTIIORITY PALO VERDE PROJECT SUPPI.F.ltIF.NTAI.
Billings to participants are designed to recover "costs" as defined by the power sales and transmission service agreements. The billings are structured to systematically provide for debt service requirements, operating funds and reserves in accordance with these agreements. Those expenses, according to generally accepted accounting principles (GAAP), which are not included as "costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt.
BAIANCE SHF.FT (In thousands) une 30 1995 Vtility plant: Production Transmission General$613,608 14,146 2 569$611,771 14,146 2 674 Less-Accumulated depreciation Construction work in progress Nuclear fuel, at amortized cost Net utility plant 630,323 250 021 380,302 9,503 13 225 403 030 628,491 219 881 408,610 9,683 12716 431 009 Special funds: Availablc for sale at fair value: Decommissioning fund Invcstmcnts Interest receivable Cash and cash cquivalcnts 33,474 115,746 1,512 67 879 24,503 143,600 1,223 49 354 218 61 218 680 Accounts rcceivablc 738 912 Materials and supplies Costs recoverable front future billings to participants Unrcalizcd loss on invcstmcnts in funds available for sale Vnamortizcd debt expenses, less accumulated antortization of$65,795 and$71,525 Total assets 9,240 204,945 456 204 093 f~~73 9,618 197,515 226 209 740~067 700 I.IABII,ITIFS Long-term debt 5 9S1 155~996 390 Current liabilities:
Costs recoverable from future billings to participants are comprised of the following:
Long-term debt duc within onc year Accrued interest Accounts payable and accrued cxpcnscs 25,690 24,535 10 333 23,855 30,685 16 770 Total current liabilities 60 558 71 310 Commitments and contingencies Total liabilities
Balance        Fiscal      Balance June 30,         1996       June 30, 1995        ~Activit        1996 GAAP items not included in billings to participants:
~0~7~067 700 See notes to financial statements.
Depreciation of plant                                   8348,328      8 49,323      N97,651 Amortization of bond discount, debt issue costs, and cost of refunding                     206,470         37,745       244,215 Nuclear fuel amortization                                    18,650          898         19,548 Decommissioning expense                                      75,233        7,610         82,843 Interest expense                                            23,165        22,798         45,963 Bond requirements included in billings to participants:
I I l l SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Operations and maintenance, net of investment income       (67,253)      (21,062)      (88,315)
Year Ended une 30 1996 1995 Operating revenue: Sales of electric energy~185 464~129 180 Operating expenses: Nuclear fuel Other operations Maintenance Depreciation Decommissioning Total operating expenses Operating income Investment income Income before debt expense 7,949 25,815 6,317 18,425 12 497 71.003 64,461 10 886 75,347 8,150 25,307 7,825 19,145 15 401 73.828 55,352 9.968 65,320 Debt expense Costs recoverable from future billings to participants 82 777 77 976 See notes to financial statements.
Costs of acquisition of capacity - STS                     (18,350)                    (18,350)
I l I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMFNTAL STATEMENT OF CASH FLOWS (In thousands)
Reduction in debt service billings due to transfer of excess funds                           78,658      (11,099)       67,559 Principal repayments                                      (222,130)       (39,559)     (261,689)
Year Fndcd unc 30 1996 1995 Cash flows from operating activities:
Other                                                    ~31 740        ~3858         ~85 598
Costs recoverable from future billings to participants Adjustments to arrive at net cash provided by (used for)operating activitics-Depreciation Decommissioning Amortization of nuclear fuel Amortization of debt costs Changes in assets and liabilities:
                                                              ~41~1@f~42~7                 ]~~27 I
Decommissioning fund Interest receivable Accounts receivable Materials and supplies Other assets Accrued interest Accounts payable and accrued expenses 18,425 12,497 7,949 24,428 19,145 13,401 8,150 16,607 (8,971)(289)174 378 55 (6,150)~6437 (1,297)127 131 729 (2)(719)3 241 (S 7,430)(S 12,656)Net cash provided by operating activities 34 629 46 857 Cash flows from investing activities:
%' ~
Payments for construction of facility Purchases of investmcnts Proceeds from sale/maturity of invcstmcnts (10,892)(9,569)(154,685)(97,108)182 309 68 891 Net cash provided by (used for)investing activities 16 732~37 786 Cash flows from capital and related financing activities:
I I
Payment of principal on long-term debt Payment of bond issue costs Payment for defcasancc of revenue bonds Proceeds from issuance of refunding bonds (231855)(4,832)(233,632)229 483 (22,425)Nct cash used for capital and rclatcd financing activities (32,836)(22,425)Nct increase (decrease) in cash and cash cquivalcnts Cash and cash cquivalcnts at beginning of period 18,525 49 354 (13,354)62 708 Cash and cash equivalents at end of year~67 87~9~35 Supplemental disclosure of cash flow infortnation:
I
Cash paid during the year for interest (nct of amount capitalized)
 
~644 9~62089 Scc notes to financial statements.
NOTE 8 - COMMITMENTS AND CONTINGENCIES:
I l SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEMEKIS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDFD UNF.30 1996 (In thousands)
On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill) which provides for broad deregulation of the power generation industry in California. The Bill, which is pending approval by the Governor, requires the participation of the state's three investor-owned utilities. Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process. The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission system established by the legislation. The Bill also mandates the collection of a public benefit charge from all electric utility customers in the state. Although these funds (currently estimated at 2.5% of gross revenues) must be spent on renewable resources, conservation, research and development, or low income rate subsidies, the governing authority of each consumer-owned utility will control actual expenditures.
Debt Service Fund Revenue Fund Operating Fund Reserve&Contingency Fund Decommissioning Issue Funds Fund I&II Total Balance at June 30, 1995 132 133 8 30948 8 16574 8 12482 8 24490 8 216627 Additions:
As a participant in the PVNGS, the Authority could be subject to assessment of retroactive insurance premium adjustments in the event of a nuclear incident at the PVNGS or at any other licensed reactor in the United States.
Investment earnings Distribution of investment earnings Discount on investment purchases Revenue from power sales Distribution of revenues Transfers to escrow for rcfundings Transfer from escrow for principal and interest payments Total 4,409 (5,734)1,971 49 81,922 (10,413)379 634 451 838 31 8,604 3 129,180 (138,843)78 951 834 (1,213)513 37 39,603 (93)11 067 28 614 1,100 (1,000)336 6 3,989 (2,886)10 581 12 126 616 (657)41 5,325 4,046 749 423 8,004 7,739 3,287 129,272 (9,268)380 099 9 371 9 176 511 129 Deductions:
The Authority is involved in various legal actions. In the opinion of management, the outcome of such litigation or claims will not have a material effect on the financial position of the Authority or the respective separate projects.
Construction expenditures Operating expenditures Fuel costs Bond issue costs Payment of principal Interest paid Premium and interest paid on investments Payment of principal and interest on escrow bonds 23,855 55,130 202 380 099 31,041 8,45?115 3,060 58 3,173 5,663 131 3,060 31,046 8,457 3,173 23,855 60,793 506 380 099 Total 459 286 39 613 3 118 8 836 136 510 989 Balance at June 30, 1996~124 684 S 4~19 949~24 582~I~07 3 33 530~26 767 This schedule summarizes the receipts and disbursements in funds required under thc Bond Indenture and has been prepared from thc trust statements.
NOTE 9: SUBSE UENT EVENTS:
The balances in the funds consist of cash and investments at original cost.These balances do not include accrued interest receivable of$1,245 and$1,223 and Decommissioning Fund accrued interest receivable of$267 and$138 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discounts of$788 and$918 at June 30, 1996 and 1995, respectively.
On July 1, 1996, the crossover date for t)ie Palo Verde Special Obligation Bonds Series B, trust assets held in escrow of 863,415,000 were used to advance refund 862,000,000 of previously issued bonds.
These balances also do not include unrealized loss on investments in funds available for sale of$456 and$226 at June 30, 1996 and 1995, respectively.
In August 1996, the Authority issued $ 89,570,000 of Palo Verde 1996 Subordinate Refunding Series C bonds to refund $ 95,015,000 of 1986 Refunding Series B bonds. The refunding is expected to reduce total debt service payments over the next 20 years by approximately 824,713,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately $ 16,955,000.
g i SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT 55527S SUPPLFBIENTAL BALANCE SHEET (In thousands) 1996 unc 30 1995 Utility plant: Transmission General S 674,606 18 893 8 675,301 18 893 Less-Accumulated depreciation 693,499 194 127 694,194 174 392 Construction work in progress 499,372 519,802 1 212 Nct utility plant Special funds: Available for sale at fair value: Investmcnts Escrow account-Subordinate Refunding Crossover Series Advance to Intermountain Power Agency Interest rcccivablc Cash and cash equivalents 499 372 102,842 343,898 19,550 2,169 90 324 521 014 144,476 343,921 19,550 1,807 54 678 558 783 564 432 Accounts receivable 2,687 2,469 Costs recoverable from future billings to participants Unrealized loss on investments in funds available for sale 203,787 2,865 183,154 1,89?Unamortized debt expenses, less accumulated amortization of S59,752 and S51,415 164 247 172 780 Total assets aL 43~741 1 445 746 I.IABILITIES Long-term debt Subordinate Refunding Crossover Series 1 034 757 347 388 5 1 042002 347 782 Current liabilities:
In September 1996, the Authority issued 842,245,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series A and 8121,065,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series B to refund 868,720,000 and 8127,100,000 of the STS 1986 Refunding Series A and B, respectively. The refunding is expected to reduce total debt service payments over the next 10 years by approximately $ 6,029,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately N,372,000.
Long-term debt duc within one year Accrued interest Accounts payable and accrued expenses Total current liabilities 10,845 38,436 315 49 596 14,325 39,379 2 258 55 962 Commitmcnts and contingencies Total liabilities Scc notes to financial statements.
I I
~13~741 1 445 746 I I I I I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
I I
Year Ended une 30 1996 1995 Operating revenue: Sales of transmission services 85 297 91 250 Operating expenses: Other operations Maintenance Depreciation Total operating expenses Operating income Investment income Income before debt expense 10,192 5,236 20 329 35 757 49,540 28.993 78,533 11,839 4,498 19 735 36 072 55,178 30 085 85,263 Debt expense Costs recoverable from future billings to participants 99 166 99 823 OL22 KB (~4~See notes to financial statements.
 
I I I I I I I SOUTIIERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPI.FMENT I.STATEMENT OF CASH FLOWS (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMFNTAL FINANCIALINFORitfATION INDF.X Palo Verde Pro'ect Supplemental Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for thc Years Ended June 30, 1996 and 1995 Supplcmcntal Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended Junc 30, 1996 Southern Transmission S stem Pro ect Supplemental   Balance Sheet at June 30, 1996 and 1995 Supplemental   Statcmcnt of Operations for the Years Ended June 30, 1996 and 1995 Supplcmcntal   Statcmcnt of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental   Schedule of Receipts and Disbursements in Funds Required by thc Bond Indcnturc for thc Year Ended June 30, 1996 Hoover U ratin     Pro'ect Supplcmcntal Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended Junc 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 hfead-Phoenix Pro'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Rcquircd by the Bond indenture for thc Year Ended Junc 30, 1996 Mead-Adelanto Pie'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statcmcnt of Operations for the Three Months Ended June 30, 1996 Supplcmcntal Statcmcnt of Cash Flows for the Years Ended Junc 30, 1996 and 1995 Supplcmcntal Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lc Pro'cct Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Rcquircd by the Bond Indenture for the Year Ended June 30, 1996 San   uan Pro'ect Supplcmcntal Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 meed 1995 Supplemental Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schedule of Receipts and Disburscmcnts in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 5
Year Ended une 30 1996 1995 Cash flows from operating activities:
SOUTIIERN CALIFORNIA PVBLIC POWER AUTIIORITY PALO VERDE PROJECT SUPPI.F.ltIF.NTAI. BAIANCE SHF.FT (In thousands) une 30 1995 Vtility plant:
Costs recoverable from future billings to participants Adjustments to arrive at nct cash provided by (used for)operating activitics-Dcpreciation Amortization of debt costs Write-off of construction work in progress costs Changes in assets and liabilities:
Production                                                                             $ 613,608       $ 611,771 Transmission                                                                              14,146            14,146 General                                                                                    2 569              2 674 630,323          628,491 Less - Accumulated depreciation                                                       250 021          219 881 380,302          408,610 Construction work in progress                                                             9,503              9,683 Nuclear fuel, at amortized cost                                                           13 225            12716 Net utility plant                                                                 403 030          431 009 Special funds:
Interest reccivablc Accounts rcccivablc Other assets Accrued interest Accounts payablc and accrued expenses (8 20,633)20,329 11,739 1,313 (362)(218)(943)~1943 (8 14,560)19,735 11,545 315 1,940 17 10,773~268 Net cash provided by operating activities 9 282 29 497 Cash flows from investing activities:
Availablc for sale at fair value:
Payments for construction of facility Purchases of investments Proceeds from sale/maturity of invcstmcnts (154,904)195 593 (315)(94,425)90 462 Net cash provided by (used for)investing activities 40 689 4 278 Cash flows from capital and rclatcd financing activities:
Decommissioning fund                                                                   33,474           24,503 Invcstmcnts                                                                            115,746           143,600 Interest receivable                                                                        1,512              1,223 Cash and cash cquivalcnts                                                                  67 879            49 354 218 61           218 680 Accounts rcceivablc                                                                           738               912 Materials and supplies                                                                       9,240              9,618 Costs recoverable front future billings to participants                                   204,945          197,515 Unrcalizcd loss on invcstmcnts in funds available for sale                                     456                226 Vnamortizcd debt expenses, less accumulated antortization of $ 65,795 and $ 71,525         204 093          209 740 Total assets                                                                         f~~73           ~067   700 I.IABII,ITIFS Long-term debt                                                                           5 9S1 155       ~996 390 Current liabilities:
Payment for defeasance of revenue bonds Repayment of principal on long-term debt 14 325 (5,479)~13 615 Nct cash used for capital and related financing activities Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at cnd of year 14 325 35,646 54 678 19 094 6,125 48 553~5~78 Supplemental disclosure of cash flow information:
Long-term debt duc within onc year                                                       25,690            23,855 Accrued interest                                                                         24,535            30,685 Accounts payable and accrued cxpcnscs                                                     10 333           16 770 Total current liabilities                                                               60 558           71 310 Commitments and contingencies Total liabilities                                                                   ~0~7             ~067   700 See notes to financial statements.
Cash paid during the year for interest (nct of amount capitalized) 8 370 96 072 Sce notes to financial statcmcnts.  
I I
l l
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Year Ended une 30 1996         1995 Operating revenue:
Sales of electric energy                                             ~185 464     ~129 180 Operating expenses:
Nuclear fuel                                                             7,949       8,150 Other operations                                                        25,815       25,307 Maintenance                                                              6,317       7,825 Depreciation                                                            18,425       19,145 Decommissioning                                                        12 497       15 401 Total operating expenses                                          71.003       73.828 Operating income                                                        64,461       55,352 Investment income                                                        10 886        9.968 Income before debt expense                                      75,347      65,320 Debt expense                                                             82 777      77 976 Costs recoverable from future billings to participants See notes to financial statements.
I l
I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMFNTAL STATEMENT OF CASH FLOWS (In thousands)
Year Fndcd unc 30 1996             1995 Cash flows from operating activities:
Costs recoverable from future billings to participants                             (S      7,430)  (S  12,656)
Adjustments to arrive at net cash provided by (used for) operating     activitics-Depreciation                                                                         18,425        19,145 Decommissioning                                                                       12,497        13,401 Amortization of nuclear fuel                                                           7,949        8,150 Amortization of debt costs                                                           24,428        16,607 Changes in assets and liabilities:
Decommissioning fund                                                                 (8,971)      (1,297)
Interest receivable                                                                   (289)          127 Accounts receivable                                                                     174          131 Materials and supplies                                                                 378          729 Other assets                                                                             55            (2)
Accrued interest                                                                     (6,150)        (719)
Accounts payable and accrued expenses                                         ~6437                3 241 Net cash provided by operating activities                                    34 629        46 857 Cash flows from investing activities:
Payments for construction of facility                                                (10,892)        (9,569)
Purchases of investmcnts                                                            (154,685)       (97,108)
Proceeds from sale/maturity of invcstmcnts                                          182 309        68 891 Net cash provided by (used for) investing activities                         16 732  ~37 786 Cash flows from capital and related financing activities:
Payment  of principal on long-term debt                                                (231855)     (22,425)
Payment  of bond issue costs                                                            (4,832)
Payment  for defcasancc of revenue bonds                                            (233,632)
Proceeds  from issuance of refunding bonds                                            229 483 Nct cash used for capital and rclatcd financing activities                 (32,836)     (22,425)
Nct increase (decrease) in cash and cash cquivalcnts                                       18,525      (13,354)
Cash and cash cquivalcnts at beginning of period                                           49 354       62 708 Cash and cash equivalents at end   of year                                         ~67 87         ~9~35 Supplemental disclosure of cash flow infortnation:
Cash paid during the year for interest (nct of amount capitalized)                 ~644       9 ~62089 Scc notes to financial statements.
I l
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEMEKIS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDFD UNF. 30 1996 (In thousands)
Debt                                                         Reserve &                        Decommissioning Service             Revenue               Operating           Contingency             Issue         Funds Fund               Fund                  Fund                  Fund                Fund            I & II         Total Balance at June 30, 1995                                 132 133                                 8   30948             8 16574           8     12482       8 24490       8 216627 Additions:
Investment earnings                                     4,409                  31                    834                1,100                  616            749            7,739 Distribution of investment earnings                     (5,734)              8,604                  (1,213)              (1,000)                (657)
Discount on investment purchases                        1,971                   3                    513                  336                  41            423            3,287 Revenue from power sales                                    49            129,180                      37                  6                                            129,272 Distribution of revenues                                81,922            (138,843)               39,603                 3,989              5,325          8,004 Transfers to escrow for rcfundings                      (10,413)                78                      (93)             (2,886)             4,046                           (9,268)
Transfer from escrow for principal and interest payments                              379 634                  951                11 067              10 581                                              380 099 Total                                      451 838                                      28 614              12 126                9 371           9 176         511 129 Deductions:
Construction expenditures                                                                                                 3,060                                                3,060 Operating expenditures                                                                             31,041                                                                    31,046 Fuel costs                                                                                           8,45?                                                                    8,457 Bond issue costs                                                                                                                             3,173                            3,173 Payment of principal                                   23,855                                                                                                              23,855 Interest paid                                           55,130                                                                                5,663                          60,793 Premium and interest paid on investments                   202                                        115                  58                                131              506 Payment of principal and interest on escrow bonds                                       380 099                                                                                                              380 099 Total                                      459 286                                      39 613                3 118              8 836            136        510 989 Balance at June 30, 1996                              ~124 684          S        4            ~19 949              ~24  582        ~I~07              3 33 530      ~26 767 This schedule summarizes the receipts and disbursements in funds required under thc Bond Indenture and          has been prepared from thc trust statements. The balances in the funds consist of cash and investments at original cost. These balances do not include accrued interest receivable    of $ 1,245 and $ 1,223 and Decommissioning Fund accrued interest receivable of $ 267 and $ 138 at June 30, 1996 and 1995, respectively, nor do they include total amortized      net investment discounts of $ 788 and $ 918 at June 30, 1996 and 1995, respectively. These balances also do not include unrealized loss on investments in funds available for sale    of $ 456 and $ 226 at June 30, 1996 and 1995, respectively.
i g
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLFBIENTAL BALANCE SHEET (In thousands) unc 30 1996              1995 55527S Utility plant:
Transmission                                                                 S   674,606         8   675,301 General                                                                            18 893              18 893 693,499             694,194 Less  - Accumulated depreciation                                                  194 127            174 392 499,372             519,802 Construction work in progress                                                                            1 212 Nct utility plant                                                       499 372            521 014 Special funds:
Available for sale at fair value:
Investmcnts                                                                 102,842            144,476 Escrow account - Subordinate Refunding Crossover Series                     343,898            343,921 Advance to Intermountain Power Agency                                             19,550              19,550 Interest rcccivablc                                                                2,169               1,807 Cash and cash equivalents                                                          90 324              54 678 558 783             564 432 Accounts receivable                                                                   2,687               2,469 Costs recoverable from future billings to participants                             203,787            183,154 Unrealized loss on investments in funds available for sale                           2,865               1,89?
Unamortized debt expenses, less accumulated amortization of S59,752 and S51,415                                               164 247             172 780 Total assets                                                       aL 43~741             1 445 746 I.IABILITIES Long-term debt                                                                   1 034 757        5 1 042002 Subordinate Refunding Crossover Series                                             347 388             347 782 Current liabilities:
Long-term debt duc within one year                                                 10,845              14,325 Accrued interest                                                                   38,436              39,379 Accounts payable and accrued expenses                                                 315                2 258 Total current liabilities                                               49 596             55 962 Commitmcnts and contingencies Total liabilities                                                   ~13    ~741          1 445 746 Scc notes to financial statements.
 
I I
I I
I I
I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Year Ended une 30 1996         1995 Operating revenue:
Sales of transmission services                                       85 297       91 250 Operating expenses:
Other operations                                                     10,192       11,839 Maintenance                                                            5,236       4,498 Depreciation                                                        20 329       19 735 Total operating expenses                                      35 757       36 072 Operating income                                                    49,540       55,178 Investment income                                                      28.993       30 085 Income before debt expense                                    78,533       85,263 Debt expense                                                           99 166        99 823 Costs recoverable from future billings to participants               OL22 KB     (~4~
See notes to financial statements.
I I
I I
I I
I
 
SOUTIIERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPI.FMENT I. STATEMENT OF CASH FLOWS (In thousands)
Year Ended une 30 1996           1995 Cash flows from operating activities:
Costs recoverable from future billings to participants                             (8 20,633)      (8 14,560)
Adjustments to arrive at nct cash provided by (used for) operating     activitics-Dcpreciation                                                                       20,329          19,735 Amortization of debt costs                                                         11,739          11,545 Write-off of construction work in progress costs                                   1,313 Changes in assets and liabilities:
Interest reccivablc                                                                 (362)            315 Accounts rcccivablc                                                                 (218)          1,940 Other assets                                                                                           17 Accrued interest                                                                     (943)        10,773 Accounts payablc and accrued expenses                                         ~1943           ~268 Net cash provided by operating activities                                     9 282           29 497 Cash flows from investing activities:
Payments for construction of facility                                                                     (315)
Purchases of investments                                                           (154,904)         (94,425)
Proceeds from sale/maturity of invcstmcnts                                          195 593          90 462 Net cash provided by (used for) investing activities                         40 689             4 278 Cash flows from capital and rclatcd financing activities:
Payment for defeasance of revenue bonds                                                                 (5,479)
Repayment of principal on long-term debt                                             14 325      ~13    615 Nct cash used for capital and related financing activities                  14 325           19 094 Net increase in cash and cash equivalents                                              35,646            6,125 Cash and cash equivalents at beginning of year                                        54 678          48 553 Cash and cash equivalents at cnd   of year                                                         ~5~78 Supplemental disclosure of cash flow information:
Cash paid during the year for interest (nct of amount capitalized)                     8 370           96 072 Sce notes to financial statcmcnts.


SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSh!ISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEhf ERIS IN FUNDS REQUIRED BY TIIE BOND INDENTURE YFA D D F30 1996 (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSh! ISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEhf ERIS IN FUNDS REQUIRED BY TIIE BOND INDENTURE YFA       D D         F30 1996 (In thousands)
Construction Fund-Initial Facilities
Construction Fund-Initial
~t Debt Service General Operating~utci Reserve Fund Issue~un Escrow Fund Balance at June 30, 1995 222 602~~4 2 77 ull 5 3M4222 2 542 660 Additions:
                                                                                ~t Debt             General Facilities        Service           Operating         Reserve              Issue            Escrow
Investmcnt earnings Distribution of investment earnings Revenue from transmission sales Distribution of revenue Transfer from escrow for principal and Interest payments 12 6,485 (5,710)42@30~29 463 9,408 83,953 (78,891)635 39102 (596)6,182 (5303)50,942 18,567 (9,284)(9,278)29,264 83,953~29 Total~au~a33~5264~2~2~26 28 Deductions:
                                                                                                                      ~utci             Fund                 ~un               Fund Balance at June 30, 1995                                                               222                                 602       ~~4                 2   77 ull     5   3M4222       2   542 660 Additions:
Operating expenses Payment of principal Interest paid Payment of principal and interest on escrow bonds Premium and interest paid on investment purchases Other 41476 12,921 1,267 14,904 39 149325 19/86 26@75 14,904 14/25 60,862 39,496 I/06 Total Balance at June 30, 1996 55 764 39~61 35 z 234~106 411~605~4757~76 219~343 874~13 t~4 536 946 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust staterncnts.
Investmcnt earnings                                                                   12              6,485              463              635              39102            18,567            29,264 Distribution of investment earnings                                                                   (5,710)           9,408             (596)              6,182            (9,284)
The balances in the funds consist of cash and Investments at original cost.These balances do not include accrued interest receivable of$2,169 and$1,807 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discounts of$2,983 and$2@12 at June 30, 1996 and 1995, respectively.
Revenue from transmission sales                                                                                        83,953                                                                    83,953 Distribution of revenue                                                                              42@30            (78,891)           (5303)             50,942             (9,278)
'Ihese balances do not include unrealized loss on investments in funds available for sale of$2,865 and$1,897 at June 30, 1996 and 1995, respectively.
Transfer from escrow for principal and Interest payments                                                                        ~29                                                                                         ~29 Total                                                                                 ~au               ~a33           ~5264               ~2~2                               ~26       28 Deductions:
I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands)
Operating expenses                                                                                                     14,904                                                                    14,904 Payment of principal                                                                                                                                         149325                              14/25 Interest paid                                                                                       41476                                                  19/86                                60,862 Payment of principal and interest on escrow bonds                                                   12,921                                                  26@75                              39,496 Premium and interest paid on investment purchases                                                     1,267                                 39                                                   I/06 Other Total                                                                                     55 764                                  39        ~61      35                        ~13      t~4 Balance at June 30, 1996                                                       z       234         ~106     411       ~605           ~4757               ~76 219         ~343     874         536 946 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust staterncnts. The balances in the funds consist of cash and Investments at original cost. These balances do not include accrued interest receivable of $ 2,169 and $ 1,807 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discounts of $ 2,983 and $ 2@12 at June 30, 1996 and 1995, respectively. 'Ihese balances do not include unrealized loss on investments in funds available for sale of $ 2,865 and $ 1,897 at June 30, 1996 and 1995, respectively.
ASSETS 1996 une 30 1995 Special funds: Investments available for sale at fair value Advances for capacity and energy, net Interest receivable Cash and cash equivalents 8 9,628 10,119 6 1 997 7,653 11,903 26 2 745 21 750 22 327 Accounts receivable 19 Costs recoverable from future billings to participants Unrealized loss on investments in funds available for sale 7,538 7,299 18 Unamortized debt expenses, less accumulated amortization of$937 and$795 3 307 3 512 Total assets R&2&i f~l'g LIABILITIES Long-term debt 30 981 31 977 Current liabilities:
I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996            1995 ASSETS Special funds:
Long-term debt due within one year Accrued interest Accounts payable and accrued expenses 1,085 489 62 610 500 69 Total current liabilities 1 636 1 179.Commitments and contingencies Total liabilities
Investments available for sale at fair value                       8 9,628            7,653 Advances for capacity and energy, net                               10,119          11,903 Interest receivable                                                       6              26 Cash and cash equivalents                                             1 997           2 745 21 750         22 327 Accounts receivable                                                         19 Costs recoverable from future billings to participants                   7,538          7,299 Unrealized loss on investments in funds available for sale                                   18 Unamortized debt expenses, less accumulated amortization of $ 937 and $ 795                                         3 307           3 512 Total assets                                                 R&2&i           f~l'g LIABILITIES Long-term debt                                                         30 981         31 977 Current liabilities:
~2~17 See notes to financial statements.
Long-term debt due within one year                                     1,085            610 Accrued interest                                                         489            500 Accounts payable and accrued expenses                                     62             69 Total current liabilities                                       1 636           1 179
.Commitments and contingencies Total liabilities                                             ~2~17 See notes to financial statements.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Year Ended une 30 1996 1995 Operating revenue: Sales of electric energy Operating expenses: Capacity charges Energy charges Other operations Reimbursement of advances for capacity and energy Total operating expenses 3 349 1,011 844 342 3 2 200 3 569 1,207 832 360 12 2 411 Operating income Investment income 1,149 874 1,158 514 Income before debt expense Debt expense Costs recoverable from future billings to participants 2,023 2 262 1,672 2 810 (l~K)See notes to financial statements.
Year Ended une 30 1996           1995 Operating revenue:
I I I I I I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
Sales of electric energy                                           3 349        3 569 Operating expenses:
Cash flows from operating activities:
Capacity charges                                                   1,011        1,207 Energy charges                                                       844          832 Other operations                                                     342          360 Reimbursement of advances for capacity and energy                     3            12 Total operating expenses                                     2 200         2 411 Operating income                                                   1,149         1,158 Investment income                                                      874          514 Income before debt expense                                   2,023        1,672 Debt expense                                                         2 262        2 810 Costs recoverable from future billings to participants                           (l~K)
Costs recoverable from future billings to participants Adjustments to arrive at net cash used for operating activities:
See notes to financial statements.
Amortization of debt costs Changes in assets and liabilities:
I I
Interest receivable Accounts receivable Other assets Accrued interest Accounts payable and accrued expenses 294 288 20 (19)54 21 (18)~594 Year Ended une 30 1996 1995 (8 239)(8 638)Net cash provided by (used)for operating activities 38 887 Cash flows from investing activities:
I I
Purchases of investments Proceeds from sale/maturity of investments Advances for capacity and energy, net (22,665)20,705 1 784 (11,546)9,491 1 415 Net cash used for investing activities
I I
~176~640 Cash flows from capital and related financing activities:
I I
Payment for defeasance of revenue bonds Repayment of principal on long-term debt (319)~610~860 Net cash used for capital and related financing activities
 
~610~1179 Net decrease in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year (748)2 745~lr)7 (2,706)5 451 j~27~4 Supplemental disclosure of cash flow information:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
Year Ended une 30 1996        1995 Cash flows from operating activities:
Costs recoverable from future billings to participants               (8  239)    (8  638)
Adjustments to arrive at net cash used for operating activities:
Amortization of debt costs                                               294          288 Changes in assets and liabilities:
Interest receivable                                                       20 Accounts receivable                                                     (19)          54 Other assets                                                                           21 Accrued interest                                                                     (18)
Accounts payable and accrued expenses                                           ~594 Net cash provided by (used) for operating activities                     38         887 Cash flows from investing activities:
Purchases of investments                                             (22,665)      (11,546)
Proceeds from sale/maturity of investments                             20,705        9,491 Advances for capacity and energy, net                                   1 784       1 415 Net cash used for investing activities                             ~176         ~640 Cash flows from capital and related financing activities:
Payment for defeasance of revenue bonds                                               (319)
Repayment of principal on long-term debt                             ~610         ~860 Net cash used for capital and related financing activities         ~610         ~1179 Net decrease in cash and cash equivalents                                 (748)      (2,706)
Cash and cash equivalents at beginning of year                           2 745        5 451 Cash and cash equivalents at end of year                               ~lr)7       j~27~4 Supplemental disclosure of cash flow information:
Cash paid during year for interest (net of amount capitalized)
Cash paid during year for interest (net of amount capitalized)
See notes to financial statements.
See notes to financial statements.
I I I I I I I' SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE YEAR ENDED UNE 30 1996 (In thousands)
I I
Advance Payments Funds Operating Fund Revenue Fund Operating Working Capital Fund Debt Service Account Debt Service Reserve Account General Reserve Account Total Balance at June 30, 1995 S 2410 560 S I 435 S 3 083 S 2876 S 10364 Additions:
I I
Investment earnings Distribution of investment earnings Discount on investment purchases Revenue from power sales Distribution of revenues Transfer from escrow for principal and interest payments Total 16 193 85 2 393 2 099 2 (2)43 165 147 355 2 256 3,330 (3,342)251 29 (29)33 (90)289 3,177 2 433 5 842 152 (115)37 3 (213)211 2 382 2 383 237 628 3,330 2 318 6 513 Deductions:
I I
Advances for capacity and energy Payment of principal Administrative expenditures Interest paid Premium on investment purchases Payment of principal and interest on escrow bonds 75 236 117 (5)610 1,978 2 318 37 75 610 348 1,978 37 2 318 Total 311 117~5 4 906 37 5 366 Balance at June 30, 1996 238 560~2;177~3083~52 S S 11 511 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.
I'
The balances in the funds consist of cash and investments at original cost.'Ihese balances do not include accrued interest receivable of$6 and$26 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of$11Z and$52 at June 30, 1996 and 1995, respectivdy.
 
These balances abo do not include unrealized loss on investments in funds available for sale of$3 and$18 at June 30, 1996 and 1995, respectively.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE YEAR ENDED UNE 30 1996 (In thousands)
41-l I ASSETS SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands) 1996 une 30 1995 Utility plant: Transmission General S 48,307 I 971 Less: Accumulated depreciation 50,278 846 Construction work in progress 49,432 3 116 39 179 Nct utility plant 52,548 39,179 Special funds: Investmcnts available for sale at fair value Interest receivable Cash and cash equivalents 21,591 841 1 548 32,759 1,246 I 280 23 980 35285 Accounts receivable Costs recoverable from future billings to participants Unrealized loss on invcstmcnts in funds availablc for sale 1,750 1,3.94 1,963 51 Prepaid expense 2,003 Unamortized debt expenses, less accumulated amortization of$1,257 and 8736 Total assets 9 8II8~895 5 10 408~88 889 LIABILITIES Long-term debt 86 417 86 267 Current liabilities:
Operating                                    Debt Advance                                                       Working                  Debt              Service              General Payments             Operating            Revenue              Capital                Service            Reserve              Reserve Funds                 Fund                 Fund                 Fund                 Account           Account               Account               Total Balance at June 30, 1995                             S   2410                                                             560             S I 435           S 3   083           S 2876             S 10364 Additions:
Accrued interest Accounts payable Total current liabilities 2,588 590 3 178 2,588 34 2 622 Commitments and contingencies Total liabilities
Investment earnings                                       16                    2                  2                  29                    33                152                    3                  237 Distribution of investment earnings                     193                    (2)              256                  (29)                  (90)              (115)                (213)
~895 5 88 889 Sce notes to financial statcmcnts.
Discount on investment purchases                           85                  43                                                            289                                      211                  628 Revenue from power sales                                                                       3,330                                                                                                    3,330 Distribution of revenues                                                     165              (3,342)                                    3,177 Transfer from escrow for principal and interest payments                             2 393                   147                251                                    2 433                                    2 382                2 318 Total                                            2 099                  355                                                         5 842                   37               2 383               6 513 Deductions:
4 I I~~
Advances for capacity and energy                           75                                                                                                                                                75 Payment of principal                                                                                                                         610                                                            610 Administrative expenditures                             236                  117                  (5)                                                                                                    348 Interest paid                                                                                                                             1,978                                                          1,978 Premium on investment purchases                                                                                                                                   37                                        37 Payment of principal and interest on escrow bonds                                                                                                                       2 318                                                         2 318 Total                                               311                 117           ~5                                           4 906                   37                                   5 366 Balance at June 30, 1996                                                         238                                     560             ~2;177             ~3083                 ~52     S           S 11 511 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of cash and investments at original cost. 'Ihese balances do not include accrued interest receivable of $ 6 and $26 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of $ 11Z and $ 52 at June 30, 1996 and 1995, respectivdy. These balances abo do not include unrealized loss on investments in funds available for sale of $ 3 and $ 18 at June 30, 1996 and 1995, respectively.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*(In thousands)
41-
Operating revenue: Sales of transmission services 226 Operating expenses: Other operation Maintenance Depreciation 213 13 342 Total operating expenses 568 Operating loss Investment income (342)410 Income before debt expense 68 Debt expense Costs recoverable from future billings to participants 1 462 0~%~3 See notes to financial statements.
 
*Operations commenced April 1996.
l I
I I I~
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996            1995 ASSETS Utility plant:
Transmission                                                               S 48,307 General                                                                        I 971 50,278 Less: Accumulated depreciation                                                 846 49,432 Construction work in progress                                                 3 116           39 179 Nct utility plant                                                               52,548           39,179 Special funds:
Investmcnts available for sale at fair value                                 21,591           32,759 Interest receivable                                                              841            1,246 Cash and cash equivalents                                                      1 548            I 280 23 980           35285 Accounts receivable                                                             1,750            1,963 Costs recoverable from future billings to participants                           1,3.94 Unrealized loss on invcstmcnts in funds availablc for sale                                           51 Prepaid expense                                                                                   2,003 Unamortized debt expenses, less accumulated amortization of $ 1,257 and 8736                                   9 8II8          10 408 Total assets                                                           ~895   5       ~88   889 LIABILITIES Long-term debt                                                                 86 417           86 267 Current liabilities:
Accrued interest                                                               2,588            2,588 Accounts payable                                                                 590              34 Total current liabilities                                                 3 178           2 622 Commitments and contingencies Total liabilities                                                     ~895   5         88 889 Sce notes to financial statcmcnts.
4 I
I
~
~
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*
(In thousands)
Operating revenue:
Sales of transmission services                                         226 Operating expenses:
Other operation                                                       213 Maintenance                                                             13 Depreciation                                                           342 Total operating expenses                                             568 Operating loss                                                           (342)
Investment income                                                        410 Income before debt expense                                             68 Debt expense                                                           1  462 Costs recoverable from future billings to participants                                           0~%~3 See notes to financial statements.
* Operations commenced April 1996.
I I
I
~
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
Cash flows from operating activities:
Year Ended  une 30 1996          1995 Cash flows from operating activities:
Cost recoverable from future billings to participants Adjustments to arrive at net cash provided by (used for)operating activities:
Cost recoverable from future billings to participants                   ~1394 Adjustments to arrive at net cash provided by (used for) operating activities:
Depreciation Amortization of debt costs Changes in assets and liabilities:
Depreciation                                                               342 Amortization of debt costs                                                 167 Changes in assets and liabilities:
Interest receivable Accounts receivable Other assets Accounts payable Year Ended une 30 1996 1995~1394 342 167 405 213 1,977 556 Net cash provided by operating activities 2 266 Cash flows from investing activities:
Interest receivable                                                     405 Accounts receivable                                                     213 Other assets                                                         1,977 Accounts payable                                                        556 Net cash provided by operating activities                             2 266 Cash flows from investing activities:
Interest received on investments Payments for construction of facility Purchases of investments Proceeds from sale/maturity of investments Reimbursement from WAPA (13,208)(3,264)14,474 4,251 (21,310)(2,725)26,078 83 Net cash (used for)provided by investing activities
Interest received on investments                                                           4,251 Payments for construction of facility                                     (13,208)       (21,310)
~1998 6 377 Cash flows from capital and related financing activities:
Purchases of investments                                                  (3,264)         (2,725)
Payment of interest on long-term debt Payment for bond issue costs (5,093)~9 Net cash used for capital and related financing activities 5 102 Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year 268 1,275 1 280 5~1~4~1280 Supplemental disclosure of cash flow information:
Proceeds from sale/maturity of investments                                14,474        26,078 Reimbursement from WAPA                                                                        83 Net cash (used for) provided by investing activities               ~1998             6 377 Cash flows from capital and related financing activities:
Payment of interest on long-term debt Payment for bond issue costs                                                         ~9  (5,093)
Net cash used for capital and related financing activities                                                               5 102 Net increase in cash and cash equivalents                                       268          1,275 Cash and cash equivalents at beginning of year                               1 280              5 Cash and cash equivalents at end     of year                               ~1~4         ~1280 Supplemental disclosure of cash flow information:
Cash paid during the period for interest (net of amount capitalized)
Cash paid during the period for interest (net of amount capitalized)
See notes to financial statements.
See notes to financial statements.
1 I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR FNDFD UNE 30 1996 (In thousands)
1 I
Acquisition Account Debt Service Account Debt Service Reserve Account Revenue Fund Issue Fund Operating Fund Total Balance at Junc 30, 1995$18972 l 4288$5916 3,$4994 3,$34170 Additions:
I
Investment earnings Transfer of invcstmcnts Rcimburscmcnt from WAPA Transmission rcvcnuc Transfer of monthly tfansnllsslon costs 1,564 80 286 435 435 (435)360 297 154 297 2,441 80 360 Total 1 644 721 65 154 297 2 881 Deductions:
 
Construction expcnditurcs Intcrcst paid Premium and intcrcst paid on invcstmcnt purchases Operating cxpenscs 8,536 2,642 2,534 60 8,536 5,176 89 60 Total 8 536 2 642 2 623 60 13 861 Balance at Junc 30, 1996 teuJ 2~00~2867~5916 s 65~2525~287 tc 23~0 This schcdulc summarizes the receipts and disbursements in funds required under thc Bond Indenture and has been prepared from the trust statements.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR FNDFD UNE 30 1996 (In thousands)
Thc balances in the funds consist of cash and investmcnts at original cost.Thcsc balances do not include accrued intcrcst rcccivable of S841 and S1,246 at June 30, 1996 and 1995, rcspcctively, nor do they include total amortized nct invcstmcnt prcmiunls of$42 and$80 at Junc 30, 1996 and 1995, respectively.
Debt Debt          Service Acquisition  Service       Reserve       Revenue      Issue      Operating Total 3,
These balances do not include unrealized loss on invcstmcnts in funds availablc for sale of S9 and$51 at Junc 30, 1996 and 1995, rcspcctivcly.
Account    Account        Account         Fund         Fund         Fund Balance at Junc 30, 1995       $ 18972     l 4288       $     5916   3,           $   4994                 $   34170 Additions:
l 1' SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMENTAL BALANCE SHFFT (In thousands)
Investment earnings             1,564        286              435                      154                    2,441 Transfer of invcstmcnts                       435            (435)
~SFTS 1996 une 30 1995 Utility plant: Transmission General 8 171,068 164 Less: Accumulated depreciation Construction work in progress Nct utility plant 171,232 1 255 169 977~154 011 154 011 Special funds: Investments availablc for sale at fair value Interest receivable Cash and cash equivalents 62,562 2,285 4 504 76,235 2,976 4 279 69 351 83 490 Accounts rcccivable 4,741 4,669 Costs rccovcrablc from future billings to participants Unrcalizcd loss on invcstmcnts in funds available for sale 4,383 28 171 Prepaid cxpcnsc 3,533 Unamortized debt cxpcnscs, less accumulated amortization of 83,582 and$2,098 28 123 29 607 Total assets 75 481 I.IABILITIFS Long-term debt 268 005 267 561 Current liabilities:
Rcimburscmcnt from WAPA             80                                                                              80 Transmission rcvcnuc                                                     360                                      360 Transfer of monthly tfansnllsslon costs                                                   297                         297 Total                       1 644       721                         65           154         297       2 881 Deductions:
Accrued intcrcst Accounts payable Total current liabilities 7,884 780 8 664 7,885 35 7 920 Commitments and contingcncics Total liabilities Sce notes to financial statcmcnts.
Construction expcnditurcs       8,536                                                                          8,536 Intcrcst paid                              2,642                                     2,534                     5,176 Premium and intcrcst paid on invcstmcnt purchases                                                                                        89 Operating cxpenscs                                                                                    60          60 Total                       8 536     2 642                                     2 623           60       13 861 Balance at Junc 30, 1996       teuJ 2~00   ~2867         ~5916         s     65     ~2525         ~287       tc   23~0 This schcdulc summarizes the receipts and disbursements in funds required under thc Bond Indenture and has been prepared from the trust statements. Thc balances in the funds consist of cash and investmcnts at original cost. Thcsc balances do not include accrued intcrcst rcccivable of S841 and S1,246 at June 30, 1996 and 1995, rcspcctively, nor do they include total amortized nct invcstmcnt prcmiunls of $ 42 and $ 80 at Junc 30, 1996 and 1995, respectively. These balances do not include unrealized loss on invcstmcnts in funds availablc for sale of S9 and $ 51 at Junc 30, 1996 and 1995, rcspcctivcly.
~27t~66 275 481 I
l 1'
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*(In thousands)
 
Operating revenue: Sales of transmission services 172 Operating expenses: Other operation Maintenance Depreciation 145 27 1 182 Total operating expenses Operating loss 1 504 1 132 Investment income 1 174 Income before debt expense Debt expense 4 425 Costs recoverable from future billings to participants C~E)See notes to financial statements.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL BALANCE SHFFT (In thousands) une 30 1996            1995
            ~SFTS Utility plant:
Transmission                                                                     8 171,068 General                                                                                164 171,232 Less: Accumulated depreciation                                                       1 255 Construction work in progress                                                                       ~154 011 Nct utility plant                                                                   169 977         154 011 Special funds:
Investments availablc for sale at fair value                                       62,562           76,235 Interest receivable                                                                  2,285           2,976 Cash and cash equivalents                                                            4 504            4 279 69 351           83 490 Accounts rcccivable                                                                   4,741           4,669 Costs rccovcrablc from future billings to participants                                 4,383 Unrcalizcd loss on invcstmcnts in funds available for sale                               28             171 Prepaid cxpcnsc                                                                                         3,533 Unamortized debt cxpcnscs, less accumulated amortization of 83,582 and $ 2,098                                                 28 123           29 607 Total assets                                                                                     75 481 I.IABILITIFS Long-term debt                                                                       268 005         267 561 Current liabilities:
Accrued intcrcst                                                                     7,884            7,885 Accounts payable                                                                       780              35 Total current liabilities                                                         8 664           7 920 Commitments and contingcncics Total liabilities                                                             ~27t~66            275 481 Sce notes to financial statcmcnts.
I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*
(In thousands)
Operating revenue:
Sales of transmission services                                           172 Operating expenses:
Other operation                                                         145 Maintenance                                                               27 Depreciation                                                           1 182 Total operating expenses                                           1 504 Operating loss                                                     1 132 Investment income                                                       1 174 Income before debt expense Debt expense                                                             4 425 Costs recoverable from future billings to participants                                             C~E)
See notes to financial statements.
Operations commenced April 1996.
Operations commenced April 1996.
l SOUTHERN CALIFORNIA PUBLIC POVYER AUTHORITY MEAD-ADELANTO PROJECT SUPPLEMFNTAL STATEMFNT OF CASH FI.OWS (In thousands) 1996 une 30 1995 Cash flows from operating activities:
l SOUTHERN CALIFORNIA PUBLIC POVYER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMFNTAL STATEMFNT OF CASH FI.OWS (In thousands) une 30 1996            1995 Cash flows from operating activities:
Cost recoverable from future billings to participants Adjustments to arrive at nct cash provided by (used for)operating activities:
Cost recoverable from future billings to participants                           (3    4,383)    3 Adjustments to arrive at nct cash provided by (used for) operating activities:
Dc preciation Amortization of debt costs Changes in assets and liabilities:
Dc preciation                                                                     1,132 Amortization of debt costs                                                           482 Changes in assets and liabilities:
Interest receivable Accounts receivable Prepaid expense Accrued interest Accounts payable (3 4,383)3 1,132 482 691 (72)3,467 (I)745 Nct cash provided by operating activities 2 981 Cash flows from investing activities:
Interest receivable                                                             691 Accounts receivable                                                               (72)
Intcrcst rcceivcd on investments Payments for construction of facility Purchases of invcstmcnts Procccds from sale/maturity of investments Reimbursement from O'APA (15,652)(9,184)23,000 11,316 (71,033)(4,627)84,113 28 Nct cash (used for)provided by investing activities
Prepaid expense                                                                3,467 Accrued interest                                                                  (I)
~1838 19 797 Cash flows from capital and related financing activities:
Accounts payable                                                                745 Nct cash provided by operating activities                                                 2 981 Cash flows from investing activities:
Payments of interest on long-term debt Payment for bond issue costs (15,487)~31 Nct cash used for capital and related financing activities 15 518 Nct increase in cash and cash equivalents Cash and cash cquivalcnts at beginning of year Cash and cash equivalents at cnd of year 225 4,279 4 279~449k S 4 279 Supplemental disclosure of cash flow information:
Intcrcst rcceivcd on investments                                                                       11,316 Payments for construction of facility                                               (15,652)         (71,033)
Purchases of invcstmcnts                                                              (9,184)         (4,627)
Procccds from sale/maturity of investments                                            23,000          84,113 Reimbursement from O'APA                                                                                    28 Nct cash (used for) provided by investing activities                         ~1838                 19 797 Cash flows from capital and related financing activities:
Payments of interest on long-term debt Payment for bond issue costs                                                                       ~31(15,487)
Nct cash used for capital and related financing activities                                                                 15 518 Nct increase in cash and cash equivalents                                                   225            4,279 Cash and cash cquivalcnts at beginning of year                                           4 279 Cash and cash equivalents at cnd of year                                           ~449k             S     4 279 Supplemental disclosure of cash flow information:
Cash paid during the period for interest (net of amount capitalized)
Cash paid during the period for interest (net of amount capitalized)
Sec notes to financial statements.
Sec notes to financial statements.
l I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY hIEAD-ADELANTO PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEhIENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
l I
Debt Acquisition Service Account Account Debt Service Reserve Account Operating Fund Issue Fund Rcvenuc Fund Total Balance at June 30, 1995$36 134$11 793$16 267$$16 760$$80 954 Additions:
 
Investment earnings Transfer of invcstmcnt earnings Reimbursement from WAPA Transfers to operating fund Transmission revenue 3,217 13 772 1,196 1,196 (1,196)451 517 1 5,704 13 (451)521 521 Total 3 230 1 968 452 517 71 6 238 Deductions:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY hIEAD-ADELANTO PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEhIENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
Construction expenditures Intcrcst paid Premium and interest paid on invcstmcnt purchases Operating cxpcnscs 3,697 7,264 189 8,505 298 3,697 15,769 298 191 Total 3 699 7 264 189 8 803 19 955 Balance at June 30, 1996~85 663~64~7~16 267$263~8474~71~67 237 This schcdulc summarizes the receipts and disburscmcnts in funds required under the Bond Indenture and has been prcparcd from thc trust statements.
Debt Debt          Service Acquisition Service       Reserve    Operating      Issue      Rcvenuc Account   Account       Account       Fund       Fund         Fund         Total Balance at June 30, 1995           $ 36 134   $ 11 793       $ 16 267   $           $ 16 760 $               $ 80 954 Additions:
Thc balances in the funds consist of cash and investmcnts at original cost.These balances do not include accrued interest receivable of S2,285 and S2,976 at June 30, 1996 and 1995, respectively, nor do they include total amortized nct invcstmcnt premiums of S143 and S269 at June 30, 1996 and 1995, respectively.
Investment earnings                 3,217         772         1,196                       517          1      5,704 Transfer of invcstmcnt earnings                  1,196         (1,196)
Thcsc balances do not include unrcalizcd loss on investments in funds available for sale of S28 and S171 at Junc 30, 1996 and 1995, respectively.
Reimbursement from WAPA                                  13                                                                          13 Transfers to operating fund                                                  451                     (451)
I I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET (In thousands)
Transmission revenue                                                                                    521         521 Total                       3 230       1 968                       452           517         71       6 238 Deductions:
ASSETS 1996 une 30 1995 Special funds: Investments available for sale at fair value Interest receivable 8 250,888 8 249,020 9220 9194.Total assets LIABILITIES Long-term debt Arbitrage rebate payable~2~1$2~214$242 786$242.107 77 Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project Deferred credits 6 402 2 664 6.632 1.141 Current liabilities:
Construction expenditures           3,697                                                                        3,697 Intcrcst paid                                    7,264                                   8,505                 15,769 Premium and interest paid on invcstmcnt purchases                                                                      298                    298 Operating cxpcnscs                                                            189                                  191 Total                       3 699       7 264                       189         8 803                 19 955 Balance at June 30, 1996           ~85 663     ~64~7           ~16 267     $   263   ~8474         ~71       ~67   237 This schcdulc summarizes the receipts and disburscmcnts in funds required under the Bond Indenture and has been prcparcd from thc trust statements. Thc balances in the funds consist of cash and investmcnts at original cost. These balances do not include accrued interest receivable of S2,285 and S2,976 at June 30, 1996 and 1995, respectively, nor do they include total amortized nct invcstmcnt premiums of S143 and S269 at June 30, 1996 and 1995, respectively. Thcsc balances do not include unrcalizcd loss on investments in funds available for sale of S28 and S171 at Junc 30, 1996 and 1995, respectively.
Accrued interest 8 256 8.257 Commitments and contingencies Total liabilities
 
~2)Jgg~2M 214 See notes to financial statements.  
I I
I I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996          1995 ASSETS Special funds:
Investments available for sale at fair value                           8 250,888     8 249,020 Interest receivable                                                        9220         9194.
Total assets                                                       ~2~1           $ 2~214 LIABILITIES Long-term debt                                                          $ 242 786     $ 242.107 Arbitrage rebate payable                                                                      77 Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project                                                   6 402         6.632 Deferred credits                                                              2 664        1.141 Current liabilities:
Accrued interest                                                           8 256         8.257 Commitments and contingencies Total liabilities                                                 ~2)Jgg         ~2M 214 See notes to financial statements.
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
Year Ended une 30 1996            1995 Cash flows from operating activities Cash flows from investing activities:
Interest received on investments                                        18,380          18,470 Arbitrage payment                                                                        (3,757)
Purchases of investments                                                (1,868)        (1,958)
Proceeds from sale/maturity of investments                                                5 757 Net cash provided by investing activities                        16 512          16.512 Cash flows from capital and related financing activities:
Payments of interest on long-term debt                                  16 512          16 512 Net cash used for capital and financing activities            ~16 512          ~16  512 Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year See notes to financial statements.
I I
I I
I'
)
I I
 
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
Debt Proceeds          Service      Earnings Account          Account      Account            Total Balance at June 30, 1995                247 727                      ~1295            249 020 Additions:
Investment earnings                    18,208                            172          18,380 Transfer to earnings account          (16,512)                        16,512 Transfer to debt service account                          16 512    ~16 512 Total                          1 696            16.512          172          18 580 Deductions:
Interest paid                                            16 512                        16 512 Total                                          16 512                        16 512 Balance at June 30, 1996              ~249 42'f                                        ~2%Un g This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of investments at original cost. These balances do not include accrued interest receivable of 59,220 and $ 9,194 at June 30, 1996 and 1995, respectively.
I I
I I
I I


SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands) 1996 Year Ended une 30 1995 Cash flows from operating activities Cash flows from investing activities:
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLFMFNTAL BAI.ANCE SHFET (In thousands) une 30 1996              1995 ASSETS Utility plant:
Interest received on investments Arbitrage payment Purchases of investments Proceeds from sale/maturity of investments 18,380 (1,868)18,470 (3,757)(1,958)5 757 Net cash provided by investing activities 16 512 16.512 Cash flows from capital and related financing activities:
Production                                                                   S   183,309       8 183,309 General                                                                            8 613            7 688 191,922          190,997 Less - Accumulated depreciation                                                   36 622           24 415 155,300          166,582 Construction work in process                                                       3 501             2 488 Nct utility plant                                                             158 801           169 070 Special funds:
Payments of interest on long-term debt 16 512 16 512 Net cash used for capital and financing activities
Investmcnts available for sale at fair value                                     34,170            28,699 Intcrcst rcccivablc                                                                   67                69 Cash and cash equivalents                                                         7 546             8 274 41 783           37 042 Accounts receivable                                                                     945             1,891 Materials and supplies                                                                 3,569            3,679 Costs rccovcrablc ftxun future billings to participants                               31,780            23,063 Unrcalizcd loss (gain) on investments in funds availablc for sale                                           (28)
~16 512~16 512 Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year See notes to financial statements.
Unamortized debt expenses, less accumulated amortization of $ 942 and $ 628                                                   3 090             3 461 Total assets                                                           ~2~72               238 78 LIABILITIFS Long-term debt                                                                     222 444           228 167 Current liabilities:
I I I I I')I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
Long-term debt due within one year                                                 6,035 Accrued interest                                                                  5,994             5,994 Accounts payable                                                                  5 499            4 017 Total current liabilities                                                   17 528           10 011 Commitntcnts and contingcncics Total liabilities                                                     ~23    ~7            238 178 See notes to financial statements.
Proceeds Account Debt Service Account Earnings Account Total Balance at June 30, 1995 247 727~1295 249 020 Additions:
l SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Investment earnings Transfer to earnings account Transfer to debt service account 18,208 (16,512)172 16,512 16 512~16 512 18,380 Total 1 696 16.512 172 18 580 Deductions:
Year Ended une 30 1996           1995 Operating revenue:
Interest paid Total 16 512 16 512 16 512 16 512 Balance at June 30, 1996~249 42'f~2%Un g This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.
Sales of electric energy                                             50 117          50 854 Operating expenses:
The balances in the funds consist of investments at original cost.These balances do not include accrued interest receivable of 59,220 and$9,194 at June 30, 1996 and 1995, respectively.
Other operations                                                         314            316 Maintenance                                                           35,760          38,511 Depreciation                                                           9,095          9,095 Decommissioning                                                       3 113          3 112 Total operating expenses                                         48 282          51 034 Operating income (loss)                                               1,835           (180)
I I I I I I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT ASSETS SUPPLFMFNTAL BAI.ANCE SHFET (In thousands) 1996 une 30 1995 Utility plant: Production General S 183,309 8 613 8 183,309 7 688 Less-Accumulated depreciation 191,922 36 622 190,997 24 415 Construction work in process 155,300 3 501 166,582 2 488 Nct utility plant 158 801 169 070 Special funds: Investmcnts available for sale at fair value Intcrcst rcccivablc Cash and cash equivalents 34,170 67 7 546 28,699 69 8 274 41 783 37 042 Accounts receivable 945 1,891 Materials and supplies Costs rccovcrablc ftxun future billings to participants Unrcalizcd loss (gain)on investments in funds availablc for sale 3,569 31,780 3,679 23,063 (28)Unamortized debt expenses, less accumulated amortization of$942 and$628 3 090 3 461 Total assets~2~72 238 78 LIABILITIFS Long-term debt 222 444 228 167 Current liabilities:
Investment income                                                        2 062          1.884 Income before debt expense                                         3,897          1,704 Debt expense                                                           12.614          12 598 Costs recoverable from future billings to participants                 5 8717 See notes to financial statements.
Long-term debt due within one year Accrued interest Accounts payable 6,035 5,994 5 499 5,994 4 017 Total current liabilities 17 528 10 011 Commitntcnts and contingcncics Total liabilities See notes to financial statements.
~23~7 238 178 l
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)
Year Ended une 30 1996 1995 Operating revenue: Sales of electric energy Operating expenses: Other operations Maintenance Depreciation Decommissioning Total operating expenses Operating income (loss)Investment income 50 117 314 35,760 9,095 3 113 48 282 1,835 2 062 50 854 316 38,511 9,095 3 112 51 034 (180)1.884 Income before debt expense Debt expense Costs recoverable from future billings to participants 3,897 12.614 5 8717 1,704 12 598 See notes to financial statements.  


SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)
Year Ended une 30 1996 1995 Cash flows from operating activities:
Year Ended une 30 1996             1995 Cash flows from operating activities:
Costs recoverable from future billings to participants Adjustments to arrive at net cash provided by (used for)operating activities-Depreciation Decommissioning costs Amortization of debt costs Changes in assets and liabilities:
Costs recoverable from future billings to participants                     (S  8,717)      (S 10,894)
Interest receivable Accounts receivable Materials and supplies Other assets Accounts payable 9,095 3,113 626 9,095 3,112 610 2 946 110 56 1 482 (59)(669)1,340 81 711 (S 8,717)(S 10,894)Net cash provided by operating activities 6 713 3 327 Cash flows from investing activities:
Adjustments to arrive at net cash provided by (used for) operating activities-Depreciation                                                                 9,095            9,095 Decommissioning costs                                                         3,113            3,112 Amortization of debt costs                                                       626            610 Changes in assets and liabilities:
Payments for construction of facility Purchases of investments Proceeds from sale/maturity of investments (1,938)(14,370)8 867 (1,861)(12,749)10 918 Net cash used for investing activities 7 441 3 692 Net decrease in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year (728)(365)8 274 8 639~Kk M~>>4 Supplemental disclosure of cash flow information:
Interest receivable                                                             2              (59)
Cash paid during the year for interest (net of amount capitalized) i~12K~>I'K See notes to financial statements.
Accounts receivable                                                           946            (669)
Materials and supplies                                                         110          1,340 Other assets                                                                   56              81 Accounts payable                                                           1 482             711 Net cash provided by operating activities                     6 713           3 327 Cash flows from investing activities:
Payments   for construction of facility                                       (1,938)         (1,861)
Purchases  of investments                                                    (14,370)         (12,749)
Proceeds  from sale/maturity of investments                                    8 867          10 918 Net cash used for investing activities                         7 441           3 692 Net decrease in cash and cash equivalents                                           (728)          (365)
Cash and cash equivalents at beginning of year                                   8 274            8 639 Cash and cash equivalents at end of year                                     ~Kk               M~>>4 Supplemental disclosure of cash flow information:
Cash paid during the year for interest (net of amount capitalized)         i~12K             ~>I 'K See notes to financial statements.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)
Revenue Fund Operating Fund Operating Reserve Project Fund Debt Service Reserve&Debt Service Revenue Reserve~Contin ene Total Balance at June 30, 1995$1 633 112$5 994~18 025 rt 11 179~36 943 Additions:
Reserve &
Investment earnings Distribution of investment earnings Discount on investment purchases Revenue from power sales Distribution of revenues Refund from Century Power Corporation Total 32 1,945 4 52,933 (54,914)(64)10 38,249 38 249 12 (168)114 14,515 400 414 14 515 1,061 (1,061)537 (652)112 2,145 1,750 242 52,933 400 2 142 55 325 Deductions:
Revenue       Operating     Operating         Project       Debt      Debt Service     Revenue Fund          Fund        Reserve           Fund        Service       Reserve       ~Contin ene     Total Balance at June 30, 1995                                     $   1 633                           112     $ 5 994       ~18 025         rt 11 179 ~36 943 Additions:
Payment for construction Administrative expenditures Interest paid Total 1,938 36,691 38 629 11 988 11 988 1,938 36,691 11 988 50 617 Balance at June 30, 1996~253 g 5 g 526 3 8 621~18 026~3 321 r~4~65 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.
Investment earnings                                 32                                            12                      1,061              537      1,750 Distribution of investment earnings             1,945              (64)                                      (168)      (1,061)            (652)
The balances in the funds consist of cash and investments at original cost.These balances do not include accrued interest receivable of S67 and S69 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of$69 and S2 at Junc 30, 1996 and 1995, respectively.
Discount on investment purchases                     4              10                                        114                            112        242 Revenue from power sales                       52,933                                                                                                52,933 Distribution of revenues                      (54,914)       38,249                                       14,515                           2,145 Refund from Century Power Corporation                                                            400                                                       400 Total                                                    38 249                            414       14 515                           2 142     55 325 Deductions:
These balances do not include unrealized loss (gain)on investments in funds available for sale of S4 and ($28)at June 30, 1996 and 1995, respectively.
Payment for construction                                         1,938                                                                                  1,938 Administrative expenditures                                   36,691                                                                                  36,691 Interest paid                                                                                              11 988                                     11 988 Total                                                    38 629                                      11 988                                   50 617 Balance at June 30, 1996                                     ~253         g       5       g     526     3 8 621       ~18 026         ~3 321     r~4~65 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of cash and investments at original cost. These balances do not include accrued interest receivable of S67 and S69 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of $ 69 and S2 at Junc 30, 1996 and 1995, respectively. These balances do not include unrealized loss (gain) on investments in funds available for sale of S4 and ($ 28) at June 30, 1996 and 1995, respectively.
I}}
I}}

Latest revision as of 03:30, 4 February 2020

Southern California Public Power Authority 1995-96 Annual Rept. W/Financial Statements
ML17312B562
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1996
From: Waters D
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
To:
Shared Package
ML17312B559 List:
References
NUDOCS 9707180220
Download: ML17312B562 (170)


Text

9707180220 9707i0 PDR 'ADDCK 05000528 I PDR

TABLE OF CONTENTS SCPPA by Definition Executive Director's Letter Prcsidcnt's Letter The Retail Revolution Operations and Financiais Palo Verde Nuclear Generating Station... 9 San Juan Gcncrating Station Mead-Phoenix/Mead-Adclanto Transmission Projects l2 Hoover Uprating Project l2 Southern Transmission System l3 Legislative Advocacy l3 Report of Independent Accountants l7 Combined Balance Sheet IS Combined Statement of Operations l9 Combined Statement of Cash Flows l9 Notes to Financial Statements 2I Supplemental Financial Information 3I Palo Verde Nuclear Generating Station... 32 Southern Transmission System 36 Hoover Uprating Project 40 Mead-Phoenix Transmission Project 43 Mead-Adclanto Transmission Project 47 Multiple Project 5I San Juan Generating Station 53

SCPPA BY DEFINITION The Southern California Public Power Authority (SCPPA) is a joint powers authority formed in 1980 to acquire reliable, cost-efficient electrical generation facilities and transmission systems for its members. The membership includes ten municipal utilities and one irrigation district that deliver electricity to nearly two million customers from northern Los Angeles County to the Mexican border.

Backed by its members'fifnancial strength, SCPPA has issued $ 8.2 billion in bonds, notes and refunding bonds since its inception, of which $ 3.6 billion in principal remains outstanding. With these proceeds the SCPPA members have jointly purchased or refinanced interests in generating and transmission facilities throughout the southwestern United States.

SCPPA's primary role has been to secure financing for these projects, but in light of pending electric industry restructuring, SCPPA has increasingly helped its members become more competitive and provided legislative and regulatory advocacy at the state and federal. levels. This advocacy ensures that legislators and regulators will consider the needs of public power providers in this region as they propose sweeping changes in laws and regulations affecting the electric industry.

Today's radically shifting economic and political climates pose major challenges for public power providers. SCPPA's sound financial basis and cooperative approach to industry problem-solving will help its members weather the storm and deliver new benefits to their customers.

SCPPA MEMBERS City of Anaheim NEVAOA -Q.>Ml

~ Southern Transmission System

~ Mead-Phoenix City of Azusa Transmission Project ll City of Banning

+c ID TATSS INTTAM cxAN Yt Sl Aot ~ Mead-Adelanto City of Burbank STATI Transmission Project UTAH 7 Q Palo Verde Nuclear City of Colton SOVI IIIAN VSSII TTAhlklssloU Generating Station City of Glendale sv Dc Q Hoover Uprating

~SANNANIINTT l ADttANTO, Imperial Irrigation District CONYTATIA MCADADIIANTO Project Los Angeles Department S I TANTO TATI(AN+co

+

STATION rtoilctl MSSY AC I tn sa nt m A

t AIIIZONA

> Ftnsintttk Q San juan Generating of Water And Power IAMSIIAP Station City of Pasadena tes ttts 0 ~ Ivrttsot + tl ~ Member Agencies SS ~

~ ANAAtlu NEW MEXICO City of Riverside rtottct IITSTIIINO IO svssTATIDN City of Vernon ININAIkANAIIOS

~

TAIO YTADS rtoktt

EXECUTIVE DIRECTOR'S LETTER In last year's message I predicted that this fiscal year would be a watershed period for the nation's public utilities and the events that unfolded proved my penchant for understatement. Debate about electric utility restructuring and competition was highly visible on the U.S. congressional agenda, and legislation that would direct states to begin retail customer access choice by the end of the year 2000 was proposed. The Federal Energy Regulatory Commission continued their move to ensure that the nation's transmission system is open to all in a fair, nondiscriminatory fashion.

In Californi, discussion intensified and the realities of market transformation began to unfold.

In a landmark decision in December, the California Public Utilities Commission issued a policy decision setting January 1, 1998 as the beginning of direct access for retail customers of the state' investor-owned utilities. The Deregulation Countdown on page 7 further illustrates the timing of the new market scenario.

During this year SCPPA's staff and its member agencies infused their own considerable energy into representing and protecting public power agencies and their customers in the deregulation continuum. I caned these themes to the U.S. Senate when I testified before its Energy and Natural Resources Committee at a restructuring hearing in March. As SCPPA representatives and I visited with Members of Congress and staff, we provided them a consumer-owned utilityperspective on the CPUC decision and its impacts, and on proposed federal legislation. These views took on reality for congressional staff members as they toured several SCPPA facilities in April.

Back at home the SCPPA staff worked to reduce project and overhead costs, and to restructure project debt including a move to increased variable rate debt, thereby lowering project costs.

SCPPA members spent this year in high gear, delivering reliable power and quality energy services to their customers, while retooling to meet the demands of the coming open market envi-ronment. The following pages further describe their strategies to reduce costs, increase efficiency, develop new revenue sources, and communicate with their customers, city administrators, and elected officials. SCPPA has served as a catalyst and resource for these efforts.

p 0

0 Eldon A. Cotton Bill D. Carnahan Bernard Y. Palk SECRETARY PRESIDENT VICE PRESIDENT Daniel W.Waters Thomas H. MOGuinness EXECVTIYE DIRECTOR ASSISTANT SECRETARY Despite the current maelstrom of changing times and markets, SCPPA's mission is becoming progressively clearer. We will continue to support our member utilities'conomic strength and marketing presence as we enter the new millennium.

Daniel W. Waters Ezcunva DiREcroR

PRESIDENT'S LETTER In this era of profound change, SCPPA's benefit is its ability to influence the develop-ment of a new industry structure, ensuring that its member utilities can compete effectively. Two years ago we set a goal of making SCPPA the voice of the Southern California municipal utilities in national forums, and we have made great progress in this regard.

In the past year, SCPPA continued to become more prominent in its spheres of influence at the federal and state levels.

SCPPA projects are critical to its member utilities'ability to compete. Over the past year we member utilities have worked to critically analyze our own operations, with efficiencies and cost reduction as our prime objectives. Our participation in SCPPA-funded projects provides us some of these efficiencies, such as expanding our access to low-cost power sources.

In addition to its advocacy and financial benefits, SCPPA helps member agencies develop common strategies, including how to establish Competition Transition Charges. SCPPA serves as a forum for identifying interacfive issues and ferreting out solutions.

Aided by our SCPPA membership, our customers will continue to reap the benefits of local control of public utilities. We know our customers, operate our own generation and transmission system, and can provide more opportunities for value-added energy services. These attributes will make the crucial difference as we head into the coming market environment.

Bill D. Camahan PREsroHNr

THE RETAIL REVOLUTION In March 1896, an enterprising businessman bought a franchise from the City of Los Angeles for

$ 100, permitting the operation of a power system within the city. He and his partners had built a small generating plant outside the city limits the previous December that would supply the proposed system. Since this franchise was to expire within two weeks, he and his three partners, along with their four employees, put on their overalls and feverishly strung wire through the streets and over rooftops of the city. At 4:55 p.m. on April 14, 1896, the first electric lights lit up the City Hall tower.

This tiny company owned the exclusive right to sell power to its customers, along THE COMPETITION with the exclusive responsibility to maintain near-perfect service and develop new TRANSITION CHARGE (CTC) power supplies to support the explosive growth to come. Reeonnfing the Past toith the Future This scenario was repeated in burgeoning cities throughout Southern California in Under tho proposed CTC, consumers who choose to change electricity suppliers the 1890s. Small companies built and operated generation resources and transmission would pay a monthly surcharge on their electricity bill.The purpose of this surcharge ls to infrastructure, and kept up with the insatiable thirst for power of a population fresh off ensure that the cost of retiring the debt on exisdng power, infrastructure does not shift to the new trains from the east. the customers who remain with their uuhty. In many cases, Some of these cities later bought the electrical systems within their boundaries, the remaining customers are likely to be residential and small business customers, while acquiring the same exclusive rights and responsibilities to their customers. To purchase the ones who change suppliers will be the large commercial/

industrial customers.

the new generation and transmission systems they needed, they would subsequently pool their financial resources in the Southern California Public Power Authority.

In March 1996, descendants of private companies like that first private partnership filed to divest themselves of their generating plants voluntarily. This followed on the decision the previous December by the California Public Utilities Commission to open market access to the power infra-structure initiated 100 years ago. A few weeks later, in April1996, these private power companies filed to create a Power Exchange, into which they would sell their generation, and an Independent System Operator to operate and manage the state's transmission system.

clTY OF ANAHEIM As the City's sole power provider for more that l00 years, tho Anaheim Public Utilities Department has The municipal power companies, although not directly regulated by the now positioned Itself for dereguladon and competition. In I4arch 1996, cominerclal CPUC, willparticipate and compete in this market-based environment... a whole and industrial customers saw a rato decrease of up to five percent. Reslden.

tlal rates remained stable, already set new world.

approximately 25 percent lower than thoso In neighboring communities. Taking advantage of a unique opportunity, the Department entered into a landmark wHv nEREaumTE7 Historically, the regulatory compact provided exclusive publicfprivate partnership to utilize Its fiber optic cable This partnership will pro-vide the community with access to a service territories and rates sufficient to cover utilities'costs. In the 1970s, utilities VnlversalTelecommunications System In I 997.

were facing demand growth of seven percent per year, and were forbidden by Custome Served:.......... I 04,805 Power Generated and Purchased (In Hegawatt.Hours) federal law from burning natural gas in utility boilers. This led to investments in Self-generated 880,7 I 5 Purchased............. l,973, I I 0 Total ...............

Transmhslon (In mlles) 2,853,825 I>417 nuclear and coal fueled generating plants.

Total Revenues (000's)

Operating Costs (000's)

....... $ 246,479

$ I 97,895 In recent years the California government mandated investment in renewable energy sources and promotion of energy efficiency. In this era the utilities provided a complete electric system. They also had the obligation to plan and develop facilities to cover future electric needs and were accountable for near-perfect service to all customers. As a result of the move to protect the environment and promote renewable resources, investor-owned utility gOU) rates in California were 50 percent higher than the national average. The rates of consumer-owned utilities like the SCPPA member agencies were generally 15 to 30 percent lower than those of the IOUs.

These high rates are driving the move to deregulation in Californi.

New technology enables new projects to generate electricity at lower cost using relatively inex-pensive natural gas. At the same time, global economic forces are pressuring California's industries to become more competitive. These customers want the immediate benefit of the new generation technology and lower electricity bills.

In the new world of deregulated power supply, industrial customers will have access to an open market in which they can buy electricity from the lowest bidder.

9dEh5aaR AaEPgciES IN ACTloN The eleven SCPPA member agencies have been planning for the new market transformation for the last few years. This past fiscal year has seen the most active

PASSWORDS TO A NEW ERA AGGREGATORS - Brokers who seek to bring together

, customers to create a "load" so that they can buy power in bulk, DEREGULATION COUNTDOWN making a profit on the sale.

COMPETITION TRANSITION CHARGE (CTC) A non--

bypassable fec paid by retail customers to their former power supplier when taking service from an alternative Direct retail access for supplier. This fee reflects the all customers begins.

difference between a stranded IOUs no longer must asset's market price and its cost.

bid generation into The purpose Is to avoid cost the Powci Exchange. shifting, and to enable utilities to CTC ends. retire debt and compete fairly.

OVARY Ii Five. year phase-In iirect retail access for IOUs ins: Largo customers may ose alternate generation 2003 COST BASED RATEMAKING Regulated rates based on costs expended.

pliers. IOUs must bid all National Energy COST SHIFTING Moving-eratlon into Power Exchange cost Increases or decreases to Policy Act gives FERC satisfy customers'nergy classes of customers, a.g. to authority to order ds by buying from the Power residential from industrial or to open transmission hange. Customers choosing commercial from residential.

access.

mate suppliers pay CTC.

DIRECT ACCESS - Abilityof a power producer to sell directly to thc retail customer.

INDEPENDENT SYSTEM OPERATOR (ISO)-

CPUC Issues Independent manager of trans-y li + draft rulemaklng mission lines which assures safe p envisioning futuro where customers choose among competing generation pioviders, and performance-and fair transfer of electricity from generators to distribution companies INTEGRATED UTILITY 0 based ratcmaking replaces traditional castoff-service A company that provides a ructurlnglfunctlonal complete electric system, ndling. IOUs to file ratcmaklng. generation transmission and icatlons to transfer distribution services, for Its

e. CPUC to ensure customers.

al consumer protection PERFORMANCE BASED ores are in place. RATEMAKING(PBR)

X995 MARCH: FERC issues Notice of Proposed Regula(ed rates based on performance objectives, not on actual costs.

Rulemaklng (NOPR) proposing significant -A POWER EXCHANGE (PX) changes in transmission scrvicc regulation.

MARCH: IOUs apply for spot prico market for electricity Goal: to deny transmission facility owners voluntary divestiture of into which power generators unfair advantage over competitors. could sell their electricity and 50 percent of fossil generation.

from which retail and wholesale MAY: CPUC issues proposal that electric customers could buy.

gcncrators should sell power to independent APRIL Draft of ISO/Power system operator (ISO), which would distributo RESTRUCTURING Exchange filing availablo power to Californians at lower price than Reconliguring tha market to stakcholders. IOUs file currently paying. A new Power Exchange structure by eliminating tha proposals to establish ISO would create a wholesale power pool where monopoly on the essential func-and Power Exchange. all suppliers could sell electricity according to tions of an electric company.

established competitive bidding procedures. RETAIL WHEELING Tile JULY: IOUs apply for performance-based ability of generation companies DECEMBERi CPUC adopts final policy or brokers to sell directly to ratemaklng. which Includes the following: Creates a Power retail customers, utilizing regu-Exchange starting Jan. I, I 998. Initiates direct lated transmission lines and the access for retail customers with five-year distribution services of existing phase-In and proposes competition transition utility companies.

charge (CTC). Creates ISO for the trans-mission grid. Develops performance-bascd STRANDED INVESTMENT OR STRANDED ASSETS ratemaking for IOUs. Requires real-time rate Gcncration facilities, owned by and time-of.usc rate options. existing utility companies, that produce electricity at above-markct marginal prices.

UNBUNDLED RATES Separate itcmlzcd charges for generation, transmission, distrib-ution, and other services.

UNBUNDLED SERVICES Customer can select which services they want and which company provides them WHOLESALE WHEELING Selling electricity to wholesale buyers for resale to retail customers

fulfillment of their transformation plans to date. The agencies have put significant time and effort into many of these activities:

~ Communicating with city councils, utility boards, and major customers about the deregulation process, its implications, and the member agencies'preparation for it.

JOSEPH FI HSV

~ Downsizing and reorganizing staff.

~ Transforming from engineering-based to customer-focused corporate culture.

~ Becoming more familiar with customer needs and planning new products and clTY oF AzvsA Tho city's electric I was established ln I 898, and for most services. history Azusa purchased electricity w sale from Southern California Ed Since tho mid.l980s, through succr

~ Aggressively cutting costs while maintaining service reliability. litigation against Edison on transmi access, Azusa began to obtain short

~ Preparing new unbundled and time-of-use rate structures. long. term contracts with other utiliti well as from SCPPA, by particlpath Palo Verde Nuclear Generadng Se

~ Working on reducing transfers to their cities'general funds. Hoover Hydroelectric Plant, and San Generating Station Unit ¹3. By havln,

~ Renegotiating power contracts to cut costs. ability to diversify its power supply ol tlons, Azusa has maintained its retail i

~ Meeting off-balance sheet debt obligations. at tho l983 level.These compedtivo i w/II help tho city make a less stressful sltlon toward tho deregulated

~ Pursuing revenue enhancement opportunities, such as leasing poles and m'nvironment.

conduit for fiber optics and other telecommunications activities. Customers Served:......... i4 Power Generated and Purchased (in H egawatt. Hours)

~ Adopting a Competition Transition Charge. Self.genensted: ..........

Purchased:............. 422 Sales

~ Reducing project operating and maintenance costs. Recall: 220 Wholesale: 202

~ Renegotiating fuel contracts. Total Revenues (000s):....... $ 23 Operating Costs (000s): ...... $ 20 rVrued lted

~ Reducing debt service by refinancing at lower interest rates.

~ Moving to more variable rate debt.

~ Pursuing aggressive legislative advocacy.

set PA JN AcTJON The last three items above are the particular expertise and benefit that SCPPA brought its member agencies during this fiscal year. Moreover, SCPPA staff members have adopted the new streamlined business atmosphere of the member agencies by"doing more with less" in all aspects of operations. It has been a year of unprecedented energy and accomplishment.

PAUL TOOR OPERATIONS AND FINANCIALS CITY OF OAHHIHG Established ln I 9 I 3,the Banning electrical system now serves an area of approxi-As of Oetober 31, 1996 Iveighted Average Bond Ratings mately 2I square miles. The city owns a SCPPA BONDS Hoover Uprating Project Cost

~)of Capitatt 6.11 hfood~slnvestor Standard Ibor's

& pordon of San Juan Unit 3 and a portion of Mead Adelanto and Mead-Phoenix transmission lines. In addition, the city Southern Transmission System Project 432 owns a distribution system and four sub-Seruor Uen Bonds Aa AA- statlons to serve the customers. Being a Subordinate Uen Aaa/VMG1 AAA/A-1+ full service city, Banning's load mix is Verde Project Bonds'alo strengthened by Industrial customers, Senior Uen Bonds A1 AA- with more Industrial projects on the way.

Project'stimated 1992 Subordinate Uen Uen Bonds'ubordinate Aaa Aaa/VMIG1 AAA AAA/A-1+

Major distribution system improvements are also ln progress.

Transmission Project Bonds'ead-Adelanto SAO Customers Served:......... 9,0$ 0 Insured Refunding Power Generated and Purchased Bonds'onrefunded (In Megawatt-Hours)

Self~en eratedt 0 SA8 Purchased:.............

Bonds'ead-Phoenix TransmLsion Project I I 7,879 Insured Refunding Bonds'onrefunded Aaa A

AAA A

Total ...............

Transmission (in miles)

I I 7,87 I l22 A Total Revenues (000s):....... $ I3,230 A

Bonds'ultiple 6.21 Operating Costs (000s)I $ I2,7$ 0 Project'an Juan Unit 3 5.12 Aaa AAA

'nsured; 1991 Suhndinate Van'able Rate Bonds QMBAC)t 1996 Subordinate Snies A Bonds (MBIA)/1996Subordinate van'able Rate genes B Bonds (ESA).

I Insund: 1992 Senior Ifm Bonds QMBAC); 1993 Subordinate Bonds (IGIC); 1996 Suhndinate Snies A Bonds QAIBAC),'996 Subordfnate Vanabie Rate Senes B and C Bonds QI(IBAC).

I Insund: 1994 Sen'es A Bonds (AMBAC),

Unmmmittof bond promds eecund by a guarantmi rate Investment contract.

I Insund: 1993 genes A Bonds (MBIA).

IAilgenemtion bonds: 466%; ali transmissum bonds: 512%; eomhned gennntion and transmission: 500%

During the fiscal year, SCPPA continued to monitor the financial markets and address opportu-nities to reduce its fixed interest costs.

SCPPA refunded $ 222.2 million in PaloVerde Project bonds which were originally issued in 1986 and 1987. The 1996 refunding bonds consisted of sales of $ 152.9 million in Series A fixed rate bonds in February, and $58.9 million in Series B variable rate obligations in April. These insured revenue bonds will produce estimated present value savings of $ 29.5 million, or 14 percent of the refunding bonds.

As the fiscal year ended, SCPPA was working on a similar two-part refunding for the Southern Transmission System, and an additional variable rate issue for Palo Verde.

Following is a status report on SCPPA's generating and transmission projects.

PALO VERDE OPERATIONS PALO VERDE NUCLEAR GENERATING 199$ 90 OPERATIONS Generation Ca(tacity (Millionsof Utiiuation MIVHs) (%)

sTATIDN (PvNGS) Ten SCPPA members (all but the City of Unit 1 9.8 Unit 2 9.2 Anaheim) share a 5.91 percent interest in the three units of PVNGS, Unit 3 entitling them to 225 megawatts of power. SCPPA continues to Agg"ga<<

Industry average 69.9

work with the operating agent, Arizona Public Service (APS), to increase output and lower costs in order to make Palo Verde a competitive and dependable resource.

Palo Verde began a reengineering of work processes and organization in September 1993. Thus far, the reengineering effort has yielded lower costs, higher output, higher PRODUCTION COST I >>>dhkiswmcr N>>ch>>cr>>ce Ckieadhr ratings by the Nuclear Regulatory Commission (NRC) and the Institute of Year per klVh 1993 2.02 1994 1.93 Nuclear Power Operations (INPO), shorter refueling outages, and better 1995 1.61 teamwork and morale.

~ >

v. l.- ~ >

I I

c PaloVerdo's Spring l 996 refueling outage for Unit 2 was completed in a record 49 days.

INPO conducted a two-week evaluation of PVNGS in October 1995 and issued its first "1" rating, indicating that PVNGS achieved the highest level of exceHence in nuclear plant operation. The AOIIAIOY SYASSI high rating is expected to reduce PVNGS'insurance costs by nearly $ 1 million per year.

t>>I ') r, i);.,Ikj >

The NRC's latest Systematic Assessment of Licensee Performance (SALP) report clTY oF nunaatex Burbank's Public gave PVNGS ratings of"1"in Operations, Maintenance, and Engineering, and"2>vin Service f3epartment began serving cus-tomers In I 9 I 3,and installed onwlte gen-eration ln response to a surge in industri- Plant Support. "1" is the highest rating, and represents superior safety performance al and residential growth In tho 1940's and I 950's.Today the city receives power from which exceeds NRC standards. In the previous assessment period, PVNGS received three SCPPA projects, the Bonneville Power Admlnhtratlon, as well as firm and Interruptible supplies from other utilities "2" ratings in all four categories. The NRC noted that APS has established new and government agencies.

Customers Served:......... programs and processes necessary to achieve and sustain superior performance.

Power Generated and pe>chased (ln Hegawatt-I4ours)

Self.generated I 0 I,078 Purchased Total

............. 928,0 I I I,029,098 Transmission (In Miles)....... 398 Total Revenues (000'I)

Operating Costs (000's)

....... 8 94,430 8 93>744

THOMAS K CtARKE Corrective measures implemented following a tube rupture in one of crrv os cotTDH The Colton munidpal electric utility was established in I 895, Unit 2's steam generators in 1993 have allowed operation at full capacity, eight years after city incorporation. Since I 986,the electric utilityhas changed from being solely dependent on Southern but the operating agent has recommended replacement of unit 2's two steam California Edison for its purchased power to being actively engaged in purchasing generators, perhaps within the next ten years, due to safety and economy power from several different sources, achieving significant cost savings in the process.

reasons. If the co-owners of PVNGS decide to replace the steam generators, Customers Served:......... 15,932 Power Generated and Purchased (in ldegawatt.Hours)

SCPPA's share of the cost is estimated at approximately $9 million and would be Sclf~ncratcd 0 Purchased .............

Total .............. ~ ~

241,582 24 I,582 expended over approximately six years. Transmission (ln miles) 23 Total Revenues (000's)

Operating Costs (000's)

....... $ 26,072e

$ 24,60 I e One owner of PVNGS, El Paso Electric Company, has been under e unaudited bankruptcy protection since 1992, and filed its Fourth Amended Stand Alone Plan in September 1995. The Bankruptcy Court approved the plan, and El Paso emerged from Chapter 11 bankruptcy on February 12, 1996. All of El Paso's obligations regarding PVNGS during the bank-ruptcy period have been met.

sAN JUAN oPERATIQNs San Juan Unit 3 continued to be a dependable resource for the five SCPPA members (Azusa, Banning, Colton, Glendale, and Imperial Irrigation District) who own a 41.8 per-cent share of the unit through SCPPA.

A second Interim Invoicing Agreement further encouraged high capacity IARD Ya PAtK factors and lower per unit fuel costs. Despite the major scheduled maintenance outage in the spring, SCPPA members received nearly 1.5 million MWH from os otsHDAta Incorporated In l 906, idalo purchased Its electric utility In San Juan in FY 1995-96.

', obtaining power from outside sup-

s. It received Its first power frotn ver Dam ln I 937 and inaugurated thc Installation of a new limestone scrubber system for the removal of sulfur unit of its own steam generating t In l94I. Now called the Grayson cr Plant, this facility today has eight ~

dioxide was approved late in the fiscal year. Besides improving emissions control, iratlng units. Glendale continues to hase 85 percent of Its power from ilde sources. the three-year project will save SCPPA $ 3 million per year in operating and main-omen Served:......... 82,57 I ir Gencratcd and Purchased tenance costs.

legawatt.Hours)

If.generated I d3,499 rchased ............. 939,096 I, I 02,595 Both the operating agent (Public Service Company of New Mexico) and the smhslon (in miles) d9 IR cvenues (000's) ....... $ 98,020 rating Costs (000's) $ 85,026

coal supplier are actively exploring other ways to reduce costs and make San Juan Generating Station a competitive resource for its owners MEAD-PHQENIx/MEAD-ADELANToTRANsMIssloN PRDJEcTs After more than a decade of plan-ning and two and a half years of construction the Mead-Phoenix and Mead-Adelanto Transmission Lines went into commercial operation in April 1996. These two 500-kV AC transmission lines will cany power between the Phoenix area, the Las Vegas area, and Southern California. Nine San Juan Gonaratlng Station SCPPA members own roughly one-fifth of Mead-Phoenix and one-third of Mead-Adelanto through SCPPA.

HoovER UPRATING PRoJEcT The Hoover Uprating Project, which increased the rated capacity at Hoover Power Plant by 35 percent, was declared complete this year. Nine SCPPA members (Anaheim, Azusa, Banning, Burbank, Colton, Glendale, Pasadena, Riverside, and Vernon) participated in the uprating and have obtained entitlements totaling 127 MW of capacity and approximately 143,000 MWH per year in allocated energy. The cities of Anaheim, Riverside, Burbank, Azusa, Banning, and Colton financed their participation through SCPPA.

Two issues which may affect operations at Hoover are the proposed sale of the Federal Power

KENNETH S MOILER Marketing Administrations (PMAs) and possible required mitigation of effects on endangered species in the lower Colorado River area. These issues are discussed IMPERIAL IRRIGATION DISTRICT under Legislative Advocacy. IID entered the power Industry In l936 and today serves a peak load of 640 NW with 790 NW of generating resources.

Among IID~ned resources are 24 NW souTHERN TRANshIissloN SYSTEM As usual, the Southern Transmission System of low head hydro units along the All American Canal, 307 NW of gas-fired steam and combined cyde units, and l62 (STS) continued to operate at or above design parameters, transmitting 11.3 mil- NW of peaking gas turbines. In addition to IID's share of SCPPA resources com-lion MWH of power over its 488 miles, compared with 12 million MWH in fiscal prislng l04 NW at San Juan and l4 NW at Palo Verde, IID has 179 NW of other resources under long-tenn purchase con-year 1994-95. The line operated at 70.5 percent of capability, with 99.53 percent tracts.

Customers Serve>h........ 86,870 Power Generated and Purchased availability. STS, a a 500-kV DC transmission line and associated converter (In N egawatt-Hours)

Self-Generated Purchased

........... 774,587 I,893,599 stations, moves power between the Intermountain Converter Station in Utah to Total ...............

Transmission Facilities (in Miles) 2,668,I86 l,637 Total Revenues (000's) ..... I 97,9 I 7 the Adelanto Converter Station in Southern California. Operating Costs (000's) .... $$ I 77,624 LEGISLATIVEADVOCACY In the past year, SCPPA played its most crucial role to date in representing public power issues in Washington, D.C. By year end it had also made plans to maintain a continuous presence in the California legislature. The following examples underscore the value of SCPPA's advocacy in Congress.

ELEcTRlc UTILITY INDUsTRY REsTRUcTURING Discussions about electric utility restructuring 4 A> COTTON and ways to increase competition in the industry were prominent on the congres-li'NCEIXS sional agenda in 1996. SCPPA was actively involved in this federal restructuring DEPARTMENT OF WATER AND In 19I6, the City of Los Angeles debate. During visits with Members of Congress and staff in Washington, D.C., and I distributing electric power pur-id from the Pasadena Municipal

r Plant, and the following year an April congressional staff tour of several SCPPA facilities, SCPPA representatives
Orated its first generating capacity at Francisqulto Power Plant No. I.

discussed the effects of the California restructuring on municipal utilities, and 22 the city purchased thc remaining butlon system of Southern California

>n Company within the city limits. It SCPPA's view that federal legislation would be premature at this'time. In addition, Ir thc largest Inunlcipally owned elec-itilityIn the nation. During l 995-96 It rwcnt a major business restructuring Executive Director Dan Waters testified for SCPPA and the American Public Power Iss to prepare for upcoming dcrcgu-I Association on March 29 at a restructuring hearing held by the Senate Energy and

>mers Servcdi........ I,350,807 rG eneratcd and Purchased egawatt.Hours) Natural Resources Committee.

I'-generated .........

chased............

2I,848,8I6 7,079,3 I 3 al ...............

,mhslon (ln miles) .....

28>928,I29 3,743 Revenues (000's) ...... $ l,946,850 sting Costs(000's) ..... $ I,625,753

Rusus HICHTOWER clTY DF FAsADEHA Established In 1906, Utilityrestructuring and consumer choice issues are likely to be at the top of tho city built its first electric generating steam plant In I 907 and took over opera-tion of its municipal street lighting from the energy agenda in the 105th Congress. SCPPA willcontinue to play a role in the Edison Electric. In 1909, Pasadena began the extension of its operations to com-mercial and residential customers that development of legislation as the restructuring debate moves forward next year.

resulted In the replacement of all Edison electric service In tho city by l920. In I 995.96, Pasadena purchased approxi-mately 85 percent of its power needs. THE NUcLEAR wAsTE PQLIGY AcT With a 5.91 percent interest in the PaloVerde Customers Scrvcd:......... 58,732 Power Generated and Purchased Nuclear Generating Facility, SCPPA has a keen interest in pending legislation to (ln Megawatt. Hours)

Sell-generated I 85,289 Purchased 984,0$ 7 reauthorize the Nuclear Waste Policy Act of 1982, with amendments. Passage Total I ~ I 69,346 Transmission Facilidcs (in Miles) . $7 Total Revenues (000's)

Operating Costs (000's)

....... $ I I 0,975 of these proposed amendments would provide solutions for waste generated at

$ 9$ ,654 the station at an interim nuclear waste disposal facility by 1998 and later at a permanent disposal site atYucca Mountain, Nevada. The Senate bill was eventually approved, but a veto threat from President Clinton and strong opposition from the Nevada delegation stopped efforts to pass the legislation this year.

PowER 9dARKETINa AotdiNISTRATIoNS In its early years the Clinton administration attempted to auction federally owned power marketing administrations (PMAs) for a one-time reduction in the federal deficit. One PMA earmarked for sale was the Western Area Power Administration (WAPA),

which provides power to most SCPPA members. This proposed sale would privatize the Hoover hydroelectric project, the Parker and Davis power plants, and their related transmission facilities. Sale of the PMAs would negatively affect public power operations unless the sales are BILL Do CARHAHAH l

made to existing contractors. Although no serious PMA auction effort surfaced in . ~

1996, the federal power program was carefully scrutinized, and many legislators clTY oF RlvfnsIDE Rlversldo Pl Utilities is posltlonlng Itself to offer t remain staunch advocates of privatization. petltive rates ln the new dercgul environment. Power and transmh costs constitute the bulk of cha passed on to our customers thrI ENI3ANaEREI3 SPEciES ACT REAUTHoRIXATIoN Republican leaders named rates. Cost reduction and rcstructII efforts at SCPPA have had slgnlfi impact on Riverside Public Utlli reauthorization of the Endangered Species Act as a top legislative priority, but their efforts in meeting our lower ope .

cost targets. Additional efforts, espc at Palo Verde Iqucicar Gener.

legislation immediately met opposition from environmental groups, Democrats, Station, will be required for Riversid compete ln future years.

and many Republicans. Fearing anti-environmental sentiment for the GOP, its Customers Served:

Power Generated and Purchased (In Megawatt. Hours)

Self~ncratcd 29 Purchased.............

Total Transmhsion (In miles)

Total Revenues (000's)

Operating Costs (000's)

....... $ I7 5 I6

leadership kept the legislation from being brought to the House floor for a vote this year. SCPPA continues to support ongoing voluntary efforts by California, Arizona, Nevada, and the Department of the Interior to protect endangered species in the Lower Colorado River region. These agencies are proceeding on the assumption that there willbe no significant changes to the Endangered Species Act in the future.

TAx-ExEIuiPT FUNDING Concentrated efforts by SCPPA members and the public power community

~ '

I; er Dam KENNETH Je DE DARIO to educate Members of Congress and staff of the value of tax-exempt financing provided a needed advantage in 1996. Investor-owned utilities gOUs) have oF YERNQN Vernon's Light and opposed tax-exemption for public power entities, claiming that this status would Power Department began serving indus-trial'customers in !933, with completion of its diesel generating plant. In addition give public power an unfair advantage under deregulation. Despite IOU attempts to its own power from diesel units plus recently Installed gas turbines, Vernon to restrict tax-exempt financing in 1996 budget reconciliation legislation, no such now receives power from Palo Verde, Hoover, and various utilities, including APS, CDWR, SRP, BPA and Edison.

proposals were approved. Customers Served:......... 2,04062t'lTY Power Generated and Purchased (in Megawatt-Hours)

Selpgenerated 676 RENEwABLE ENERGY PRDDUcTIDN INcENTIYE The Department of Energy's Purchased ........,..., l,077,823 Total l,078,499 Transmission (in miles) 2.4 Renewable Energy Production Incentive (REPg provides incentive payments to Total Revenues (000's) $ 50, I 99e Operadng Costs (000's) $ 37, I

~ Unaudited

energy providers who generate energy from such sources as wind, geothermal sources, and landfill gas. SCPPA and other REPI supporters obtained last-minute funding for the program during the fiscal year 1996 appropriations process. SCPPA member City of Glendale received the largest single payment of $ 946,921 for more than 60 million kilowatt-hours of power generated during 1995 at its Grayson landfill gas-fired facility. Intense efforts by SCPPA and other REPI supporters established fiscal year 1997 incentives as a major bipartisan platform during the appropriations debate.

N A)e; 'js g>C"

! A(lj 4 Br'delanto Converter Station is the western terminus of tho Southern Tranmission System.

PERCENTAGE OF SCPPA MEMBER PARTICIPATION IN SCPPA'S INTEREST PALO VERDE HOOVER VPRATIHO HEAD ADELAHIO HNA~ SOUTHERH NAH JVAH PROJECT PROJECT PROJECT PRO/ECI TRAHIHUNIOH PROJECT NVNTEH PROJECT (OX (0%

u( NP(LNN LllQ LNQ(5 ND(ONL NINON(

OX(NN( ((LNR I

LN(((5 Nmx NNNUN 1L(L((NL LNINBN LML QBDIL(

(1X BDO NYBM( LINENS NN(5D( N(DDN QNJNQ (11(X QLNN QBO(lf 0 NINNNN ts(X JL(ONL BO0 (LIX MNJ

REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its opemtions and its cash flows for the years then ended in conformity with generally accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with generally accep'ted auditing standards which require that we plan and perform the audit to obtain reasonable assumnce about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reason-able basis for the opinion expressed above.

In our opinion, the accompanying separate balance sheets and the related sepamte statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Mo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of opemtions of the Authority's PaloVerde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generaHy accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial state-ments based on our audits. We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for the opinion expressed above.

Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole.

The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements. This information is the responsibility of the Authority's management. Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.

Price Waterhouse LLP Los Angeles, California

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED BALANCE SHEET tin thousands)

June 30, 1996 Mo Itansn2issu7n Hoooer Mead- Mead- Mutt2)7tc San June 30, Verde System I!puting Phoenix BMttanto Project juan 1995 project ptoj62t pn7jeet project project F~ Projnt Thtal Xta!

ASSETS Utilityplant:

Production . S 613,608 S 171,068 $ 183@09 S 967985 $ 795080 Transmission 14,146 $ 674,606 $ 48,307 164 737,223 689,447 General ~569 18 893 1 971 8 613 ~3046 29155 630+23 693,499 S0,278 171,232 191,922 1,737,254 1513,682 Less - Accumulated depreciation . 250 021 194 127 846 1 255 36622 ~48 871 418688 380+02 499,372 49,432 169,977 155,300 1,254$ 83 1,094,994 Construction work in progress 9+03 3,116 3,501 16,120 206/73 Nudear fuel, at amortized cost 13 225 13225 ~1716 Net utilityplant ~5'48 169977 158 801 1,283 728 ~114.283 Spedal funds:

Available for sale at fair value (Note 2):

Decommissioning fund........ 33,474 33,474 24~

Investmcnts 11S,746 102,842 $ 9,628 21/91 6~62 $ 250,888 34,170 597,427 682,442 Escrow account - Came series 343,898 343,898 343,921 Advance to Intennountain Power Agency . 19~ 19/50 19~0 Advances for capacity and energy, net 10,119 10,119 11,903 Interest receivable 16~1 Cash and cash cquivalcnts 1,512 67879 2,169 90324 1997 6

~18 ~4N 841 2,285 9,220 7546 67 16,100 173 798 120 610 218 611 558 718 21 750 23 980 ~69 1 260108 41 783 1 '194 366 1 219470 Accounts receivable 738 2,687 19 '1,750 4,741 (6,402) 945 4,478 S,272 Materials and supplies 9,240 3569 12,809 13,297 Costs recoverable from future billings to participants.................. 204,945 203,787 7~ Ir394 4+83 31,780 453,827 411,031 Unrealized loss on investments in funds available for sale 3 9 28 4 3,365 2+35 Prepaid construction costs 5~

Prepaid cxpcnses................ 26 66 92 Unamortized debt expenses, less accumulated amortization of $ 132,265 and $ 127,197 in1996and1995 . 201 693 164 247 ~37 9 888 28 225 3090 413348 ~429 08 S 1,011,713 $ 1,431,741 S 32.617 $ 89,59S $ 276,669 S 253,706 $ 239,972 $ 3,366,013 $ 3,400,732 LIABILITIES Long-tenn debt $ 981,155 $ 1,034,757 S 30,981 S 86,417 $ 268,05 S 242,786 $ 222,444 S 2,866~5 $ 2,894,471 Subordinate Refunding Crossover Series 347/88 347,782 Arbitmgc rebate payable 77 Defcrrcd aedits 2,664 1,141 Current liabilities:

Long-tenn debt due within one year Acaucd interest Accounts payable and accrued expenses 25,690 24~

10 333 10,845 38,436 315 1,085 489 62

~ S90 7,884 780 8,256 6,035 S,994 5499 43,655 88,182 17579 38,790 95,288 73185 Total cunent liabilities ~60 8 ~49 96 1636 3178 8664 8256 ~17 28 149416 157261 Commitments and contingencies.....

$ 1,041,713 $ 1,431,741 $ 32,617 $ 89595 $ 276,669 $ 253,706 $ 239,972 $ 3,366,013 $ 3,400,732 7he turornpanying notes an an integ7u! Part of thesefinaneiat statrrnenh.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPERATIONS (in thousands)

Year Pe7ded j(ale SO, 1996 Southe7n T)nrn7nission Hoootr San 7172r Bukd Sltste7n trprating juan june 30, p7ofeet profert ptojeet 7t)tat 199S Operating revenues:

Sales of electric enetm7 . $ 135,464 $ 3+49 $ 50,117 $ 188,930 $ 183,603 Sales of transmission services . $ 85 297 $ 226 $ 172 85 695 91,250 Total operating revenues 155 464 85 297 ~39 226 172 50'117 274 625 274.853 Opera tmg expenses:

Amortization of nudear fuel 7,949 7,949 8,150 Other operations .. 25,815 10,192 213 145 314 38,879 39,873 50,834 Maintenance . 6,317 5,236 13 27 35,760 47@53 Depreciation . 18,425 20329 342 1.132 9,095 49/23 47,975 Decommissioning 12,497 3 113 15 610 ~16 13 Total operating expenses 7I 024 35 757 568 ~101 48,282 159114 ~163 5 Operating income (loss) 64,461 49+40 1,149 (342) (1,132) 1,835 115+11 111~

Investment income '10 886 28 993 874 410 2174 ~062 ~44 99 23 884 Income before debt expense 42 3,897 159,910 Debt expense ~8777 99 166 ~262 1 462 4,425 ~1614 2D2 706 174 140 Costs recoverable from future billings to participants ($ 7.43D) (8 20.633) ($ 239) (5 )S94) 54083)

(5 ($ 8.71)l (8 42.796) ($ 38.748) 7he ~ng notes are an integral part of these finantia stalnntnts.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF CASH FLOWS

(/n tticnnands) year Ended June 3tt, 1996 itib 1hmsmission Hoover Mead- /44/ead- Ma/tip/e San Jime 30, Verde System Upn ting Pttoenir Adetanto Pnojnt Juan 1995 hoject hoject hiojcct hojoct hijiect Fimd hofect 7bta/ 7tita!

Cash flows from operating activities:

Costs recoverable from future billings to participants ($ 7,430) ($ 20,633) ($ 239) (S 1494) ($ 4~) ($ 8,717) (S 42,796) ($ 38,748)

Adjustments to amve at net cash provided by (used for) operating activities-Depredation 18,425 20,329 342 1,132 9,095 49,323 47,975 Decommissioning 12,497 3,113 15,610 16+13 Amortization of nuclear fuel 7,949 7,949 8,150 Amortization of debt costs 24,428 11,739 294 167 482 626 37,736 29,050 Write-offof construction work in progress costs ~.........

Changes in assets and liabilities:

~ 1+13 1+13 Decommissioning fund........... (8,971) (8,971) (1,297)

Interest receivable (289) (362) 20 405 691 2 467 437 Accounts reccivablc 174 (218) (19) 213 (72) 946 1,024 1,402 Materials and supplies 378 110 488 2069 Other assets 55 1,977 3,467 56 5,555 117 Accrued interest (6,150) (943) (I) (7,105) 10,036 Accounts payable and accrued expenses ~643 ~1943 745 ~1482 ~604 3090 Net cash provided by operating activities..... 34,629 ~9282 ~061 ~6713 ~989 78 794 Cash flows from investing activities:

Interest received on investments $ 18@80 18380 34,037 Arbitrage payment...............

~

(3,757)

Payments for construction of facilities...... (10,892) (13,208) (15,652) (1,938) (41,690) (104,088)

Purchases of investments............ (154,685) ( 154,904) (22,665) (3,264) (9,184) (1,868) (14+70) (360,940) (230,693) from sale/maturity of investments... 18~ 195+93 20,705 14,474 23,000 8,867 444,948 299,265 Advances for capacity and energy, net 1,784 1,784 1,415 Reimbursement from WAPA 111 Net cash provided by (used for) investing activities 16 732 40.689 ~17 ~2998 ~1,836 ~16 12 ~441 62,482 3 710 Cash flows from capital and related financing activities:

Payments of interest on long-term debt.... (16+12) (16412) (37,092)

Proceeds from sale of bonds 229,483 229,483 Payment for defeasance of revenue bonds... (233,632) (233,632) (5,798)

Repayment of principal on long-term debt (23,855) (14+25) (610) (38,790) (36,900)

Payment for bond issue costs......... ~4832 ~4,832 ~40 Nct cash used for capital and related financing activities ~3836 ~14325 610 16 12 Nct increase (decrease) in cash and cash equivalents 18/25 35,646 (748) (728) 53,188 (4,746)

Cash and cash equivalents at beginning of year .. ~49 4 54,678 ~745 ~1280 4,279 ~8274 ~120 610 56

'1 Cash and cash equivalents at cnd of year..... $ 67,879 S 90324 $ 1,997 $ 1&8 $ 4304 $ 7&6 $ 173,798 $ 120.610 Supplemental disclosure of cash flow information:

Cash paid during the year for interest (net of amount capitalized).......... S 64.499 $ 88370 S 1,978 $ - S - $ 16512 S 11,988 $ 183,347 $ 188,700 The accointicuping notes are an intern! part of ttiese financial statements.

SOUTHERN CALIFORNIA PUSLIC POWER AUTHORITY NOTES TO FINANCIALSTATEMENTS Note I Ot1fanlzatfon and

Purpose:

Southern California Public Power Authority (Authority), a public Station in Utah to Southern California. The Authority entered entity organized under the laws of the State of California, was into an agreement also dated as of May 1, 1983 with six of its formed by a Joint Powers Agreement dated as of November 1, 1980 participants pursuant to which each member assigned its entitle-pursuant to the Joint Exercise of Powers Act of the State of ment to capacity of FIS to the Authority in return for the California. The Authority's participant membership consists of ten Authority's agreement to make payments-in-aid of construction to Southern California cities and one public district of the State of IPA. STS commenced commercial operations in July 1986. The California. The Authority was formed for the purpose of planning, Department of Water and Power of the City of Los Angeles financing, developing, acquiring, constructing, operating and (LADWP), a member of the Authority, serves as project manager maintaining projects for the generation and transmission of elec- and operating agent of the Intermountain Power Project (IPP).

tric energy for sale to its participants. The Joint Powers Agreement has a term of fiftyyears. Hoover Uprating Project The Authority and six participants The members have the following participation percentages entered into an agreement dated as of March 1, 1986, pursuant to in the Authority's interest in the projects at June 30, 1996 and 1995: which each participant assigned its entitlement to capacity and Southern associated firm energy to the Authority in return for the Authority's Palo Tranunisslon em Hocwer U ting Plead-Phoenhc Mead.

Adetauto San Juan agreement to make advance payments to the United States Bureau Participants Verde S of Reclamation (USBR) on behalf of such participants. The USBR I

Gty of Los Ansclcs 67.0% 595 o% 24.8% 35.7%

has declared that the Project was substantially complete as of Gty of Anaheim 17.6 42.6% 24.2 135 135 September 30, 1995 with minor work scheduled to be completed Gty of Riverside 5.4 10.2 31.9 4.0 in the spring of 1997. The Authority has an 18.68/o interest in the Imperial Iimsation District 65 51.0% contingent capacity of the Hoover Uprating Project (HU). All Gty of Vernon 4.9 seventeen"uprated" generators of the HU have commenced com-GtyofAzusa 1.0 4.2 1.0 2.2 14.7 mercial operations.

Gty of Bannins 1.0 2.1 1.0 13 98 Gty of Colton 1.0 3.2 1.0 2.6 14.7 Mead-Phoenix Project The Authority entered into an agreement Gty of Burbank 4.4 45 16.0 15.4 115 dated as of December 17, 1991 to acquire an interest in the Mead-Gty of Glendale 4.4 23 14.8 11.1 9.8 Phoenix Project (MP), a transmission line extending between, the Gty of Pasadena 4A 5.9 13.8 8.6 Westwing substation in Arizona and the Marketplace substation 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% in Nevada. The agreement provides the Authority with an 18.31'/o interest in the Westwing-Mead project component, a

'lhe mernhcrs do nct cunently pantdpate in the Multiple project BmL 17.76'/o interest in the Mead Substation project component and a Mead phocntc partidpattonrcQccts thee ownership cocnponcnts (sce below).

22.41'/o interest in the Mead-Marketplace project component. The Authority has entered into transmission service contracts for the Palo Verde Project The Authority, pursuant to an assignment entire capability of its interest with nine members of the Authority agreement dated as of August 14, 1981 with the Salt River Project on a "take or pay" basis. In addition, the Authority has admini-(Salt River), purchased a 5.91'/o interest in the Mo Verde Nuclear strative responsibility for accounting for the separate ownership Generating Station (PVNGS), a 3,810 megawatt nuclear-fueled interest in the project by Western Area Power Administration generating station near Phoenix, Arizona, and a 6.55'/o share of the (WAPA), who is providing separate funding ($ 72,874,000 and right to use certain portions of the Arizona Nuclear Power Project $ 58,676,000 at June 30, 1996 and 1995, respectively) for its interest.

Valley Transmission System (collectively, the Palo Verde Project). Commercial operations of MP commenced in April 1996. Funding As of July1, 1981, ten participants had entered into power sales was provided by a transfer of funds from the Multiple Project Fund contracts with the Authority to purchase the Authority's share of (Note 4).

PVNGS capacity and energy. Units 1, 2 and 3 of the Palo Verde Project began commercial operations in January 1986, Septembei Mead-Adelanto Project -The Authority entered into an agteement 1986, and Januaty 1988, respectively. dated as of December 17, 1991 to acquire a 67.92/o interest in the Mead-Adelanto Project (MA), a transmission line extending Soffthern TJIIJJsnnssioJJ Systnn Project The Authority, pursuant to between the Adelanto substation in Southern California and the an agreement dated as of May 1, 1983 with the Intermountain Marketplace substation in Nevada. The Authority has entered into Power Agency (IPA), has made payments-in-aid of construction to transmission service contracts for the entire capability of its inter-IPA to defray all the costs of acquisition and construction of the est with nine members of the Authority on a"take or pay" basis. In Southern Transmission System Project (STS), which provides for addition, the Authority has administrative responsibility for the transmission of energy from the Intermountain Generating

accounting for the sepamte ownership interest in the project by plant construction work in progress until a facility commences WAPA, who is providing sepamte funding ($ 17,088,000 and commercial operation.

$ 16,282,000 at June 30, 1996 and 1995, respectively) for its interest. The Authority's share of construction and betterment costs Funding was provided by a transfer of funds from the Multiple associated with PVNGS is included as utility plant. Depreciation Project Fund (Note 4). Commercial operations commenced in expense is computed using the straight-line method based on the April 1996. LADWP serves as both construction manager and estimated service life of thirty-five years. Nuclear fuel is amortized operations manager. and charged to expense on the basis of actual thermal energy pro-duced relative to total thermal energy expected to be produced MultipieProject Fund During fiscal year 1990, the Authority issued over the life of the fuel. Under the provisions of the Nuclear Waste Multiple Project Revenue Bonds for net proceeds of approxi- Policy Act of 1982, the Authority is charged one mill per kilowatt-mately $ 600 million to provide funds to finance costs of construc- hour, by the federal governmen, on its share of electricity pro-tion and acquisition of ownership interests or capacity rights in one duced by PVNGS, and such funds willeventually be utilized by the or more then unspecified projects for the generation or trans- fedeml government to provide for PVNGS'nuclear waste disposal.

mission of electric energy. The Authority records this charge as a current year expense.

In August 1992, the Authority's Board of Directors approved a The Authority's share of construction and betterment costs resolution authorizing the use of certain proceeds of Multiple associated with STS, MP, MA and SJGS are included as utility Project Revenue Bonds to finance the Authority's ownership inter- plant. Depreciation expense is computed using the stmight-line ests in the Mead-Phoenix and Mead-Adelanto projects. Tmnsfers method based on the estimated service lives, principally thirty-five made from the Multiple Project Fund are sufficient to provide years for STS, MAand MP and twenty-one years for SJGS.

for the Authority's share of the estimated costs of acquisition and Interest costs incurred by the MP and MAprojects through the construction of these two projects, including reimbursement of date commercial operations commenced (April 1996) are capital-planning, development and other related costs. ized in utilityplant. Total interest costs capitalized were $ 11,827,000 and $ 15,769,000 in fiscal 1996 and 1995, respectively, for the MA San Juan Project Effective July 1, 1993, the Authority purchased project and $ 3,881,000 and $ 5,175,000 in fiscal 1996 and 1995, a 41.80/o interest in Unit 3, a 488 megawatt unit and related respectively, for the MP project.

common facilities, of the San Juan Generating Station (SJGS) from Century Power Corpomtion. Unit 3 is one unit of a four-unit Arlvnnces for Capacity and Enegp -Advance payments to USBR for coal-fired power genemting station in New Mexico. The Authority the upmting of the 17 genemtors at the Hoover Power Plant are allocated the $ 193 million purchase price to the estimated fair included in advances for capacity and energy. These advances are value of the utility plant ($ 190 million) and to materials and being reduced by credits on billings to participants for energy and supplies ($3 million).The purchase has been financed through the capacity.

issuance of approximately $ 237 million (par value) of San Juan Project Revenue Bonds. The Authority has entered into power sales Nuclear Decommissioning Decommissioning of PVNGS is contracts for the entire capability of its interest with five members projected to commence subsequent to the year 2022. Based upon of the Authority on a"take or pay" basis. an updated study performed by an independent engineering firm, the Authority's share of the estimated decommissioning costs is

$ 85.5 million in 1995 dollars ($ 390 miHion in 2022 dollars assum-Nota 2 Summary of Significant Accounting Pollclcs: ing a 6'/0 estimated annual inflation mte). The Authority is provid-The financial statements of the Authority are presented in confor- ing for its share of the estimated future decommissioning costs mity with generally accepted accounting principles, and substan- over the remaining life of the nuclear power plant (25 to 27 years) tiaHy in conformity with accounting principles prescribed by the through annual charges to expense which amounted to $ 12.5 mil-Federal Energy Regulatory Commission and the California Public lion and $ 13.4 million in fiscal 1996 and 1995, respectively.

Utilities Commission. The Authority is not subject to regulation by The decommissioning liabilityis included as a component of accu-either of these regulatory bodies. mulated depreciation and was $ 88.1 million and $ 75.6 million at The financial statements represent the Authority's share in each June 30, 1996 and 1995, respectively.

jointly-owned project. The Authority's share of direct expenses of A Decommissioning Fund has been established and partiaHy jointly-owned projects are included in the corresponding operat- funded at $ 33.9 million at June 30, 1996. The Decommissioning ing expense of the statement of opemtions. Each owner of the Fund earned interest income of $ 700,000 during fiscal 1996.

jointly-owned projects is required to provide their own financing.

Dnnvlifion nnd Site Reclamation Demolition and site reclamation UtilityPlant The Authority's share of aH expenditures, including of SJGS, which involves restoring the site to a "green" condition geneml administmtive and other overhead expenses, payments- which existed prior to SJGS construction, is projected to commence in-aid of construction, interest net of related investment income, subsequent to the year 2014. Based upon a study performed by an deferred cost amortization and the fair value of test power gener- independent engineering firm, the Authority's share of the esti-ated and delivered to the participants are capitalized as utility mated demolition and site reclamation costs is $ 18.7 million in

1992 dollars ($ 65.3 million in 2014 dollars using a 6% estimated ing and each consecutive five years thereafter. The Authority made annual inflation rate). The Authority is providing for its share of its first rebate payment of $ 3.8 million during fiscal year 1995. The the estimated future demolition costs over the remaining life of next rebate payment to the IRS is due in fiscal year 2000.

the power plant (18 years) through annual charges to expense of

$ 3.1 million.lIiedemolition liabilityis included as a component of ReclassrJicafious Certain reclassifications have been made in the accumulated depreciation and was $ 9.3 million and $ 6.2 million at fiscal year 1995 financial statements to conform to the fiscal year June 30, 1996 and 1995, respectively. 1996 presentation.

As of June 30, 1996, the Authority has not billed participants for the cost of demolition nor has it established a demolition fund.

Use of Estimntes The preparation of financial statements in con-formity with generally accepted accounting principles requires Unamortized Debt Expenses Unamortized debt issue costs, management to make estimates and assumptions that affect the including the loss on refundings, are being amortized over the reported amounts of assets and liabilities and disclosure of contin-terms of the respective issues and are reported net of accumulated gent assets and liabilities at the date of the financial statements and amortization. Total deferred loss on refundings, net of accumulated the reported amounts of revenues and expenses during the report-amortization, was $ 378,070,000 and $ 393,440,000 at June 30, 1996 ing period. Actual results could differ from those estimates.

and 1995, respectively.

Inveshunlts Investments include United States Government and Note 3 Special Funds:

governmental agency securities and repurchase agreements which The Bond Indentures for the six projects and the Multiple Project are collateralized by such securities. Additionally, the Mead- Fund require the following special funds to be established to Phoenix Project, the Mead-Adelanto Project and the Multiple account for the Authority's receipts and disbursements. The Project Fund's investments are comprised of an investment agree- moneys and investments held in these funds are restricted in use ment with a financial institution earning a guaranteed rate of to the purposes stipulated in the Bond Indentures. A summary of return. The Southern Transmission System Project has debt service these funds follows:

reserve funds associated with the 1991 and 1992 Subordinate Fund Pu Refunding Series Bonds invested with a financial institution under Construction 'Ib disburse funds for the acquisition and mnstruction of the a specific investment agreement allowed under the Bond Project.

Indenture earning a guaranteed rate of return.

Debt Service To pay interest and pdncipal related to the Revenue Bonds.

Investments available for sale are carried at aggregate fair value and changes in unrealized net gains or losses are recorded sepa- Rcvcnuc To initMlyreceive all revenues and disburse them to other funds.

rately. Investments are reduced to estimated net realizable value when necessary for declines in value considered to be other than To pay operating expenses

'emporary. Gains and losses realized on the sale of investments are Reset,u and Ib pay capital Improlvments and make up defidcndcs in generally determined using the specific identification method. Contingency other funds.

As discussed in Note 3, all of the investments are restricted as to Geneml Rcservc To make up any defidencies in other funds.

their use. Advance Ibymcnts lb disburse funds for thc mst of acquisition of capadty.

Cash ruid Cash Equivalents Cash and cash equivalents include Proceeds Acmunt To initiallyreceive the proceeds of the sale of the hiultiple Project Revenue Bonds.

cash and all investments with original maturities less than 90 days.

Earnings Account Tb reccivc immtment earnings on the Multiple Prelect Revenue Bonds.

Revenues- Revenues consist of billings to participants for the sales of electric energy and of transmission service in accordance with Revolving Fund To pay the Authority's operating expenses.

the participation agreements. Generally, revenues are fixed at Decommissioning Fund To accumulate funds rcLued to the future decommissioning a level to recover all operating and debt service costs over the of PVNGS, commercial life of the property (see Note 6). Issue Fund 'Ib initiallyreceive pledged revenues associated with the applicable subordinated refunding series'Indenture of Thrst Debt Experrse Debt expense includes interest on debt and the and pay the related interest and principaL amortization of bond discounts, debt issuance expense and loss on

~

Escrow account- To initiallyrecrive pledged revenues assodated with refunding costs. Subordinate Component 3 of the 1993 Subordinate Refunding Refunding of Trust and pay the rekt ted interest Cross'eries'Indenture Series and principal.

Arbitrage Rebate- A rebate payable to the Internal Revenue Service Acquisition Acmunt To disburse funds for the acquisition and constmction of the (IRS) results from the investment of the proceeds from the Multiple Mead-Phoenix, Mead-Adeianto and San juan pmjects.

Project Revenue Bond offering in a taxable financial instrument that yields a higher rate of interest income than the cost of the associated funds. The excess of interest income over costs is Allof the funds listed above, except for the Revolving Fund, are payable to the IRS within five years of the date of the bond offer-held by the respective trustees.

Palo Verde Project- The balances of the funds required by the Bond Hoover Uprrfting Project-The balances in the special funds required Indenture are as follows, in thousands: by the Bond Indenture are as follows, in thousands:

1995 1995 Debt Service Fund- Advance payments Fund $ 2,437 $ 2,437 Dcbt Senrice Acmunt $ 51~ $ 51394 $ 57 457 $ 52,467 Operating-irking Capital Fund 563 563 Debt Senrice Reserve Account 74,420 74,160 81,497 81,077 Debt Scnrice Fund-Revenue Fund 5 5 1 1 Debt Service Account W90 2390 1,440 1,429 Operating Fund 20,130 20.134 31,141 31,026 Debt Service Reserve Account 3,122 3,121 3,078 3,068 Reserve and Contingency Fund 25,924 26,107 16,776 17,075 General Reserve Fund 5+18 5316 2,911 2,914 Demnunissioning Trust Fund Issue Fund 34,131 13,026 33,740 13,026 24503 12,486 2~

14486 Revolving Fund 13 13

$ 11,634 $ 11,631 $ 10,442 $ 10,424 Revolving Fund 45 45 45 45

$ 219,067 $ 218,611 $ 218,906 $ 218,680 Contractual maturitics:

Within one year Contractual maturities: After one >ear through Within one >sea $ 69,781 $ 69+91 6ve >eas 9,631 9 628 After one year through $ 11,634 $ 11,631 6ve )'eas 136,279 136,148 After 6ve >eas thmugh ten yeas 3,187 3,252 In addition, at June 30, 1996 and 1995, the Authority had After tcn yeas 9,820 9~ advances to USBR of $ 10,119,000 and $ 11,903,000, respectively.

$ 219,067 $ 218,611 Mead-Phoenix Project The balances in the special funds required Soufheni Transmission Sysfern Project The balances in the special by the Bond Indenture are as foHows, in thousands:

funds required by the Bond Indenture are as follows, in thousands:

Fair Value Amati'ail Cost Value Acquisition Acmunt $ 12571 $ 1%71 $ 19,830 $ 19,830 Debt Service Fund-Construction fund-Debt Savice Account 4,976 4,967 4,444 4444 Initial Facilities Amount $ 235 $ 235 $ 223 $ 223 Debt Service Reserve Account 6,133 6,133 6,132 6,132 Debt Service Fund-Debt Service Account Issue Fund 4,924 M73 21,921 21,896 31,480 31/91 Revenue Fund 64 64 Debt Service Reserve Account 86,220 86,189 66,672 66,857 Operating Fund 239 239 Operating Fund 6,015 6,007 5,987 5,987 Revolving Fund General Reserve Fund 4,194 4,194 9~ 9~2 6 6 35~

6 6

~

Issue Fund 77,024 76,794 77,768 77P79 $ 23,989 $ 23,980 $ $ 35,285 Escmsv Account-Subordinatc Refunding Contractual maturities:

Series 346,474 343,903 355,101 353,188 Within one )ea $ ~9 $ 2+89 Revolving Fund 15 15 15 15 After one >sea through 6ve >seas 1,242 1,233

$ 542,098 $ 539,233 $ 546,779 $ 544,882 After ten years 20,358 20&8 Contractual maturities: $ 23,989 $ 23,980 Within one >ear $ 102,008 $ 101,975 After one year thmugtt Mead-Arlelnnfo Project -The balances in the special funds required 6ve )'Mls 80,852 80g03 After five yeas through by the Bond Indenture are as follows, in thousands:

ten )'eas 36,972 34,189 After ten )seas 322,266 322,266

$ 542.098 $ 539,233 Fair moonized Fair Value Cost Value In addition, at June 30, 1996 and 1995, the Authority had non- Acquisition Account $ 36,979 $ 36,979 $ 37,745 $ 37,745 Debt Savice Fund-interest bearing advances outstanding to IPA of $ 19,550,000. Dcbt Service Account 15,194 15,166 1'4353 12m Debt Service Rcserm Acmunt 16,865 16,865 17,040 17,010 Issue Fund 16/17 16+46 Revenue Fund 71 71 Operating Fund 264 264 Revolving Fund 6 6 6 6

$ 69379 $ 69&1 $ 83,661 $ 83A90 Contractual maturities:

Within one year $ 6,794 $ 6,789 After one year thmugh 6ve yeas 4,161 4,138 After ten >ears 58,424 58,424

$ 69379 $ 69,351

Multiple Project Fund The balances in the special funds required interest on all moneys or securities (other than in the Construction by the Bond Indenture are as follows, in thousands: Fund) held pursuant to the Bond Indenture and (3) all funds estab-lished by the Bond Indenture.

At the option of the Authority, all outstanding Power Project Revenue Bonds and Subordinate Refunding Term Bonds are subject to redemption prior to maturity, except for the 1996 Proceeds Account $ 256,830 $ 256,830 $ 256/30 $ 256,830 3,278 3,278 1~ 1~ Subordinate Refunding Series A which is not redeemable.

Earnings Account

$ 260,108 $ 260,108 $ 258.214 $ 258,214 The Bond Indenture requires mandatory sinking fund install-ments to be made beginning in fiscal year 2003 (1986 Series A Contractual maturities:

Within one year $ 9,220 $ 9,220 Bonds and 1987 Series A Bonds), 2005 (1989 Series A Bonds), 2010 After ten years 250,888 250g88 (1993 Series A Bonds), and 2008 (1996 Subordinate Refunding

$ 260,108 $ 260,10S Series B). Scheduled principal maturities for the Palo Verde Project during the five fiscal years followingJune 30, 1996 are $ 25,690,000 San Juan Project The balances in the special funds required by the in 1997, $ 22,220,000 in 1998, $ 23,580,000 in 1999, $ 25,145,000 in Bond Indenture are as follows, in thousands: 2000, and $ 12,860,000 in 2001. The average interest rate on out-standing debt during fiscal year 1996 and 1995 was 5.8% and 6.0%,

1995 respectively.

Fair Fair Value Cost Vatue Operating Account Operating Reserve Account

$ 1,238 7

$ 1,23S 7

$ 1,618 2

$ 1,618 2 Southern Transnnssion Systmn Project - To finance payments-in-aid Acquisition Account 527 527 112 112 of construction to IPA for construction of the FIS, the Authority Debt Service Fund-Dcbt Service Account 8,607 8597 6,017 6,017 issued Transmission Project Revenue Bonds pursuant to the Debt Service Reserve Account 18,031 18,031 18,026 18,026 Authority's Indenture of Trust dated as of May 1, 1983 (Senior Rcscrve and Contingency Fund 13077 13~ 11,224 11,252 Indenture), as amended and supplemented. The Authority also has Revolving Fund 15 15 issued and has outstanding Tmnsmission Project'Revenue Bonds

$ 41,787 $ 41,783 $ 37.014 $ 37,012 1991 and 1992 Subordinate Refunding Series issued under Contractual matunties: Indentures of Trust dated as of March 'I, 1991 and June 1, 1992, Within one year $ 7,613 $ 7,613 After one year tluough respectively. The 1991 and 1992 subordinated bonds were issued to five )'eius 16,149 ~ 16,145 advance refund certain bonds previously issued under the Senior After ten years 18,025 18,025 Indenture.

$ 41,787 $ 41,783 The bond indentures provide that the Revenue Bonds and the Subordinate Refunding Series Bonds shall be special, limited oblig-Project Investnfent Sales There were no proceeds from sales of ations of the Authority payable solely from and secured solely by investments during fiscal 1996 or 1995.

(1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to STS (see Note 6) and interest on all moneys or securities (other than in the Construction Fund) held Note 4 Long-tcrnt Debt:

pursuant to the Bond Indenture and (3) all funds established by the Reference is made below to the Combined Schedule of Long-term Bond Indenture.

Debt at June 30, 1996 for details related to all of the Authority's out-All outstanding Tmnsmission Project Revenue and Refunding standing bonds.

Bonds, at the option of the Authority, are subject to redemption

-To finance the purchase and construction of the prior to maturity.

Palo Verde Project The Bond Indenture requires mandatory sinking fund install-Authority's share of the Palo Verde Project, the Authority issued ments to be made beginning in fiscal year 2003 (for the 1986 Series Power Project Revenue Bonds pursuant to the Authority's A Bonds), 2002 (1986 Series B Bonds) and 2007 (1988 Series A Indenture of Trust dated as of July 1, 1981 (Senior Indenture), as Bonds). Scheduled principal maturities for FIS during the five fis-amended and supplemented. The Authority also has issued and cal years following June 30, 1996 are $ 10,845,000 in 1997, has outstanding Power Project Subordinate Refunding Series

$ 21,565,000 in 1998, $ 22,790,000 in 1999, $ 10,200,000 in 2000, and Bonds issued under an Indenture of Trust dated as of January 1,

$ 10,115,000 in 2001. The average interest mte on outstanding debt 1993 (Subordinate Indenture). The Subordinate Refunding Bonds during fiscal year 1996 and 1995 was 8.3%.

were issued to advance refund certain bonds previously issued under the Senior Indenture. -

Hoover Uprating Project To finance advance payments to USBR for The bond indentures provide that the Revenue Bonds and Project, the application to the costs of the Hoover Upmting Subordinate Refunding Bonds shall be special, limited obligations Bonds pur-Authority issued Hydroelectric Power Project Revenue of the Authority payable solely from and secured solely by (1) pro- suant to the Authority's Indenture of Trust dated as of March 1, ceeds from the sale of bonds, (2) all revenues, incomes, rents and 1986 (Bond Indenture).

receipts attributable to the Palo Verde Project (see Note 6) and

The Bond Indenture provides that the Revenue Bonds shall be Indenture). The proceeds from the Revenue Bonds, together with special, limited obligations of the Authority payable solely from dmwdowns from the Debt Service Fund and Project Acquisition and secured solely by (1) the proceeds from the sale of the bonds, Fund, were used to advance refund $ 64,840,000 of the Multiple (2) all revenues I'rom sales of energy to participants (see Note 6), Project Revenue Bonds previously transferred to the Mead-(3) interest or other receipts derived from any moneys or securities Phoenix Project.

held pursuant to the Bond Indenture and (4) all funds established The Bond Indenture provides that the Revenue Bonds shall be by the Bond Indenture (except for the Interim Advance Payments special, limited obligations of the Authority payable solely from, Account in the Advance Payments Fund). and secured solely by, (1) proceeds from the sale of bonds, (2) all At the option of the Authority, all outstanding Hydroelectric revenues, incomes, rents and receipts attributable to Mead-Power Project Revenue Bonds are subject to redemption prior to Phoenix (see Note 6) and interest on all moneys or securities and maturity. (3) all funds established by the Bond Indenture.

The Bond Indenture requires mandatory sinking fund install- At the option of the Authority, all outstanding Mead-Phoenix ments to be made beginning in fiscal year 2007 for the 1991 Series Revenue Bonds are subject to redemption prior to maturity.

A Bonds maturing on October 1, 2010 and fiscal year 2011 for The Bond Indenture requires mandatory sinking fund install-the 1991 Series A Bonds maturing on October 1, 2017. Scheduled ments to be made beginning in fiscal year 2018 for the 1994 Series principal maturities for the Hoover Upmting Project during the five Bonds. The first scheduled principal maturity for the Mead-fiscal years following June 30, 1996 are $ 1,085,000 in 1997, Phoenix Revenue Bonds is $ 1,295,000 in fiscal year 2000. The aver-

$ 1,'130,000 in 1998, $ 1,230,000 in 1999, $ 1,285,000 in 2000, and age interest rate on outstanding debt during fiscal year 1996 and

$ 1,400,000 in 2001. The avemge interest mte on outstanding debt 1995 was 6.00/.

during fiscal year 1996 and 1995 was 5.8'/0 and 6.1'/0, respectively.

During fiscal 1995, the Authority repurchased $ 340,000 of out- Mead-Adelanto Proj ect-To finance the Authority's ownership inter-standing Hydroelectric Power Project Revenue Bonds with excess est in the estimated cost of the project, $ 285,010,000 of the Multiple funds in the Advance Payments Fund. Project Revenue Bonds were tmnsferred to the Mead-Adelanto Project in October 1992. In March 1994, the Authority issued and Multiple Proj ect Fund To finance costs of construction and acqui- has outstanding $ 173,955,000 of Mead-Adelanto Revenue Bonds sition of ownership interests or capacity rights in one or more under an Indenture of Trust dated as of January 1, 1994 (Bond projects expected to be undertaken within five years after issuance, Indenture). The proceeds of the Revenue Bonds, together with the Authority issued Multiple Project Revenue Bonds pursuant to dmwdowns from the Debt Service Fund and Project Acquisition the Authority's Indenture ofTrust dated as of August 1, 1989 (Bond Fund, were used to advance refund $ 178,310,000 of the Multiple Indenture), as amended and supplemented. Project Revenue Bonds previously transferred to the Mead-The Bond Indenture provides that the Revenue Bonds shall be Adelanto Project.

special, limited obligations of the Authority payable solely from, The Bond Indenture provides that the Revenue Bonds shall be and secured solely by, (1) proceeds from the sale of bonds, (2) with special, limited obligations of the Authority payable solely from, respect to each authorized project, the revenues of such authorized and secured solely by, 1) proceeds from the sale of bonds, (2) all project, and (3) all funds established by the Bond Indenture. revenues, incomes, rents and receipts attributable to Mead-In October 1992, $ 103,640,000 and $ 285,010,000 of the Multiple Adelanto (see Note 6) and interest on all moneys or securities and Project Revenue Bonds were transferred to the Mead-Phoenix (3) all funds established by the Bond Indenture.

Project and the Mead-Adelanto Project, respectively, to finance the At the option of the Authority, all outstanding Mead-Adelanto estimated costs of acquisition and construction of the projects. Revenue Bonds are subject to redemption prior to maturity.

A total of $ 153,500,000 of the outstanding Multiple Project The Bond Indenture requires mandatory sinking fund install-Revenue Bonds are not subject to redemption prior to maturity. At ments to be made beginning in fiscal year 2018 for the 1995 Series the option of the Authority, the balance of the outstanding bonds Bonds. The first scheduled principal maturity for the Mead-are subject to redemption prior to maturity. Adelanto Revenue Bonds is $ 3,560,000 in fiscal year 2000. The The Bond Indenture requires mandatory sinking fund install- avemge interest rate on outstanding debt during fiscal year 1996 ments to be made beginning in fiscal year 2006 for the 1989 Series and 1995 was 5.9'/0 and 6.0'/0, respectively.

Bonds. The first scheduled principal maturity for the Multiple Project Revenue Bonds is $ 8,645,000 in fiscal year 2000. The aver- San juan Project To finance the costs of acquisition of an owner-age interest rate on outstanding debt during fiscal year 1996 and ship interest in Unit 3 of the SJGS, the Authority issued San Juan 1995 was 6.8'/0. Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of January 1, 1993 (Bond Indenture).

Mead-Phoenix Project To finance the Authority's ownership inter- The Bond Indenture provides that the Revenue Bonds shall be est in the estimated cost of the project, $ 103,640,000 of the Multiple special, limited obligations of the Authority payable solely from, Project Revenue Bonds were tmnsferred to the Mead-Phoenix and secured solely by, (1) proceeds from the sale of bonds, (2) all Project in October '1992. In March 1994, the Authority issued and revenues, incomes, rents and receipts attributable to San Juan (see has outstanding $ 51,835,000 of Mead-Phoenix Revenue Bonds Note 6) and interest on all moneys or securities and (3) all funds under an Indenture of Trust dated as of January '1, 1994 (Bond established by the Bond Indenture.

At the option of the Authority, all outstanding San Juan Project interest on the bonds is payable from interest earned on invest-Revenue Bonds are subject to redemption prior to maturity. ments with a financial institution under a specific investment

'Ihe Bond Indenture requires mandatory sinking Eund install- agreement purchased out of the proceeds of the sales and held in ments to be made beginning in fiscal year 2012 for the 1993 Series bank escrow accounts. After the monies in the escrow accounts are A Bonds. The scheduled principal maturities for the San Juan applied to redeem the bonds to be called, primarily through fiscal Project Revenue Bonds during the five fiscal years following June 1997, interest on the bonds willbe payable from revenues. The trust 30, 1996 are $ 6,035,000 in 1998, $ 6,275,000 in 1999, $ 6,540,000 in account assets ($343,898,000 in escrow accounts and $ 2,410,000 in 2000 and $ 6,825,000 in 2001. The average interest rate on out- unamortized debt expense at June 30, 1996) and liabilities standing debt during fiscal year 1996 and 1995 was 5.3'lo. ($ 347,388,000, net of bond discounts, at June 30, 1996) for Component 3 are included in the Authority's financial statement.

ReJiaiding Bonds In April 1996, the Authority issued $ 152,905,000 The revenue bonds to be refunded are also included in the finan-of Palo Verde 1996 Subordinate Refunding Series A Bonds to cial statements until the scheduled call date, at which time the refund $ 163,355,000 of previously issued Palo Verde 1987 refunded bonds and related trust account assets will be removed Refunding Series A Bonds and issued $ 58,870,000 of Palo Verde from the balance sheet and the cost of refunding the debt will be 1996 Subordinate Refunding Series B Bonds to refund $ 18,555,000 included in unamortized debt expenses.

and $ 40,315,000 of previously issued Iblo Verde 1986 Refunding In January 1992, $ 70,680,000 of Mo Verde Special Obligation Series B and 1987 Refunding Series A Bonds, respectively. The Crossover Series Bonds were issued, the proceeds of which were refunding is expected to reduce total debt service payments over placed in an irrevocable trust and will be used to redeem the next 13 years by approximately $ 50,967,000 (the difference $ 69,125,000 of bonds currently included within long term debt at between the debt service payments on the old and new debt) scheduled call dates.

and is expected to result in a net present value savings of approxi- Until the bonds to be reEunded by the Mo Verde Special mately $ 29,537,000. Obligation Crossover Series Bonds are called, interest on the Mo In March 1994, the Authority issued $ 51,835,000 of Mead- Verde Special Obligation Crossover Series Bonds is payable f'rom Phoenix Project Revenue Bonds and $ 173,955,000 of Mead- interest earned on securities of the United States Government pur-Adelanto Project Revenue Bonds to refund $ 243,150,000 of chased out of the proceeds of the sales and held in bank escrow previously issued Multiple Project Revenue Bonds which were accounts. After the monies in the escrow accounts are applied to transferred to the Mead-Phoenix and Mead-Adelanto projects redeem the bonds to be called, primarily through 1996, interest on during fiscal year 1993. The partial refunding of the original issue the Iblo Verde Special Obligation Crossover Series Bonds will be within five years of its issuance triggered a recalculation of the arbi- payable from revenues. The trust account assets and the liabilityfor trage yield. The recalculation resulted in a higher arbitrage yield the Palo Verde Special Obligation Crossover Series Bonds are not which reduced the rebate liability of the Authority. At June 30, included in the Authority's financial statements. At June 30, 1996 1996, cumulative savings due to the rebate calculation amounted to and 1995, $ 63,849,000 and $ 70,959,000, respectively, of these trust

$ 6,401,924. This amount was allocated $ 1,707,180 and $ 4,694,744 assets have been offset against the Palo Verde Special Obligation to the Mead-Phoenix and Mead-Adelanto Projects, respectively. Crossover Series Bonds.

In July 1992, the Authority issued $ 475,000,000 of Southern On July 1, 1995, the crossover date for the Mo Verde Special Tmnsmission Project Revenue Bonds to refund $ 385,385,000 of Obligation Bonds Series A, trust assets in escrow of $ 7,131,000 previously issued bonds. Principal and interest with respect to the were used to advance reEund $ 7,125,000 of previously issued 1992 bonds are allocated into four separate components. Each of bonds.

components 1, 2 and 3 is secured by, and payable from, invest- At June 30, 1996 and 1995, the aggregate amount of debt in all ments in its escrow fund until scheduled crossover dates. projects considered to be defeased was $ 3,535,075,000 and Component 4 proceeds of $ 14,100,000 were used to advance $ 3,305,725,000, respectively.

retund approximately $ 9,000,000 of bonds in fiscal year 1993. On the Component 1 Crossover date (January 1, 1994), Component 1 Iuterest Rate Swap In fiscal year 1991, the Authority entered into proceeds of $ 13,959,000 were used in fiscal 1994 to advance reEund an Interest Rate Swap agreement with a third party for the purpose

$ 13,455,000 of previously issued bonds. On the Component 2 of hedging against interest mte fluctuations arising from the Crossover date (January 1, 1995), Component 2 proceeds of issuance of the Transmission Project Revenue Bonds, 1991

$ 5,519,000 were used in fiscal 1995 to advance refund $ 5,335,000 Subordinate Refunding Series as variable mte obligations. The of previously issued bonds. Proceeds from Component 3 of notional amount of the Swap Agreement is equal to the par value

$ 343,921,000 were placed in an irrevocable trust and will be used of the bond ($291,700,000 and $ 292,000,000 at June 30, 1996 and to redeem $ 313,050,000 of bonds currently included within long- 1995, respectively). The Swap Agreement provides for the term debt at scheduled call dates. The combined refunding is Authority to make payments to the third party on a fixed mte basis expected to reduce total debt service payments over the next at 6.38'lo, and for the third party to make reciprocal payments 25 years by approximately $ 52,585,000 and is expected to result in based on a variable rate basis (3.1'/o and 3.9'lo at June 30, 1996 and an ovemll net present value savings of approximately $ 25,060,000. 1995, respectively). The bonds mature in 2019.

Until the bonds to be refunded by Component 3 are called,

COMBINED SCHEDULE OF LONG-TERM DEBT AT JUNE 303 1996 fin th7outanA)

I/ate Effntloe Maturity on oJ Sate Interest Rate July I Total Principal:

Palo Verde Project Revenue and Refunding Bonds 1985A 05/22/85 9.7% 1996 to 1999 $ 1,070 1985B 07/02/85 9.1% 1996 to 2000 5,610 1986A 03/13/86 8.2% 1996 to 2006 71,220 1986B 12/16/86 7.2% 1996 to 2017 96,450 1987A 02/11/87 6.9% 1996 to 2017 43,720 1989A 02/1S/89 7.2% 1996 to 2015 287,705 1992A 01/01/92 6.0% 1996 to 2010 7,265 1992C 01/01/92 6.0% '1996 to 2010 15,620 1993Sub 03/01/93 55% 1996 to 2017 98,200 1993A 03/01/93 55% 1996 to 2017 270,035 1996A 02/13/96 4.4% 1996 to 2017 152,905 1996B 02/29/96 44% 1996 to 2017 58 870 1,108,670 Southern I?ansmission System Project Revenue and Refunding Bonds 1986A 03/18/86 8.0% 1996 to 2021 107@00 1986B 04/29/86 75% 1996 to 2023 401570 1988A 11/22/88 7.2% 1996 to 2015 154,085 1991A IN/17/91 6.4% 2019 291,700 1992 Comp 1,2,4 07/20/92 6.1% 1996 to 2021 40,639 1992 Comp 3 07/20/92 6.1% 1996 to 2021 431,766 1993A 07/01/93 S.4% 1996 to 2023 125 865 Hoover Uprating Project Revenue and Refunding Bonds . 1986A '8/13/86 8.1% 1996 to 2017 4,160 1991 08/01/91 6.2% 1996 to 2017 31695

'ultiple Project Revenue Bonds Mead-Phoenix Project 1989 01/01/90 7.1% 1999 to 2020 38,800 Mead-Adeianto Project 1989 01/IN/90 7.1% 1999 to 2020 106,700 Multiple Project . 1989 01/04/90 7.1% 1999 to 2020 259 100 Mead-Phoenix Project Revenue Bonds 03/01/94 53% 2006 to 2015 51 835 Mead-Adelanto Projed Revenue Bonds 03/01/94 53% 2006 to 2015 173 955 San Juan Project Revenue Bonds 1993 06/01/93 5.6% 1997 to 2020 ~257 75 Total principal amount ~365 015 Unamortized bond discount:

MoVerde Project (101,823)

Southcmltansmission System Project (1S9,935)

Hoover Uprating Project (3~9)

Mead-Phoenix Project Mead-Adelanto Project Multiple Projed Fund

........ (4,218)

(12,650)

(16313)

San Juan Project ~8899 Total unamortized bond discount 30742 Long-tenn debt due within one year 43 655

'lbtal long-term debt, net (including Subordinate Refunding Crom'eries) $ 3.213.933

Note S Disclosures about Fair Value of Financial Instrumcntsr for their proportionate share of operating and maintenance The following methods and assumptions were used to estimate the expenses and debt service on Tmnsmission Project Revenue Bonds fair value of each class of financial instruments for which it is pmc- and other debt. The contmcts expire in 2027 and, as long as any ticable to estimate that value: Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or Cnsh and cash equivalents -The carrying value approximates fair adversely affect the rights of the bondholders.

value because of the short maturity of those instruments. In March 1986, the Authority entered into power sales contmcts with six participants of the Hoover Upmting Project (see Note 1).

Investnlents/Decouunissioning fiui/Escroto account Subordinate Under the terms of the contmcts, the participants are entitled to Refiutding Crossover Series/Crossover escrow accounts- The fair values capacity and associated firm energy of the Hoover Uprating Project of investments are estimated based on quoted market prices for the and are obligated to make payments on a "take or pay" basis for same or similar investments.

their proportionate share of opemting and maintenance expenses Long-tenn debt/Special Obligation Crossover Series Bonds/Subordinate and debt service whether or not the Hoover Upmting Project or Refiutding Crossover Series-The fair value of the Authority's debt is any part thereof has been completed, is operating or is operable, or estimated based on the quoted market prices for the same or sim- its service is suspended, interfered with, reduced or curtailed or ter-ilar issues or on the current avemge rates offered to the Authority minated in whole or in part. The contracts expire in 2018, and as for debt of approximately the same remaining maturities, net'of the long as any Hydroelectric Power Project Revenue Bonds are out-effect of a related interest rate swap agreement. standing, cannot be terminated or amended in any manner which The fair values of the Authority's financial instruments are as win impair or adversely affect the rights of the bondholders.

follows (in thousands): In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1). Under the terms of the contracts, the participants are enti-Fait Fatr tled to transmission service utilizing the Mead-Phoenix Project and Vitue Cost Wue are obligated to make payments on a "take or pay" basis for their Abets:

$ 120,610 $ '120,610 proportionate share of operating and maintenance expenses and Cash and cash equivalents $ 173,798 $ 173,798 Escrow account debt service on the Multiple Project and Mead-Phoenix Revenue Subordinate Refunding Bonds and other debt, whether or not the Mead-Phoenix Project Crom'eries 346,468 343,898 345,782 343,921 or any part thereof has been completed, is operating and operable, Decommissioning fund 33,865 33,474 24503 24~

Investments 597,831 597,427 682,916 682,442 or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as

~

Liabilities:

Debt 2,910,200 3,210,790 2,933,261 3,198~ long as any Multiple Project and Mead-Phoenix Revenue Bonds Suboniinate Refunding are outstanding, cannot be terminated or amended in any manner Series 347@88 385,516 347,782 377,700 which willimpair or adversely affect the rights of the bondholders.

OJIBalarree Shert Ffrtanrfal In August 1992, the Authority entered into transmission service

~ contracts with nine participants of the Mead-Adelanto Project Iastrurrrents:

Spedal Obligation Crammer Series Bonds 63,415 67,739 70,680 75+00 (see Note 1). Under the terms of the contmcts, the participants are escrow accounts 63,849 63,849 70,959 70,959 entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a"take or pay"basis for their proportionate share of operating and maintenance Noto 5 Power Sales and Transmission Scrvlco Contracts: expenses and debt service on the Multiple Project and Mead-The Authority has power sales contmcts with ten participants of Adelanto Revenue Bonds and other debt, whether or not the the Palo Verde Project (see Note 1). Under the terms of the con- Mead-Adelanto Project or any part thereof has been completed, is tracts, the participants are entitled to power output from the operating and operable, or its service is suspended, interfered with, PVNGS and are obligated to make payments on a "take or pay" reduced or curtailed or terminated in whole or in part. The con-basis for their proportionate share of operating and maintenance tracts expire in 2030 and, as long as any Multiple Project expenses and debt service on Power Project Revenue Bonds and and Mead-Adelanto Revenue Bonds are outstanding, cannot be other debt. The contracts expire in 2030 and, as long as any Power terminated or amended in any manner which will impair or Project Revenue Bonds are outstanding, cannot be terminated or adversely affect the rights of the bondholders.

amended in any manner which will impair or adversely affect the In January 1993, the Authority entered into power sales rights of the bondholders. contracts with five participants of Unit 3 of the San Juan Project The Authority has tmnsmission service contmcts with six partic- (see Note 1). Under the terms of the contmcts, the participants are ipants of the Southern Transmission System Project (see Note 1). entitled to their proportionate share of the power output of the Under the terms of the contracts, the participants are entitled to San Juan Project and are obligated to make payments on a"take or tmnsmission service utilizing the Southern Tmnsmission System pay" basis for their proportionate share of operating and mainte-Project and are obligated to make payments on a"take or pay"basis nance expenses and debt service on the San Juan Revenue Bonds,

whether or not Unit 3 of the San Juan Project or any part thereof is system established by the legislation. The Bill also mandates the operating or operable, or its senrice is suspended, interfered with, collection of a public benefit charge from all electric utility reduced or curtailed or terminated in whole or in part. The con- customers in the state. Although these funds (currently estimated tracts expire in 2030 and, as long as any San Juan Revenue Bonds at 2.5'/o of gross revenues) must be spent on renewable resources, are outstanding, cannot be terminated or amended in any manner conservation, research and development, or low income rate which willimpair or adversely affect the rights of the bondholders. subsidies, the governing authority of each consumer-owned utility willcontrol actual expenditures.

As a participant in the PVNGS, the Authority could be subject Note 7 Costs Rccoverablc from Future Billings to

Participants:

to assessment of retroactive insumnce premium adjustments in the Billings to participants are designed to recover "costs" as defined event of a nuclear incident at the PVNGS or at any other licensed by the power sales and transmission service agreements. 'Ihe reactor in the United States.

billings are structured to systematically provide for debt senrice The Authority is involved in various legal actions. In the requirements, opemting funds and reserves in accordance with opinion of management, the outcome of such litigation or claims these agreements. Those expenses, according to generally accepted will not have a material effect on the financial position of the accounting principles (GAAP), which are not included as Authority or the respective separate projects.

"costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt. Note 9 subsequent Events:

Costs recoverable from future billings to participants are On July 1, 1996, the crossover date for the Palo Verde Special comprised of the following: Obligation Bonds Series B, trust assets held in escrow of

$ 63,415,000 were used to advance refund $ 62,000,000 of previously l4Luue Bseat Mance tune30, 1996 tune 30, issued bonds.

Aetnt 1995 1996 In August 1996, the Authority issued $ 89,570,000 of Mo Verde GAAP items not induded in 1996 Subordinate Refunding Series C bonds to refund $ 95,015,000 billings to partidpants:

Depreciation of plant $ 348328 $ 49323 $ 397,651 of 1986 Refunding Series B bonds. The refunding is expected to Amortization of bond discount, reduce total debt service payments over the next 20 years debt issue costs, and mst of refunding 206,470 37,745 by approximately $ 24,713,000 (the difference between the debt 244,215 Nudear fuel amortization 18,650 898 19W8 service payments on the old and new debt) and is expected to Decommissioning expense 75.233 7,610 82,843 result in a net present value savings of approximately $ 16,955,000.

Interest cxpcnse 23,165 22,798 45,963 In September 1996, the Authority issued $ 42,245,000 of Bond requirements induded in billings Transmission Project Revenue Bonds, 1996 Subordinate Refunding to participants:

Series A and $ 121,065,000 of Transmission Project Revenue Bonds, Operations and maintenance, net of investment inmrnc (67,253) (21,062) (88315) 1996 Subordinate Refunding Series B to refund $ 68,720,000 and Costs of acquisition of capacity - SIS (18/50) (18~) $ 127,100,000 of the STS 1986 Refunding Series A and B, respec-Reduction in debt service billings duc to transfer of excess funds tively. The refunding is expected to reduce total debt service 78,658 (11,099) 67W9 prind pal repayments (222,130) (39N9) (261,689) payments over the next 10 years by approximately $ 6,029,000 Other ~31 740 ~3858 ~35598 (the difference between the debt senrice payments on the old and

$ 411,031 $ 42,796 $ 453W7 new debt) and is expected to result in a net present value savings of approximately $ 3,372,000.

Note 8 Commltmcnts and Contlngenclest On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill) which provides for broad deregulation of the power generation industry in California. The Bill, which is pending approval by the Governo, requires the participation of the state' three investor-owned utilities. Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process. The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMENTAL FINANCIALINFORMATION INDEX Palo Verde Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Southern Transmission S tern Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Hoover Upratlng Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead. Phoenix Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Opemtions for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and '1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Mead-Adelanto Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lo Pro ect Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 San Juan Project Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL BALANCE SHEET fin uh7uuranh) junc 50, 1995 ASSETS Utilityplant:

Production . $ 613,608 $ 611,771 Tlallsnusslon 14,146 14,146 General 4569 M74 628,491 Less - Acaunulatal depreciation 219 881 380@02 408,610 Construction work in progress 9~ 9,683 Nudcar fueL at amortized cost 13 223 12716 Net utilityplant . 403 030 431,009 Special funds:

Available for sale at fair value:

Decommissioning fund . 33,474 24~

lnvcstmcnts 115,746 143,600 Interest receivable 1,512 1 223 Cash and cash equivalents 67 879 ~49 354 218 611 218 680 Accounts receivable . 912 Materials and supplies 9,240 9,618 Costs recoverable from future billings to participants 204,945 197/15 Unrealized loss on investments in funds available for sale Unamortized debt expenses, less accumulated amortization of $ 65,795 and $ 71+25 204,693 209 740

'Ibtal assets . $ 1,041,713 $ '1.067,700 LIABILITIES Long-tenn debt $ 981,155 Current liabilities:

Long-term debt due within one year 25,690 23,855 Acaued interest 24~ 30,685 Accounts payablc and acaued expenses 10~ '16 770 Total aurcnt liabilities 71310 Commitments and contingencies Total liabilities $ 1,041,713 $ 1.067,700

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS t176 tl74744547ndS)

Y674r Enhd june 30, 1996 1995 Operating revenue:

SaIes of electric energy . $ 135464 5 129,180 Opetatmg expenses:

Nudear fuel . 7,949 8,150 Other operations 25,815 25+07 Maintenance 6317 7,825 Depreciation . 18,425 19,145 Deconunissioning ~1497 13 401 Total operating expenses Operating income . 64,461 Investment income 10,886 9963 Income before debt expense 65@20 Debt expense 77 976 Costs recoverable from future billings to participants ($ 7,430) (3 176567 5te tx7tts t474i7x3Ã471 tt44tr777677ts.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS fin thttsanat&s)

Year Enkd tuna 30, 1996 Cash flows from operating activities:

Costs recoverable from future billings to partidpants . ($ 7rI30) ($ 12,656)

Adjustments to amve at net cash provided by (used for) operating activitics-Depreciation .. 18,425 19,145 Decommissioning . 17497 13,401 Amortization of nudear fuel . 7,949 8,150 Amortization of debt costs 24,428 16,607 Changes in assets and liabilities:

Decommissioning fund (8,971) (1,297)

Interest receivable (289) 127 Accounts receivable 174 131 Materials and supplies . 378 729 Other assets . 55 (2)

Accrued interest . (6,150) (719)

Accounts payable and accrued expenses .. ~643 3 241 Net cash provided by operating activities 34 629 46 837 Cash flows from investing activities:

Payments for construction of faciTity . (10,892) (9/69)

Purchases of investments Proceeds frotn sale/maturity of investments 1~

(154,685) (97,108) 68,891 Nct cash provided by (used for) investing activities 16 732 37 786 Cash flows from capital and related financing activities:

Payment of pnndpal on long-term debt (23,855) lbyment of bond issue costs .. (4,832)

Payment for defeasance of rcvcnue bonds (233,632)

Proceeds from issuance of refunding bonds 229 483 Net cash used for capital and related financing activities (32,836) (22425)

Net increase (decease) in cash and cash equivalents 18/25 (13/54)

Cash and cash equivalents at beginning of period ~49 ~6708 Cash and cash equivalents at end of year $ 67,879 8 49384 Supplemental disdosure of cash flow information:

Cash paid during the year for interest (net of amount capitalized) $ 64,499 $ 62.089 Se notes tofinant7a! staten3tne.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ 1996 fin hurusandsi 9 22rrantis-Detrt RSserre & surtNtg gemue Rettenue Operating Gintingeruy issue Funds Fund Fimd Fund Fund Fimd I &11 7tttal Mance at June 30, 1995 3 137,133 5 - $ 30 948 3 16$ 74 S 12,4S2 $ 24.490 $ 216 627 Additions:

Investment earnings 4,409 31 834 1,100 616 749 7,739 Distribution of investment camings . (5,734) 8,604 (1,213) (1,000) (657)

Discount on investment purchases 1,971 3 513 336 41 3,287 Revenue from power sales 49 129,180 37 6 129,272 Distribution of rcvenucs 81,922 (138,843) 39,603 3,989 5325 8,004 Transfers to csaow for refundings .. (10,413) 78 (93) (2,886) 4,046 (9,268)

Transfer from escrow for prinopal and interest payments 379 634 951 ~11 06 ~10 81 380 099 Total 451 838 4 28 614 ~1126 ~972 9176 S11129 Deductions:

Construction expenditures 3,060 3,060 Operating cxpcnditures .. 31,041 5 31,046 Fuel costs..... 8,457 8,457 Bond issue costs 3.173 3.173 Ibyment of principal 23,855 23,855 Intcrcst paid 55,130 60,793 Premium and interest paid on investments 202 115 58 131 506 Payment of principal and interest on esaow bonds 3SO 099 380 099 459 236 39 613 3118 8 836 186 510 989 Mance at Junc 30, 1996 $ 124,685 $ 4 $ 19,949 $ 25582 $ 13,017 $ 33,530 $ 216,767 1his schedule sununarizes the rccdpts and disbursements in funds requited under thc Bond Indenture and has been prepared from the trust statements.'Ihe balances in thc funds consist of cash and investments at original cost. These balances do not indudc aeaued interest receivable of $ 1,245 and $ 1,223 and Decommissioning Fund acaued intaest receivable of respectively.'Ihese

$ 267 and $ 138 at june 30, 1996 and 1995, respectively, nor do they include total amortized net investmcnt discounts of $ 788 and $ 918 at june 30, 1996 and 1995, balances also do not indude utuealizcd loss on investments in funds available for sale of $ 456 and $ 226 at Junc 30, 1996 and 1995, ~ly.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT

~)

SUPPLEMENTAL BALANCE SHEET f172 199S ASSETS Utihty plant:

Transnusslon $ 674,606 $ 675+01 General 18 893 18,893 693,499 694,194 Less - Accumulated depreciation 194 127 ~174 92 519,802 Construction work in progress 1 212 Nct utiTity plant 499 372 321034 Special funds:

Available for sale at fair value:

Investments 102,842 144,476 Escrow account - Subordinate Refunding Crosamr Series 343,898 343,921 Advance to Intennountain power Agency . 19/50 19~

Interest receivable 2,169 1,807 Cash and cash equivalents ~90 24 54 678 558 7S3 564 432 Accounts receivable 2,469 Costs recoverable hum future billings to participants 203,787 183,154 Unrealized loss on investments in funds available for sale 1,897 Unamortized debt expenses, less accumulated amortization of $ 59,752 and $ 51,415 164 247 Total assets $ 1.431,741 $ 1.445.746 LIABILITIES Long-tenn debt $ 1 034 757 $ 1,042,002 Subordinate Refunding Crossover Series 347 782 Current liabilities:

Long-tenn debt due within one year 10,845 14325 Accrued interest 38,436 39/79 Accounts payable and acaued expenses 315 2,258 Total cunent liabilities . 49 596 Commitments and contingcndes Total liabilities $ 1,431,741 $ 1,445.746

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS iin huus(tnds)

Yav Erukd June 30, 1995 Opemting revenue:

Sales of tmnsmission services $ $ 5297 Operating expenses:

Other opemtions 10,192 11,839 Maintenance 5,236 4,498 Depreciation . 20 329 19 735 Total opcmting expenses 36072 Opcmting income 49~0 Investment income Income before debt expense 85,263 Debt expense Costs rccovemblc from fuhue billings to participants ($ 20.633) ($ 160(0)

&e notts t()fi)u(ntt((ltt()tt)ntnls.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAl STATEMENT OF CASH FLOWS (bi thou54uur51 Year Enkd June 30, 1995 Cash flows from operating activities:

Costs remvcrable from future billings to participants . ($ 20,633) ($ 1~)

Adjustments to anivc at net cash provided by (used for) operating activities-Depreciation 20329 19,735 Amortization of debt msts 11,739 Write-offof construction work in progress msts 1313 11'15 Changes in assets and liabilities:

Interest receivable . (362)

Accounts receivable (218) 1,940 Other assets . 17 Accrued interest .. (943) 10,773 Accounts payable and accrued expenses ~7943 ~))

Net cash provided by operating activities 9282 29 497 Cash flows from investing activities:

~

Payments for construction of facility .

Purchases of investments from sale/maturity of investments Net cash provided by (used for) investing activities (154,904)

~395 93 40 689 (315)

(94,425) 90 462

~4,278 Cash flows from capital and related financing activities:

Payment for defeasance of revenue bonds (5,479)

Repayment of principal on long-term debt 14,3 ~13 615 Net cash used for capital and related flnancing activities ~243 19 094 Nct increase in cash and cash equivalents 35,646 6,125 Cash and cash cqirivalents at beginning of year Cash and cash equivalents at end of >ear $ 90324 5 54.678 Supplemental disdosure of cash flow information:

Cash paid during thc year for interest (nct of amount capi~ $ 88370

SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ I 996 ffn t 67usands)

GSnstnution Fund. Initial Dtt7t Cc7urul F8uititus Se727ite Ot7entting teese727e Issue Ament Fund Fund Fund Fund Balance at June 30, 1995 $ 222 3 115959 8 6822 8 94N $ 77128 $ 343S69 ~54

$ 6N Additions:

Investment earnings 12 6,485 463 635 3,102 18~7 29,264 Distribution of investment earnings (5,710) 9,408 (596) 6,182 (9,284)

Revenue from transmission sales 83,953 83,953 Distribution of revenue .. 42,530 (78,891) (5@03) 50,942 (9,278)

Transfer from escrow for principal and interest payments ~1911 Total 12 56,216 14 933 ~264 N 226 5 126128 Deductions:

Operating expenses . 14,904 Payment of principal 14+25 14/25 Intcrcst paid 41/76 19,286 60,862 Payment of principal and interest on esaow bonds 1/921 26575 39,496 Premium and interest paid on investment purchases 1,267 39 1/06 Other 949 949 Total 55 764 14 9N 39 61 135 131 842 Balance at Junc 30, 1996 $ 234 $ 106,411 $ 6.051 $ 4,157 $ 76,219 $ 343,874 $ 536,946 This schedule sununarizes the receipts and disbursements in funds ettuited under the Bond Indenture and has been prepared from thc tmst statements. The bahnces in the funds consist of cash and investments at original cost.These balances do not indude acaucd interest receivable of $2,169 and $ 1,807 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discounts of $ 2,983 and f4312 at June 30, 1996 and 1995, respectably.112ese bahnccs do not indude ueaeat'zcd loss on investmcnts in funds avaihble for sale of $ 2 865 and $ 1 897 at June 30, 1996 and 1995, respectively.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET tin thousanh) 1995 ASSETS Special funds:

Investments available for saic at fair value . $ 9,628 $ 7,653 Advances for capacity and energy, nct 10,119 11,903 Interest receivable 6 26 Cash and cash equivalents 1 997 2,745 31 750 ~327 Accounts receivable 19 Costs rcawcrable fiom future billings to partlcipants 7,538 7,299 Unrealized loss on investments in funds availablc for sale .. 3 18 Unamortize debt expenses, Total assets .

less accumulated amortization of $ 937 and $ 795 ~37

$ 32,617 5 3 12 33.156 LIABILITIES Long-tenn debt 3 30 931 $ 31,977 Current liabilities:

Long-term debt due within one year 1,085 . 610 Accrued interest 489 500 Accounts payablc and accrued expenses 62 69 Total current liabilities 1,636 1.179 Commitments and contingencies .

Total liabilities $ 32,617 $ 33,156 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS tin uhousan61$ )

Yrar &cbtfuno30, 1996 1995 Operating revenue:

Sales of electri energy . $ 3349 $ 3W9 Operating expenses:

Capacity charges .. 1,011 1,207 Energy charges 844 832 Other operations 342 360 Reimbursement of advances for capacity and energy Total operating Operating income .

~............ 3 2,411 12

'1,158 1,149 Investment income 874 514 Income before debt cxpcnse 1,672 Debt expense MIO Costs rmwerablc from future billings to participants ($ 239) ($ 693)

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f178 rru7us457ds)

Yi44r Eekd fuze 30, 1996 1999 Cash flows from operating activities:

Costs recoverable from future billings to partidpants .. ($ 239) ($ 638)

Adjustments to anivc at net cash used for operating activities:

Amortization of debt costs 294 Changes in assets and liabilities:

interest receivable 20 Accounts receivable (19)

Other assets 21 Accrued interest Accounts payablc and accrued expenses . ~94 (18)

Net cash provided by (used) for operating activities

~

Cash fiows from investing activities:

Purchases of investments from salelmaturity of investments Advances for capacity and energy, net (22,665) 20,705 1,784 (11~6) 9,491 1 415 Nct cash used for investing activities ~640 Cash Qows from capital and related financing activities:

Payment for defeasance of revenue bonds (319)

Repayment of principal on long-term debt .. 610 ~860 Net cash used for capital and related financing activities 610 1 179 Net decrease in cash and cash equivalents (748)

Cash and cash equivalents at bcy'nning of year 2,745 5451 Cash and cash equivalents at cnd of year $ 1,997 5 0,745 Supplemental disdosurc of cash Row information:

Cash paid during ycar for interest (net of amount capitalized) 5 1.978 $ 2059

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 30$ I 996 (tn thousanA)

Dtbt Wortdng Debt Stroke G$ 7ural S$ 7$ 7irc Rtsrrre Rts$ 7225 Fund Am7unt Ament Ament Tbtal Balance at June 30, 1995 ~410

$ $ - $ - 3 u0 $ 1435 $ 3018 ~$ 876 ~10

$ 64 Additions:

Investment earnings 16 2 2 33 1S2 3 Distribution of investment earnings 193 (2) 256 (29) (90) (11S) (213)

Discount on investment purchases 85 43 289 211 628 Revenue from paver sales ..... .

3,330 3,330 Distribution of revenues 165 (3,342) 3.177 Thnsfer from escrow for principal and interest payments ~2393 147 ~751 ~433 ~382 ~318 Total ~099 355 5 842 37 ~383 ~613 Deductions:

Advances for capacity and energy 75 75 Payment of principal 610 610 Administrative expenditures 117 348 Interest paid Premium on investment p~........

Payment of principal and interest on escrow bonds 1,978 24418 37 1,978 37 70418 Total 311 117 4 906 37 Balance at June 30, 1996 $ - $ 560 $ &71 $ 3,083 $ 5,259 $ 11511 net investment discount of $ 117 and $ 52 at June 30, 1996 and 1995, respectively.'Ihese bahnces aho do not indude at June 30, 1996 and 1995, respectively.

~

This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements.'Ihe bahnces in the funds consist of cash and innstmcnts at orighai cost These balances do not indude accrued interest rcccivablc of $ 6 and $26 at June 30, 'l996 and 1995, respectively, nor do they indude total amortized loss on investments in funds avaihble for sale of $ 3 and $ 18

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT

~)

SUPPLEMENTAL BALANCE SHEET 119$

1995 ASSETS Utilityplant:

Transmission $ 48/07 Geneml 1 921 50,278 Less: Accumulated depreciation 846 49,432 Construction work in progress 3 116 $ 39119 Net utilityplant .. 5~8 39,179 Special funds:

Investments available for sale at fair value . 21591 32,759 Interest receivable 841 1,246 Cash and cash equivalents 1~8 1 280 35 285 Accounts rcccivable 1,750 1,963 Costs recoverable from future billings to participants 1+94 Unrealized loss on investments in funds available for saIc 9 51 Prepaid expense 26 2,003 Unamortized debt expenses, less accumulated amortization of $ 1,257 and $ 736 . 10 608

$ 89595 $ 88.889 LIABIUTIES Long-term debt $ 86,417 $ 86,267 Current liabiTitics:

Acaucd interest 2,588 Accounts payable 590 Total current liabilities . 3,178 Commitments and contingencies Total liabiTities $ 89395 $ 88.889

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30$ 1996*

fin housan4ts)

Operating revenue:

Sales of tmnsmission services Operating expenses:

Other operations . 213 Maintenance . 13 Depredation 342 Total operating expenses (342)

Investment income 410 Income before debt expense Debt expense 1462 Costs recoverable from future billings to participants ($ 1264)

See notes lofinancid stalen$ ents

'Operations commenced April 1996.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS f/2$ 6$ 6uSa226b) 1995 Cash flows from operating activities:

Cost recoverable from future billings to participants $ 1 94 Adjustments to amve at net cash provided by (used for) operating activities:

Depreciation . 342 Amortizafion of debt costs .. 167 Changes in assets and liabilities:

Intcrcst receivable .. 405 Accounts receivable 213 Other assets 1,977 Accounts payable 556 Net cash provided by operating activities .

Cash flows from investing activities:

Interest received on investmcnts 4,251 Payments for construction of facility (13,208) (21410)

Purchases of investments (3,264) (2,725)

Proceeds from sale/maturity of investments 16L474 26,078 Reimbursement from WAPA .. 83 Nct cash (used for) provided by investing activities 6 312 Cash flmvs from capital and related financing activities:

Payment of interest on long-term debt Payment for bond issue costs Net cash used for capital and related finandng activities

~8 (5,093) 5 102 Net Increase in cash and cash equivalents 1,275 Cash and cash equivalents at beginning of year 1 280 Cash and cash equivalents at end of year $ 2668 $ 1.2M Supplemental disdosure of cash flow information:

Cash paid during the period for interest (net of amount capitalized)

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FORTHE YEAR ENDED JUNE 30$ 1996 tin thus427uh)

Dd7t

$ $ 727ue Sc777k>> R2s$ 727s It7n7rnus issue Otscnt ting Aaount 6tc727unt Fund Fund Fund Tbt6d Balance at June 30, 1995 $ 18972 $ 4288 $ 8916 $ $ 4994 $ $ 34,170 Additions:

Investment earnings 435 2,441

'itansfer of investments (435)

Reimbursement from WAPA 80

'iiansmission revenue... 360 Transfer of monthly transmission costs ~2!t7t 297 Total 1 644 297 ~881 Deductions:

Construction <<xpendihues 8~

Interest paid 5,176 Premium and interest paid on investment purchases 89 89 Operating expenses .. 60 8,536 2,642 ~629 60 '13,861 Nance at June 30, 1996 $ 12,080 $ 2367 $ 5,916 $ 65 $ Z525 $ 237 $ 23,190 1Ius schedule sununarizcs the receipts and isbursemcnts in funds ~ under the Bond Indenture and has been prepared from the trust statements.1hc balances in the funds consist of cash and investments at orighal cost.'Ihese balances do not indude accrued intent receivable of $841 and $ 1,246 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment premiums of $ 42 and $ 80 at June 30, 1996 and 1995, respecuvely. 1hese balances do not indude unrealized loss on investments in funds available for sale of

$ 9 and $ 51 at June 30, 1996 and 1995, espectimly.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD ADELANTO PROJECT SUPPLEMENTAL BALANCE SHEET fin thousands) jun@ 30 1996 1995 ASSETS UtiTityplant:

Transmission $ 171,068 General 164 171 232 Less: Accumulated depreciation 1 255 Construction work in progress $ 154 011 Net utilityplant .. '169 977 154 011 Special funds:

Investments available for sale at fair value 62,562 76,235 Interest receivable 2,285 2,976 Cash and cash equivalents 4,279 69 1 Accounts receivable 4,741 4,669 Costs recoverable from future billings to participants Unrealized loss on investments in funds available for saic Prepaid expense Unamortized debt expenses, less accumulated amortization of $ 3582 and $2,098 28125 29 607 Total assets $ 276,669 $ 275.481 LIABILITIES Long-term debt ~$ 267 61 Current liabilities:

Accrued interest 7,884 7,885 Accounts payable 780 35 Total current liabilities . 8,664 Commitments and contingencies Total liabilities $ 276,669 $ 278,481

SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED JUNE 30s 1996*

tIn t7asananh)

Operating revenue Sales of transmission services $ 172 Opcratlng expenses:

Other operations . 145 Maintenance 27 Depredation 1 132 Total operating expenses Operating loss 1 132 Investment income . 1 174 Income before debt expense 42 Debt expense . 4,425 Costs recoverable from future billings to participants (3 3233)

See notes to financia statements.

'Operations commenced April 1996.

SOUTHERN CALIFORNIA PUIILIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS tin thousands) 1996 1995 Cash flows from opemting activities:

Cost recoverable &om future billings to participants ($ 4+83)

Adjustments to anive at net cash provided by (used for) operating activities:

Depreciation 1.132 Amortization of debt costs....... 482 Changes in assets and liabilities:

Interest receivable .. 691 Accounts receivable (72)

Prepaid expense 3,467 Acaued interest (I)

Accounts payable 745 Net cash provided by operating adivities .

Cash flows from investing activities:

Interest received on investments .. 11+16 Payments for construction of facility (15,652) (71,033)

Purchases of investments (9,184) (4,627)

Proceeds horn sale/maturity of investments 23,000 84,113 Rcimburscment from WAPA........

Nct cash (used for) provided by investing adivities 19797 Cash flows from capital and related financing activities:

Payments of interest on long-term debt Payment for bond issue costs ~$ (15,487) 15 18 7

Net cash used for capital and related Gnancing activities Net increase in cash and cash cquivalcnts 4,279 Cash and cash equivalents at beginning of year 4 279 Cash and cash equivalents at cnd of year $ 4~ $ 4.279 Supplemental disdosure of cash flow information:

Cash paid during the period for interest (net of amount capitalized)

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 I 996 fin thousands)

Debt Debt $ 7727ioe Acquisition Shia Reseirle Operating Issue Reoenue Aemunl Aimunt Aemunt Fund Fund Fund Tbta!

Balance at June 30, 1995 3 36,134 S 11793 S 16267 3 S 16,760 S Additions:

Investment camings 3,217 772 1,196 517 1 S,704 Transfer of investment earnings 1,196 (1,196)

Reimbursement from WAPA . 13 13 Transfers to opemting fund 451 (451)

Tmnsmission revenue 521 521 Total 3 230 '1,968 452 517 Deductions:

Construction expenditures 3,697 3,697 Interest paid 7,264 8,505 15,769 Premium and interest paid on investment purchases 298 298 Operatmg expenses . 2 189 191 Total 3 699 7 264 189 0840 - 19 93S Mance at June 30, 1996 3 6497 3 16.267 S 263 $ 8,474 $ 71 3 67.237 1Ms schedule summarizes the receipts and d'sbursements in funds requital under the Bond Indenture and has been prepared from the trust statements. The bahnces in thc funds consist of cash and investments at origlnal cost. These balances do not indude acctucd interest receivable of $ 2285 and $ 2,976 at June 30, 1996 and 1995, rcspomvcly, nor do they indude total amortized nct investment premiums of $ 143 and $269 at June 30, 1996 and 1995, ~vcly. These balances do not indude unrealized loss on investments in funds available for sale of

$ 28 and $ 171 at June 30, 1996 and 1995, respectively.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET tin thousands)

June 30, 1996 1995 ASSETS Special funds:

Investments available for saic at fair va! ue $ 250,888 $ 249,020 Interest receivable 9220 9 194 Total assets $ 260,108 $ 258.214 LIABILITIES Long-term debt ~24

$ 786 $ 242,107 Arbitrage rebate payablc Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project 6 402 6,632 Deferred credits 1,141 Current liabilities:

Accrued interest 8,256 8 257 Commitments and contingcncics

'otal liabilities 5 u0,108 $ 258.214 SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS fln thousands)

Year Ended June 30, 1995 Cash flows from operating activities Cash flows from investing activities:

Interest received on investments 18+80 18,470

~

Arbitrage payment Purchases of investmcnts from sale/maturity of investmcnts Net cash provided by investing activities ~I6 (1,868) 12 (3,757)

(1,958) 3 757 16/12 Cash flows from capital and related financing activities:

16 12 16 12 Payments of interest on long-term debt 16512 16 12 Nct cash used for capital and financing activities Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash cquivalcnts at cnd of year Sre notre tofina7dal ttaten7enls.

SOUTHERN CALIFORNIAPUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS

~)

REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 3031996 ff72 842772ingS 44274472t Mance at June 30, 1995 $ 247 727 $ 1 293 $ 249020 Additions:

investment earnings...... 18,208 172 18,380 Transfer to earnings account (16512) 16412 Transfer to debt service account 16 12 ~16 512 Total ~16 12 172 ~13 Deductions:

interest paid ~16 12 16 512 Total 16 512 ~16 12 Balance at June 30, 1996 $ 249,423 S 1,465 This schedule summarizes the receipts and disbursements in funds required under the Bond indenture and has been prepared from the trust statements.1he Mances in the funds consist of investments at original cost.'Ihese balances do not indude accrued interest receivable of $ 9,220 and $ 9,19I at June 30, 1996 and 1995, espectbely.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN jUAN PROIECT SUPPLEMENTAL BALANCE SHEET t17$ 4$ 627nids) 1995 ASSETS Utilityphut:

Production $ 183,309 $ 183~

General 8613 7 688 191,922 190,997 Less - Accumulated depreciation 36 622 24,415 Construction work in process ~31 155+00 166/82 2,488 Net utilityplant . 158 Ml 169 070 Special funds:

Investments available for sale at fair value 34,170 28,699 Interest receivable 67 69 Cash and cash equivalents 7 546 8 274 41,783 37,042 Accounts receivable .. 1,891 Materials and supplies 3~9 3,679 Costs recoverable from future billings to participants 31,780 Unrealized loss (gain) on investments in funds availablc for sale (28)

Unamortized debt expenses, less accumulated amortization of $ 942 and $ 628 3,461 Total assets $ 239,972 $ 238,178 LIABILITIES Long-term debt $ 222,444 S 228,167 Current liabilities:

Long-tenn debt due within one year 6,035 Accrued interest 5,994 5,994 Accounts payable 5,499 4,017 Total current liabiTitics . 17528 10,011 Commitments and contingencies Total liabilities $ 239.972 $ 238.178

SOLITHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS fin Ohuusan)ts) year Ended june A, 1996 1995 Operating revenue:

Sales of electric energy . $ 50 117 Operating expenses:

Other operations 314 316 Maintenance 35,760 38511 Depreciation . 9,095 9,095 Decommissioning 3 113 3 112 Total operating expenses 48 282 51 534 Operating income (loss) 1,835 (180)

Investment income Income before debt expense 3,897 1/70I Debt cxpcnsc 1 614 ~1595 Costs recoverable statemaine.

from future billings to participants (S 8,717) ($ 13894)

Sa notes tofinane2a!

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT

~)

'SUPPLEMENTAL STATEMENT OF CASH FLOWS fin Yem Ended June 30, 1995 Cash flows from operating activities:

Costs recoverable from future billings to participants ($ 8,717) ($ 10,894)

Adjustments to arrive at net cash provided by (used for) operating activitics-Depreciation . 9,095 9,095 Decommissioning costs 3113 3112 Amortization of debt costs .. 626 610 Changes in assets and liabilities:

Interest receivable 2 (59)

Accounts receivable 946 (669)

Materials and supplies 110 1/40 Other assets 56 81 Accounts payable 1482 711 Net cash provided by operating activities 6 713 ~327 Cash flows from inv4csting activities:

Payments for construction of facility (1,938) (1,861)

Purchases of investments (14370) (12749)

Proceeds from sale/maturity of investments 8 S67 19 918 Net cash used for investing activities . 441 3 692 Nct decrease in cash and cash equivalents... (728) (365)

Cash and cash equivalents at beginning of year 8 274 8639 Cash and cash equivalents at cnd of year $ 7~6 8 8.274 Supplemental disclosure of cash flow information:

Cash paid during the year for interest (net of amount capitaliizcd) $ 11,988 3 11.988

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS

~)

REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED JUNE 300 1996 f178 Debt Drt7t $ 57$ 48te Stroke Rsme 44$ 27477r 44828477r Mance at June 30, 1995 $ - $ 1 &93 $ - $ 112 $ 5,994 $ 18,025 $ 11 179 $ 36943 Additions:

Investment earnings 32 54 12 54 1,061 537 1,750 Distribution of investment earnings 1,945 (64) (168) (1,061) (652)

Discount on investment purchases... 4 10 114 112 242 Revenue from power sales S2933 S2,933 Distribution of revenues (54,914) 38,249 14+15 2,145 Refund from Cenhuy Ibwcr Corporation 400 Total 38 249 414 ~14 15 ~142 ~55 25 Deductions:

Payment for construction .. 1,938 1,938 Administmtive <<xpcnditures 36,691 36,691 Interest paid . 11 988 11 983 Total 38 629 11 988 50617 Mance at June 30, 1996 $ 1,253 $ 5 $ 526 $ 8621 $ 18025 $ 13021 $ 41651 1hts schedule surnmarizcs the receipts and ~cuts in funds rc4luired under the Bond Indenture and has been prepared from the trust statements.lhe balances in the funds consist of cash and investments at original cost. 1hese balances do not indudc accrued intent receivable of $ 67 and $ 69 at June 30, 1996 and 1995, respectively, nor do they indude total amortized net investment discount of $ 69 and $ 2 at June 30, 1996 and 1995, respectively. These balances do not indude unrealized loss (gain) on Investments in funds available for sale of

$ 4 and ($28) at June 30, 1996 and 1995, respectively.

~

~

I ~ ~

~ 0 ' 0 ~ ~ ~

~ ~ ~

g

SOUTHERN CALIF<ORNIA PUBLIC POWER AUTHORITY REPORT AND FINANCIALSTATEMENTS AND SUPPLE<MENTAL FINANCIALINFORMATION JUNE 80, 1996 AND 1998

I 400 South Hope Street Telephone 213 236 3000 Los Angetes, CA 90071.2889 Price Paterhouse Lsz REPORT OF INDEPENDENT ACCOUNTANTS September 10, 1996 To the Board of Directors of the Southern California Public Power Authority In our opinion, the accompanying combined balance sheet and the related combined statements of operations and of cash flows present fairly, in all material respects, the financial position of the Southern California Public Power Authority (Authority) at June 30, 1996 and 1995, and the results of its operations and its cash flows for the years then ended in conformity with generally accepted accounting principles. These financial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for the opinion expressed above.

In our opinion, the accompanying separate balance sheets and the related separate statements of cash flows of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, Multiple Project Fund and San Juan Project and the separate statements of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project, and San Juan Project present fairly, in all material respects, the financial position of each of the Projects at June 30, 1996, and their cash flows, and the results of operations of the Authority's Palo Verde Project, Southern Transmission System Project, Hoover Uprating Project, Mead-Phoenix Project, Mead-Adelanto Project and San Juan Project for the year then ended in conformity with generally accepted accounting principles. These'inancial statements are the responsibility of the Authority's management; our responsibility is to express an opinion on these financial statements based on our audits. We, conducted our audits of these statements in accordance with generally accepted auditing standards which require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, An audit includes examining, on a test basis, evidence

l I

I

~

~

I

~

I

~

The Board of Directors September 10, 1996 Page 2 supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for the opinion expressed above.

Our audits were conducted for the purpose of forming an opinion on the basic financial statements taken as a whole. The supplemental financial information, as listed on the accompanying index, is presented for purposes of additional analysis and is not a required part of the basic financial statements. This information is the responsibility of the Authority's management. Such information has been subjected to the auditing procedures applied in the audits of the basic financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic financial statements taken as a whole.

I l

I

SOIyfHERN CALIFORNIA PUBLIC POWER AUTHORITY CotfBI DB A (in thousands) une 30 Em'outhern Palo Transmission Hoover hfead- hfead- hfultiple San June 30, Verde System Uprating Phoenix Adelanto Project Juan 1995

~&oaf Emmy JMaL ~id ~t~a Utility plant:

Production $ 613,608 $ 171,068 S 183,309 $ 967,985 $ 795,080 Transmission Ceileral ~~5 14,146 S

~88 674,606

~7

$ 48/07 164 8~ ~228't

'?37,223

~2 1K689,447 Less - Accumulated depreciation 630,323

~9dhU, 380@02

~ 693,499 JRI 499,372 50,278 49,432

~u171,232 169,977 191,922

~KfbIR 155,300 1,737,254

~2JUl 1,254,383 1,513,682 1,09f,994 Construction work in progress

'Nuclear fuel, at amortized cost ~225 9/03 3,116 3,501

~iu 16,120 206,573

'Net utility plant 403 030 ~92~37 ~880 ~uz773 ~34 83 Special funds:

Available for sale at fair value (Note 2):

Decommissioning fund 33,474 33,474 24403

'Investments 115,746 102,842 S 9,628 21491 62462 S 250,888 34,170 597,427 682,442 Escrow account - Crossover series 343,898 343,898 343,921 Advance to Intemountaln Power Agency 19+50 19+50 19,550

<<Advances for capacity and energy, net 10,119 10,119 11,903 Interest receivable 1,512 2,169 6 811 2485 9/20 67 16,100 16~1 Cash and cash equivalents ~7879 90 374 I 2u ~725 ~73 XK ~9hlQ

~53u 438783 21730 73980 ~2a4<< MOtu25 ~LJ>u ~7~3! ~26u Accounts receivable 738 2,687 19 1,750 4,741 (6,402) 9IS 4,478 5,272 hlaterials and supplies 9,240 3/69 12,809 13,297 Costs receive from future billings. to participants 20I,9IS 203,787 7+38 1@9h 313780 453,827 411,031

'Unrealized loss on investments in funds available for sale 456 2,865 28 3,365 2@35

,Prepaid construction costs 59536 Prepaid expenses 26 Unamortized debt expenses, less accumulated amortization of $ 132,265 and $ 127,197 in 1996 and 1995 ~07 ~888 ~28 2 3 090 ~4348 ~42 508 t J 01~73 ~1431 741 ~32 617 ~89 595 aata~660 ~253 706 ~23 7g ~3366 0 3 t 3 ~00 73 Long-turn debt $ 981,155 5 1,034,757 $ 30,981 $ 86,417 $ 268,005 S 242,786 3 222,444 5 2,866,545 $ 2,894,471 Subordinate Refunding Crossover Series 347@88 347,388 347,782 Ariiitrage rebate payable 77 Defencd credits 2,664 2,664 1,141 Cuncnt liabilities:

Long. tenn debt due within one year

'Accrued interest Accounts payable and accrued expenses Total cuncnt liabilities

~333

~suit 25,690 24435

~3

~49 10,845 38,436 06

~ 1,085 489 I &16

~90 2,588

~78 ~l~

7,884 7110 8,256

~852 ~728 6,035 5,994

~22 ~'~7

~4~

43,655 88,182

~z22!2 38,790 95,288 23 183 Comiuitmcnts and contingencies

~II'~13 ~43~74 ~32 6 7 ~IIO 505 ~276 669 ~25 706 ~23 ~07 ~~3~03 ~!I 400 73 The accompanying notes arc an inteyal part of these {inancial statements.

I I

'l I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY COMBINED STATEMENT OF OPFRATIONS (In thousands)

Year Ended une 30 1996 Southern Palo Transmission Hoover Mead- Mead- Year Ended Verde System Uprating Phoenix Adelanto San Juan June 30,

~Pro'ect ~Pro'ect ~Pro eat ~Pro'act ~Pro'ect ~Pro ect Total 1995 Operating revenues:

Sales of electric energy S 135,464 S 3,349 S 50,117 S 188,930 S 183,603 Sales of transmission services 85 297 226 g 172 85 695 91 250 Total operating revenues 135 464 85 297 3 349 226 172 50 117 274 625 274 853 Operating cxpcnses:

Amortization of nuclear fuel 7,949 7,949 8,150 Other operations 25,815 10,192 2,200 213 145 314 38,879 39,873 Maintenance 6,317 5,236 13 27 35,760 47,353 50,834 Depreciation 18,425 20,329 342 1,132 9,095 49,323 47,975 Decommissioning 12 497 3 113 15 610 16 513 Total operating expenses 71 003 35 757 2 200 568 1 304 48 282 159 114 163 345 Operating income (loss) 64,461 49,540 1,149 (342) (1,132) 1,835 115,511 111,508 Investment income 10 886 28 993 874 410 1 174 2 062 44 399 23 884 Income before debt expense 75,347 78,533 2,023 68 3,897 159,910 135,392 Debt expense 82 777 99 166 2 262 1 462 4 425 12 614 202 706 174 140 Costs recoverable from future billings to participants ~7430 ~20 633 ~239 ~1394 ~4383 ~8717 ~42 796 ~38 748 The accompanying notes are an integral part of these financial statements.

4

l l

I I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY 8 M W (In thousands)

Year Ended Palo Southern Hoover hfead- hfead- hfultiplc San June 30, Verde Transmission Uprating Phoenix Adelanto Project Juan 1995 205991 2252052272991 &0555> U22j2a U4225a Total Cash flows from operating activities:

Costs recoverable from I'uture billings to participants (S 7,430) (S 20,633) (S 239) (S 1,394) (S 4,383) (S 8,717) (S 42,796) (S 38,748)

Adjustments to arrive at net cash provided by (used for) operating activities-Depreciation 18,425 20/29 342 1,132 9,095 49,323 47,975 Decommissioning 12,497 3,113 15,610 16,513 Amortization of nuclear fuel 7,949 7,949 8,150 Amortization of debt costs 24,428 11,739 294 167 482 626 379736 29,050 Write-off of construction work in progress costs 1,313 1,313 Changes in assets and liabilities:

Decommissioning I'und (8,971) (8,971) (1,297)

Interest receivable (289) (362) 20 405 691 2 467 437 Accounts receivable 174 (218) (19) 213 (72) 946 1,024 1,402

~ ~jd hlaterials and supplies 378 110 488 2,069

'Other assets 55 1,977 3,467 56 5,555 117 Accrued interest (6,150) (943) (11) (I) (7,105) 10,036 Accounts payablc and accrued expenses ~6823 ~2653 ~56OQ ~QK Net cash provided by operating activities ~2IZ 9S ~266 ~06 Cash flows from investing activiticst Interest received on investments S 18,380 18@80 34,037 Arbitrage payment (3,757)

Pa>ments for construction of facilities (10,892) (13,208) (15,652) (1,938) (41,690) (104,088)

Purchases of investments (154,685) (154,904) (22,665) (3,264) (9,184) (1,868) (14@70) (360,940) (230,693)

Proceeds from sale/maturity of investments 182,309 195,593 20,705 14,474 23,000 8,867 444,948 299,265 Advances for capacity and energy, net Reimbursement from WAPA 19784 1,784

~1 1,415 Net cash provided by (used for) investing activities ~473 40 659 Qyyjj ~zjjy ~22j ~hjz ~yddjj ~62 0 ~37 0 Cash flows from capital and related financing activities:

Payments of interest on long-term debt (16512) (16,512) (37,092)

Proceeds from sale of bonds 229,483 229,483 Papncnt for defeasance of revenue bonds (233,632) (233,632) (5,798)

Repapnent of principal on long. term debt (14325)

'Pa>ment for bond issue costs ~403 (23,855) (610)

~484 (38,790)

~40j (36,900)

Net cash used for capital and related financing activities M2R) - UkhRS ~7dQS Net increase (decrease) in cash and cash equivalents 18,525 35,646 (748) 268 225 (728) 53,188 (4,746)

Cash and cash equivalents at beginning of year ~K@II ~~ ~K ~12 - ~I~ ~ME ~~3k C h d h~141 I 0 d fy ~67II7 hZ0~%S j~t7 ~540 ~4507 t . ~7546 5 173 798 ~120 610 Supplemental disclosure oi'ash flow inforrnationt Cash paid during the year for interest (net of amount capitalized) jy 64 49z ~00 37II ~ja70 t, s, ~6us ~II 903 ~87 347 ~00 700 The accompanying notes arc an Integral part of these flnancial statements.

l I

l I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY NOTES TO I INANCIALSTATEMENTS NOTE 1 - ORGANIZATION AND PURPOSE:

Southern California Public Power Authority (Authority), a public entity organized under the laws of the State of California, was formed by a Joint Powers Agreement dated as of November 1, 1980 pursuant to the Joint Exercise of Powers Act of the State of California. The Authority's participant membership consists of ten Southern California cities and one public district of the State of California. The Authority was formed for the purpose of planning, financing, developing, acquiring, constructing, operating and maintaining projects for the generation and transmission of electric energy for sale to its participants. The Joint Powers Agreement has a term of fifty years.

The members have the following participation percentages in the Authority's interest in the projects at June 30, 1996 and 1995:

Southern Palo Transmission Hoover Mead- Mead- San

~Partici ants V s s II i h i Ad]

City of Los Angeles 67.0% 59.5% 24.8% 35.7%

City of Anaheim 17.6 42.6% 24.2 13.5 City of Riverside 5.4 10.2 31.9 4.0 13.5 Imperial Irrigation District 6.5 51.0%

City of Vernon 4.9 City of Azusa 1.0 4.2 1.0 2.2 14.7 City of Banning 1.0 2.1 1.0 1.3 9.8 City of Colton 1.0 3.2 1.0 2.6 14.7 City of Burbank 4.4 4.5 16.0 15.4 11.5 City of Glendale 4,,4, 2.3 14.8 11.1 9.8 City of Pasadena 4,.4. 5.9 13.8 8.6

~l.  % ~1,  % ~1 The members do not currently participate in the Multiple Project Fund.

Mead-Phoenix participation reflects three ownership components (see below).

Palo Verde Pro'ect The Authority, pursuant to an assignment agreement dated as of August 14, 1981 with the Salt River Project (Salt River), purchased a 5.91% interest in the Palo Verde Nuclear Generating Station (PVNGS), a 3,810 megawatt nuclear-fueled generating station near Phoenix, Arizona, and a 6.55% share of the right to use certain portions of the Arizona Nuclear Power Project Valley Transmission System (collectively, the Palo Verde Project).

I I

NOTE 1: (Continued)

As of July 1, 1981, ten participants had entered into power sales contracts with the Authority to purchase the Authority's share of PVNGS capacity and energy. Units 1, 2 and 3 of the Palo Verde Project began commercial operations in January 1986, September 1986, and January 1988, respectively.

Southern Transmission S stem Pro'ect The Authority, pursuant to an agreement dated as of May 1, 1983 with the Intermountain Power Agency (IPA), has made payments-in-aid of construction to IPA to defray all the costs of acquisition and construction of the Southern Transmission System Project (STS), which provides for the transmission of energy from the Intermountain Generating Station in Utah to Southern California. The Authority entered into an agreement also dated as of May 1, 1983 with six of its participants pursuant to which each member assigned its entitlement to capacity of STS to the Authority in return for the Authority's agreement to make payments-in-aid of construction to IPA.

STS commenced commercial operations in July 1986. The Department of Water and Power of the City of Los Angeles (LADWP), a member of the Authority, serves as project manager and operating agent of the Intermountain Power Project (IPP).

Hoover U ratin Pro'ect The Authority and six participants entered into an agreement dated as of March 1, 1986, pursuant to which each participant assigned its entitlement to capacity and associated firm energy to the Authority in return for the Authority's agreement to make advance payments to the United States Bureau of Reclamation (USBR) on behalf of such participants. The USBR has declared that the Project was substantially complete as of September 30, 1995 with minor work scheduled to be completed in the spring of 1997. The Authority has an 18.68% interest in the contingent capacity of the Hoover Uprating Project (HU). All seventeen "uprated" generators of the HU have commenced commercial operations.

Mead-Phoenix Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire an interest in the Mead-Phoenix Project (MP), a transmission line extending between the Westwing substation in Arizona and the Marketplace substation in Nevada. The agreement provides the Authority with an 18.31% interest in the Westwing-Mead project component, a 17.76% interest in the Mead Substation project component and a 22.41% interest in the Mead-Marketplace project component.

The Authority has entered into transmission service contracts for the entire capability of its interest with nine members of the Authority on a "take or pay" basis. In addition, the Authority has administrative responsibility for accounting for the separate ownership interest in the project by Western Area Power Administration (WAPA), who is providing separate funding (872,874,000 and 858,676,000 at June 30, 1996 and 1995, respectively) for its interest. Commercial operations of MP commenced in April 1996. Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4).

I

~

I I

I

NOTE 1: (Continued)

Mead-Adelanto Pro'ect The Authority entered into an agreement dated as of December 17, 1991 to acquire a 67.92%

interest in the Mead-Adelanto Project (MA), a transmission linc extending between the Adelanto substation in Southern California and the Marketplace substation in Nevada. The Authority has entered into transmission service contracts for thc entire capability of its interest with nine members of the Authority on a "take or pay" basis. In addition, thc Authority has administrative responsibility for accounting for the separate ownership interest in the project by WAPA, who is providing separate funding (817,088,000 and 816,282,000 at June 30, 1996 and 1995, respectively) for its interest. Funding was provided by a transfer of funds from the Multiple Project Fund (Note 4). Commercial operations commenced in April 1996. LADWP serves as both construction manager and operations manager.

Multi le Pro'ect Fund During fiscal year 1990, the Authority issued Multiple Project Revenue Bonds for net proceeds of approximately 8600 million to provide funds to finance costs of construction and acquisition of ownership interests or capacity rights in one or more then unspecified projects for the generation or transmission of electric energy.

In August 1992, the Authority's Board of Directors approved a resolution authorizing the use of certain proceeds of Multiple Project Revenue Bonds to finance t)ie Authority's ownership interests in the Mead-Phoenix and Mead-Adelanto projects. Transfers made from the Multiple Project Fund are sufficient to provide for the Authority's sharc of the estimated costs of acquisition and construction of these two projects, including reimbursement of planning, development and other related costs.

Effective July 1, 1993, the Authority purchased a 41.80% interest in Unit 3, a 488 megawatt unit and related common facilities, of the San Juan Generating Station (SJGS) from Century Power Corporation. Unit 3 is one unit of a four-unit coal-fired power generating station in New Mexico.

The Authority allocated the $ 193 million purchase price to the estimated fair value of the utility plant (8190 million) and to materials and supplies (83 million). The purchase has been financed through the issuance of approximately $ 237 million (par value) of San Juan Project Revenue Bonds. The Authority has entered into power sales contracts for thc entire capability of its interest with five members of the Authority on a "take or pay" basis.

Oc I

l

NOTE 2 -

SUMMARY

Ol SIGNIFICANT ACCOUNTING POLICIES:

The financial statements of the Authority are presented in conformity with generally accepted accounting principles, and substantially in conformity with accounting principles prescribed by the Federal Energy Regulatory Commission and the California Public Utilities Commission. The Authority is not subject to regulation by either of these regulatory bodies.

The financial statements represent the Authority's share in each jointly-owned project. The Authority's share of direct expenses of jointly-owned projects are included in the corresponding operating expense of the statement of operations. E<ach owner of the jointly-owned projects is required to provide their own financing.

~Utilit Plant The Authority's share of all expenditures, including general administrative and other overhead expenses, payments-in-aid of construction, interest net of related investment income, deferred cost amortization and the fair value of test power generated and delivered to the participants are capitalized as utility plant construction work in progress until a facility commences commercial operation.

The Authority's sharc of construction and betterment costs associated with PVNGS is included as utility plant. Depreciation expense is computed using the straight-line method based on the estimated service life of thirty-five years. Nuclear fuel is amortized and charged to expense on the basis of actual thermal energy produced relative to total thermal energy expected to be produced over the life of the fuel. Under the provisions of the Nuclear Waste Policy Act of 1982, the Authority is charged one mill per kilowatt-hour, by the federal government, on its share of electricity produced by PVNGS, and such funds will eventually be utilized by the federal government to provide for PVNGS'uclear waste disposal. The Authority records this charge as a current year expense, The Authority's share of construction and betterment costs associated with STS, MP, MA and SJGS are included as utility plant. Depreciation expense is computed using the straight-line method based on the estimated service lives, principally thirty-five years for STS, MA and MP and twenty-one years for SJGS.

Interest costs incurred by the MP and MA projects through the date commercial operations commenced (April 1996) are capitalized in utility plant. Total interest costs capitalized were 811,827,000 and 315,769,000 in fiscal 1996 and 1995, respectively, for the MA project and 83,881,000 and 85,175,000 in fiscal 1996 and 1995, respectively, for the MP project.

Advances for Ca acit and Ener Advance payments to USBR for the uprating of the 17 generators at the Hoover Power Plant are included in advances for capacity and energy. These advances are being reduced by credits on billings to participants for energy and capacity.

I I

I

NOTE 2: (Continued)

Nuclear Decommissionin Decommissioning of PVNGS is projected to commence subsequent to the year 2022. Based upon an updated study performed by an independent engineering firm, the Authority's share of the estimated decommissioning costs is $ 85.5 million in 1995 dollars (8390 million in 2022 dollars assuming a 6% estimated annual inflation rate). The Authority is providing for its share of the estimated future decommissioning costs over the remaining life of the nuclear power plant (25 to 27 years) through annual charges to expense which amounted to 812.5 million and 813.4 million in fiscal 1996 and 1995, respectively. The decommissioning liability is included as a component of accumulated depreciation and was 888.1 million and $ 75.6 million at June 30, 1996 and 1995, respectively.

A Decommissioning Fund has been established and partially funded at $ 33.9 million at June 30, 1996. The Decommissioning Fund earned interest income of 5700,000 during fiscal 1996.

Demolition and Site Reclamation Demolition and site reclamation of SJGS, which involves restoring the site to a "green" condition which existed prior to SJGS construction, is projected to commence subsequent to the year 2014.

Based upon a study performed by an independent engineering firm, the Authority's share of the estimated demolition and site reclamation costs is $ 18.7 million in 1992 dollars (865.3 million in 2014 dollars using a 6% estimated annual inflation rate). The Authority is providing for its share of the estimated future demolition costs over the remaining life of the power plant (18 years) through annual charges to expense of $ 3.1 million. The demolition liability is included as a component of accumulated depreciation and was 89.3 million and 86.2 million at June 30, 1996 and 1995, respectively.

As of June 30, 1996, the Authority has not billed participants for the cost of demolition nor has it established a demolition fund.

Unamortized Debt Ex enses Unamortized debt issue costs, including the loss on refundings, are being amortized over the terms of the respective issues and arc reported net of accumulated amortization. Total deferred loss on refundings, net of accumulated amortization, was $ 378,070,000 and $ 393,440,000 at June 30, 1996 and 1995, respectively.

Investments Investments include United States Government and governmental agency securities and repurchase agreements which are collateralized by such securities. Additionally, the Mead-Phoenix Project, the Mead-Adelanto Project and the Multiple Project Fund's investments are comprised of an investment agreement with a financial institution earning a guaranteed rate of l

I 4

( c I

a~'

I I

I l

NOTE 2: (Continued) return. The Southern Transmission System Project has debt service reserve funds associated with the 1991 and 1992 Subordinate Refunding Series Bonds invested with a financial institution under a specific investment agreement allowed under the Bond Indenture earning a guaranteed rate of return.

Investments available for sale are carried at aggregate fair value and changes in unrealized net gains or losses are recorded separately. Investments are reduced to estimated net realizable value when necessary for declines in value considered to be other than temporary. Gains and losses realized on the sale of investments are generally determined using the specific identification method. As discussed in Note 3, all of the investments are restricted as to their use.

Cash and Cash E uivalents Cash and cash equivalents include cash and all investments with original maturities less than 90 days.

Revenues Revenues consist of billings to participants for the sales of electric energy and of transmission service in accordance with the participation agreements. Generally, revenues are fixed at a level to recover all operating and debt service costs over the commercial life of the property (see Note 6).

Debt Ex ense Debt expense includes interest on debt and the amortization of bond discounts, debt issuance expense and loss on refunding costs.

Arbitra e Rebate A rebate payable to the Internal Revenue Service (IRS) results from the investment of the proceeds from the Multiple Project Revenue Bond offering in a taxable financial instrument that yields a higher rate of interest income than the cost of the associated funds. The excess of interest income over costs is payable to the IRS within five years of the date of the bond offering and each consecutive five years thereafter. The Authority made its first rebate payment of $ 3.8 million during fiscal year 1995. The next rebate payment to the IRS is due in fiscal year 2000.

Reclassi fications Certain reclassifications have been made in the fiscal year 1995 financial statements to conform to the fiscal year 1996 presentation.

I I

I I

I I

NOTE 2: (Continued)

Use of Estimates The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.

NOTE 3 - SPECIAL FUNDS:

The Bond Indentures for the six projects and the Multiple Project Fund require the following special funds to be established to account for the Authority's receipts and disbursements. The moneys and investments held in these funds are restricted in use to the purposes stipulated in the Bond Indentures. A summary of these funds follows:

I'und ~Pur ose Construction To disburse funds for the acquisition and construction of the project.

Debt Service To pay interest and principal related to the Revenue Bonds.

Revenue To initially receive all revenues and disburse them to other funds.

Operating To pay operating expenses.

Reserve and Contingency To pay capital improvements and make up deficiencies in other funds.

General Reserve To make up any deficiencies in other funds.

Advance Payments To disburse funds for the cost of acquisition of capacity.

Proceeds Account To initially receive the proceeds of the sale of the Multiple Project Revenue Bonds.

Earnings Account To receive investment earnings on the Multiple Project Revenue Bonds.

Revolving Fund To pay the Authority's operating expenses.

Decommissioning Fund To accumulate funds related to the future decommissioning of PVNGS.

I I

l I

I I

I

NOTE 3: (Continued)

Issue Fund To initially receive pledged revenues associated with the applicable subordinated refunding series'ndenture of Trust and pay the related interest and principal.

Escrow account - Subordinate To initially receive pledged revenues associated with Refunding Crossover Series Component 3 of the 1993 Subordinate Refunding Crossover Series'ndenture of Trust and pay the related interest and principal.

Acquisition Account To disburse funds for the acquisition and construction of the Mead-Phoenix, Mead-Adelanto and San Juan projects.

All of the funds listed above, except for the Revolving Fund, are held by the respective trustees.

Palo Verde Pro'ect The balances of the funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Debt Service Fund-Debt Service Account 8 51,386 8 51,394 8 52,457 S 52,467 Debt Service Reserve Account 74,420 74,160 81,497 81,077 Revenue Fund 5 5 1 1 Operating Fund 20,130 20,134 31,141 31,026 Reserve and Contingency Fund 25,924 26,107 16,776 17,075 Decommissioning Trust Fund 34,131 33,740 24,503 24,503 Issue Fund 13,026 13,026 12,486 12,486 Revolving Fund 45 45 45 45 Contractual maturities:

~2~~7 ~2~ ~21 ~Q ~211~

Within one year 3 69,781 8 69,391 After one year through five years 136,279 136,148 After five years through ten years 3,187 3,252 After ten years 9 820 9 820

~2] 067 $ 218~11 NOTE 3: (Continued)

Southern Transmission S stem Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Construction fund - Initial Facilities Account S 235 8 235 8 223 8 223 Debt Service Fund-Debt Service Account 21,921 21,896 31,480 31,491 Debt Service Reserve Account 86,220 86,189 66,672 66,857 Operating Fund 6,015 6,007 5,987 5,987 General Reserve Fund 4,194 4,194 9,533 9,542 Issue Fund 77,024 76,794 77,768 77,579 Escrow Account - Subordinate Refunding Crossover Series 346,474 343,903 355,101 353,188 Revolving Fund 15 15 15 15 f~42 Z  %~2 ~4~77 Contractual maturities:

Within one year 8102,008 8101,975 After one year through five years 80,852 80,803 After five years through ten years 36,972 34,189 After ten years 322 266 322 266

~42 098 ~63')~2. 3 In addition, at June 30, 1996 and 1995, the Authority had non-interest bearing advances outstanding to IPA of 819,550,000.

I I

I k

I I

I

NOTE 3: (Continued)

Ifoover U ratin Pro ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized I'air Amortized Fair Cost Value Cost Value Advance Payments Fund 3 8 2,437 8 2,437 Operating-Working Capital Fund 804 804 563 563 Debt Service Fund-Debt Service Account 2,390 2,390 1,440 1,429 Debt Service Reserve Account 3,122 3,121 3,078 3,068 General Reserve Fund 5,318 5,316 2,911 2,914 Revolving Fund 13 13 5 1 1~4 ]~ll +1 ~1~442 ~1(~424 Contractual maturities:

Within one year 8 2,003 8 2,003 After one year through five years 9 681 9 628

)~ll 34 ~1~1+1 In addition, at June 30, 1996 and 1995, the Authority had advances to USBR of 810,119,000 and 811,903,000, respectively.

Mead-Phoenix Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Acquisition Account 8 12,571 8 12,571 8 19,830 8 19,830 Debt Service Fund-Debt Service Account 4,976 4,967 4,444 4,444 Debt Service Reserve Account 6,133 6,133 6,132 6,132 Issue Fund 4,924 4,873 Revenue Fund 64 64 Operating Fund 239 239 Revolving Fund 6 6

~23 982 M2'h~R

NOTE 3: (Continued)

Contractual maturities:

Within one year 2,389 8 2,389 After one year through five years 1,242 1,233 After ten years 20 858 20 358 5 2'>MR ~22K Mead-Adelanto Pro'ect The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Acquisition Account 8 36,979 8 36,979 8 37,745 8 37,745 Debt Service Fund-Debt Service Account 15,194 15,166 12,353 12,353 Debt Service Reserve Account 16,865 16,865 17,040 17,040 Issue Fund 16,517 16,346 Revenue Fund 71 71 Operating Fund 264 264 Revolving Fund 6 6 Contractual maturities:

Within one year 8 6,794 8 6,789 After one year through five years 4,161 4,138 After ten years 58 424 58 424 I

I I

I

NOTE 3: (Continued)

Multi le Pro'ect Fund The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Proceeds Account 8256,830 8256,830 8256,830 8 256,830 Earnings Account 3 278 3 278 1 384 1 384

~20~10 [~2(~1$ ~2~214 ~2~214 Contractual maturities:

Within one year 9,220 8 9,220 After ten years 250 888 250 888

~2() 10/f $ 2{~01 The balances in the special funds required by the Bond Indenture are as follows, in thousands:

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Operating Reserve 8 1,238 8 1,238 8 1,618 8 1,618 Operating Revenue Fund 7 7 2 2 Acquisition Account 527 527 112 112 Debt Service Fund-Debt Service Account 8,607 8,597 6,017 6,017 Debt Service Reserve Account 18,031 18,031 18,026 18,026 Reserve and Contingency 13,377 13,383 11,224 11,252 Revolving 15 15 JL44~77 g 41~73 ~7~4 ~~~7L422 Contractual maturities:

Within one year 5 7,613 8 7,613 After one year through five years 16,149 16,145 After ten years 18 025 18 025 fj 41~77 j~4~7$

I I

I I

I

NOTE 3: (Continued Pro'ect Investment Sales There were no proceeds from sales of investments during fiscal 1996 or 1995.

NOTE 4 - LONG-TERM DEBT:

Reference is made below to the Combined Schedule of Long-term Debt at June 30, 1996 for details related to all of the Authority's outstanding bonds.

Palo Verde Pro'ect To finance the purchase and construction of the Authority's share of the Palo Verde Project, the Authority issued Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of July 1, 1981 (Senior Indenture), as amended and supplemented. The Authority also has issued and has outstanding Power Project Subordinate Refunding Series Bonds issued under an Indenture of Trust dated as of January 1, 1993 (Subordinate Indenture). The Subordinate Refunding Bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.

The bond indenturcs provide that the Revenue Bonds and Subordinate Refunding Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to the Palo Verde Project (see Note 6) and interest on all moneys or securities (other than in the Construction Fund) held pursuant to the Bond Indenture and (3) all funds established by the Bond Indenture.

At the option of the Authority, all outstanding Power Project Revenue Bonds and Subordinate Refunding Term Bonds are subject to redemption prior to maturity, except for the 1996 Subordinate Refunding Series A which is not redeemable.

The Bond Indenture requires mandatory 'sinking fund installments to be made beginning in fiscal year 2003 (1986 Series A Bonds and 1987 Series A Bonds), 2005 (1989 Series A Bonds), 2010 (1993 Series A Bonds), and 2008 (1996 Subordinate Refunding Series B). Scheduled principal maturities for the Palo Verde Project during the five fiscal years following June 30, 1996 are

$ 25,690,000 in 1997, 822,220,000 in 1998, $ 23,580,000 in 1999, 825,145,000 in 2000, and 512,860,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8% and 6.0%, respectively.

NOTE 4: (Continued)

Southern Transmission S stem Pro'ect To finance payments-in-aid of construction to IPA for construction of the STS, the Authority issued Transmission Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of May 1, 1983 (Senior Indenture), as amended and supplemented. The Authority also has issued and has outstanding Transmission Project Revenue Bonds 1991 and 1992 Subordinate Refunding Series issued under Indentures of Trust dated as of March 1, 1991 and June 1, 1992, respectively. The 1991 and 1992 subordinated bonds were issued to advance refund certain bonds previously issued under the Senior Indenture.

The bond indentures provide that the Revenue Bonds and the Subordinate Refunding Series Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to STS (see Note 6) and interest on all moneys or securities (other than in the Construction Fund) held pursuant to the Bond Indenture and (3) all funds established by the Bond Indenture.

All outstanding Transmission Project Revenue and Refunding Bonds, at the option of the Authority, are subject to redemption prior to maturity.

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2003 (for the 1986 Series A Bonds), 2002 (1986 Series B Bonds) and 2007 (1988 Series A Bonds). Scheduled principal maturities for STS during the five fiscal years following June 30, 1996 are $ 10,845,000 in 1997, 821,565,000 in 1998, 822,790,000 in 1999, 810,200,000 in 2000, and

$ 10,115,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 8.3%.

I.loover U ratin Pro ect To finance advance payments to USBR for application to the costs of the Hoover Uprating Project, the Authority issued Hydroelectric Power Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of March 1, 1986 (Bond Indenture).

The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from and secured solely by (1) the proceeds from the sale of the bonds, (2) all revenues from sales of energy to participants (see Note 6), (3) interest or other receipts derived from any moneys or securities held pursuant to the Bond Indenture and (4) all funds established by the Bond Indenture (except for the Interim Advance Payments Account in the Advance Payments Fund).

At the option of the Authority, all outstanding Hydroelectric Power Project Revenue Bonds are subject to redemption prior to maturity.

I I

I I

I I

I

NOTE 4: (Continued)

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2007 for the 1991 Series A Bonds maturing on October 1, 2010 and fiscal year 2011 for the 1991 Series A Bonds maturing on October 1, 2017. Scheduled principal maturities for the Hoover Uprating Project during the five fiscal years following June 30, 1996 are 81,085,000 in 1997, 81,130,000 in 1998, 81,230,000 in 1999, $ 1,285,000 in 2000, and 81,400,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.8% and 6.1%,

respectively.

During fiscal 1995, the Authority repurchased 8340,000 of outstanding Hydroelectric Power Project Revenue Bonds with excess funds in the Advance Payments I und.

Multi le Pro'ect Fund To finance costs of construction and acquisition of ownership interests or capacity rights in one or more projects expected to be undertaken within five years after issuance, the Authority issued Multiple Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of August 1, 1989 (Bond Indenture), as amended and supplemented.

The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) with respect to each authorized project, the revenues of such authorized project, and (3) all funds established by the Bond Indenture.

In October 1992, 8103,640,000 and 8285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project and the Mead-Adelanto Project, respectively, to finance the estimated costs of acquisition and construction of the projects.

A total of $ 153,500,000 of the outstanding Multiple Project Revenue Bonds are not subject to redemption prior to maturity. At the option of the Authority, the balance of the outstanding bonds are subject to redemption prior to maturity.

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2006 for the 1989 Series Bonds. The first scheduled principal maturity for the Multiple Project Revenue Bonds is 88,645,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.8%.

Mead-Phoenix Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, 8103,640,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Phoenix Project in October 1992.

In March 1994, the Authority issued and has outstanding 851,835,000 of Mead-Phoenix Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture). The proceeds from the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project I

I

NOTE 4: (Continued)

Acquisition Fund, werc used to advance refund 864,840,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Phoenix Project.

The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to Mead-Phoenix (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.

At the option of the Authority, all outstanding Mead-Phoenix Revenue Bonds are subject to redemption prior to maturity.

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1994 Series Bonds. The first scheduled principal maturity for the Mead-Phoenix Revenue Bonds is $ 1,295,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 6.0%.

Mead-Adelanto Pro'ect To finance the Authority's ownership interest in the estimated cost of the project, S285,010,000 of the Multiple Project Revenue Bonds were transferred to the Mead-Adelanto Project in October 1992.

In March 1994, the Authority issued and has outstanding 8173,955,000 of Mead-Adelanto Revenue Bonds under an Indenture of Trust dated as of January 1, 1994 (Bond Indenture). The proceeds of the Revenue Bonds, together with drawdowns from the Debt Service Fund and Project Acquisition Fund, were used to advance refund 8178,310,000 of the Multiple Project Revenue Bonds previously transferred to the Mead-Adelanto Project.

The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, 1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to Mead-Adelanto (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.

At the option of the Authority, all outstanding Mead-Adelanto Revenue Bonds are subject to redemption prior to maturity.

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2018 for the 1995 Series Bonds, The first scheduled principal maturity for the Mead-Adelanto Revenue Bonds is 83,560,000 in fiscal year 2000. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.9% and 6.0%, respectively.

S~P To finance the costs of acquisition of an ownership interest in Unit 3 of the SJGS, the Authority issued San Juan Project Revenue Bonds pursuant to the Authority's Indenture of Trust dated as of January 1, 1993 (Bond Indenture).

NOTE 4: (Continued)

The Bond Indenture provides that the Revenue Bonds shall be special, limited obligations of the Authority payable solely from, and secured solely by, (1) proceeds from the sale of bonds, (2) all revenues, incomes, rents and receipts attributable to San Juan (see Note 6) and interest on all moneys or securities and (3) all funds established by the Bond Indenture.

At the option of the Authority, all outstanding San Juan Project Revenue Bonds are subject to redemption prior to maturity.

The Bond Indenture requires mandatory sinking fund installments to be made beginning in fiscal year 2012 for the 1993 Series A Bonds. The scheduled principal maturities for the San Juan Project Revenue Bonds during the five fiscal years following June 30, 1996 are 86,035,000 in 1998, 86,275,000 in 1999, 86,540,000 in 2000 and 86,825,000 in 2001. The average interest rate on outstanding debt during fiscal year 1996 and 1995 was 5.3%.

Refundin Bonds In April 1996, the Authority issued 8152,905,000 of Palo Verde 1996 Subordinate Refunding Series A Bonds to refund 8163,355,000 of previously issued Palo Verde 1987 Refunding Series A Bonds and issued 858,870,000 of Palo Verde 1996 Subordinate Refunding Series B Bonds to refund 818,555,000 and 840,315,000 of previously issued Palo Verde 1986 Refunding Series B and 1987 Refunding Series A Bonds, respectively. The refunding is expected to reduce total debt service payments over the next 13 years by approximately 850,967,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately 829,537,000.

In March 1994, the Authority issued 851,835,000 of Mead-Phoenix Project Revenue Bonds and 8173,955,000 of Mead-Adelanto Project Revenue Bonds to refund 8243,150,000 of previously issued Multiple Project Revenue Bonds which were transferred to the Mead-Phoenix and Mead-Adelanto projects during fiscal year 1993. The partial refunding of the original issue within five years of its issuance triggered a recalculation of the arbitrage yield. The recalculation resulted in a higher arbitrage yield which reduced the rebate liability of the Authority. At June 30, 1996, cumulative savings due to the rebate calculation amounted to 86,401,924. This amount was allocated 81,707,180 and 84,694,744 to the Mead-Phoenix and Mead-Adelanto Projects, respectively.

In July 1992, the Authority issued 8475,000,000 of Southern Transmission Project Revenue Bonds to refund 8385,385,000 of previously issued bonds. Principal and interest with respect to the 1992 bonds are allocated into four separate components. Each of components 1, 2 and 3 is secured by, and payable from, investments in its escrow fund until scheduled crossover dates. Component 4 proceeds of 814,100,000 were used to advance refund approximately 89,000,000 of bonds in fiscal year 1993. On the Component 1 Crossover date (January 1, 1994), Component 1 proceeds of 813,959,000 were used in fiscal 1994 to advance refund 813,455,000 of previously issued bonds.

On the Component 2 Crossover date (January 1, 1995), Component 2 proceeds of 85,519,000 were used in fiscal 1995 to advance refund 85,335,000 of previously issued bonds. Proceeds from Component 3 of 8343,921,000 werc placed in an irrevocable trust and will be used to redeem 8313,050,000 of bonds currently included within long-term debt at scheduled call dates. The I

NOTE 4: (Continued) combined refunding is expected to reduce total debt service payments over the next 25 years by approximately 852,585,000 and is expected to result in an overall net present value savings of approximately 825,060,000.

Until the bonds to be refunded by Component 3 are called, interest on the bonds is payable from interest earned on investments with a financial institution under a specific investment agreement purchased out of the proceeds of the sales and held in bank escrow accounts. After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through fiscal 1997, interest on the bonds will be payable from revenues. The trust account assets (8343,898,000 in escrow accounts and 82,410,000 in unamortized debt expense at June 30, 1996) and liabilities (8347,388,000, net of bond discounts, at June 30, 1996) for Component 3 are included in the Authority's financial statements. The revenue bonds to be refunded are also included in the financial statements until the scheduled call date, at which time the refunded bonds and related trust account assets will be removed from the balance sheet and the cost of refunding the debt will be included in unamortized debt expenses.

In January 1992, $ 70,680,000 of Palo Verde Special Obligation Crossover Series Bonds were issued, the proceeds of which were placed in an irrevocable trust and will be used to redeem 869,125,000 of bonds currently included within long term debt at scheduled call dates.

Until the bonds to be refunded by the Palo Verde Special Obligation Crossover Series Bonds are called, interest on the Palo Verde Special Obligation Crossover Series Bonds is payable from interest earned on securities of the United States Government purchased out of the proceeds of the sales and held in bank escrow accounts. After the monies in the escrow accounts are applied to redeem the bonds to be called, primarily through 1996, interest on the Palo Verde Special Obligation Crossover Series Bonds will be payable from revenues. The trust account assets and the liability for the Palo Verde Special Obligation Crossover Series Bonds are not included in the Authority's financial statements. At June 30, 1996 and 1995, $ 63,849,000 and $ 70,959,000, respectively, of these trust assets have been offset against the Palo Verde Special Obligation Crossover Series Bonds.

On July 1, 1995, the crossover date for the Palo Verde Special Obligation Bonds Series A, trust assets in escrow of 87,131,000 were used to advance refund 87,125,000 of previously issued bonds.

At June 30, 1996 and 1995, the aggregate amount of debt in all projects considered to be defeased was $ 3,535,075,000 and 83,305,725,000, respectively.

Interest Rate Swa In fiscal year 1991, the Authority entered into an Interest Rate Swap agreement with a third party for the purpose of hedging against interest rate fluctuations arising from the issuance of the Transmission Project Revenue Bonds, 1991 Subordinate Refunding Series as variable rate obligations. The notional amount of the Swap Agreement is equal to the par value of the bond ($ 291,700,000 and

$ 292,000,000 at June 30, 1996 and 1995, respectively). The Swap Agreement provides for the Authority to make payments to the third party on a fixed rate basis at 6.38%, and for the third party to make reciprocal payments based on a variable rate basis (3.1% and 3.9% at June 30, 1996 and 1995, respectively). The bonds mature in 2019.

I I

I I

I

COMBiNED SCHEDULE OF LONG-TERhf DEBT (ln thousands)

Date Effcctivc Maturity on

~o tu33, Principal:

Palo Verde Project Revenue and Refunding Bonds 1985A 05/22/85 9.7% 1996 to 1999 8 1,070 1985B 07/02/85 9.1% 1996 to 2000 5,610 1986A 03/13/86 8.2% 1996 to 2006 71,220 1986B 12/16/86 7.2% 1996 to 2017 96,450 1987A 02/11/87 6.9% 1996 to 2017 43,720 1989A 02/15/89 Z.2% 1996 to 2015 287,705 1992A 01/01/92 6.0% 1996 to 2010 7465 1992C 01/01/92 6.0% 1996 to 2010 15,620 1993Sub 03/01/93 5.5% 1996 to 2017 98,200 1993A 03/01/93 5.5% 1996 to 2017 270,035 1996A 02/13/96 4.4% 1996 to 2017 152,905 1996B 02/29/96 4.4% 1996 to 201Z 1,108,670 Southern Transmission System Project Revenue and Refunding Bonds 1986A 03/18/86 8.0% 1996 to 2021 107,300 1986B 04/29/86 7.5% 1996 to 2023 401,570 1988A 11/22/88 7.2% 1996 to 2015 154,085 1991A 4/17/91 6.4% 2019 291,700 1992 Comp 1, 2,4 7/20/92 6.1% 1996 to 2021 40,639 1992 Comp 3 7/20/92 6.1% 1996 to 2021 431,766 1993A 7/01/93 5.4% 1996 to 2023

~5925 Hoover Uprating Project Revenue and Refunding Bonds 1986A 08/13/86 8.1% 1996 to 2017 4,160 1991 08/01/91 6.2% 1996 to 2017

~5655 multiple Project Revenue Bonds Mead-Phoenix Project 1989 01/04/90 7.1% 1999 to 2020 38,800 Mead-Adelanto Project 1989 01/0$ /90 7.1% 1999 to 2020 106,ZOO hfultiple Project 1989 01/0$ /90 7.1% 1999 to 2020 ~259 99 Mead-Phoenix Project Revenue Bonds 1994A 03/01/94 5.3% 2006 to 2015 5 835 hfead.Addanto Project Revenue Bonds 1994A 03/01/94 5.3% 2006 to 2015 7 955 San Juan Project Revenue Bonds 1993 06/01/93 5.6% 1997 to 2020 237 37 Total principal amount Unamortized bond discount:

Palo Verde Project (101,823)

Southern Transmission System Project (159,935)

Hoover Uprating Project (3+89)

Mead-Phoenix Project (4,218) hfead-Adelanto Project (12,650) hfultiple Project Fund (16813)

San Juan Project ~L92$

Total unamortized bond discount ~3974 7 Long. tenn debt due within one year ~4~5 Total long-term debt, net (including Subordinate Refunding Crossover Series) ~32 3933 Note - bonds which have been refunded arc excluded from this schedule

vg I

I

NOTE 5 - DISCLOSURES ABOUT FAIR VALUE 01 FINANCIALINSTRUMENTS:

The following methods and assumptions were used to estimate the fair value of each class of financial instruments for which it is practicable to estimate that value:

Cash and cash e uivalents The carrying value approximates fair value because of the short maturity of those instruments.

Investments Decommissionin fund Escrow account - Subordinate Refundin Crossover Series Crossover escrow accounts The fair values of investments are estimated based on quoted market prices for the same or similar investments.

Lon -term deb S ecial Obli ation Crossover Series Bonds Subordinate Refundin Crossover Series The fair value of the Authority's debt is estimated based on the quoted market prices for the same or similar issues or on the current average rates offered to the Authority for debt of approximately the same remaining maturities, net of the effect of a related interest rate swap agreement.

The fair values of the Authority's financial instruments are as follows (in thousands):

une 30 1996 1995 Amortized Fair Amortized Fair Cost Value Cost Value Assets:

Cash and cash equivalents 173,798 8 173,798 8 120,610 8 120,610 Escrow account - Subordinate Refunding Crossover Series 346,468 343,898 345,782 343,921 Decommissioning fund 33,865 33,474 24,503 24,503 Investments 597,831 597,427 682,916 682,442 Liabilities:

Debt 2,910,200 3,210,790 2,933,261 3,198,500 Subordinate Refunding Crossover Series 347,388 385,516 347,782 377,700 Off Balance Sheet Financial Instruments:

Special Obligation Crossover Series Bonds 63,415 - 67,739 70,680 75,800 Crossover escrow accounts 63,849 63,849 70,959 70,959 I

l;

'I I

NOTE 6 - POWER SALES AND TRANSMISSION SERVICE CONTRACTS:

The Authority has power sales contracts with ten participants of the Palo Verde Project (see Note 1).

Under the terms of the contracts, the participants are entitled to popover output from the PVNGS and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Power Project Revenue Bonds and other debt. The contracts expire in 2030 and, as long as any Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.

The Authority has transmission service contracts with six participants of the Southern Transmission System Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Southern Transmission System Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on Transmission Project Revenue Bonds and other debt. The contracts expire in 2027 and, as long as any Transmission Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.

In March 1986, the Authority entered into power sales contracts with six participants of the Hoover Uprating Project (see Note 1). Under the terms of the contracts, the participants are entitled to capacity and associated firm energy of the Hoover Uprating Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service whether or not the Hoover Uprating Project or any part thereof has been completed, is operating or is operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2018, and as long as any Hydroelectric Power Project Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.

In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Phoenix Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Phoenix Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Phoenix Revenue Bonds and other debt, whether or not the Mead-Phoenix Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as long as any Multiple Project and Mead-Phoenix Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.

In August 1992, the Authority entered into transmission service contracts with nine participants of the Mead-Adelanto Project (see Note 1). Under the terms of the contracts, the participants are entitled to transmission service utilizing the Mead-Adelanto Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the Multiple Project and Mead-Adelanto Revenue Bonds and other debt, whether or not the Mead-Adelanto Project or any part thereof has been completed, is operating and operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire l

k%

~

sg .

Y I

J 1

I k

I

NOTE 6: (Continued) in 2030 and, as long as any Multiple Project and Mead-Adelanto Revenue Bonds are outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bond holders.

In January 1993, the Authority entered into power sales contracts with five participants of Unit 3 of the San Juan Project (see Note 1). Under the terms of the contracts, the participants are entitled to their proportionate share of the power output of the San Juan Project and are obligated to make payments on a "take or pay" basis for their proportionate share of operating and maintenance expenses and debt service on the San Juan Revenue Bonds, whether or not Unit 3 of the San Juan Project or any part thereof is operating or operable, or its service is suspended, interfered with, reduced or curtailed or terminated in whole or in part. The contracts expire in 2030 and, as long as any San Juan Revenue Bonds are

'outstanding, cannot be terminated or amended in any manner which will impair or adversely affect the rights of the bondholders.

NOTE 7 - COSTS RECOVERABLE I ROM I'UTURE BILLINGS TO PARTICIPANTS:

Billings to participants are designed to recover "costs" as defined by the power sales and transmission service agreements. The billings are structured to systematically provide for debt service requirements, operating funds and reserves in accordance with these agreements. Those expenses, according to generally accepted accounting principles (GAAP), which are not included as "costs" are deferred to such periods when it is intended that they be recovered through billings for the repayment of principal on related debt.

Costs recoverable from future billings to participants are comprised of the following:

Balance Fiscal Balance June 30, 1996 June 30, 1995 ~Activit 1996 GAAP items not included in billings to participants:

Depreciation of plant 8348,328 8 49,323 N97,651 Amortization of bond discount, debt issue costs, and cost of refunding 206,470 37,745 244,215 Nuclear fuel amortization 18,650 898 19,548 Decommissioning expense 75,233 7,610 82,843 Interest expense 23,165 22,798 45,963 Bond requirements included in billings to participants:

Operations and maintenance, net of investment income (67,253) (21,062) (88,315)

Costs of acquisition of capacity - STS (18,350) (18,350)

Reduction in debt service billings due to transfer of excess funds 78,658 (11,099) 67,559 Principal repayments (222,130) (39,559) (261,689)

Other ~31 740 ~3858 ~85 598

~41~1@f~42~7 ]~~27 I

%' ~

I I

I

NOTE 8 - COMMITMENTS AND CONTINGENCIES:

On August 31, 1996, the California State Legislature approved Bill AB 1890 (Bill) which provides for broad deregulation of the power generation industry in California. The Bill, which is pending approval by the Governor, requires the participation of the state's three investor-owned utilities. Consumer-owned utilities can participate on a voluntary basis but must hold public hearings as part of its decision making process. The Bill, which was supported by the Authority, authorizes the collection of a transition charge for generation when a consumer-owned utility opens its service area to competition and participates in the independent transmission system established by the legislation. The Bill also mandates the collection of a public benefit charge from all electric utility customers in the state. Although these funds (currently estimated at 2.5% of gross revenues) must be spent on renewable resources, conservation, research and development, or low income rate subsidies, the governing authority of each consumer-owned utility will control actual expenditures.

As a participant in the PVNGS, the Authority could be subject to assessment of retroactive insurance premium adjustments in the event of a nuclear incident at the PVNGS or at any other licensed reactor in the United States.

The Authority is involved in various legal actions. In the opinion of management, the outcome of such litigation or claims will not have a material effect on the financial position of the Authority or the respective separate projects.

NOTE 9: SUBSE UENT EVENTS:

On July 1, 1996, the crossover date for t)ie Palo Verde Special Obligation Bonds Series B, trust assets held in escrow of 863,415,000 were used to advance refund 862,000,000 of previously issued bonds.

In August 1996, the Authority issued $ 89,570,000 of Palo Verde 1996 Subordinate Refunding Series C bonds to refund $ 95,015,000 of 1986 Refunding Series B bonds. The refunding is expected to reduce total debt service payments over the next 20 years by approximately 824,713,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately $ 16,955,000.

In September 1996, the Authority issued 842,245,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series A and 8121,065,000 of Transmission Project Revenue Bonds, 1996 Subordinate Refunding Series B to refund 868,720,000 and 8127,100,000 of the STS 1986 Refunding Series A and B, respectively. The refunding is expected to reduce total debt service payments over the next 10 years by approximately $ 6,029,000 (the difference between the debt service payments on the old and new debt) and is expected to result in a net present value savings of approximately N,372,000.

I I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SUPPLEMFNTAL FINANCIALINFORitfATION INDF.X Palo Verde Pro'ect Supplemental Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for thc Years Ended June 30, 1996 and 1995 Supplcmcntal Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended Junc 30, 1996 Southern Transmission S stem Pro ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statcmcnt of Operations for the Years Ended June 30, 1996 and 1995 Supplcmcntal Statcmcnt of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by thc Bond Indcnturc for thc Year Ended June 30, 1996 Hoover U ratin Pro'ect Supplcmcntal Balance Sheet at Junc 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended Junc 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 hfead-Phoenix Pro'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Three Months Ended June 30, 1996 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schcdulc of Receipts and Disbursements in Funds Rcquircd by the Bond indenture for thc Year Ended Junc 30, 1996 Mead-Adelanto Pie'ect Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statcmcnt of Operations for the Three Months Ended June 30, 1996 Supplcmcntal Statcmcnt of Cash Flows for the Years Ended Junc 30, 1996 and 1995 Supplcmcntal Schedule of Receipts and Disbursements in Funds Required by the Bond Indenture for the Year Ended June 30, 1996 Multi lc Pro'cct Fund Supplemental Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Cash Flows for the Years Ended June 30, 1996 and 1995 Supplemental Schedule of Receipts and Disbursements in Funds Rcquircd by the Bond Indenture for the Year Ended June 30, 1996 San uan Pro'ect Supplcmcntal Balance Sheet at June 30, 1996 and 1995 Supplemental Statement of Operations for the Years Ended June 30, 1996 meed 1995 Supplemental Statement of Cash Flows for thc Years Ended Junc 30, 1996 and 1995 Supplemental Schedule of Receipts and Disburscmcnts in Funds Required by the Bond Indenture for thc Year Ended June 30, 1996 5

SOUTIIERN CALIFORNIA PVBLIC POWER AUTIIORITY PALO VERDE PROJECT SUPPI.F.ltIF.NTAI. BAIANCE SHF.FT (In thousands) une 30 1995 Vtility plant:

Production $ 613,608 $ 611,771 Transmission 14,146 14,146 General 2 569 2 674 630,323 628,491 Less - Accumulated depreciation 250 021 219 881 380,302 408,610 Construction work in progress 9,503 9,683 Nuclear fuel, at amortized cost 13 225 12716 Net utility plant 403 030 431 009 Special funds:

Availablc for sale at fair value:

Decommissioning fund 33,474 24,503 Invcstmcnts 115,746 143,600 Interest receivable 1,512 1,223 Cash and cash cquivalcnts 67 879 49 354 218 61 218 680 Accounts rcceivablc 738 912 Materials and supplies 9,240 9,618 Costs recoverable front future billings to participants 204,945 197,515 Unrcalizcd loss on invcstmcnts in funds available for sale 456 226 Vnamortizcd debt expenses, less accumulated antortization of $ 65,795 and $ 71,525 204 093 209 740 Total assets f~~73 ~067 700 I.IABII,ITIFS Long-term debt 5 9S1 155 ~996 390 Current liabilities:

Long-term debt duc within onc year 25,690 23,855 Accrued interest 24,535 30,685 Accounts payable and accrued cxpcnscs 10 333 16 770 Total current liabilities 60 558 71 310 Commitments and contingencies Total liabilities ~0~7 ~067 700 See notes to financial statements.

I I

l l

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)

Year Ended une 30 1996 1995 Operating revenue:

Sales of electric energy ~185 464 ~129 180 Operating expenses:

Nuclear fuel 7,949 8,150 Other operations 25,815 25,307 Maintenance 6,317 7,825 Depreciation 18,425 19,145 Decommissioning 12 497 15 401 Total operating expenses 71.003 73.828 Operating income 64,461 55,352 Investment income 10 886 9.968 Income before debt expense 75,347 65,320 Debt expense 82 777 77 976 Costs recoverable from future billings to participants See notes to financial statements.

I l

I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMFNTAL STATEMENT OF CASH FLOWS (In thousands)

Year Fndcd unc 30 1996 1995 Cash flows from operating activities:

Costs recoverable from future billings to participants (S 7,430) (S 12,656)

Adjustments to arrive at net cash provided by (used for) operating activitics-Depreciation 18,425 19,145 Decommissioning 12,497 13,401 Amortization of nuclear fuel 7,949 8,150 Amortization of debt costs 24,428 16,607 Changes in assets and liabilities:

Decommissioning fund (8,971) (1,297)

Interest receivable (289) 127 Accounts receivable 174 131 Materials and supplies 378 729 Other assets 55 (2)

Accrued interest (6,150) (719)

Accounts payable and accrued expenses ~6437 3 241 Net cash provided by operating activities 34 629 46 857 Cash flows from investing activities:

Payments for construction of facility (10,892) (9,569)

Purchases of investmcnts (154,685) (97,108)

Proceeds from sale/maturity of invcstmcnts 182 309 68 891 Net cash provided by (used for) investing activities 16 732 ~37 786 Cash flows from capital and related financing activities:

Payment of principal on long-term debt (231855) (22,425)

Payment of bond issue costs (4,832)

Payment for defcasancc of revenue bonds (233,632)

Proceeds from issuance of refunding bonds 229 483 Nct cash used for capital and rclatcd financing activities (32,836) (22,425)

Nct increase (decrease) in cash and cash cquivalcnts 18,525 (13,354)

Cash and cash cquivalcnts at beginning of period 49 354 62 708 Cash and cash equivalents at end of year ~67 87 ~9~35 Supplemental disclosure of cash flow infortnation:

Cash paid during the year for interest (nct of amount capitalized) ~644 9 ~62089 Scc notes to financial statements.

I l

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY PALO VERDE PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEMEKIS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDFD UNF. 30 1996 (In thousands)

Debt Reserve & Decommissioning Service Revenue Operating Contingency Issue Funds Fund Fund Fund Fund Fund I & II Total Balance at June 30, 1995 132 133 8 30948 8 16574 8 12482 8 24490 8 216627 Additions:

Investment earnings 4,409 31 834 1,100 616 749 7,739 Distribution of investment earnings (5,734) 8,604 (1,213) (1,000) (657)

Discount on investment purchases 1,971 3 513 336 41 423 3,287 Revenue from power sales 49 129,180 37 6 129,272 Distribution of revenues 81,922 (138,843) 39,603 3,989 5,325 8,004 Transfers to escrow for rcfundings (10,413) 78 (93) (2,886) 4,046 (9,268)

Transfer from escrow for principal and interest payments 379 634 951 11 067 10 581 380 099 Total 451 838 28 614 12 126 9 371 9 176 511 129 Deductions:

Construction expenditures 3,060 3,060 Operating expenditures 31,041 31,046 Fuel costs 8,45? 8,457 Bond issue costs 3,173 3,173 Payment of principal 23,855 23,855 Interest paid 55,130 5,663 60,793 Premium and interest paid on investments 202 115 58 131 506 Payment of principal and interest on escrow bonds 380 099 380 099 Total 459 286 39 613 3 118 8 836 136 510 989 Balance at June 30, 1996 ~124 684 S 4 ~19 949 ~24 582 ~I~07 3 33 530 ~26 767 This schedule summarizes the receipts and disbursements in funds required under thc Bond Indenture and has been prepared from thc trust statements. The balances in the funds consist of cash and investments at original cost. These balances do not include accrued interest receivable of $ 1,245 and $ 1,223 and Decommissioning Fund accrued interest receivable of $ 267 and $ 138 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discounts of $ 788 and $ 918 at June 30, 1996 and 1995, respectively. These balances also do not include unrealized loss on investments in funds available for sale of $ 456 and $ 226 at June 30, 1996 and 1995, respectively.

i g

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLFBIENTAL BALANCE SHEET (In thousands) unc 30 1996 1995 55527S Utility plant:

Transmission S 674,606 8 675,301 General 18 893 18 893 693,499 694,194 Less - Accumulated depreciation 194 127 174 392 499,372 519,802 Construction work in progress 1 212 Nct utility plant 499 372 521 014 Special funds:

Available for sale at fair value:

Investmcnts 102,842 144,476 Escrow account - Subordinate Refunding Crossover Series 343,898 343,921 Advance to Intermountain Power Agency 19,550 19,550 Interest rcccivablc 2,169 1,807 Cash and cash equivalents 90 324 54 678 558 783 564 432 Accounts receivable 2,687 2,469 Costs recoverable from future billings to participants 203,787 183,154 Unrealized loss on investments in funds available for sale 2,865 1,89?

Unamortized debt expenses, less accumulated amortization of S59,752 and S51,415 164 247 172 780 Total assets aL 43~741 1 445 746 I.IABILITIES Long-term debt 1 034 757 5 1 042002 Subordinate Refunding Crossover Series 347 388 347 782 Current liabilities:

Long-term debt duc within one year 10,845 14,325 Accrued interest 38,436 39,379 Accounts payable and accrued expenses 315 2 258 Total current liabilities 49 596 55 962 Commitmcnts and contingencies Total liabilities ~13 ~741 1 445 746 Scc notes to financial statements.

I I

I I

I I

I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)

Year Ended une 30 1996 1995 Operating revenue:

Sales of transmission services 85 297 91 250 Operating expenses:

Other operations 10,192 11,839 Maintenance 5,236 4,498 Depreciation 20 329 19 735 Total operating expenses 35 757 36 072 Operating income 49,540 55,178 Investment income 28.993 30 085 Income before debt expense 78,533 85,263 Debt expense 99 166 99 823 Costs recoverable from future billings to participants OL22 KB (~4~

See notes to financial statements.

I I

I I

I I

I

SOUTIIERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSMISSION SYSTEM PROJECT SUPPI.FMENT I. STATEMENT OF CASH FLOWS (In thousands)

Year Ended une 30 1996 1995 Cash flows from operating activities:

Costs recoverable from future billings to participants (8 20,633) (8 14,560)

Adjustments to arrive at nct cash provided by (used for) operating activitics-Dcpreciation 20,329 19,735 Amortization of debt costs 11,739 11,545 Write-off of construction work in progress costs 1,313 Changes in assets and liabilities:

Interest reccivablc (362) 315 Accounts rcccivablc (218) 1,940 Other assets 17 Accrued interest (943) 10,773 Accounts payablc and accrued expenses ~1943 ~268 Net cash provided by operating activities 9 282 29 497 Cash flows from investing activities:

Payments for construction of facility (315)

Purchases of investments (154,904) (94,425)

Proceeds from sale/maturity of invcstmcnts 195 593 90 462 Net cash provided by (used for) investing activities 40 689 4 278 Cash flows from capital and rclatcd financing activities:

Payment for defeasance of revenue bonds (5,479)

Repayment of principal on long-term debt 14 325 ~13 615 Nct cash used for capital and related financing activities 14 325 19 094 Net increase in cash and cash equivalents 35,646 6,125 Cash and cash equivalents at beginning of year 54 678 48 553 Cash and cash equivalents at cnd of year ~5~78 Supplemental disclosure of cash flow information:

Cash paid during the year for interest (nct of amount capitalized) 8 370 96 072 Sce notes to financial statcmcnts.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SOUTHERN TRANSh! ISSION SYSTEM PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPIS AND DISBURSEhf ERIS IN FUNDS REQUIRED BY TIIE BOND INDENTURE YFA D D F30 1996 (In thousands)

Construction Fund-Initial

~t Debt General Facilities Service Operating Reserve Issue Escrow

~utci Fund ~un Fund Balance at June 30, 1995 222 602 ~~4 2 77 ull 5 3M4222 2 542 660 Additions:

Investmcnt earnings 12 6,485 463 635 39102 18,567 29,264 Distribution of investment earnings (5,710) 9,408 (596) 6,182 (9,284)

Revenue from transmission sales 83,953 83,953 Distribution of revenue 42@30 (78,891) (5303) 50,942 (9,278)

Transfer from escrow for principal and Interest payments ~29 ~29 Total ~au ~a33 ~5264 ~2~2 ~26 28 Deductions:

Operating expenses 14,904 14,904 Payment of principal 149325 14/25 Interest paid 41476 19/86 60,862 Payment of principal and interest on escrow bonds 12,921 26@75 39,496 Premium and interest paid on investment purchases 1,267 39 I/06 Other Total 55 764 39 ~61 35 ~13 t~4 Balance at June 30, 1996 z 234 ~106 411 ~605 ~4757 ~76 219 ~343 874 536 946 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust staterncnts. The balances in the funds consist of cash and Investments at original cost. These balances do not include accrued interest receivable of $ 2,169 and $ 1,807 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discounts of $ 2,983 and $ 2@12 at June 30, 1996 and 1995, respectively. 'Ihese balances do not include unrealized loss on investments in funds available for sale of $ 2,865 and $ 1,897 at June 30, 1996 and 1995, respectively.

I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996 1995 ASSETS Special funds:

Investments available for sale at fair value 8 9,628 7,653 Advances for capacity and energy, net 10,119 11,903 Interest receivable 6 26 Cash and cash equivalents 1 997 2 745 21 750 22 327 Accounts receivable 19 Costs recoverable from future billings to participants 7,538 7,299 Unrealized loss on investments in funds available for sale 18 Unamortized debt expenses, less accumulated amortization of $ 937 and $ 795 3 307 3 512 Total assets R&2&i f~l'g LIABILITIES Long-term debt 30 981 31 977 Current liabilities:

Long-term debt due within one year 1,085 610 Accrued interest 489 500 Accounts payable and accrued expenses 62 69 Total current liabilities 1 636 1 179

.Commitments and contingencies Total liabilities ~2~17 See notes to financial statements.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)

Year Ended une 30 1996 1995 Operating revenue:

Sales of electric energy 3 349 3 569 Operating expenses:

Capacity charges 1,011 1,207 Energy charges 844 832 Other operations 342 360 Reimbursement of advances for capacity and energy 3 12 Total operating expenses 2 200 2 411 Operating income 1,149 1,158 Investment income 874 514 Income before debt expense 2,023 1,672 Debt expense 2 262 2 810 Costs recoverable from future billings to participants (l~K)

See notes to financial statements.

I I

I I

I I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)

Year Ended une 30 1996 1995 Cash flows from operating activities:

Costs recoverable from future billings to participants (8 239) (8 638)

Adjustments to arrive at net cash used for operating activities:

Amortization of debt costs 294 288 Changes in assets and liabilities:

Interest receivable 20 Accounts receivable (19) 54 Other assets 21 Accrued interest (18)

Accounts payable and accrued expenses ~594 Net cash provided by (used) for operating activities 38 887 Cash flows from investing activities:

Purchases of investments (22,665) (11,546)

Proceeds from sale/maturity of investments 20,705 9,491 Advances for capacity and energy, net 1 784 1 415 Net cash used for investing activities ~176 ~640 Cash flows from capital and related financing activities:

Payment for defeasance of revenue bonds (319)

Repayment of principal on long-term debt ~610 ~860 Net cash used for capital and related financing activities ~610 ~1179 Net decrease in cash and cash equivalents (748) (2,706)

Cash and cash equivalents at beginning of year 2 745 5 451 Cash and cash equivalents at end of year ~lr)7 j~27~4 Supplemental disclosure of cash flow information:

Cash paid during year for interest (net of amount capitalized)

See notes to financial statements.

I I

I I

I I

I'

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY HOOVER UPRATING PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE YEAR ENDED UNE 30 1996 (In thousands)

Operating Debt Advance Working Debt Service General Payments Operating Revenue Capital Service Reserve Reserve Funds Fund Fund Fund Account Account Account Total Balance at June 30, 1995 S 2410 560 S I 435 S 3 083 S 2876 S 10364 Additions:

Investment earnings 16 2 2 29 33 152 3 237 Distribution of investment earnings 193 (2) 256 (29) (90) (115) (213)

Discount on investment purchases 85 43 289 211 628 Revenue from power sales 3,330 3,330 Distribution of revenues 165 (3,342) 3,177 Transfer from escrow for principal and interest payments 2 393 147 251 2 433 2 382 2 318 Total 2 099 355 5 842 37 2 383 6 513 Deductions:

Advances for capacity and energy 75 75 Payment of principal 610 610 Administrative expenditures 236 117 (5) 348 Interest paid 1,978 1,978 Premium on investment purchases 37 37 Payment of principal and interest on escrow bonds 2 318 2 318 Total 311 117 ~5 4 906 37 5 366 Balance at June 30, 1996 238 560 ~2;177 ~3083 ~52 S S 11 511 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of cash and investments at original cost. 'Ihese balances do not include accrued interest receivable of $ 6 and $26 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of $ 11Z and $ 52 at June 30, 1996 and 1995, respectivdy. These balances abo do not include unrealized loss on investments in funds available for sale of $ 3 and $ 18 at June 30, 1996 and 1995, respectively.

41-

l I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996 1995 ASSETS Utility plant:

Transmission S 48,307 General I 971 50,278 Less: Accumulated depreciation 846 49,432 Construction work in progress 3 116 39 179 Nct utility plant 52,548 39,179 Special funds:

Investmcnts available for sale at fair value 21,591 32,759 Interest receivable 841 1,246 Cash and cash equivalents 1 548 I 280 23 980 35285 Accounts receivable 1,750 1,963 Costs recoverable from future billings to participants 1,3.94 Unrealized loss on invcstmcnts in funds availablc for sale 51 Prepaid expense 2,003 Unamortized debt expenses, less accumulated amortization of $ 1,257 and 8736 9 8II8 10 408 Total assets ~895 5 ~88 889 LIABILITIES Long-term debt 86 417 86 267 Current liabilities:

Accrued interest 2,588 2,588 Accounts payable 590 34 Total current liabilities 3 178 2 622 Commitments and contingencies Total liabilities ~895 5 88 889 Sce notes to financial statcmcnts.

4 I

I

~

~

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*

(In thousands)

Operating revenue:

Sales of transmission services 226 Operating expenses:

Other operation 213 Maintenance 13 Depreciation 342 Total operating expenses 568 Operating loss (342)

Investment income 410 Income before debt expense 68 Debt expense 1 462 Costs recoverable from future billings to participants 0~%~3 See notes to financial statements.

  • Operations commenced April 1996.

I I

I

~

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)

Year Ended une 30 1996 1995 Cash flows from operating activities:

Cost recoverable from future billings to participants ~1394 Adjustments to arrive at net cash provided by (used for) operating activities:

Depreciation 342 Amortization of debt costs 167 Changes in assets and liabilities:

Interest receivable 405 Accounts receivable 213 Other assets 1,977 Accounts payable 556 Net cash provided by operating activities 2 266 Cash flows from investing activities:

Interest received on investments 4,251 Payments for construction of facility (13,208) (21,310)

Purchases of investments (3,264) (2,725)

Proceeds from sale/maturity of investments 14,474 26,078 Reimbursement from WAPA 83 Net cash (used for) provided by investing activities ~1998 6 377 Cash flows from capital and related financing activities:

Payment of interest on long-term debt Payment for bond issue costs ~9 (5,093)

Net cash used for capital and related financing activities 5 102 Net increase in cash and cash equivalents 268 1,275 Cash and cash equivalents at beginning of year 1 280 5 Cash and cash equivalents at end of year ~1~4 ~1280 Supplemental disclosure of cash flow information:

Cash paid during the period for interest (net of amount capitalized)

See notes to financial statements.

1 I

I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-PHOENIX PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR FNDFD UNE 30 1996 (In thousands)

Debt Debt Service Acquisition Service Reserve Revenue Issue Operating Total 3,

Account Account Account Fund Fund Fund Balance at Junc 30, 1995 $ 18972 l 4288 $ 5916 3, $ 4994 $ 34170 Additions:

Investment earnings 1,564 286 435 154 2,441 Transfer of invcstmcnts 435 (435)

Rcimburscmcnt from WAPA 80 80 Transmission rcvcnuc 360 360 Transfer of monthly tfansnllsslon costs 297 297 Total 1 644 721 65 154 297 2 881 Deductions:

Construction expcnditurcs 8,536 8,536 Intcrcst paid 2,642 2,534 5,176 Premium and intcrcst paid on invcstmcnt purchases 89 Operating cxpenscs 60 60 Total 8 536 2 642 2 623 60 13 861 Balance at Junc 30, 1996 teuJ 2~00 ~2867 ~5916 s 65 ~2525 ~287 tc 23~0 This schcdulc summarizes the receipts and disbursements in funds required under thc Bond Indenture and has been prepared from the trust statements. Thc balances in the funds consist of cash and investmcnts at original cost. Thcsc balances do not include accrued intcrcst rcccivable of S841 and S1,246 at June 30, 1996 and 1995, rcspcctively, nor do they include total amortized nct invcstmcnt prcmiunls of $ 42 and $ 80 at Junc 30, 1996 and 1995, respectively. These balances do not include unrealized loss on invcstmcnts in funds availablc for sale of S9 and $ 51 at Junc 30, 1996 and 1995, rcspcctivcly.

l 1'

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL BALANCE SHFFT (In thousands) une 30 1996 1995

~SFTS Utility plant:

Transmission 8 171,068 General 164 171,232 Less: Accumulated depreciation 1 255 Construction work in progress ~154 011 Nct utility plant 169 977 154 011 Special funds:

Investments availablc for sale at fair value 62,562 76,235 Interest receivable 2,285 2,976 Cash and cash equivalents 4 504 4 279 69 351 83 490 Accounts rcccivable 4,741 4,669 Costs rccovcrablc from future billings to participants 4,383 Unrcalizcd loss on invcstmcnts in funds available for sale 28 171 Prepaid cxpcnsc 3,533 Unamortized debt cxpcnscs, less accumulated amortization of 83,582 and $ 2,098 28 123 29 607 Total assets 75 481 I.IABILITIFS Long-term debt 268 005 267 561 Current liabilities:

Accrued intcrcst 7,884 7,885 Accounts payable 780 35 Total current liabilities 8 664 7 920 Commitments and contingcncics Total liabilities ~27t~66 275 481 Sce notes to financial statcmcnts.

I SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS THREE MONTHS ENDED UNE 30 1996*

(In thousands)

Operating revenue:

Sales of transmission services 172 Operating expenses:

Other operation 145 Maintenance 27 Depreciation 1 182 Total operating expenses 1 504 Operating loss 1 132 Investment income 1 174 Income before debt expense Debt expense 4 425 Costs recoverable from future billings to participants C~E)

See notes to financial statements.

Operations commenced April 1996.

l SOUTHERN CALIFORNIA PUBLIC POVYER AUTHORITY MEAD-ADELANTOPROJECT SUPPLEMFNTAL STATEMFNT OF CASH FI.OWS (In thousands) une 30 1996 1995 Cash flows from operating activities:

Cost recoverable from future billings to participants (3 4,383) 3 Adjustments to arrive at nct cash provided by (used for) operating activities:

Dc preciation 1,132 Amortization of debt costs 482 Changes in assets and liabilities:

Interest receivable 691 Accounts receivable (72)

Prepaid expense 3,467 Accrued interest (I)

Accounts payable 745 Nct cash provided by operating activities 2 981 Cash flows from investing activities:

Intcrcst rcceivcd on investments 11,316 Payments for construction of facility (15,652) (71,033)

Purchases of invcstmcnts (9,184) (4,627)

Procccds from sale/maturity of investments 23,000 84,113 Reimbursement from O'APA 28 Nct cash (used for) provided by investing activities ~1838 19 797 Cash flows from capital and related financing activities:

Payments of interest on long-term debt Payment for bond issue costs ~31(15,487)

Nct cash used for capital and related financing activities 15 518 Nct increase in cash and cash equivalents 225 4,279 Cash and cash cquivalcnts at beginning of year 4 279 Cash and cash equivalents at cnd of year ~449k S 4 279 Supplemental disclosure of cash flow information:

Cash paid during the period for interest (net of amount capitalized)

Sec notes to financial statements.

l I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY hIEAD-ADELANTO PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEhIENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)

Debt Debt Service Acquisition Service Reserve Operating Issue Rcvenuc Account Account Account Fund Fund Fund Total Balance at June 30, 1995 $ 36 134 $ 11 793 $ 16 267 $ $ 16 760 $ $ 80 954 Additions:

Investment earnings 3,217 772 1,196 517 1 5,704 Transfer of invcstmcnt earnings 1,196 (1,196)

Reimbursement from WAPA 13 13 Transfers to operating fund 451 (451)

Transmission revenue 521 521 Total 3 230 1 968 452 517 71 6 238 Deductions:

Construction expenditures 3,697 3,697 Intcrcst paid 7,264 8,505 15,769 Premium and interest paid on invcstmcnt purchases 298 298 Operating cxpcnscs 189 191 Total 3 699 7 264 189 8 803 19 955 Balance at June 30, 1996 ~85 663 ~64~7 ~16 267 $ 263 ~8474 ~71 ~67 237 This schcdulc summarizes the receipts and disburscmcnts in funds required under the Bond Indenture and has been prcparcd from thc trust statements. Thc balances in the funds consist of cash and investmcnts at original cost. These balances do not include accrued interest receivable of S2,285 and S2,976 at June 30, 1996 and 1995, respectively, nor do they include total amortized nct invcstmcnt premiums of S143 and S269 at June 30, 1996 and 1995, respectively. Thcsc balances do not include unrcalizcd loss on investments in funds available for sale of S28 and S171 at Junc 30, 1996 and 1995, respectively.

I I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL BALANCE SHEET (In thousands) une 30 1996 1995 ASSETS Special funds:

Investments available for sale at fair value 8 250,888 8 249,020 Interest receivable 9220 9194.

Total assets ~2~1 $ 2~214 LIABILITIES Long-term debt $ 242 786 $ 242.107 Arbitrage rebate payable 77 Accounts payable to Mead-Phoenix Project and Mead-Adelanto Project 6 402 6.632 Deferred credits 2 664 1.141 Current liabilities:

Accrued interest 8 256 8.257 Commitments and contingencies Total liabilities ~2)Jgg ~2M 214 See notes to financial statements.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)

Year Ended une 30 1996 1995 Cash flows from operating activities Cash flows from investing activities:

Interest received on investments 18,380 18,470 Arbitrage payment (3,757)

Purchases of investments (1,868) (1,958)

Proceeds from sale/maturity of investments 5 757 Net cash provided by investing activities 16 512 16.512 Cash flows from capital and related financing activities:

Payments of interest on long-term debt 16 512 16 512 Net cash used for capital and financing activities ~16 512 ~16 512 Net increase in cash and cash equivalents Cash and cash equivalents at beginning of year Cash and cash equivalents at end of year See notes to financial statements.

I I

I I

I'

)

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY MULTIPLE PROJECT FUND SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)

Debt Proceeds Service Earnings Account Account Account Total Balance at June 30, 1995 247 727 ~1295 249 020 Additions:

Investment earnings 18,208 172 18,380 Transfer to earnings account (16,512) 16,512 Transfer to debt service account 16 512 ~16 512 Total 1 696 16.512 172 18 580 Deductions:

Interest paid 16 512 16 512 Total 16 512 16 512 Balance at June 30, 1996 ~249 42'f ~2%Un g This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of investments at original cost. These balances do not include accrued interest receivable of 59,220 and $ 9,194 at June 30, 1996 and 1995, respectively.

I I

I I

I I

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLFMFNTAL BAI.ANCE SHFET (In thousands) une 30 1996 1995 ASSETS Utility plant:

Production S 183,309 8 183,309 General 8 613 7 688 191,922 190,997 Less - Accumulated depreciation 36 622 24 415 155,300 166,582 Construction work in process 3 501 2 488 Nct utility plant 158 801 169 070 Special funds:

Investmcnts available for sale at fair value 34,170 28,699 Intcrcst rcccivablc 67 69 Cash and cash equivalents 7 546 8 274 41 783 37 042 Accounts receivable 945 1,891 Materials and supplies 3,569 3,679 Costs rccovcrablc ftxun future billings to participants 31,780 23,063 Unrcalizcd loss (gain) on investments in funds availablc for sale (28)

Unamortized debt expenses, less accumulated amortization of $ 942 and $ 628 3 090 3 461 Total assets ~2~72 238 78 LIABILITIFS Long-term debt 222 444 228 167 Current liabilities:

Long-term debt due within one year 6,035 Accrued interest 5,994 5,994 Accounts payable 5 499 4 017 Total current liabilities 17 528 10 011 Commitntcnts and contingcncics Total liabilities ~23 ~7 238 178 See notes to financial statements.

l SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF OPERATIONS (In thousands)

Year Ended une 30 1996 1995 Operating revenue:

Sales of electric energy 50 117 50 854 Operating expenses:

Other operations 314 316 Maintenance 35,760 38,511 Depreciation 9,095 9,095 Decommissioning 3 113 3 112 Total operating expenses 48 282 51 034 Operating income (loss) 1,835 (180)

Investment income 2 062 1.884 Income before debt expense 3,897 1,704 Debt expense 12.614 12 598 Costs recoverable from future billings to participants 5 8717 See notes to financial statements.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL STATEMENT OF CASH FLOWS (In thousands)

Year Ended une 30 1996 1995 Cash flows from operating activities:

Costs recoverable from future billings to participants (S 8,717) (S 10,894)

Adjustments to arrive at net cash provided by (used for) operating activities-Depreciation 9,095 9,095 Decommissioning costs 3,113 3,112 Amortization of debt costs 626 610 Changes in assets and liabilities:

Interest receivable 2 (59)

Accounts receivable 946 (669)

Materials and supplies 110 1,340 Other assets 56 81 Accounts payable 1 482 711 Net cash provided by operating activities 6 713 3 327 Cash flows from investing activities:

Payments for construction of facility (1,938) (1,861)

Purchases of investments (14,370) (12,749)

Proceeds from sale/maturity of investments 8 867 10 918 Net cash used for investing activities 7 441 3 692 Net decrease in cash and cash equivalents (728) (365)

Cash and cash equivalents at beginning of year 8 274 8 639 Cash and cash equivalents at end of year ~Kk M~>>4 Supplemental disclosure of cash flow information:

Cash paid during the year for interest (net of amount capitalized) i~12K ~>I 'K See notes to financial statements.

SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY SAN JUAN PROJECT SUPPLEMENTAL SCHEDULE OF RECEIPTS AND DISBURSEMENTS IN FUNDS REQUIRED BY THE BOND INDENTURE FOR THE YEAR ENDED UNE 30 1996 (In thousands)

Reserve &

Revenue Operating Operating Project Debt Debt Service Revenue Fund Fund Reserve Fund Service Reserve ~Contin ene Total Balance at June 30, 1995 $ 1 633 112 $ 5 994 ~18 025 rt 11 179 ~36 943 Additions:

Investment earnings 32 12 1,061 537 1,750 Distribution of investment earnings 1,945 (64) (168) (1,061) (652)

Discount on investment purchases 4 10 114 112 242 Revenue from power sales 52,933 52,933 Distribution of revenues (54,914) 38,249 14,515 2,145 Refund from Century Power Corporation 400 400 Total 38 249 414 14 515 2 142 55 325 Deductions:

Payment for construction 1,938 1,938 Administrative expenditures 36,691 36,691 Interest paid 11 988 11 988 Total 38 629 11 988 50 617 Balance at June 30, 1996 ~253 g 5 g 526 3 8 621 ~18 026 ~3 321 r~4~65 This schedule summarizes the receipts and disbursements in funds required under the Bond Indenture and has been prepared from the trust statements. The balances in the funds consist of cash and investments at original cost. These balances do not include accrued interest receivable of S67 and S69 at June 30, 1996 and 1995, respectively, nor do they include total amortized net investment discount of $ 69 and S2 at Junc 30, 1996 and 1995, respectively. These balances do not include unrealized loss (gain) on investments in funds available for sale of S4 and ($ 28) at June 30, 1996 and 1995, respectively.

I