| {{#Wiki_filter:March 24, 1982 L. G. Hulman, Chief Accident Evaluation Branch Division of Syste.ms Integration Office of Nuclear Reactor Regulation LJ_S. Nuclear Regulatory Commission Washington, D.C. 20555 | | {{#Wiki_filter:ENCLOSURE 2 |
| | ~~- 0 -4(,e~1e |
| | ~~lDaU* i. |
| | Pacific Northwest Laboratories P.O. Box 999 Richland, Washington U.S.A. 99352 Telephone (509) |
| | March 24, 1982 Telex 15-2874 376-5417 L. G. Hulman, Chief Accident Evaluation Branch Division of Syste.ms Integration Office of Nuclear Reactor Regulation LJ_S. Nuclear Regulatory Commission Washington, D.C. 20555 |
|
| |
|
| ==Dear Mr. Hulman:== | | ==Dear Mr. Hulman:== |
| FIN ND-82323 TMI ACTION PLAN: III. D. 3.4 CONTROL ROOM HABITABILITY EVALUATION PALISADES PLANT CONSUMERS POWER COMPANY DOCKET NO. 50-255 ENCLOSURE 2 | | |
| : i. Pacific Northwest Laboratories P.O. Box 999 Richland, Washington U.S.A. 99352 Telephone (509) 376-5417 Telex 15-2874 Based upon PNL review of the information submitted by the licensee in response to NUREG-0660, NUREG-0737, and other NRC Guidance, the control room meets the requirements of SRP 2.2. 1 -2.2.2, 2.2.3, and 6.4; and therefore ID2ets the requirements of General Design Criteria {GDC) 4 and 19. The conclusions are based on the present plant system and presumes implementation of effective HVAC modifications addressed by the licensee and incorporation of the recomnendations of this evaluation.
| | FIN ND- 82323 TMI ACTION PLAN: III. D. 3.4 CONTROL ROOM HABITABILITY EVALUATION PALISADES PLANT CONSUMERS POWER COMPANY DOCKET NO. 50-255 Based upon PNL review of the information submitted by the licensee in response to NUREG-0660, NUREG-0737, and other NRC Guidance, the control room meets the requirements of SRP 2.2. 1 - 2.2.2, 2.2.3, and 6.4; and therefore ID2ets the requirements of General Design Criteria {GDC) 4 and 19. The conclusions are based on the present plant system and presumes implementation of effective HVAC modifications addressed by the licensee and incorporation of the recomnendations of this evaluation. |
| The Palisades plant review indicated a number of modifications to be made by January l, 1983. These included extending the control room air intake .from the present configuration, increasing int'ake air duct to* allow 100% makeup air, installing redundant charcoal filters, extending the control room habitability zone, and replacing air intake and charge dampers. These changes will improve habitability. | | The Palisades plant review indicated a number of modifications to be made by January l, 1983. These included extending the control room air intake .from the present configuration, increasing int'ake air duct to* |
| When final . modifications have been implemented, control room operator radiation doses should meet GDC 19. The licensee referenced the Palisades SEP Topic II-1.C in response to hazards from off-site toxic chemicals and gases. The SEP indicated that a review of possible hazardous chemical transportation accidents be performed. | | allow 100% makeup air, installing redundant charcoal filters, extending the control room habitability zone, and replacing air intake and dis-charge dampers. These changes will improve habitability. When final |
| Tbe licensee revie\ved the Michigan Department of Highway files and the Michigan State Policy Post files which indicated 11 *** no accidents involving hazardous chemicals in the past 14 years ... " The absence of past accidents does not preclude the potential for accidents in the future. This does not meet the guidance in Regulatory Guide 1.78 nor the Standard Review Plans. The licensee needs to analyze for hazardous chemicals/gases (including smoke) which may present a potential hazard to the habitability of the control room. Additionally, the potential control room air concentrations of toxic chemicals from on-site release$ should be determined. | | . modifications have been implemented, control room operator radiation doses should meet GDC 19. |
| f :J-07oYOe>a..0 XA Copy Has BeetrSenttO PDR | | The licensee referenced the Palisades SEP Topic II-1.C in response to hazards from off-site toxic chemicals and gases. The SEP indicated that a review of possible hazardous chemical transportation accidents be performed. Tbe licensee revie\ved the Michigan Department of Highway files and the Michigan State Policy Post files which indicated 11 |
| \. L. G. Hulman .March 24, 1982 Paqe 2 ..
| | *** no accidents involving hazardous chemicals in the past 14 years ... " The absence of past accidents does not preclude the potential for accidents in the future. This does not meet the guidance in Regulatory Guide 1.78 nor the Standard Review Plans. The licensee needs to analyze for hazardous chemicals/gases (including smoke) which may present a potential hazard to the habitability of the control room. Additionally, the potential control room air concentrations of toxic chemicals from on-site release$ should be determined. |
| * The licensee stated that 4 individuals are in the control room under normal conditions and that 3 Self-Contained Breathing Apparati (SCBA) are in the control room. To meet single failure criteria, additional SCBA must be available in the control. Therefore, based on the submittal, the implementation of the proposed modifications, and incorporation of the above we conclude that the control room habitability system can provide safe, habitable conditions within the control room under both normal and conditions, including loss-of-coolant accidents, and that occupancy can be maintained under accident conditions.
| | f :J-07oYOe>a..0 ~ XA Copy Has BeetrSenttO PDR |
| Therefore, the proposed program meets the criteria identified in Item No. III.D.3.4, "Control Room Habitability" of NUREG-0737 and is, therefore acceptable. | | |
| * | | L. G. Hulman |
| * Respectfully A / /\. r:_,,,.-, ---------:. '\_/ '"' . ; _ _,,.... .;:/ -Dennis W. Murphy, Ph.D. / Senior Research Scientist Dosimetry Technology Section cc: H.E.P. Krug, NRC T.R. Quay, NRC}} | | .March 24, 1982 Paqe 2 The licensee stated that 4 individuals are in the control room under normal conditions and that 3 Self-Contained Breathing Apparati (SCBA) are in the control room. To meet single failure criteria, additional SCBA must be available in the control. |
| | Therefore, based on the submittal, the implementation of the proposed modifications, and incorporation of the above reco~mendations, we conclude that the control room habitability system can provide safe, habitable conditions within the control room under both normal and acci~ent conditions, including loss-of-coolant accidents, and that occupancy can be maintained under accident conditions. Therefore, the ap~licant's proposed program meets the criteria identified in Item No. |
| | III.D.3.4, "Control Room Habitability" of NUREG-0737 and is, therefore acceptable. * |
| | * Respectfully ~ubmitted, A |
| | :./\. r:_,,,.-, |
| | '\_/ '"' - .; _ _,,.... - |
| | .;:/ - ------- / |
| | Dennis W. Murphy, Ph.D. / |
| | Senior Research Scientist Dosimetry Technology Section cc: H.E.P. Krug, NRC T.R. Quay, NRC |
| | \.}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML18054B5641989-04-18018 April 1989 Summarizes 890413 Meeting W/Util & Consultants in Jackson,Mi Re Review of Eddy Current Qualification Program ML20214E1721986-02-25025 February 1986 Ack Receipt of 860210 & 21 Ltrs Accepting Task Orders 3 & 4 Under FIN A-3552 & Task Order 5,respectively.Orders Include Work at Palisades & LaSalle Stations & Mod Review at Davis-Besse.Modified Task Order 4 Under FIN A-3550 Encl ML18047A3301982-04-28028 April 1982 Comments on SEP Integrated Plant Safety Assessment,Per Request.Sep Program Appears Well Organized ML18047A3271982-04-27027 April 1982 Submits Technical Evaluation Rept on Facility Integrated Plant Safety Assessment Per Draft NUREG-0820.Rept Fulfills Intent of SEP ML18047A3401982-04-16016 April 1982 Forwards Draft Review of SEP Rept.Mods Could Be Discussed During 820419 Trip to Bethesda,Md & Implemented by 820529 Deadline.Critique of Contents Could Be Beneficial When Ginna Rept Available ML18047A4231982-03-24024 March 1982 Notifies That Control Room Meets Requirements of SRP 2.2.1 - 2.2.2,2.2.3 & 6.4 & General Design Criteria 4 & 19. Conclusions Based on Present Plant Sys & Presumes Implementation of Effective HVAC Mods by Licensee ML18046B1151981-11-24024 November 1981 Forwards Summary of Review of Open Equipment Items for Palisades Nuclear Power Station. Info Result of 811106 Meeting W/Util ML18046B1761981-11-20020 November 1981 Suppls Draft 811006 Ltr,Developing Basis for Recommendations for Changes to Sssp Spectrum to Account for Soil Column ML19351A1191981-05-0101 May 1981 Forwards marked-up Draft SEP Containment Analysis & Evaluation for Facility ML18046A7461981-02-17017 February 1981 Provides Status on SEP Containment Analysis for Facility. Containment Design Temp Is Exceeded in Some Cases.W/O Stated Encls ML19345D6991980-11-24024 November 1980 Submits Monthly Mgt Ltr 8 for Oct 1980 Re Containment Analysis Support for Sep. ML19344B1261980-07-31031 July 1980 Forwards Review of Facility Containment Integrity Analysis for SEP Containment Analysis Support,To Satisfy Requirements of Subtasks 1,2 & 5.Requests Review of Rept ML20204D1621978-08-30030 August 1978 Interim Rept on SER Review Re Fire Protection Program. Inadequately Covered Items:Lube Oil Fire in Turbine Bldg, Control Valves Subj to Human Failure,Effect of Seismic Damage,Smoke Removal by Ducts & Wiring in Signaling Sys 1989-04-18
[Table view] |
Text
ENCLOSURE 2
~~- 0 -4(,e~1e
~~lDaU* i.
Pacific Northwest Laboratories P.O. Box 999 Richland, Washington U.S.A. 99352 Telephone (509)
March 24, 1982 Telex 15-2874 376-5417 L. G. Hulman, Chief Accident Evaluation Branch Division of Syste.ms Integration Office of Nuclear Reactor Regulation LJ_S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Hulman:
FIN ND- 82323 TMI ACTION PLAN: III. D. 3.4 CONTROL ROOM HABITABILITY EVALUATION PALISADES PLANT CONSUMERS POWER COMPANY DOCKET NO. 50-255 Based upon PNL review of the information submitted by the licensee in response to NUREG-0660, NUREG-0737, and other NRC Guidance, the control room meets the requirements of SRP 2.2. 1 - 2.2.2, 2.2.3, and 6.4; and therefore ID2ets the requirements of General Design Criteria {GDC) 4 and 19. The conclusions are based on the present plant system and presumes implementation of effective HVAC modifications addressed by the licensee and incorporation of the recomnendations of this evaluation.
The Palisades plant review indicated a number of modifications to be made by January l, 1983. These included extending the control room air intake .from the present configuration, increasing int'ake air duct to*
allow 100% makeup air, installing redundant charcoal filters, extending the control room habitability zone, and replacing air intake and dis-charge dampers. These changes will improve habitability. When final
. modifications have been implemented, control room operator radiation doses should meet GDC 19.
The licensee referenced the Palisades SEP Topic II-1.C in response to hazards from off-site toxic chemicals and gases. The SEP indicated that a review of possible hazardous chemical transportation accidents be performed. Tbe licensee revie\ved the Michigan Department of Highway files and the Michigan State Policy Post files which indicated 11
- no accidents involving hazardous chemicals in the past 14 years ... " The absence of past accidents does not preclude the potential for accidents in the future. This does not meet the guidance in Regulatory Guide 1.78 nor the Standard Review Plans. The licensee needs to analyze for hazardous chemicals/gases (including smoke) which may present a potential hazard to the habitability of the control room. Additionally, the potential control room air concentrations of toxic chemicals from on-site release$ should be determined.
f :J-07oYOe>a..0 ~ XA Copy Has BeetrSenttO PDR
L. G. Hulman
.March 24, 1982 Paqe 2 The licensee stated that 4 individuals are in the control room under normal conditions and that 3 Self-Contained Breathing Apparati (SCBA) are in the control room. To meet single failure criteria, additional SCBA must be available in the control.
Therefore, based on the submittal, the implementation of the proposed modifications, and incorporation of the above reco~mendations, we conclude that the control room habitability system can provide safe, habitable conditions within the control room under both normal and acci~ent conditions, including loss-of-coolant accidents, and that occupancy can be maintained under accident conditions. Therefore, the ap~licant's proposed program meets the criteria identified in Item No.
III.D.3.4, "Control Room Habitability" of NUREG-0737 and is, therefore acceptable. *
- Respectfully ~ubmitted, A
- ./\. r:_,,,.-,
'\_/ '"' - .; _ _,,.... -
.;:/ - ------- /
Dennis W. Murphy, Ph.D. /
Senior Research Scientist Dosimetry Technology Section cc: H.E.P. Krug, NRC T.R. Quay, NRC
\.