Line 3: Line 3:
| issue date = 06/10/1998
| issue date = 06/10/1998
| title = Forwards Palisades Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period, Per 10CFR55.45(b)(5).Ltr Contains No New Commitments & No Revs to Existing Commitments
| title = Forwards Palisades Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period, Per 10CFR55.45(b)(5).Ltr Contains No New Commitments & No Revs to Existing Commitments
| author name = HASKELL N L
| author name = Haskell N
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:( ' A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2276 27780 Blue Star Memorial Highway Fax: 616 764 2490 June 10, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Covert, Ml 49043 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT Nathan L. Ha.Itel/ Director, Licensing FOUR YEAR TEST REPORT FOR THE PALISADES SIMULATION FACILITY.
{{#Wiki_filter:A CMS Energy Company Palisades Nuclear Plant           Tel: 616 764 2276 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Ha.Itel/
Director, Licensing June 10, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT FOUR YEAR TEST REPORT FOR THE PALISADES SIMULATION FACILITY.
10 CFR 55.45(b)(5), "Certification of Simulation Facilities," requires simulator facility licensees to submit a report to the Commission which identifies any uncorrected performance test failures during the past four year period and a schedule for their correction.
10 CFR 55.45(b)(5), "Certification of Simulation Facilities," requires simulator facility licensees to submit a report to the Commission which identifies any uncorrected performance test failures during the past four year period and a schedule for their correction.
The report must also include, (1) a description of the simulation facility performance testing completed during the past four years, (2) a description of performance tests to be conducted on the facility during the subsequent four years, and (3) a schedule for the conduct of approximately 25% of the performance tests to be completed per year during that next four year period. The attachment to this letter provides the required report. The Palisades Simulation Facility was initially certified on June 11, 1990.  
The report must also include, (1) a description of the simulation facility performance testing completed during the past four years, (2) a description of performance tests to be conducted on the facility during the subsequent four years, and (3) a schedule for the conduct of approximately 25% of the performance tests to be completed per year during that next four year period. The attachment to this letter provides the required report.
The Palisades Simulation Facility was initially certified on June 11, 1990.


==SUMMARY==
==SUMMARY==
OF COMMITMENTS This letter contains no commitments and no revisions to existing commitments . . Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector  
OF COMMITMENTS This letter contains no             n~w    commitments and no revisions to existing commitments .
-Palisades Attachment  
        . Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment
*1 .. r"'\ i\ r1 *..J *.:; v ._) ' 9806160123 980610 PDR ADOCK 05000255 R
                          *1 ~*..~ r"'\ i\ r1 ~
                          ~ *..J *.:;   v ._) '
(
9806160123 980610 PDR     ADOCK 05000255 R
* PDR}}
* PDR}}

Latest revision as of 11:19, 3 February 2020

Forwards Palisades Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period, Per 10CFR55.45(b)(5).Ltr Contains No New Commitments & No Revs to Existing Commitments
ML18066A181
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/10/1998
From: Haskell N
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18066A183 List:
References
NUDOCS 9806160123
Download: ML18066A181 (1)


Text

A CMS Energy Company Palisades Nuclear Plant Tel: 616 764 2276 27780 Blue Star Memorial Highway Fax: 616 764 2490 Covert, Ml 49043 Nathan L. Ha.Itel/

Director, Licensing June 10, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT FOUR YEAR TEST REPORT FOR THE PALISADES SIMULATION FACILITY.

10 CFR 55.45(b)(5), "Certification of Simulation Facilities," requires simulator facility licensees to submit a report to the Commission which identifies any uncorrected performance test failures during the past four year period and a schedule for their correction.

The report must also include, (1) a description of the simulation facility performance testing completed during the past four years, (2) a description of performance tests to be conducted on the facility during the subsequent four years, and (3) a schedule for the conduct of approximately 25% of the performance tests to be completed per year during that next four year period. The attachment to this letter provides the required report.

The Palisades Simulation Facility was initially certified on June 11, 1990.

SUMMARY

OF COMMITMENTS This letter contains no n~w commitments and no revisions to existing commitments .