ML18139B774: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-*------------------------------8203050235 820224 PDR p . --*----25. 26. 27. 28. 29. 30. 31. 32. 33. 34. ADQCI,( 05000280 PDR CHANNEL DESCRIPTION Turbine First Stage Pressure Emergency Plan Radiati~n Instr._ Environmental Radiation Monitors Logic Channel Testing Turbine Overspeed Protection Trip Chann_el (Electrical)
{{#Wiki_filter:-*-------     ------ --------- ---- ----
Turbine Tr:l.p Setpoint Seismic Instrumentation Reactor Trip Breaker Reactor Coolant Pressure (Low) Auxiliary Feedwater
8203050235 820224 PDR ADQCI,( 05000280 p                         PDR
: a. Steam Generator Water Level Low-Low b. RCP Undervoltage TABLE 4.1-1 CHECK CALIBRATE TEST s R M *M R M *M N.A. N.A. N.A. N.A. M N.A. R R ~.A. R R M R M N.A. N.A. M N.A. R N.A. s R M s R M c. S.I. -(All Safety Injection surveillance requirements)  
. - -*-- --                                                           TABLE 4.1-1 CHANNEL DESCRIPTION                                   CHECK              CALIBRATE          TEST            REMARKS
: d. Station Blackout N.A. N.A. R N.A. e. Main Feedwater Pump Trip S -Each shift D -Daily W .-Weekly NA -Not applicable SA -Semiannually M -Monthly* P -Prior to each startup if not done previous week R -Each Refueling Shutdown BW -Every two weeks AP -After each startup if not done previous week Q -Every 90 effective full power days -. 1
: 25. Turbine First Stage Pressure                 s                  R                  M
* See Specification 4.lD N.A. R REMARKS TLD Dosimeters Stop valve closure or low EH fluid pressure -*i -,}}
: 26. Emergency Plan Radiati~n Instr._             *M                 R                 M
: 27. Environmental Radiation Monitors              *M                 N.A.               N.A. TLD Dosimeters
: 28. Logic Channel Testing                        N.A.               N.A.               M
: 29. Turbine Overspeed Protection                  N.A.               R                 R Trip Chann_el (Electrical)
: 30. Turbine Tr:l.p Setpoint                      ~.A.               R                 R     Stop valve closure or low EH fluid pressure
                                                                                                                                  *i
: 31. Seismic Instrumentation                      M                   R                 M
: 32. Reactor Trip Breaker                          N.A.               N.A.               M
: 33. Reactor Coolant Pressure (Low)                N.A.               R                   N.A.
: 34. Auxiliary Feedwater
: a.      Steam Generator Water                s                   R                 M Level Low-Low s
: b.      RCP Undervoltage                                          R                 M
: c.     S.I.                           - (All Safety Injection surveillance requirements)
: d.     Station Blackout                     N.A.               R                   N.A.
: e. Main Feedwater Pump Trip               N.A.                N.A.                R S - Each shift                     M - Monthly*
D - Daily                          P - Prior to each startup if not done previous week W.- Weekly                        R - Each Refueling Shutdown NA - Not applicable                BW - Every two weeks SA - Semiannually                  AP - After each startup if not done previous week Q - Every 90 effective full power days                 -   . 1
* See Specification 4.lD}}

Latest revision as of 00:58, 3 February 2020

Proposed Revision to Tech Spec Table 4.1-1,Item 31,changing Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency
ML18139B774
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B773 List:
References
NUDOCS 8203050235
Download: ML18139B774 (1)


Text

-*------- ------ --------- ---- ----

8203050235 820224 PDR ADQCI,( 05000280 p PDR

. - -*-- -- TABLE 4.1-1 CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS

25. Turbine First Stage Pressure s R M
26. Emergency Plan Radiati~n Instr._ *M R M
27. Environmental Radiation Monitors *M N.A. N.A. TLD Dosimeters
28. Logic Channel Testing N.A. N.A. M
29. Turbine Overspeed Protection N.A. R R Trip Chann_el (Electrical)
30. Turbine Tr:l.p Setpoint ~.A. R R Stop valve closure or low EH fluid pressure
  • i
31. Seismic Instrumentation M R M
32. Reactor Trip Breaker N.A. N.A. M
33. Reactor Coolant Pressure (Low) N.A. R N.A.
34. Auxiliary Feedwater
a. Steam Generator Water s R M Level Low-Low s
b. RCP Undervoltage R M
c. S.I. - (All Safety Injection surveillance requirements)
d. Station Blackout N.A. R N.A.
e. Main Feedwater Pump Trip N.A. N.A. R S - Each shift M - Monthly*

D - Daily P - Prior to each startup if not done previous week W.- Weekly R - Each Refueling Shutdown NA - Not applicable BW - Every two weeks SA - Semiannually AP - After each startup if not done previous week Q - Every 90 effective full power days - . 1

  • See Specification 4.lD