{{#Wiki_filter:U'S.NUCLEAR REGULATORY Co'SION NRC FORM 195 I2.7C)NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-315 FILE NUMBER ENVIRO, To: Mr.J.G.Keppler FROM: Indiana&Michigan Power Co.Bridgman, Michigan R.W.Lurgensen DATE OF DOCUMENT 3/10/77 ATE RECEIVED 3/15/77 BETTE R 0ORIGINAL QCOP Y DESCRIPTION 0 NOTOR I 2 E D IabNCLASSIF IE D PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED One 0 KGT RR)fovE (1-P)kCZXOWLED GZD Ltr, furnishing information regarding abnormal environmental occurrence concerning the unplanned release of low leval radioactive gas from the plant and indicatin that a complete report of this event will be submitted by March 17, 1977....~I I ASSIGNED AD: N SAFETY FOR ACT NFORMATION RO C MANA F L C ASST 1 r PROJECT MANAGER'IC ASST G FI X&E'L OELD GOSSXCK 6 STAFF MXPC CASE HANAUER HARLESS PROJECT MANAGEMENT BOYD P, COLLINS HOUSTON PETERSON MELTZ HELTEMES 8KOVHOLT LPDR~+o a TIC: INTERNAL D SYSTEMS SAFETY HEINEMAN-';-'SCHROEDER ENGXNEERING MA CARRY BOSNAK SIHWEIL PAWL CK REACTOR SAFE ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB~N REG V IE ISTRI BUTION PLANT SYSTEMS'EDESCO IPPOL TO OPERATING REACTORS STELLO OPERATING TECH EISENHUT B E B ULRIKSON OR S TE SA E ERNST BALLARD YOUNGBLOOD SITE TECH GAMMILL STEPP HULlfAN SITE ANALYSIS VOLLMER BUNCH J.COLLINS KREGER CONTROL NUMBER NSIC: ASLB: LA PDR CONSULTANTS:
{{#Wiki_filter:NRC FORM 195                                            U'S. NUCLEAR REGULATORY Co '                 SION DOCKET NUMBER I2.7C)                                                                                                           50-315 FILE NUMBER NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL                                                         ENVIRO, To:                                             FROM:                                                     DATE OF DOCUMENT Indiana   & Michigan Power Co.                                 3/10/77 Mr. J. G. Keppler                          Bridgman, Michigan                                       ATE RECEIVED R. W. Lurgensen                                                 3/15/77 BETTE R               0 NOTOR 2 E D I                PROP                   INPUT FORM                         NUMBER OF COPIES RECEIVED 0ORIGINAL          IabNCLASSIF IE D QCOP Y                                                                                                        One DESCRIPTION                                                    ENCLOSURE Ltr, furnishing information regarding abnormal environmental occurrence concerning                                                                       ~
E T NRC FORM I96 (2.76)AC RS CYS HOLDXN8/
the unplanned release of low leval                                                                                         I I
~.h~P~C-rAf~'cQ Qg~MJ+N~8h NICjgGAIV POVZER CO~SX'ONALD C.COOK iNUCLBAR PLANT P.O.Box 458, Bridgman,.
radioactive gas from the plant and           indicatin that a complete report of this event           will be submitted by March 17, 1977....
~1iichigan 49106 Harch 10, 1977 Hr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Pegion III 799 Roosevelt Road Glen Ellyn, IL 60 137 r ocket No.50-315 h
0 KGT RR)fovE (1-P) kCZXOWLEDGZD SAFETY                                FOR ACT      NFORMATION ASSIGNED AD:
N RO   C MANA F                                                 PROJECT r
MANAGER'IC L C   ASST                       1 ASST INTERNAL D ISTRI BUTION G FI                           SYSTEMS SAFETY              PLANT SYSTEMS                            S TE SA E HEINEMAN                                            'EDESCO X&E 'L                       -';- 'SCHROEDER OELD GOSSXCK   6 STAFF                 ENGXNEERING                  IPPOL TO MXPC                                 MACARRY                                                              ERNST CASE                                 BOSNAK                                                                BALLARD HANAUER                             SIHWEIL                      OPERATING REACTORS                        YOUNGBLOOD HARLESS                             PAWL CK                      STELLO SITE TECH PROJECT MANAGEMENT                   REACTOR SAFE                OPERATING TECH                          GAMMILL BOYD                                 ROSS                        EISENHUT                                STEPP P, COLLINS                           NOVAK                                                                HULlfAN HOUSTON                             ROSZTOCZY PETERSON                             CHECK                        B    E                                  SITE ANALYSIS MELTZ                                                                                                     VOLLMER HELTEMES                             AT&I                                                                 BUNCH 8KOVHOLT                            SALTZMAN                                                             J. COLLINS RUTBERG                                                               KREGER EXTERNAL DISTRIBUTION                                                         CONTROL NUMBER LPDR~    +    o a              NAT LAB ~       N             B TIC:                            REG V IE                       ULRIKSON             OR NSIC:                           LA PDR ASLB:                           CONSULTANTS:
AC RS      CYS HOLDXN8/ E T NRC FORM I96 (2.76)


==Dear Hr.Keppler:==
h
This ip.to confirm our.verbal report.to NRC RO: III Inspector, , Hr.K.R.Baker, at 0940 hours on Ha'rch 8, 1977.In that conversation we reported the unplanned release of low level radioactive gas from the plant during the period.of time.from 0000 hours on Harch.5, 1977, to 1600 hours on Harch 7, 1977.At the time of the telephpne reporthwe were of the opinion that this was reportable only in accordance with Regulatory Guide 1.16, Revision 4, Section 4, Hr.Baker concurred with this opinion.Subsequent discussion with llr: Baker and NRC RO: III'nspector, Hr.D.E.lliller on Hay 10, 1977;pointed out that this was reportable as an Abnormal Environmental Occurrence in accordance with Appendix B Technsca ion and 2.4.4.e and Table 2.4-2 because the gas was not sampled and analyzed prior to release.A complete report of this event will be submitted by Harch 17, 1977;as required by Appendix B Technical Specifications Section 5.4.2.1.*.Sincerely, ,.bf.Jur se Plant H ger/bab cc: R.S.Hunter J.E.Dolan R.Ktlburn G.E.Lien R.J.Vollen, BPI K,R, Baker, RO:III P.ll.Steketee, Esq.R.C.Callen R.Malsh, Esq, G.Olson PNSRC R.S.Keith G.Charnoff, Esq.J.fl.Hennigan r~r r~,~~Di r:, IE (20 copies)Dir., HIPC (2 copies)'irectorate of Licensing MP~'r t~j 0 lh}}
      ~ P ~
~ .
C-
 
rAf~'cQ Q g~MJ+N~8h NICjgGAIV              POVZER C. COOK iNUCLBAR PLANT CO~SX        'ONALD P.O. Box 458, Bridgman,. ~1iichigan 49106 Harch 10, 1977 Hr. J.G. Keppler, Regional Director Office of Inspection and Enforcement                                                                                      h United States Nuclear Regulatory Commission Pegion      III 799 Roosevelt Road Glen Ellyn, IL 60 137 r
ocket  No. 50-315
 
==Dear Hr. Keppler:==
 
This ip.to confirm our.verbal report. to NRC RO:                         III Inspector,
, Hr. K.R. Baker,       at 0940 hours     on   Ha'rch 8,       1977. In that conversation we reported the       unplanned     release     of low       level   radioactive   gas from the plant during the         period. of   time. from   0000       hours on Harch. 5,   1977, to 1600 hours on Harch 7,         1977.     At   the time       of the telephpne   reporthwe were of the opinion that this was reportable only in accordance with Regulatory Guide 1.16, Revision 4, Section 4, Hr. Baker concurred with this opinion. Subsequent discussion with llr: Baker and NRC RO: III
'nspector, Hr. D.E. lliller on Hay 10, 1977; pointed out that this was reportable as an Abnormal Environmental Occurrence in accordance with Appendix B Technsca                         ion                             and 2.4.4.e and Table 2.4-2 because the gas was not sampled and analyzed prior to release.
A   complete report       of this event will           be submitted by Harch 17, 1977; as required by Appendix         B Technical Specifications Section 5.4.2.1.                                               *.
Sincerely, r
                                                                                                    ~ r r
                                                                                                                                    ~,
    ,.bf. Jur     se Plant   H     ger                                                                                                         ~ ~
    /bab cc:     R.S. Hunter                         R.C. Callen                        Di r:,  IE (20 copies)
J.E. Dolan                           R. Malsh, Esq,                      Dir.,  HIPC (2 R. Ktlburn                         G. Olson                                          of Licensing copies)'irectorate G.E. Lien                           PNSRC R.J. Vollen, BPI                     R.S. Keith K,R, Baker, RO:III                   G. Charnoff, Esq.
P.ll. Steketee, Esq.                 J.fl. Hennigan
 
MP ~
    'r t~ j 0 lh}}

Latest revision as of 20:13, 2 February 2020

03/10/1977 Letter Reporting of Unplanned Release of Low Level Radioactive Gas
ML18219D521
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/10/1977
From: Jurgensen R
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/IE, NRC/RGN-III
References
LER 1977-001-00
Download: ML18219D521 (4)


Text

NRC FORM 195 U'S. NUCLEAR REGULATORY Co ' SION DOCKET NUMBER I2.7C) 50-315 FILE NUMBER NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL ENVIRO, To: FROM: DATE OF DOCUMENT Indiana & Michigan Power Co. 3/10/77 Mr. J. G. Keppler Bridgman, Michigan ATE RECEIVED R. W. Lurgensen 3/15/77 BETTE R 0 NOTOR 2 E D I PROP INPUT FORM NUMBER OF COPIES RECEIVED 0ORIGINAL IabNCLASSIF IE D QCOP Y One DESCRIPTION ENCLOSURE Ltr, furnishing information regarding abnormal environmental occurrence concerning ~

the unplanned release of low leval I I

radioactive gas from the plant and indicatin that a complete report of this event will be submitted by March 17, 1977....

0 KGT RR)fovE (1-P) kCZXOWLEDGZD SAFETY FOR ACT NFORMATION ASSIGNED AD:

N RO C MANA F PROJECT r

MANAGER'IC L C ASST 1 ASST INTERNAL D ISTRI BUTION G FI SYSTEMS SAFETY PLANT SYSTEMS S TE SA E HEINEMAN 'EDESCO X&E 'L -';- 'SCHROEDER OELD GOSSXCK 6 STAFF ENGXNEERING IPPOL TO MXPC MACARRY ERNST CASE BOSNAK BALLARD HANAUER SIHWEIL OPERATING REACTORS YOUNGBLOOD HARLESS PAWL CK STELLO SITE TECH PROJECT MANAGEMENT REACTOR SAFE OPERATING TECH GAMMILL BOYD ROSS EISENHUT STEPP P, COLLINS NOVAK HULlfAN HOUSTON ROSZTOCZY PETERSON CHECK B E SITE ANALYSIS MELTZ VOLLMER HELTEMES AT&I BUNCH 8KOVHOLT SALTZMAN J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR~ + o a NAT LAB ~ N B TIC: REG V IE ULRIKSON OR NSIC: LA PDR ASLB: CONSULTANTS:

AC RS CYS HOLDXN8/ E T NRC FORM I96 (2.76)

h

~ P ~

~ .

C-

rAf~'cQ Q g~MJ+N~8h NICjgGAIV POVZER C. COOK iNUCLBAR PLANT CO~SX 'ONALD P.O. Box 458, Bridgman,. ~1iichigan 49106 Harch 10, 1977 Hr. J.G. Keppler, Regional Director Office of Inspection and Enforcement h United States Nuclear Regulatory Commission Pegion III 799 Roosevelt Road Glen Ellyn, IL 60 137 r

ocket No. 50-315

Dear Hr. Keppler:

This ip.to confirm our.verbal report. to NRC RO: III Inspector,

, Hr. K.R. Baker, at 0940 hours on Ha'rch 8, 1977. In that conversation we reported the unplanned release of low level radioactive gas from the plant during the period. of time. from 0000 hours on Harch. 5, 1977, to 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on Harch 7, 1977. At the time of the telephpne reporthwe were of the opinion that this was reportable only in accordance with Regulatory Guide 1.16, Revision 4, Section 4, Hr. Baker concurred with this opinion. Subsequent discussion with llr: Baker and NRC RO: III

'nspector, Hr. D.E. lliller on Hay 10, 1977; pointed out that this was reportable as an Abnormal Environmental Occurrence in accordance with Appendix B Technsca ion and 2.4.4.e and Table 2.4-2 because the gas was not sampled and analyzed prior to release.

A complete report of this event will be submitted by Harch 17, 1977; as required by Appendix B Technical Specifications Section 5.4.2.1. *.

Sincerely, r

~ r r

~,

,.bf. Jur se Plant H ger ~ ~

/bab cc: R.S. Hunter R.C. Callen Di r:, IE (20 copies)

J.E. Dolan R. Malsh, Esq, Dir., HIPC (2 R. Ktlburn G. Olson of Licensing copies)'irectorate G.E. Lien PNSRC R.J. Vollen, BPI R.S. Keith K,R, Baker, RO:III G. Charnoff, Esq.

P.ll. Steketee, Esq. J.fl. Hennigan

MP ~

'r t~ j 0 lh