03/10/1977 Letter Reporting of Unplanned Release of Low Level Radioactive Gas
ML18219D521
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/10/1977
From: Jurgensen R
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: James Keppler
NRC/IE, NRC/RGN-III
References
LER 1977-001-00
Download: ML18219D521 (4)


Text

NRC FORM 195 U'S. NUCLEAR REGULATORY Co ' SION DOCKET NUMBER I2.7C) 50-315 FILE NUMBER NRC DISTRIBUTION FQR PART 50 DOCKET MATERIAL ENVIRO, To: FROM: DATE OF DOCUMENT Indiana & Michigan Power Co. 3/10/77 Mr. J. G. Keppler Bridgman, Michigan ATE RECEIVED R. W. Lurgensen 3/15/77 BETTE R 0 NOTOR 2 E D I PROP INPUT FORM NUMBER OF COPIES RECEIVED 0ORIGINAL IabNCLASSIF IE D QCOP Y One DESCRIPTION ENCLOSURE Ltr, furnishing information regarding abnormal environmental occurrence concerning ~

the unplanned release of low leval I I

radioactive gas from the plant and indicatin that a complete report of this event will be submitted by March 17, 1977....

0 KGT RR)fovE (1-P) kCZXOWLEDGZD SAFETY FOR ACT NFORMATION ASSIGNED AD:

N RO C MANA F PROJECT r

MANAGER'IC L C ASST 1 ASST INTERNAL D ISTRI BUTION G FI SYSTEMS SAFETY PLANT SYSTEMS S TE SA E HEINEMAN 'EDESCO X&E 'L -';- 'SCHROEDER OELD GOSSXCK 6 STAFF ENGXNEERING IPPOL TO MXPC MACARRY ERNST CASE BOSNAK BALLARD HANAUER SIHWEIL OPERATING REACTORS YOUNGBLOOD HARLESS PAWL CK STELLO SITE TECH PROJECT MANAGEMENT REACTOR SAFE OPERATING TECH GAMMILL BOYD ROSS EISENHUT STEPP P, COLLINS NOVAK HULlfAN HOUSTON ROSZTOCZY PETERSON CHECK B E SITE ANALYSIS MELTZ VOLLMER HELTEMES AT&I BUNCH 8KOVHOLT SALTZMAN J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR~ + o a NAT LAB ~ N B TIC: REG V IE ULRIKSON OR NSIC: LA PDR ASLB: CONSULTANTS:

AC RS CYS HOLDXN8/ E T NRC FORM I96 (2.76)

h

~ P ~

~ .

C-

rAf~'cQ Q g~MJ+N~8h NICjgGAIV POVZER C. COOK iNUCLBAR PLANT CO~SX 'ONALD P.O. Box 458, Bridgman,. ~1iichigan 49106 Harch 10, 1977 Hr. J.G. Keppler, Regional Director Office of Inspection and Enforcement h United States Nuclear Regulatory Commission Pegion III 799 Roosevelt Road Glen Ellyn, IL 60 137 r

ocket No. 50-315

Dear Hr. Keppler:

This ip.to confirm our.verbal report. to NRC RO: III Inspector,

, Hr. K.R. Baker, at 0940 hours on Ha'rch 8, 1977. In that conversation we reported the unplanned release of low level radioactive gas from the plant during the period. of time. from 0000 hours on Harch. 5, 1977, to 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on Harch 7, 1977. At the time of the telephpne reporthwe were of the opinion that this was reportable only in accordance with Regulatory Guide 1.16, Revision 4, Section 4, Hr. Baker concurred with this opinion. Subsequent discussion with llr: Baker and NRC RO: III

'nspector, Hr. D.E. lliller on Hay 10, 1977; pointed out that this was reportable as an Abnormal Environmental Occurrence in accordance with Appendix B Technsca ion and 2.4.4.e and Table 2.4-2 because the gas was not sampled and analyzed prior to release.

A complete report of this event will be submitted by Harch 17, 1977; as required by Appendix B Technical Specifications Section 5.4.2.1. *.

Sincerely, r

~ r r

~,

,.bf. Jur se Plant H ger ~ ~

/bab cc: R.S. Hunter R.C. Callen Di r:, IE (20 copies)

J.E. Dolan R. Malsh, Esq, Dir., HIPC (2 R. Ktlburn G. Olson of Licensing copies)'irectorate G.E. Lien PNSRC R.J. Vollen, BPI R.S. Keith K,R, Baker, RO:III G. Charnoff, Esq.

P.ll. Steketee, Esq. J.fl. Hennigan

MP ~