MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 ML9934002411999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L ML18219B5641978-08-10010 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-051/03L-0) ML18219B5651978-08-0909 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-1) ML18219B5661978-08-0808 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-050/03L-0) ML18219B5671978-08-0404 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-0) ML18219B5681978-08-0202 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-029/03L-1 and RO 78-048/03L-0) ML18219B5691978-07-21021 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-019/03L-1 and RO 78-023/03L-1) ML18219B5701978-07-18018 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-047/03L-0) ML18219B5711978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-043/03L-0), Submitted Late Due to a Paper Defect ML18219B5721978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-034/03L-1, RO 78-044/03L-0, RO 78-045/03L-0, RO 78-046/03L-0) ML18219B5731978-07-0505 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-042/03L-0) ML18219B5751978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken IR 05000316/19780371978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken ML18219B5771978-06-22022 June 1978 D.C. Cook - Submit Licensee Event Report RO 78-036/03L-0 for Unit 2 ML18219B5761978-06-21021 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-035/03L-0), a Resubmittal of LER 78-034/03L-0 Dated 6/19/1978 IR 05000316/19780341978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 ML18219B5781978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 ML18219B5221978-06-0606 June 1978 06/06/1978 Letter Licensee Event Report ML18219B5741978-06-0303 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-038/03L-0, RO 78-039/03L-0, RO 78-040/03L-0, RO 78-041/03L-0) ML18219B5241978-06-0202 June 1978 06/02/1978 Letter Licensee Event Report ML18219B5231978-06-0202 June 1978 06/02/1978 Letter Licensee Event Report ML18219B5251978-05-25025 May 1978 05/25/1978 Letter Licensee Event Report 2017-05-19
[Table view] |
Text
ay(i$ /e g REGULATORY INFORMATION 'DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-316 REC: KEPPLER J 6 QRG: SHALLER D V DOCDATE: 07/ii/78 NRC IN Zc MI PWR DATE RCVD: 07/14/78 DQCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL FORWARDING CORRECTED LICENSEE EVENT REPT (RO 50-316/78-043) ON 06/03/78 CONCERNING WHILE IN MODE 1 OPERATION PRESSURIZER STARTED DECLINING RAPIDLY DUE TO ONE OF TWO SPRAY VALVES FAILED ONE HALF OPEN.
PLANT NAME: COOK UNIT 2 REVIEWER INITIAL: XJM DISTRIBUTOR INITiAL: ~
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
'OTES:
- i. SEND 3 COPIES QF ALL MATERIAL TO I5E ED REEVES-1 CY ALL MATERIAL INCIDENT REPORTS
<DISTRIBUTION CODE A002>
FOR ACTION: BR 62 BC~~M/4 ENCL INTERNAL: 6 FILE++ NRC PDR++W/ENCL 2 ENCL MIPC~~W/3 ENCL I 8c C SYSTEMS BR%4W/ENCL EMERGENCY PLAN BR++W/ENCL NQVAK/CHECK~~W/ENCL EEB~~W/ENCL AD FQR ENG++W/ENCL PLANT SYSTEMS BR>>W/ENCL HANAUER~~~W/ENCL AD FOR PLANT SYSTEMS4+W/ENCL AD FOR SYS 8. PROJ++W/ENCL REACTOR SAFETY BR>%W/ENCL ENGINEERING BR+4W/ENCL VQLLMER/BUNCIl<H~W/ENCL KREGER/J. COLLINS+>W/ENCL POWER SYS BR+4W/ENCL K SEYFRIT/IE+4W/ENCL EXTERNAL: LPDR S ST. JOSEPH'I ++A/ENCL TERA~~W/ENCL NSIC++W/ENCL ACRS CAT 8++8/lh ENCL DISTRIBUTION: LTR 45 ENCL 45 CONTROL NBR: 781 50 35 SIZE: iP+iP THF FND
i1 t
'l~ Az l
P Iy 5
1I I
IPip
~ rlcsn INDIANAtr MICHIGANPDNE8 COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 July ll, 1978 Mr. J.G. Keppler, Regional Director C'"
Office of Inspection and Enforcement cn p
United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen .Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316
Dear Mr. Keppler:
Pursuant to the requirements of the Appendix A Technical Specifications the following report is submitted:
RO 78-043/03L-O.
The attached report is being submitted late because during the reproduction process of the Condition Report a paper defect in the original reproduced as a number one in the event date which appeared to be a 13 when, in actuality, the number should have been a 3.
Sincerely, D.V. Shaller Plant Manager
/bab cc: J.E. Dolan G. Olson R.W. Jurgensen J.M. Hennigan R.F. Kroeger PNSRC R. Kilburn J.F. Stietzel R.J. Vollen BPI R.S. Keith K.R. Baker RO:III Dir., IE (30 copies)
ROC. Callen MPSC Dir., MIPC (3 copies)
P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
JUL 13 1978
l gc a~
J 0
I il
lY.~ FJ3RM 366 U. S. NUCLEAR REGULATORY COMMISSION LlCENSEE EVENT REPORT CONTROL BLOCK: I Q1 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 Qs4 I I I 1Qs~Qs 7,
~o>
CON'T 8 9 N I D LICENSEE CODE C C ZQs 14 15 0 0 0 0 0 0 LICENSE NUMBER 0 0 0 0 0 25 26 LICENSE TYPE 30 57 CAT 58 7/ 8 soURGE LLJQB 60 61 0 5 0 0 0 DOCKET NUMBER 3 1 6 QI Q7 69 EVENT PATC 74 Q 75 REPORT DATE 80 QB EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10
~02 WHILE IN MODE 1 OPERATION PRESSURIZER PRESSURE STARTED DECLINING'.RAPIDLY.
~o 3 PRESSURIZER SPRAY VALVE CONTROLLERS WERE PLACED IN MANUAL AND GIVEN A CLO 4 SE SIGNAL. PRESSURE CONTINUED TO DECLINE AND REACTOR WAS MANUALLY TRIPPED 5 8 MINUTES AFTER START OF EXCURSION. TRIP PRESSURE WAS 2000 PSIG WHICH WAS
~OB 205 PSI LESS THAN TECH. SPEC. 3.2.5 BUT 100 PSI GRfATER THAN AUTO. TRIP.
~o 7 NO PROBABLE CONSEQUENCES.
~08 80 7 8 9 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE
[OO~]
7 8
~CJ 9 10 Q>>
11 E Q>> ~EQ>>
12 13 V A L V 0 P 18 Q4 ~DQls 19
~Z 20 Qls SEQUENTIAL OCCURRENCE REPORT REVISION Ql LERIRP REPoRT ACTION FUTURE EVENT YEAR
~78 21 22 EFFECT
~23 SHUTDOWN
~04 24 REPORT NO.
3 26
~W 27
~03 28 ATTACHMENT CODE 29 NPRDP TYPE
~L 30 PRIME COMP.
~
31
~0 32 NO.
COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER 33 Qls ~ZQl 34
~AQss 35
~AS 36 37 0 0 3 3 40
+NQss 41 ,
~YQss 42
~NQss 43 44 8 0 4 0 47 Qss CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 p
o INVESTIGATION FOUND ONE OF TWO PRESSURIZER SPRAY VALVES FAILED ONE HALF OPEN. PROBLEM WAS TRACED TO AN IMPROPERLY INSTALLED GASKET IN THE VALVE POSITIONER. A NEW GASKET WAS PROPERLY INSTALLED AND THE UNIT RETURNED TO 3 SERVICE ~ NO FURTHfR ACTIONS ARE PLANNED ~
4 7 8 9 80 FACILITY STATUS 88 POWER OTHER STATUS Q METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q2 8 Qss ~08 10 3
12 Q N A 44
~AQ31 45 46 RAPID PRESSURf DfCLINE 80 7 8 9 13 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY Q LOCATION OF RELEASE QBB ZIZ ~Z Q 7 8 9 uZQ34 10 11 N A 44 45 N A
'Qs " ss PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 8
~00 0 QZ 12 Qss 13 N A 80 7 9 11 PERSONNEL INJURIES NUMBER DESCRIPTION Q41 8 LOOOO JQ4s 80 7 8 9 11 12 LOSS OF OR DAMAGE.TO FACILITY TYPE DESCRIPTION Q43 9 Z Q42 NA 7 8 9 10 80 l
PUBLICITY NRC USE ONLY ISSUED DESCRIPTION ~N O O ~Q44 8 9 10 68 69 80 0
E PF PRFPARER R. S. LEASE (616) 465-5901 a