| issue date = 12/13/2018
| issue date = 12/13/2018
| title = Notification of Changes to Comprehensive Recovery Plan
| title = Notification of Changes to Comprehensive Recovery Plan
| author name = Sullivan B R
| author name = Sullivan B
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name = Lew D C
| addressee name = Lew D
| addressee affiliation = NRC/NRR, NRC/RGN-I
| addressee affiliation = NRC/NRR, NRC/RGN-I
| docket = 05000293
| docket = 05000293
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Letter Number 2.18.060 December 13, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713  
{{#Wiki_filter:Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Letter Number 2.18.060 December 13, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713


==SUBJECT:==
==SUBJECT:==
Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President
Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35


==REFERENCES:==
==REFERENCES:==
: 1. NRC letter to Entergy, "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 17214A088)  
: 1. NRC letter to Entergy, "Confirmatory Action Letter - Pilgrim Nuclear Power Station," dated August 2, 2017 (ML17214A088)


==Dear Mr. Lew:==
==Dear Mr. Lew:==
On August 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference  
 
: 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP). During review of Nuclear Safety Culture (NSC) closure packages in advance of the December confirmatory inspection, PNPS has determined that minor clarifications are appropriate for a number of the actions. Accordingly, clarifications to NSC-1.1, NSC-1.5, NSC-2.2, NSC-2.3 and NSC-8.9 are provided in Attachment  
On August 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP).
: 1. If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127.
During review of Nuclear Safety Culture (NSC) closure packages in advance of the December confirmatory inspection, PNPS has determined that minor clarifications are appropriate for a number of the actions. Accordingly, clarifications to NSC-1.1, NSC-1.5, NSC-2.2, NSC-2.3 and NSC-8.9 are provided in Attachment 1.
Sincerely, BRS/rb Attachment 1 : Notification of Changes to Comprehensive Recovery Plan t,<DAJDI jr!)bl ;Jf__f_ /!_~tJ-&#xa3; Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station cc: U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-9012 Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station Letter No. 2.18.060 Page 2 of 2 Attachment 1 Letter Number 2.18.060 Notification of Changes to Comprehensive Recovery Plan Notification of Changes to Comprehensive Recovery Plan NSC-1.1 NSC-1.5 Implement the Individual Targeted Performance Improvement Plans (TPIP) developed from CR PNP-2016-2052, CA-35 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127.
& Organizational Effectiveness.
Sincerely, BRS/rb t,<DAJDI : Notification of Changes to Comprehensive Recovery Plan jr!)bl
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
                                                                                                      ;Jf__f_
When a Senior Leader has positively satisfied their TPIP objectives, the Site Vice President SVP can close the TPIP. Implement the Individual Targeted Performance Improvement Plans (TPIP) developed from CR PNP-2016-2052, CA-35 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development  
                                                                                                /!_~tJ-&#xa3;
& Organizational Effectiveness.
 
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
Entergy Nuclear Operations, Inc.             Letter No. 2.18.060 Pilgrim Nuclear Power Station                         Page 2 of 2 cc:
When a Senior Leader has positively satisfied their TPIP objectives, the SVP can close the TPIP. Letter Number 2.18.060 Attachment 1 Implement the Individual Targeted Performance Improvement Plans {TPIP) for the GMPO and Directors (Senior Leaders) developed from CR PNP-2016-2052, CA-36 utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-9012 Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
& Organizational Effectiveness.
 
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
Attachment 1 Letter Number 2.18.060 Notification of Changes to Comprehensive Recovery Plan
When a Senior Leader has positively satisfied their TPIP objectives, the Site Vice President SVP) can close the TPIP. Develop and implement Individual Targeted Performance Improvement Plans (TPI P) for Managers, Superintendents and Supervisors using the criteria listed in PN P-2016-2052, CA-36 and utilizing the guidance contained in EN-FAP-HR-006, Fleet Approach to Leadership Development
 
& Organizational Effectiveness.
Notification of Changes to Comprehensive Recovery Plan
Document review plan progress as determined during the individual Monthly Performance Management Meetings to ensure sufficient evidence exists for plan closures.
                                                                                                            .. :~4:)iJSO:for C~~ng~
When a leader has positively satisfied their TPIP objectives, the one-up leader can close the TPIP. .. :~4:)iJSO:
:! , "': ,~, "CS'"' *  'l ,,, , ,
for C~~ng~ :! , "': ,~, "CS'"' * 'l ,,, , ,
Implement the Individual Targeted              Implement the Individual Targeted          *The reference to CR-PNP-2016-Performance Improvement Plans (TPIP)          Performance Improvement Plans {TPIP)         2052 CA-35 in the 1st sentence of developed from CR PNP-2016-2052,               for the GMPO and Directors (Senior          the CAL action has been revised to CA-35 utilizing the guidance contained         Leaders) developed from CR PNP-2016-        CA-36 to correct a typographical in EN-FAP-HR-006, Fleet Approach to           2052, CA-36 utilizing the guidance          error.
* The reference to CR-PNP-2016-2052 CA-35 in the 1st sentence of the CAL action has been revised to CA-36 to correct a typographical error. The GMPO and Directors have been added to the 1st sentence to clarify the intent of this action. The reference to CR-PNP-2016-2052 CA-35 in the 1st sentence of the CAL action has been revised to CA-36 to correct a typographical error. Managers, Superintendents, and Supervisors have been added to the 1st sentence, along with the action to develop and implement individual TPIPs, to clarify the intent of this action. In addition, the last sentence has been revised to identify that the one-up leader will close the TPIPs. Page 1 of 3 Notification of Changes to Comprehensive Recovery Plan *.:CAL.> " .. , * ,, , . * , , Actionr ', *.~urr:e!1l',CAL':Ac~ion Deshriptiori , , " #,, , , , ' ~* ' NSC-2.2 NSC-2.3 Rollout the PNPS Employee handbook (or equivalent) to site personnel.
Leadership Development &                       contained in EN-FAP-HR-006, Fleet Organizational Effectiveness. Document         Approach to Leadership Development &        The GMPO and Directors have NSC-review plan progress as determined             Organizational Effectiveness. Document      been added to the 1st sentence to 1.1 during the individual Monthly                   review plan progress as determined during    clarify the intent of this action.
The rollout meeting should include:
Performance Management Meetings to             the individual Monthly Performance ensure sufficient evidence exists for           Management Meetings to ensure sufficient plan closures. When a Senior Leader             evidence exists for plan closures. When a has positively satisfied their TPIP           Senior Leader has positively satisfied their objectives, the Site Vice President            TPIP objectives, the Site Vice President SVP can close the TPIP.                       SVP) can close the TPIP.
* Senior Leaders (Senior Manager or above) facilitating in the rollout meeting to ensure effective communications and understanding of the commitment to the handbook and its use.
Implement the Individual Targeted             Develop and implement Individual              The reference to CR-PNP-2016-Performance Improvement Plans (TPIP)          Targeted Performance Improvement Plans        2052 CA-35 in the 1st sentence of developed from CR PNP-2016-2052,              (TPI P) for Managers, Superintendents and    the CAL action has been revised to CA-35 utilizing the guidance contained        Supervisors using the criteria listed in CR-  CA-36 to correct a typographical in EN-FAP-HR-006, Fleet Approach to            PN P-2016-2052, CA-36 and utilizing the       error.
* Individuals signing for their copy of PNPS Employee Handbook and acknowledgement of expectations for use. Conduct alignment sessions with station leadership on the content and implementation expectations on the PNPS handbook (or equivalent) based on the EN-PL-100, Nuclear Excellence Model (PNPS's vision, mission, strategy, goals, core values, attributes of leader and individual behaviors), and site-specific recovery procedure EN-OM XXX-PNP-RC (Created in CR PNP-2016-2052, CA-39). These sessions will be led by the Site Vice President and focus on establishing accountability for high standards of performance to align behaviors in support of a strong nuclear safety culture. Station Leadership includes first line supervisor level up to Director and General Manager-Plant 0 erations GMPO level. Letter Number 2.18.060 Attachment 1 ::. '""* "" ?Pfo~o*~~~.*CAl:A~tiJ~
Leadership Development &                      guidance contained in EN-FAP-HR-006, Organizational Effectiveness. Document        Fleet Approach to Leadership                 Managers, Superintendents, and NSC-    review plan progress as determined             Development & Organizational                Supervisors have been added to 1.5    during the individual Monthly                 Effectiveness. Document review plan          the 1st sentence, along with the Performance Management Meetings to             progress as determined during the            action to develop and implement ensure sufficient evidence exists for         individual Monthly Performance              individual TPIPs, to clarify the intent plan closures. When a Senior Leader            Management Meetings to ensure sufficient    of this action. In addition, the last has positively satisfied their TPIP           evidence exists for plan closures. When a    sentence has been revised to objectives, the SVP can close the TPIP.        leader has positively satisfied their TPIP  identify that the one-up leader will objectives, the one-up leader can close the close the TPIPs.
:he~chp{io~*
TPIP.
: (''~ 't,. .,:,, ' '{;.:_ *
Letter Number 2.18.060 Attachment 1                                                                                                    Page 1 of 3
* f,:' : '."\,' c', , ~;,:* '* "'}'' *:) ! **~ Rollout the PNPS Employee handbook (or equivalent) to site personnel.
 
The rollout should include:
Notification of Changes to Comprehensive Recovery Plan
* Senior Leaders (Senior Manager or above) facilitating the rollout to ensure effective communications and understanding of the commitment to the handbook and its use.
  *.:CAL.>    " .. , *       ,, , .      *          ,                                                   ::.  '""* ""
* Individuals signing for their copy of PNPS Employee Handbook and acknowledgement of expectations for use. Conduct alignment sessions with station leadership on the content and implementation expectations on the PNPS handbook (or equivalent) based on the EN-PL-100, Nuclear Excellence Model (PNPS's vision, mission, strategy, goals, core values, attributes of leader and individual behaviors), and site-specific recovery procedure EN-OM XXX-PNP-RC (Created in CR PNP-2016-2052, CA-39). These sessions will be led by Station Senior Management and focus on establishing accountability for high standards of performance to align behaviors in support of a strong nuclear safety culture. Station Leadership includes first line supervisor level up to Director and General Manager-Plant Operations GMPO level. The word "meeting" has been removed from the second sentence and the first bulleted phrase to clarify that the roll out was conducted in two steps not in a meeting format. The intent and actions taken to meet this CAL requirement remain unchanged.
,Actionr
The word "in" in the 1st bulleted sentence following the word "facilitating" has been removed to improve the readability of the sentence.
          ',  *.~urr:e!1l',CAL':Ac~ion Deshriptiori , ,      ?Pfo~o*~~~.*CAl:A~tiJ~ :he~chp{io~* :
Change of wording from "Site Vice President" to "Station Senior Management" to more correctly describe the handbook roll out and alignment.
                              ,        , ' ~*        '        (''~ 't,. .,:,, ' '{;.:_ *
Although the SVP was present in the process and during meetings providing his leadership, guidance and oversight of the alignment sessions, the presentations were created and led by station senior managers.
* f,:' : '."\,' c', ,   ~ ~;,:* '* "'}'' *:) ! **~
CAP and ACRB closure packages provide documentation of the station senior management presentation.
Rollout the PNPS Employee handbook              Rollout the PNPS Employee handbook (or                                            The word "meeting" has been (or equivalent) to site personnel. The          equivalent) to site personnel. The rollout                                        removed from the second sentence rollout meeting should include:                should include:                                                                    and the first bulleted phrase to
Page 2 of 3 
* Senior Leaders (Senior Manager or
,**,CAL ,Ac:tion .#, NSC-8.9 Notification of Changes to Comprehensive Recovery Plan Reinforce the use of Entergy's Managerial Accountability Model as stated in EN-PL-100, Attachment 3.2 with all full-time site personnel and supplemental personnel to improve consistent performance of Managerial and Individual Accountability.
* Senior Leaders (Senior Manager or                                                clarify that the roll out was above) facilitating in the rollout meeting      above) facilitating the rollout to ensure                                          conducted in two steps not in a to ensure effective communications and          effective communications and                                                      meeting format. The intent and NSC-     understanding of the commitment to the          understanding of the commitment to the                                            actions taken to meet this CAL 2.2    handbook and its use.                          handbook and its use.                                                              requirement remain unchanged.
Reinforce the use of the Culpability model (accountability) as stated in EN-PL-100 with full-time, actively badged, site assigned personnel to improve consistent performance of Managerial and Individual Accountability.
* Individuals signing for their copy of
Letter Number 2.18.060 Attachment 1 :j=~e,s9ri)or c;:h~~gi.
* Individuals signing for their copy of PNPS PNPS Employee Handbook and                      Employee Handbook and                                                             The word "in" in the 1st bulleted acknowledgement of expectations for            acknowledgement of expectations for use.                                           sentence following the word use.                                                                                                                              "facilitating" has been removed to improve the readability of the sentence.
* "~ ,\ ,-" *s ', '';;' . ' ' 'i The wording change captures the intended audience with the most current accountability model from procedure EN-PL-100, Nuclear Excellence Model -now called the "Culpability Model." EN-PL-100 has been revised and attachment 3.2 no longer exists. Page 3 of 3}}
Conduct alignment sessions with station        Conduct alignment sessions with station                                            Change of wording from "Site Vice leadership on the content and                   leadership on the content and                                                     President" to "Station Senior implementation expectations on the              implementation expectations on the PNPS                                            Management" to more correctly PNPS handbook (or equivalent) based            handbook (or equivalent) based on the                                              describe the handbook roll out and on the EN-PL-100, Nuclear Excellence            EN-PL-100, Nuclear Excellence Model                                                alignment. Although the SVP was Model (PNPS's vision, mission,                  (PNPS's vision, mission, strategy, goals,                                          present in the process and during strategy, goals, core values, attributes        core values, attributes of leader and                                              meetings providing his leadership, of leader and individual behaviors), and        individual behaviors), and site-specific                                          guidance and oversight of the site-specific recovery procedure EN-OM          recovery procedure EN-OM XXX-PNP-RC                                                alignment sessions, the NSC-XXX-PNP-RC (Created in CR PNP-                  (Created in CR PNP-2016-2052, CA-39).                                             presentations were created and led 2.3 2016-2052, CA-39). These sessions will          These sessions will be led by Station                                              by station senior managers. CAP be led by the Site Vice President and          Senior Management and focus on                                                    and ACRB closure packages focus on establishing accountability for        establishing accountability for high                                              provide documentation of the high standards of performance to align          standards of performance to align                                                  station senior management behaviors in support of a strong nuclear        behaviors in support of a strong nuclear                                          presentation.
safety culture. Station Leadership              safety culture. Station Leadership includes includes first line supervisor level up to      first line supervisor level up to Director and Director and General Manager-Plant              General Manager-Plant Operations 0 erations GMPO level.                          GMPO level.
Letter Number 2.18.060 Attachment 1                                                                                                                                  Page 2 of 3
 
Notification of Changes to Comprehensive Recovery Plan
,**,CAL
,Ac:tion                                                                                                :j=~e,s9ri)or c;:h~~gi.
    .#,                                                                                                 * "~
                                                                                                                  ,\
                                                                                                                      'i
                                                                                                                          *s  ',  '';;'
Reinforce the use of Entergy's                Reinforce the use of the Culpability model The wording change captures the Managerial Accountability Model as            (accountability) as stated in EN-PL-100    intended audience with the most stated in EN-PL-100, Attachment 3.2            with full-time, actively badged, site      current accountability model from with all full-time site personnel and         assigned personnel to improve consistent  procedure EN-PL-100, Nuclear NSC-supplemental personnel to improve              performance of Managerial and Individual  Excellence Model - now called the 8.9 consistent performance of Managerial          Accountability.                            "Culpability Model." EN-PL-100 has and Individual Accountability.                                                            been revised and attachment 3.2 no longer exists.
Letter Number 2.18.060 Attachment 1                                                                                          Page 3 of 3}}

Latest revision as of 15:06, 2 February 2020

Notification of Changes to Comprehensive Recovery Plan
ML18352A753
Person / Time
Site: Pilgrim
Issue date: 12/13/2018
From: Brian Sullivan
Entergy Nuclear Operations
To: David Lew
Office of Nuclear Reactor Regulation, NRC Region 1
References
2.18.060
Download: ML18352A753 (6)


Text

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Letter Number 2.18.060 December 13, 2018 Mr. David C. Lew Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713

SUBJECT:

Notification of Changes to Comprehensive Recovery Plan Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35

REFERENCES:

1. NRC letter to Entergy, "Confirmatory Action Letter - Pilgrim Nuclear Power Station," dated August 2, 2017 (ML17214A088)

Dear Mr. Lew:

On August 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) transmitted the Pilgrim Nuclear Power Station (PNPS) Confirmatory Action Letter (CAL) (Reference 1) which confirmed the actions PNPS planned to take in accordance with our Comprehensive Recovery Plan (CRP).

During review of Nuclear Safety Culture (NSC) closure packages in advance of the December confirmatory inspection, PNPS has determined that minor clarifications are appropriate for a number of the actions. Accordingly, clarifications to NSC-1.1, NSC-1.5, NSC-2.2, NSC-2.3 and NSC-8.9 are provided in Attachment 1.

If you have any questions or require additional information, please contact Mr. Peter J. Miner at (508) 830-7127.

Sincerely, BRS/rb t,<DAJDI : Notification of Changes to Comprehensive Recovery Plan jr!)bl

Jf__f_

/!_~tJ-£

Entergy Nuclear Operations, Inc. Letter No. 2.18.060 Pilgrim Nuclear Power Station Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-9012 Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station

Attachment 1 Letter Number 2.18.060 Notification of Changes to Comprehensive Recovery Plan

Notification of Changes to Comprehensive Recovery Plan

.. :~4:)iJSO:for C~~ng~

! , "': ,~, "CS'"' * 'l ,,, , ,

Implement the Individual Targeted Implement the Individual Targeted *The reference to CR-PNP-2016-Performance Improvement Plans (TPIP) Performance Improvement Plans {TPIP) 2052 CA-35 in the 1st sentence of developed from CR PNP-2016-2052, for the GMPO and Directors (Senior the CAL action has been revised to CA-35 utilizing the guidance contained Leaders) developed from CR PNP-2016- CA-36 to correct a typographical in EN-FAP-HR-006, Fleet Approach to 2052, CA-36 utilizing the guidance error.

Leadership Development & contained in EN-FAP-HR-006, Fleet Organizational Effectiveness. Document Approach to Leadership Development & The GMPO and Directors have NSC-review plan progress as determined Organizational Effectiveness. Document been added to the 1st sentence to 1.1 during the individual Monthly review plan progress as determined during clarify the intent of this action.

Performance Management Meetings to the individual Monthly Performance ensure sufficient evidence exists for Management Meetings to ensure sufficient plan closures. When a Senior Leader evidence exists for plan closures. When a has positively satisfied their TPIP Senior Leader has positively satisfied their objectives, the Site Vice President TPIP objectives, the Site Vice President SVP can close the TPIP. SVP) can close the TPIP.

Implement the Individual Targeted Develop and implement Individual The reference to CR-PNP-2016-Performance Improvement Plans (TPIP) Targeted Performance Improvement Plans 2052 CA-35 in the 1st sentence of developed from CR PNP-2016-2052, (TPI P) for Managers, Superintendents and the CAL action has been revised to CA-35 utilizing the guidance contained Supervisors using the criteria listed in CR- CA-36 to correct a typographical in EN-FAP-HR-006, Fleet Approach to PN P-2016-2052, CA-36 and utilizing the error.

Leadership Development & guidance contained in EN-FAP-HR-006, Organizational Effectiveness. Document Fleet Approach to Leadership Managers, Superintendents, and NSC- review plan progress as determined Development & Organizational Supervisors have been added to 1.5 during the individual Monthly Effectiveness. Document review plan the 1st sentence, along with the Performance Management Meetings to progress as determined during the action to develop and implement ensure sufficient evidence exists for individual Monthly Performance individual TPIPs, to clarify the intent plan closures. When a Senior Leader Management Meetings to ensure sufficient of this action. In addition, the last has positively satisfied their TPIP evidence exists for plan closures. When a sentence has been revised to objectives, the SVP can close the TPIP. leader has positively satisfied their TPIP identify that the one-up leader will objectives, the one-up leader can close the close the TPIPs.

TPIP.

Letter Number 2.18.060 Attachment 1 Page 1 of 3

Notification of Changes to Comprehensive Recovery Plan

  • .:CAL.> " .. , * ,, , . * ,  ::. '""* ""

,Actionr

', *.~urr:e!1l',CAL':Ac~ion Deshriptiori , , ?Pfo~o*~~~.*CAl:A~tiJ~ :he~chp{io~* :

, , ' ~* ' (~ 't,. .,:,, ' '{;.:_ *

  • f,:' : '."\,' c', , ~ ~;,:* '* "'} *:) ! **~

Rollout the PNPS Employee handbook Rollout the PNPS Employee handbook (or The word "meeting" has been (or equivalent) to site personnel. The equivalent) to site personnel. The rollout removed from the second sentence rollout meeting should include: should include: and the first bulleted phrase to

  • Senior Leaders (Senior Manager or
  • Senior Leaders (Senior Manager or clarify that the roll out was above) facilitating in the rollout meeting above) facilitating the rollout to ensure conducted in two steps not in a to ensure effective communications and effective communications and meeting format. The intent and NSC- understanding of the commitment to the understanding of the commitment to the actions taken to meet this CAL 2.2 handbook and its use. handbook and its use. requirement remain unchanged.
  • Individuals signing for their copy of
  • Individuals signing for their copy of PNPS PNPS Employee Handbook and Employee Handbook and The word "in" in the 1st bulleted acknowledgement of expectations for acknowledgement of expectations for use. sentence following the word use. "facilitating" has been removed to improve the readability of the sentence.

Conduct alignment sessions with station Conduct alignment sessions with station Change of wording from "Site Vice leadership on the content and leadership on the content and President" to "Station Senior implementation expectations on the implementation expectations on the PNPS Management" to more correctly PNPS handbook (or equivalent) based handbook (or equivalent) based on the describe the handbook roll out and on the EN-PL-100, Nuclear Excellence EN-PL-100, Nuclear Excellence Model alignment. Although the SVP was Model (PNPS's vision, mission, (PNPS's vision, mission, strategy, goals, present in the process and during strategy, goals, core values, attributes core values, attributes of leader and meetings providing his leadership, of leader and individual behaviors), and individual behaviors), and site-specific guidance and oversight of the site-specific recovery procedure EN-OM recovery procedure EN-OM XXX-PNP-RC alignment sessions, the NSC-XXX-PNP-RC (Created in CR PNP- (Created in CR PNP-2016-2052, CA-39). presentations were created and led 2.3 2016-2052, CA-39). These sessions will These sessions will be led by Station by station senior managers. CAP be led by the Site Vice President and Senior Management and focus on and ACRB closure packages focus on establishing accountability for establishing accountability for high provide documentation of the high standards of performance to align standards of performance to align station senior management behaviors in support of a strong nuclear behaviors in support of a strong nuclear presentation.

safety culture. Station Leadership safety culture. Station Leadership includes includes first line supervisor level up to first line supervisor level up to Director and Director and General Manager-Plant General Manager-Plant Operations 0 erations GMPO level. GMPO level.

Letter Number 2.18.060 Attachment 1 Page 2 of 3

Notification of Changes to Comprehensive Recovery Plan

,**,CAL

,Ac:tion :j=~e,s9ri)or c;:h~~gi.

.#, * "~

,\

'i

  • s ', ;;'

Reinforce the use of Entergy's Reinforce the use of the Culpability model The wording change captures the Managerial Accountability Model as (accountability) as stated in EN-PL-100 intended audience with the most stated in EN-PL-100, Attachment 3.2 with full-time, actively badged, site current accountability model from with all full-time site personnel and assigned personnel to improve consistent procedure EN-PL-100, Nuclear NSC-supplemental personnel to improve performance of Managerial and Individual Excellence Model - now called the 8.9 consistent performance of Managerial Accountability. "Culpability Model." EN-PL-100 has and Individual Accountability. been revised and attachment 3.2 no longer exists.

Letter Number 2.18.060 Attachment 1 Page 3 of 3