| May 11, 1979 NLR3 - 08 Mr J G Keppler, Director Office of Inspection and Enforcement U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 g | | May 11, 1979 NLR3 - 08 Mr J G Keppler, Director Office of Inspection and Enforcement U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 g |
| TYRONE ENERGY iskK E-7470 Docket No. STN Q-484 Dear Mr Keppler Your letter dated March 12, 1979 forwarded for review and action IE Bulletin No. 79-03 concerning ASME SA-312 type 304 fusion welded stainless steel pipe spools manufactured by Youngstown Welding and Engineering Company. The fol-lowing information concerning the use or potential use of fusion welded pipe spools manufactured by Youngstown has been developed and is fomarded as an interim response to the subject Bulletin. This information has been developed generically to all five SNUPPS units. The SNUPPS units are Callaway I and II, Wolf Creek, Sterling, and Tyrone Energy Park. The need for additional actions applicable specifically to Tyrone Energy Park will be indicated in a follow-up response. The items below are numbered to coincide with action items listed in the NRC Bulletin. | | TYRONE ENERGY iskK E-7470 Docket No. STN Q-484 Dear Mr Keppler Your letter dated March 12, 1979 forwarded for review and action IE Bulletin No. 79-03 concerning ASME SA-312 type 304 fusion welded stainless steel pipe spools manufactured by Youngstown Welding and Engineering Company. The fol-lowing information concerning the use or potential use of fusion welded pipe spools manufactured by Youngstown has been developed and is fomarded as an interim response to the subject Bulletin. This information has been developed generically to all five SNUPPS units. The SNUPPS units are Callaway I and II, Wolf Creek, Sterling, and Tyrone Energy Park. The need for additional actions applicable specifically to Tyrone Energy Park will be indicated in a follow-up response. The items below are numbered to coincide with action items listed in the NRC Bulletin. |
Line 42: |
Line 40: |
| The results of ultrasonic examinations of pipe currently in fabrication at Dravo will also be referenced in the follow-up report which is presently scheduled for transmittal to NRC by August 10, 1979. The need for further corrective actions will be indicated in the follow-up response. | | The results of ultrasonic examinations of pipe currently in fabrication at Dravo will also be referenced in the follow-up report which is presently scheduled for transmittal to NRC by August 10, 1979. The need for further corrective actions will be indicated in the follow-up response. |
| Yours very truly 3 ' | | Yours very truly 3 ' |
| .
| |
| .
| |
| / | | / |
| PE Arthur V Dienhart Vice President Tyrone Energy Park Project cc U S Nuclear Regulatory Corrmission 228 003 Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D C 20555}} | | PE Arthur V Dienhart Vice President Tyrone Energy Park Project cc U S Nuclear Regulatory Corrmission 228 003 Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D C 20555}} |
Latest revision as of 22:00, 1 February 2020
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML1129708341981-10-23023 October 1981 Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 ML19350C6911981-03-26026 March 1981 Requests Change of Title & Address To:Commissioner of Health,Mn Dept of Health,717 Delaware St.Minneapolis,Mn 55440 ML19338F0721980-10-0101 October 1980 Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice ML19320B9001980-07-0707 July 1980 Ack Receipt of NRC 800616 Ltr W/Encl Show Cause Order Issued to Applicants.Phone Number & New Address Submitted for Further Correspondence ML19318D0811980-07-0101 July 1980 Forwards Response to NRC 800616 Ltr & Order to Show Cause Why License CPPR-157 Should Not Be Revoked.No Objection Raised ML19323G0601980-05-27027 May 1980 Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis ML19259B4611979-12-19019 December 1979 Requests Assistance in Responding to Constituent D Haenke ML19249D3981979-07-26026 July 1979 Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated ML19242A3681979-07-26026 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power ML19249A8541979-07-25025 July 1979 Forwards Northern States Power 790724 News Release Announcing Decision by co-owners to Cancel Project.Requests Termination of Proceedings ML19208D0431979-07-25025 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Requests Termination of Proceedings in Docket. Press Release & Certificate of Svc Encl ML19249A0651979-07-24024 July 1979 Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML19242D5311979-07-12012 July 1979 Submits 790710 News Release Re Future of Facility.No Final Decision Has Been Made ML19247B2961979-07-0505 July 1979 Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts ML19242B1141979-06-29029 June 1979 Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification ML19276G8091979-06-26026 June 1979 Notifies of Change of Address,Effective Immediately ML19261D7921979-06-19019 June 1979 Requests Timely Notification of Any OL Proceedings within Jurisdiction of Mo Public Svc Commission,To Facilitate State Participation ML19247A3181979-06-14014 June 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19259C0491979-06-0101 June 1979 Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. ML19273B6981979-05-30030 May 1979 Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR ML19270H1321979-05-23023 May 1979 Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses ML19270H1031979-05-22022 May 1979 Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required ML19224D3561979-05-17017 May 1979 Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B ML19259C4341979-05-11011 May 1979 Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility ML19269E3061979-05-10010 May 1979 Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities ML20062H0791979-04-16016 April 1979 Forwards Annual Financial Rept 1978 ML19263D6931979-03-21021 March 1979 Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review ML19317D1301979-03-0909 March 1979 Forwards Findings of Fact,Conclusions of Law & 790306 Order of Wi Public Svc Commission Re Denial of Application for Certificate of Public Convenience, & Necessity for Const Permit.Certificate of Sve Encl ML19270F9611979-03-0101 March 1979 Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary ML19289D1871979-02-19019 February 1979 Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl ML19269C2711979-01-22022 January 1979 Comments on Matl Re Permit for Transmission Lines.Submits Info Indicating High Density of Archaeological Sites within Area of Mississippi River & Vicinity of Chippewa River.Seeks Addl Info for Thorough Archaeological Reconnaissance ML20062G1541978-12-15015 December 1978 Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec ML20147J2571978-12-0606 December 1978 Emphasizes Importance of Sumbitting Accurate & Complete Info to NRC by Licensees & Applicants.Info Submitted Must Be Substantiated by Data & Calculations.Licensee Must Notify NRC of Any Inaccuracies or Enforcement Action Will Result ML20062E4811978-11-27027 November 1978 Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured ML20062E2311978-11-24024 November 1978 Forwards IE Bulletin 78-12A,suppl to IE Bulletin 78-12. W/Encl ANO:7811300055 ML20062D3751978-11-0808 November 1978 Forwards Recent NRC Memos Re Pipe Support Base Plate Design. Problem Applies to Subj Facil.(W/Encl ANO:7811020332 & 7811020336) ML20062C8701978-11-0606 November 1978 Forwards IE Circular 78-18 ML20062D1291978-10-25025 October 1978 Review of Proj Is Proc on Sched.Will Be Holding Hearing to Determine Whether Plant Is Needed Beginning 781211.W/encl Cert of Svc ML20062B2981978-10-16016 October 1978 Discusses Exhibit 14.Interrogatories Contain Ltr from Atty Er Jackson to Fg Kripps of Northern States Power Co Giving Jackson Opinion as to Ownership of Lands Condemned on Site of Proposed Facility.Svc List Encl ML20062B5081978-10-10010 October 1978 Confirms That 781003 Ecology Action of Oswego Petition Filed W/Permission of Northern Thunder,Inc ML20062A4551978-10-0202 October 1978 Forwards from Northern States Pwr Co to Pub Svc Comm of Wi Announcing Scheduled Oper Date for Subj Facil Is Apr 1986.W/o Ltr ML20147D5561978-09-29029 September 1978 Forwards pre-constr & Constr Schedules for Tyrone Energy Park ML20147F3951978-09-0808 September 1978 Fowards Northern Thunder Motion to Postpone Filing of Direct Testimony.Unless Objections Raised,Insp of Documents Will Be Postponed Until Presiding Officer Rules on Northern Thunder Motion ML20011A5501978-05-0303 May 1978 Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg ML20011A5351978-02-13013 February 1978 Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const 1981-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML1129708341981-10-23023 October 1981 Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 ML19350C6911981-03-26026 March 1981 Requests Change of Title & Address To:Commissioner of Health,Mn Dept of Health,717 Delaware St.Minneapolis,Mn 55440 ML19338F0721980-10-0101 October 1980 Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice ML19320B9001980-07-0707 July 1980 Ack Receipt of NRC 800616 Ltr W/Encl Show Cause Order Issued to Applicants.Phone Number & New Address Submitted for Further Correspondence ML19318D0811980-07-0101 July 1980 Forwards Response to NRC 800616 Ltr & Order to Show Cause Why License CPPR-157 Should Not Be Revoked.No Objection Raised ML19323G0601980-05-27027 May 1980 Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis ML19249D3981979-07-26026 July 1979 Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated ML19242A3681979-07-26026 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power ML19208D0431979-07-25025 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Requests Termination of Proceedings in Docket. Press Release & Certificate of Svc Encl ML19249A8541979-07-25025 July 1979 Forwards Northern States Power 790724 News Release Announcing Decision by co-owners to Cancel Project.Requests Termination of Proceedings ML19249A0651979-07-24024 July 1979 Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML19242D5311979-07-12012 July 1979 Submits 790710 News Release Re Future of Facility.No Final Decision Has Been Made ML19247B2961979-07-0505 July 1979 Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts ML19242B1141979-06-29029 June 1979 Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification ML19276G8091979-06-26026 June 1979 Notifies of Change of Address,Effective Immediately ML19261D7921979-06-19019 June 1979 Requests Timely Notification of Any OL Proceedings within Jurisdiction of Mo Public Svc Commission,To Facilitate State Participation ML19247A3181979-06-14014 June 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19259C0491979-06-0101 June 1979 Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. ML19273B6981979-05-30030 May 1979 Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR ML19270H1321979-05-23023 May 1979 Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses ML19270H1031979-05-22022 May 1979 Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required ML19224D3561979-05-17017 May 1979 Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B ML19259C4341979-05-11011 May 1979 Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility ML19269E3061979-05-10010 May 1979 Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities ML20062H0791979-04-16016 April 1979 Forwards Annual Financial Rept 1978 ML19263D6931979-03-21021 March 1979 Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review ML19317D1301979-03-0909 March 1979 Forwards Findings of Fact,Conclusions of Law & 790306 Order of Wi Public Svc Commission Re Denial of Application for Certificate of Public Convenience, & Necessity for Const Permit.Certificate of Sve Encl ML19270F9611979-03-0101 March 1979 Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary ML19289D1871979-02-19019 February 1979 Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl ML20062G1541978-12-15015 December 1978 Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec ML20062E4811978-11-27027 November 1978 Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured ML20062D1291978-10-25025 October 1978 Review of Proj Is Proc on Sched.Will Be Holding Hearing to Determine Whether Plant Is Needed Beginning 781211.W/encl Cert of Svc ML20062B5081978-10-10010 October 1978 Confirms That 781003 Ecology Action of Oswego Petition Filed W/Permission of Northern Thunder,Inc ML20062A4551978-10-0202 October 1978 Forwards from Northern States Pwr Co to Pub Svc Comm of Wi Announcing Scheduled Oper Date for Subj Facil Is Apr 1986.W/o Ltr ML20011A5501978-05-0303 May 1978 Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg ML20011A5351978-02-13013 February 1978 Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const 1981-03-26
[Table view] Category:UTILITY TO NRC
MONTHYEARML1129708341981-10-23023 October 1981 Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4 ML19338F0721980-10-0101 October 1980 Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended Notice ML19323G0601980-05-27027 May 1980 Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic Basis ML19249D3981979-07-26026 July 1979 Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated ML19242A3681979-07-26026 July 1979 Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power ML19249A0651979-07-24024 July 1979 Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications ML19247B2961979-07-0505 July 1979 Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts ML19242B1141979-06-29029 June 1979 Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification ML19247A3181979-06-14014 June 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility ML19259C0491979-06-0101 June 1979 Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification. ML19273B6981979-05-30030 May 1979 Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR ML19270H1321979-05-23023 May 1979 Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses ML19270H1031979-05-22022 May 1979 Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required ML19224D3561979-05-17017 May 1979 Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B ML19259C4341979-05-11011 May 1979 Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility ML19269E3061979-05-10010 May 1979 Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities ML20062H0791979-04-16016 April 1979 Forwards Annual Financial Rept 1978 ML19263D6931979-03-21021 March 1979 Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review ML19270F9611979-03-0101 March 1979 Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary ML19289D1871979-02-19019 February 1979 Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl ML20062G1541978-12-15015 December 1978 Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec ML20062E4811978-11-27027 November 1978 Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured ML20011A5501978-05-0303 May 1978 Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg ML20011A5351978-02-13013 February 1978 Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const 1981-10-23
[Table view] |
Text
ai tk r
%j.. . _ _
NSP NORTHERN STATES POWER COMPANY EAU CL AIRE, WISCONSIN 84709
^",'.,".Y"Y.J.'.'.""..^.".'.......
May 11, 1979 NLR3 - 08 Mr J G Keppler, Director Office of Inspection and Enforcement U S Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 g
TYRONE ENERGY iskK E-7470 Docket No. STN Q-484 Dear Mr Keppler Your letter dated March 12, 1979 forwarded for review and action IE Bulletin No. 79-03 concerning ASME SA-312 type 304 fusion welded stainless steel pipe spools manufactured by Youngstown Welding and Engineering Company. The fol-lowing information concerning the use or potential use of fusion welded pipe spools manufactured by Youngstown has been developed and is fomarded as an interim response to the subject Bulletin. This information has been developed generically to all five SNUPPS units. The SNUPPS units are Callaway I and II, Wolf Creek, Sterling, and Tyrone Energy Park. The need for additional actions applicable specifically to Tyrone Energy Park will be indicated in a follow-up response. The items below are numbered to coincide with action items listed in the NRC Bulletin.
- 1. A survey of current SNUPPS suppiiers of pipe spools and pre-assembled pipe formations indicates that only Dravo Corporation, Marietta, Ohio, has supplied pipe spools containing fusion welded SA-312 type 304 pipe (without filler material) manufactured by Youngstown Welding and Engineering Company. To date, the total number of Dravo-supplied pipe spools shipped to Callaway and Wolf Creek sites containing Youngstown-manufacture'd materials is 65 and 70, respectively. To date there have been no pipe spools of any type fabricated for or shipped to Sterling or Tyrone sites. Dravo is currently in the process of identifying other spools in fabrication which they plan to ship to SNUPPS jobsites and which contain the referenced fusion welded pipe.
This review process can be expected to continue over the next several months to obtain sufficient data concerning the quality and acceptability of the Youngstown pipe being furnished for SNUPPS.
2281 002
, 1 4 1979 79062200D/'
NORTHERN STATES POWER COMPANY I Page 2 6
May 11, 1979 Mr J G Keppler 2.
As indicated in item 1 above, a total of 65 and 70 pipe spools containing fusion welded SA312 type 304 pipe manufactured by Youngstown have to date been shipped to Callaway and Wolf Creek sites, respectively. A listing indicating pipe spools currently in fabrication for shipment to the Tyrone jobsite will be furnished in a follow-up to this interim report.
3.
Each longitudinal weld seam of fusion welded SA312 type 304 pipe manufactured by Youngstown and presently on site at Calla-way and Wolf Creek plants will be ultrasonically examined. This examination will be limited only by accessibility considerations which. according to preliminary site data, will impact fewer than 10 percent of the total number of spools previously installed.
The examination procedure, reference standards, and acceptance criteria shall be performed in accordance with Paragraph NC-2552 of the 1977 edition of ASME Section III Code. Any repairs re-quiring welding shall be in accordance with Paragraph NC-2559 of the 1977 edition of the ASME Section III Code. The preceding on-site examinations will be performed over the next 60 days and the results tabulated for transmittal to NRC.
Ultrasonic examinations will also be performed on all pipe spools presently in fabrication at Dravo containing fusion welded SA312 type 304 pipe. Acceptance criteria and repair provisions will be the same as indicated above. The results of these additional examinations as they relate to Tyrone Energy Park will be included in a follow-up to this interim report.
4.
This item is applicable to holders of operating licenses only.
5.
The ultrasonic examinations being performed at Callaway and Wolf Creek sites are scheduled for completion within the next 60 days and will be referenced into a follow-up to this interim report.
The results of ultrasonic examinations of pipe currently in fabrication at Dravo will also be referenced in the follow-up report which is presently scheduled for transmittal to NRC by August 10, 1979. The need for further corrective actions will be indicated in the follow-up response.
Yours very truly 3 '
/
PE Arthur V Dienhart Vice President Tyrone Energy Park Project cc U S Nuclear Regulatory Corrmission 228 003 Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D C 20555