 Issue dateTitleTopic
ML11297083423 October 1981Forwards Annual Financial Rept for 1980 & Schedule Showing Cash Flow Generated in 1980 & Projected Flow for 1981,per Reg Guide 9.4
ML19338F0721 October 1980Requests That Application Filed by Util 791019 & Notice Published in Fr on 800826 Be Amended to Reflect Fact That Util Is Seeking Issuance of OL Only for Unit 1.Lists Three Items for Correction in Amended NoticeIncorporated by reference
ML19323G06027 May 1980Responds to 800320 Ltrs to Union Electric & Ks Gas & Electric Re QA Programs for Design Const & Fire Protection. Responds to NRC Questions Offered on Generic BasisEmergency Lighting
Fire Protection Program
ML19249D39826 July 1979Discusses 790724 Decision by Facility Owners to Cancel Project & Requests Further Action Be Terminated
ML19242A36826 July 1979Forwards Util 790724 Press Release Re Cancellation of Project.Wi Public Svc Commission 790306 Denial of Project Would Prevent Completing Plant in Time to Meet Projected Needs for Power
ML19249A06524 July 1979Responds to IE Bulletin 79-11.No Westinghouse Type DB-50 or 75 Circuit Breakers Included in Any safety-related Applications
ML19247B2965 July 1979Forwards Rept on Pipe-Support Base Plate Designs Using Concrete Expansion Anchor Bolts, in Response to IE Bulletin 79-02.Response Is Result of Review Design & Installation Practices & Procedures for Anchor Bolts
ML19242B11429 June 1979Responds to IE Bulletins 78-12,12A & 12B.C-E Submitted Rept Containing Info Requested Re Atypical Weld Matl in Reactor Pressure Vessel Welds.Westinghouse Will Inventory Archive Surveillance Weldment Matl to Be Used for Verification
ML19247A31814 June 1979Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breaker Are Used or Planned for Use at Facility
ML19259C0491 June 1979Requests NRC Concurrence Re Use of ASME Section III Code Case N-242,Matls Certification.
ML19273B69830 May 1979Confirms Plan to Discuss & Resolve Matters Re Fuel Rod Bowing Effects in Snupps FSAR
ML19270H13223 May 1979Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.Lists Computer Codes Used in Analyses
ML19270H10322 May 1979Responds to IE Bulletin 79-04 Re Incorrect Weights for Velan Swing Check Valves.Incorrect Valve Weights Not Used.No Mod Required
ML19224D35617 May 1979Confirms 790629 Deadline for Response to IE Bulletins 78-12,78-12A & 78-12B
ML19259C43411 May 1979Responds to IE Bulletin 79-03 Re Use of Fusion Welded Pipe Spools Mfg by Youngstown Welding & Engineering Co.No Such Pipe Spools Have Been Shipped to Facility
ML19269E30610 May 1979Responds to IE Bulletin 79-03.To Date,There Have Been No Pipe Spools of Any Type Fabricated for or Shipped to Facilities
ML20062H07916 April 1979Forwards Annual Financial Rept 1978
ML19263D69321 March 1979Response to IE Bulletin 78-12A:Westinghouse Is Pressure Vessel supplier.C-E Will Not Provide Needed Info Until Aug 1979,so Util Requests Submission Extension to 790930 to Allow Time for Review
ML19270F9611 March 1979Withdraws Requested Partial Exemption from 10CFR21.Revised Regulations Providing Exemptions for Commercial Grade Items Make Request Unnecessary
ML19289D18719 February 1979Forwards Financial Qualifications, Consisting of Revised Pages A-6 Through A-17 to Exhibit a of Ltr NLNRC-86,dtd 780825.Attachment 2 W/Suppl Info to Ltr NLNRC-80 Dtd 780420 Is Not Encl.Certificate of Svc Encl
ML20062G15415 December 1978Discusses Snupps Fsar.Advises That Snupps Utils Plan to Submit Standardized Portion of FSAR in Oct 1979.Most Significant Changes from Design Described in PSAR Are Associated W/Fire Protec
ML20062E48127 November 1978Responds to IE Bulletin 78-12 Re Atypical Weld Matl in Reactor Vessel Pressure Welds.States That Reactor Vessel Not Yet Manufactured
ML20011A5503 May 1978Requests Mod of Max Depth Requirement for Snupps Containment Structures for Areas Adjacent to Two Electrical Penetration Banks Located in Reactor Bldg,Third Through Sixth Lifts Adjacent to Auxiliary Bldg
ML20011A53513 February 1978Requests NRC Confirm Design Requirements for Util Containment Structures as Soon as Possible Because of Impact on Const