ML19321A106: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:(7-71) g*                                                                      LICENSEE EVENT REPORT
{{#Wiki_filter:(7-71) g*                                                                      LICENSEE EVENT REPORT CONTROL BLOCK: l                l    l    l    l  l                        (PLEASE PRINT CR TYPE ALL RECUlRED INFORMATl!N) o i 7      8    l9 ol alLICENSEE ol BICODE  Sl 11@l    14    IS 010l Ol 0 l LICENSE 01 OlNUMSEH  01010 l o l e26l@l26 4 l LICENSE  i l i l 1l    1 l@l 67 TYPE JO l
          #
CONTROL BLOCK: l                l    l    l    l  l                        (PLEASE PRINT CR TYPE ALL RECUlRED INFORMATl!N) o i 7      8    l9 ol alLICENSEE ol BICODE  Sl 11@l    14    IS 010l Ol 0 l LICENSE 01 OlNUMSEH  01010 l o l e26l@l26 4 l LICENSE  i l i l 1l    1 l@l 67 TYPE JO l
GATb8 l@
GATb8 l@
, CON'T M
, CON'T M
i        8
i        8 3$ny 60lL @l610l 5l 0l -l Ol 3l 416 l@l O l 6 l I l 918 l g @l 0l 7l 1l 7l 8 l 0 l@
                        "
3$ny 60lL @l610l 5l 0l -l Ol 3l 416 l@l O l 6 l I l 918 l g @l 0l 7l 1l 7l 8 l 0 l@
DOCK ET NUV8E R              68    69      EVENT DATE .        74    75      REPORT DATE        80 EVE'
DOCK ET NUV8E R              68    69      EVENT DATE .        74    75      REPORT DATE        80 EVE'
                             'FSCRIPTION AND PROBABLE CONSEQUENCES h o 2        l (Nr , 80-62) On 6/19/80 at 1300 hours while perferming ST 5031.07 Phase II, the                                                                            I o a l sequencer logic channels 2 and 4 did not operate as designed. The action statement ofi l o 14 l l T.S. 3.3.2.1 was not entered as the station was in Mode 6.                                                      This is being reported to l ITTT] I document a component failure. There was no danger to the public or station personnel.l ITTTI I All emergency safety features equipment eventually started within two minutes of the l o 7      I Safety Features Actuation System trip.                                                                                                                    I LoJ 8.J l                                                                                                                                                                I 7      8 9                                                                                                                                                        80 E            CODE      S SC E                    COMPONENT CODE              SUBCODE        SU      E M
                             'FSCRIPTION AND PROBABLE CONSEQUENCES h o 2        l (Nr , 80-62) On 6/19/80 at 1300 hours while perferming ST 5031.07 Phase II, the                                                                            I o a l sequencer logic channels 2 and 4 did not operate as designed. The action statement ofi l o 14 l l T.S. 3.3.2.1 was not entered as the station was in Mode 6.                                                      This is being reported to l ITTT] I document a component failure. There was no danger to the public or station personnel.l ITTTI I All emergency safety features equipment eventually started within two minutes of the l o 7      I Safety Features Actuation System trip.                                                                                                                    I LoJ 8.J l                                                                                                                                                                I 7      8 9                                                                                                                                                        80 E            CODE      S SC E                    COMPONENT CODE              SUBCODE        SU      E M
Line 44: Line 40:
11l5l ( Hj @ l 0l 0 l 0l h l NA                                                      l      [B_j@l Surveillance Test ST 5031.07                                        l ACTIVITY CO TENT l
11l5l ( Hj @ l 0l 0 l 0l h l NA                                                      l      [B_j@l Surveillance Test ST 5031.07                                        l ACTIVITY CO TENT l
6ELEASED OF RELEASE                        AMOUNTOF ACTavlTY                                                  LOCATION OF RELEASE
6ELEASED OF RELEASE                        AMOUNTOF ACTavlTY                                                  LOCATION OF RELEASE
[,iJ 6,j {_Z,] @ l Z l@l NA                                                          l            l NA                                                                  l
[,iJ 6,j {_Z,] @ l Z l@l NA                                                          l            l NA                                                                  l PERSONNEt ExPOSMES                                                                                                                                            i NUMBER              TYPE        DE SCRIPTION l
  #        * *                '
PERSONNEt ExPOSMES                                                                                                                                            i NUMBER              TYPE        DE SCRIPTION l
lTlTll0l0l0l@lZl@lNA                                                                                                                                                    l PERSONNE L INJURIES NUMBER              DESCRIPTION @
lTlTll0l0l0l@lZl@lNA                                                                                                                                                    l PERSONNE L INJURIES NUMBER              DESCRIPTION @
                                                                                                                                                                                    .
i 4                                    NA 7        d 9 1 Ol 010l@l12    11 I
i 4                                    NA 7        d 9 1 Ol 010l@l12    11 I
LOSS OF OR DAMAGE TO FACILITY                                                                                                                          80 TYPE      DESCRIPTION
LOSS OF OR DAMAGE TO FACILITY                                                                                                                          80 TYPE      DESCRIPTION
Line 58: Line 51:
\                    8007e20ye5                                                                                                                                                  s_
\                    8007e20ye5                                                                                                                                                  s_


e
e J
  .
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-62 DATE OF EVENT: June 19, 1980
J TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-62
    .
DATE OF EVENT: June 19, 1980
* FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE:    Safety Features Actuation System (SFAS) Sequencer Logic Channels 2 and 4 failed to operate as designed Conditions Prior to Occurrence: The unit was in Mode 6, with Power (MWT) = 0 and Load (Gross MWE) = 0.
* FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE:    Safety Features Actuation System (SFAS) Sequencer Logic Channels 2 and 4 failed to operate as designed Conditions Prior to Occurrence: The unit was in Mode 6, with Power (MWT) = 0 and Load (Gross MWE) = 0.
Description of Occurrence: On June 19, 1980 at 1300 hours, during the performance of the Integrated SFAS Test ST 5031.07, Phase II, the sequencer logic channels 2 and 4 did not operate as designed. This changed the order in which some of the equipment started, even though all started within two minutes.
Description of Occurrence: On June 19, 1980 at 1300 hours, during the performance of the Integrated SFAS Test ST 5031.07, Phase II, the sequencer logic channels 2 and 4 did not operate as designed. This changed the order in which some of the equipment started, even though all started within two minutes.

Latest revision as of 04:39, 1 February 2020

LER 80-051/03L-0:on 800619,while Performing ST 5031.07 Phase Ii,Sequencer Logic Channels 2 & 4 Did Not Operate as Designed.Caused by Component Failure of Relay Seqx & CR-3X in C3618.Relay Seqx Was replaced.CR-3X Was Cleaned
ML19321A106
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/17/1980
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19321A102 List:
References
LER-80-051-03L, LER-80-51-3L, NUDOCS 8007220465
Download: ML19321A106 (2)


Text

(7-71) g* LICENSEE EVENT REPORT CONTROL BLOCK: l l l l l l (PLEASE PRINT CR TYPE ALL RECUlRED INFORMATl!N) o i 7 8 l9 ol alLICENSEE ol BICODE Sl 11@l 14 IS 010l Ol 0 l LICENSE 01 OlNUMSEH 01010 l o l e26l@l26 4 l LICENSE i l i l 1l 1 l@l 67 TYPE JO l

GATb8 l@

, CON'T M

i 8 3$ny 60lL @l610l 5l 0l -l Ol 3l 416 l@l O l 6 l I l 918 l g @l 0l 7l 1l 7l 8 l 0 l@

DOCK ET NUV8E R 68 69 EVENT DATE . 74 75 REPORT DATE 80 EVE'

'FSCRIPTION AND PROBABLE CONSEQUENCES h o 2 l (Nr , 80-62) On 6/19/80 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> while perferming ST 5031.07 Phase II, the I o a l sequencer logic channels 2 and 4 did not operate as designed. The action statement ofi l o 14 l l T.S. 3.3.2.1 was not entered as the station was in Mode 6. This is being reported to l ITTT] I document a component failure. There was no danger to the public or station personnel.l ITTTI I All emergency safety features equipment eventually started within two minutes of the l o 7 I Safety Features Actuation System trip. I LoJ 8.J l I 7 8 9 80 E CODE S SC E COMPONENT CODE SUBCODE SU E M

't 8 l Il Bl@ [J,j@ [_A_j h l R l E l L l A lY lX l@ lM l@ W @

9 10 11 12 13 18 19 20

. SEQUENTIAL OCCURRENCE REPORT REVISION LER EVENT YEAR REPORT NO. COOE TYPE No.

a

@ sgo/RO g l218lel l-l 1015111 [d 1 01 31 lLI L--J l_0_I

_ 22 23 24 26 27 28 M 30 31 32 AK N A QN ON PLANT ME HOURS SB IT D FOR b 8. SU PLI MANUFACTURER

[_A_j@lXJ@

~

33 34 l_Z_j@

35 lZl@

36 3 0l0l0lel 40

[_Y_J 41

@ lN 42 l@ lN l@ l44C l 6 l 4 l 947 l@

43 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h y l The cause was a component failure of relay SEQX in RC3702 and relay CR-3X in C3618. I 1 i l Relay SEQX was replaced and CR-3X was cleaned. This phase of the test was rerun on I 1 :1 1 6/20/80 at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br /> and the sequencers were declared operable. I t u sj l I in.ij l 1

7 8 9 80 ST S  % POWER oTHER STATUS DIS O RY DISCOVERY DESCRIPTION  ;

11l5l ( Hj @ l 0l 0 l 0l h l NA l [B_j@l Surveillance Test ST 5031.07 l ACTIVITY CO TENT l

6ELEASED OF RELEASE AMOUNTOF ACTavlTY LOCATION OF RELEASE

[,iJ 6,j {_Z,] @ l Z l@l NA l l NA l PERSONNEt ExPOSMES i NUMBER TYPE DE SCRIPTION l

lTlTll0l0l0l@lZl@lNA l PERSONNE L INJURIES NUMBER DESCRIPTION @

i 4 NA 7 d 9 1 Ol 010l@l12 11 I

LOSS OF OR DAMAGE TO FACILITY 80 TYPE DESCRIPTION

  • 1 9 [_Zjhl NA l

7 8 9 to 80 ISSUE DESCRIPT'ON L1]ojl_NhlNA

  • 17 8 9 10 l

68 69 lllllllllllll5

80 5 k'R 80-099 NAME OF PREPARER Tom Isley PHONE: 419-259-5000, Ext. 230 g

\ 8007e20ye5 s_

e J

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-80-62 DATE OF EVENT: June 19, 1980

  • FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Safety Features Actuation System (SFAS) Sequencer Logic Channels 2 and 4 failed to operate as designed Conditions Prior to Occurrence: The unit was in Mode 6, with Power (MWT) = 0 and Load (Gross MWE) = 0.

Description of Occurrence: On June 19, 1980 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, during the performance of the Integrated SFAS Test ST 5031.07, Phase II, the sequencer logic channels 2 and 4 did not operate as designed. This changed the order in which some of the equipment started, even though all started within two minutes.

Technical Specification 3.3.2.1 requires the sequencer logic channels to be opera-ble in Modes 1, 2, 3, and 4. Being in Mode 6 at the time of the finding, the station did not enter any action statement. This is being reported to document a component failure.

Designation of Apparent Cause of Occurrence: The cause of the event is the component failure of two relays. Relay SEQX in RC3702 was introducing noise in the sequencer circuit. Relay CR-3X in C3618 was dirty and not operating properly. These two prob-lems caused the sequencer for channels 2 and 4 to operate out of step. The sequencer logic of both channels must be in step to cause the equipment to start in the designed crder.

Analysis of Occurrence: There was no danger to the health and safety of the public cr to station personnel. Even though the SEAS loads did not sequence in the designed crder, all emergency safety features equipment started within two minutes of the SEAS trip.

Corrective Action: Relay SEQX in the circuit for the channel 2 sequencer was re-placed and relay CR-3X was cleaned. This phase of the test was rerun at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br /> on June 20, 1980, and the sequencers were declared operable. The CR-3X relays have been added to the preventive maintenance program for periodic cleaning. ,

i Failure Data: None previously reported for the above reasons. '

LER #80-051 L