ML19321A102

From kanterella
Jump to navigation Jump to search
Forwards LER 80-051/03L-0
Date released: 12/01/2019 Download: ML19321A102


LER 80-051/03L-0:on 800619,while Performing ST 5031.07 Phase Ii,Sequencer Logic Channels 2 & 4 Did Not Operate as Designed.Caused by Component Failure of Relay Seqx & CR-3X in C3618.Relay Seqx Was replaced.CR-3X Was Cleaned
ML19321A106
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/17/1980
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19321A106 (2)
Forwards LER 80-051/03L-0
ML19321A101
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/17/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19321A101 (1)