| Audit report cc: NuScale DC ListServ | | Audit report cc: NuScale DC ListServ |
|
| |
|
| ML19331A397 *via email NRR-106 OFFICE DNRL/NRLB: PM DNRL/NRLB: LA DEX/EMIB: BC DNRL/NRLB: PM NAME MVera CSmith SBailey MVera DATE 11/26/2019 12/05/2019 12/20/2019 12/20/2019 | | ML19331A397 *via email NRR-106 OFFICE DNRL/NRLB: PM DNRL/NRLB: LA DEX/EMIB: BC DNRL/NRLB: PM NAME MVera CSmith SBailey MVera DATE 11/26/2019 12/05/2019 12/20/2019 12/20/2019 U.S. NUCLEAR REGULATORY COMMISSION STAFFS REPORT OF THE REGULATORY AUDIT FOR NUSCALE POWER, LLC; SEISMIC CATEGORY I EQUIPMENT AND ENVIRONMENT QUALIFICATION OF ELECTRICAL EQUIPMENT SPECIFICATIONS NRC AUDIT TEAM: |
| | |
| U.S. NUCLEAR REGULATORY COMMISSION STAFFS REPORT OF THE REGULATORY AUDIT FOR NUSCALE POWER, LLC; SEISMIC CATEGORY I EQUIPMENT AND ENVIRONMENT QUALIFICATION OF ELECTRICAL EQUIPMENT SPECIFICATIONS NRC AUDIT TEAM: | |
| Tuan Le, Office of New Reactors (NRO) Mechanical Engineer Michael Breach, Mechanical Engineer, Lead Auditor Marieliz Vera Amadiz, Project Manager Sheila Ray, Sr. Electrical Engineer Jorge Cintron-Rivera, Electrical Engineer | | Tuan Le, Office of New Reactors (NRO) Mechanical Engineer Michael Breach, Mechanical Engineer, Lead Auditor Marieliz Vera Amadiz, Project Manager Sheila Ray, Sr. Electrical Engineer Jorge Cintron-Rivera, Electrical Engineer |
|
| |
|
Line 51: |
Line 49: |
| * Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. | | * Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment. |
| The NRC staff focused the review on the environmental qualification information for containment electrical penetration assemblies (EPAs), pressurizer heater bundles, and containment isolation valves and actuated valves. | | The NRC staff focused the review on the environmental qualification information for containment electrical penetration assemblies (EPAs), pressurizer heater bundles, and containment isolation valves and actuated valves. |
| The NRC staff provided NuScale with the audit plan documented in ADAMS under Accession No. | | The NRC staff provided NuScale with the audit plan documented in ADAMS under Accession No. ML19225B594. The NRC staff followed the NRO Office Instruction, NRO-REG-108 (Revision 0), |
| ML19225B594. The NRC staff followed the NRO Office Instruction, NRO-REG-108 (Revision 0), | |
| Regulatory Audits, in performing the audit of the NuScale design specifications. | | Regulatory Audits, in performing the audit of the NuScale design specifications. |
| The NRC staff conducted the audit at the NRC office in Rockville, Maryland, from August 22, 2019, through September 24, 2019. The NRC staff members were from the Mechanical Engineering Branch (MEB) of the Division of Engineering and Infrastructure in NRO and the Mechanical Engineering and Inservice Testing Branch, the Electrical Engineering New Reactor and License Renewal Branch, and the Electrical Engineering Operating Reactor and License Renewal Branch of the Division of Engineering in the Office of Nuclear Reactor Regulation (NRR). | | The NRC staff conducted the audit at the NRC office in Rockville, Maryland, from August 22, 2019, through September 24, 2019. The NRC staff members were from the Mechanical Engineering Branch (MEB) of the Division of Engineering and Infrastructure in NRO and the Mechanical Engineering and Inservice Testing Branch, the Electrical Engineering New Reactor and License Renewal Branch, and the Electrical Engineering Operating Reactor and License Renewal Branch of the Division of Engineering in the Office of Nuclear Reactor Regulation (NRR). |
| 2.0 AUDIT RESULTS The NRC staff found that all confirmatory items identified under Accession No. ML18173A291, were addressed and that the items could be closed.}} | | 2.0 AUDIT RESULTS The NRC staff found that all confirmatory items identified under Accession No. ML18173A291, were addressed and that the items could be closed.}} |
|
---|
Category:Audit Report
MONTHYEARML20160A2502020-07-28028 July 2020 Enclosure 1 - ECCS Boron Redistribution Issue Audit Summary Public Version ML20176A1572020-07-10010 July 2020 Enclosure 1 - Chapter 15 Audit Summary Public Version ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20010D1332020-01-28028 January 2020 Enclosure 1 - LOCA Audit Summary Public Version ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commissions Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding NuScales Power Module Leakage Flow Instability Analysis - Public Memo ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19308A0612019-11-0101 November 2019 Summary of NRC Staff Audit of NuScale Power'S Containment and Ventilation Systems ML19291A8872019-10-21021 October 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory Close-out Audit of NuScale Power, LLC, Component Design Specification ML19220B6752019-09-0909 September 2019 Hfe Vv Rsr Audit Summary Report ML19203A0432019-07-25025 July 2019 Phase IV Regulatory Audit of NuScale Neutron Radiation Source Term ML19175A0672019-07-18018 July 2019 Audit Summary Report for the Regulatory Audit of NuScale Power, LLC Proposed Inspections, Tests, Analyses, and Acceptance Criteria and Revised Design Implementation Implementation Plan ML19151A6582019-06-14014 June 2019 Audit Report for the Regulatory Audit of Nuscale Power, LLC FSAR Chapter 20, Mitigation of Beyond-Design-Basis Events ML19037A4892019-03-15015 March 2019 Memo - Summary Report for the Environmental Audit of Part 3 of the NuScale Design Certification Application ML19018A1402019-02-11011 February 2019 U.S. Nuclear Regulatory Commission Staff Report of Regulatory Audit for Nuscale Power, LLC; Follow-Up Audit of Component Design Specifications ML18333A2212018-12-13013 December 2018 Phase 2 Audit Nuscale Reactor Internals Comprehensive Vibration Assessment Program ML18331A0422018-12-0707 December 2018 U.S. Nuclear Regulator Commission Staff Report of Regulatory Audit of Nuscale Power, LLC; Design Documents for Containment Isolation Valves and Reactor Safety Valves ML18325A1532018-12-0606 December 2018 U.S. Nuclear Regulatory Commission Staff Report of Follow-Up Regulatory Audit for Nuscale Power, LLC Design Certification Application Final Safety Analysis Report Sections 3.9.4 and 4.6 ML18324A5622018-11-29029 November 2018 U.S. Nuclear Regulatory Commission NuScale Power, LLC; Summary Report of Regulatory Audit of Computer Program Codes as Part of the NuScale Design Control Document ML18298A1902018-11-14014 November 2018 July-August 2018 NuScale Isv Audit Summary Report for the Regulatory Audit of NuScale Power, LLC, Design Certification Application Human Factors Engineering ML18317A2772018-11-14014 November 2018 Audit Summary for Nuscale Topical Report TR-0915-17564, Revision 1, Subchannel Analysis Methodology. ML18291B2282018-11-0909 November 2018 Interim Audit Summary Report - Containment and Ventilation Systems ML18173A2912018-10-25025 October 2018 U.S. Nuclear Regulatory Commission Report of Regulatory Audit for Nuscale Power, LLC Seismic Category 1 Equipment and Environment Qualification of Electrical Equipment Specifications ML18219B6342018-08-14014 August 2018 U.S. Nuclear Regulatory Commission Staff Report of Regulatory Audit of Failure Modes and Effects Analysis and Other Supporting Documents for Emergency Core Cooling System Valves in the NuScale Power, LLC, Design Certification Application ML18208A3712018-08-0101 August 2018 June 26-28 2018 NuScale Hfe Audit Summary Report ML18172A0762018-06-13013 June 2018 Nonproprietary - Regulatory Audit of Nuscale Draft Rev 3 of the Accident Source Term Methodology Topical Report TR-0915-17565 ML18143B6672018-06-13013 June 2018 Summary Report for the Environmental Audit of Part 3 of the NuScale Design Certification Application ML18135A0502018-05-24024 May 2018 Hfe Audit Report (Jul 25-2017 - Feb 14-2018) ML18103A1982018-04-30030 April 2018 Chapter 11 Audit Report - June Through November 2017 ML18051A7222018-03-26026 March 2018 Audit Summary for NuScale Steam Generators_Non_Prop Version ML18051A7302018-03-26026 March 2018 Audit Summary Memo NuScale Steam Generators ML18052A0792018-02-26026 February 2018 U.S. Nuclear Regulatory Commission Staff Report of Initial Regulatory Audit for Emergency Core Cooling System Valves in Nuscale Power, LLC, Design Certification Application ML18031A4542018-02-16016 February 2018 Physical Seurity Audit Report ML18023A0912018-02-0505 February 2018 Public - Audit Report NuScale 3.9.2 ML18018A2342018-01-25025 January 2018 Summary Audit Report of Phase 1 NuScale Design Specfication Rev ML18004A0462018-01-0505 January 2018 Audit Report - Nuscale'S EC-0000-3070, Station Blackout Transient Analysis, Revision 1 (Docket No. 52-048) 2020-07-28
[Table view] Category:Memoranda
MONTHYEARML24004A0472024-01-31031 January 2024 U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss Nuscale’S Us600 Exemption Request ML20274A1082020-09-30030 September 2020 Summary of September 16, 2020 Public Meeting with NuScale Power, LLC to Discuss Operator Licensing Topics ML20199M1492020-08-19019 August 2020 Memo Transmitting Summary of the July 15, 2020 Pre-Submittal Meeting with NuScale, LLC, Regarding Its Plans to Submit a Topical Report Using Automated Test System ML20219A4112020-08-10010 August 2020 Summary of the May 28, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss NuScales Standard Design Application Control Room Staffing Topical Report-0520-69851 ML20210M0772020-07-28028 July 2020 Memo - Category 1 Public Meeting - Audit Exit NuScale Emergency Core Cooling System Boron Redistribution Issue and Applicable Design Changes ML20160A2472020-07-28028 July 2020 Audit Summary Memo NuScale ECCS Boron Redistribution Issue ML20176A1582020-07-10010 July 2020 Audit Summary 2019 Memo NuScale Chapter 15 ML20108F5082020-05-27027 May 2020 Summary of April 15 2020 Public Meeting on NuScale EPZ Sizing Methodology TR ML20140A1892020-05-19019 May 2020 Public Meeting Summary May 14, 2020, NuScale Boron Redistribution Issue ML20114E2162020-05-0404 May 2020 Summary of the April 1, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0192020-04-27027 April 2020 Summary of the April 15, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution of the Design Certification Application ML20114E0392020-04-23023 April 2020 Meeting Summary for the April 21, 2020, Public Meeting to Discuss NuScale SDA Significance Review Process ML20097C2292020-04-0707 April 2020 Summary of the March 9, 2020, Category 1 Public Teleconference with NuScale Power, LLC to Discuss the Emergency Core Cooling System Boron Distribution ML20072M7982020-03-19019 March 2020 Meeting Summary for the January 30, 2020, Public Meeting to Discuss NuScale SDA Regulatory Engagement Plan ML20076D8852020-03-16016 March 2020 Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 ML20072K5232020-03-11011 March 2020 Summary of the September 4, 2019, Public Teleconference with NuScale Power, Llc., Regarding Responses to Staff Requests for Additional Information (RAI) (52-048) ML20059N6872020-03-0202 March 2020 Regulatory Audit Plan for NuScale DCA Chapters 6, 7, and 15 ML20054A0602020-02-28028 February 2020 Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change ML20044E3522020-02-18018 February 2020 Memo to ACRS Rod Ejection Accident Methodology SER ML20049H1872020-02-18018 February 2020 Memo to ACRS Rea NON-LOCA TR SE ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20042E0242020-02-12012 February 2020 LOCA Topical Report Phase IV Audit Report - Public ML20042E0392020-02-12012 February 2020 NON-LOCA Topical Report Phases 3 and 4 Audit Report ML20010D1312020-01-16016 January 2020 Audit Summary Memo NuScale LOCA TR ML19345E9362020-01-13013 January 2020 Summary of the December 9, 2019, Public Teleconference Meeting on Incorporation by Reference ML19340A9712020-01-13013 January 2020 U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) ML20006G4202020-01-0808 January 2020 ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapters 2, 8 and 12 ML19343C7562020-01-0808 January 2020 Generator Tube - Siet Audit Report (Public) ML20006G5752019-12-20020 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 8, Electric Power ML19331A3972019-12-20020 December 2019 U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications ML19340A0152019-12-20020 December 2019 U.S. Nuclear Regulatory Commissions Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding NuScales Power Module Leakage Flow Instability Analysis - Public Memo ML20006G4892019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters ML19340A0192019-12-19019 December 2019 U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification ML20006G7002019-12-19019 December 2019 Proposed Recommendation for ACRS Review of NuScale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 12, Radiation Protection ML19143A1042019-12-12012 December 2019 DCA - Safety Evaluation with No Open Items for Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors - Memo ML19168A1382019-12-12012 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 3, Design of Structures, Systems, Components and Equipment ML19169A2992019-12-11011 December 2019 Memo to ACRS Transmitting SER - Chapter 15 ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19165A2792019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 1, Introduction and General Discussion ML19168A1682019-12-0909 December 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 4, Reactor - Memo ML19168A2002019-12-0909 December 2019 Memo to ACRS Transmitting SER - Chapter 6 ML19169A3142019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Memo ML19169A3322019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Memo ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19319C2322019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves ML19270G6762019-11-22022 November 2019 Audit Summary for the Regulatory Audit of NuScale Power, LLC, Final Safety Analysis Report Chapter 15, Transient and Accident Analyses, (Memo) ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A1192019-11-22022 November 2019 Memo to ACRS Transmitting Phase 4 SER for Chapter 8 ML19162A2732019-11-15015 November 2019 LLC, Design Certification Application Memo - Safety Evaluation with No Open Items for Chapter 18, Human Factors Engineering ML19162A0962019-11-13013 November 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 2, Site Characteristics and Site Parameters 2024-01-31
[Table view] |
Text
December 20, 2019 MEMORANDUM TO: Michael I. Dudek, Chief New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM: Marieliz Vera, Project Manager /RA/
New Reactor Licensing Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation
SUBJECT:
U.S. NUCLEAR REGULATORY COMMISSION REPORT OF THE REGULATORY FOLLOW-UP AUDIT PERFORMED BETWEEN AUGUST 22, 2019, THROUGH SEPTEMBER 24, 2019, REGARDING NUSCALE POWER, SEISMIC CATEGORY I EQUIPMENT AND ENVIRONMENT QUALIFICATION OF ELECTRICAL EQUIPMENT SPECIFICATIONS On January 6, 2017, NuScale Power, LLC (NuScale) submitted a design certification (DC) application, for a Small Modular Reactor, to the U.S. Nuclear Regulatory Commission (NRC)
(Agencywide Documents Access and Management System (ADAMS) Accession Number ML17013A229). The NRC staff started its detailed technical review of NuScales DC application on March 15, 2017.
The NRC staff conducted an audit to confirm that the appropriate changes have been completed for the audit items that were assigned the status as confirmatory in the NRC staffs audit report, U.S. Nuclear Regulatory Commission Staff report of regulatory audit for NuScale Power, LLC: Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications, dated October 25, 2018 (ADAMS Accession No. ML18173A291).
The audit was initiated on August 22, 2019, and concluded on September 24, 2019, in accordance with the audit plan in ADAMS (ML19225B594).
The purpose of the audit was to: (1) gain a better understanding of the NuScale design; (2) verify information; (3) identify information that may require docketing to support the basis of the licensing or regulatory decision; and (4) review related documentation and non-docketed information to evaluate conformance with regulatory guidance and compliance with NRC regulations.
CONTACT: Marieliz Vera, NRR/DNRL 301-415-5861
M. Dudek 2 The NRC staff conducted the audit via access to NuScales electronic reading room. The audit was conducted in accordance with the NRC Office of New Reactors (NRO) Office Instruction NRO-REG-108, Regulatory Audits.
Docket No.52-048
Enclosure:
Audit report cc: NuScale DC ListServ
ML19331A397 *via email NRR-106 OFFICE DNRL/NRLB: PM DNRL/NRLB: LA DEX/EMIB: BC DNRL/NRLB: PM NAME MVera CSmith SBailey MVera DATE 11/26/2019 12/05/2019 12/20/2019 12/20/2019 U.S. NUCLEAR REGULATORY COMMISSION STAFFS REPORT OF THE REGULATORY AUDIT FOR NUSCALE POWER, LLC; SEISMIC CATEGORY I EQUIPMENT AND ENVIRONMENT QUALIFICATION OF ELECTRICAL EQUIPMENT SPECIFICATIONS NRC AUDIT TEAM:
Tuan Le, Office of New Reactors (NRO) Mechanical Engineer Michael Breach, Mechanical Engineer, Lead Auditor Marieliz Vera Amadiz, Project Manager Sheila Ray, Sr. Electrical Engineer Jorge Cintron-Rivera, Electrical Engineer
1.0 BACKGROUND
Title 10 of the Code of Federal Regulations (10 CFR), Part 52, Section 47, Contents of applications; technical information, states that:
The application must contain a level of design information sufficient to enable the Commission to judge the applicant's proposed means of assuring that construction conforms to the design and to reach a final conclusion on all safety questions associated with the design before the certification is granted. The information submitted for a design certification must include performance requirements and design information sufficiently detailed to permit the preparation of acceptance and inspection requirements by the [U.S. Nuclear Regulatory Commission] NRC, and procurement specifications and construction and installation specifications by an applicant. The Commission will require, before design certification, that information normally contained in certain procurement specifications and construction and installation specifications be completed and available for audit if the information is necessary for the Commission to make its safety determination.
In conducting the review of the NuScale Power, LLC (NuScale) design certification (DC) application, the NRC staff requested that the applicant make available, design specifications for mechanical and electrical equipment. This audit confirms that the provisions of the NuScale design control document (DCD) will be properly implemented into the design qualification specifications of these components.
The NRC staff completed an audit as documented in U.S. Nuclear Regulatory Commission Staff Report of Regulatory Audit for NuScale Power, LLC: Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications (Agencywide Documents and Access Management System (ADAMS) Accession No. ML18173A291). Subsequently, an audit was planned to confirm that the open items identified in Plan for Regulatory Audit of NuScale Power, LLC, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications (ADAMS Accession No. ML19225B594), were addressed and are considered to be closed.
Enclosure
The NRC staff audited the equipment design specifications for active mechanical and electrical equipment in support of its review against the following SRP sections:
- Section 3.10, Seismic and Dynamic Qualification of Mechanical and Electrical Equipment.
Additionally, the NRC staff performed an audit of the electrical equipment qualification in support of its review against the following SRP section:
- Section 3.11, Environmental Qualification of Mechanical and Electrical Equipment.
The NRC staff focused the review on the environmental qualification information for containment electrical penetration assemblies (EPAs), pressurizer heater bundles, and containment isolation valves and actuated valves.
The NRC staff provided NuScale with the audit plan documented in ADAMS under Accession No. ML19225B594. The NRC staff followed the NRO Office Instruction, NRO-REG-108 (Revision 0),
Regulatory Audits, in performing the audit of the NuScale design specifications.
The NRC staff conducted the audit at the NRC office in Rockville, Maryland, from August 22, 2019, through September 24, 2019. The NRC staff members were from the Mechanical Engineering Branch (MEB) of the Division of Engineering and Infrastructure in NRO and the Mechanical Engineering and Inservice Testing Branch, the Electrical Engineering New Reactor and License Renewal Branch, and the Electrical Engineering Operating Reactor and License Renewal Branch of the Division of Engineering in the Office of Nuclear Reactor Regulation (NRR).
2.0 AUDIT RESULTS The NRC staff found that all confirmatory items identified under Accession No. ML18173A291, were addressed and that the items could be closed.