Issue date | Title | Topic | |
---|---|---|---|
ML20160A250 | 28 July 2020 | Enclosure 1 - ECCS Boron Redistribution Issue Audit Summary Public Version | Mission time Hydrostatic Probabilistic Risk Assessment Incorporated by reference Flow Induced Vibration |
ML20176A157 | 10 July 2020 | Enclosure 1 - Chapter 15 Audit Summary Public Version | Boric Acid Ultimate heat sink Rod Drop Event |
ML20076D885 | 16 March 2020 | Summary Report for the January 2019 Regulatory Audit of NuScale Chapter 20 | FLEX Fuel cladding |
ML20054A060 | 28 February 2020 | Regulatory Audit Report for NuScale DCA Inadvertent Actuation Block (Iab) Operating Range Change | Stroke time Anticipated operational occurrence Hydrostatic |
ML20042E039 | 12 February 2020 | NON-LOCA Topical Report Phases 3 and 4 Audit Report | Incorporated by reference |
ML20042E024 | 12 February 2020 | LOCA Topical Report Phase IV Audit Report - Public | |
ML20010D133 | 28 January 2020 | Enclosure 1 - LOCA Audit Summary Public Version | |
ML20010D131 | 16 January 2020 | Audit Summary Memo NuScale LOCA TR | |
ML19340A971 | 13 January 2020 | U.S. Nuclear Regulatory Commission Report of the Regulatory Follow-Up Audit Performed Between May 1, 2019, Through September 19, 2019, Regarding the Nuscale Stress and Fatigue Analysis of Major Design Components (Public) | Safe Shutdown Finite Element Analysis |
ML19343C756 | 8 January 2020 | Generator Tube - Siet Audit Report (Public) | |
ML19331A397 | 20 December 2019 | U.S. Nuclear Regulatory Commission Report of the Regulatory follow-up Audit Performed Between 8/22/19 - 9/24/19, Regarding NuScale Power, Seismic Category I Equipment and Environment Qualification of Electrical Equipment Specifications | |
ML19340A015 | 20 December 2019 | U.S. Nuclear Regulatory Commission'S Report of the Regulatory Audit Performed Between March 4, 2019, Through September 10, 2019, for Nuscale Power, LLC, Regarding Nuscale'S Power Module Leakage Flow Instability Analysis - Public Memo | Flow Induced Vibration |
ML19340A019 | 19 December 2019 | U.S. Nuclear Regulatory Commission Report - Regulatory Audit Between 03/20/19 - 10/09/19 - Emergency Core Cooling System Valve Design Demonstration Testing and Follow-Up Items NuScale Power, LLC, Standard Plant Design Certification | Boric Acid Ultimate heat sink Stroke time Anticipated operational occurrence Hydrostatic Squib |
ML19319C232 | 26 November 2019 | U.S. Nuclear Regulatory Commission Summary Report of Regulatory follow-up Audit of Design Documents for NuScale Containment Isolation Valves and Reactor Safety Valves | Stroke time Hydrostatic |
ML19308A061 | 1 November 2019 | Summary of NRC Staff Audit of NuScale Power'S Containment and Ventilation Systems | Safe Shutdown Ultimate heat sink Stroke time Probabilistic Risk Assessment Incorporated by reference Exemption Request Fuel cladding |
ML19291A887 | 21 October 2019 | U.S. Nuclear Regulatory Commission Summary Report of Regulatory Close-out Audit of NuScale Power, LLC, Component Design Specification | Weak link |
ML19220B675 | 9 September 2019 | Hfe Vv Rsr Audit Summary Report | Post Accident Monitoring Probabilistic Risk Assessment Incorporated by reference Exemption Request |
ML19203A043 | 25 July 2019 | Phase IV Regulatory Audit of NuScale Neutron Radiation Source Term | Ultimate heat sink |
ML19175A067 | 18 July 2019 | Audit Summary Report for the Regulatory Audit of NuScale Power, LLC Proposed Inspections, Tests, Analyses, and Acceptance Criteria and Revised Design Implementation Implementation Plan | |
ML19151A658 | 14 June 2019 | Audit Report for the Regulatory Audit of Nuscale Power, LLC FSAR Chapter 20, Mitigation of Beyond-Design-Basis Events | Safe Shutdown Ultimate heat sink FLEX |
ML19037A489 | 15 March 2019 | Memo - Summary Report for the Environmental Audit of Part 3 of the NuScale Design Certification Application | |
ML19018A140 | 11 February 2019 | U.S. Nuclear Regulatory Commission Staff Report of Regulatory Audit for Nuscale Power, LLC; Follow-Up Audit of Component Design Specifications | Boric Acid Incorporated by reference Weak link |
ML18333A221 | 13 December 2018 | Phase 2 Audit Nuscale Reactor Internals Comprehensive Vibration Assessment Program | |
ML18331A042 | 7 December 2018 | U.S. Nuclear Regulator Commission Staff Report of Regulatory Audit of Nuscale Power, LLC; Design Documents for Containment Isolation Valves and Reactor Safety Valves | Stroke time Anticipated operational occurrence Hydrostatic Incorporated by reference Weak link |
ML18325A153 | 6 December 2018 | U.S. Nuclear Regulatory Commission Staff Report of Follow-Up Regulatory Audit for Nuscale Power, LLC Design Certification Application Final Safety Analysis Report Sections 3.9.4 and 4.6 | |
ML18324A562 | 29 November 2018 | U.S. Nuclear Regulatory Commission NuScale Power, LLC; Summary Report of Regulatory Audit of Computer Program Codes as Part of the NuScale Design Control Document | Commercial Grade Dedication Finite Element Analysis |
ML18298A190 | 14 November 2018 | July-August 2018 NuScale Isv Audit Summary Report for the Regulatory Audit of NuScale Power, LLC, Design Certification Application Human Factors Engineering | Earthquake |
ML18317A277 | 14 November 2018 | Audit Summary for Nuscale Topical Report TR-0915-17564, Revision 1, Subchannel Analysis Methodology. | Anticipated operational occurrence |
ML18291B228 | 9 November 2018 | Interim Audit Summary Report - Containment and Ventilation Systems | Ultimate heat sink Probabilistic Risk Assessment Exemption Request GOTHIC |
ML18173A291 | 25 October 2018 | U.S. Nuclear Regulatory Commission Report of Regulatory Audit for Nuscale Power, LLC Seismic Category 1 Equipment and Environment Qualification of Electrical Equipment Specifications | |
ML18219B634 | 14 August 2018 | U.S. Nuclear Regulatory Commission Staff Report of Regulatory Audit of Failure Modes and Effects Analysis and Other Supporting Documents for Emergency Core Cooling System Valves in the NuScale Power, LLC, Design Certification Application | Boric Acid Ultimate heat sink Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Squib |
ML18208A371 | 1 August 2018 | June 26-28 2018 NuScale Hfe Audit Summary Report | |
ML18172A076 | 13 June 2018 | Nonproprietary - Regulatory Audit of Nuscale Draft Rev 3 of the Accident Source Term Methodology Topical Report TR-0915-17565 | Probabilistic Risk Assessment |
ML18143B667 | 13 June 2018 | Summary Report for the Environmental Audit of Part 3 of the NuScale Design Certification Application | High winds Ultimate heat sink Internal Flooding Probabilistic Risk Assessment |
ML18135A050 | 24 May 2018 | Hfe Audit Report (Jul 25-2017 - Feb 14-2018) | |
ML18103A198 | 30 April 2018 | Chapter 11 Audit Report - June Through November 2017 | Anticipated operational occurrence |
ML18051A722 | 26 March 2018 | Audit Summary for NuScale Steam Generators_Non_Prop Version | Anticipated operational occurrence Nondestructive Examination |
ML18051A730 | 26 March 2018 | Audit Summary Memo NuScale Steam Generators | |
ML18052A079 | 26 February 2018 | U.S. Nuclear Regulatory Commission Staff Report of Initial Regulatory Audit for Emergency Core Cooling System Valves in Nuscale Power, LLC, Design Certification Application | Ultimate heat sink Anticipated operational occurrence |
ML18031A454 | 16 February 2018 | Physical Seurity Audit Report | Ultimate heat sink Incorporated by reference Finite Element Analysis |
ML18023A091 | 5 February 2018 | Public - Audit Report NuScale 3.9.2 | Earthquake Flow Induced Vibration |
ML18018A234 | 25 January 2018 | Summary Audit Report of Phase 1 NuScale Design Specfication Rev | Boric Acid Incorporated by reference Weak link |
ML18004A046 | 5 January 2018 | Audit Report - Nuscale'S EC-0000-3070, Station Blackout Transient Analysis, Revision 1 (Docket No. 52-048) |