ML081400115: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML081400115
| number = ML081400115
| issue date = 05/19/2008
| issue date = 05/19/2008
| title = 06/04/2008, Notice of Meeting with Duke Energy Carolinas, LLC Re the Fiber-Reinforced Polymer Test Program
| title = Notice of Meeting with Duke Energy Carolinas, LLC Re the Fiber-Reinforced Polymer Test Program
| author name = Olshan L N
| author name = Olshan L
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| addressee name = Wong M C
| addressee name = Wong M
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| docket = 05000269, 05000270, 05000287
| docket = 05000269, 05000270, 05000287
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:May 19, 2008 MEMORANDUM TO: Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                Leonard N. Olshan, Project Manager /RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
==SUBJECT:==
FORTHCOMING MEETING WITH DUKE ENERGY CAROLINAS, LLC (DUKE) OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DATE & TIME:        Wednesday, June 4, 2008 10:30 a.m. - 12:30 p.m.
LOCATION:            U.S. Nuclear Regulatory Commission (NRC)
One White Flint North 11555 Rockville Pike, Room O-11B2 Rockville, Maryland PURPOSE:            To discuss the fiber-reinforced polymer test program (Agencywide Documents Access and Management (ADAMS) Accession Number ML081370211) (TAC Nos. MD8571, MD8572, and MD8573)
CATEGORY 1:*        This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
MEETING CONTACTS:            Leonard N. Olshan, NRR      John F. Stang, NRR 301-415-1419                301-415-1345 lno@nrc.gov                  jfs2@nrc.gov
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002
 
M. Wong                                      PARTICIPANTS:      Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC                          DUKE K. Manoly                    S. Newman F. Farzam                    L. Llibre L. Olshan                    C. Davis Docket Nos. 50-269, 50-270, and 50-287
 
==Enclosure:==
 
Agenda cc w/encl: See next page
 
M. Wong                                          PARTICIPANTS:        Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC                              DUKE K. Manoly                        S. Newman F. Farzam                        L. Llibre L. Olshan                        C. Davis Docket Nos. 50-269, 50-270, and 50-287
 
==Enclosure:==
 
Agenda cc w/encl: See next page Distribution:
PUBLIC                                  M. Cox, EDO Rgn II LPL2-1 R/F                              PMNS RidsNrrAdro                              K. Manoly, NRR RidsNrrDorl (TMcGinty)                  F. Farzam, NRR RidsNrrDorlLpl2-1 (MWong)                KClark, OPA, Rgn II RidsNrrLAMOBrien (hard copy)            RidsOgcMailCenter RidsNrrPMLOlshan (hard copy)            Receptionist (OWFN and TWFN)
RidsAcrsAcnw&mMailCenter                RidsRgn2MailCenter (KWeaver)
RidsOpaMail                              C. Tucci, NRR Accession Number: ML081400115 OFFICE      NRR/LPL2-1/PM      NRR/LPL2-1/LA    NRR/LPL2-1/BC NAME        JStang for LOlshan MOBrien          MWong DATE            5/19/08            5/19/08          5/19/08 OFFICIAL RECORD COPY
 
FORTHCOMING MEETING ON JUNE 4, 2008, WITH DUKE ENERGY CAROLINAS, LLC TO DISCUSS OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, FIBER-REINFORCED POLYMER (FRP) TEST PROGRAM AGENDA 10:30 a.m. - 10:35 a.m. Introductions 10:35 a.m. - 10:45 a.m. Purpose of the meeting 10:45 a.m. - 11:00 a.m. Brief description of natural phenomenon barrier system modifications employing an FRP system 11:00 a.m. - 11:15 a.m. Proposed solution - FRP system on solid concrete brick masonry 11:15 a.m. - 11:45 a.m. Overview of FRP test program presently being conducted at North Carolina State University 11:45 a.m. - 12:15 p.m. Discussion of FRP test program and NRC staff questions and concerns 12:15 p.m. - 12:30 p.m. Closing remarks 12:30 p.m.                Adjourn Enclosure
 
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton                Mr. Leonard G. Green Vice President, Oconee Site          Assistant Attorney General Duke Power Company LLC              NC Department of Justice 7800 Rochester Highway              P.O. Box 629 Seneca, SC 29672                    Raleigh, NC 27602 Ms. Lisa F. Vaughn                  Mr. R. L. Gill, Jr.
Associate General Counsel and        Manager - Nuclear Regulatory Managing Attorney                      Issues and Industry Affairs Duke Energy Carolinas, LLC          Duke Power Company LLC 526 South Church Street -            526 S. Church St.
EC07H                                Mail Stop EC05P Charlotte, North Carolina 28202      Charlotte, NC 28202 Manager, LIS                        Division of Radiation Protection NUS Corporation                      NC Dept of Environment, Health, &
2650 McCormick Dr., 3rd Floor        Natural Resources Clearwater, FL 34619-1035            3825 Barrett Dr.
Raleigh, NC 27609-7721 Senior Resident Inspector U.S. Nuclear Regulatory              Mr. Peter R. Harden, IV Commission                          VP-Customer Relations and Sales 7812B Rochester Highway              Westinghouse Electric Company Seneca, SC 29672                    6000 Fairview Road 12th Floor Mr. Henry Porter, Director          Charlotte, NC 28210 Division of Radioactive Waste Management                          Mr. Henry Barron Bureau of Land and Waste            Group Vice President, Nuclear Generation Management                            and Chief Nuclear Officer Dept. of Health and Env. Control    P.O. Box 1006-EC07H 2600 Bull St.                        Charlotte, NC 28201-1006 Columbia, SC 29201-1708 Mr. Charles Brinkman Mr. Michael A. Schoppman            Director, Washington Operations Framatome ANP                        Westinghouse Electric Company 1911 North Ft. Myer Dr.              12300 Twinbrook Parkway, Suite 330 Suite 705                            Rockville, MD 20852 Rosslyn, VA 22209 Ms. Kathryn B. Nolan Mr. B. G. Davenport                  Senior Counsel Regulatory Compliance Manager        Duke Energy Carolinas, LLC Oconee Nuclear Site                  526 South Church Street - EC07H Duke Energy Corporation              Charlotte, NC 28202 ON03RC 7800 Rochester Highway Seneca, SC 29672}}

Latest revision as of 07:40, 7 December 2019

Notice of Meeting with Duke Energy Carolinas, LLC Re the Fiber-Reinforced Polymer Test Program
ML081400115
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/19/2008
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Melanie Wong
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
Download: ML081400115 (5)


Text

May 19, 2008 MEMORANDUM TO: Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Leonard N. Olshan, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH DUKE ENERGY CAROLINAS, LLC (DUKE) OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DATE & TIME: Wednesday, June 4, 2008 10:30 a.m. - 12:30 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room O-11B2 Rockville, Maryland PURPOSE: To discuss the fiber-reinforced polymer test program (Agencywide Documents Access and Management (ADAMS) Accession Number ML081370211) (TAC Nos. MD8571, MD8572, and MD8573)

CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS: Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

M. Wong PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE K. Manoly S. Newman F. Farzam L. Llibre L. Olshan C. Davis Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page

M. Wong PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE K. Manoly S. Newman F. Farzam L. Llibre L. Olshan C. Davis Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page Distribution:

PUBLIC M. Cox, EDO Rgn II LPL2-1 R/F PMNS RidsNrrAdro K. Manoly, NRR RidsNrrDorl (TMcGinty) F. Farzam, NRR RidsNrrDorlLpl2-1 (MWong) KClark, OPA, Rgn II RidsNrrLAMOBrien (hard copy) RidsOgcMailCenter RidsNrrPMLOlshan (hard copy) Receptionist (OWFN and TWFN)

RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (KWeaver)

RidsOpaMail C. Tucci, NRR Accession Number: ML081400115 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME JStang for LOlshan MOBrien MWong DATE 5/19/08 5/19/08 5/19/08 OFFICIAL RECORD COPY

FORTHCOMING MEETING ON JUNE 4, 2008, WITH DUKE ENERGY CAROLINAS, LLC TO DISCUSS OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, FIBER-REINFORCED POLYMER (FRP) TEST PROGRAM AGENDA 10:30 a.m. - 10:35 a.m. Introductions 10:35 a.m. - 10:45 a.m. Purpose of the meeting 10:45 a.m. - 11:00 a.m. Brief description of natural phenomenon barrier system modifications employing an FRP system 11:00 a.m. - 11:15 a.m. Proposed solution - FRP system on solid concrete brick masonry 11:15 a.m. - 11:45 a.m. Overview of FRP test program presently being conducted at North Carolina State University 11:45 a.m. - 12:15 p.m. Discussion of FRP test program and NRC staff questions and concerns 12:15 p.m. - 12:30 p.m. Closing remarks 12:30 p.m. Adjourn Enclosure

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.

Associate General Counsel and Manager - Nuclear Regulatory Managing Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - 526 S. Church St.

EC07H Mail Stop EC05P Charlotte, North Carolina 28202 Charlotte, NC 28202 Manager, LIS Division of Radiation Protection NUS Corporation NC Dept of Environment, Health, &

2650 McCormick Dr., 3rd Floor Natural Resources Clearwater, FL 34619-1035 3825 Barrett Dr.

Raleigh, NC 27609-7721 Senior Resident Inspector U.S. Nuclear Regulatory Mr. Peter R. Harden, IV Commission VP-Customer Relations and Sales 7812B Rochester Highway Westinghouse Electric Company Seneca, SC 29672 6000 Fairview Road 12th Floor Mr. Henry Porter, Director Charlotte, NC 28210 Division of Radioactive Waste Management Mr. Henry Barron Bureau of Land and Waste Group Vice President, Nuclear Generation Management and Chief Nuclear Officer Dept. of Health and Env. Control P.O. Box 1006-EC07H 2600 Bull St. Charlotte, NC 28201-1006 Columbia, SC 29201-1708 Mr. Charles Brinkman Mr. Michael A. Schoppman Director, Washington Operations Framatome ANP Westinghouse Electric Company 1911 North Ft. Myer Dr. 12300 Twinbrook Parkway, Suite 330 Suite 705 Rockville, MD 20852 Rosslyn, VA 22209 Ms. Kathryn B. Nolan Mr. B. G. Davenport Senior Counsel Regulatory Compliance Manager Duke Energy Carolinas, LLC Oconee Nuclear Site 526 South Church Street - EC07H Duke Energy Corporation Charlotte, NC 28202 ON03RC 7800 Rochester Highway Seneca, SC 29672