ML081400115
| ML081400115 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/19/2008 |
| From: | Olshan L NRC/NRR/ADRO/DORL/LPLII-1 |
| To: | Melanie Wong NRC/NRR/ADRO/DORL/LPLII-1 |
| Olshan L N, NRR/DORL, 415-1419 | |
| References | |
| Download: ML081400115 (5) | |
Text
May 19, 2008 MEMORANDUM TO: Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Leonard N. Olshan, Project Manager /RA/
Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH DUKE ENERGY CAROLINAS, LLC (DUKE) OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DATE & TIME:
Wednesday, June 4, 2008 10:30 a.m. - 12:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North 11555 Rockville Pike, Room O-11B2 Rockville, Maryland PURPOSE:
To discuss the fiber-reinforced polymer test program (Agencywide Documents Access and Management (ADAMS) Accession Number ML081370211) (TAC Nos. MD8571, MD8572, and MD8573)
CATEGORY 1:*
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
MEETING CONTACTS:
Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002
M. Wong PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE K. Manoly S. Newman F. Farzam L. Llibre L. Olshan C. Davis Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/encl: See next page
M. Wong PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE K. Manoly S. Newman F. Farzam L. Llibre L. Olshan C. Davis Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Agenda cc w/encl: See next page Distribution:
PUBLIC M. Cox, EDO Rgn II LPL2-1 R/F PMNS RidsNrrAdro K. Manoly, NRR RidsNrrDorl (TMcGinty)
F. Farzam, NRR RidsNrrDorlLpl2-1 (MWong)
KClark, OPA, Rgn II RidsNrrLAMOBrien (hard copy)
RidsOgcMailCenter RidsNrrPMLOlshan (hard copy)
RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (KWeaver)
RidsOpaMail C. Tucci, NRR Accession Number: ML081400115 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME JStang for LOlshan MOBrien MWong DATE 5/19/08 5/19/08 5/19/08 OFFICIAL RECORD COPY
Enclosure FORTHCOMING MEETING ON JUNE 4, 2008, WITH DUKE ENERGY CAROLINAS, LLC TO DISCUSS OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, FIBER-REINFORCED POLYMER (FRP) TEST PROGRAM AGENDA 10:30 a.m. - 10:35 a.m.
Introductions
10:35 a.m. - 10:45 a.m.
Purpose of the meeting 10:45 a.m. - 11:00 a.m.
Brief description of natural phenomenon barrier system modifications employing an FRP system 11:00 a.m. - 11:15 a.m.
Proposed solution - FRP system on solid concrete brick masonry 11:15 a.m. - 11:45 a.m.
Overview of FRP test program presently being conducted at North Carolina State University 11:45 a.m. - 12:15 p.m.
Discussion of FRP test program and NRC staff questions and concerns 12:15 p.m. - 12:30 p.m.
Closing remarks 12:30 p.m.
Adjourn
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street -
EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, &
Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202