MONTHYEARML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans 2024-09-10
[Table view] |
Text
WBN2Public Resource From: Lamb, John Sent: Friday, November 19, 2010 2:09 PM To: 'garent@tva.gov'; Crouch, William D Cc: Campbell, Stephen; Lyon, Fred; Raghavan, Rags; Milano, Patrick; Poole, Justin; Wiebe, Joel; WBN2HearingFile Resource
Subject:
For Your Review - Watts Bar Unit 2 - Draft RAI for Section 3.11 EQ Attachments: RAI SSER 22 Section 3 11.docx Importance: High Gordon & Bill, Attached, for your review, is a draft RAI regarding Section 3.11 EQ. Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time TVA needs to respond to the RAI.
Thanks.
John 1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 193 Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E2556F23CDF)
Subject:
For Your Review - Watts Bar Unit 2 - Draft RAI for Section 3.11 EQ Sent Date: 11/19/2010 2:09:15 PM Received Date: 11/19/2010 2:09:18 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
"Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Lyon, Fred" <Fred.Lyon@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None
"'garent@tva.gov'" <garent@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 408 11/19/2010 2:09:18 PM RAI SSER 22 Section 3 11.docx 32700 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Environmental Qualification of Mechanical and Electrical Equipment The NRC staff reviewed FSAR Amendments 95 and 100 (ADAMS Accession Nos.
ML093370275 and ML102530216, respectively), and supplemental information provided by TVA in letters dated August 6, August 30, and September 1, 2010 (ADAMS Accession Nos.
ML102210440, ML102510580, and ML102500170, respectively), and Section 3.11 of the original SER supplement prepared for the environmental qualification (EQ) of mechanical and electrical equipment (SSER 15).
Qualification Methods
- 1. In its FSAR amendments and supplemental letters, TVA stated that qualification tests and analyses for safety-related electrical equipment were conducted in accordance with the requirements of 10 CFR 50.49 and the guidelines of NUREG-0588, Revision 1. In NUREG-0588, Revision 1, the NRC staff presents detailed procedures for qualifying safety-related electrical equipment in a harsh environment. The NUREG-0588 criteria apply to equipment that is important to safety as defined in 10 CFR 50.49.
The staff concluded that the qualification methods used by TVA are consistent with NRC regulations and are, therefore, acceptable. However, based on the extensive layup period of equipment within WBN Unit 2, the NRC staff must review, prior to fuel load, the assumptions used by TVA to re-establish a baseline for the qualified life of equipment.
The purpose of the staffs review is to ensure that TVA has addressed the effects of environmental conditions on equipment during the layup period.
Please provide the assumptions used by TVA to re-establish a baseline for the qualified life of equipment based on the extensive layup period of equipment within WBN Unit 2.
Electrical Equipment in a Harsh Environment
- 2. Please provide TVAs EQ program procedures for WBN Unit 2.
- 3. The NRC staff requested TVA confirm that equipment being replaced or refurbished will be qualified as Category I, as required by 10 CFR 50.49. In its response dated September 1, 2010, TVA stated that replaced equipment is being procured qualified to the NUREG-0588, Category I requirements. TVA also stated, however, that a small population of components is being refurbished. The NRC staff reviewed these components as noted below.
3a. All 6.9 kV motors will be refurbished TVA considers the refurbishment activities to be routine maintenance that do not impact the qualification of the motors. The staff considers that routine maintenance activities should result in increasing the EQ of the motors to Category I status in accordance with 10 CFR 50.49. Please justify refurbishment of all 6.9 kV motors impact on EQ.
3-1
3b. Terminal Blocks TVA stated that it noted during a field walkdown that the terminal blocks installed in the EQ application for WBN Unit 2 are GE-make CR151B. According to TVA, these terminal blocks are qualified to NUREG-0588, Category I. TVA further noted that design modifications have been issued to inspect and replace the EQ terminal blocks that are found damaged or degraded with equivalent CR151B blocks.
Please clarify the use of the term equivalent (e.g., identical, similar) regarding the replacement terminal blocks. If the blocks are similar, please complete a similarity analysis and provide it to the NRC staff for review.
3c. Main Steam Isolation Valves (MSIVs)
TVA stated that the original WBN Unit 2 MSIVs are qualified to NUREG-0588, Category II. The MSIVs are being refurbished by replacing the missing subcomponents, including the solenoid valves, terminal blocks and manufacturing wiring, with components of the same make, model, and type as supplied on the original purchase order. With the exception of the solenoid valves, the subcomponents will be qualified to NUREG-0588, Category I requirements. According to TVA, the solenoid valves cannot be upgraded because equivalent subcomponents qualified to NUREG-0588, Category I requirements are not available.
Please justify not upgrading the MSIV solenoid valves to Category I in light of 10 CFR 50.49(l).
3-2
- 4. Mild Environment The NRC staff requested that TVA clarify that, for a mild environment, the threshold for electronic components such as semiconductors or electronic components containing organic material is a total integrated dose of less than 1x103 Rads, and that a threshold for a mild radiation environment for other equipment is less than 1x104 Rads. In its response dated August 30, 2010, TVA stated that the upper threshold for the EQ Mild Environment is 1x104 Rads for all components, which is consistent with WBN Unit 1.
Since certain components may have a lower threshold for impacts from radiation exposure, TVA stated that it requires the following at WBN:
- Per design standards, any device, whether in a mild, essentially mild, or harsh environment, is required to be purchased to the environmental conditions where it is to be located. That includes the usual radiation, temperature, humidity, etc.
guidelines. An environmental conditions data sheet with the stated environmental parameters is sent to the manufacturer along with the purchase request and [TVA asks] the vendor to meet those conditions.
- For MOS [metal oxide semiconductors], CMOS or like circuitry, the same holds true. But, the design standard for qualification of electrical equipment in a harsh environment specifically requires that any of this type circuitry be evaluated on a case-by-case basis for any gamma dose exceeding 1x103 Rads.
Please provide supporting documentation to justify TVAs establishment of a mild environment threshold for total integrated dose of less than 1x103 Rads for electronic components such as semiconductors or electronic components containing organic material.
3-3