ML111050010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111050010
| number = ML111050010
| issue date = 04/08/2011
| issue date = 04/08/2011
| title = 2011/04/08 Watts Bar 2 OL - FW: Updated Bucket List 4/8/11
| title = OL - FW: Updated Bucket List 4/8/11
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Friday, April 08, 2011 12:59 PM To: Epperson, Dan; Raghavan, Rags Cc: WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                       Poole, Justin Sent:                       Friday, April 08, 2011 12:59 PM To:                         Epperson, Dan; Raghavan, Rags Cc:                         WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: Updated Bucket List 4/8/11 Attachments:
FW: Updated Bucket List 4/8/11 Attachments:                 NRC PM Open Items List 4-8-11.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Crouch, William D [mailto:wdcrouch@tva.gov]
NRC PM Open Items List 4-8-11.docx JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Crouch, William D [mailto:wdcrouch@tva.gov]
Sent: Friday, April 08, 2011 12:57 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Arent, Gordon; Bryan, Robert H Jr; Smith, James D
Sent: Friday, April 08, 2011 12:57 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Arent, Gordon; Bryan, Robert H Jr; Smith, James D  


==Subject:==
==Subject:==
Updated Bucket List 4/8/11 Iupdatedthelistbasedontoday'sphonecall.William D. (Bill) Crouch(423)365 2004WBN(256)777 7676Cell Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 301   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7F6E4FC164)
Updated Bucket List 4/8/11 I updated the list based on todays phone call.
William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1
 
Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         301 Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7F6E4FC164)


==Subject:==
==Subject:==
FW: Updated Bucket List 4/8/11 Sent Date:   4/8/2011 12:58:42 PM Received Date: 4/8/2011 12:58:57 PM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
FW: Updated Bucket List 4/8/11 Sent Date:           4/8/2011 12:58:42 PM Received Date:       4/8/2011 12:58:57 PM From:                 Poole, Justin Created By:           Justin.Poole@nrc.gov Recipients:
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov> Tracking Status: None  
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None Post Office:          HQCLSTR02.nrc.gov Files                        Size                    Date & Time MESSAGE                      533                      4/8/2011 12:58:57 PM NRC PM Open Items List 4-8-11.docx                  34590 Options Priority:                    Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


Post Office:  HQCLSTR02.nrc.gov Files    Size      Date & Time MESSAGE    533      4/8/2011 12:58:57 PM  NRC PM Open Items List 4-8-11.docx   34590  
Page 1 of 6 NRC PM Open Items List 4/8/11 (423) 751-6338 ID 657601 No.              Description                Status                    Additional Comments                      Resp Org/Person
: 1. Cyber Security Plan/Controls and   Assess          Update Cyber Security Plan IAW NEI 08-09 Rev 6 per Heinrich/Snyder Implementation                      CDAs/Identify  NRC letter dated 5/24/10. NRC Inspection in 2011    (Bryan)
Mods 2/28/11A        Provide update to change commitment for April ready for Inspection RAI Response 4/7/11A        Response to 3 Generic RAIs Scope Mods 3/31/11 TI issued 5/30/11 NRC Table Top/Pilot TBD Procedures complete 9/30/11 Inspection 10/23/11
: 2. RAIs (Elton) FSAR, SSER            Closed          All RAI captured individually below.                Licensing/Eng (Crouch)
: 3. GL 2004-02 submittal of post Unit 1 Step 1          Step 1 Report w/o test data                        Eng/Koontz RAIs (Beach)                        9/10/10A                                                            (Bryan)
Step 2 Include test data and remainder of RAI Step 2          responses 3/4/11A


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Page 2 of 6 No.               Description                 Status                   Additional Comments                           Resp Org/Person
Page 1 of 6     NRC PM Open Items List 4/8/11 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation Assess CDAs/Identify Mods 2/28/11A RAI Response 4/7/11A  
: 4. Instrumentation RAI List (Knuettel)  Ongoing                                                              Eng/Hilmes (Smith)
 
: 5. Develop list of planned License      9/1/11        Review Unit 1 SER for exemptions.                     NRR/TVA Conditions, Exemptions and Relief                                                                          (Bryan)
Scope Mods
Requests (Crouch)
 
: 6. Resolve Licensing Basis Preservation  4/28/11      NRC/NRR Inspection in April                            Eng/Freeman Self Assessment PERs (Crouch)                                                                              (Smith)
3/31/11 TI issued 5/30/11
: 7. Generic Letter 2008-01 Gas            3/14/11A      Provide submittal of Engineering Products with        Eng/Helms Accumulation High Point Vents (Beach)              commitment for final walkdown in 2011                  (Bryan)
Include latest RAIs
: 8. Status on Aquatic Contention (Arent) 3/29/11A      Thermal-hydraulic submittal by 2/8/11A                Arent Impingement/Entrainment info by 3/18/11                (Bryan)
: 9. Unit Difference submittal (Stockton)  10/28/10A    Bulk of Unit Differences addressed by 10/28/10 letter. Licensing 4/7/11A       Need final supplement for remainder of EDCRs          (Smith)
: 10. Status of GSI 199 Eastern Seismicity  4/15/11                                                              TVA/NRR (Crouch)
: 11. Address ACRS questions - Tritium      2/24/11A      Issues addressed in 2/24/11 ACRS                      Eng/Freeman concentration in plume from leak, WBN                                                                      (Crouch) versus VC Summer weld flaw commonalities, baffle bolts status (Crouch)
: 12. Submit final REP prior to fuel load  Complete      NRR to determine if submittal has to occur before      EP/
(Spink)                              Item 1        License rather than before fuel load.                  Detchemendy (Bryan) 5/1/11        1. Fix Section 6.0, Event 6.2 in Rev 92xx.
Item 2
: 2. Submit EPIPs 180 days prior to OL.
: 13. Complete Implementation (Hemmer)      RAI Response  Respond to RAI                                        Hemmer 3/29/11A                                                            (Smith)
Implement two unit commitments.
RAI Clarification Provide updated information for tables contained in for Fuel      the 6/29/07 and 7/1/10 letters.
Question 2


NRC Table Top/Pilot
Page 3 of 6 No.                Description                  Status                  Additional Comments                          Resp Org/Person 4/22/10      Letter did not address Phase I commitments Diesel 6/1/11 Pump Relocation 6/17/11 Procedures Issued 6/30/11 Inspection -
August 2011 Phase I commitments 2/11/11
: 14. Issue two Unit Offsite Dose Calculation 9/1/11                                                              Chemistry/
Manual (Beach) Review TS Chapter 5                                                                          Woods programs also                                                                                              (Bryan)
: 15. Issue Unit 2 Completion Letter (Crouch)                                                                    Licensing (Crouch)
: 16. Combined U1/U2 FSAR (Stockton)                                                                              Licensing (Crouch)
: 17. Provide feedback on the status of NRC  SSER 23      Were there any assumptions/lineups in the Unit 1 test  NRR review of Integrated Safeguards Test                that would make the test applicable for single unit submittal                                            operation only? What facility changes have been made that could affect the results of the test and how do we ensure they do not affect the independence?
Provide copy of presentation to Bob Haag.
: 18. Document Control Issues for two letters 4/15/11      7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint    Licensing/Boyd 7/15 letter and provide to NRC Document control.
TVA/Bechtel to provide non-proprietary version of


TBD Procedures complete 9/30/11 Inspection 10/23/11 Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10. NRC Inspection in 2011 
Page 4 of 6 No.                Description                Status                  Additional Comments                          Resp Org/Person documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. TVA to confirm A102 gets into ADAMS. Currently only the cover letter is available.
Contacted Kenny Nguyen, NRC Document Control.
He has the action.
: 19. Submit final as-constructed FSAR      10/1/11                                                            Licensing/
figures                                                                                                    Stockton (Crouch)
: 20. Unit 1 Tech Specs                      4/15/11      Verify current Unit 1 Tech Specs are acceptable for  Unit 1 Licensing two unit operation (specifically review common        (Bryan) systems).
: 21. Joint Dry Run of ACRS (Feb 24)        2/22/11A      ACRS presentation to provide status of each licensing TVA/NRR issue
: 22. Chapter 15.5 RAIs                      12/10/10A    Additional question regarding meteorology data from  Wastrack RAI response 2008-2009                                            (Bryan) 4/30/11
: 23. Fire Protection Report Questions      3/31/11A      Justification Criteria                                ENG/Hilmes regarding OMA                          4/29/11       Justifications                                        (Crouch)
TBD (draft    Next RAI set prior to 4/21 mtg)
: 24. IST Tech Spec Change                  4/15/11                                                            TVA Corporate Licensing (Smith)
: 25. Environmental Phone call to discuss    4/15/11      Telecon held. Response in progress                    Environmental/
intake flow rate/velocity at IPS and                                                                      Hopping SCCW in EIS versus NPDES.                                                                                  (Bryan)
: 26. Verify Tech Spec Setpoints match calcs 8/1/11                                                              Eng/Hilmes (Bryan)
: 27. Letter to terminate Part 30/40 License                                                                    Licensing after receipt of Part 50 License                                                                          (Crouch)
: 28. SSER 22 Open Items Response            4/6/11A      Partial response 4/4/11                              ENG/Freeman (Bryan)
: 29. Chapter 11/12 RAIs                    2/25/11A      Response submitted                                    Chem/Eng


Provide update to change commitment for April ready for Inspection
Page 5 of 6 No.                Description                Status                    Additional Comments                            Resp Org/Person Closed                                                                (Bryan)
: 30. Tech Spec Revisions from latest T/S    4/22/11        NRC comments due by 4/8/11                              Licensing/Elton markup                                                                                                        (Bryan)
: 31. ASME III to XI transition                            When does ISI program begin with partial plant N-3?    Eng/Helms Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI?
: 32. AFW RAIs                              2/25/11A      Response submitted                                      Eng/Koontz Closed                                                                (Smith)
: 33. Anti-Trust RAIs                        2/22/11A      Letter submitted                                        Licensing/Arent Closed
: 34. Chapter 15 RAI on Dose calc basis                    Bechtel (Fredrick) preparing answer.                    Eng/Koontz (Bryan)
: 35. Chapter 9 RAI on PASS elimination      4/1/11A                                                                Licensing/REP (Smith)
: 36. FSAR Amendment A103                    3/15/11A                                                              Licensing/
Stockton
: 37. Chapter 11/12 E-mail RAIs              4/30/11                                                                Chem/Woods (Bryan)
: 38. Chapter 15 Transient Analysis RAIs    Public Meeting Inadvertent SI, CVCS Malfunction, Overpressure,        Eng/Koontz 3/15/11A      Steam Line Break                                        (Bryan)
: 39. Confirm ACRS accepted IST              3/08/11A      Discussed with Ed Hackett and provided copy of          Lic/Crouch presentation                                          presentation on 3/15/11 3/18/11A      Followup with Ed Hackett to confirm actions required ACRS requested a re-presentation. Added item to ACRS topics below.
: 40. Boron Related RAI (e-mail)            3/25/11A      Provide requested technical information Additional      Eng/Koontz info requested during 3/15/11 public meeting
: 41. Turbine Integrity RAI                  3/25/11A      Siemens provide draft answers                          Eng/Koontz
: 42. Hydrology sand bag question            4/15/11        Has the NRC accepted the use of sand bags on the        Corp/Selman dams? Five RAI questions
: 43. Letter to notify NRC when Vital Area  5/31          Date for schedule                                      Lic/Crouch Boundary returned to original location
: 44. GDC 5 RAIs                            4/11/11        Provide requested technical information                Eng/Koontz


Response to 3 Generic RAIs
Page 6 of 6 No.               Description               Status               Additional Comments                         Resp Org/Person
 
: 45. Fire Protection/GDC 5 Public Meeting 3/29/11A   Provide background on revised FPR and RAI             Eng/Hilmes responses. Provide methodology of GDC 5 cooldown analysis
Heinrich/Snyder (Bryan) 2. RAIs  (Elton) FSAR, SSER Closed All RAI captured individually below.
: 46. Large Break LOCA RAI                 4/1/11A   Provide requested technical information               Koontz/WEC
Licensing/Eng (Crouch) 3. GL 2004-02 submittal of post Unit 1 RAIs (Beach)
: 47. PSA Definition of Vulnerability     4/1/11A                                                           Enis
Step 1 9/10/10A  Step 2  3/4/11A  Step 1 Report w/o test data Step 2 Include test data and remainder of RAI responses Eng/Koontz (Bryan)
: 48. Part 70 License vs Part 50 procedure 4/15/11   Determine ability to control Part 70 fuel under Unit 1 Milano question                                        Part 50 procedures. TVA to contact Rafael regarding wording of license. Discussed issue with Rafael on 3/30/11. E-mail sent to Rafael on 3/31/11 with proposed license markup.
Page 2 of 6     No. Description Status Additional Comments Resp Org/Person 4. Instrumentation RAI List (Knuettel)
: 49. ACRS Topics                                     Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security
Ongoing  Eng/Hilmes (Smith) 5. Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) 9/1/11 Review Unit 1 SER for exemptions. NRR/TVA (Bryan) 6. Resolve Licensing Basis Preservation Self Assessment PERs (Crouch) 4/28/11 NRC/NRR Inspection in April Eng/Freeman (Smith) 7. Generic Letter 2008-01 Gas Accumulation High Point Vents (Beach)
: 50. SAMDA RAIs                           05/20/11   Provide partial responses to speed up review.
Include latest RAIs 3/14/11A Provide submittal of Engineering Products with commitment for final walkdown in 2011 Eng/Helms (Bryan) 8. Status on Aquatic Contention (Arent) 3/29/11A Thermal-hydraulic submittal by 2/8/11A Impingement/Entrainment info by 3/18/11 Arent (Bryan) 9. Unit Difference submittal (Stockton) 10/28/10A 4/7/11A Bulk of Unit Differences addressed by 10/28/10 letter. Need final supplement for remainder of EDCRs Licensing (Smith) 10. Status of GSI 199 Eastern Seismicity (Crouch) 4/15/11  TVA/NRR 11. Address ACRS questions - Tritium concentration in plume from leak, WBN versus VC Summer weld flaw commonalities, baffle bolts status (Crouch) 2/24/11A Issues addressed in 2/24/11 ACRS Eng/Freeman (Crouch) 12. Submit final REP prior to fuel load (Spink) Complete Item 1  5/1/11 Item 2 NRR to determine if submittal has to occur before License rather than before fuel load.
: 51. SSER 22 Open Items Response
: 1. Fix Section 6.0, Event 6.2 in Rev 92xx.
: 52. Chapter 12 RAI on Instrument Channel                                                                   ENG/Hilmes Operability Tests
: 2. Submit EPIPs 180 days prior to OL.
: 53. Transient Analysis issues                                                                             ENG/Koontz Inadvertent SI                       4/22/11                                                           WEC/Morgan CVCS Malfunction                    4/22/11 Steam line break                    4/15/11}}
EP/ Detchemendy (Bryan) 13. Complete Implementation (Hemmer)
RAI Response 3/29/11A  RAI Clarification for Fuel Question 2 Respond to RAI Implement two unit commitments.
Provide updated information for tables contained in the 6/29/07 and 7/1/10 letters.
Hemmer (Smith)
Page 3 of 6    No. Description Status Additional Comments Resp Org/Person 4/22/10  Diesel 6/1/11  Pump Relocation 6/17/11  Procedures Issued 6/30/11  Inspection -
August 2011 Phase I commitments 2/11/11 Letter did not address Phase I commitments
: 14. Issue two Unit Offsite Dose Calculation Manual (Beach)  Review TS Chapter 5 programs also 9/1/11  Chemistry/
Woods (Bryan) 15. Issue Unit 2 Completion Letter (Crouch)
Licensing (Crouch) 16. Combined U1/U2 FSAR (Stockton)
Licensing (Crouch) 17. Provide feedback on the status of NRC review of Integrated Safeguards Test submittal SSER 23 Were there any assumptions/lineups in the Unit 1 test that would make the test applicable for single unit operation only?  What facility changes have been made that could affect the results of the test and how do we ensure they do not affect the independence?
Provide copy of presentation to Bob Haag. NRR 18. Document Control Issues for two letters 4/15/11 7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint 7/15 letter and provide to NRC Document control.
TVA/Bechtel to provide non-proprietary version of Licensing/Boyd Page 4 of 6    No. Description Status Additional Comments Resp Org/Person documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. TVA to confirm A102 gets into ADAMS. Currently only the cover letter is available. Contacted Kenny Nguyen, NRC Document Control. He has the action. 19. Submit final as-constructed FSAR figures 10/1/11  Licensing/ Stockton (Crouch) 20. Unit 1 Tech Specs 4/15/11 Verify current Unit 1 Tech Specs are acceptable for two unit operation (specifically review common systems). Unit 1 Licensing (Bryan) 21. Joint Dry Run of  ACRS (Feb 24) 2/22/11A ACRS presentation to provide status of each licensing issue TVA/NRR 22. Chapter 15.5 RAIs 12/10/10A RAI response 4/30/11 Additional question regarding meteorology data from 2008-2009 Wastrack (Bryan) 23. Fire Protection Report Questions regarding OMA 3/31/11A 4/29/11 TBD (draft prior to 4/21 mtg) Justification Criteria Justifications Next RAI set ENG/Hilmes (Crouch) 24. IST Tech Spec Change 4/15/11  TVA Corporate Licensing (Smith) 25. Environmental Phone call to discuss intake flow rate/velocity at IPS and SCCW in EIS versus NPDES.
4/15/11 Telecon held. Response in progress Environmental/
Hopping (Bryan) 26. Verify Tech Spec Setpoints match calcs 8/1/11  Eng/Hilmes (Bryan) 27. Letter to terminate Part 30/40 License after receipt of Part 50 License Licensing (Crouch)  28. SSER 22 Open Items Response 4/6/11A Partial response 4/4/11 ENG/Freeman (Bryan) 29. Chapter 11/12 RAIs 2/25/11A Response submitted Chem/Eng Page 5 of 6    No. Description Status Additional Comments Resp Org/Person Closed (Bryan) 30. Tech Spec Revisions from latest T/S markup 4/22/11 NRC comments due by 4/8/11 Licensing/Elton (Bryan) 31. ASME III to XI transition When does ISI program begin with partial plant N-3?
Are repairs/mods after N-5 controlled under Section III or Section XI? Eng/Helms (Crouch) 32. AFW RAIs 2/25/11A Closed Response submitted Eng/Koontz (Smith) 33. Anti-Trust RAIs 2/22/11A Closed Letter submitted Licensing/Arent 34. Chapter 15 RAI on Dose calc basis Bechtel (Fredrick) preparing answer.
Eng/Koontz (Bryan) 35. Chapter 9 RAI on PASS elimination 4/1/11A  Licensing/REP (Smith) 36. FSAR Amendment A103 3/15/11A  Licensing/ Stockton 37. Chapter 11/12 E-mail RAIs 4/30/11  Chem/Woods (Bryan) 38. Chapter 15 Transient Analysis RAIs Public Meeting 3/15/11A Inadvertent  SI, CVCS Malfunction, Overpressure, Steam Line Break Eng/Koontz (Bryan) 39. Confirm ACRS accepted IST presentation 3/08/11A  3/18/11A Discussed with Ed Hackett and provided copy of presentation on 3/15/11 Followup with Ed Hackett to confirm actions required ACRS requested a re-presentation. Added item to ACRS topics below. Lic/Crouch 40. Boron Related RAI (e-mail) 3/25/11A Provide requested technical information  Additional info requested during 3/15/11 public meeting Eng/Koontz 41. Turbine Integrity RAI 3/25/11A Siemens provide draft answers Eng/Koontz 42. Hydrology sand bag question 4/15/11 Has the NRC accepted the use of sand bags on the dams?  Five RAI questions Corp/Selman 43. Letter to notify NRC when Vital Area Boundary returned to original location 5/31 Date for schedule Lic/Crouch 44. GDC 5 RAIs 4/11/11 Provide requested technical information Eng/Koontz Page 6 of 6    No. Description Status Additional Comments Resp Org/Person 45. Fire Protection/GDC 5 Public Meeting 3/29/11A Provide background on revised FPR and RAI responses. Provide methodology of GDC 5 cooldown analysis Eng/Hilmes 46. Large Break LOCA RAI 4/1/11A Provide requested technical information Koontz/WEC 47. PSA Definition of Vulnerability 4/1/11A Enis 48. Part 70 License vs Part 50 procedure question 4/15/11 Determine ability to control Part 70 fuel under Unit 1 Part 50 procedures. TVA to contact Rafael regarding wording of license. Discussed issue with Rafael on 3/30/11. E-mail sent to Rafael on 3/31/11 with proposed license markup.
Milano 49. ACRS Topics Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security  
: 50. SAMDA RAIs 05/20/11 Provide partial responses to speed up review.  
: 51. SSER 22 Open Items Response  
: 52. Chapter 12 RAI on Instrument Channel Operability Tests ENG/Hilmes 53. Transient Analysis issues Inadvertent SI CVCS Malfunction Steam line break 4/22/11 4/22/11 4/15/11 ENG/Koontz WEC/Morgan}}

Latest revision as of 09:37, 6 December 2019

OL - FW: Updated Bucket List 4/8/11
ML111050010
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/08/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML111050010 (8)


Text

WBN2Public Resource From: Poole, Justin Sent: Friday, April 08, 2011 12:59 PM To: Epperson, Dan; Raghavan, Rags Cc: WBN2HearingFile Resource

Subject:

FW: Updated Bucket List 4/8/11 Attachments: NRC PM Open Items List 4-8-11.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Crouch, William D [1]

Sent: Friday, April 08, 2011 12:57 PM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Arent, Gordon; Bryan, Robert H Jr; Smith, James D

Subject:

Updated Bucket List 4/8/11 I updated the list based on todays phone call.

William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 301 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7F6E4FC164)

Subject:

FW: Updated Bucket List 4/8/11 Sent Date: 4/8/2011 12:58:42 PM Received Date: 4/8/2011 12:58:57 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 533 4/8/2011 12:58:57 PM NRC PM Open Items List 4-8-11.docx 34590 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 6 NRC PM Open Items List 4/8/11 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and Assess Update Cyber Security Plan IAW NEI 08-09 Rev 6 per Heinrich/Snyder Implementation CDAs/Identify NRC letter dated 5/24/10. NRC Inspection in 2011 (Bryan)

Mods 2/28/11A Provide update to change commitment for April ready for Inspection RAI Response 4/7/11A Response to 3 Generic RAIs Scope Mods 3/31/11 TI issued 5/30/11 NRC Table Top/Pilot TBD Procedures complete 9/30/11 Inspection 10/23/11

2. RAIs (Elton) FSAR, SSER Closed All RAI captured individually below. Licensing/Eng (Crouch)
3. GL 2004-02 submittal of post Unit 1 Step 1 Step 1 Report w/o test data Eng/Koontz RAIs (Beach) 9/10/10A (Bryan)

Step 2 Include test data and remainder of RAI Step 2 responses 3/4/11A

Page 2 of 6 No. Description Status Additional Comments Resp Org/Person

4. Instrumentation RAI List (Knuettel) Ongoing Eng/Hilmes (Smith)
5. Develop list of planned License 9/1/11 Review Unit 1 SER for exemptions. NRR/TVA Conditions, Exemptions and Relief (Bryan)

Requests (Crouch)

6. Resolve Licensing Basis Preservation 4/28/11 NRC/NRR Inspection in April Eng/Freeman Self Assessment PERs (Crouch) (Smith)
7. Generic Letter 2008-01 Gas 3/14/11A Provide submittal of Engineering Products with Eng/Helms Accumulation High Point Vents (Beach) commitment for final walkdown in 2011 (Bryan)

Include latest RAIs

8. Status on Aquatic Contention (Arent) 3/29/11A Thermal-hydraulic submittal by 2/8/11A Arent Impingement/Entrainment info by 3/18/11 (Bryan)
9. Unit Difference submittal (Stockton) 10/28/10A Bulk of Unit Differences addressed by 10/28/10 letter. Licensing 4/7/11A Need final supplement for remainder of EDCRs (Smith)
10. Status of GSI 199 Eastern Seismicity 4/15/11 TVA/NRR (Crouch)
11. Address ACRS questions - Tritium 2/24/11A Issues addressed in 2/24/11 ACRS Eng/Freeman concentration in plume from leak, WBN (Crouch) versus VC Summer weld flaw commonalities, baffle bolts status (Crouch)
12. Submit final REP prior to fuel load Complete NRR to determine if submittal has to occur before EP/

(Spink) Item 1 License rather than before fuel load. Detchemendy (Bryan) 5/1/11 1. Fix Section 6.0, Event 6.2 in Rev 92xx.

Item 2

2. Submit EPIPs 180 days prior to OL.
13. Complete Implementation (Hemmer) RAI Response Respond to RAI Hemmer 3/29/11A (Smith)

Implement two unit commitments.

RAI Clarification Provide updated information for tables contained in for Fuel the 6/29/07 and 7/1/10 letters.

Question 2

Page 3 of 6 No. Description Status Additional Comments Resp Org/Person 4/22/10 Letter did not address Phase I commitments Diesel 6/1/11 Pump Relocation 6/17/11 Procedures Issued 6/30/11 Inspection -

August 2011 Phase I commitments 2/11/11

14. Issue two Unit Offsite Dose Calculation 9/1/11 Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

15. Issue Unit 2 Completion Letter (Crouch) Licensing (Crouch)
16. Combined U1/U2 FSAR (Stockton) Licensing (Crouch)
17. Provide feedback on the status of NRC SSER 23 Were there any assumptions/lineups in the Unit 1 test NRR review of Integrated Safeguards Test that would make the test applicable for single unit submittal operation only? What facility changes have been made that could affect the results of the test and how do we ensure they do not affect the independence?

Provide copy of presentation to Bob Haag.

18. Document Control Issues for two letters 4/15/11 7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint Licensing/Boyd 7/15 letter and provide to NRC Document control.

TVA/Bechtel to provide non-proprietary version of

Page 4 of 6 No. Description Status Additional Comments Resp Org/Person documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. TVA to confirm A102 gets into ADAMS. Currently only the cover letter is available.

Contacted Kenny Nguyen, NRC Document Control.

He has the action.

19. Submit final as-constructed FSAR 10/1/11 Licensing/

figures Stockton (Crouch)

20. Unit 1 Tech Specs 4/15/11 Verify current Unit 1 Tech Specs are acceptable for Unit 1 Licensing two unit operation (specifically review common (Bryan) systems).
21. Joint Dry Run of ACRS (Feb 24) 2/22/11A ACRS presentation to provide status of each licensing TVA/NRR issue
22. Chapter 15.5 RAIs 12/10/10A Additional question regarding meteorology data from Wastrack RAI response 2008-2009 (Bryan) 4/30/11
23. Fire Protection Report Questions 3/31/11A Justification Criteria ENG/Hilmes regarding OMA 4/29/11 Justifications (Crouch)

TBD (draft Next RAI set prior to 4/21 mtg)

24. IST Tech Spec Change 4/15/11 TVA Corporate Licensing (Smith)
25. Environmental Phone call to discuss 4/15/11 Telecon held. Response in progress Environmental/

intake flow rate/velocity at IPS and Hopping SCCW in EIS versus NPDES. (Bryan)

26. Verify Tech Spec Setpoints match calcs 8/1/11 Eng/Hilmes (Bryan)
27. Letter to terminate Part 30/40 License Licensing after receipt of Part 50 License (Crouch)
28. SSER 22 Open Items Response 4/6/11A Partial response 4/4/11 ENG/Freeman (Bryan)
29. Chapter 11/12 RAIs 2/25/11A Response submitted Chem/Eng

Page 5 of 6 No. Description Status Additional Comments Resp Org/Person Closed (Bryan)

30. Tech Spec Revisions from latest T/S 4/22/11 NRC comments due by 4/8/11 Licensing/Elton markup (Bryan)
31. ASME III to XI transition When does ISI program begin with partial plant N-3? Eng/Helms Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI?
32. AFW RAIs 2/25/11A Response submitted Eng/Koontz Closed (Smith)
33. Anti-Trust RAIs 2/22/11A Letter submitted Licensing/Arent Closed
34. Chapter 15 RAI on Dose calc basis Bechtel (Fredrick) preparing answer. Eng/Koontz (Bryan)
35. Chapter 9 RAI on PASS elimination 4/1/11A Licensing/REP (Smith)
36. FSAR Amendment A103 3/15/11A Licensing/

Stockton

37. Chapter 11/12 E-mail RAIs 4/30/11 Chem/Woods (Bryan)
38. Chapter 15 Transient Analysis RAIs Public Meeting Inadvertent SI, CVCS Malfunction, Overpressure, Eng/Koontz 3/15/11A Steam Line Break (Bryan)
39. Confirm ACRS accepted IST 3/08/11A Discussed with Ed Hackett and provided copy of Lic/Crouch presentation presentation on 3/15/11 3/18/11A Followup with Ed Hackett to confirm actions required ACRS requested a re-presentation. Added item to ACRS topics below.
40. Boron Related RAI (e-mail) 3/25/11A Provide requested technical information Additional Eng/Koontz info requested during 3/15/11 public meeting
41. Turbine Integrity RAI 3/25/11A Siemens provide draft answers Eng/Koontz
42. Hydrology sand bag question 4/15/11 Has the NRC accepted the use of sand bags on the Corp/Selman dams? Five RAI questions
43. Letter to notify NRC when Vital Area 5/31 Date for schedule Lic/Crouch Boundary returned to original location
44. GDC 5 RAIs 4/11/11 Provide requested technical information Eng/Koontz

Page 6 of 6 No. Description Status Additional Comments Resp Org/Person

45. Fire Protection/GDC 5 Public Meeting 3/29/11A Provide background on revised FPR and RAI Eng/Hilmes responses. Provide methodology of GDC 5 cooldown analysis
46. Large Break LOCA RAI 4/1/11A Provide requested technical information Koontz/WEC
47. PSA Definition of Vulnerability 4/1/11A Enis
48. Part 70 License vs Part 50 procedure 4/15/11 Determine ability to control Part 70 fuel under Unit 1 Milano question Part 50 procedures. TVA to contact Rafael regarding wording of license. Discussed issue with Rafael on 3/30/11. E-mail sent to Rafael on 3/31/11 with proposed license markup.
49. ACRS Topics Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security
50. SAMDA RAIs 05/20/11 Provide partial responses to speed up review.
51. SSER 22 Open Items Response
52. Chapter 12 RAI on Instrument Channel ENG/Hilmes Operability Tests
53. Transient Analysis issues ENG/Koontz Inadvertent SI 4/22/11 WEC/Morgan CVCS Malfunction 4/22/11 Steam line break 4/15/11