| {{#Wiki_filter:Licensee: Facility: Docket No.Date and Time: Location: Purpose: Attendees: | | {{#Wiki_filter:No. 11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OL! |
| NRC: Pubtic Participation:
| | Licensee: Constellation Energy and Entergy Nuclear Northeast Facility: Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Docket No. 50-220;50-410; 50-333 Date and Time: May 4, 2011 at 6:00 p.m. |
| Meeting Contact: No. 11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OL!Constellation Energy and Entergy Nuclear Northeast Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant 50-220;50-410; 50-333 May 4, 2011 at 6:00 p.m.Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations.
| | Location: Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 |
| D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation. | | |
| Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. | | ==Purpose:== |
| The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209. | | The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations. |
| ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html. | | Attendees: |
| | NRC: D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick Pubtic Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation. |
| | Meeting |
| | |
| | ==Contact:== |
| | Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov |
| | |
| | 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209. ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html. |
| Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html. | | Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html. |
| The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate. | | The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security. |
| lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. | | The NRC provides reasonable accommodation to individuals with disabilities where appropriate. |
| Please confirm the meeting schedule on the NRC website under public meetings.Approved by://^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. | | lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. |
| The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209. | | Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact. |
| ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html. | | Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. |
| | Please confirm the meeting schedule on the NRC website under public meetings. |
| | Approved by: |
| | //^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ |
| | |
| | 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209. ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html. |
| Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html. | | Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html. |
| The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate. | | The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security. |
| lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings.Approved by:/RA/Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution | | The NRC provides reasonable accommodation to individuals with disabilities where appropriate. |
| : (see attached)DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review Complete: | | lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. |
| ACP (Reviewer's Initials)After declaring this document'An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure | | Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact. |
| 'E" = Copy with attachmenVenclosure "N" = No copy ML111050100)FFICE TVDRP lhp RI/DRP RI/DRP{AME APatel/ACP MGray/MKG 3Dentel/GTD)ATE o4toBt11 04t12t11 04t18 t11 OFFICIAL RECORD COPY 3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes)Discussion of U.S. plant safety operations in light of Japan event ..(10 minutes)NRC to address public questions (as needed)Closing Remarks ....... (5 minutes) 4 Distribution: | | Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings. |
| Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OED Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation NRR Director, Division of lnspection | | Approved by: |
| & Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Asst. General Counsel Materials Litigation | | /RA/ |
| & Enforcement' OGC W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard. | | Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution : (see attached) |
| Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc. | | DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review Complete: ACP (Reviewer's Initials) |
| gov PMNS (RIDSEDOMAILCENTER)(RTDSEDOMAILCENTER)(RTDSNRROD)(RTDSNRROD)(RTDSNRRDIRS)(RTDSNRRDORL)(RIDSOGCMAILCENTER)}} | | After declaring this document'An Official Agency Record" it will be released to the Public. |
| | To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure |
| | 'E" = Copy with attachmenVenclosure "N" = No copy ML111050100 |
| | )FFICE TVDRP lhp RI/DRP RI/DRP |
| | {AME APatel/ACP MGray/MKG 3Dentel/GTD |
| | )ATE o4toBt11 04t12t11 04t18 t11 OFFICIAL RECORD COPY |
| | |
| | 3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes) |
| | Discussion of U.S. plant safety operations in light of Japan event ..(10 minutes) |
| | NRC to address public questions (as needed) |
| | Closing Remarks ....... (5 minutes) |
| | |
| | 4 Distribution: |
| | Executive Director for Operations, OEDO (RIDSEDOMAILCENTER) |
| | Deputy Executive Director for Reactor Programs, OED (RTDSEDOMAILCENTER) |
| | Director, Office of Nuclear Reactor Regulation, NRR (RTDSNRROD) |
| | Deputy Director, Office of Nuclear Reactor Regulation NRR (RTDSNRROD) |
| | Director, Division of lnspection & Regional Support, NRR/DIRS (RTDSNRRDIRS) |
| | Director, Division of Operating Reactor Licensing, NRR/DORL (RTDSNRRDORL) |
| | Asst. General Counsel Materials Litigation & Enforcement' OGC (RIDSOGCMAILCENTER) |
| | W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard. Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc. gov PMNS}} |
|
---|
Category:Meeting Notice
MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-11-0606 November 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20241208, Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions2024-09-18018 September 2024 Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions ML24109A0412024-04-18018 April 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL & Sus ML24100A0552024-04-15015 April 2024 Constellation - Closed Meeting Notice Regarding a Future Topical Report Submittal PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-0303 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20231019, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions2023-09-21021 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions PMNS20230748, Notice of Meeting with Constellation Energy Generation, LLC Regarding James A. FitzPatrick Nuclear Plant2023-06-23023 June 2023 Notice of Meeting with Constellation Energy Generation, LLC Regarding James A. FitzPatrick Nuclear Plant ML23124A1072023-05-0404 May 2023 Notice of Public Meeting (Webinar) - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels ML22305A5952022-11-0101 November 2022 Pre-Application Teleconference Meeting with Constellation Energy Generation, LLC to Discuss Planned License Amendment Requests for Nine Mile Point Nuclear Station, Unit No. 1 ML22131A2212022-05-11011 May 2022 Notice of Public Meeting (Webinar) - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sus) PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards ML21140A3142021-05-20020 May 2021 Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201418, Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 12020-12-21021 December 2020 Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 1 PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20147A1882020-05-26026 May 2020 Notice of Category 3 Public Meeting: Annual Assessment Meeting for FitzPatrick, Ginna, and Nine Mile for 2019 ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19261B7282019-09-18018 September 2019 and Nine Mile Point Nuclear Generating Station, Public Meeting Notice on October 3, 2019 ML18186A2512018-07-0303 July 2018 8/21/18: Notice of Public Meeting for Nine Mile Point Nuclear Power Plant and James A. Fitzpatrick Nuclear Generating Station ML17265A7672017-09-25025 September 2017 Notice of Forthcoming Closed Teleconference with Exelon Generation Company, LLC to Discuss Planned License Amendment Request to Remove Boraflex Credit for Nine Mile Point Nuclear Station, Unit 1 ML17076A0822017-03-17017 March 2017 4/20/2017 - Notice of Public Meeting - James A. FitzPatrick Nuclear Power Plant; Nine Mile Point Nuclear Generating Station ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16197A0402016-07-15015 July 2016 Revised Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance at James A. Fitzpatrick Nuclear Power Plant for 2015 ML16194A0122016-07-11011 July 2016 Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance at James A. Fitzpatrick Nuclear Power Plant for 2015 ML16076A1512016-03-15015 March 2016 5/18/2016 - Notice of Category 3 Public Meeting - Annual Assessment of Safety Performance at the Nine Mile Point Nuclear Station for 2015 ML15103A0192015-04-10010 April 2015 4/23/2015 - Notice of Category 3 Public Meeting with FitzPatrick to Discuss Annual Assessment ML15092A1792015-04-0101 April 2015 4/28/2015 - Notice of Category 3 Public Meeting with Nine Mile Point to Discuss the Performance ML14063A3942014-03-0404 March 2014 3/18/2014 - Notice of Public Meeting - Nine Mile Point and FitzPatrick Annual Assessment Meeting ML13282A6282013-10-0909 October 2013 11/1/2013 - Notice of Public Meeting - Nine Mile Point Regulatory Conference, to Discuss Preliminary Greater than Green Finding and Apparent Violation ML13199A3282013-07-17017 July 2013 8/5/13 - Notice of Public Meeting - Constellation Energy Nuclear Group, LLC (Calvert Cliffs, Ginna, and Nine Mile Point) ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13077A0472013-03-18018 March 2013 3/29/2013 - Notice of Category 1 Meeting with Nine Mile Point Nuclear Station, Llc. to Discuss Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request (LAR) Submittal and the Use of GESTR-M Vs. Prime Codes ML13077A1162013-03-18018 March 2013 4/3/2013 - Notice of Public Meeting - Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant ML13036A0062013-02-0606 February 2013 Notice of Forthcoming Meeting with Nine Mile Point Nuclear Station, LLC to Discuss the Maximum Extended Load Line Limit Analysis Plus (Mellla+) Implementation for Nine Mile Point (NMP) Unit 2 ML12249A0522012-09-0505 September 2012 Notice of Public Meeting with NRC and Constellation Energy Nuclear Group, Inc., Llc., to Discuss Constellation fleet-wide Performance (Calvert Cliffs, R.E. Ginna and Nine Mile Point) ML13017A3592012-04-19019 April 2012 from R1DRPMail Resource to Sam Mccarver: FW Fitzpatrick G20120172/EDATS ML12107A5052012-04-16016 April 2012 Forthcoming Category 1 Public Meeting with Constellation Energy Nuclear Group, LLC to Discuss Preliminary Enforcement ML13017A3572012-04-0505 April 2012 from R1DRPMail Resource to Sam Mccarver: FW Fitzpatrick G20120172/EDATS ML12102A0082012-04-0505 April 2012 Revised Notice of Meeting with the Petitioners, Beyond Nuclear Et Al, Requesting Action Under 10 Cfr 2.206 Regarding Immediate Suspension of the Operating License for James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick) Due to Concerns .. ML13022A3542012-04-0505 April 2012 from Bhalchandra Vaida to George Wilson: G20120172/EDATS: OEDO-2012-0147 - Forthcoming Meeting with Petitioners, Beyond Nuclear Et Al, Requesting Action Under 10 CFR 2.206 ML12095A1712012-04-0505 April 2012 G20120172/EDATS-OEDO-2012-0147-ME8189-Meeting Notice-1st Meeting with Petitioners ML1207200542012-03-12012 March 2012 Notice of Forthcoming Pre-Application Meeting with Licensee for Nine Mile Point, Unit No. 1 to Discuss Proposed NFPA-805 License Amendment Request 2024-09-18
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-11-0606 November 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20241208, Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions2024-09-18018 September 2024 Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-0303 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20231019, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions2023-09-21021 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions PMNS20230748, Notice of Meeting with Constellation Energy Generation, LLC Regarding James A. FitzPatrick Nuclear Plant2023-06-23023 June 2023 Notice of Meeting with Constellation Energy Generation, LLC Regarding James A. FitzPatrick Nuclear Plant PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22305A5952022-11-0101 November 2022 Pre-Application Teleconference Meeting with Constellation Energy Generation, LLC to Discuss Planned License Amendment Requests for Nine Mile Point Nuclear Station, Unit No. 1 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201418, Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 12020-12-21021 December 2020 Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 1 PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML17265A7672017-09-25025 September 2017 Notice of Forthcoming Closed Teleconference with Exelon Generation Company, LLC to Discuss Planned License Amendment Request to Remove Boraflex Credit for Nine Mile Point Nuclear Station, Unit 1 ML15169B1392015-06-18018 June 2015 Agenda - ACRS Power Uprates Subcommittee Meeting, June 22, 2015 ML13282A6282013-10-0909 October 2013 11/1/2013 - Notice of Public Meeting - Nine Mile Point Regulatory Conference, to Discuss Preliminary Greater than Green Finding and Apparent Violation ML13199A3282013-07-17017 July 2013 8/5/13 - Notice of Public Meeting - Constellation Energy Nuclear Group, LLC (Calvert Cliffs, Ginna, and Nine Mile Point) ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13077A0472013-03-18018 March 2013 3/29/2013 - Notice of Category 1 Meeting with Nine Mile Point Nuclear Station, Llc. to Discuss Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request (LAR) Submittal and the Use of GESTR-M Vs. Prime Codes ML13036A0062013-02-0606 February 2013 Notice of Forthcoming Meeting with Nine Mile Point Nuclear Station, LLC to Discuss the Maximum Extended Load Line Limit Analysis Plus (Mellla+) Implementation for Nine Mile Point (NMP) Unit 2 ML12249A0522012-09-0505 September 2012 Notice of Public Meeting with NRC and Constellation Energy Nuclear Group, Inc., Llc., to Discuss Constellation fleet-wide Performance (Calvert Cliffs, R.E. Ginna and Nine Mile Point) ML13017A3592012-04-19019 April 2012 from R1DRPMail Resource to Sam Mccarver: FW Fitzpatrick G20120172/EDATS ML13162A7442012-04-17017 April 2012 from Andrea Russell: Meeting Agenda, Script Attached ML12107A5052012-04-16016 April 2012 Forthcoming Category 1 Public Meeting with Constellation Energy Nuclear Group, LLC to Discuss Preliminary Enforcement ML12095A1712012-04-0505 April 2012 G20120172/EDATS-OEDO-2012-0147-ME8189-Meeting Notice-1st Meeting with Petitioners ML13022A3542012-04-0505 April 2012 from Bhalchandra Vaida to George Wilson: G20120172/EDATS: OEDO-2012-0147 - Forthcoming Meeting with Petitioners, Beyond Nuclear Et Al, Requesting Action Under 10 CFR 2.206 ML12102A0082012-04-0505 April 2012 Revised Notice of Meeting with the Petitioners, Beyond Nuclear Et Al, Requesting Action Under 10 Cfr 2.206 Regarding Immediate Suspension of the Operating License for James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick) Due to Concerns .. ML13017A3572012-04-0505 April 2012 from R1DRPMail Resource to Sam Mccarver: FW Fitzpatrick G20120172/EDATS ML1207200542012-03-12012 March 2012 Notice of Forthcoming Pre-Application Meeting with Licensee for Nine Mile Point, Unit No. 1 to Discuss Proposed NFPA-805 License Amendment Request ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1113605612011-05-16016 May 2011 NRC Meeting Slides, Nine Mile Point & Fitzpatrick 2011 Annual Assessment Meeting ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1110501002011-04-18018 April 2011 and James A. FitzPatrick Nuclear Power Plant Notice of Public Meeting on May 4, 2011 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100300212010-12-29029 December 2010 Ltr to E. Erb Re Participation in Commission Meeting on Implementation of Part 26 on 02/08/11 ML1028600022010-10-19019 October 2010 Summary of Closed Meeting with Nine Mile Point Nuclear Station, LLC, to Discuss Proposed Extended Power Uprate (EPU) Steam Dryer Review and Analyses for Nine Mile Point, Unit No. 2 ML1025719262010-09-15015 September 2010 Revised Notice of Closed Meeting with Nine Mile Point Nuclear Station, LLC, to Discuss the Review of Steam Dryer Analysis for the NMP2 Extended Power Uprate License Amendment Request 2024-09-18
[Table view] |
Text
No.11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OL!
Licensee: Constellation Energy and Entergy Nuclear Northeast Facility: Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Docket No. 50-220;50-410; 50-333 Date and Time: May 4, 2011 at 6:00 p.m.
Location: Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126
Purpose:
The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations.
Attendees:
NRC: D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick Pubtic Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.
Meeting
Contact:
Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov
2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209. ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
Approved by:
//^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ
2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209. ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings.
Approved by:
/RA/
Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution : (see attached)
DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review Complete: ACP (Reviewer's Initials)
After declaring this document'An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure
'E" = Copy with attachmenVenclosure "N" = No copy ML111050100
)FFICE TVDRP lhp RI/DRP RI/DRP
{AME APatel/ACP MGray/MKG 3Dentel/GTD
)ATE o4toBt11 04t12t11 04t18 t11 OFFICIAL RECORD COPY
3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes)
Discussion of U.S. plant safety operations in light of Japan event ..(10 minutes)
NRC to address public questions (as needed)
Closing Remarks ....... (5 minutes)
4 Distribution:
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OED (RTDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RTDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation NRR (RTDSNRROD)
Director, Division of lnspection & Regional Support, NRR/DIRS (RTDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RTDSNRRDORL)
Asst. General Counsel Materials Litigation & Enforcement' OGC (RIDSOGCMAILCENTER)
W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard. Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc. gov PMNS