| number = ML11285A482
| number = ML11285A482
| issue date = 09/19/2011
| issue date = 09/19/2011
| title = 2011/09/19 Watts Bar 2 OL - NRC PM Open Items List 9-20-11.docx
| title = OL - NRC PM Open Items List 9-20-11.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                 Boyd, Desiree L [dlboyd@tva.gov]
Sent: Monday, September 19, 2011 11:04 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Br yan, Robert H Jr; Smith, James D
Sent:                 Monday, September 19, 2011 11:04 AM To:                   Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                   Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D


==Subject:==
==Subject:==
NRC PM Open Items List 9-20-11.docx Attachments:
NRC PM Open Items List 9-20-11.docx Attachments:           NRC PM Open Items List 9-20-11.docx For next phone call.
NRC PM Open Items List 9-20-11.docx For next phone call.  
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1


Thank You, 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           527 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF232EA0C9)
  ~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
 
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 527   Mail Envelope Properties   (7AB41F650F76BD44B5BCAB7C0CCABFAF232EA0C9)


==Subject:==
==Subject:==
NRC PM Open Items List 9-20-11.docx Sent Date:   9/19/2011 11:04:05 AM Received Date: 9/19/2011 11:04:08 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Arent, Gordon" <garent@tva.gov>
NRC PM Open Items List 9-20-11.docx Sent Date:               9/19/2011 11:04:05 AM Received Date:           9/19/2011 11:04:08 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov Files     Size     Date & Time MESSAGE   254     9/19/2011 11:04:08 AM NRC PM Open Items List 9-20-11.docx   33760 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Page 1 of 5    NRC PM Open Items List 9/20/11 (423) 751-7777 ID 4233652004#
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
No. Description Status Additional Comments Resp Org/Person 1. Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
 
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Oct 2011  Procedures complete 9/30/11 Pre-inspection TBD
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                   Date & Time MESSAGE                         254                   9/19/2011 11:04:08 AM NRC PM Open Items List 9-20-11.docx                   33760 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:


Inspection  
Page 1 of 5 NRC PM Open Items List 9/20/11 (423) 751-7777 ID 4233652004#
No.              Description            Status                    Additional Comments                    Resp Org/Person
: 1. Cyber Security Plan/Controls and NRC TI issued  NRC Inspection in 2011                            Heinrich/Snyder Implementation                  TBD                                                              (Bryan)
To be discussed at the next ACRS meeting (October NRC Table      5th - closed portion).
Top/Pilot Oct 2011      Follow-up meeting 9/21 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011


Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October
Page 2 of 5 No.                Description                  Status                    Additional Comments                      Resp Org/Person
: 2. Instrumentation RAI List (Knuettel)      1. TBD        1. Draft response due by 9/19/11.                    Eng/Hilmes
: 1. Item 3 for GA-ESI RM-1000 RAD          2. Various -  2. 04038903-1SP: 9/30/11                            (Smith)
Monitors.                                see status    04038903-2SP: 10/6/11
: 2. GA proprietary, non-proprietary and    3. 9/26/11      04038903-4SP: 10/21/11 affidavits for withholding submittals 4. 10/1/11      04038903-QSR: 9/30/11
(~12 documents.)                      5. 11/18/11      Non-props and affidavits due 11/18/11
: 3. NRC comments on procedures to          6. Various -  3. OP-7.3-240: 9/26/11 GA-ESI                                  see status 4. Create new bridge document 04038800-1SP:
: 4. RM1000 EMI/RFI questions              7. TBD          10/1/11
: 5. Submit non-prop/affidavits            8. TBD        5. Provide NRC non-prop and affidavit for all
: 6. WEC to provide demarcated          9. TBD          remaining documents proprietary, non-proprietary and                    6. WEC to provide the following documents:
affidavits for withholding for each                    CN-EQT-10-44: TBD item.                                                  DAR-ME-09-10: TBD
: 7. WEC to revise figure to remove                      EQ-EV-62-WBT: TBD connection from OM to printer to                      EQLR-171: TBD complete commitment.                                  EQ-QR-33-WBT: TBD 8 and 9 to be discussed at telecom                    EQ-QR-64-GEN: TBD 1100 on 9/20.                                          WNA-SD-00250-WBT: TBD WNA-SD-00248-WBT: TBD
: 7. WNA-AR-00189-WBT
: 8. IITA Incore EQ report
: 9. MI cable 600V test report
: 3. Verify MACCs values for SAMA Cost        1. 9/8/11A    1. Non-conservatisms in some values identified. ENG/Koontz Benefit Evaluation                        2. 9/16/11A        Discuss updated results with NRC
: 2. Submitted revised tables & revised RAI responses
: 4. Exemption to 10CFR50.49 for some            9/23/11        Determine if exemption required. Check SSER 24. Hilmes Category II cables                                                                                          (Stockton)


5 th - closed portion).  
Page 3 of 5 No.              Description              Status                    Additional Comments                        Resp Org/Person
: 5. Complete Implementation (Hemmer)    Pump          Additional clarification to Phase I actions will be  Hemmer Relocation    needed. Fleet wide issue.                            (Smith) 5/30/12        Substantial building to complete and equipment in May.
Bldg Plan      Provide document of mitigating equipment and 9/23/11        location for unit 2.
Inspection -
June 2012 Phase I commitments 10/1/11
: 6. Chapter 15.5 RAIs                  9/21/11        Includes FHA calc. X/Q discussion for each accident,  Wastrack corrections to previously submitted dose calcs, and a (Bryan) complete 15.5 markup. Potential meeting following submittal.
9/15/11A      Look at splitting submittal up.
: 7. Fire Protection Report Questions    1. 10/24-28/11 1. Audit                                              ENG/Hilmes regarding OMA                      2.9/30/11      2. Group 7 RAI response                              (Crouch) 3.10/1/11      3. Receive Group 8 RAIs - if needed
: 4. 11/4/11    4. Response to Group 8 - if needed
: 5. 11/30/11    5. Submit As-designed U1/U2 FPR
: 6. TBD        6. Fire Protection Program Audit Frequency - add to
: 7. TBD        group 7 response
: 7. Follow-up meeting
: 8. Tech Spec Revisions from latest T/S 1. Oct, 2011  1. CSST A & B - discretionary                        Licensing/Elton markup and NRC Review comments      2. Sept, 2011  2. I-131 DEI                                          (Bryan)
: 3. Oct, 2011  3. Diesel Generator Frequency
: 4. TBD        4. Unit 1 AST FHA
: 9. ACRS Topics                        10/5/11        Cyber, Chapter 15 except dose, Chapter 4 (Fuels),    Gordon WINCISE, Hydrology, process for FSAR drawing documentation update,
: 10. SSER 22/23/24 Open Items Response  9/30/11        9/16 is the target date for the next SSER update. The Licensing expanded HH list and status is covered periodically.


Follow-up meeting 9/21 Heinrich/Snyder (Bryan)
Page 4 of 5 No.               Description                 Status                     Additional Comments                           Resp Org/Person
Page 2 of 5     No. Description Status Additional Comments Resp Org/Person 2. Instrumentation RAI List (Knuettel) 1. Item 3 for GA-ESI RM-1000 RAD Monitors. 2. GA proprietary, non-proprietary and affidavits for withholding submittals (~12 documents.) 3. NRC comments on procedures to GA-ESI 4. RM1000 EMI/RFI questions 5. Submit non-prop/affidavits 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item. 7. WEC to revise figure to remove connection from OM to printer to complete commitment. 8 and 9 to be discussed at telecom 1100 on 9/20. 1. TBD 2. Various - see status  3. 9/26/11 4. 10/1/11 5. 11/18/11 6. Various -
: 11. Transient Analysis issues              9/21/11        Question on RG revision and modes 3, 4, & 5. TVA to    ENG/Koontz provide write up explaining NRC acceptance (CLB) of    WEC/Morgan Boron dilution RAI response                            unit1 for modes 3, 4, & 5. See SSER OI 132.
see status 7. TBD 8. TBD 9. TBD 1. Draft response due by 9/19/11. 2. 04038903-1SP: 9/30/11 04038903-2SP: 10/6/11 04038903-4SP: 10/21/11 04038903-QSR: 9/30/11 Non-props and affidavits due 11/18/11 3. OP-7.3-240: 9/26/11
: 12. FSAR A107                              10/17/11       Current target date for A107 is 10/17/11.               Lic/Stockton How will note 4 & 5 on FSAR figure 9.2-23 change for two unit operation when the CCS C-S and 2B pumps are realigned
: 4. Create new bridge document 04038800-1SP:
: 13. Develop list of planned License            1. 11/1/11     1. Review Unit 1 SER for exemptions. Sand          NRR/TVA Conditions, Exemptions and Relief          2. TBD            baskets, cyber security, physical security, PAD (Bryan)
10/1/11 5. Provide NRC non-prop and affidavit for all remaining documents 6. WEC to provide the following documents: CN-EQT-10-44: TBD DAR-ME-09-10: TBD EQ-EV-62-WBT: TBD EQLR-171: TBD EQ-QR-33-WBT: TBD EQ-QR-64-GEN: TBD WNA-SD-00250-WBT: TBD WNA-SD-00248-WBT: TBD 7. WNA-AR-00189-WBT 8. IITA Incore EQ report
Requests (Crouch)                          3. TBD            4.0
: 9. MI cable 600V test report Eng/Hilmes (Smith) 3. Verify MACCs values for SAMA Cost Benefit Evaluation 1. 9/8/11A 2. 9/16/11A 1. Non-conservatisms in some values identified. Discuss updated results with NRC 2. Submitted revised tables & revised RAI responses ENG/Koontz 4. Exemption to 10CFR50.49 for some Category II cables 9/23/11 Determine if exemption required. Check SSER 24.
: 2. NRR to review current exemptions
Hilmes (Stockton)
: 3. Verify required notifications made
Page 3 of 5    No. Description Status Additional Comments Resp Org/Person 5. Complete Implementation (Hemmer)
: 14. Verify Tech Spec Setpoints match calcs  1. 10/4/11     1. 3 SSDs remaining to be issued. Possible submittal    Eng/Hilmes if any number changes.                                  (Bryan)
Pump Relocation 5/30/12 Bldg Plan 9/23/11  Inspection - June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue. Substantial building to complete and equipment in May. Provide document of mitigating equipment and location for unit 2. Hemmer (Smith) 6. Chapter 15.5 RAIs 9/21/11    9/15/11A Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up. Wastrack (Bryan) 7. Fire Protection Report Questions regarding OMA 1. 10/24-28/11 2.9/30/11 3.10/1/11 4. 11/4/11 5. 11/30/11
TS certification                        2. TBD        2. TS certification
: 6. TBD 7. TBD 1. Audit 2. Group 7 RAI response 3. Receive Group 8 RAIs - if needed 4. Response to Group 8 - if needed 5. Submit As-designed U1/U2 FPR 6. Fire Protection Program Audit Frequency - add to group 7 response
: 15. Issue two Unit Offsite Dose Calculation 3/1/12        Determine actual need date                              Chemistry/
: 7. Follow-up meeting ENG/Hilmes (Crouch) 8. Tech Spec Revisions from latest T/S markup and NRC Review comments
Manual (Beach) Review TS Chapter 5                                                                            Woods programs also                                                                                                  (Bryan)
: 1. Oct, 2011
: 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12                                                                 Licensing
: 2. Sept, 2011
: 17. Submit final as-constructed FSAR        7/1/12                                                                Licensing/
: 3. Oct, 2011
figures                                                                                                        Stockton
: 4. TBD 1. CSST A & B - discretionary
: 18. TMI action items                        7/1/12        TVA to provide letter when TMI actions are field        Licensing complete.                                               (Gordon)
: 2. I-131 DEI
: 19. ASME N-801 & N-802 code cases          11/30/11       NRC response to relief request submitted 9/1/11.       NRR
: 3. Diesel Generator Frequency
: 20. ASME Section III N-3 reports            8/2012
: 4. Unit 1 AST FHA Licensing/Elton (Bryan) 9. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon 10. SSER 22/23/24 Open Items Response 9/30/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically. Licensing Page 4 of 5    No. Description Status Additional Comments Resp Org/Person 11. Transient Analysis issues Boron dilution RAI response 9/21/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5. See SSER OI 132. ENG/Koontz WEC/Morgan 12. FSAR A107 10/17/11 Current target date for A107 is 10/17/11.
: 0. Discretionary Actions
How will note 4 & 5 on FSAR figure 9.2-23 change
: 1. Letter to terminate Part 30/40 License  4/1/12                                                                Licensing after receipt of Part 50 License                                                                              (Crouch)
: 2. Combined U1/U2 FSAR (Stockton)         3/1/13                                                                Licensing
: 3. Status of GSI 199 Eastern Seismicity    Fall 2011      No action pending upcoming Generic Letter              TVA/NRR (Crouch)                                              Related information on GSI 194 may need input
: 4. Letter to notify NRC when Vital Area    12/1/11       Security Plan Update - Boundary to be restored by      Lic/Crouch Boundary returned to original location                9/30/11


for two unit operation when the CCS C-S and 2B pumps are realigned Lic/Stockton 13. Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) 1. 11/1/112. TBD 3. TBD 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 2. NRR to review current exemptions 3. Verify required notifications made NRR/TVA (Bryan) 14. Verify Tech Spec Setpoints match calcs TS certification 1. 10/4/11
Page 5 of 5 No.             Description       Status               Additional Comments                       Resp Org/Person
: 2. TBD 1. 3 SSDs remaining to be issued. Possible submittal if any number changes.
: 5. IEB 88-02 SG Tube Cracking TBD       Tubes are assumed locked in the WEC analysis. Corp SG/
: 2. TS certification Eng/Hilmes (Bryan) 15. Issue two Unit Offsite Dose Calculation Manual (Beach)  Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Waiting for NRC concurrence. When will the WEC   Webber analysis be submitted? NRC willing to review as a ISI/Tinley contingency.}}
Woods (Bryan) 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12  Licensing 17. Submit final as-constructed FSAR figures 7/1/12  Licensing/ Stockton 18. TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon) 19. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR 20. ASME Section III N-3 reports 8/2012  0. Discretionary Actions
: 1. Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12  Licensing (Crouch) 2. Combined U1/U2 FSAR (Stockton) 3/1/13  Licensing  3. Status of GSI 199 Eastern Seismicity (Crouch) Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR 4. Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch Page 5 of 5     No. Description Status Additional Comments Resp Org/Person 5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Waiting for NRC concurrence. When will the WEC analysis be submitted? NRC willing to review as a contingency.
Corp SG/ Webber ISI/Tinley}}

Latest revision as of 02:19, 6 December 2019

OL - NRC PM Open Items List 9-20-11.docx
ML11285A482
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/19/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11285A482 (7)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Monday, September 19, 2011 11:04 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D

Subject:

NRC PM Open Items List 9-20-11.docx Attachments: NRC PM Open Items List 9-20-11.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 527 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF232EA0C9)

Subject:

NRC PM Open Items List 9-20-11.docx Sent Date: 9/19/2011 11:04:05 AM Received Date: 9/19/2011 11:04:08 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 254 9/19/2011 11:04:08 AM NRC PM Open Items List 9-20-11.docx 33760 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 5 NRC PM Open Items List 9/20/11 (423) 751-7777 ID 4233652004#

No. Description Status Additional Comments Resp Org/Person

1. Cyber Security Plan/Controls and NRC TI issued NRC Inspection in 2011 Heinrich/Snyder Implementation TBD (Bryan)

To be discussed at the next ACRS meeting (October NRC Table 5th - closed portion).

Top/Pilot Oct 2011 Follow-up meeting 9/21 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011

Page 2 of 5 No. Description Status Additional Comments Resp Org/Person

2. Instrumentation RAI List (Knuettel) 1. TBD 1. Draft response due by 9/19/11. Eng/Hilmes
1. Item 3 for GA-ESI RM-1000 RAD 2. Various - 2. 04038903-1SP: 9/30/11 (Smith)

Monitors. see status 04038903-2SP: 10/6/11

2. GA proprietary, non-proprietary and 3. 9/26/11 04038903-4SP: 10/21/11 affidavits for withholding submittals 4. 10/1/11 04038903-QSR: 9/30/11

(~12 documents.) 5. 11/18/11 Non-props and affidavits due 11/18/11

3. NRC comments on procedures to 6. Various - 3. OP-7.3-240: 9/26/11 GA-ESI see status 4. Create new bridge document 04038800-1SP:
4. RM1000 EMI/RFI questions 7. TBD 10/1/11
5. Submit non-prop/affidavits 8. TBD 5. Provide NRC non-prop and affidavit for all
6. WEC to provide demarcated 9. TBD remaining documents proprietary, non-proprietary and 6. WEC to provide the following documents:

affidavits for withholding for each CN-EQT-10-44: TBD item. DAR-ME-09-10: TBD

7. WEC to revise figure to remove EQ-EV-62-WBT: TBD connection from OM to printer to EQLR-171: TBD complete commitment. EQ-QR-33-WBT: TBD 8 and 9 to be discussed at telecom EQ-QR-64-GEN: TBD 1100 on 9/20. WNA-SD-00250-WBT: TBD WNA-SD-00248-WBT: TBD
7. WNA-AR-00189-WBT
8. IITA Incore EQ report
9. MI cable 600V test report
3. Verify MACCs values for SAMA Cost 1. 9/8/11A 1. Non-conservatisms in some values identified. ENG/Koontz Benefit Evaluation 2. 9/16/11A Discuss updated results with NRC
2. Submitted revised tables & revised RAI responses
4. Exemption to 10CFR50.49 for some 9/23/11 Determine if exemption required. Check SSER 24. Hilmes Category II cables (Stockton)

Page 3 of 5 No. Description Status Additional Comments Resp Org/Person

5. Complete Implementation (Hemmer) Pump Additional clarification to Phase I actions will be Hemmer Relocation needed. Fleet wide issue. (Smith) 5/30/12 Substantial building to complete and equipment in May.

Bldg Plan Provide document of mitigating equipment and 9/23/11 location for unit 2.

Inspection -

June 2012 Phase I commitments 10/1/11

6. Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, Wastrack corrections to previously submitted dose calcs, and a (Bryan) complete 15.5 markup. Potential meeting following submittal.

9/15/11A Look at splitting submittal up.

7. Fire Protection Report Questions 1. 10/24-28/11 1. Audit ENG/Hilmes regarding OMA 2.9/30/11 2. Group 7 RAI response (Crouch) 3.10/1/11 3. Receive Group 8 RAIs - if needed
4. 11/4/11 4. Response to Group 8 - if needed
5. 11/30/11 5. Submit As-designed U1/U2 FPR
6. TBD 6. Fire Protection Program Audit Frequency - add to
7. TBD group 7 response
7. Follow-up meeting
8. Tech Spec Revisions from latest T/S 1. Oct, 2011 1. CSST A & B - discretionary Licensing/Elton markup and NRC Review comments 2. Sept, 2011 2. I-131 DEI (Bryan)
3. Oct, 2011 3. Diesel Generator Frequency
4. TBD 4. Unit 1 AST FHA
9. ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), Gordon WINCISE, Hydrology, process for FSAR drawing documentation update,
10. SSER 22/23/24 Open Items Response 9/30/11 9/16 is the target date for the next SSER update. The Licensing expanded HH list and status is covered periodically.

Page 4 of 5 No. Description Status Additional Comments Resp Org/Person

11. Transient Analysis issues 9/21/11 Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response unit1 for modes 3, 4, & 5. See SSER OI 132.
12. FSAR A107 10/17/11 Current target date for A107 is 10/17/11. Lic/Stockton How will note 4 & 5 on FSAR figure 9.2-23 change for two unit operation when the CCS C-S and 2B pumps are realigned
13. Develop list of planned License 1. 11/1/11 1. Review Unit 1 SER for exemptions. Sand NRR/TVA Conditions, Exemptions and Relief 2. TBD baskets, cyber security, physical security, PAD (Bryan)

Requests (Crouch) 3. TBD 4.0

2. NRR to review current exemptions
3. Verify required notifications made
14. Verify Tech Spec Setpoints match calcs 1. 10/4/11 1. 3 SSDs remaining to be issued. Possible submittal Eng/Hilmes if any number changes. (Bryan)

TS certification 2. TBD 2. TS certification

15. Issue two Unit Offsite Dose Calculation 3/1/12 Determine actual need date Chemistry/

Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)

16. Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
17. Submit final as-constructed FSAR 7/1/12 Licensing/

figures Stockton

18. TMI action items 7/1/12 TVA to provide letter when TMI actions are field Licensing complete. (Gordon)
19. ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11. NRR
20. ASME Section III N-3 reports 8/2012
0. Discretionary Actions
1. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
2. Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
3. Status of GSI 199 Eastern Seismicity Fall 2011 No action pending upcoming Generic Letter TVA/NRR (Crouch) Related information on GSI 194 may need input
4. Letter to notify NRC when Vital Area 12/1/11 Security Plan Update - Boundary to be restored by Lic/Crouch Boundary returned to original location 9/30/11

Page 5 of 5 No. Description Status Additional Comments Resp Org/Person

5. IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. Corp SG/