| title = 2011/12/07 Davis-Besse Lr - FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds
| title = Lr - FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, December 07, 2011 3:28 PM To: dorts@firstenergycorp.com; cu sterc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource
{{#Wiki_filter:Davis-BesseNPEm Resource From:                       CuadradoDeJesus, Samuel Sent:                       Wednesday, December 07, 2011 3:28 PM To:                         dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc:                         Davis-BesseHearingFile Resource


==Subject:==
==Subject:==
FW: Davis Besse Clarification Ques tions for SG Tube-to-tubesheet Welds Attachments:
FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Attachments:               DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docx Cliff and Steve:
DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docxCliff and Steve:  
 
Please let me know if we can have a teleconference next Monday to discuss our staff concerns related to your latest response addressing the SG tube to tubesheet welds issue(see attached Draft RAI).
Please let me know if we can have a teleconference next Monday to discuss our staff concerns related to your latest response addressing the SG tube to tubesheet welds issue(see attached Draft RAI).
From: Min, Seung Sent: Wednesday, December 07, 2011 2:41 PM To: CuadradoDeJesus, Samuel Cc: Karwoski, Kenneth; Hunt, Christophe r; Davis-BesseHearingFile Resource  
From: Min, Seung Sent: Wednesday, December 07, 2011 2:41 PM To: CuadradoDeJesus, Samuel Cc: Karwoski, Kenneth; Hunt, Christopher; Davis-BesseHearingFile Resource


==Subject:==
==Subject:==
Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Sam, As we briefly discussed, the attached file contains follow-up clarification question for DB RAI 3.1.2.2.16-2.
Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds
The DCI reviewer (Chris) for the SG Program agreed to the need for a teleconference call.  
: Sam, As we briefly discussed, the attached file contains follow-up clarification question for DB RAI 3.1.2.2.16-2.
 
The DCI reviewer (Chris) for the SG Program agreed to the need for a teleconference call.
Please, schedule a teleconference call with the applicant: If available, our preference is as early as Monday, December 12.  
Please, schedule a teleconference call with the applicant:
 
If available, our preference is as early as Monday, December 12.
Let me know if you have any question.  
Let me know if you have any question.
: Thanks, Seung Min 1


Thanks, Seung Min Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 2837   Mail Envelope Properties   (377CB97DD54F0F4FAAC7E9FD88BCA6D0806F8F5EA6)
Hearing Identifier:     Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:           2837 Mail Envelope Properties     (377CB97DD54F0F4FAAC7E9FD88BCA6D0806F8F5EA6)


==Subject:==
==Subject:==
FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Sent Date:   12/7/2011 3:28:29 PM Received Date: 12/7/2011 3:28:30 PM From:   CuadradoDeJesus, Samuel Created By:   Samuel.CuadradoDeJesus@nrc.gov Recipients:     "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com> Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com> Tracking Status: None  
FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Sent Date:             12/7/2011 3:28:29 PM Received Date:         12/7/2011 3:28:30 PM From:                   CuadradoDeJesus, Samuel Created By:             Samuel.CuadradoDeJesus@nrc.gov Recipients:
 
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Post Office:   HQCLSTR01.nrc.gov Files     Size     Date & Time MESSAGE   912     12/7/2011 3:28:30 PM DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docx   35860
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None Post Office:           HQCLSTR01.nrc.gov Files                         Size                     Date & Time MESSAGE                       912                       12/7/2011 3:28:30 PM DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docx                         35860 Options Priority:                      Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
DB DRAI 3.1.2.2.16-3
Page 1 of 1 DB DRAI 3.1.2.2.16-3  


===Background===
===Background===
By letter dated November 23, 2011, the applicant responded to RAI 3.1.2.2.16-2, which addresses the extent and method of the inspections to manage cracking due to primary water stress corrosion cracking (PWSCC) of the steam generator (SG) tube-to-tubesheet welds. In its response, the applicant indicated that a gross visual inspection coupled with eddy-current inspections will be performed on the steam generator tube-to-tubesheet welds. The applicant also indicated that the inspection schedule will be concurrent with the eddy-current inspections of the SG tubes in accordance with Davis-Besse Technical Specification 5.5.8, "Steam Generator (SG) Program.The applicant further indicated that at a minimum, 100% of the tubes are inspected at sequential periods of 60 effective full power months.
By letter dated November 23, 2011, the applicant responded to RAI 3.1.2.2.16-2, which addresses the extent and method of the inspections to manage cracking due to primary water stress corrosion cracking (PWSCC) of the steam generator (SG) tube-to-tubesheet welds. In its response, the applicant indicated that a gross visual inspection coupled with eddy-current inspections will be performed on the steam generator tube-to-tubesheet welds. The applicant also indicated that the inspection schedule will be concurrent with the eddy-current inspections of the SG tubes in accordance with Davis-Besse Technical Specification 5.5.8, Steam Generator (SG) Program. The applicant further indicated that at a minimum, 100% of the tubes are inspected at sequential periods of 60 effective full power months.
Issue In its review, the staff noted that it is not clear if the visual inspection of the tube-to-tubesheet welds will include the welds on the hot leg, cold leg, or both legs. The staff also needs more clarifications on the extent and methods of the inspections addressed in the applicant's response.
Issue In its review, the staff noted that it is not clear if the visual inspection of the tube-to-tubesheet welds will include the welds on the hot leg, cold leg, or both legs. The staff also needs more clarifications on the extent and methods of the inspections addressed in the applicants response.
Request 1. Clarify if the gross visual inspection will be conducted on the welds on the hot leg, cold leg, or both legs. In addition, describe the extent of the visual inspection, and clarify if the gross visual inspection will be conducted on each tube-to-tubesheet weld.
Request
: 2. Clarify whether the gross visual inspection is equivalent to EVT-1, VT-1, or VT-3 inspection. In addition, describe how the visual inspections will be coupled to the eddy-current inspections in order to detect and manage the aging effect.}}
: 1. Clarify if the gross visual inspection will be conducted on the welds on the hot leg, cold leg, or both legs. In addition, describe the extent of the visual inspection, and clarify if the gross visual inspection will be conducted on each tube-to-tubesheet weld.
: 2. Clarify whether the gross visual inspection is equivalent to EVT-1, VT-1, or VT-3 inspection.
In addition, describe how the visual inspections will be coupled to the eddy-current inspections in order to detect and manage the aging effect.
Page 1 of 1}}

Latest revision as of 00:47, 6 December 2019

Lr - FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds
ML11361A040
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/07/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML11361A040 (3)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, December 07, 2011 3:28 PM To: dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource

Subject:

FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Attachments: DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docx Cliff and Steve:

Please let me know if we can have a teleconference next Monday to discuss our staff concerns related to your latest response addressing the SG tube to tubesheet welds issue(see attached Draft RAI).

From: Min, Seung Sent: Wednesday, December 07, 2011 2:41 PM To: CuadradoDeJesus, Samuel Cc: Karwoski, Kenneth; Hunt, Christopher; Davis-BesseHearingFile Resource

Subject:

Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds

Sam, As we briefly discussed, the attached file contains follow-up clarification question for DB RAI 3.1.2.2.16-2.

The DCI reviewer (Chris) for the SG Program agreed to the need for a teleconference call.

Please, schedule a teleconference call with the applicant:

If available, our preference is as early as Monday, December 12.

Let me know if you have any question.

Thanks, Seung Min 1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 2837 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806F8F5EA6)

Subject:

FW: Davis Besse Clarification Questions for SG Tube-to-tubesheet Welds Sent Date: 12/7/2011 3:28:29 PM Received Date: 12/7/2011 3:28:30 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 912 12/7/2011 3:28:30 PM DB DRAI 3 1 2 2 16-3 Tube to tubesheet welds v3 12-7-2011 to PM.docx 35860 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DB DRAI 3.1.2.2.16-3

Background

By letter dated November 23, 2011, the applicant responded to RAI 3.1.2.2.16-2, which addresses the extent and method of the inspections to manage cracking due to primary water stress corrosion cracking (PWSCC) of the steam generator (SG) tube-to-tubesheet welds. In its response, the applicant indicated that a gross visual inspection coupled with eddy-current inspections will be performed on the steam generator tube-to-tubesheet welds. The applicant also indicated that the inspection schedule will be concurrent with the eddy-current inspections of the SG tubes in accordance with Davis-Besse Technical Specification 5.5.8, Steam Generator (SG) Program. The applicant further indicated that at a minimum, 100% of the tubes are inspected at sequential periods of 60 effective full power months.

Issue In its review, the staff noted that it is not clear if the visual inspection of the tube-to-tubesheet welds will include the welds on the hot leg, cold leg, or both legs. The staff also needs more clarifications on the extent and methods of the inspections addressed in the applicants response.

Request

1. Clarify if the gross visual inspection will be conducted on the welds on the hot leg, cold leg, or both legs. In addition, describe the extent of the visual inspection, and clarify if the gross visual inspection will be conducted on each tube-to-tubesheet weld.
2. Clarify whether the gross visual inspection is equivalent to EVT-1, VT-1, or VT-3 inspection.

In addition, describe how the visual inspections will be coupled to the eddy-current inspections in order to detect and manage the aging effect.